CN107059644B - 一种柔性拱非对称无支架的安装方法 - Google Patents

一种柔性拱非对称无支架的安装方法 Download PDF

Info

Publication number
CN107059644B
CN107059644B CN201710431996.5A CN201710431996A CN107059644B CN 107059644 B CN107059644 B CN 107059644B CN 201710431996 A CN201710431996 A CN 201710431996A CN 107059644 B CN107059644 B CN 107059644B
Authority
CN
China
Prior art keywords
arch
arch rib
lateral
sunpender
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710431996.5A
Other languages
English (en)
Other versions
CN107059644A (zh
Inventor
周京
包立明
郭东明
才宝山
白虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Shitong Chongqing Heavy Industry Co ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
China Communications Heavy Industries (beijing) Co Ltd
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications Heavy Industries (beijing) Co Ltd, CCCC First Highway Engineering Co Ltd filed Critical China Communications Heavy Industries (beijing) Co Ltd
Priority to CN201710431996.5A priority Critical patent/CN107059644B/zh
Publication of CN107059644A publication Critical patent/CN107059644A/zh
Application granted granted Critical
Publication of CN107059644B publication Critical patent/CN107059644B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

本发明公开了一种柔性拱非对称无支架的安装方法,属于连续钢桁梁柔性拱桥安装施工技术领域。本方法是充分利用拱肋、吊杆与上弦杆形成三角形稳定结构,拱肋构成斜边,吊杆和对应上弦杆构成俩直角边。先安装完所有上弦杆,再安装对应节段吊杆即直角边处与拱肋即斜边处。边与边交点钻高强螺栓孔群栓接,达到刚接形式。不需搭设辅助支架,安装只需一台全回转吊机,完成柔性拱的安装。采用该方法的目的是减小施工载荷,降低钢桁梁的变形,利用拱肋成桥应力小的特征,推拱完成拱肋的合龙。合龙时全回转吊机已在钢桁梁加劲腿上,对拱梁结合段已无影响。拱肋合龙时接近于成桥应力状态。

Description

一种柔性拱非对称无支架的安装方法
技术领域
本发明涉及一种钢桁梁柔性拱桥柔性拱的安装方法,属于连续钢桁梁柔性拱桥安装施工技术领域。
背景技术
大跨径钢桁梁桥分两类,1:钢性梁柔性拱结构,即主梁是钢桁架梁主要受力结构,柔性拱和吊杆辅助受力,吊杆为钢性吊杆,典型桥梁是九江长江大桥;2:钢性拱柔性梁结构(梁为系杆),拱肋为主要受力结构,典型桥梁是南京大胜关长江大桥。
传统的安装方法是搭设辅助支架,从跨中开始采用两台全回转吊机,先安装吊杆,后装拱肋。对称向两侧安装直至拱脚,需进行两次合龙。
发明内容
本发明专利的方法是充分利用拱肋、吊杆与上弦杆形成三角形稳定结构,拱肋构成斜边,吊杆和对应上弦杆构成俩直角边。先安装完所有上弦杆,再安装对应节段吊杆即直角边处与拱肋即斜边处。边与边交点钻高强螺栓孔群栓接,达到刚接形式。上下游拱肋之间有平联杆件联系,采用一台全回转吊机从一侧拱脚A12开始,往另一侧拱脚A12’安装,在另一端拱脚A12’推拱合龙。
此安装方法,不需搭设辅助支架,安装只需一台全回转吊机,完成柔性拱的安装。采用该方法的目的是减小施工载荷,降低钢桁梁的变形,利用拱肋成桥应力小的特征,推拱完成拱肋的合龙。合龙时全回转吊机已在钢桁梁加劲腿上,对拱梁结合段已无影响。拱肋合龙时接近于成桥应力状态。
附图说明
图1-1、1-2、1-3为钢桁梁与柔性拱的主视图。
图2钢桁梁与柔性拱的侧视图。
图3-8为安装流程图。
图9为合拢方法示意图。
图10为钢丝绳拉紧交叉斜撑的截面结构稳定。
图中:SG13~SG13’为拱肋,SG13A13~SG13’A13’为吊杆,A12~A12’为上弦杆,E11~E11’为下弦杆。
具体实施方式
图1-1、1-2、1-3中,主桁为N形桁式,平弦桁高15m,节间长12m和13m,边跨及中跨跨中的6个节间为12m,中跨靠近中支点的6个节间为13m。中支点处向下设加劲腿,加劲腿至下弦杆中心的距离为15m,加劲腿与下弦间设直线过渡,边跨为两个节间,中跨为一个节间过渡。柔性拱肋按圆曲线布置,矢高69m,矢跨228m。
图2中,上部为拱肋平联,下部为上弦杆平联,两侧为吊杆。
以E10或E10’标高为基准点,测量E11~E11’标高,通过调整下弦杆节点标高,控制吊杆安装时与拱肋的角度。
(1)测量E11-E14相对标高,根据设计线形使标高达到设计值。
(2)图3、图4、图5所示安装顺序:A12SG13→SG13A13→SG13→A12SG13平联→SG14A14→SG14→SG13平联。
(3)测量E15~E17相对标高进行调整,使标高达到设计值。
(4)图6所示安装顺序:SG15A15→SG15→SG14平联→SG16A16→SG16→SG15平联→SG17A17→SG17→SG16平联。
(5)测量E18~E18’相对标高进行调整,使标高达到设计值。
(6)图7、图8安装顺序:SG18A18→SG19A19→SG19SG18’→SG17平联→SG18平联→SG19平联→SG18’A18’→SG18’→SG18’平联。
(7)拱肋为对称结构,依据上述步骤安装到合拢段。
(8)合拢段安装
图9为合拢方法,通过在无日照影响、气温稳定的情况下进行拱肋的线形与杆件内力测量(包括节点高程、里程和轴线偏差),并与设计线形比较后,在加工厂内进行合拢段制孔。利用边配重,主墩处起顶装置及在合拢口处施加顶力调整合拢口尺寸实现拱肋合拢。
(9)图10中,为保证柔性拱安装中截面的结构稳定,需在已完成安装后用钢丝绳拉紧交叉斜撑。

Claims (1)

1.一种柔性拱非对称无支架的安装方法,其特征在于:本方法是充分利用拱肋、吊杆与上弦杆形成三角形稳定结构,拱肋构成斜边,吊杆和对应上弦杆构成俩直角边;先安装完所有上弦杆,再安装对应节段吊杆即直角边处与拱肋即斜边处;边与边交点钻高强螺栓孔群栓接,达到刚接形式;上下游拱肋之间有平联杆件联系,采用一台全回转吊机从一侧拱脚A12开始,往另一侧拱脚A12’安装,在另一端拱脚A12’推拱合龙;
此安装方法,不需搭设辅助支架,安装只需一台全回转吊机,完成柔性拱的安装;采用该方法的目的是减小施工载荷,降低钢桁梁的变形,利用拱肋成桥应力小的特征,推拱完成拱肋的合龙;合龙时全回转吊机已在钢桁梁加劲腿上,对拱梁结合段已无影响;拱肋合龙时接近于成桥应力状态;
主桁为N形桁式,平弦桁高15m,节间长12m和13m,边跨及中跨跨中的6个节间为12m,中跨靠近中支点的6个节间为13m;中支点处向下设加劲腿,加劲腿至下弦杆中心的距离为15m,加劲腿与下弦间设直线过渡,边跨为两个节间,中跨为一个节间过渡;柔性拱肋按圆曲线布置,矢高69m,矢跨228m;
SG13~SG13’为拱肋,SG13A13~SG13’A13’为吊杆,A18~A18’及A19为上弦杆,E18~E18’及E19为下弦杆;
E为钢桁梁各个下弦杆编号,E0、E0’为钢桁梁的下弦杆初始位置,E0-E18和E0’-E18’以中点E19对称分布;A为钢桁梁各个上弦杆编号,A1、A1’为钢桁梁的上弦杆初始位置,A1-A18和A1’-A18’以中点A19对称分布;
SG为柔性拱的拱肋编号,SG13-SG18以及SG13’-SG18’以中点SG19对称布置,SG19与E19在同一竖直方向上SG19E19的连线为拱桥的中线;SG+A*中,+为柔性拱的拱肋编号,*为钢桁梁各个上弦杆编号,SG+A*表示柔性拱的吊杆编号;
上部为拱肋平联,下部为上弦杆平联,两侧为吊杆;
以E10或E10’标高为基准点,测量E11~E11’标高,通过调整下弦杆节点标高,控制吊杆安装时与拱肋的角度;
(1)测量E11-E14相对标高,根据设计线形使标高达到设计值;
(2)安装顺序:A12SG13→SG13A13→SG13→A12SG13平联→SG14A14→SG14→SG13平联;
(3)测量E15~E17相对标高进行调整,使标高达到设计值;
(4)安装顺序:SG15A15→SG15→SG14平联→SG16A16→SG16→SG15平联→SG17A17→SG17→SG16平联;
(5)测量E18~E18’相对标高进行调整,使标高达到设计值;
(6)安装顺序:SG18A18→SG19A19→SG19SG18’→SG17平联→SG18平联→SG19平联→SG18’A18’→SG18’→SG18’平联;
(7)拱肋为对称结构,依据上述步骤安装到合拢段;
(8)合拢段安装;
合拢方法,通过在无日照影响、气温稳定的情况下进行拱肋的线形与杆件内力测量包括节点高程、里程和轴线偏差,并与设计线形比较后,在加工厂内进行合拢段制孔;利用边配重,主墩处起顶装置及在合拢口处施加顶力调整合拢口尺寸实现拱肋合拢;
(9)为保证柔性拱安装中截面的结构稳定,需在已完成安装后用钢丝绳拉紧交叉斜撑。
CN201710431996.5A 2017-06-09 2017-06-09 一种柔性拱非对称无支架的安装方法 Active CN107059644B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710431996.5A CN107059644B (zh) 2017-06-09 2017-06-09 一种柔性拱非对称无支架的安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710431996.5A CN107059644B (zh) 2017-06-09 2017-06-09 一种柔性拱非对称无支架的安装方法

Publications (2)

Publication Number Publication Date
CN107059644A CN107059644A (zh) 2017-08-18
CN107059644B true CN107059644B (zh) 2018-12-18

Family

ID=59616017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710431996.5A Active CN107059644B (zh) 2017-06-09 2017-06-09 一种柔性拱非对称无支架的安装方法

Country Status (1)

Country Link
CN (1) CN107059644B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374340B (zh) * 2018-01-10 2019-07-02 中交第二航务工程局有限公司 大跨度钢桁梁上支架拼装柔性拱的方法
CN108374324B (zh) * 2018-04-09 2023-12-19 广西大学 大桁拱桥
CN110219241A (zh) * 2019-04-03 2019-09-10 中铁大桥局集团有限公司 一种变高度钢桁梁的合拢方法
CN114059454A (zh) * 2021-12-21 2022-02-18 中铁大桥局第七工程有限公司 一种大跨度钢桁架施工偏差调整方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446074A (zh) * 2008-12-26 2009-06-03 中铁大桥局集团第二工程有限公司 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法
JP2011069162A (ja) * 2009-09-28 2011-04-07 Nippon Sharyo Seizo Kaisha Ltd 単弦ローゼ橋桁部材送出し工法
CN102373671A (zh) * 2011-11-18 2012-03-14 中铁四局集团有限公司 钢桁梁柔性拱桥带拱顶推施工方法
CN102619170A (zh) * 2012-03-20 2012-08-01 中铁四局集团钢结构有限公司 大跨度柔性拱拱脚合龙施工方法
CN202380390U (zh) * 2011-11-18 2012-08-15 中铁四局集团钢结构有限公司 带拱顶推钢桁梁柔性拱支撑框架
CN104790297A (zh) * 2015-04-20 2015-07-22 中国铁建大桥工程局集团有限公司 一种钢桁梁柔性拱拼装方法
CN205501792U (zh) * 2016-04-01 2016-08-24 中铁第一勘察设计院集团有限公司 一种高速铁路三等跨连续钢桁柔性拱

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446074A (zh) * 2008-12-26 2009-06-03 中铁大桥局集团第二工程有限公司 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法
JP2011069162A (ja) * 2009-09-28 2011-04-07 Nippon Sharyo Seizo Kaisha Ltd 単弦ローゼ橋桁部材送出し工法
CN102373671A (zh) * 2011-11-18 2012-03-14 中铁四局集团有限公司 钢桁梁柔性拱桥带拱顶推施工方法
CN202380390U (zh) * 2011-11-18 2012-08-15 中铁四局集团钢结构有限公司 带拱顶推钢桁梁柔性拱支撑框架
CN102619170A (zh) * 2012-03-20 2012-08-01 中铁四局集团钢结构有限公司 大跨度柔性拱拱脚合龙施工方法
CN104790297A (zh) * 2015-04-20 2015-07-22 中国铁建大桥工程局集团有限公司 一种钢桁梁柔性拱拼装方法
CN205501792U (zh) * 2016-04-01 2016-08-24 中铁第一勘察设计院集团有限公司 一种高速铁路三等跨连续钢桁柔性拱

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
厦深铁路榕江特大桥主桥连续钢桁梁柔性拱施工关键技术;鄢怀斌等;《世界桥梁》;20140728;第6-8页 *

Also Published As

Publication number Publication date
CN107059644A (zh) 2017-08-18

Similar Documents

Publication Publication Date Title
CN107059644B (zh) 一种柔性拱非对称无支架的安装方法
CN102108676B (zh) 一种结合梁-钢拱组合体系拱桥施工方法
CN102619170B (zh) 大跨度柔性拱拱脚合龙施工方法
CN108374347A (zh) 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法
CN103882812B (zh) 斜拉索桥中跨主梁的施工方法
CN110230262A (zh) 提篮式钢管拱桥主拱肋半整体吊装结构及对接方法
CN102535348B (zh) 一种铰塔斜拉桥斜拉索的张拉方法
CN102561191A (zh) 一种拱桥拱肋的整体提升系统及施工方法
CN106192776A (zh) 一种大跨连续钢桁梁柔性拱桥悬臂拼装施工工艺
CN105926464A (zh) 倒挂式梯形斜爬挂篮
CN107142835A (zh) 无应力状态法的肋拱桥拱肋节段分肋安装施工控制方法
CN106835981A (zh) 一种适用于桥墩和桥塔内的自平衡型拉索锚固结构
CN112391950A (zh) 一种高低塔斜拉桥合拢口中心线偏差调整的装置及方法
CN110468734A (zh) 钢拱肋顶推系统及钢拱肋顶推施工方法
CN107574763B (zh) 一种三主桁钢桁梁分步合龙施工方法
CN209227394U (zh) 一种大跨度组合体系拱桥顶推施工措施
CN102418329B (zh) 大型水工弧门快速安装方法
CN104452573A (zh) 斜拉桥结构及斜拉桥施工方法
CN109898421B (zh) 用于钢箱拱桥拱肋整体提升的抗风结构及抗风方法
CN208717717U (zh) 一种复合步道结构的轻钢桁架桥体系
CN207244425U (zh) 部分地锚式悬索桥
CN110080083A (zh) 安装提篮式钢桁拱主弦杆的方法
CN101994294A (zh) 公路工程三角轻型挂篮悬臂浇筑施工
CN209703272U (zh) 一种可伸缩半简支半连续可拼装梁
CN112853993A (zh) 一种大跨度悬索桥拼装施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Co-patentee after: CCCC WORLDCOM HEAVY INDUSTRIES (BEIJING) CO.,LTD.

Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd.

Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Co-patentee before: CCCC WORLDCOM HEAVY INDUSTRIES (BEIJING) CO.,LTD.

Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191209

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Co-patentee after: CCCC SHITONG (CHONGQING) HEAVY INDUSTRY Co.,Ltd.

Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd.

Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Co-patentee before: CCCC WORLDCOM HEAVY INDUSTRIES (BEIJING) CO.,LTD.

Patentee before: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd.