CN107059644B - 一种柔性拱非对称无支架的安装方法 - Google Patents
一种柔性拱非对称无支架的安装方法 Download PDFInfo
- Publication number
- CN107059644B CN107059644B CN201710431996.5A CN201710431996A CN107059644B CN 107059644 B CN107059644 B CN 107059644B CN 201710431996 A CN201710431996 A CN 201710431996A CN 107059644 B CN107059644 B CN 107059644B
- Authority
- CN
- China
- Prior art keywords
- arch
- arch rib
- lateral
- sunpender
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710431996.5A CN107059644B (zh) | 2017-06-09 | 2017-06-09 | 一种柔性拱非对称无支架的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710431996.5A CN107059644B (zh) | 2017-06-09 | 2017-06-09 | 一种柔性拱非对称无支架的安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107059644A CN107059644A (zh) | 2017-08-18 |
CN107059644B true CN107059644B (zh) | 2018-12-18 |
Family
ID=59616017
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710431996.5A Active CN107059644B (zh) | 2017-06-09 | 2017-06-09 | 一种柔性拱非对称无支架的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107059644B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374340B (zh) * | 2018-01-10 | 2019-07-02 | 中交第二航务工程局有限公司 | 大跨度钢桁梁上支架拼装柔性拱的方法 |
CN108374324B (zh) * | 2018-04-09 | 2023-12-19 | 广西大学 | 大桁拱桥 |
CN110219241A (zh) * | 2019-04-03 | 2019-09-10 | 中铁大桥局集团有限公司 | 一种变高度钢桁梁的合拢方法 |
CN114059454A (zh) * | 2021-12-21 | 2022-02-18 | 中铁大桥局第七工程有限公司 | 一种大跨度钢桁架施工偏差调整方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101446074A (zh) * | 2008-12-26 | 2009-06-03 | 中铁大桥局集团第二工程有限公司 | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 |
JP2011069162A (ja) * | 2009-09-28 | 2011-04-07 | Nippon Sharyo Seizo Kaisha Ltd | 単弦ローゼ橋桁部材送出し工法 |
CN102373671A (zh) * | 2011-11-18 | 2012-03-14 | 中铁四局集团有限公司 | 钢桁梁柔性拱桥带拱顶推施工方法 |
CN102619170A (zh) * | 2012-03-20 | 2012-08-01 | 中铁四局集团钢结构有限公司 | 大跨度柔性拱拱脚合龙施工方法 |
CN202380390U (zh) * | 2011-11-18 | 2012-08-15 | 中铁四局集团钢结构有限公司 | 带拱顶推钢桁梁柔性拱支撑框架 |
CN104790297A (zh) * | 2015-04-20 | 2015-07-22 | 中国铁建大桥工程局集团有限公司 | 一种钢桁梁柔性拱拼装方法 |
CN205501792U (zh) * | 2016-04-01 | 2016-08-24 | 中铁第一勘察设计院集团有限公司 | 一种高速铁路三等跨连续钢桁柔性拱 |
-
2017
- 2017-06-09 CN CN201710431996.5A patent/CN107059644B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101446074A (zh) * | 2008-12-26 | 2009-06-03 | 中铁大桥局集团第二工程有限公司 | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 |
JP2011069162A (ja) * | 2009-09-28 | 2011-04-07 | Nippon Sharyo Seizo Kaisha Ltd | 単弦ローゼ橋桁部材送出し工法 |
CN102373671A (zh) * | 2011-11-18 | 2012-03-14 | 中铁四局集团有限公司 | 钢桁梁柔性拱桥带拱顶推施工方法 |
CN202380390U (zh) * | 2011-11-18 | 2012-08-15 | 中铁四局集团钢结构有限公司 | 带拱顶推钢桁梁柔性拱支撑框架 |
CN102619170A (zh) * | 2012-03-20 | 2012-08-01 | 中铁四局集团钢结构有限公司 | 大跨度柔性拱拱脚合龙施工方法 |
CN104790297A (zh) * | 2015-04-20 | 2015-07-22 | 中国铁建大桥工程局集团有限公司 | 一种钢桁梁柔性拱拼装方法 |
CN205501792U (zh) * | 2016-04-01 | 2016-08-24 | 中铁第一勘察设计院集团有限公司 | 一种高速铁路三等跨连续钢桁柔性拱 |
Non-Patent Citations (1)
Title |
---|
厦深铁路榕江特大桥主桥连续钢桁梁柔性拱施工关键技术;鄢怀斌等;《世界桥梁》;20140728;第6-8页 * |
Also Published As
Publication number | Publication date |
---|---|
CN107059644A (zh) | 2017-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059644B (zh) | 一种柔性拱非对称无支架的安装方法 | |
CN102108676B (zh) | 一种结合梁-钢拱组合体系拱桥施工方法 | |
CN102619170B (zh) | 大跨度柔性拱拱脚合龙施工方法 | |
CN108374347A (zh) | 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法 | |
CN103882812B (zh) | 斜拉索桥中跨主梁的施工方法 | |
CN110230262A (zh) | 提篮式钢管拱桥主拱肋半整体吊装结构及对接方法 | |
CN102535348B (zh) | 一种铰塔斜拉桥斜拉索的张拉方法 | |
CN102561191A (zh) | 一种拱桥拱肋的整体提升系统及施工方法 | |
CN106192776A (zh) | 一种大跨连续钢桁梁柔性拱桥悬臂拼装施工工艺 | |
CN105926464A (zh) | 倒挂式梯形斜爬挂篮 | |
CN107142835A (zh) | 无应力状态法的肋拱桥拱肋节段分肋安装施工控制方法 | |
CN106835981A (zh) | 一种适用于桥墩和桥塔内的自平衡型拉索锚固结构 | |
CN112391950A (zh) | 一种高低塔斜拉桥合拢口中心线偏差调整的装置及方法 | |
CN110468734A (zh) | 钢拱肋顶推系统及钢拱肋顶推施工方法 | |
CN107574763B (zh) | 一种三主桁钢桁梁分步合龙施工方法 | |
CN209227394U (zh) | 一种大跨度组合体系拱桥顶推施工措施 | |
CN102418329B (zh) | 大型水工弧门快速安装方法 | |
CN104452573A (zh) | 斜拉桥结构及斜拉桥施工方法 | |
CN109898421B (zh) | 用于钢箱拱桥拱肋整体提升的抗风结构及抗风方法 | |
CN208717717U (zh) | 一种复合步道结构的轻钢桁架桥体系 | |
CN207244425U (zh) | 部分地锚式悬索桥 | |
CN110080083A (zh) | 安装提篮式钢桁拱主弦杆的方法 | |
CN101994294A (zh) | 公路工程三角轻型挂篮悬臂浇筑施工 | |
CN209703272U (zh) | 一种可伸缩半简支半连续可拼装梁 | |
CN112853993A (zh) | 一种大跨度悬索桥拼装施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Co-patentee after: CCCC WORLDCOM HEAVY INDUSTRIES (BEIJING) CO.,LTD. Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Co-patentee before: CCCC WORLDCOM HEAVY INDUSTRIES (BEIJING) CO.,LTD. Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191209 Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Co-patentee after: CCCC SHITONG (CHONGQING) HEAVY INDUSTRY Co.,Ltd. Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Co-patentee before: CCCC WORLDCOM HEAVY INDUSTRIES (BEIJING) CO.,LTD. Patentee before: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. |