CN101228321A - 用于建造拼装预应力混凝土梁的分段及其制造方法 - Google Patents
用于建造拼装预应力混凝土梁的分段及其制造方法 Download PDFInfo
- Publication number
- CN101228321A CN101228321A CNA2006800121669A CN200680012166A CN101228321A CN 101228321 A CN101228321 A CN 101228321A CN A2006800121669 A CNA2006800121669 A CN A2006800121669A CN 200680012166 A CN200680012166 A CN 200680012166A CN 101228321 A CN101228321 A CN 101228321A
- Authority
- CN
- China
- Prior art keywords
- segmentation
- segment body
- junction piece
- junction
- making
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/22—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members assembled from preformed parts
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/02—Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/002—Producing shaped prefabricated articles from the material assembled from preformed elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
- B28B23/024—Supporting means
- B28B23/026—Mould partitionning elements acting as supporting means in moulds, e.g. for elongated articles
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
- E04C3/22—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members built-up by elements jointed in line
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
- E04C3/26—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members prestressed
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
- E01D2101/285—Composite prestressed concrete-metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Lining And Supports For Tunnels (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明提供了一种制造分段的方法,通过组合多个所述分段来建造拼装预应力混凝土梁,所述方法包括步骤:制造一个或多个接合块,每个接合块具有第一端和第二端,所述第一端具有抗剪键并被拼装到相邻分段的一端,所述第二端连接到分段的分段主体;和通过使用一个或多个接合块作为在其中制作分段主体的模板的一个或多个端部并通过在模板中浇注和固化混凝土来制造分段主体,其中,在制造分段主体的过程中,一个或多个接合块被固定地连接到分段主体的一个或多个端部。
Description
技术领域
本发明涉及拼装预应力混凝土梁的分段以及制造这种分段的方法,特别涉及在接合处具有改进的结构整体性的拼装预应力混凝土梁的分段,以及制造这种分段的方法。
背景技术
拼装预应力混凝土梁是一种整体式预应力混凝土梁,其被制造为很多分段,然后被运送到建设现场,在这里这些分段被相互连接起来,钢筋束在梁内沿其纵向被拉伸。
拼装预应力混凝土梁的分段可通过把分段以预定间距安放在建设现场、连接钢筋和在钢筋周围浇注混凝土、砂浆或者水泥浆的现浇方法进行连接。在分段的接合表面薄地涂敷一种粘结剂(比如环氧树脂)的方法,或仅使用钢筋束的拉力而不用任何粘结剂来安装分段的方法是连接分段的其它方法。
混凝土、砂浆或水泥浆在接合处被浇注的现浇方法具有的优点在于被连接的分段不必具有匹配的横截面,但缺点是由于钢筋要被安放在分段之间并且混凝土、砂浆或水泥浆要被浇注和固化,因此其建设过程复杂且建设周期长。
发明内容
技术问题
带有或不带有环氧树脂的使用钢筋束的拉力来固定分段的方法与现浇方法相比可极大地缩短建设周期时间并产生低成本,这是由于如图1和2所示,梁9是通过使用带抗剪键2的接合处来连接预制分段1而建造的。但是,使用钢筋束的拉力来固定分段的方法的缺点在于被连接的分段应具有精确匹配的横截面。同样,因为尽管事实上分段1的接合处由于抗剪键2、导向键、钢筋管等等而具有复杂的形状,但连接的分段1之间的抗剪键的对应凹凸部应完全匹配或者在薄的粘结剂厚度范围内匹配,所以制造分段1是很困难的。此外,因为纵向钢筋在接合处是分散的,并且接合处的应力集中可能会由于制造误差或者不适当的环氧树脂配制或涂敷而发生,所以梁9在结构上是不牢固的。
同样,由于现有的在其中制造分段1的模板很昂贵,因此分段的长度已经标准化,且只有具有标准长度的梁或分段已经被制造出来,由此使得制造不同长度的分段或梁很困难。
技术方案
上述技术问题可通过所提供的本发明得以解决,所述本发明即一种在接合处具有改进的结构整体性的拼装预应力混凝土梁的分段,以及制造这种分段的方法。制造被组合起来以建造拼装预应力混凝土梁的分段的方法,包括步骤:制造一个或多个接合块,每个接合块具有第一端和第二端,所述第一端具有抗剪键并被拼装到相邻分段的一端,所述第二端连接到分段的分段主体;通过使用一个或多个接合块作为在其中制作分段主体的模板的一个或多个端部并通过在模板中浇注和固化混凝土来制造分段主体,其中,在制造分段主体的过程中,一个或多个接合块被固定地连接到分段主体的一个或多个端部。
有益效果
所提供的是一种在接合处具有改进的结构整体性的拼装预应力混凝土梁的分段以及制造这种分段的方法。制造这种被组合起来以建造拼装预应力混凝土梁的分段的方法,包括步骤:制造一个或多个接合块,每个接合块具有第一端和第二端,所述第一端具有抗剪键并被拼装到相邻分段的一端,所述第二端连接到分段的分段主体;通过使用一个或多个接合块作为在其中制作分段主体的模板的一个或多个端部并通过在模板中浇注和固化混凝土来制造分段主体,其中,在制造分段主体的过程中,一个或多个接合块被固定地连接到分段主体的一个或多个端部。
附图说明
本发明的上述和其它特征和优点将通过参照附图对详细实施例的说明而变得更显而易见,其中:
图1为传统的被分成分段的匹配浇注的拼装预应力混凝土梁的分解透视图;
图2为图1中梁的透视图,示出了分段被相互连接处的状态;
图3为根据本发明的一个实施例被分成分段的拼装预应力混凝土梁的分解透视图;
图4为图3中的拼装预应力混凝土梁的透视图,示出了分段被互相连接处的状态;
图5A到5C为图3中的分段的接合块的透视图;
图6和7为示出根据本发明的一个实施例的分段的制造方法的透视图。
优选实施方式
现将参照附图更充分地描述本发明,附图中示出了发明的示例性实施例。
图3为根据本发明的一个实施例的被分成分段10的拼装预应力混凝土梁100的分解透视图。图4为图3中的拼装预应力混凝土梁100的透视图,示出了分段10被相互连接处的状态。
参照图3和4,分段10被组合以建造拼装预应力混凝土梁100。分段10包括两接合块30和一分段主体40。图5A到5C为图3中的接合块的示例的透视图。
两接合块30中的每个的第一端具有抗剪键20,并可被拼装到另一分段。容纳钢筋束的钢筋套管50被安装于接合块30内。钢筋90埋入接合块30内。钢筋90的端部从接合块30的第二端的表面伸出。
接合块30可具有与分段主体40相同的横截面。然而,接合块30可具有与分段主体40不同的横截面以减少施加到接合处的应力并增大抗剪面积,从而为接合处安装张力调整器或抗拉增强装置,或者将横梁连接到接合处。图5A到5C示出了接合块30的各种示例。如图5B所示的使用钢材的用于连接分段10的钢制孔70,或者外部钢筋束通过其中的外部钢筋束孔80可形成在如图5C所示的接合块30的横截面内。但是,接合块30不限于这些示例,并可在不背离本发明精神和范围内进行改进。
分段主体40被连接到接合块30以形成如图3所示的分段10。参照图6描述制造分段10的方法。分段主体40通过使用接合块30作为在其中制作分段主体40的模板60的两端而进行制造,也就是说,通过将接合块30定位于模板60的两端并在模板60内浇注和固化混凝土进行制造。
从每个接合块30的第二端伸出的钢筋90被安放在模板60内浇注的混凝土中,从而使钢筋90被插入分段主体40中。
接合块30的混凝土的强度可比分段主体40的混凝土的强度高。与接合块30和分段主体40由相同强度的混凝土制成的情况相比,在这种情况下,由于纵向钢筋90的破裂或接合处的误差而产生的应力集中引起的接合处的结构缺陷可更有效地被处理。具有抗压强度为35-55MPa的混凝土常被用于分段体,而具有更高强度为100-200MPa的混凝土偶尔被用到。为了使接合块30能够具有比分段主体40更高的强度,分段主体40可由35-55MPa的混凝土制成而接合块30可由100-200MPa的高强混凝土制成。
现将说明根据本发明的一个实施例的拼装预应力混凝土梁100的分段10的制造方法。
首先,每个接合块30用单独的模板制成,使得要被拼装到另一分段10的接合块30的第一端可具有抗剪键20,并且埋入接合块30的钢筋90的端部可从接合块30的第二端伸出。
由于分段10的接合块是被单独制作的,因此接合块30可小于分段10,并且可通过在接合块30的第一端的截面向下浇注混凝土,从而使得将接合块30精确地制造成具有复杂形状成为可能。如果具有抗剪键20的部分设置于模板的一侧并浇注混凝土,尽管未凝固的混凝土具有流动性,但由于混凝土中含有砂子或石子,所以用混凝土密实地填满模板仍然是很困难的。但是,当具有抗剪键20的部分设置于下侧且如本实施例一样浇注混凝土时,即使截面复杂,也可密实地填充混凝土,从而获得比将具有抗剪键20的部分设置于模板侧边上的情况下更精确的制造工艺。同样,可以使用匹配浇注法,在匹配浇注法中,成对的接合块30中的一个要提前制造出来,然后使用先前制造出的接合块30作为模板60的一部分来制造成对的接合块30中的另一个,从而使得容易制造匹配浇注的成对的接合块30。甚至当使用不同的模板而不是使用匹配浇注法制造成对的接合块30时,接合块30比分段10轻得多,因此可比分段10的精确试验更容易地进行接合块30的精确试验。相应地,可避免当整个分段10由于接合误差而需要重新制造时所导致的损失。
接合块30被制造好之后,接合块30被布置于在其中制造分段主体40的模板60的两端,通过将接合块30用作模板60的两端来浇注混凝土。然后,从接合块30伸出的钢筋90被安放在被浇注以形成分段主体40的混凝土中。
经过一段预定的时间后,浇注在模板60内的混凝土被固化,并同时与接合块30接触以形成分段主体40。相应地,当分段主体40完成时,接合块30被连接到分段主体40。在此期间,安放在浇注以形成分段主体40的混凝土内的钢筋90被插入到分段主体40中以加强分段主体40与接合块30之间的结合强度,并避免发生在接合块30和分段主体40之间出现的结构缺陷。
在分段主体40和接合块30具有相同横截面时,如图7所示,具有不同长度的分段10可通过改变接合块30中的至少一个的位置而采用相同的模板60制成。为了使模板60适用于具有不同长度的分段10,边模应可以纵向移动。由于钢筋束的位置随着边模板的移动而改变,因此钢筋束套管50的位置应能够改变。如果边模由钢制成,在改变钢筋束套管50的位置是困难的,因此相应于每个长度的边模应被单独制造。然而,由于接合块30是单独制造的,所以可根据钢筋束改变后的位置来安装钢筋束套管50。因此,当接合块30被用作模板60的两端时,可容易地制造出各种长度的分段10。
如上所述,由于接合块30可被单独制造,然后被连接到分段主体40,因此具有复杂且精确的接合部的分段10和在接合处具有改进的结构整体性的相应梁可被制造出来。
尽管在上述实施例中接合块30被用作模板60的两端,但是本发明并不限于此,并且可以仅仅使用单个接合块作为模板60的一端。
虽然已经参照本发明的示例性实施例具体地示出和描述了本发明,但是在不脱离如权利要求所限定的本发明的精神和范围的情况下,本领域普通技术人员可以在形式和细节上对本发明作出各种改变。
本发明实施例
根据本发明的一方面,提供了一种制造分段的方法,将多个所述分段组合起来以建造拼装预应力混凝土梁,所述方法包括步骤:制造一个或多个接合块,每个接合块具有第一端和第二端,所述第一端具有抗剪键并被拼装到相邻分段的一端,所述第二端连接到分段的分段主体;通过使用一个或多个接合块作为在其中制作分段主体的模板的一个或多个端部并通过在模板中浇注和固化混凝土来制造分段主体,其中,在制造分段主体的过程中,一个或多个接合块被固定地连接到分段主体的一个或多个端部。
根据本发明的另一方面,提供了用于建造拼装预应力混凝土梁的多个分段,每个分段包括:一个或多个接合块,每个接合块具有第一端,所述第一端具有抗剪键并被拼装到相邻分段的一端;通过使用一个或多个接合块作为在其中制作分段主体的模板的一个或多个端部并通过在模板中浇注和固化混凝土来制造分段主体,其中,在制造分段主体的过程中,一个或多个接合块被固定地连接到分段主体的一个或多个端部。
钢筋可被埋入每个接合块内,钢筋的端部可从接合块的第二端的表面伸出,其中从接合块的第二端的表面的端部伸出的钢筋的端部被固定插入到分段主体中。
形成每个接合块的材料可具有比分段主体更高的强度。
工业实用性
本发明可应用于用于建造预应力混凝土梁的分段的生产。
Claims (6)
1.一种制造分段的方法,通过组合多个所述分段来建造拼装预应力混凝土梁,所述方法包括步骤:
制造一个或多个接合块,每个接合块具有第一端和第二端,所述第一端具有抗剪键并被拼装到相邻分段的一端,所述第二端连接到分段的分段主体;和
通过使用一个或多个接合块作为在其中制作分段主体的模板的一个或多个端部并通过在模板中浇注和固化混凝土来制造分段主体,
其中,在制造分段主体的过程中,一个或多个接合块被固定地连接到分段主体的一个或多个端部。
2.根据权利要求1所述的方法,其中钢筋被埋入每个接合块中,并且钢筋端部从接合块的第二端的表面伸出,
其中从接合块的第二端的表面伸出的钢筋端部被固定地插入到分段主体中。
3.根据权利要求1或2所述的方法,其中形成每个接合块的材料具有比分段主体的材料更高的强度。
4.用于建造拼装预应力混凝土梁的多个分段,每个分段包括:
一个或多个接合块,每个接合块具有第一端,所述第一端具有抗剪键并被拼装到相邻段的一端;和
通过使用一个或多个接合块作为在其中制作分段主体的模板的一个或多个端部并通过在模板中浇注和固化混凝土而制造的分段主体,
其中,在制造分段主体的过程中,一个或多个接合块被固定连接到分段主体的一个或多个端部。
5.根据权利要求4所述的分段,其中钢筋被埋入每个接合块中,并且钢筋的端部从接合块的第二端的表面伸出,
其中从接合块第二端的表面伸出的钢筋端部被固定地插入到分段主体中。
6.根据权利要求4或5所述的分段,其中形成每个接合块的材料具有比分段主体更高的强度。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050030720A KR100510254B1 (ko) | 2005-04-13 | 2005-04-13 | 분절 프리스트레스 콘크리트 거더의 세그먼트 및 그제조방법 |
KR1020050030720 | 2005-04-13 | ||
PCT/KR2006/001253 WO2006109952A1 (en) | 2005-04-13 | 2006-04-05 | Segments for building spliced prestressed concrete girder and method of manufacturing the segments |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101228321A true CN101228321A (zh) | 2008-07-23 |
CN100595384C CN100595384C (zh) | 2010-03-24 |
Family
ID=37087204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200680012166A Expired - Fee Related CN100595384C (zh) | 2005-04-13 | 2006-04-05 | 用于建造拼装预应力混凝土梁的分段及其制造方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US8806820B2 (zh) |
JP (1) | JP5090339B2 (zh) |
KR (1) | KR100510254B1 (zh) |
CN (1) | CN100595384C (zh) |
CA (1) | CA2603559C (zh) |
WO (1) | WO2006109952A1 (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418400A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种先张法预应力钢筋砼预制梁 |
CN102433961A (zh) * | 2011-12-12 | 2012-05-02 | 中冶建工集团有限公司 | 一种预制梁结构施工构件 |
CN103009469A (zh) * | 2012-12-26 | 2013-04-03 | 中南建设(沈阳)建筑产业有限公司 | 一种预制装配整体式剪力墙抗剪键预留块 |
CN103392043A (zh) * | 2010-09-30 | 2013-11-13 | 斯博泰科有限公司 | 用于桥梁的上部结构 |
CN107605044A (zh) * | 2017-09-25 | 2018-01-19 | 上海建工五建集团有限公司 | 装配式外包型钢链式组合结构 |
CN108060738A (zh) * | 2017-12-20 | 2018-05-22 | 东南大学 | 一种后张预应力分段拼装预制双t板结构及拼装方法 |
CN111395149A (zh) * | 2019-12-12 | 2020-07-10 | 中国船舶重工集团应急预警与救援装备股份有限公司 | 一种箱型连接接头 |
CN112391933A (zh) * | 2020-10-30 | 2021-02-23 | 山东高速城投绕城高速公路有限公司 | 一种采用剪力键纵向拼接的混合梁箱梁桥及施工方法 |
CN114658097A (zh) * | 2022-03-31 | 2022-06-24 | 上海市机械施工集团有限公司 | 一种组合结构及其建造方法 |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100976847B1 (ko) * | 2008-02-18 | 2010-08-20 | (주)써포텍 | 조립식 프리캐스트 콘크리트 복공 및 가교 구조체 |
DE102008019847A1 (de) * | 2008-04-19 | 2009-10-22 | Universität Kassel | Adapter für eine Klebverbindung zur Verbindung mit einem Bauwerk oder einem Teil eines Bauwerks |
DE102009049411A1 (de) * | 2009-10-14 | 2011-04-21 | Db Netz Ag | Spannbetonschwelle sowie Verfahren zum Transport und Einbau einer Weiche mit Spannbetonschwellen |
KR101078991B1 (ko) * | 2010-04-28 | 2011-11-01 | 김유지 | 프리캐스트 콘크리트 구조물 및 그 시공방법 |
DE102010035675A1 (de) | 2010-08-27 | 2012-03-01 | Db Netz Ag | Klappbare Weiche |
CN103249893B (zh) * | 2010-09-30 | 2015-11-25 | 爱安世技有限公司 | 用于桥梁的水泥板结构 |
KR101177342B1 (ko) | 2010-11-26 | 2012-08-30 | 한국건설기술연구원 | 연속교용 프리캐스트 단부 세그먼트, 이를 단부거푸집으로 이용하는 거더 제작방법 및 이를 이용한 교량시공방법 |
KR101196874B1 (ko) | 2011-04-01 | 2012-11-01 | 한국건설기술연구원 | 프리캐스트 단부 세그먼트를 단부거푸집으로 이용하는 거더 제작방법 및 그 방법으로 제작된 거더 |
KR101107310B1 (ko) | 2011-08-05 | 2012-01-20 | 주식회사 길교이앤씨 | 분절형 콘크리트 빔 시공용 거푸집 및 그 거푸집을 이용하는 분절형 콘크리트 빔 시공 방법. |
KR101125673B1 (ko) | 2011-10-13 | 2012-03-27 | 후토산업개발(주) | 프리스트레스트 콘크리트 거더 제작을 위한 프리캐스트 다이아프램의 구조 및 이를 이용한 프리스트레스트 콘크리트 거더의 제작방법 |
ES2402720B1 (es) * | 2011-10-31 | 2014-03-12 | Puentes Y Calzadas Grupo De Empresas, S.A. | Sistema de bancada desmontable para fábricas móviles de elementos prefabricados de hormigón. |
CN104047225B (zh) * | 2014-07-01 | 2016-08-24 | 中铁第一勘察设计院集团有限公司 | 设置钢套管弹性剪力榫的节段预制拼装梁体结构 |
CN104196245B (zh) * | 2014-08-08 | 2016-04-13 | 宝钢钢构有限公司 | 大型钢管桁架变截面曲梁的分段制作拼装方法 |
JP6676287B2 (ja) * | 2015-05-19 | 2020-04-08 | 株式会社ピーエス三菱 | プレキャスト・コンクリート部材の製造方法および構築方法 |
KR101751724B1 (ko) * | 2016-08-31 | 2017-06-29 | (주)한맥기술 | 부재의 강성비 조절을 통하여 모멘트를 재분배하여 형고를 낮춘 저형고 일체식 psc i형 거더교 |
US11530547B2 (en) * | 2017-02-24 | 2022-12-20 | Parkd Ltd | Building structure |
GB201718746D0 (en) * | 2017-11-13 | 2017-12-27 | Univ College Dublin Nat Univ Ireland Dublin | Structural member |
US10626687B1 (en) * | 2018-09-14 | 2020-04-21 | Hawker Equipment Solutions, LLC. | Wedge system to extend and elevate a pipe handler |
CN109235287A (zh) * | 2018-11-15 | 2019-01-18 | 天津城建大学 | 节段预制悬臂拼装桥梁预制剪力键结构及剪力键施工方法 |
US10900218B2 (en) * | 2019-04-24 | 2021-01-26 | Big Time Investment, Llc | Method and apparatus for fabricating a floor plate for a building |
KR102151046B1 (ko) | 2019-09-23 | 2020-09-03 | 강용길 | 확대접합면을 가지는 고강도 분절 거더 및 고강도 분절 거더의 시공방법 |
CN111300619A (zh) * | 2020-03-31 | 2020-06-19 | 中国十七冶集团有限公司 | 一种预制箱梁蒸汽养生自动化温度控制系统 |
KR102261493B1 (ko) * | 2020-04-07 | 2021-06-07 | 김성 | 세그먼트 프리플렉스 합성빔 및 그 시공방법 |
KR102241713B1 (ko) * | 2020-07-28 | 2021-04-20 | 주식회사 길교이앤씨 | 프리캐스트 단부 블록, 이를 포함하는 라멘교용 콘크리트 거더, 라멘교용 콘크리트 거더를 포함하는 교량 및 프리캐스트 단부 블록을 이용한 라멘교용 콘크리트 거더 제작 방법 |
FR3114823B1 (fr) * | 2020-10-07 | 2023-11-17 | Aevia | Système de pont modulaire et son procédé de fabrication |
KR102247374B1 (ko) * | 2020-11-18 | 2021-05-03 | (주)인터컨스텍 | 분절 프리스트레스 콘크리트 거더 및 그 제작방법 |
CN112942141B (zh) * | 2021-04-06 | 2022-11-22 | 中铁大桥局第九工程有限公司 | 一种节段梁匹配预制方法 |
CN113374171B (zh) * | 2021-06-08 | 2022-09-13 | 华南理工大学 | 一种再生块体混凝土预制装配式圈梁结构及其施工方法 |
CN115341753B (zh) * | 2022-08-31 | 2023-08-11 | 中国建筑第八工程局有限公司 | 一种用于钢结构屋面支座抗剪键的模板及模板支设方法 |
Family Cites Families (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2208814A (en) * | 1937-05-01 | 1940-07-23 | John A Peabody | Building construction |
SE345150B (zh) * | 1964-04-01 | 1972-05-15 | S Nilsson | |
US3284977A (en) | 1965-04-08 | 1966-11-15 | Lickliter | Expansion splice |
US3377284A (en) * | 1965-06-07 | 1968-04-09 | Dow Corning | Solvent-resistant greases for high speed bearings |
US3593532A (en) * | 1968-10-02 | 1971-07-20 | Grazel Inc John | Concrete pile sections and joints therefor |
US3810337A (en) * | 1970-10-28 | 1974-05-14 | S Pollard | An elongated stressed structural member |
US3794433A (en) | 1971-07-08 | 1974-02-26 | Schupack Ass | Segmental precast concrete post-tensioned overpass bridges with cantilevered abutment |
US3892096A (en) * | 1971-08-02 | 1975-07-01 | Romualdo Macchi | Beam structures |
CA1009856A (en) * | 1974-12-02 | 1977-05-10 | West's Piling And Construction Company Limited | Pile connecting device |
US4604003A (en) * | 1983-02-22 | 1986-08-05 | Francoeur Ronald A | Method and apparatus for retensioning prestressed concrete members |
US4604841A (en) * | 1983-04-01 | 1986-08-12 | Barnoff Robert M | Continuous, precast, prestressed concrete bridge deck panel forms, precast parapets, and method of construction |
US4733986A (en) | 1985-08-08 | 1988-03-29 | Square D Company | Splice plate for cable tray |
US4993095A (en) | 1989-11-09 | 1991-02-19 | Armco Inc. | Splice for a structural member |
JPH0529203Y2 (zh) * | 1991-06-28 | 1993-07-27 | ||
US5437072A (en) * | 1992-01-23 | 1995-08-01 | J. Muller International | Rapid transit viaduct with post-tensioning cable system |
US5305573A (en) * | 1992-06-03 | 1994-04-26 | Baumann Hanns U | Energy dissipating connector |
JPH0617481A (ja) * | 1992-06-30 | 1994-01-25 | Shimizu Corp | コンクリート建造物の柱梁接合部構築工法及び同工法に用いる柱梁接合部用ブロック |
JP2919243B2 (ja) * | 1993-08-26 | 1999-07-12 | ミサワホーム株式会社 | プレキャストコンクリート製基礎及びその製造方法 |
US5577284A (en) * | 1994-02-22 | 1996-11-26 | Muller; Jean | Channel bridge |
US5785419A (en) * | 1995-10-10 | 1998-07-28 | Mckelvey; Paul A. | Lightweight building material and method of construction of cast-in-place structures |
US5688069A (en) * | 1996-07-05 | 1997-11-18 | Hoshino; Juichi | Joint structure of structural members |
JPH11293629A (ja) | 1998-04-06 | 1999-10-26 | Kajima Corp | 場所打ちコンクリートブロック工法 |
JP3561833B2 (ja) * | 1999-04-15 | 2004-09-02 | 株式会社日本ピーエス | プレストレスを導入したプレキャストコンクリートセグメントの製造方法 |
KR100380637B1 (ko) * | 1999-05-10 | 2003-04-16 | 주식회사 인터컨스텍 | 교량의 내하력이 조정되는 프리스트레스트 콘크리트 거더및 이를 이용한 교량의 내하력 조정방법 |
US6402435B1 (en) * | 1999-12-29 | 2002-06-11 | Cyrrus Gregory Lewis | Pre-stressed modular retaining wall system and method |
KR100461000B1 (ko) | 2002-11-18 | 2004-12-09 | 주식회사 노빌테크 | 견고한 조립구조를 가지는 프리캐스트 콘크리트 패널합성빔의 종방향 연결시공방법 |
US20060137115A1 (en) * | 2002-12-30 | 2006-06-29 | Park Young J | Prestressed composite girder, continuous prestressed composite girder structure and methods of fabricating and connecting the same |
KR20040004337A (ko) | 2003-12-23 | 2004-01-13 | 문형동 | 아파트 마감재 선택 시스템 |
-
2005
- 2005-04-13 KR KR1020050030720A patent/KR100510254B1/ko active IP Right Review Request
-
2006
- 2006-04-05 CN CN200680012166A patent/CN100595384C/zh not_active Expired - Fee Related
- 2006-04-05 WO PCT/KR2006/001253 patent/WO2006109952A1/en active Application Filing
- 2006-04-05 JP JP2008506366A patent/JP5090339B2/ja not_active Expired - Fee Related
- 2006-04-05 CA CA2603559A patent/CA2603559C/en not_active Expired - Fee Related
- 2006-04-05 US US11/918,451 patent/US8806820B2/en active Active
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418400B (zh) * | 2010-09-28 | 2014-07-09 | 杨峰 | 一种先张法预应力钢筋砼预制梁 |
CN102418400A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种先张法预应力钢筋砼预制梁 |
CN103392043B (zh) * | 2010-09-30 | 2015-09-02 | 斯博泰科有限公司 | 用于桥梁的上部结构 |
CN103392043A (zh) * | 2010-09-30 | 2013-11-13 | 斯博泰科有限公司 | 用于桥梁的上部结构 |
US8910336B2 (en) | 2010-09-30 | 2014-12-16 | Supportec Co., Ltd. | Upper structure for bridge |
CN102433961A (zh) * | 2011-12-12 | 2012-05-02 | 中冶建工集团有限公司 | 一种预制梁结构施工构件 |
CN103009469A (zh) * | 2012-12-26 | 2013-04-03 | 中南建设(沈阳)建筑产业有限公司 | 一种预制装配整体式剪力墙抗剪键预留块 |
CN107605044A (zh) * | 2017-09-25 | 2018-01-19 | 上海建工五建集团有限公司 | 装配式外包型钢链式组合结构 |
CN108060738A (zh) * | 2017-12-20 | 2018-05-22 | 东南大学 | 一种后张预应力分段拼装预制双t板结构及拼装方法 |
CN108060738B (zh) * | 2017-12-20 | 2023-09-12 | 东南大学 | 一种后张预应力分段拼装预制双t板结构及拼装方法 |
CN111395149A (zh) * | 2019-12-12 | 2020-07-10 | 中国船舶重工集团应急预警与救援装备股份有限公司 | 一种箱型连接接头 |
CN112391933A (zh) * | 2020-10-30 | 2021-02-23 | 山东高速城投绕城高速公路有限公司 | 一种采用剪力键纵向拼接的混合梁箱梁桥及施工方法 |
CN114658097A (zh) * | 2022-03-31 | 2022-06-24 | 上海市机械施工集团有限公司 | 一种组合结构及其建造方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100595384C (zh) | 2010-03-24 |
KR100510254B1 (ko) | 2005-08-26 |
CA2603559A1 (en) | 2006-10-19 |
JP2008535707A (ja) | 2008-09-04 |
US20090064610A1 (en) | 2009-03-12 |
CA2603559C (en) | 2010-11-02 |
JP5090339B2 (ja) | 2012-12-05 |
US8806820B2 (en) | 2014-08-19 |
WO2006109952A1 (en) | 2006-10-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100595384C (zh) | 用于建造拼装预应力混凝土梁的分段及其制造方法 | |
CN107849831B (zh) | 用于使用预制底板和钢管混凝土桁架梁来顶推/建造桥梁的方法 | |
CN104047225B (zh) | 设置钢套管弹性剪力榫的节段预制拼装梁体结构 | |
CN111024480B (zh) | 一种模拟混凝土应力状态的模型及试验方法 | |
US2535100A (en) | Process for prestressing cement products | |
KR101269639B1 (ko) | 피씨 구조물의 단부 철근 이음용 코어식 슬리브 | |
CN105369981A (zh) | 一种配筋式嵌扣连接永久性梁模板、混凝土结构构件及制造方法 | |
KR20160078150A (ko) | 분절형 프리스트레스트 콘크리트 거더 및 이의 시공방법 | |
JP6839622B2 (ja) | コンクリート床版の接合構造、コンクリート床版の接合方法及びコンクリート床版の製造方法 | |
KR101674103B1 (ko) | 선제작 긴장재 정착부 및 이를 이용한 fcm 교량의 긴장 시공 방법 | |
KR101585745B1 (ko) | 분절형 프리스트레스트 콘크리트 거더 | |
JP3925860B2 (ja) | 接合部の構造及びその構築方法 | |
KR102473333B1 (ko) | 키이가 일체로 구성된 철근 커플러용 클램프 및 그 클램프의 제조방법 | |
CN1769624B (zh) | 一种砼填充用空心管 | |
CN211286603U (zh) | 一种建筑用模板 | |
CN105904587A (zh) | 一种预制混凝土构件及其制作方法 | |
TWI356116B (zh) | ||
EP4098996A1 (en) | Anchorage system of structural components for manufac-turing and testing of composite elements | |
CN105350717A (zh) | 一种配筋式销接永久性梁模板、混凝土结构构件及制造方法 | |
CN107116665A (zh) | 十字型多孔混凝土桩用模板及其制造和施工方法 | |
KR20210031232A (ko) | 프리캐스트 콘크리트 중공 슬래브의 접속 구조 | |
JP6462502B2 (ja) | プレキャスト・コンクリート部材の製造方法および構築方法 | |
KR20220080251A (ko) | 철근 커플러용 클램프의 슬리브 제조방법 및 슬리브 | |
CN100381671C (zh) | 一种砼填充用空心管 | |
CN117230987A (zh) | 一种采用超高韧性混凝土组合永久模板的柱构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100324 |