BRPI0411149A - produção de tubos de revestimento - Google Patents
produção de tubos de revestimentoInfo
- Publication number
- BRPI0411149A BRPI0411149A BRPI0411149-4A BRPI0411149A BRPI0411149A BR PI0411149 A BRPI0411149 A BR PI0411149A BR PI0411149 A BRPI0411149 A BR PI0411149A BR PI0411149 A BRPI0411149 A BR PI0411149A
- Authority
- BR
- Brazil
- Prior art keywords
- tube section
- outer tube
- section
- inner tube
- pipe
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/15—Making tubes of special shape; Making tube fittings
- B21C37/154—Making multi-wall tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D39/00—Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders
- B21D39/04—Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders of tubes with tubes; of tubes with rods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D39/00—Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders
- B21D39/08—Tube expanders
- B21D39/20—Tube expanders with mandrels, e.g. expandable
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49826—Assembling or joining
- Y10T29/49908—Joining by deforming
- Y10T29/49938—Radially expanding part in cavity, aperture, or hollow body
- Y10T29/4994—Radially expanding internal tube
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
- Lining Or Joining Of Plastics Or The Like (AREA)
- Branch Pipes, Bends, And The Like (AREA)
Abstract
"PRODUçãO DE TUBOS DE REVESTIMENTO". Um método para se fabricar uma estrutura tubular como um tubo de revestimento (10) com seções de tubo interna e externa (11, 13) com uma interferência encaixada entre elas e também um tubo de revestimento (10) fabricado de acordo com esse método. O método é composto das etapas a seguir: (a) posicionamento de duas seções de tubo uma na outra para oferecer um sistema (15) composto de uma seção de tubo interna (11) e seção de tubo externa (13); (b) expansão radial de uma porção da seção de tubo interna (11) no engate com a porção circundante da seção de tubo externa (13) com o uso de uma ferramenta de expansão (17); (c) continuação da expansão radial da referida porção da seção de tubo interna (11) para expandir de forma plástica a referida porção da seção de tubo interna (13) ¢sic 11! e para expandir de forma elástica a porção circundante da seção de tubo externa (13); e (d) repetição das etapas (b) e (c) em uma ou mais porções da seção de tubo interna (11). Como a seção de tubo interna (11) se expande radialmente em uma condição que a submete à deformação plástica, e a seção de tubo externa (13) se expande radialmente para se submeter à deformação elástica mas não plástica, a interferência entre as seções de tubo interna e externa é conseguida por causa do estresse elástico residual na seção de tubo externa (13) e o estresse de compressão residual na seção de tubo interna (11). O método também pode envolver a estabilização de um elo metalúrgico entre as superfícies de confronto das duas seções de tubo (11, 13).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2003902440A AU2003902440A0 (en) | 2003-05-20 | 2003-05-20 | Production of clad pipes |
PCT/AU2004/000672 WO2004103603A1 (en) | 2003-05-20 | 2004-05-20 | Production of clad pipes |
Publications (1)
Publication Number | Publication Date |
---|---|
BRPI0411149A true BRPI0411149A (pt) | 2006-07-11 |
Family
ID=31501306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0411149-4A BRPI0411149A (pt) | 2003-05-20 | 2004-05-20 | produção de tubos de revestimento |
Country Status (7)
Country | Link |
---|---|
US (1) | US20070132228A1 (pt) |
EP (1) | EP1635969A4 (pt) |
CN (1) | CN100364685C (pt) |
AU (1) | AU2003902440A0 (pt) |
BR (1) | BRPI0411149A (pt) |
NO (1) | NO20056071L (pt) |
WO (1) | WO2004103603A1 (pt) |
Families Citing this family (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DK1827727T3 (da) * | 2004-12-21 | 2008-09-15 | Bergrohr Gmbh Siegen | Fremgangsmåde til fremstilling af et flerlagsrör |
CN100369693C (zh) * | 2005-12-31 | 2008-02-20 | 浙江工业大学 | 制备双金属复合管的复合装置以及复合管的制备方法 |
CN102078900B (zh) * | 2011-01-27 | 2012-11-07 | 江苏龙城洪力液压设备有限公司 | 钢管复合套装机 |
EP2683515A4 (en) | 2011-03-10 | 2015-06-03 | Mesocoat Inc | METHOD AND APPARATUS FOR FORMING PLATED METAL PRODUCTS |
CN103212602A (zh) * | 2012-01-18 | 2013-07-24 | 番禺珠江钢管有限公司 | 双层金属复合焊管机械扩径工艺 |
CN103899906B (zh) * | 2012-12-30 | 2016-05-11 | 上海沃迪自动化装备股份有限公司 | 一种复合管及其制造方法 |
BR112015023290A2 (pt) | 2013-03-15 | 2017-07-18 | Mesocoat Inc | pó de aspersão térmica, método de fabricação de um pó de aspersão térmica, revestimento por aspersão térmica formado de um pó de aspersão térmica, e, método de formação de um revestimento por aspersão térmica em um substrato |
DE102013103811B3 (de) | 2013-04-16 | 2014-03-20 | EISENBAU KRäMER GMBH | Verfahren zum Herstellen eines mehrlagigen Großrohres |
CN103272878A (zh) * | 2013-06-09 | 2013-09-04 | 汤晓明 | 制造复合钢管的方法 |
BR102013021662A2 (pt) * | 2013-08-23 | 2014-09-02 | Vallourec Tubos Do Brasil S A | Tubo multicamadas revestido |
BR102013021663B1 (pt) * | 2013-08-23 | 2020-08-25 | Vallourec Soluções Tubulares Do Brasil S.A. | processo para a produção de tubo revestido por expansão e tubo revestido produzido por esse processo |
BR102013021664B1 (pt) * | 2013-08-23 | 2020-11-10 | Vallourec Soluções Tubulares Do Brasil S.A | processo para produção de tubo cladeado por trefilação e tubo cladeado |
CN104708577A (zh) * | 2013-12-13 | 2015-06-17 | 哈尔滨朗格斯特节能科技有限公司 | 预制直埋保温管穿管引导器的穿管引导方法 |
DE102014108145A1 (de) * | 2014-06-10 | 2015-12-17 | EISENBAU KRäMER GMBH | Verfahren zum Herstellen eines mehrlagigen Großrohres |
GB2528713B (en) * | 2014-07-30 | 2017-10-25 | Technip France | Method of manufacturing a bi-metallic mechanically lined pipe |
GB2533644B (en) * | 2014-12-24 | 2017-12-06 | Acergy France SAS | Improving the bending behaviour of mechanically-lined rigid pipe |
CN104588964B (zh) * | 2014-12-29 | 2018-01-09 | 佛山晓世科技服务有限公司 | 异种金属管材及其制备方法和应用 |
DE202015101441U1 (de) | 2015-03-06 | 2016-06-08 | EISENBAU KRäMER GMBH | Vorrichtung zum Herstellen eines mehrlagigen Großrohres |
KR102005168B1 (ko) | 2015-03-06 | 2019-10-17 | 아이젠바우 크레이머 게엠베하 | 다층 헤비-듀티 파이프 제조 동안 클래딩 층을 도포하기 위한 방법 및 코팅 장치 |
DE102015103338B3 (de) * | 2015-03-06 | 2016-04-14 | EISENBAU KRäMER GMBH | Verfahren zum Herstellen eines mehrlagigen Großrohres |
CN104874994B (zh) * | 2015-05-27 | 2017-02-22 | 安徽普伦智能装备有限公司 | 一种复合管装配工装 |
DE102015122297A1 (de) * | 2015-12-18 | 2017-06-22 | Sandvik Materials Technology Deutschland Gmbh | Verfahren zum Herstellen eines Hochdruckrohres |
CN107042246B (zh) * | 2016-04-28 | 2019-02-22 | 西北大学 | 一种利用牵引法生产双金属复合管的方法 |
JP6697959B2 (ja) * | 2016-06-15 | 2020-05-27 | オリンパス株式会社 | 接合方法 |
DE102016010162A1 (de) | 2016-08-25 | 2018-03-01 | Erndtebrücker Eisenwerk GmbH & Co. KG | Verfahren zur Herstellung eines Mehrlagenrohres und Mehrlagenrohr |
CN107309618B (zh) * | 2017-06-19 | 2019-09-27 | 南京水门电子有限公司 | 水表玛瑙轴套的装配工艺方法 |
JP7118645B2 (ja) * | 2017-06-27 | 2022-08-16 | 株式会社神戸製鋼所 | 部材の接合方法および接合体 |
CN107297705B (zh) * | 2017-08-24 | 2023-08-01 | 上海翊科聚合物科技有限公司 | 一种套管的制作装置及制作方法 |
CN108000036B (zh) * | 2018-01-01 | 2023-08-04 | 宁波市江北保隆消声系统制造有限公司 | 装饰尾管焊接工装设备 |
CN108890263B (zh) * | 2018-08-22 | 2024-02-23 | 江苏众信绿色管业科技有限公司 | 一种钢衬复合管的组装设备 |
CN109140057B (zh) * | 2018-09-30 | 2024-02-13 | 佛山市顺德区鑫雷节能设备有限公司 | 一种双壁管及其制造方法 |
CN109531104B (zh) * | 2019-01-17 | 2023-07-25 | 安徽海螺川崎装备制造有限公司 | 一种挤压辊辊套热拆装置及使用该装置的拆卸方法 |
CN110626848B (zh) * | 2019-08-14 | 2024-05-03 | 山东广泰环保科技有限公司 | 一种复合管、制备装置、工艺、辊体和辊体的应用 |
CN110860778B (zh) * | 2019-10-18 | 2021-09-28 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 一种基于二氧化碳膨胀致裂管制备金属复合管的方法 |
CN110977410A (zh) * | 2019-12-31 | 2020-04-10 | 嘉兴丰沃增压技术有限公司 | 一种电动压缩机转子总成装碳纤维管压装工装 |
JP6999729B2 (ja) * | 2020-03-30 | 2022-01-19 | 中西商事株式会社 | 二重管構造体及びサポート |
CN112719102B (zh) * | 2020-12-04 | 2022-11-25 | 浙江凯越塑胶工业有限公司 | 一种全自动金属双扣管组装的装置 |
CN115283771A (zh) * | 2022-07-29 | 2022-11-04 | 鸿创智能装备(苏州)有限公司 | 一种自行车铝件双工位感应钎焊设备 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3101531A (en) * | 1961-01-09 | 1963-08-27 | Western Gear Corp | Method of applying internal metallic linings to tubes and the like |
GB1333172A (en) * | 1971-07-20 | 1973-10-10 | Legate R A | Metal pipe lining method |
US4585374A (en) * | 1979-08-16 | 1986-04-29 | Jet Research Center Inc. | High energy formed connections |
KR850001846B1 (ko) * | 1980-06-05 | 1985-12-28 | 더 뱁콕 앤드 윌콕스 캄패니 | 관내에 슬리이브를 고정하는 장치 |
US4420866A (en) * | 1982-01-25 | 1983-12-20 | Cities Service Company | Apparatus and process for selectively expanding to join one tube into another tube |
US4558721A (en) * | 1982-09-28 | 1985-12-17 | Apx Group Inc. | Double walled tubing |
US4620660A (en) * | 1985-01-24 | 1986-11-04 | Turner William C | Method of manufacturing an internally clad tubular product |
DE3839308A1 (de) * | 1988-02-15 | 1990-05-23 | Siemens Ag | In eine rohrleitung einfahrbare rohrformvorrichtung |
DE4210547C1 (pt) * | 1992-03-31 | 1993-06-03 | Heinrich Dr. Moresnet-Chapelle Be Hampel | |
US5479699A (en) * | 1994-02-07 | 1996-01-02 | Westinghouse Electric Corporation | Apparatus for expanding tubular members |
US5549335A (en) * | 1994-04-06 | 1996-08-27 | Peerless Of America, Incorporated | Solderless metallurgical joint |
DE4412992C2 (de) * | 1994-04-15 | 1998-07-02 | Bbc Reaktor Gmbh | Verfahren zur Kontrolle eines hydraulischen Aufweitvorganges bei einer Hülse-/Rohrverbindung |
CN1107561C (zh) * | 1999-12-14 | 2003-05-07 | 东北大学 | 一种双金属复合管的制造方法 |
-
2003
- 2003-05-20 AU AU2003902440A patent/AU2003902440A0/en not_active Abandoned
-
2004
- 2004-05-20 EP EP04734032A patent/EP1635969A4/en not_active Withdrawn
- 2004-05-20 CN CNB2004800202084A patent/CN100364685C/zh not_active Ceased
- 2004-05-20 US US10/557,981 patent/US20070132228A1/en not_active Abandoned
- 2004-05-20 BR BRPI0411149-4A patent/BRPI0411149A/pt not_active Application Discontinuation
- 2004-05-20 WO PCT/AU2004/000672 patent/WO2004103603A1/en active Search and Examination
-
2005
- 2005-12-20 NO NO20056071A patent/NO20056071L/no not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
US20070132228A1 (en) | 2007-06-14 |
NO20056071L (no) | 2006-02-20 |
WO2004103603A1 (en) | 2004-12-02 |
CN1822907A (zh) | 2006-08-23 |
EP1635969A1 (en) | 2006-03-22 |
EP1635969A4 (en) | 2009-12-02 |
CN100364685C (zh) | 2008-01-30 |
AU2003902440A0 (en) | 2003-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI0411149A (pt) | produção de tubos de revestimento | |
DE59107431D1 (de) | Rohrverbindung, insbesondere an verbundrohren | |
BRPI0607790A2 (pt) | tubo e método de melhoria da resistência à deformação de um tubo corrugado | |
WO2008131771A3 (en) | Cladding method and expansion tool | |
JP2015524041A (ja) | 管用のクランプ接続部 | |
ITGE20030110A1 (it) | Metodo di fabbricazione di condotte termoisolate a tubi | |
NO20055539L (no) | Ekspandersystem for okende ekspansjon av et rorelement | |
EP0815995A3 (en) | Method for making cylindrical structures with cooling channels | |
BRPI0512051A (pt) | anel de anuloplastia tridimensional e molde | |
BR0215556A (pt) | Sistema de montagem para um elemento vibratório, e, método para formar o mesmo | |
KR960011375A (ko) | 팽창밸브 부착부재 | |
GB2457606A (en) | Radially expanding a tubular element | |
EA200501662A1 (ru) | Расширительная система для поэтапного расширения трубного элемента | |
JPH09236187A (ja) | ホースとその製造方法 | |
BRPI0401496A (pt) | Método de formar junta corrediça | |
JP4196879B2 (ja) | 配管継手装置 | |
KR20110118508A (ko) | 익스팬션 조인트 | |
JP2009197926A (ja) | 配管の接続体及びその製造方法 | |
CN108662342A (zh) | 一种真空绝热低温管道用真空波纹膨胀节 | |
FR2877070B1 (fr) | Jonc de verrouillage segmente, assemblage et procede de montage correspondants | |
BR9907707A (pt) | Processo de produção de tubulações a serem ligadas em uma canalização de parede dupla, máquina para implementação do processo, e, instalação de fabricação em série de tubulações a serem ligadas topo a topo em uma canalização de parede dupla | |
BRPI0608027A2 (pt) | soquete de tubo | |
DE502004004180D1 (de) | Herstellungsverfahren für ein Mehrschichtrohr zur Führung eines Wärmeübertragungsfluids und Mehrschichtrohr | |
BR0110372A (pt) | Afixação de conjuntos de camisa a tubulações | |
BR0302538A (pt) | Junta de expansão, processo de fabricação de junta e perfil de reforço |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
B09B | Patent application refused [chapter 9.2 patent gazette] |
Free format text: INDEFIRO O PEDIDO DE ACORDO COM O(S) ARTIGO(S) 8O E 11, 13 DA LPI |
|
B12B | Appeal against refusal [chapter 12.2 patent gazette] | ||
B25G | Requested change of headquarter approved |
Owner name: CLADTEK INTERNATIONAL PTY LTD (AU) |
|
B25A | Requested transfer of rights approved |
Owner name: CLADTEK HOLDINGS PTE LTD (SG) |