WO2022131214A1 - 吊り金具および吊り金具の製造方法 - Google Patents

吊り金具および吊り金具の製造方法 Download PDF

Info

Publication number
WO2022131214A1
WO2022131214A1 PCT/JP2021/045843 JP2021045843W WO2022131214A1 WO 2022131214 A1 WO2022131214 A1 WO 2022131214A1 JP 2021045843 W JP2021045843 W JP 2021045843W WO 2022131214 A1 WO2022131214 A1 WO 2022131214A1
Authority
WO
WIPO (PCT)
Prior art keywords
metal fitting
bearing
circumscribed
anchor
rotating shaft
Prior art date
Application number
PCT/JP2021/045843
Other languages
English (en)
French (fr)
Inventor
幸介 小菅
理佳 鈴木
Original Assignee
株式会社キトー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社キトー filed Critical 株式会社キトー
Priority to US18/267,114 priority Critical patent/US20230392671A1/en
Priority to JP2022569987A priority patent/JP7423140B2/ja
Priority to CN202180081101.4A priority patent/CN116685774A/zh
Priority to DE112021006464.9T priority patent/DE112021006464T5/de
Publication of WO2022131214A1 publication Critical patent/WO2022131214A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16GBELTS, CABLES, OR ROPES, PREDOMINANTLY USED FOR DRIVING PURPOSES; CHAINS; FITTINGS PREDOMINANTLY USED THEREFOR
    • F16G15/00Chain couplings, Shackles; Chain joints; Chain links; Chain bushes
    • F16G15/08Swivels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B45/00Hooks; Eyes
    • F16B45/002Eyes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C19/00Bearings with rolling contact, for exclusively rotary movement
    • F16C19/02Bearings with rolling contact, for exclusively rotary movement with bearing balls essentially of the same size in one or more circular rows
    • F16C19/14Bearings with rolling contact, for exclusively rotary movement with bearing balls essentially of the same size in one or more circular rows for both radial and axial load
    • F16C19/18Bearings with rolling contact, for exclusively rotary movement with bearing balls essentially of the same size in one or more circular rows for both radial and axial load with two or more rows of balls
    • F16C19/181Bearings with rolling contact, for exclusively rotary movement with bearing balls essentially of the same size in one or more circular rows for both radial and axial load with two or more rows of balls with angular contact
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/30Parts of ball or roller bearings
    • F16C33/58Raceways; Race rings
    • F16C33/581Raceways; Race rings integral with other parts, e.g. with housings or machine elements such as shafts or gear wheels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C43/00Assembling bearings
    • F16C43/04Assembling rolling-contact bearings
    • F16C43/06Placing rolling bodies in cages or bearings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B35/00Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws
    • F16B35/04Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws with specially-shaped head or shaft in order to fix the bolt on or in an object
    • F16B35/06Specially-shaped heads
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C2322/00Apparatus used in shaping articles
    • F16C2322/50Hand tools, workshop equipment or manipulators

Definitions

  • the present invention relates to a hanging metal fitting and a method for manufacturing the hanging metal fitting.
  • the hanging metal fitting has an annular link, a rotary connecting member in which the connecting portion of the link is rotatable, and an anchor metal fitting that rotatably supports the rotary connecting member.
  • the anchor metal fitting is provided with a male screw portion, and this male screw portion is screwed into the female screw portion of the load mounting hole. That is, some loads are provided with a female threaded portion such as a building member or a mold, and the above-mentioned male threaded portion is screwed into and fixed to the female threaded portion of such a load. Then, hang a hook or the like on the link member. This makes it possible to lift and move the load.
  • the rotary connecting member is attached to the anchor metal fitting when a load is applied in the direction perpendicular to the rotation axis (horizontal direction). If they fall down, they will slide directly.
  • a bush may be arranged between the anchor fitting and the rotary connecting member. However, since this bush functions as a slide bearing, the rotational performance between the anchor fitting and the rotary connecting member deteriorates.
  • Patent Document 1 a hanging metal fitting having two rows of bearings is disclosed in Patent Document 1.
  • FIG. 5 of Patent Document 1 two rows of bearings (16, 17) are provided on the outer peripheral side of the guide pin (24) of the mounting member (20) and the inner peripheral side of the concave portion (25) of the fixing member (21). The configuration arranged between the is disclosed.
  • the upper bearing (16) is arranged between the outer peripheral side of the guide pin (12) of the fixing member (13) and the inner peripheral side of the recess of the mounting member (1).
  • the lower bearing (17) is arranged between the flange-shaped portion of the fixing member (13) and the lower end surface of the mounting member (1).
  • FIG. 8 of Patent Document 1 also has the same problem as the configuration disclosed in FIG. 1 of Patent Document 1. That is, in order to arrange the upper bearing (17), which is a portion that receives the load in the direction perpendicular to the axial direction (horizontal direction), the upper end surface of the connecting member (29) and the stepped mounting member (20). It is necessary to form concave grooves on both sides of the portion. However, when the above groove is formed, a space is required by that amount, and as a result, it is necessary to increase the diameters of the connecting member (29) and the mounting member (20), which leads to an increase in the size of the hanging metal fitting. It ends up.
  • the present invention has been made in view of the above circumstances, and it is possible to prevent the size from increasing in size while arranging two or more rows of bearings, and the hanging metal fittings and hanging metal fittings having an optimum bearing structure.
  • the purpose is to provide a manufacturing method.
  • a rotating shaft portion is provided, and the anchor metal fitting is provided with a fixing portion to be attached to a load and a metal fitting connecting portion integrated with the fixing portion, and the rotating shaft portion is inserted into the metal fitting connecting portion.
  • the first bearing is provided with an external concave groove that is recessed from the inner wall surface of the connecting recess, and an internal concave groove that is recessed from the outer peripheral surface of the rotating shaft portion and faces the external concave groove. It comprises a plurality of first bearing balls inserted into an endless passage formed by an inner recess and an outer recess, the second bearing being in the opening of the connecting recess into which the rotating shaft is inserted.
  • An external step portion that is provided and dents from the inner diameter side to the outer diameter side, an inner step portion that is provided at the base of the rotating shaft portion, and an inner step portion that faces the outer step portion, and an outer contact step and an inner step.
  • hanging fittings comprising, a plurality of second bearing balls, which are inserted into an endless passage formed by a portion.
  • the fixing portion has an anchor seat portion having a seat surface in close contact with the mounting surface of the load.
  • a convex portion protruding toward the rotary connecting member is projected around the opening portion of the connecting recess in the metal fitting connecting portion, and the circumscribed step portion. It is preferable that the protrusion height in the axial direction from the bottom to the top of the convex portion is provided to be larger than the diameter of the second bearing ball.
  • the rotary connecting member is provided with a facing recess recessed from the second thrust surface facing the first thrust surface, and the facing recess is convex. It is preferable that the labyrinth structure is formed by the inclusion of the shaped portion.
  • a rotating shaft portion is provided so as to project toward, and the anchor fitting is provided with a fixing portion to be attached to the load and a fitting connecting portion integrated with the fixing portion.
  • a connecting recess for inserting the rotating shaft portion is provided, and the first bearing has an external concave groove recessed from the inner wall surface of the connecting recess, a recessed from the outer peripheral surface of the rotating shaft portion, and an inner facing the external concave groove. It comprises a contact groove and a plurality of first bearing balls inserted into an endless passage formed by the inner concave groove and the outer concave groove, and the second bearing is connected to insert a rotating shaft portion.
  • An external step portion that is provided in the opening portion of the recess and is recessed from the inner diameter side to the outer diameter side, and an inner step portion that faces the outer step portion and an outer step portion that is provided at the base of the rotating shaft portion.
  • a shaft portion insertion step of inserting a rotating shaft portion into a connecting recess by a predetermined depth, and a shaft portion, which are provided with a plurality of second bearing balls inserted into an endless passage formed by a portion and an inner tangent portion. Before and after the insertion process, a jig is placed in the facing portion where the anchor fitting and the rotary connecting member face each other in the direction orthogonal to the axial direction, and a gap in which the second bearing ball can move is placed in the facing portion.
  • the first ball placement step of inserting a plurality of second bearing balls into the gaps formed in the jig placement process and arranging the plurality of second bearing balls in the external step portion, and the first After the ball placement process, the jig is removed from the facing portion and the rotating shaft is inserted all the way to the back of the connecting recess so that both the outer and inner steps are in contact with the second bearing ball.
  • a plurality of first bearing balls are inserted from the input holes extending from the outer peripheral surface of the metal fitting connecting portion to the external concave groove, and the plurality of first bearing balls are inserted into the external concave groove and the internal concave groove.
  • a rear ball arranging step in which both of the grooves are in contact with each other, and a sealing step of sealing the input hole after the rear ball arranging step.
  • a method of manufacturing a hanging bracket is provided, which comprises performing the above.
  • the present invention it is possible to prevent the size from becoming large while arranging two or more rows of bearings, and it is possible to provide a hanging metal fitting having an optimum bearing structure.
  • FIG. 1 is a partial cross-sectional view showing an enlarged view of a bearing and a lower support portion facing the metal fitting connecting portion among the hanging metal fittings shown in FIG. 1.
  • FIG. 5 is an enlarged partial cross-sectional view showing a bearing facing a metal fitting connecting portion and a lower support portion according to a modified example of FIG. FIG.
  • FIG. 3 is a perspective view showing a state in which a ring set is mounted between an anchor metal fitting and a rotary connecting member in order to manufacture the hanging metal fitting shown in FIG. 1. It is sectional drawing in the state which the ring set is attached between the anchor metal fitting and the rotary connecting member shown in FIG. 7.
  • the extending direction of the link hole 85 is the X direction
  • the upper right side in FIG. 1 is the X1 side
  • the opposite lower left side in FIG. 1 is the X2 side.
  • the direction connecting both ends of the substantially U-shaped upper ring portion 82 is the Y direction
  • the lower right side in FIG. 1 is the Y1 side
  • the opposite upper left side in FIG. 1 is the Y2 side.
  • the axial direction of the male screw portion 40 is the Z direction
  • the link connecting portion 80 side when viewed from the male screw portion 40 is the Z1 side (upper side)
  • the male screw portion 40 side when viewed from the opposite link connecting portion 80 is the Z2 side (lower side).
  • FIG. 1 is a perspective view showing the configuration of the hanging metal fitting 10.
  • FIG. 2 is a side view showing the configuration of the hanging metal fitting 10.
  • FIG. 3 is an exploded perspective view showing the configuration of the rotating metal fitting 20.
  • FIG. 4 is a cross-sectional view showing the configuration of the rotating metal fitting 20.
  • the hanging metal fitting 10 has a rotating metal fitting 20 and a link 120.
  • the rotary fitting 20 has an anchor fitting 30, a rotary connecting member 60, a first bearing 100, and a second bearing 110.
  • the anchor metal fitting 30 is a portion attached to a load (not shown), and in the present embodiment, the anchor metal fitting 30 is provided in a shape in which a recess is formed in the head of a hexagon bolt.
  • the anchor metal fitting 30 is provided with a male screw portion 40, a metal fitting connecting portion 50 which is a portion corresponding to the head of a hexagon bolt, and an anchor seat portion 45.
  • the male screw portion 40 is a shaft-shaped portion in which a screw is formed, and the male screw portion 40 is screwed into a female screw provided in a load mounting hole. As a result, the anchor fitting 30 is fixed to the load.
  • the anchor metal fitting 30 is provided with an anchor seat portion 45.
  • the male screw portion 40 and the anchor seat portion 45 correspond to the fixing portion.
  • the anchor seat portion 45 is a portion having a seat surface 45a that abuts on the loading surface of the load. Therefore, the anchor seat portion 45 is provided on the upper end side (Z1 side) of the male screw portion 40 and is integrated with the upper end side (Z1 side) thereof. Further, the anchor seat portion 45 is located on the lower side (Z2 side) of the metal fitting connecting portion 50 and is integrated with the metal fitting connecting portion 50. As shown in FIG.
  • the anchor seat portion 45 is provided in a circular ring shape around the male screw portion 40, but the male screw portion 40 is provided on the lower side (Z2 side) of the metal fitting connecting portion 50. It may be provided in a disk shape on the upper side (Z1 side) of the above.
  • the metal fitting connecting portion 50 is a portion connected to the rotary connecting member 60. As shown in FIG. 3, the metal fitting connecting portion 50 is provided with a concave connecting recess 51, and the rotating shaft portion 70 of the rotary connecting member 60 enters the connecting recess 51.
  • An outer peripheral portion 52 is provided on the outer peripheral side of the metal fitting connecting portion 50.
  • the outer peripheral portion 52 is provided in a shape (for example, a hexagonal shape) into which a tool such as a spanner can be fitted. Workability when screwing into and tightening the female thread is improved.
  • the metal fitting connecting portion 50 is provided with a charging hole 53 (see FIG. 3).
  • a plurality of bearing balls 101 (described later) constituting the first bearing 100 are inserted from the input hole 53.
  • the input hole 53 is a screw hole, and a screw 130 with a hexagonal hole for sealing (hereinafter, simply referred to as a screw 130) is screwed into the input hole 53. As a result, the bearing ball 101 is prevented from falling off.
  • an external concave groove 54 and an external step portion 55 are provided on the inner wall side of the connecting recess 51.
  • the circumscribed concave groove 54 and the circumscribed step portion 55 will be described later.
  • FIG. 5 is an enlarged partial cross-sectional view showing the first bearing 100, the second bearing 110, and the lower support portion 81 facing the metal fitting connecting portion 50.
  • a convex portion 56 protruding upward (Z1 side) from the circumscribed step portion 55 is formed around the opening of the connecting recess 51. It is provided.
  • the convex portion 56 is provided with a top portion 56a, and the top portion 56a is a portion located on the uppermost side (Z1 side) in the vicinity of the connecting recess 51 with respect to the outer peripheral side of the metal fitting connecting portion 50. ing.
  • the height dimension H1 from the top portion 56a to the circumscribed step portion 55 is provided to be larger than the diameter of the bearing ball 111 described later. Therefore, it has a structure that protects the bearing ball from the intrusion of foreign matter from the outside and holds the lubricant.
  • the convex portion 56 penetrates into the annular recess 81b, which will be described later, to form a labyrinth structure. As a result, the prevention of foreign matter from entering the second bearing 110 and the retention of the lubricant are further improved.
  • the rotary connecting member 60 is provided with a rotary shaft portion 70 and a link connecting portion 80.
  • the rotating shaft portion 70 is a shaft-shaped portion that is inserted into the connecting recess 51 of the anchor fitting 30.
  • a radial facing portion RA1 in which the outer peripheral surface 70a of the rotating shaft portion 70 and the inner wall surface 51a of the connecting recess 51 face each other in the radial direction is formed.
  • the lower surface 81a of the lower support portion 81 and the upper surface 50a around the connecting recess 51 of the metal fitting connecting portion 50 face each other, whereby the thrust facing portion TH1 is formed.
  • the upper surface 50a corresponds to the first thrust surface
  • the lower surface 81a corresponds to the second thrust surface.
  • a plurality of bearing balls 101 constituting the first bearing 100 and a plurality of bearing balls 111 constituting the second bearing 110 are arranged between the rotating shaft portion 70 and the connecting recess 51.
  • the rotary connecting member 60 is rotatable about the axis of the rotary shaft portion 70 with respect to the anchor metal fitting 30.
  • the rotary shaft portion 70 is provided with an inscribed concave groove 71 and an inscribed step portion 72, and these inscribed concave grooves 71 and the inscribed step portion 72 will be described later.
  • the link connecting portion 80 is a portion located on the side (Z1 side) away from the anchor metal fitting 30 from the rotating shaft portion 70 in the rotation axis direction (Z direction) of the link connecting portion 80.
  • the link connecting portion 80 has a lower support portion 81, an upper ring portion 82, an inclined shoulder portion 83, a link receiving portion 84, and a link hole 85.
  • the lower support portion 81 is a portion of the rotary connecting member 60 located on the anchor metal fitting 30 side, and is provided in a substantially disk shape.
  • the inclined shoulder portion 83 and the link hole 85 which will be described later, are formed in the portion of the lower support portion 81 opposite to the anchor metal fitting 30 by cutting out a part of the columnar shape. There is. A portion cut out in a substantially cylindrical shape from the upper side (Z1 side) to the lower side (Z2 side) of the lower support portion 81 is a part of the link hole 85.
  • annular recess 81b is provided on the lower surface 81a side of the lower support portion 81.
  • the annular recess 81b is a portion that is adjacent to the outer diameter side of the inscribed step portion 72 and is recessed toward the upper side (Z1 side), and is a portion into which the convex portion 56 is inserted.
  • the convex portion 56 and the annular concave portion 81b form a labyrinth structure to prevent foreign matter such as dust from entering the second bearing 110 side. Further, it prevents the lubricant of the bearing portion such as the second bearing 110 and the first bearing 100 from leaking out.
  • the annular recess 81b corresponds to the facing recess.
  • an upper ring portion 82 is provided on the upper surface side (the surface side on the Z1 side) of the lower support portion 81.
  • the upper ring portion 82 one end side and the other end side of a substantially U-shape are connected to the lower support portion 81, so that a link hole 85 surrounded by the lower support portion 81 and the upper ring portion 82 is formed.
  • the link hole 85 When the link hole 85 is viewed from the front, its shape is circular.
  • the frontal shape of the link hole 85 is not limited to the circular shape, and may be provided in an elliptical shape or an oval shape.
  • the inclined shoulder portion 83 is provided near the boundary between the lower support portion 81 and the upper ring portion 82, and is inclined with respect to the ZY plane parallel to both the Z direction and the Y direction.
  • the shape of the rotary connecting member 60 when viewed in a plan view is symmetrical in the X direction and the Y direction. Therefore, since there are a total of four boundaries between the lower support portion 81 and the upper ring portion 82, there are also a total of four inclined shoulder portions 83.
  • a link receiving portion 84 is provided on the lower side (Z2 side) of the inclined shoulder portion 83.
  • the link receiving portion 84 comes into contact with the link 120, and the link 120 is on the male screw portion 40 side (lower side; Z2). It is a part that regulates rotation toward the side).
  • the bearing ball 101 corresponds to the first bearing ball.
  • a plurality of bearing balls 101 are inserted into the above-mentioned external concave groove 54 and internal concave groove 71, and the bearing ball 101 is in a state of being movable inside them. Further, the bearing balls 101 are densely arranged in the circumscribed concave groove 54 and the inner concave groove 71 so that no gap is formed between the bearing balls 101.
  • the first bearing 100 has a groove deeper than that of a configuration similar to a radial bearing, and has a structure capable of receiving a large thrust load as well as a radial load.
  • the circumscribed step portion 55 constituting the second bearing 110 is provided in the opening portion of the connecting recess 51 where the rotating shaft portion 70 is inserted. That is, the above-mentioned circumscribed step portion 55 is provided at the boundary portion B1 between the radial facing portion RA1 and the thrust facing portion TH1. Since the circumscribed step portion 55 is provided in the opening portion of the connecting recess 51, the inner diameter of the opening portion is provided to be larger than the inner diameter of the other portion of the connecting recess 51.
  • the circumscribed step portion 55 has an R-shaped portion, and a plurality of bearing balls 111 constituting the second bearing 110 can be brought into contact with the R-shaped portion. That is, a plurality of bearing balls 111 roll along the R-shaped portion of the endless circumscribed step portion 55.
  • the circumscribed step portion 55 is located at the opening portion in the connecting recess 51, so that the circumscribed step portion 55 is separated from the above-mentioned circumscribed concave groove 54 by a certain distance in the vertical direction (Z direction). ..
  • the radius of curvature of the arcuate portion of the circumscribed step portion 55 is equal to the radius of the bearing ball 111, which will be described later, or slightly larger than the radius of the bearing ball 111.
  • the inscribed step portion 72 constituting the second bearing 110 is an R-shaped portion provided at a portion facing the circumscribed step portion 55 at the base portion on the upper end side of the rotating shaft portion 70, and is the second bearing.
  • a plurality of bearing balls 111 constituting the 110 roll.
  • the radius of curvature of the R-shaped portion of the inscribed step portion 72 is equal to the radius of the bearing ball 111, which will be described later, or slightly larger than the radius of the bearing ball 111.
  • the diameter of the bearing ball 111 is provided to be smaller than the diameter of the bearing ball 101. As a result, it is possible to increase the dimension (thickness) from the circumscribed step portion 55 to the outer peripheral surface of the metal fitting connecting portion 50. As a result, it is possible to reduce the size of the hanging metal fitting 10. On the other hand, if the diameter of the bearing ball 111 is made too small, the bearing ball 111 will be worn and then pop out to the outside.
  • FIG. 6 is a partial cross-sectional view showing an enlarged view of the first bearing 100, the second bearing 110, and the lower support portion 81 facing the metal fitting connecting portion 50 according to the modified example of FIG.
  • the reason why the position where the innermost inner diameter side of the bearing ball 111 is in contact with the rotating shaft portion 70 is between the tangent line A and the tangent line B is as follows. That is, the hanging metal fitting 10 has various capacities (rated loads), and in order to use the off-the-shelf bearing ball 111 for the hanging metal fitting 10 having such a capacity, a range that can be finely adjusted. is required.
  • the bearing balls 111 are arranged so as to be in contact with the lower surface 81a of the rotary shaft portion 70 and the rotary connecting member 60 (the lower surface 81a on the center side in the radial direction from the annular recess 81b), the bearing balls 111 are arranged as much as possible. It is preferable that the bearing ball 111 is located in the range between the tangent line A and the tangent line B so that the gap between the two is not opened.
  • the bearing ball 111 having a smaller diameter than the bearing ball 101 can be made smaller. It is possible to reduce the size of the hanging metal fitting 10 and increase the number of contacts of the bearing ball 111 when the hanging metal fitting 10 is pulled horizontally. As a result, when the hanging metal fitting 10 is pulled horizontally, the contact points of the bearing ball 111 can be supported over the widest possible range so that the rotary connecting member 60 does not fall against the anchor metal fitting 30. It becomes.
  • the link 120 has an endless length by inserting a round steel bar (steel wire) having a predetermined length into the link hole 85 described above, bending the link 120 into an annular shape, and joining both ends (not shown) by welding or the like. It has a circular shape and is connected to the rotary connecting member 60.
  • the screw 130 is a screw that is screwed into the input hole 53, and for example, a hexagon socket head screw (screw screw) is suitable.
  • FIG. 7 is a perspective view showing a state in which the ring set 200 is mounted between the anchor metal fitting 30 and the rotary connecting member 60.
  • FIG. 8 is a cross-sectional view showing a state in which the ring set 200 is mounted between the anchor metal fitting 30 and the rotary connecting member 60.
  • the ring set 200 shown in FIGS. 7 and 8 is composed of a pair of half-split rings 210.
  • each half-split ring 210 When each half-split ring 210 is viewed in a plan view, its shape is provided in a semicircular shape. However, when the end faces (reference numerals omitted) located on the end side in the circumferential direction of the pair of half-split rings 210 are butted against each other, a gap S1 is formed between the pair of half-split rings 210.
  • the circumferential length L1 of the gap S1 is provided to be larger than the diameter of the bearing ball 111. As a result, the bearing ball 111 can be inserted from the gap S1 toward the gap formed by the circumscribed step portion 55 and the inscribed step portion 72.
  • the half-split ring 210 When the half-split ring 210 having such a configuration is locked to the upper corner portion 50b of the metal fitting connecting portion 50, the half-split ring 210 is formed between the upper corner portion 50b and the convex portion 56 of the metal fitting connecting portion 50. It is sandwiched between the upper surface 50a located and the lower surface 81a of the lower support portion 81.
  • the thickness dimension (dimension in the Z direction) of the sandwiching portion 213 is provided to be larger than the diameter of the bearing ball 111. Therefore, the bearing ball 111 can be inserted from the gap S1 described above to supply the bearing ball 111 to the gap between the circumscribed step portion 55 and the inscribed step portion 72. Therefore, the bearing balls 111 are sequentially supplied from the gap S1 toward the gap between the circumscribed step portion 55 and the inscribed step portion 72 (corresponding to the front ball arranging step).
  • the rotary connecting member 60 When supplying the bearing balls 111, the rotary connecting member 60 is rotated with respect to the anchor metal fitting 30, so that the plurality of bearing balls 111 can be connected to the circumscribed step portion 55 and the inscribed step portion 72. It can be supplied while moving in the ring-shaped gap between them. Further, the half split ring 210 may be locked to the upper corner portion 50b prior to inserting the rotary shaft portion 70 into the connecting recess 51. Further, when supplying the bearing ball 111 to the ring-shaped gap between the circumscribed step portion 55 and the inscribed step portion 72, it is preferable to appropriately supply a lubricant.
  • the half-split ring 210 is removed from between the upper surface 50a and the lower surface 81a (corresponding to the jig removal process).
  • the rotary shaft portion 70 is inserted to the inner side of the connecting recess 51, and the bearing ball 111 is sandwiched between the circumscribed step portion 55 and the inscribed step portion 72.
  • the screw 130 is screwed into the charging hole 53 to seal the charging hole 53 (corresponding to the sealing process). As described above, the assembly of the hanging metal fitting 10 is completed.
  • the rotary metal fitting 20 is a rotary connection between the anchor metal fitting 30 fixed to the load mounting surface and the anchor metal fitting 30 pivotally supported by a rotation axis perpendicular to the load mounting surface.
  • the rotary connecting member 60 is provided with a rotary shaft portion 70 projecting toward the anchor metal fitting 30, and the anchor metal fitting 30 has a male screw portion 40 and an anchor seat portion 45 (fixed portion) attached to a load. And a metal fitting connecting portion 50 integrated with the male screw portion 40 and the anchor seat portion 45 (fixing portion), and the metal fitting connecting portion 50 is provided with a connecting recess 51 through which the rotating shaft portion 70 is inserted. Has been done.
  • the first bearing 100 has an external concave groove 54 recessed from the inner wall surface 51a of the connecting recess 51, and an internal concave groove 71 recessed from the outer peripheral surface of the rotating shaft portion 70 and facing the external concave groove 54.
  • a plurality of bearing balls 101 (first bearing balls) inserted into the endless passage formed by the inscribed concave groove 71 and the circumscribed concave groove 54 are provided.
  • the second bearing 110 is provided at the opening portion of the connecting recess 51 into which the rotary shaft portion 70 is inserted, and at the circumscribed step portion 55 recessed from the inner diameter side to the outer diameter side and at the base portion of the rotary shaft portion 70.
  • a plurality of bearing balls 111 (second bearings) provided and inserted into the endless passage formed by the inscribed step portion 72 facing the circumscribed step portion 55 and the circumscribed step portion 55 and the inscribed step portion 72. The ball) and.
  • the first bearing 100 composed of the circumscribed concave groove 54, the inscribed concave groove 71, and the bearing ball 101 (first bearing ball) is arranged on the inner side of the connecting recess 51. .. Further, in the opening portion of the connecting recess 51, a second bearing 110 composed of an outer tangent step portion 55, an inner tangent step portion 72, and a bearing ball 111 (second bearing ball) is arranged. Therefore, the two rows of bearings are arranged between the anchor fitting 30 and the rotary connecting member 60.
  • the second bearing 110 can be configured to be similar to an angular bearing by not only being provided in the portion but also being recessed from the inner diameter side to the outer diameter side.
  • a concave groove for inserting a bearing ball is required, and the inner diameter side sandwiches the concave groove.
  • a bank is required to prevent the movement of the bearing ball. Therefore, since two embankments, one on the outer diameter side and the other on the inner diameter side, are required, the dimension in the radial direction becomes larger by that amount.
  • the circumscribed step portion 55 is not only provided in the opening portion of the connecting recess 51 but also recessed from the inner diameter side to the outer diameter side. The embankment for blocking the movement exists only on the outer diameter side. Therefore, it is possible to reduce the diameter of the second bearing 110.
  • the link 120 when the link 120 is tilted (the length of the link 120 shown in FIG. 1 is along the Y direction) and a load (lateral load) is applied in the Y direction (lateral direction), the above angular bearing is subjected to the load (lateral load).
  • a second bearing 110 having a similar configuration can receive a lateral load.
  • the bearing ball 111 is pressed against the bearing ball 111 along the axial direction (Z direction) or the direction in which the bearing ball 111 is inclined in the radial direction, which is a direction intersecting the radial direction. Therefore, as shown in FIG. 5 of Patent Document 1, the load can be received on the outer diameter side of the bearing ball 111 rather than on the inner diameter side.
  • the hanging metal fitting 10 can be downsized.
  • the fixing portion provided with the male screw portion 40 has an anchor seat portion 45 having a seat surface 45a that is in close contact with the mounting surface of the load.
  • the seat surface 45a of the anchor seat portion 45 comes into contact with the mounting surface of the load, so that the hanging metal fitting 10 can be satisfactorily attached to the load.
  • a convex portion 56 protruding from the upper surface 50a (thrust surface) toward the rotary connecting member 60 is projected around the opening portion of the connecting recess 51 in the metal fitting connecting portion 50.
  • the protrusion height in the axial direction (Z direction) from the bottom of the circumscribed step portion 55 to the top portion 56a of the convex portion 56 is provided to be larger than the diameter of the bearing ball 111 (second bearing ball).
  • the bearing ball 111 (second bearing ball) pops out to the outside even if the backlash due to wear increases between the anchor metal fitting 30 and the rotary connecting member 60. It is possible to prevent it from being stored by the convex portion 56.
  • the convex portion 56 enters the annular recess 81b (opposing recess) to form a labyrinth structure, so that dust enters from the outside toward the facing portion between the circumscribed step portion 55 and the inscribed step portion 72. It becomes difficult. Therefore, it is possible to prevent deterioration of bearing performance due to intrusion of dust for a long period of time.
  • a plurality of bearing balls 111 are inserted into the gaps formed in the jig arrangement process, and the plurality of bearing balls 111 (second bearing balls) are externally connected.
  • the half-split ring 210 is removed from the above-mentioned facing portion and the rotating shaft portion 70 is inserted to the back side of the connecting recess 51.
  • a jig removing step is executed in which both the outer contact step portion 55 and the inner contact step portion 72 are in contact with the bearing ball 111 (second bearing ball).
  • the half-split ring 210 (jig) is arranged at the facing portion where the anchor metal fitting 30 and the rotary connecting member 60 face each other in the direction orthogonal to the axial direction (Z direction).
  • the work of inserting the bearing balls 111 becomes easy.
  • a plurality of bearing balls 101 (first bearing balls) are inserted from the input hole 53 and supplied to the facing portion of the external concave groove 54 and the internal concave groove 71, thereby supplying the bearing ball 101.
  • the work of inserting the (first bearing ball) becomes easy. Therefore, it is possible to improve productivity.
  • the hanging metal fitting 10 includes a rotating metal fitting 20 and a link 120.
  • the hanging metal fitting may be composed of only the rotating metal fitting 20.
  • the metal fitting connecting portion 50 of the anchor metal fitting 30 is provided with the connecting recess 51
  • the rotary connecting member 60 is provided with the rotating shaft portion 70
  • the rotating shaft portion 70 is the connecting recess 51. It is inserted in.
  • the anchor fitting 30 may be provided with a portion corresponding to the rotary shaft portion 70
  • the rotary connecting member 60 may be provided with a portion corresponding to the connecting recess.
  • the number of bearing portions is not limited to two, and a configuration in which three or more bearing portions are provided may be adopted.
  • the distance to the outside in the radial direction of 111 (second bearing ball) is not particularly described.
  • the distance to the outside of the bearing ball 101 (first bearing ball) in the radial direction may be smaller than the distance to the outside in the radial direction of the bearing ball 111 (second bearing ball), but the bearing ball 101 It is preferable that the distance to the outside of the (first bearing ball) in the radial direction is equal to or greater than the distance to the outside in the radial direction of the bearing ball 111 (second bearing ball).
  • the anchor seat portion 45 has a distance to the rotation axis portion smaller than that of the outer peripheral portion 52, or a distance to the rotation axis portion 52 is provided to be the same as that of the outer peripheral portion 52.
  • the anchor seat portion 45 may be provided with a distance to the rotation axis center larger than that of the outer peripheral portion 52.
  • the shape of the anchor seat 45 is not limited to a circular ring shape (disk shape), and may be a polygonal shape such as a triangle or a quadrangle, an oval shape, or any other appropriate shape. It is possible.
  • a mounting hole is provided in the flange-shaped portion of the anchor seat portion 45 protruding from the outer peripheral portion 52. It may be formed and a separate mounting hole may be formed in the mounting hole.
  • the hanging metal fitting 10 can be attached to the load by inserting a separate mounting bolt (corresponding to a fastening member) into the mounting hole and screwing it into the screw hole or the like of the load.
  • the seat surface 45a of the anchor seat portion 45 can be in contact with the mounting surface of the load in a relatively wide area. Therefore, when the strength of the load mounting surface is weaker than that of the metal hanging metal fitting 10, it is possible to prevent the load mounting surface from being damaged.
  • the male screw portion 40 having the thread formed on the shaft-shaped member omits the thread and is simply a shaft. It may be used as a shaped member. In this case, the shaft-shaped member having no thread formed corresponds to a part of the fixing portion.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Rolling Contact Bearings (AREA)
  • Pivots And Pivotal Connections (AREA)
  • Mounting Of Bearings Or Others (AREA)

Abstract

2列以上のベアリングを配置しながらも寸法が大型化するのを防止することが可能な吊り金具および吊り金具の製造方法を提供する。 吊り金具(10)は、回転金具(20)は、アンカー金具(30)と、アンカー金具(30)に対して回転自在に支持される回転連結部材(60)と、アンカー金具(30)と回転連結部材(60)の間に配置される第1軸受(100)と、アンカー金具(30)と回転連結部材(60)の間に配置される第2軸受(110)と、を備える。また、第1軸受(100)は、連結凹部(51)の内壁面(51a)から凹む外接凹溝(54)と、回転軸部(70)の外周面から凹む内接凹溝(71)と、複数のベアリングボール(101)とを備える。また、第2軸受(110)は、連結凹部(51)の開口部分に設けられる外接段部(55)と、回転軸部(70)の付け根部分に設けられる内接段部(72)と、複数の第2ベアリングボール(111)とを備える。

Description

吊り金具および吊り金具の製造方法
 本発明は、吊り金具および吊り金具の製造方法に関する。
 荷を吊り上げるための吊り金具の中には、リフティングポイントと呼ばれるものがある。この吊り金具は、環状のリンクと、リンクの連結部分が回転可能な回転連結部材と、回転連結部材を回転自在に支持するアンカー金具とを有している。また、アンカー金具には、雄ネジ部が設けられていて、この雄ネジ部が荷の取り付け穴の雌ネジ部に捻じ込まれる。すなわち、荷の中には、たとえば建築部材や金型等のように雌ネジ部が設けられているものがあり、そのような荷の雌ネジ部に、上記の雄ネジ部を捻じ込んで固定し、リンク部材にフック等を掛ける。それにより、荷を持ち上げて移動させることが可能となっている。
 ところで、アンカー金具と回転連結部材の間に配置されるベアリングが1列のみの場合には、回転軸と垂直な方向(横方向)に荷重がかかった場合に、回転連結部材がアンカー金具に対して倒れることで、両者が直接摺動してしまう。このような直接の摺動を防ぐために、アンカー金具と回転連結部材の間にブッシュが配置されるものがある。しかしながら、このブッシュは滑り軸受として機能するので、アンカー金具と回転連結部材の間の回転性能が悪化してしまう。
 そこで、上記のような回転性能の悪化を防ぐために、2列のベアリングを有する吊り金具が特許文献1に開示されている。特許文献1の図5には、2列のベアリング(16,17)が、取付け部材(20)のガイドピン(24)の外周側と固定部材(21)の凹部(25)の内周側との間に配置されている構成が開示されている。
 また、特許文献1の図1には、上側のベアリング(16)が固定部材(13)のガイドピン(12)の外周側と取付け部材(1)の凹部の内周側との間に配置されている。これと共に、下側のベアリング(17)が固定部材(13)のフランジ状の部分と、取付け部材(1)の下端面との間に配置されている構成が開示されている。
 また、特許文献1の図8には、上側のベアリング(17)が連結部材(29)の上端面と、取付け部材(20)の段状の部分との間に配置されている。これと共に、下側のベアリング(16)が取付け部材(20)のガイドピン(24)の外周側と連結部材(29)の凹部(28)の内周側との間に配置されている構成が開示されている。
特表2005-513388号公報(図1、図5および図8参照)
 ところで、特許文献1の図5に開示の構成においては、回転軸に垂直な方向(横方向)に荷重がかかった場合、ガイドピン(24)のうち、2列のベアリング(16,17)の接触部位の内側(内径が小さくなっている部分)で上記の荷重を受け止める状態となる。この場合、大きな荷重に抗するためには、ガイドピン(24)の直径を大きくする必要がある。しかしながら、ガイドピン(24)の直径を大きくすると、その分だけ、吊り金具の大型化を招いてしまう。
 また、特許文献1の図1に開示の構成においては、回転軸に垂直な方向(横方向)に荷重がかかった場合、下側のベアリング(17)が配置されている固定部材(13)のフランジ状の部分において、荷重を受け止めることができる。それにより、固定部材(13)のガイドピン(12)のうち、ベアリング(16)の接触部位の内側(内径が小さくなっている部分)の寸法を小さくすることが可能となっている。しかしながら、この構成では、下側のベアリング(17)を配置するために、固定部材(13)のフランジ状の部分と、取付け部材(1)の下端面の双方に凹状の溝を形成する必要がある。しかしながら、上記の溝を形成する場合、その分だけスペースが必要となり、その結果、固定部材(13)と取付け部材(1)の直径を大きくする必要があるので、吊り金具の大型化を招いてしまう。
 なお、特許文献1の図8に開示の構成においても、特許文献1の図1に開示の構成と同様な問題が生じる。すなわち、軸方向に垂直な方向(横方向)の荷重を受ける部位である上側のベアリング(17)を配置するために、連結部材(29)の上端面と、取付け部材(20)の段状の部分の双方に、双方に凹状の溝を形成する必要がある。しかしながら、上記の溝を形成する場合、その分だけスペースが必要となり、その結果、連結部材(29)と取付け部材(20)の直径を大きくする必要があるので、吊り金具の大型化を招いてしまう。
 本発明は上記の事情に鑑みなされたもので、2列以上のベアリングを配置しながらも寸法が大型化するのを防止することが可能であり、最適なベアリング構造を有する吊り金具および吊り金具の製造方法を提供することを目的とする。
 上記課題を解決するために、本発明の第1の観点によると、荷に取り付けられると共に、吊り上げ手段が連結される回転金具を備える吊り金具であって、回転金具は、荷の取り付け面に固定されるアンカー金具と、アンカー金具に荷の取り付け面に垂直な回転軸で軸支される回転連結部材と、アンカー金具に対して回転連結部材を回転自在に支持する第1軸受と、アンカー金具に対して回転連結部材を回転自在に支持すると共に、第1軸受に対して回転軸の軸方向に離間している第2軸受と、を備え、回転連結部材には、アンカー金具に向かって突出する回転軸部が設けられていて、アンカー金具には、荷に取り付けられる固定部と、固定部と一体化された金具連結部とが設けられていて、金具連結部には、回転軸部を挿通する連結凹部が設けられていて、第1軸受は、連結凹部の内壁面から凹んでいる外接凹溝と、回転軸部の外周面から凹むと共に、外接凹溝と対向する内接凹溝と、内接凹溝と外接凹溝で形成される無端の通路に挿入される複数の第1ベアリングボールと、を備えていて、第2軸受は、回転軸部が挿入される連結凹部の開口部分に設けられていると共に内径側から外径側に凹む外接段部と、回転軸部の付け根部分に設けられていると共に、外接段部と対向する内接段部と、外接段部と内接段部で形成される無端の通路に挿入される複数の第2ベアリングボールと、を備えている、ことを特徴とする吊り金具が提供される。
 また、本発明の他の側面は、上述の発明において、固定部は、荷の取り付け面に密着する座面を有するアンカー座部を有している、ことが好ましい。
 また、本発明の他の側面は、上述の発明において、第2ベアリングボールの直径は、第1ベアリングボールの直径よりも小さく設けられている、ことが好ましい。
 また、本発明の他の側面は、上述の発明において、金具連結部のうち連結凹部の開口部分の周囲には、回転連結部材に向かって突出する凸状部が突出していて、外接段部の底部から凸状部の頂部までの軸方向における突出高さは、第2ベアリングボールの直径よりも大きく設けられている、ことが好ましい。
 また、本発明の他の側面は、上述の発明において、回転連結部材には、第1スラスト面と対向する第2スラスト面から凹んでいる対向凹部が設けられていて、対向凹部には、凸状部が入り込むことで、ラビリンス構造が形成されている、ことが好ましい。
 また、上記課題を解決するために、本発明の第2の観点によると、荷に取り付けられると共に、吊り上げ手段が連結される回転金具を備える吊り金具の製造方法であって、回転金具は、荷の取り付け面に固定されるアンカー金具と、アンカー金具に荷の取り付け面に垂直な回転軸で軸支される回転連結部材と、アンカー金具に対して回転連結部材を回転自在に支持する第1軸受と、アンカー金具に対して回転連結部材を回転自在に支持すると共に、第1軸受に対して回転軸の軸方向に離間している第2軸受と、を備え、回転連結部材には、アンカー金具に向かって突出する回転軸部が設けられていて、アンカー金具には、荷に取り付けられる固定部と、固定部と一体化された金具連結部とが設けられていて、金具連結部には、回転軸部を挿通する連結凹部が設けられていて、第1軸受は、連結凹部の内壁面から凹んでいる外接凹溝と、回転軸部の外周面から凹むと共に、外接凹溝と対向する内接凹溝と、内接凹溝と外接凹溝で形成される無端の通路に挿入される複数の第1ベアリングボールと、を備えていて、第2軸受は、回転軸部が挿入される連結凹部の開口部分に設けられていると共に内径側から外径側に凹む外接段部と、回転軸部の付け根部分に設けられていると共に、外接段部と対向する内接段部と、外接段部と内接段部で形成される無端の通路に挿入される複数の第2ベアリングボールと、を備えると共に、回転軸部を連結凹部に所定深さだけ挿入する軸部挿入工程と、軸部挿入工程に前後して、アンカー金具と回転連結部材とが軸方向と直交する方向で対向している対向部位に治具を配置して、当該対向部位に、第2ベアリングボールが移動可能な隙間を形成する治具配置工程と、治具配置工程で形成された隙間に複数の第2ベアリングボールを挿入して、複数の第2ベアリングボールを外接段部に配置させる先ボール配置工程と、先ボール配置工程の後に、治具を対向部位から取り外して回転軸部を連結凹部の奥側まで挿入して、外接段部と内接段部の双方が第2ベアリングボールと当接する状態とする冶具取り外し工程と、冶具取り外し工程の後に、金具連結部の外周面から外接凹溝に至る投入孔から複数の第1ベアリングボールを挿入して、複数の第1ベアリングボールを外接凹溝と内接凹溝の双方に当接する状態とする後ボール配置工程と、後ボール配置工程の後に、投入孔を封止する封止工程と、を実行することを特徴とする吊り金具の製造方法が提供される。
 本発明によると、2列以上のベアリングを配置しながらも寸法が大型化するのを防止することが可能であり、最適なベアリング構造を有する吊り金具を提供することができる。
本発明の一実施の形態に係る吊り金具の構成を示す斜視図である 図1に示す吊り金具の側面図である。 図1に示す吊り金具の構成を示す分解斜視図である。 図1に示す吊り金具の回転金具の構成を示す断面図である。 図1に示す吊り金具のうち、金具連結部と対向する軸受および下支持部を拡大して示す部分的な断面図である。 図5の変形例に係る、金具連結部と対向する軸受および下支持部を拡大して示す部分的な断面図である。 図1に示す吊り金具を製造するために、アンカー金具と回転連結部材の間にリングセットを装着した状態を示す斜視図である。 図7に示すアンカー金具と回転連結部材の間にリングセットを装着した状態における断面図である。
 以下、本発明の一実施の形態に係る、吊り金具10について、図面に基づいて説明する。なお、本実施の形態では、リンク孔85の延伸方向をX方向とし、図1において右上側をX1側、それとは逆の図1における左下側をX2側とする。また、図1において略U字形状の上環部82の両端を結ぶ方向をY方向とし、図1において右下側をY1側、それとは逆の図1における左上側をY2側とする。また、雄ネジ部40の軸方向をZ方向とし、雄ネジ部40から見てリンク連結部80側をZ1側(上側)、それとは逆のリンク連結部80から見て雄ネジ部40側をZ2側(下側)とする。
<吊り金具の構成について>
 図1は、吊り金具10の構成を示す斜視図である。図2は、吊り金具10の構成を示す側面図である。図3は、回転金具20の構成を示す分解斜視図である。図4は、回転金具20の構成を示す断面図である。図1から図4に示すように、吊り金具10は、回転金具20と、リンク120とを有している。これらのうち、回転金具20は、アンカー金具30と、回転連結部材60と、第1軸受100と、第2軸受110とを有している。
 アンカー金具30は、不図示の荷に取り付けられる部分であり、本実施の形態では、アンカー金具30は、概ね六角ボルトの頭部に凹みを形成した形状に設けられている。このアンカー金具30には、雄ネジ部40と、六角ボルトの頭部に相当する部分である金具連結部50と、アンカー座部45とが設けられている。雄ネジ部40は、ネジが形成されている軸状の部分であり、その雄ネジ部40が荷の取り付け穴に設けられた雌ネジに捻じ込まれる。それにより、アンカー金具30が荷に固定される。
 また、アンカー金具30には、アンカー座部45が設けられている。なお、雄ネジ部40とアンカー座部45とは、固定部に対応する。アンカー座部45は、荷の取り付け面と当接する座面45aを有する部位である。そのため、アンカー座部45は、雄ネジ部40の上端側(Z1側)に設けられると共に、その上端側(Z1側)と一体化されている。また、アンカー座部45は、金具連結部50の下方側(Z2側)に位置し、その金具連結部50と一体化されている。なお、たとえば図4に示すように、アンカー座部45は、雄ネジ部40の周囲に円形のリング状に設けられているが、金具連結部50の下側(Z2側)で雄ネジ部40の上側(Z1側)に円盤状に設けられているとしても良い。
 また、金具連結部50は、回転連結部材60と連結される部分である。図3に示すように、金具連結部50には、凹状の連結凹部51が設けられていて、この連結凹部51に回転連結部材60の回転軸部70が入り込む。なお、金具連結部50の外周側には外周部52が設けられている。外周部52は、スパナ等の工具が嵌合可能な形状(たとえば六角形状)に設けられていて、この外周部52に工具の作用部を嵌合させることで、雄ネジ部40を、荷の雌ネジ部に捻じ込み締め付ける際の作業性が向上する。
 また、金具連結部50には、投入孔53が設けられている(図3参照)。この投入孔53からは、第1軸受100を構成する複数のベアリングボール101(後述)が挿入される。また、投入孔53は、ネジ孔であり、この投入孔53には封止用の六角穴付きネジ130(以下、単にネジ130と称呼する)が捻じ込まれる。それにより、ベアリングボール101の脱落が防止される。
 また、連結凹部51の内壁側には、外接凹溝54と、外接段部55とが設けられている。なお、これら外接凹溝54と外接段部55については、後述する。
 図5は、金具連結部50と対向する第1軸受100、第2軸受110および下支持部81を拡大して示す部分的な断面図である。図4および図5に示すように、金具連結部50のうち、連結凹部51の開口部付近の周囲には、外接段部55よりも上方側(Z1側)に突出している凸状部56が設けられている。この凸状部56には、頂部56aが設けられていて、その頂部56aは、金具連結部50の外周側よりも連結凹部51の近傍において、最も上方側(Z1側)に位置する部分となっている。また、頂部56aから外接段部55までの高さ寸法H1は、後述するベアリングボール111の直径よりも大きく設けられている。そのため、外部からの異物侵入からベアリングボールを保護するとともに、潤滑剤を保持する構造となっている。
 なお、凸状部56は、後述する環状凹部81bに入り込んでラビリンス構造を形成している。それにより、第2軸受110への異物侵入防止及び潤滑剤の保持を一層良好なものとしている。
 図1から図4に示すように、回転連結部材60には、回転軸部70と、リンク連結部80とが設けられている。回転軸部70は、アンカー金具30の連結凹部51に差し込まれる軸状の部分である。この回転軸部70が連結凹部51に差し込まれることにより、回転軸部70の外周面70aと連結凹部51の内壁面51aとが径方向において対向するラジアル対向部分RA1が形成される。また、下支持部81の下面81aと金具連結部50の連結凹部51の周囲の上面50aとが対向することで、スラスト対向部分TH1が形成される。なお、上面50aは第1スラスト面に対応し、下面81aは第2スラスト面に対応する。
 この回転軸部70と連結凹部51の間には、第1軸受100を構成する複数のベアリングボール101と、第2軸受110を構成する複数のベアリングボール111とが配置される。それにより、回転連結部材60がアンカー金具30に対して回転軸部70の軸心を中心に回転自在となっている。
 なお、回転軸部70には、内接凹溝71と、内接段部72とが設けられているが、これら内接凹溝71と内接段部72については、後述する。
 また、リンク連結部80は、リンク連結部80の回転軸方向(Z方向)において、回転軸部70よりもアンカー金具30から離れる側(Z1側)に位置している部分である。このリンク連結部80は、下支持部81と、上環部82と、傾斜肩部83と、リンク受け部84と、リンク孔85とを有している。
 下支持部81は、回転連結部材60のうちアンカー金具30側に位置している部分であり、略円板状に設けられている。本実施の形態では、下支持部81のアンカー金具30と反対側の部位には、円柱状の一部を切り欠くことで、後述する傾斜肩部83およびリンク孔85が形成されているしている。なお、下支持部81の上側(Z1側)から下側(Z2側)に向かうように、略円筒状に切り欠いた部分は、リンク孔85の一部となっている。
 また、下支持部81の下面81a側には、環状凹部81bが設けられている。環状凹部81bは、内接段部72の外径側に隣接して上側(Z1側)に向かって凹む部分であり、上記の凸状部56が入り込む部分である。なお、上述したように、凸状部56と環状凹部81bとによって、ラビリンス構造が形成され、塵埃などの異物が第2軸受110側に入り込むのを防止している。また、第2軸受110や第1軸受100といった軸受部の潤滑剤が漏れ出るのを防止している。なお、環状凹部81bは、対向凹部に対応する。
 また、下支持部81の上面側(Z1側の面側)には、上環部82が設けられている。上環部82は、略U字形状の一端側と他端側とが下支持部81に連結されることで、下支持部81および上環部82で囲まれるリンク孔85が形成されている。なお、リンク孔85を正面視した場合、その形状は円形状となっている。しかしながら、リンク孔85の正面形状は円形状には限られず、楕円形状や長円形状に設けられていても良い。
 また、傾斜肩部83は、下支持部81と上環部82の境界付近に設けられていて、Z方向とY方向の両方に平行なZY平面に対して傾斜している。本実施の形態では、回転連結部材60を平面視したときの形状は、X方向およびY方向において、対称となっている。このため、下支持部81と上環部82の境界は合計4箇所存在するので、傾斜肩部83も合計4箇所存在している。
 また、傾斜肩部83の下方側(Z2側)には、リンク受け部84が設けられている。リンク受け部84は、フリー状態のリンク120が、リンク孔85への挿通部位を支点として回動したときに、リンク120と当接して、当該リンク120が雄ネジ部40側(下側;Z2側)に向かうように回動するのを規制する部位である。
<第1軸受100および第2軸受110について>
 次に、第1軸受100および第2軸受110について説明する。図3および図4に示すように、第1軸受100は、金具連結部50に設けられている外接凹溝54と、回転軸部70に設けられている内接凹溝71と、複数のベアリングボール101とを備えている。また、第2軸受110は、金具連結部50に設けられている外接段部55と、回転軸部70に設けられている内接段部72と、複数のベアリングボール111とを備えている。
 外接凹溝54は、連結凹部51に面する内壁面51aを凹ませた溝状の部分であり、その内部に第1軸受100を構成する複数のベアリングボール101が転動可能に配置される。図4に示すように、外接凹溝54は、内壁面51aのうち、高さ方向の中途部分に設けられている。この外接凹溝54は、円弧状(図4では、概ね半円状)の凹部であり、その曲率半径は、後述するベアリングボール101の半径と等しいか、ベアリングボール101の半径よりも若干大きく設けられている。
 このような外接凹溝54に対し、内接凹溝71が対向配置されている。内接凹溝71は、回転軸部70のうち外接凹溝54と対向する外周面70aを凹ませた溝状の部分であり、その内部に複数のベアリングボール101が転動可能に配置される。この内接凹溝71も上記の外接凹溝54と同様に、円弧状(図4では、概ね半円状)の凹部であり、その曲率半径は、後述するベアリングボール101の半径と等しいか、ベアリングボール101の半径よりも若干大きく設けられている。
 なお、外接凹溝54と内接凹溝71は、内壁面51aと外周面70aとが対向しているラジアル対向部分RA1に形成されている。
 また、ベアリングボール101は、第1ベアリングボールに対応する。このベアリングボール101は、上述した外接凹溝54と内接凹溝71に複数個挿入されるが、ベアリングボール101は、それらの内部を移動可能な状態となっている。また、外接凹溝54と内接凹溝71には、ベアリングボール101の間に隙間が生じないよう、ベアリングボール101が密に配置されている。
 このような構成により、第1軸受100は、ラジアルベアリングに類する構成よりも深い溝を有し、ラジアル荷重とともに大きなスラスト荷重を受けられる構造となっている。
 また、第2軸受110を構成する外接段部55は、連結凹部51のうち、回転軸部70が挿入される部分の開口部分に設けられている。すなわち、ラジアル対向部分RA1とスラスト対向部分TH1の境界部分B1に、上記の外接段部55が設けられている。なお、外接段部55が連結凹部51の開口部分に設けられることで、その開口部分の内径は、連結凹部51の他の部分の内径よりも大径に設けられている。
 上記の外接段部55には、R形状の部分が存在しており、そのR形状の部分に、第2軸受110を構成する複数のベアリングボール111が当接可能となっている。すなわち、無端の外接段部55のR形状の部分に沿って、複数のベアリングボール111が転動する。このように、外接段部55が連結凹部51における開口部分に位置することで、当該外接段部55は、上述した外接凹溝54と上下方向(Z方向)において一定の距離だけ離間している。なお、外接段部55の円弧状の部分の曲率半径は、後述するベアリングボール111の半径と等しいか、ベアリングボール111の半径よりも若干大きく設けられている。
 また、第2軸受110を構成する内接段部72は、回転軸部70の上端側の付け根部分において外接段部55と対向する部位に設けられているR形状の部分であり、第2軸受110を構成する複数のベアリングボール111が転動する。この内接段部72のR形状の部分の曲率半径は、後述するベアリングボール111の半径と等しいか、ベアリングボール111の半径よりも若干大きく設けられている。
 また、ベアリングボール111は、第2ベアリングボールに対応する。このベアリングボール111は、上述した外接段部55と内接段部72の間に複数個挿入されるが、ベアリングボール111は、それらの内部を移動可能な状態となっている。また、外接段部55と内接段部72には、隣り合うベアリングボール111の間に隙間が生じないよう、ベアリングボール111が密に配置される。なお、図4に示すように、ベアリングボール111が、R形状の外接段部55と、同じくR形状の内接段部72の両者に当接するように配置されることで、ベアリングボール111に作用する荷重は、雄ネジ部40の軸線方向に対し、略45度傾斜する方向となっている。それにより、ベアリングボール111は、ラジアル荷重とスラスト荷重の両方の荷重を受け止めることが可能な、アンギュラベアリングに類する構成となっている。
 また、ベアリングボール111の直径は、ベアリングボール101の直径よりも小さく設けられている。それにより、金具連結部50のうち、外接段部55から外周面までの寸法(肉厚)を大きくすることが可能となる。それにより、吊り金具10の小型化を図ることが可能となっている。一方、ベアリングボール111の直径をあまりにも小さくすると、ベアリングボール111が摩耗した後に、外部に飛び出してしまう。
 以上のような、小型化と、ベアリングボール111の摩耗後に外部へのベアリングボール111の飛び出しを防止することを図るため、ベアリングボール101の直径とベアリングボール111の直径の比は、以下のように設定されることが好ましい。なお、以下では、ベアリングボール111の直径を直径D1とし、ベアリングボール101の直径を直径D2としている。
 直径D1:直径D2=1:1.2~1.8
 なお、上記の範囲内において、最も好適なのは、直径D1:直径D2=1:1.6程度のときである。
 また、ベアリングボール111の最も内径側が回転軸部70と接する位置は、図5に示す接線Aと、図6に示す接線Bの間に存在することが好ましい。図6は、図5の変形例に係る、金具連結部50と対向する第1軸受100、第2軸受110および下支持部81を拡大して示す部分的な断面図である。
 図5においては、回転軸部70の中心から外周面70aまでの距離と、回転軸部70の中心から接線Aまでの距離は、同等となっている。一方、図6においては、回転軸部70の中心から内壁面51aまでの距離と、回転軸部70から接線Bまでの距離は、同等となっている。したがって、ベアリングボール111の最も内径側が回転軸部70と接する位置は、外周面70aよりも外径側に突出している突出部としても良いが、その突出部は、内壁面51aよりも外径側に突出しない状態とすることが好ましい。
 上記のように、ベアリングボール111の最も内径側が回転軸部70と接する位置が、接線Aと接線Bの間に存在する理由は、次の通りである。すなわち、吊り金具10には、様々な容量(定格負荷)が存在しているが、そのような各容量の吊り金具10に、既製品のベアリングボール111を使用するためには、微調整できる範囲が必要である。そして、ベアリングボール111を、回転軸部70と回転連結部材60の下面81a(環状凹部81bよりも径方向の中央側の下面81a)に接するように配置した場合、可能な限り、ベアリングボール111同士の隙間が開かないようにするために、接線Aと接線Bの間の範囲にベアリングボール111が位置することが好ましい。
 たとえば、接線Aと接線Bの間の寸法よりも大きな寸法範囲に、ベアリングボール111の最も内径側が回転軸部70と接する位置が存在する場合、吊り金具10の水平引きで引っ張られる向きとは反対側に大きな隙間が形成され易くなり、その反対側にベアリングボール111が移動し易くなる。一方、接線Aと接線Bの間の寸法が小さくなると、上記のような既製品のベアリングボール111を使用するために微調整できる範囲が狭まる。したがって、上記のように、ベアリングボール111の最も内径側が回転軸部70と接する位置が、接線Aと接線Bの間に存在することが好ましい。
 また、接線Bの位置は、回転連結部材60とアンカー金具30(金具連結部50)がオーバーラップしないように設定されている。それにより、回転連結部材60とアンカー金具30(金具連結部50)の干渉を避けつつ、吊り金具10の重量が増加するのを回避している。
 なお、上記のような接線Aと接線Bの間に、ベアリングボール111の最も内径側が回転軸部70と接する位置が存在する場合、ベアリングボール101よりも小径のベアリングボール111を小さくすることで、吊り金具10の小型化を図ると共に、吊り金具10を水平引きした場合における、ベアリングボール111の接点を増やすことも可能となる。それにより、吊り金具10を水平引きした場合に、ベアリングボール111の接点をできる限り広い範囲に跨るようにすることで、回転連結部材60がアンカー金具30に対して倒れないように支えることが可能となる。
 また、リンク120は、所定長さの丸棒鋼(鋼線)を上述したリンク孔85に挿通すると共に、環状に曲げ加工し両端(図示せず)を溶接等で接合することで、無端の長円形状としたもので、回転連結部材60と連結されている。また、ネジ130は、投入孔53に捻じ込まれるネジであり、たとえば六角穴付きネジ(イモネジ)が好適である。
<吊り金具10の組み付け方法(製造方法)について>
 次に、吊り金具10の組み付け方法(製造方法)について説明する。吊り金具10の組み付けに際しては、先ず、連結凹部51に回転軸部70を挿入する(軸部挿入工程に対応)。そして、所定だけ挿入された後に、図7および図8に示すような、治具に対応するリングセット200を、アンカー金具30と回転連結部材60の間に装着する(治具配置工程に対応)。
 図7は、アンカー金具30と回転連結部材60の間にリングセット200を装着した状態を示す斜視図である。図8は、アンカー金具30と回転連結部材60の間にリングセット200を装着した状態を示す断面図である。
 図7および図8に示すリングセット200は、一対の半割リング210から構成されている。それぞれの半割リング210を平面視したときに、その形態は半円状に設けられている。しかしながら、一対の半割リング210の周方向における端部側に位置する端部面(符号省略)同士を突き合せたとき、一対の半割リング210の間には、隙間S1が形成される。この隙間S1の周方向長さL1は、ベアリングボール111の直径よりも大きく設けられている。それにより、この隙間S1からベアリングボール111を、外接段部55と内接段部72とで形成される隙間に向けて挿入可能となっている。
 また、半割リング210には係止段部212が設けられている。係止段部212は、半割リング210の内周側および下方側(Z2側)を、断面が矩形状となるように切り欠くことで段形状に形成されている部分である。この係止段部212の上部側には、挟持部213が設けられている。挟持部213は、次に述べるように、金具連結部50の上面50aと、下支持部81の下面81aとの間に挟み込まれる部分である。なお、挟持部213の厚み寸法(Z方向の寸法)は、ベアリングボール111の直径よりも大きくなっている。また、挟持部213の厚み寸法T1は、下面81aと頂部56aの間の間隔が、ベアリングボール111の直径よりも大きくなるように設けられている。
 このような構成の半割リング210を金具連結部50の上角部50bに係止させると、半割リング210は、金具連結部50のうち、上角部50bおよび凸状部56の間に位置する上面50aと、下支持部81の下面81aの間に挟み込まれる。ここで、挟持部213の厚み寸法(Z方向の寸法)は、ベアリングボール111の直径よりも大きく設けられている。このため、上述した隙間S1からベアリングボール111を挿入して、外接段部55と内接段部72の間の隙間に、当該ベアリングボール111を供給可能となる。したがって、隙間S1から順次、ベアリングボール111を外接段部55と内接段部72の間の隙間に向けて供給する(先ボール配置工程に対応)。
 なお、ベアリングボール111を供給するのに際しては、アンカー金具30に対して回転連結部材60を回転させながら行うようにすることで、複数のベアリングボール111を外接段部55と内接段部72の間のリング状の隙間内で移動させつつ供給することができる。また、連結凹部51に回転軸部70を挿入するのに先立って、半割リング210を上角部50bに係止させるようにしても良い。また、ベアリングボール111を外接段部55と内接段部72の間のリング状の隙間に供給するのに際しては、適宜、潤滑剤を供給することが好ましい。
 次に、必要とされる個数のベアリングボール111を隙間S1から供給した後に、上面50aと下面81aの間から半割リング210を取り外す(冶具取り外し工程に対応)。それにより、回転軸部70が連結凹部51の奥側まで挿入される状態となると共に、ベアリングボール111が外接段部55と内接段部72の間で挟み込まれる状態となる。
 この後に、投入孔53を介して、ベアリングボール101を外接凹溝54と内接凹溝71の間の隙間に供給する(後ボール配置工程に対応)。この場合も、アンカー金具30に対して回転連結部材60を回転させながら行うようにすることで、複数のベアリングボール101を外接凹溝54と内接凹溝71の間のリング状の隙間内で移動させつつ供給することができる。なお、ベアリングボール101を外接凹溝54と内接凹溝71の間のリング状の隙間に供給するのに際しては、適宜、潤滑剤を供給することが好ましい。
 そして、上記のベアリングボール101の供給が完了した後に、投入孔53に対してネジ130を捻じ込むことで、投入孔53を封止する(封止工程に対応)。以上のようにして、吊り金具10の組み付けが完了する。
<効果について>
 以上のような構成の吊り金具10においては、回転金具20は、荷の取り付け面に固定されるアンカー金具30と、アンカー金具30に荷の取り付け面に垂直な回転軸で軸支される回転連結部材60と、アンカー金具30に対して回転連結部材60を回転自在に支持する第1軸受100と、アンカー金具30に対して回転連結部材60を回転自在に支持すると共に、第1軸受100に対して回転軸の軸方向に離間している第2軸受110と、を備える。そして、回転連結部材60には、アンカー金具30に向かって突出する回転軸部70が設けられていて、アンカー金具30には、荷に取り付けられる雄ネジ部40およびアンカー座部45(固定部)と、雄ネジ部40およびアンカー座部45(固定部)と一体化された金具連結部50とが設けられていて、金具連結部50には、回転軸部70を挿通する連結凹部51が設けられている。
 また、第1軸受100は、連結凹部51の内壁面51aから凹んでいる外接凹溝54と、回転軸部70の外周面から凹むと共に、外接凹溝54と対向する内接凹溝71と、内接凹溝71と外接凹溝54で形成される無端の通路に挿入される複数のベアリングボール101(第1ベアリングボール)と、を備えている。また、第2軸受110は、回転軸部70が挿入される連結凹部51の開口部分に設けられていると共に内径側から外径側に凹む外接段部55と、回転軸部70の付け根部分に設けられていると共に、外接段部55と対向する内接段部72と、外接段部55と内接段部72で形成される無端の通路に挿入される複数のベアリングボール111(第2ベアリングボール)と、を備えている。
 このように構成することで、連結凹部51の内部側には、外接凹溝54、内接凹溝71およびベアリングボール101(第1ベアリングボール)で構成される第1軸受100が配置されている。また、連結凹部51の開口部分には、外接段部55と内接段部72およびベアリングボール111(第2ベアリングボール)で構成される第2軸受110が配置されている。このため、2列の軸受が、アンカー金具30と回転連結部材60の間に配置される状態となる。しかも、連結凹部51の開口部分と、回転軸部70の付け根部分に、外接段部55と内接段部72の2つの段部が対向し、しかも外接段部55は、連結凹部51の開口部分に設けられるのみならず内径側から外径側に凹むことで、第2軸受110は、アンギュラベアリングに類する構成とすることができる。
 ここで、たとえば特許文献1の図1や図8に示すような、スラストベアリングに類する構成を備える場合、ベアリングボールを挿入するための凹状の溝が必要となり、その凹状の溝を挟んで内径側と外径側には、ベアリングボールの移動を阻止するための堤部が必要となる。したがって、外径側と内径側の2つの堤部が必要となるので、その分だけ、径方向の寸法が大きくなってしまう。しかしながら、本実施の形態では、第2軸受110においては、外接段部55は、連結凹部51の開口部分に設けられるのみならず内径側から外径側に凹んでいるので、ので、ベアリングボールの移動を阻止するための堤部は、外径側のみに存在する。このため、第2軸受110の小径化を図ることが可能となる。
 また、リンク120が倒れた状態(図1に示すリンク120の長手がY方向に沿う状態)で、そのY方向(横方向)に荷重(横向き荷重)が掛かった場合に、上記のアンギュラベアリングに類する構成の第2軸受110で、横向き荷重を受け止めることができる。なお、このとき、ベアリングボール111には、径方向に対して交差する方向である、軸方向(Z方向)か、径方向に傾斜する方向に沿って、ベアリングボール111が押圧される。このため、特許文献1の図5に示す場合のように、ベアリングボール111の内径側で荷重を受け止める状態よりも外径側で荷重を受け止めることができる。このように、ベアリングボール111の内径側で荷重を受け止める状態よりも外径側で荷重を受け止めることができるので、その分だけ、第2軸受110の寸法を小径化することができる。それにより、吊り金具10の小型化を図ることができる。
 また、本実施の形態においては、雄ネジ部40を備える固定部は、荷の取り付け面に密着する座面45aを有するアンカー座部45を有している。このように構成する場合には、アンカー座部45の座面45aが荷の取り付け面に接触することで、吊り金具10を荷に良好に取り付けることが可能となる。
 また、本実施の形態では、ベアリングボール111(第2ベアリングボール)の直径は、ベアリングボール101(第1ベアリングボール)の直径よりも小さく設けられている。このため、ベアリングボール111(第2ベアリングボール)が収納される外接段部55および内接段部72が省スペースで済む。それにより、金具連結部50の肉厚を小さくすることができ、径方向の寸法を小さくすることができ、加えて金具連結部50の軸方向(Z方向)および回転軸部70の軸方向(Z方向)の寸法を小さくすることができる。そのため、吊り金具10の小型化を図ることが可能となる。
 また、本実施の形態では、金具連結部50のうち連結凹部51の開口部分の周囲には、上面50a(スラスト面)から回転連結部材60に向かって突出する凸状部56が突出していて、外接段部55の底部から凸状部56の頂部56aまでの軸方向(Z方向)における突出高さは、ベアリングボール111(第2ベアリングボール)の直径よりも大きく設けられている。
 このように構成することで、吊り金具10を使用するにつれて、アンカー金具30と回転連結部材60の間に摩耗によるガタが大きくなっても、ベアリングボール111(第2ベアリングボール)が外部に飛び出してしまうのを、凸状部56によって防止することが可能となる。
 また、本実施の形態では、回転連結部材60には、上面50a(第1対向面)と対向する下面81a(第2対向面)から凹んでいる環状凹部81b(対向凹部)が設けられていて、環状凹部81b(対向凹部)には、凸状部56が入り込むことで、ラビリンス構造が形成されている。
 このように、凸状部56が環状凹部81b(対向凹部)に入り込んでラビリンス構造を形成していることで、外接段部55と内接段部72の対向部分に向かい、外部から塵埃が侵入しがたくなる。そのため、塵埃侵入によるベアリング性能の低下を長期に亘って防止することが可能となる。
 また、本実施の形態における吊り金具10の製造方法は、回転軸部70を連結凹部51に所定深さだけ挿入する軸部挿入工程と、軸部挿入工程に前後して、アンカー金具30と回転連結部材60とが軸方向(Z方向)と直交する方向で対向している対向部位に半割リング210(治具)を配置して、当該対向部位に、ベアリングボール111(第2ベアリングボール)が移動可能な隙間を形成する治具配置工程とを実行する。また、吊り金具10の製造方法は、治具配置工程で形成された隙間に複数のベアリングボール111(第2ベアリングボール)を挿入して、複数のベアリングボール111(第2ベアリングボール)を外接段部55に配置させる先ボール配置工程と、ボール配置工程の後に、半割リング210(治具)を、上記の対向部位から取り外して回転軸部70を連結凹部51の奥側まで挿入して、外接段部55と内接段部72の双方がベアリングボール111(第2ベアリングボール)と当接する状態とする冶具取り外し工程を実行する。また、吊り金具10の製造方法は、冶具取り外し工程の後に、金具連結部50の外周面から外接凹溝54に至る投入孔53から複数のベアリングボール101(第1ベアリングボール)を挿入して、複数のベアリングボール101(第1ベアリングボール)を外接凹溝54と内接凹溝71の双方に当接する状態とする後ボール配置工程と、後ボール配置工程の後に、投入孔53を封止する封止工程と、を実行する。
 このように、治具配置工程においては、アンカー金具30と回転連結部材60とが軸方向(Z方向)と直交する方向で対向している対向部位に半割リング210(治具)を配置して、ベアリングボール111(第2ベアリングボール)が移動可能な隙間を形成することで、ベアリングボール111(第2ベアリングボール)の挿入作業が容易となる。また、後ボール配置工程においては、投入孔53から複数のベアリングボール101(第1ベアリングボール)を挿入して外接凹溝54と内接凹溝71の対向部分に供給することで、ベアリングボール101(第1ベアリングボール)の挿入作業が容易となる。そのため、生産性を向上させることが可能となる。
<変形例>
 以上、本発明の各実施の形態について説明したが、本発明はこれ以外にも種々変形可能となっている。以下、それについて述べる。
 上述の実施の形態では、吊り金具10は、回転金具20と、リンク120を備えている。しかしながら、吊り金具は、回転金具20のみから構成されても良い。
 また、上述の実施の形態では、アンカー金具30の金具連結部50に連結凹部51が設けられていると共に、回転連結部材60に回転軸部70が設けられ、この回転軸部70が連結凹部51に挿入されている。しかしながら、アンカー金具30に回転軸部70に対応する部分を設けると共に、回転連結部材60に連結凹部に対応する部分を設けるようにしても良い。
 また、上述の実施の形態では、第1軸受100と第2軸受110の2つの軸受部が設けられている構成が開示されている。しかしながら、軸受部は2つには限られず、3つ以上設ける構成を採用しても良い。
 また、上述の実施の形態では、回転軸部70の軸方向の中心からベアリングボール101(第1ベアリングボール)の径方向の外側までの距離と、回転軸部70の軸方向の中心からベアリングボール111(第2ベアリングボール)の径方向の外側までの距離については、特段、記載されていない。ここで、ベアリングボール101(第1ベアリングボール)の径方向の外側までの距離が、ベアリングボール111(第2ベアリングボール)の径方向の外側までの距離よりも小さくても良いが、ベアリングボール101(第1ベアリングボール)の径方向の外側までの距離が、ベアリングボール111(第2ベアリングボール)の径方向の外側までの距離以上である方が、好ましい。
 また、上述の実施の形態では、アンカー座部45は、回転軸心までの距離が外周部52よりも小さいか、または回転軸心までの距離が外周部52と同等に設けられている。しかしながら、アンカー座部45は、回転軸心までの距離が外周部52よりも大きく設けるようにしても良い。また、アンカー座部45の形態は、円形のリング状(円盤状)には限られず、たとえば三角形、四角形等の多角形形状としても良く、長円形状としても良く、その他、適宜の形状を採用可能である。
 また、アンカー座部45が、回転軸心までの距離が外周部52よりも大きく設けるように構成する場合、アンカー座部45のうち外周部52よりも飛び出しているフランジ状の部分に取付孔を形成し、その取付孔に別体の取付孔を形成するようにしても良い。この場合、取付孔に別体の取付ボルト(締結部材に相当)を差し込んで、荷のネジ孔等に捻じ込むことで、吊り金具10を荷に取り付けることが可能である。このように構成する場合には、荷の取り付け面に対し、アンカー座部45の座面45aが比較的広い面積で接触する構成とすることができる。そのため、金属製の吊り金具10に対し、荷の取り付け面の強度が弱い場合には、荷の取り付け面に対してダメージを与えるのを防止することができる。
 また、上述の実施の形態では、雄ネジ部40は、固定部の一部に対応し、荷の取り付け穴に形成された雌ネジに捻じ込まれるものとしている。しかしながら、固定部は、雄ネジ部40に代えて、雄ネジが形成されていない軸状部材としても良い。この場合には、荷の取り付け穴には雌ネジが形成されていなくても良い。この場合、たとえば、くさびやピンや止め輪によって、軸状部材が荷の取り付け穴から抜け止めするようにしても良い。
 なお、上記のように、アンカー座部45のフランジ状の部分に取付孔を設ける場合には、軸状部材にねじ山が形成された雄ネジ部40は、ねじ山を省略して、単なる軸状部材としても良い。この場合には、ねじ山が形成されていない軸状部材が、固定部の一部に相当する。
 10…吊り金具、20…回転金具、30…アンカー金具、40…雄ネジ部(固定部の一部に対応)、45…アンカー座部(固定部の一部に対応)、45a…座面、50…金具連結部、50a…上面(第1スラスト面に対応)、50b…上角部、51…連結凹部、51a…内壁面、52…外周部、53…投入孔、54…外接凹溝、55…外接段部、56…凸状部、56a…頂部、60…回転連結部材、70…回転軸部、70a…外周面、71…内接凹溝、72…内接段部、80…リンク連結部、81…下支持部、81a…下面(第2スラスト面に対応)、81b…環状凹部(対向凹部に対応)、82…上環部、83…傾斜肩部、84…リンク受け部、85…リンク孔、100…第1軸受、101…ベアリングボール(第1ベアリングボールに対応)、110…第2軸受、111…ベアリングボール(第2ベアリングボールに対応)、120…リンク、130…六角穴付きネジ、200…リングセット、210…半割リング、212…係止段部、213…挟持部、B1…境界部分、RA1…ラジアル対向部分、S1…隙間、TH1…スラスト対向部分

Claims (6)

  1.  荷に取り付けられると共に、吊り上げ手段が連結される回転金具を備える吊り金具であって、
     前記回転金具は、
     前記荷の取り付け面に固定されるアンカー金具と、
     前記アンカー金具に前記荷の取り付け面に垂直な回転軸で軸支される回転連結部材と、
     前記アンカー金具に対して前記回転連結部材を回転自在に支持する第1軸受と、
     前記アンカー金具に対して前記回転連結部材を回転自在に支持すると共に、前記第1軸受に対して前記回転軸の軸方向に離間している第2軸受と、
     を備え、
     前記回転連結部材には、前記アンカー金具に向かって突出する回転軸部が設けられていて、
     前記アンカー金具には、前記荷に取り付けられる固定部と、前記固定部と一体化された金具連結部とが設けられていて、
     前記金具連結部には、前記回転軸部を挿通する連結凹部が設けられていて、
     前記第1軸受は、
     前記連結凹部の内壁面から凹んでいる外接凹溝と、前記回転軸部の外周面から凹むと共に、前記外接凹溝と対向する内接凹溝と、前記内接凹溝と前記外接凹溝で形成される無端の通路に挿入される複数の第1ベアリングボールと、を備えていて、
     前記第2軸受は、
     前記回転軸部が挿入される前記連結凹部の開口部分に設けられていると共に内径側から外径側に凹む外接段部と、前記回転軸部の付け根部分に設けられていると共に、前記外接段部と対向する内接段部と、前記外接段部と前記内接段部で形成される無端の通路に挿入される複数の第2ベアリングボールと、を備えている、
     ことを特徴とする吊り金具。
  2.  請求項1記載の吊り金具であって、
     前記固定部は、前記荷の取り付け面に密着する座面を有するアンカー座部を有している、
     ことを特徴とする吊り金具。
  3.  請求項1または2記載の吊り金具であって、
     前記第2ベアリングボールの直径は、前記第1ベアリングボールの直径よりも小さく設けられている、
     ことを特徴とする吊り金具。
  4.  請求項1から3のいずれか1項に記載の吊り金具であって、
     前記金具連結部のうち前記連結凹部の開口部分の周囲には、前記軸方向と直交する第1スラスト面から前記回転連結部材に向かって突出する凸状部が突出していて、
     前記外接段部の底部から前記凸状部の頂部までの前記軸方向における突出高さは、前記第2ベアリングボールの直径よりも大きく設けられている、
     ことを特徴とする吊り金具。
  5.  請求項4記載の吊り金具であって、
     前記回転連結部材には、前記第1スラスト面と対向する第2スラスト面から凹んでいる対向凹部が設けられていて、
     前記対向凹部には、前記凸状部が入り込むことで、ラビリンス構造が形成されている、
     ことを特徴とする吊り金具。
  6.  荷に取り付けられると共に、吊り上げ手段が連結される回転金具を備える吊り金具の製造方法であって、
     前記回転金具は、
     前記荷の取り付け面に固定されるアンカー金具と、
     前記アンカー金具に前記荷の取り付け面に垂直な回転軸で軸支される回転連結部材と、
     前記アンカー金具に対して前記回転連結部材を回転自在に支持する第1軸受と、
     前記アンカー金具に対して前記回転連結部材を回転自在に支持すると共に、前記第1軸受に対して前記回転軸の軸方向に離間している第2軸受と、
     を備え、
     前記回転連結部材には、前記アンカー金具に向かって突出する回転軸部が設けられていて、
     前記アンカー金具には、前記荷に取り付けられる固定部と、前記固定部と一体化された金具連結部とが設けられていて、
     前記金具連結部には、前記回転軸部を挿通する連結凹部が設けられていて、
     前記第1軸受は、
     前記連結凹部の内壁面から凹んでいる外接凹溝と、前記回転軸部の外周面から凹むと共に、前記外接凹溝と対向する内接凹溝と、前記内接凹溝と前記外接凹溝で形成される無端の通路に挿入される複数の第1ベアリングボールと、を備えていて、
     前記第2軸受は、
     前記回転軸部が挿入される前記連結凹部の開口部分に設けられていると共に内径側から外径側に凹む外接段部と、前記回転軸部の付け根部分に設けられていると共に、前記外接段部と対向する内接段部と、前記外接段部と前記内接段部で形成される無端の通路に挿入される複数の第2ベアリングボールと、を備えると共に、
     前記回転軸部を前記連結凹部に所定深さだけ挿入する軸部挿入工程と、
     前記軸部挿入工程に前後して、前記アンカー金具と前記回転連結部材とが前記軸方向と直交する方向で対向している対向部位に治具を配置して、当該対向部位に、前記第2ベアリングボールが移動可能な隙間を形成する治具配置工程と、
     前記治具配置工程で形成された隙間に複数の前記第2ベアリングボールを挿入して、複数の前記第2ベアリングボールを前記外接段部に配置させる先ボール配置工程と、
     前記先ボール配置工程の後に、前記治具を前記対向部位から取り外して前記回転軸部を前記連結凹部の奥側まで挿入して、前記外接段部と前記内接段部の双方が前記第2ベアリングボールと当接する状態とする冶具取り外し工程と、
     前記冶具取り外し工程の後に、前記金具連結部の外周面から前記外接凹溝に至る投入孔から複数の前記第1ベアリングボールを挿入して、複数の前記第1ベアリングボールを前記外接凹溝と前記内接凹溝の双方に当接する状態とする後ボール配置工程と、
     前記後ボール配置工程の後に、前記投入孔を封止する封止工程と、
     を実行することを特徴とする吊り金具の製造方法。
PCT/JP2021/045843 2020-12-15 2021-12-13 吊り金具および吊り金具の製造方法 WO2022131214A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US18/267,114 US20230392671A1 (en) 2020-12-15 2021-12-13 Hanging metal fitting and method for manufacturing hanging metal fitting
JP2022569987A JP7423140B2 (ja) 2020-12-15 2021-12-13 吊り金具および吊り金具の製造方法
CN202180081101.4A CN116685774A (zh) 2020-12-15 2021-12-13 吊具及吊具的制造方法
DE112021006464.9T DE112021006464T5 (de) 2020-12-15 2021-12-13 Hängebeschlag aus metall und verfahren zur herstellung eines hängebeschlags aus metall

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020207776 2020-12-15
JP2020-207776 2020-12-15

Publications (1)

Publication Number Publication Date
WO2022131214A1 true WO2022131214A1 (ja) 2022-06-23

Family

ID=82059446

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/045843 WO2022131214A1 (ja) 2020-12-15 2021-12-13 吊り金具および吊り金具の製造方法

Country Status (6)

Country Link
US (1) US20230392671A1 (ja)
JP (1) JP7423140B2 (ja)
CN (1) CN116685774A (ja)
DE (1) DE112021006464T5 (ja)
TW (1) TW202229152A (ja)
WO (1) WO2022131214A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD1003703S1 (en) * 2021-06-29 2023-11-07 Kito Corporation Lifting clamp

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62146036U (ja) * 1986-03-07 1987-09-14
JP2001248693A (ja) * 2000-03-06 2001-09-14 Elephant Chain Block Co Ltd スイベルジョイント
JP2005513388A (ja) * 2001-12-21 2005-05-12 ルド・ケッテンファブリーク・リーゲル・ウント・ディーツ・ゲー・エム・ベー・ハー・ウント・ツェー・オー 止め手段

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62146036U (ja) * 1986-03-07 1987-09-14
JP2001248693A (ja) * 2000-03-06 2001-09-14 Elephant Chain Block Co Ltd スイベルジョイント
JP2005513388A (ja) * 2001-12-21 2005-05-12 ルド・ケッテンファブリーク・リーゲル・ウント・ディーツ・ゲー・エム・ベー・ハー・ウント・ツェー・オー 止め手段

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD1003703S1 (en) * 2021-06-29 2023-11-07 Kito Corporation Lifting clamp

Also Published As

Publication number Publication date
DE112021006464T5 (de) 2023-09-28
JPWO2022131214A1 (ja) 2022-06-23
US20230392671A1 (en) 2023-12-07
JP7423140B2 (ja) 2024-01-29
CN116685774A (zh) 2023-09-01
TW202229152A (zh) 2022-08-01

Similar Documents

Publication Publication Date Title
WO2022131214A1 (ja) 吊り金具および吊り金具の製造方法
US6955476B1 (en) Retainer for rolling bearings
CN102022432B (zh) 轴承装置、用于保持至少一个衬垫的保持机构和方法
JP7432289B2 (ja) 吊り金具
US7021856B2 (en) Splicing for interconnected thin-walled metal structures
JP2002013540A (ja) 複列旋回軸受
JP2016145607A (ja) 緩み止めナット
JP2008208971A (ja) クロスローラベアリング
US4979844A (en) Ball joint and manufacturing method of the same
EP1432518B1 (fr) Assemblage de plaques d'usure
US6905249B2 (en) Bearing locking mechanism
JP7201025B2 (ja) ハブユニット軸受及び車両
JP2004028123A (ja) ベアリング固定装置
JP2975903B2 (ja) 旋回座軸受
US20160327097A1 (en) Sealing assembly for a rolling bearing
JP6392287B2 (ja) シールワッシャ
TW201728839A (zh) 滾子軸承
JP2002039202A (ja) 転がり回転軸受
JP2004076802A (ja) ころ軸受
JP2020012474A (ja) 玉軸受の組立方法
JP2003013963A (ja) 単列玉旋回軸受用保持器
JPH10213140A (ja) ころ軸受
JP3229484U (ja) インサート軸受ユニット
CN102753845A (zh) 紧固用具
JPH09151958A (ja) ユニバーサルジョイント

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21906576

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022569987

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 202180081101.4

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 18267114

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 112021006464

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21906576

Country of ref document: EP

Kind code of ref document: A1