WO2020203489A1 - アスファルトフィニッシャ - Google Patents

アスファルトフィニッシャ Download PDF

Info

Publication number
WO2020203489A1
WO2020203489A1 PCT/JP2020/013111 JP2020013111W WO2020203489A1 WO 2020203489 A1 WO2020203489 A1 WO 2020203489A1 JP 2020013111 W JP2020013111 W JP 2020013111W WO 2020203489 A1 WO2020203489 A1 WO 2020203489A1
Authority
WO
WIPO (PCT)
Prior art keywords
screed
mold board
information acquisition
asphalt finisher
pavement
Prior art date
Application number
PCT/JP2020/013111
Other languages
English (en)
French (fr)
Inventor
渡邊 哲也
英紀 高山
Original Assignee
住友建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友建機株式会社 filed Critical 住友建機株式会社
Priority to JP2021511509A priority Critical patent/JP7275254B2/ja
Priority to EP20783985.3A priority patent/EP3951062A4/en
Priority to CN202080021363.7A priority patent/CN113597489A/zh
Priority to CN202311552774.0A priority patent/CN117702580A/zh
Publication of WO2020203489A1 publication Critical patent/WO2020203489A1/ja
Priority to JP2023076049A priority patent/JP2023087053A/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ

Definitions

  • This disclosure relates to asphalt finishers.
  • This asphalt finisher proceeds while holding the pavement material in front of the rear screed so that the amount of pavement material compacted by the rear screed is not insufficient.
  • the amount of pavement material held in front of the rear screed is determined by the height of the mold board placed between the screw and the rear screed in the direction of travel.
  • the amount of pavement material held in front of the rear screed basically increases as the height of the mold board increases. This is because the higher the height of the mold board, the greater the amount of pavement material passing under the mold board.
  • the above-mentioned asphalt finisher may deteriorate the quality of the pavement surface regardless of whether the mold board is too high or too low. Therefore, it is desired to provide an asphalt finisher capable of suppressing deterioration of the quality of the pavement surface.
  • the asphalt finisher includes a tractor, a hopper installed on the front side of the tractor for receiving the pavement material, a conveyor for feeding the pavement material in the hopper to the rear side of the tractor, and the conveyor.
  • the screed is provided with an elevating device to be moved, an information acquisition device for acquiring information about the pavement material held by the screed, and a control device, and the screed is arranged so as to be offset in the vehicle length direction.
  • the control device operates the elevating device based on the information acquired by the information acquisition device to adjust the height of the mold board.
  • an asphalt finisher capable of suppressing deterioration of the quality of the pavement surface is provided.
  • FIG. 1A to 1C are diagrams of an asphalt finisher 100 which is an example of a road machine according to an embodiment of the present invention. Specifically, FIG. 1A is a side view of the asphalt finisher 100, FIG. 1B is a top view of the asphalt finisher 100, and FIG. 1C is a rear view of the asphalt finisher 100.
  • the asphalt finisher 100 is mainly composed of a tractor 1, a hopper 2, a screed 3, and the like.
  • the direction of the hopper 2 as seen from the tractor 1 (+ X direction) is the front
  • the direction of the screed 3 as seen from the tractor 1 ( ⁇ X direction) is the rear.
  • the tractor 1 is a mechanism for running the asphalt finisher 100.
  • the tractor 1 uses the rear wheel running hydraulic motor to rotate the rear wheels 5, and uses the front wheel running hydraulic motor to rotate the front wheels 6 to move the asphalt finisher 100.
  • the rear wheel running hydraulic motor and the front wheel running hydraulic motor rotate by receiving the supply of hydraulic oil from the hydraulic pump.
  • the rear wheels 5 and the front wheels 6 may be replaced by crawlers.
  • the controller 50 is a control device that controls the asphalt finisher 100.
  • the controller 50 is composed of a microcomputer including a CPU, a volatile storage device, a non-volatile storage device, and the like, and is mounted on the tractor 1.
  • the functional elements that carry out each function of the controller 50 are realized by the CPU executing the program stored in the non-volatile storage device.
  • each functional element in the controller 50 may be composed of hardware, firmware, or the like.
  • Hopper 2 is a mechanism for accepting pavement materials.
  • the hopper 2 is installed on the front side of the tractor 1 and is configured to be opened and closed in the Y-axis direction (vehicle width direction) by the hopper cylinder.
  • the asphalt finisher 100 normally receives the pavement material from the loading platform of the dump truck with the hopper 2 fully open.
  • the paving material is, for example, an asphalt mixture.
  • FIG. 1B shows that the hopper 2 is in the fully open state.
  • the operator of the asphalt finisher 100 normally closes the hopper 2 when the pavement material in the hopper 2 decreases, and collects the pavement material near the inner wall of the hopper 2 in the central portion of the hopper 2.
  • the pavement material can be fed to the rear side of the tractor 1 by the conveyor CV in the central portion of the hopper 2.
  • the pavement material fed to the rear side of the tractor 1 is spread in the vehicle width direction by the screw SC on the rear side of the tractor 1 and the front side of the screed 3.
  • the screw SC is in a state where the extension screw is connected to the left and right.
  • 1A and 1B show the pavement PV spread by the screw SC in a coarse (thin) satin pattern.
  • Screed 3 is a mechanism for compacting the pavement material PV.
  • the screed 3 includes a front screed 30 and a rear screed 31.
  • the front screed 30 includes a left front screed 30L and a right front screed 30R
  • the rear screed 31 includes a left rear screed 31L and a right rear screed 31R.
  • the screed 3 is a floating screed towed by the tractor 1 and is connected to the tractor 1 via a leveling arm 3A.
  • the screed 3 is moved up and down together with the leveling arm 3A by the expansion and contraction of the scree drift cylinder 25.
  • the leveling cylinder 28 is a hydraulic cylinder that moves the front end portion of the leveling arm 3A up and down in order to adjust the leveling thickness of the pavement material.
  • the leveling cylinder 28 includes a left leveling cylinder 28L and a right leveling cylinder 28R.
  • the rear screed 31 is configured to be able to expand and contract in the vehicle width direction by a telescopic cylinder (not shown).
  • the left rear screed 31L is expanded and contracted in the vehicle width direction by the left telescopic cylinder (not shown)
  • the right rear screed 31R is expanded and contracted in the vehicle width direction by the right telescopic cylinder (not shown). It is expanded and contracted. That is, the left rear screed 31L and the right rear screed 31R can be expanded and contracted independently of each other.
  • the rear screed 31 may be a detachable fixed type (non-expandable) screed that is connected at the time of use using a crane or the like.
  • a screed lifting device 29 is attached to the connecting portion between the front screed 30 and the rear screed 31.
  • the screed elevating device 29 is configured to be able to move the rear screed 31 up and down with respect to the front screed 30.
  • the screed elevating device 29 rotates a screed elevating motor as a hydraulic actuator in response to a control command from the controller 50, and drives a rotation / linear motion conversion mechanism attached to the rear screed 31.
  • the rear screed 31 is moved up and down.
  • the screed lifting device 29 includes a left screed lifting device 29L that moves the left rear screed 31L up and down, and a right screed lifting device 29R that moves the right rear screed 31R up and down.
  • the rotation / linear motion conversion mechanism is, for example, a bolt / nut mechanism.
  • the rotation / linear motion conversion mechanism may be another mechanism such as a ball screw mechanism or a rack and pinion mechanism.
  • the screed elevating motor may be an electric motor.
  • the screed lifting device 29 may be a hydraulic cylinder.
  • the side plate 41 is configured to prevent the paving material PV from spreading in the vehicle width direction.
  • the side plate 41 includes a left side plate 41L fixed to the left end of the left rear screed 31L and a right side plate 41R fixed to the right end of the right rear screed 31R.
  • the scaffold step 42 is a member that constitutes a scaffold when an operator works behind the scaffold 3.
  • a mold board 43 is attached to the front part of the screed 3.
  • the mold board 43 includes a left mold board 43L and a right mold board 43R.
  • the left mold board 43L is configured so that the amount held by the left rear screed 31L, which is the amount of pavement PV retained in front of the left rear screed 31L, can be adjusted.
  • the right mold board 43R is configured so that the amount held by the right rear screed 31R, which is the amount of pavement PV retained in front of the right rear screed 31R, can be adjusted.
  • the pavement material PV reaches the front of the left rear screed 31L through the gap between the lower end of the left mold board 43L and the roadbed RB, and passes through the gap between the lower end of the right moldboard 43R and the roadbed RB to the right. It reaches the front of the rear screed 31R.
  • the mold board 43 is configured to expand and contract in the vehicle width direction together with the rear screed 31.
  • the mold board 43 may be a detachable fixed type (non-expandable) mold board that is connected at the time of use, similarly to the rear screed 31.
  • the mold board 43 is configured so that it can be moved up and down by the mold board elevating device 24.
  • the mold board elevating device 24 is a mechanism for moving the mold board 43 up and down.
  • the mold board elevating device 24 includes a left mold board elevating device 24L and a right mold board elevating device 24R.
  • the left mold board elevating device 24L is a mechanism for moving the left mold board 43L up and down, and includes the left outer elevating device 24LD and the left inner elevating device 24LP.
  • the left outer lifting device 24LD is a mechanism for moving the left end (distal end) of the left mold board 43L up and down
  • the left inner lifting device 24LP is a mechanism for moving the right end (proximal end) of the left mold board 43L up and down. is there.
  • the right mold board elevating device 24R is a mechanism for moving the right mold board 43R up and down, and includes the right outer elevating device 24RD and the right inner elevating device 24RP.
  • the right outer lifting device 24RD is a mechanism for moving the right end (distal end) of the right mold board 43R up and down
  • the right inner lifting device 24RP is a mechanism for moving the left end (proximal end) of the right mold board 43R up and down. is there.
  • the left outer lifting device 24LD, the left inner lifting device 24LP, the right outer lifting device 24RD, and the right inner lifting device 24RP may be a hydraulic cylinder or an electric cylinder, and may be a hydraulic motor or an electric motor and a rotation / linear motion conversion mechanism. It may be composed of a combination of.
  • One of the left outer lifting device 24LD and the left inner lifting device 24LP may be omitted.
  • the left outer lifting device 24LD when the left outer lifting device 24LD is omitted, the left end (distal end) of the left mold board 43L is slidably supported in the vertical direction (Z-axis direction) by the left side plate, and is supported by the left inner lifting device 24LP. It is moved up and down with the vertical movement of the right end (proximal end) of the left mold board 43L.
  • the left inner lifting device 24LP is omitted.
  • one of the right outer lifting device 24RD and the right inner lifting device 24RP may be omitted.
  • the right inner lifting device 24RP when the right inner lifting device 24RP is omitted, the left end (proximal end) of the right mold board 43R is slidably supported in the vertical direction (Z-axis direction) by the right front screed 30R, and the right outer lifting device 24RD It is moved up and down with the vertical movement of the right end (distal end) of the right mold board 43R.
  • the right outer lifting device 24RD is omitted.
  • the center crown device 26 is mounted on the front screed 30.
  • the center crown device 26 expands and contracts the turnbuckle attached between the left front screed 30L and the right front screed 30R, and the lower surface of the left front screed 30L (left front screed plate) and the right front screed when viewed from the rear. It is a mechanism for adjusting the angle between the 30R (right front screed plate) and the lower surface.
  • the center crown device 26 rotates the body of the turnbuckle by rotating the hydraulic motor in response to a control command from the controller 50, for example, to expand and contract the turnbuckle.
  • a slope crown device 27 is mounted between the front screed 30 and the rear screed 31.
  • the slope crown device 27 includes a left slope crown device 27L and a right slope crown device 27R. Specifically, the left slope crown device 27L is mounted between the left front screed 30L and the left rear screed 31L, and the right slope crown device 27R is mounted between the right front screed 30R and the right rear screed 31R. ing.
  • the left slope crown device 27L expands and contracts the turnbuckle attached between the left front screed 30L and the left rear screed 31L, and the lower surface and the left of the left front screed 30L (left front screed plate) when viewed from the rear. It is a mechanism for adjusting the angle between the rear screed 31L (left rear screed plate) and the lower surface.
  • the left slope crown device 27L for example, rotates the body of the turnbuckle by rotating the hydraulic motor in response to a control command from the controller 50 to expand and contract the turnbuckle.
  • a guide rail 1G that can be used as a handrail by the operator of the asphalt finisher 100 is installed on the upper part of the tractor 1.
  • the operator of the asphalt finisher 100 includes an operator who operates the tractor 1 and an operator (for example, an assistant operator) who operates the screed 3.
  • An information acquisition device 51 is attached to the guide rail 1G.
  • the information acquisition device 51 may be attached to the canopy or may be directly attached to the main body of the tractor 1. Further, the information acquisition device 51 may be attached to the front screed 30 or may be attached to the rear screed 31.
  • the information acquisition device 51 is configured to be able to acquire information on the pavement material PV.
  • the information acquisition device 51 is a lidar configured to be able to measure the distance to an object existing around the asphalt finisher 100, and includes a space in front of the rear screed 31 as a measurement range.
  • the LIDAR is configured so that, for example, the distance between each of one or more points within the measurement range and the LIDAR (reference point) can be measured.
  • the information acquisition device 51 includes a left information acquisition device 51L, a right information acquisition device 51R, and a rear information acquisition device 51C attached to the guide rail 1G.
  • the left information acquisition device 51L is configured to be able to acquire information on the pavement material PV held by the left rear screed 31L.
  • the right information acquisition device 51R is configured to be able to acquire information on the pavement material PV held by the right rear screed 31R.
  • the rear information acquisition device 51C is configured to be able to acquire information on the surface of the pavement material PV compacted by the screed 3.
  • the measurement range ZL of the left information acquisition device 51L is, for example, a pavement material PV stored in a space surrounded by a left front screed 30L, a left rear screed 31L, a left side plate 41L, and a left mold board 43L. Is set so that it can be detected as the amount of holding by the left rear screed 31L.
  • the measurement range ZR of the right information acquisition device 51R is stored in a space surrounded by, for example, the right front side screed 30R, the right rear side screed 31R, the right side plate 41R, and the right mold board 43R.
  • the amount of paving material PV is set so that it can be detected as the amount held by the right rear screed 31R.
  • the amount of pavement PV is measured by measuring at least one of, for example, the volume of the pavement PV, the height of the pavement PV peak, and the distance between the reference point and the apex of the pavement PV peak. Will be done.
  • the measurement range ZC of the rear information acquisition device 51C is set to include, for example, the width of the screed 3 (that is, the total width of the new pavement NP).
  • the information acquisition device 51 may be a monocular camera, a stereo camera, a distance sensor, a millimeter wave radar, an ultrasonic sensor, a laser radar, a laser scanner, a distance image camera, a laser range finder, or the like.
  • the asphalt finisher 100 is configured to acquire information on the pavement material PV in each of the measurement range ZL and the measurement range ZR by two information acquisition devices 51, but one information acquisition device. 51 or three or more information acquisition devices 51 may be configured to acquire information on the pavement material PV in each of the measurement range ZL and the measurement range ZR.
  • the display device 52 is configured to display information about the asphalt finisher 100.
  • the display device 52 is a liquid crystal display installed in front of the driver's seat 1S.
  • the communication device 53 is configured to control communication between the asphalt finisher 100 and a device outside the asphalt finisher 100.
  • the communication device 53 is installed in front of the driver's seat 1S.
  • FIG. 2 is a block diagram showing a configuration example of the control system LS.
  • the control system LS mainly includes a mold board elevating device 24, a center crown device 26, a slope crown device 27, a leveling cylinder 28, a screed elevating device 29, a controller 50, a left information acquisition device 51L, a right information acquisition device 51R, and a display device. It is composed of 52, a communication device 53, and the like.
  • the controller 50 includes an information acquisition unit 50a, a crown device drive unit 50b, a leveling cylinder drive unit 50c, a screed elevating unit 50d, and a mold board elevating unit 50e as functional elements.
  • the information acquisition unit 50a, the crown device drive unit 50b, the leveling cylinder drive unit 50c, the screed elevating unit 50d, and the mold board elevating unit 50e are shown separately for convenience of explanation, but are physically distinguished. It does not have to be, and may be composed of software components or hardware components that are common in whole or in part.
  • the information acquisition unit 50a is configured to be able to acquire information on the surface of the new pavement body NP.
  • the information acquisition unit 50a measures the surface shape of the new pavement NP based on the output of the lidar as the rear information acquisition device 51C.
  • the information acquisition unit 50a measures the finished shape of the surface of the new pavement body NP using the local coordinate system centered on LIDAR and the reference coordinate system. That is, the information acquisition unit 50a specifies the coordinates in the reference coordinate system corresponding to each point on the surface of the new pavement NP by converting the coordinates in the local coordinate system into the coordinates in the reference coordinate system.
  • the reference coordinate system is, for example, the world geodetic coordinate system.
  • the world geographic coordinate system is a three-dimensional Cartesian coordinate system with the origin at the center of gravity of the earth, the X axis in the direction of the intersection of the Greenwich meridian and the equator, the Y axis in the direction of 90 degrees east longitude, and the Z axis in the direction of the North Pole. It is an XYZ coordinate system.
  • the information acquisition unit 50a is configured to be able to measure the surface shape of the new pavement NP within the measurement range during construction, that is, while the asphalt finisher 100 is advancing.
  • the information acquisition unit 50a may determine whether or not there is a step on the pavement surface. In this case, the information acquisition unit 50a may display the determination result of the presence / absence of the step on the display device 52. Further, when the information acquisition unit 50a determines that a step exists, the information acquisition unit 50a may display information regarding the position of the step.
  • the information acquisition unit 50a may determine the presence or absence of a step by performing image processing on the image captured by the image pickup device as the rear information acquisition device 51C.
  • the imaging device is, for example, a monocular camera, a stereo camera, an infrared camera, a range image camera, LIDAR, or the like.
  • the image processing includes, for example, binarization processing, edge detection processing, Hough transform processing, and the like.
  • the information acquisition unit 50a may display the fact on the display device 52. In this case, the information acquisition unit 50a may output an alarm from a voice output device (not shown).
  • the crown device drive unit 50b is configured to drive at least one of the center crown device 26 and the slope crown device 27.
  • the crown device drive unit 50b operates the center crown device 26 and the slope crown device 27 individually by using a hydraulic pump, a hydraulic motor, a control valve, and the like.
  • the crown device drive unit 50b individually operates the center crown device 26 and the slope crown device 27 in response to a command from an operator of the asphalt finisher 100 via an input device (not shown).
  • the crown device drive unit 50b may operate the center crown device 26 and the slope crown device 27 individually and autonomously in response to a control command from the controller 50, in addition to the command from the operator.
  • the leveling cylinder drive unit 50c is configured to drive the leveling cylinder 28.
  • the leveling cylinder drive unit 50c operates the leveling cylinder 28 by using a hydraulic pump, a control valve, and the like. Specifically, the leveling cylinder drive unit 50c operates the leveling cylinder 28 in response to a command from the operator of the asphalt finisher 100 via the input device.
  • the leveling cylinder drive unit 50c may autonomously operate the leveling cylinder 28 in response to a control command from the controller 50, in addition to a command from the operator.
  • the screed elevating unit 50d is configured to drive the screed elevating device 29.
  • the screed lifting device 29 is a mechanism for moving the rear screed 31 up and down in order to eliminate a step formed between the pavement surface compacted by the front screed 30 and the pavement surface compacted by the rear screed 31. Is. Eliminating the step means preventing the step detected by the controller 50 from being continuously formed thereafter.
  • the step that has already been formed is removed by using, for example, a rake for leveling work, a road roller, a plate compactor, or the like.
  • the screed elevating unit 50d operates the screed elevating device 29 by using a hydraulic pump, a hydraulic motor, a control valve, and the like. Specifically, the screed elevating unit 50d operates the screed elevating device 29 in response to a command from the operator of the asphalt finisher 100 via the input device. The screed elevating unit 50d may autonomously operate the screed elevating device 29 in response to a control command from the controller 50, in addition to the command given by the operator.
  • the controller 50 controls, for example, the screed elevating portion 50d.
  • the command may be output.
  • the screed elevating unit 50d operates the screed elevating device 29 in response to the control command from the controller 50 to eliminate the step.
  • the screed elevating portion 50d is formed between the pavement surface compacted by the left front screed 30L and the pavement surface compacted by the left rear screed 31L, for example, by operating the left screed elevating device 29L.
  • the left rear screed 31L is moved up and down to eliminate the step.
  • the screed elevating unit 50d rotates a screed elevating motor as a hydraulic actuator constituting the left screed elevating device 29L in response to a control command from the controller 50, and is attached to the left rear screed 31L.
  • the rotation / linear motion conversion mechanism is driven to move the left rear screed 31L up and down. The same applies to the case where the right screed elevating device 29R is operated.
  • the mold board elevating part 50e is configured to drive the mold board elevating device 24.
  • the mold board elevating device 24 is a mechanism for moving the mold board 43 up and down in order to adjust the amount of holding by the rear screed 31.
  • the mold board elevating unit 50e operates the mold board elevating device 24 by using a hydraulic pump, a hydraulic motor, a control valve, and the like. Specifically, the mold board elevating unit 50e operates the mold board elevating device 24 in response to a command from the operator of the asphalt finisher 100 via the input device. The mold board elevating unit 50e may autonomously operate the mold board elevating device 24 in response to a control command from the controller 50, in addition to a command from the operator.
  • the controller 50 may output a control command to the mold board elevating unit 50e.
  • the mold board elevating unit 50e causes the mold board elevating device 24 to adjust the height of the mold board 43 in response to a control command from the controller 50.
  • the mold board elevating unit 50e elevates the left mold board 43L by the left outer elevating device 24LD and the left inner elevating device 24LP to adjust the amount of pavement material PV passing under the left mold board 43L. Then, the amount of holding by the left rear side screed 31L is adjusted. The same applies to the case where the holding amount by the right rear screed 31R is adjusted.
  • the controller 50 may autonomously control at least one of the mold board elevating device 24, the center crown device 26, the slope crown device 27, the leveling cylinder 28, and the screed elevating device 29.
  • the operator may manually control at least one of the mold board elevating device 24, the center crown device 26, the slope crown device 27, the leveling cylinder 28, and the screed elevating device 29.
  • FIGS. 3A and 3B show two display examples of the screen GX. Specifically, FIG. 3A is a screen GX displayed when it is detected that the holding amount by the left rear screed 31L is smaller than a predetermined lower limit value. FIG. 3B is a screen GX displayed when it is detected that the holding amount by the right rear screed 31R is larger than a predetermined upper limit value.
  • the screen GX shown in FIGS. 3A and 3B includes a machine figure GM, a pavement figure GP, and a road surface figure GR as common figures.
  • the body figure GM represents the top view of the asphalt finisher 100.
  • the body figure GM represents a top view of the entire body of the asphalt finisher 100.
  • the pavement material figure GP represents the top view of the pavement material PV before being compacted by the screed 3.
  • the pavement graphic GP is a left pavement graphic GPL representing the pavement material PV held by the left rear screed 31L and a right pavement representing the pavement PV held by the right rear screed 31R. Includes material figure GPR.
  • the pavement material graphic GP represents a portion having a large amount of pavement material PV and a portion having a small amount of pavement material PV so that the operator can distinguish them.
  • a portion having a large amount of pavement material PV is represented by a fine (dark) satin pattern
  • a portion having a small amount of pavement PV is represented by a coarse (thin) satin pattern.
  • the pavement graphic GP utilizes at least one of a difference in color, a difference in pattern, a difference in brightness, etc., and operates a portion having a large amount of pavement material PV and a portion having a small amount of pavement material PV. It may be expressed so that the person can distinguish it.
  • the road surface figure GR represents the top view of the newly constructed pavement body NP.
  • the road surface graphic GR represents the newly constructed pavement NP in a diagonal line pattern.
  • FIG. 3A includes figures G11 and G21.
  • the figure G11 is displayed when the amount held by the left rear screed 31L is not an appropriate amount.
  • the figure G11 is a warning display including character information regarding an abnormal state currently occurring such as "insufficient pavement material!.
  • the figure G21 is displayed when the amount held by the left rear screed 31L is not an appropriate amount.
  • the figure G21 is a balloon containing information on measures to be taken to eliminate the abnormal state currently occurring, and indicates the position of the measurement range ZL (see FIG. 1B).
  • the figure G21 can inform the operator of the asphalt finisher 100 that the entire left mold board 43L can be autonomously raised by the controller 50 by displaying character information such as "raise the left mold board", for example. it can.
  • FIG. 3B includes figures G12 and G22.
  • the figure G12 is displayed when the amount held by the right rear screed 31R is not an appropriate amount.
  • the figure G12 is a warning display including character information regarding an abnormal state currently occurring such as "excessive pavement material!.
  • the figure G22 is displayed when the amount held by the right rear screed 31R is not an appropriate amount.
  • the figure G22 is a balloon containing information on measures to be taken to eliminate the abnormal state currently occurring, and indicates the position of the left end portion of the measurement range ZR (see FIG. 1B). ..
  • the asphalt finisher 100 indicates that the left end (proximal end) of the right mold board 43R is autonomously lowered by the controller 50 by displaying character information such as "lowering the left end of the right mold board" in the figure G22. Can be communicated to the operator of.
  • FIG. 4 is a flowchart of the height adjustment process.
  • the controller 50 repeatedly executes this height adjustment process at a predetermined control cycle, for example, when the asphalt finisher 100 is moving forward.
  • the controller 50 determines whether or not the holding amount is insufficient on the left side (step ST1).
  • the information acquisition unit 50a of the controller 50 determines whether or not the amount held by the left rear screed 31L is less than a predetermined lower limit value based on the output of the lidar as the left information acquisition device 51L.
  • the controller 50 raises the left mold board 43L (step ST2). This is to solve the shortage of the holding amount by the left rear screed 31L by increasing the amount of the pavement material PV passing under the left mold board 43L.
  • the information acquisition unit 50a outputs a control command for raising the left mold board 43L to the mold board elevating unit 50e.
  • the mold board elevating unit 50e operates the left mold board elevating device 24L in response to a control command from the information acquisition unit 50a to raise the left mold board 43L.
  • the controller 50 determines whether or not the holding amount is surplus on the left side (step ST3).
  • the information acquisition unit 50a determines whether or not the amount held by the left rear screed 31L exceeds a predetermined upper limit value based on the output of the lidar as the left information acquisition device 51L.
  • the controller 50 lowers the left mold board 43L (step ST4). This is to eliminate the excessive amount of holding by the left rear screed 31L by reducing the amount of pavement material PV passing under the left mold board 43L.
  • the information acquisition unit 50a outputs a control command for lowering the left mold board 43L to the mold board elevating unit 50e.
  • the mold board elevating unit 50e operates the left mold board elevating device 24L in response to a control command from the information acquisition unit 50a to lower the left mold board 43L.
  • step ST3 When it is determined that the holding amount is not left over on the left side (NO in step ST3), the controller 50 executes step ST5 without executing step ST4.
  • the controller 50 may be configured to determine whether or not the holding amount is insufficient on the left side after determining whether or not the holding amount is insufficient on the left side. Alternatively, the controller 50 may simultaneously determine whether or not the holding amount is left surplus and whether or not it is insufficient.
  • the controller 50 determines whether or not the holding amount is insufficient on the right side (step ST5).
  • the information acquisition unit 50a determines whether or not the amount held by the right rear screed 31R is less than a predetermined lower limit value based on the output of the lidar as the right information acquisition device 51R.
  • the controller 50 raises the right mold board 43R (step ST6). This is to solve the shortage of the holding amount by the right rear screed 31R by increasing the amount of the pavement material PV passing under the right mold board 43R.
  • the information acquisition unit 50a outputs a control command for raising the right mold board 43R to the mold board elevating unit 50e.
  • the mold board elevating unit 50e operates the right mold board elevating device 24R in response to a control command from the information acquisition unit 50a to raise the right mold board 43R.
  • the controller 50 determines whether or not the holding amount is surplus on the right side (step ST7).
  • the information acquisition unit 50a determines whether or not the amount held by the right rear screed 31R exceeds a predetermined upper limit value based on the output of the lidar as the right information acquisition device 51R.
  • the controller 50 lowers the right mold board 43R (step ST8). This is to eliminate the excessive amount of pavement PV held by the right rear screed 31R by reducing the amount of pavement material PV passing under the right mold board 43R.
  • the information acquisition unit 50a outputs a control command for lowering the right mold board 43R to the mold board elevating unit 50e.
  • the mold board elevating unit 50e operates the right mold board elevating device 24R in response to a control command from the information acquisition unit 50a to lower the right mold board 43R.
  • step ST7 When it is determined that the holding amount is not left on the right side (NO in step ST7), the controller 50 ends the height adjustment process this time without executing step ST8.
  • the controller 50 may be configured to determine whether or not the holding amount is insufficient on the right side after determining whether or not the holding amount is insufficient on the right side. Alternatively, the controller 50 may simultaneously determine whether or not the holding amount is surplus and insufficient on the right side.
  • the controller 50 determines whether or not the holding amount is insufficient or surplus on the right side, and whether or not the holding amount is insufficient or surplus on the left side, and then the left mold. You may decide how to raise and lower each of the board 43L and the right mold board 43R.
  • the controller 50 can suppress the deterioration of the quality of the pavement surface by autonomously adjusting the excess or deficiency of the holding amount by the rear screed 31. This is because the controller 50 can improve at least one such as the flatness of the pavement surface and the homogeneity of the pavement body.
  • the asphalt finisher 100 can automatically detect the excess or deficiency of the amount held by the rear screed 31 and then autonomously move the mold board 43 up and down so that the excess or deficiency is eliminated. Therefore, the asphalt finisher 100 can prevent, for example, the pavement material PV from overcoming the rear screed 31 and overflowing behind the rear screed 31. Alternatively, the asphalt finisher 100 can prevent, for example, roughening of the pavement surface due to a shortage of the pavement material PV.
  • the asphalt finisher 100 can form a flat and homogeneous new pavement body NP without being influenced by the skill level of the operator regarding the manual operation of the mold board elevating device 24. Therefore, the asphalt finisher 100 can maintain the quality of the pavement formed at a certain level or higher.
  • the asphalt finisher 100 may autonomously move the mold board 43 up and down so that the excess or deficiency of the amount held by the rear screed 31 can be predicted in advance and the excess or deficiency can be prevented. Good.
  • the controller 50 may predict in advance the occurrence of excess or deficiency of the amount held by the rear screed 31 based on the output of the information acquisition device 51 continuously stored over a predetermined period.
  • the asphalt finisher 100 has the tractor 1, the hopper 2 installed on the front side of the tractor 1 and accepting the pavement material, and the pavement material in the hopper 2 to the rear side of the tractor 1.
  • the conveyor CV to be fed, the screw SC that spreads the pavement material fed by the conveyor CV on the rear side of the tractor 1, the screed 3 that compacts the pavement material PV on the rear side of the screw SC, and the front part of the screed 3.
  • the mold board 43 attached to the mold board 43, the mold board lifting device 24 as a lifting device for moving the mold board 43 up and down, the information acquisition device 51 for acquiring information on the pavement material PV held by the screed 3, and the control device. It includes a controller 50 and.
  • the screed 3 includes a front screed 30 and a rear screed 31 that are arranged so as to be offset in the vehicle length direction. Then, the controller 50 is configured to operate the mold board elevating device 24 based on the information acquired by the information acquisition device 51 to adjust the height of the mold board 43.
  • the asphalt finisher 100 can adjust the holding amount of the pavement material PV by the rear screed 31 so as to be within a predetermined range. Therefore, the asphalt finisher 100 prevents the pavement material PV from overflowing onto the new pavement body NP due to the excessive holding amount and the roughening of the pavement surface due to the dent or the like caused by the insufficient holding amount. It is possible to suppress deterioration of the quality of the pavement surface. As a result, the asphalt finisher 100 can reduce the work related to the repair of the pavement surface, and can improve the work efficiency of the pavement work as a whole.
  • the controller 50 is typically configured to raise the mold board 43 when it is determined that the amount held by the rear screed 31 is smaller than a predetermined lower limit value based on the information acquired by the information acquisition device 51. Has been done. This is to increase the amount of holding by the rear screed 31.
  • the controller 50 typically lowers the mold board 43 when it is determined that the amount held by the rear screed 31 is larger than a predetermined upper limit value based on the information acquired by the information acquisition device 51. It is configured in. This is to reduce the amount of holding by the rear screed 31.
  • the amount of holding may be expressed by, for example, the height of the mountain of the pavement PV with respect to the roadbed RB, and is expressed by the vertical distance between the reference point of the lidar as the information acquisition device 51 and the top of the mountain of the pavement PV. May be done.
  • the holding amount may be expressed by the volume of the pavement material PV.
  • the amount held by the right rear screed 31R is stored in a space surrounded by, for example, the right front screed 30R, the right rear screed 31R, the right side plate 41R, and the right mold board 43R. It may be represented by the volume of the pavement material PV.
  • the screed 3 includes, for example, a front screed 30, a left rear screed 31L, and a right rear screed 31R.
  • the mold board 43 includes a left mold board 43L corresponding to the left rear screed 31L and a right mold board 43R corresponding to the right rear screed 31R.
  • the controller 50 is configured so that the heights of the left mold board 43L and the right mold board 43R can be adjusted independently.
  • the asphalt finisher 100 can separately adjust the amount of pavement PV held by the left rear screed 31L and the amount of pavement PV held by the right rear screed 31R. Therefore, the asphalt finisher 100 can flexibly cope with the case where the excess or deficiency of the holding amount is different on the left and right. For example, the asphalt finisher 100 can flexibly cope with a case where the degree of expansion and contraction of the left rear screed 31L and the degree of expansion and contraction of the right rear screed 31R are different.
  • the elevating device may include a first elevating device that moves one end of the mold board 43 up and down, and a second elevating device that moves the other end of the mold board up and down.
  • the mold board elevating device 24 as an elevating device includes a left outer elevating device 24LD that moves the left end (distal end) of the left mold board 43L up and down, and a left mold board. It may include a left inner lifting device 24LP that moves the right end (proximal end) of 43L up and down.
  • the mold board elevating device 24 as an elevating device moves the right outer elevating device 24RD that moves the right end (distal end) of the right mold board 43R up and down and the left end (proximal end) of the right mold board 43R up and down. It may include a right inner lifting device 24RP to be operated.
  • the asphalt finisher 100 can, for example, have different heights at the left end (proximal end) and the right end (distal end) of the right mold board 43R. That is, the asphalt finisher 100 can appropriately cope with a case where the holding amount on the front right side of the right rear screed 31R is too large but the holding amount on the front left side is too large, as shown in FIG. 3B, for example. In this case, the asphalt finisher 100 lowers the left end (proximal end) while maintaining the height of the right end (distal end) of the right mold board 43R, thereby holding the right posterior screed 31R on the front right side. It is possible to reduce the amount of holding on the front left side while maintaining an appropriate amount.
  • the information acquisition device 51 is a lidar.
  • the information acquisition device 51 may be a monocular camera or a combination of a monocular camera and LIDAR.
  • the information acquisition device 51 may be a stereo camera, a distance sensor, a millimeter wave radar, an ultrasonic sensor, a laser radar, a laser scanner, a distance image camera, a laser range finder, or the like, and may be any combination thereof. You may. With this configuration, the asphalt finisher 100 can suppress deterioration of the quality of the pavement surface with a relatively simple configuration.
  • the controller 50 is configured to automatically detect the excess or deficiency of the holding amount and then move the mold board 43 up and down to autonomously eliminate the excess or deficiency.
  • the controller 50 may be configured to notify the operator that the excess or deficiency of the holding amount has been detected, and then prompt the operator to move the mold board 43 up and down.
  • the controller 50 may use at least one of sound, light, vibration, and the like to assist the operator in manually operating the mold board elevating device 24.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)

Abstract

アスファルトフィニッシャ(100)は、トラクタ(1)と、ホッパ(2)と、コンベア(CV)と、スクリュ(SC)と、スクリード(3)と、モールドボード(43)と、モールドボード(43)を上下動させるモールドボード昇降装置(24)と、コントローラ(50)と、情報取得装置(51)とを備えている。スクリード(3)は、車長方向にずらして配置される前側スクリード(30)と後側スクリード(31)とを含む。情報取得装置(51)は、後側スクリード(31)によって抱え込まれた舗装材に関する情報を取得する。コントローラ(50)は、情報取得装置(51)が取得した情報に基づいてモールドボード昇降装置(24)を動作させてモールドボード(43)の高さを調整する。

Description

アスファルトフィニッシャ
 本開示は、アスファルトフィニッシャに関する。
 従来、前側スクリードに対して左右方向に伸縮可能な後側スクリードを備えたアスファルトフィニッシャが知られている(特許文献1参照。)。このアスファルトフィニッシャは、後側スクリードを伸張することで、敷設する道路の幅を拡大できる。
 このアスファルトフィニッシャは、後側スクリードによって締め固められる舗装材の量が不足しないように、後側スクリードの前方に舗装材を抱え込みながら進行する。後側スクリードの前方に抱え込まれる舗装材の量は、進行方向においてスクリュと後側スクリードとの間に配置されるモールドボードの高さによって決まる。
 後側スクリードの前方に抱え込まれる舗装材の量は、基本的に、モールドボードの高さが高いほど多くなる。モールドボードの高さが高いほどモールドボードの下を通過する舗装材の量が増大するためである。
特開2017-160636号公報
 しかしながら、モールドボードの高さが高すぎると、後側スクリードの前方に抱え込まれる舗装材の量が過度に増大し、更には後側スクリードを乗り越えて後側スクリードの後方にある舗装面上に溢れ出てしまうおそれがある。
 逆に、モールドボードの高さが低すぎると、後側スクリードの前方に抱え込まれる舗装材の量が不足し、ひいては後側スクリードによって締め固められる舗装材の量が不足してしまい、舗装材の不足に起因する窪み等の荒れを舗装面に生じさせてしまうおそれがある。
 このように、上述のアスファルトフィニッシャは、モールドボードが高すぎる場合及び低すぎる場合の何れの場合においても、舗装面の品質を低下させてしまうおそれがある。そこで、舗装面の品質低下を抑制できるアスファルトフィニッシャの提供が望まれる。
 本発明の実施形態に係るアスファルトフィニッシャは、トラクタと、前記トラクタの前側に設置されて舗装材を受け入れるホッパと、前記ホッパ内の舗装材を前記トラクタの後側へ給送するコンベアと、前記コンベアにより給送された舗装材を前記トラクタの後側で敷き拡げるスクリュと、前記スクリュの後側で舗装材を締め固めるスクリードと、前記スクリードの前部に取り付けられるモールドボードと、前記モールドボードを上下動させる昇降装置と、前記スクリードによって抱え込まれた舗装材に関する情報を取得する情報取得装置と、制御装置と、を備え、前記スクリードは、車長方向にずらして配置される前側スクリードと後側スクリードとを含み、前記制御装置は、前記情報取得装置が取得した情報に基づいて前記昇降装置を動作させて前記モールドボードの高さを調整する。
 上述の手段により、舗装面の品質低下を抑制できるアスファルトフィニッシャが提供される。
本発明の実施形態に係るアスファルトフィニッシャの側面図である。 本発明の実施形態に係るアスファルトフィニッシャの上面図である。 本発明の実施形態に係るアスファルトフィニッシャの背面図である。 モールドボード昇降システムの構成例を示すブロック図である。 表示装置に表示される画面の表示例を示す図である。 表示装置に表示される画面の表示例を示す図である。 処理のフローチャートである。
 図1A~図1Cは、本発明の実施形態に係る道路機械の一例であるアスファルトフィニッシャ100の図である。具体的には、図1Aはアスファルトフィニッシャ100の側面図であり、図1Bはアスファルトフィニッシャ100の上面図であり、図1Cはアスファルトフィニッシャ100の背面図である。
 アスファルトフィニッシャ100は、主に、トラクタ1、ホッパ2、及びスクリード3等で構成されている。以下では、トラクタ1から見たホッパ2の方向(+X方向)が前方とされ、トラクタ1から見たスクリード3の方向(-X方向)が後方とされる。
 トラクタ1は、アスファルトフィニッシャ100を走行させるための機構である。本実施形態では、トラクタ1は、後輪走行用油圧モータを用いて後輪5を回転させ、且つ、前輪走行用油圧モータを用いて前輪6を回転させてアスファルトフィニッシャ100を移動させる。後輪走行用油圧モータ及び前輪走行用油圧モータは油圧ポンプから作動油の供給を受けて回転する。後輪5及び前輪6はクローラで置き換えられてもよい。
 コントローラ50は、アスファルトフィニッシャ100を制御する制御装置である。本実施形態では、コントローラ50は、CPU、揮発性記憶装置、及び不揮発性記憶装置等を含むマイクロコンピュータで構成され、トラクタ1に搭載されている。コントローラ50による各機能を担う機能要素は、不揮発性記憶装置に記憶されているプログラムをCPUが実行することで実現される。但し、コントローラ50における各機能要素は、ハードウェア又はファームウェア等で構成されていてもよい。
 ホッパ2は、舗装材を受け入れるための機構である。本実施形態では、ホッパ2は、トラクタ1の前側に設置され、ホッパシリンダによってY軸方向(車幅方向)に開閉できるように構成されている。アスファルトフィニッシャ100は、通常、ホッパ2を全開状態にしてダンプトラックの荷台から舗装材を受け入れる。舗装材は、例えば、アスファルト混合物である。図1Bはホッパ2が全開状態であることを示している。アスファルトフィニッシャ100の操作者は、通常、ホッパ2内の舗装材が減少するとホッパ2を閉じ、ホッパ2の内壁付近にあった舗装材をホッパ2の中央部に集める。ホッパ2の中央部にあるコンベアCVによってトラクタ1の後側に舗装材を給送できるようにするためである。トラクタ1の後側に給送された舗装材は、スクリュSCによってトラクタ1の後側且つスクリード3の前側で車幅方向に敷き拡げられる。本実施形態では、スクリュSCは、エクステンションスクリュが左右に連結された状態にある。図1A及び図1Bは、スクリュSCによって敷き拡げられた舗装材PVを粗い(薄い)梨地模様で示している。
 スクリード3は、舗装材PVを締め固めるための機構である。本実施形態では、スクリード3は、前側スクリード30及び後側スクリード31を含む。そして、前側スクリード30は、左前側スクリード30L及び右前側スクリード30Rを含み、後側スクリード31は、左後側スクリード31L及び右後側スクリード31Rを含む。
 スクリード3は、トラクタ1によって牽引される浮動スクリードであり、レベリングアーム3Aを介してトラクタ1に連結されている。スクリード3は、スクリードリフトシリンダ25の伸縮によってレベリングアーム3Aと共に上下に動かされる。
 レベリングシリンダ28は、舗装材の敷き均し厚さを調整するためにレベリングアーム3Aの前端部分を上下動させる油圧シリンダである。本実施形態では、レベリングシリンダ28は、左レベリングシリンダ28L及び右レベリングシリンダ28Rを含む。
 本実施形態では、後側スクリード31は、伸縮シリンダ(図示せず。)によって車幅方向に伸縮できるように構成されている。具体的には、左後側スクリード31Lは、左伸縮シリンダ(図示せず。)によって車幅方向に伸縮され、右後側スクリード31Rは、右伸縮シリンダ(図示せず。)によって車幅方向に伸縮される。すなわち、左後側スクリード31L及び右後側スクリード31Rは互いに独立して伸縮され得る。但し、後側スクリード31は、クレーン等を用いて使用時に連結される着脱可能な固定式(非伸縮式)のスクリードであってもよい。
 前側スクリード30と後側スクリード31との連結部にはスクリード昇降装置29が取り付けられている。スクリード昇降装置29は、前側スクリード30に対して後側スクリード31を上下動させることができるように構成されている。本実施形態では、スクリード昇降装置29は、コントローラ50からの制御指令に応じて油圧アクチュエータとしてのスクリード昇降用モータを回転させ、後側スクリード31に取り付けられた回転・直動変換機構を駆動して後側スクリード31を上下動させる。スクリード昇降装置29は、左後側スクリード31Lを上下動させる左スクリード昇降装置29Lと、右後側スクリード31Rを上下動させる右スクリード昇降装置29Rとを含む。回転・直動変換機構は、例えば、ボルト・ナット機構である。回転・直動変換機構は、ボールネジ機構又はラック・ピニオン機構等の他の機構であってもよい。スクリード昇降用モータは、電動モータであってもよい。スクリード昇降装置29は、油圧シリンダであってもよい。
 サイドプレート41は、舗装材PVの車幅方向への広がりを防止できるように構成されている。本実施形態では、サイドプレート41は、左後側スクリード31Lの左端に固定された左サイドプレート41Lと、右後側スクリード31Rの右端に固定された右サイドプレート41Rとを含む。スクリードステップ42は、作業者がスクリード3の後方で作業する際の足場を構成する部材である。
 スクリード3の前部にはモールドボード43が取り付けられている。モールドボード43は、左モールドボード43L及び右モールドボード43Rを含む。左モールドボード43Lは、左後側スクリード31Lの前方に滞留する舗装材PVの量である左後側スクリード31Lによる抱え込み量を調整できるように構成されている。右モールドボード43Rは、右後側スクリード31Rの前方に滞留する舗装材PVの量である右後側スクリード31Rによる抱え込み量を調整できるように構成されている。舗装材PVは、左モールドボード43Lの下端と路盤RBとの間の隙間を通って左後側スクリード31Lの前方に至り、右モールドボード43Rの下端と路盤RBとの間の隙間を通って右後側スクリード31Rの前方に至る。
 本実施形態では、モールドボード43は、後側スクリード31と共に車幅方向に伸縮できるように構成されている。但し、モールドボード43は、後側スクリード31と同様に、使用時に連結される着脱可能な固定式(非伸縮式)のモールドボードであってもよい。また、モールドボード43は、モールドボード昇降装置24によって上下動できるように構成されている。
 モールドボード昇降装置24は、モールドボード43を上下動させる機構である。本実施形態では、モールドボード昇降装置24は、左モールドボード昇降装置24L及び右モールドボード昇降装置24Rを含む。
 左モールドボード昇降装置24Lは、左モールドボード43Lを上下動させる機構であり、左外側昇降装置24LD及び左内側昇降装置24LPを含む。左外側昇降装置24LDは、左モールドボード43Lの左端(遠位端)を上下動させる機構であり、左内側昇降装置24LPは、左モールドボード43Lの右端(近位端)を上下動させる機構である。
 右モールドボード昇降装置24Rは、右モールドボード43Rを上下動させる機構であり、右外側昇降装置24RD及び右内側昇降装置24RPを含む。右外側昇降装置24RDは、右モールドボード43Rの右端(遠位端)を上下動させる機構であり、右内側昇降装置24RPは、右モールドボード43Rの左端(近位端)を上下動させる機構である。
 左外側昇降装置24LD、左内側昇降装置24LP、右外側昇降装置24RD、及び右内側昇降装置24RPは、油圧シリンダ若しくは電動シリンダであってもよく、油圧モータ若しくは電動モータと回転・直動変換機構との組み合わせで構成されていてもよい。
 左外側昇降装置24LD及び左内側昇降装置24LPの一方は省略されてもよい。例えば、左外側昇降装置24LDが省略された場合、左モールドボード43Lの左端(遠位端)は、左サイドプレートによって縦方向(Z軸方向)にスライド可能に支持され、左内側昇降装置24LPによる左モールドボード43Lの右端(近位端)の上下動に伴って上下動される。左内側昇降装置24LPが省略された場合についても同様である。
 同様に、右外側昇降装置24RD及び右内側昇降装置24RPの一方は省略されてもよい。例えば、右内側昇降装置24RPが省略された場合、右モールドボード43Rの左端(近位端)は、右前側スクリード30Rによって縦方向(Z軸方向)にスライド可能に支持され、右外側昇降装置24RDによる右モールドボード43Rの右端(遠位端)の上下動に伴って上下動される。右外側昇降装置24RDが省略された場合についても同様である。
 前側スクリード30にはセンタークラウン装置26が搭載されている。センタークラウン装置26は、左前側スクリード30Lと右前側スクリード30Rの間に取り付けられているターンバックルを伸縮させ、後方から見たときの左前側スクリード30L(左前側スクリードプレート)の下面と右前側スクリード30R(右前側スクリードプレート)の下面との間の角度を調整する機構である。センタークラウン装置26は、例えば、コントローラ50からの制御指令に応じて油圧モータを回転させることでターンバックルの胴部を回転させてターンバックルを伸縮させる。
 前側スクリード30と後側スクリード31との間にはスロープクラウン装置27が搭載されている。スロープクラウン装置27は、左スロープクラウン装置27L及び右スロープクラウン装置27Rを含む。具体的には、左前側スクリード30Lと左後側スクリード31Lとの間に左スロープクラウン装置27Lが搭載され、右前側スクリード30Rと右後側スクリード31Rとの間に右スロープクラウン装置27Rが搭載されている。
 左スロープクラウン装置27Lは、左前側スクリード30Lと左後側スクリード31Lの間に取り付けられているターンバックルを伸縮させ、後方から見たときの左前側スクリード30L(左前側スクリードプレート)の下面と左後側スクリード31L(左後側スクリードプレート)の下面との間の角度を調整する機構である。左スロープクラウン装置27Lは、例えば、コントローラ50からの制御指令に応じて油圧モータを回転させることでターンバックルの胴部を回転させてターンバックルを伸縮させる。右スロープクラウン装置27Rについても同様である。
 トラクタ1の上部には、アスファルトフィニッシャ100の操作者が手摺りとして利用可能なガイドレール1Gが設置されている。アスファルトフィニッシャ100の操作者は、トラクタ1を操作する操作者、及び、スクリード3を操作する操作者(例えばアシスタントオペレータ)等を含む。そして、ガイドレール1Gには情報取得装置51が取り付けられている。情報取得装置51は、キャノピに取り付けられていてもよく、トラクタ1の本体に直接取り付けられていてもよい。また、情報取得装置51は、前側スクリード30に取り付けられていてもよく、後側スクリード31に取り付けられていてもよい。
 情報取得装置51は、舗装材PVに関する情報を取得できるように構成されている。本実施形態では、情報取得装置51は、アスファルトフィニッシャ100の周囲に存在する物体までの距離を測定できるように構成されたLIDARであり、後側スクリード31の前方にある空間を測定範囲として含む。そして、LIDARは、例えば、測定範囲内にある100万点以上の点のそれぞれとLIDAR(基準点)との間の距離を測定できるように構成されている。
 具体的には、情報取得装置51は、ガイドレール1Gに取り付けられた左情報取得装置51L、右情報取得装置51R、及び後方情報取得装置51Cを含む。左情報取得装置51Lは、左後側スクリード31Lによって抱え込まれている舗装材PVに関する情報を取得できるように構成されている。右情報取得装置51Rは、右後側スクリード31Rによって抱え込まれている舗装材PVに関する情報を取得できるように構成されている。後方情報取得装置51Cは、スクリード3によって締め固められた舗装材PVの表面に関する情報を取得できるように構成されている。
 左情報取得装置51Lの測定範囲ZLは、例えば、左前側スクリード30Lと、左後側スクリード31Lと、左サイドプレート41Lと、左モールドボード43Lとで囲まれた空間内に蓄えられた舗装材PVの量を、左後側スクリード31Lによる抱え込み量として検知できるように設定されている。同様に、右情報取得装置51Rの測定範囲ZRは、例えば、右前側スクリード30Rと、右後側スクリード31Rと、右サイドプレート41Rと、右モールドボード43Rとで囲まれた空間内に蓄えられた舗装材PVの量を、右後側スクリード31Rによる抱え込み量として検知できるように設定されている。舗装材PVの量は、例えば、舗装材PVの体積、舗装材PVの山の高さ、及び、基準点と舗装材PVの山の頂点との間の距離等の少なくとも1つを尺度として測定される。
 後方情報取得装置51Cの測定範囲ZCは、例えば、スクリード3の幅(すなわち新設舗装体NPの全幅)を含むように設定されている。
 情報取得装置51は、単眼カメラ、ステレオカメラ、距離センサ、ミリ波レーダ、超音波センサ、レーザレーダ、レーザスキャナ、距離画像カメラ、又はレーザレンジファインダ等であってもよい。
 本実施形態では、アスファルトフィニッシャ100は、2台の情報取得装置51で測定範囲ZL及び測定範囲ZRのそれぞれにおける舗装材PVに関する情報を取得するように構成されているが、1台の情報取得装置51又は3台以上の情報取得装置51で測定範囲ZL及び測定範囲ZRのそれぞれにおける舗装材PVに関する情報を取得するように構成されていてもよい。
 表示装置52は、アスファルトフィニッシャ100に関する情報を表示するように構成されている。本実施形態では、表示装置52は、運転席1Sの前方に設置されている液晶ディスプレイである。
 通信装置53は、アスファルトフィニッシャ100とアスファルトフィニッシャ100の外部にある機器との間の通信を制御するように構成されている。本実施形態では、通信装置53は、運転席1Sの前方に設置されている。
 次に、図2を参照し、アスファルトフィニッシャ100に搭載される制御システムLSについて説明する。図2は、制御システムLSの構成例を示すブロック図である。
 制御システムLSは、主に、モールドボード昇降装置24、センタークラウン装置26、スロープクラウン装置27、レベリングシリンダ28、スクリード昇降装置29、コントローラ50、左情報取得装置51L、右情報取得装置51R、表示装置52、及び通信装置53等で構成されている。
 コントローラ50は、機能要素として情報取得部50a、クラウン装置駆動部50b、レベリングシリンダ駆動部50c、スクリード昇降部50d、及びモールドボード昇降部50eを含む。情報取得部50a、クラウン装置駆動部50b、レベリングシリンダ駆動部50c、スクリード昇降部50d、及びモールドボード昇降部50eは、説明の便宜のために区別されて示されているが、物理的に区別されている必要はなく、全体的に或いは部分的に共通のソフトウェアコンポーネント若しくはハードウェアコンポーネントで構成されていてもよい。
 情報取得部50aは、新設舗装体NPの表面に関する情報を取得できるように構成されている。本実施形態では、情報取得部50aは、後方情報取得装置51CとしてのLIDARの出力に基づいて新設舗装体NPの表面の出来形を測定する。具体的には、情報取得部50aは、LIDARを中心とする局所座標系と基準座標系とを用いて新設舗装体NPの表面の出来形を測定する。すなわち、情報取得部50aは、局所座標系における座標を基準座標系における座標に変換することで、新設舗装体NPの表面上の各点に対応する基準座標系における座標を特定する。基準座標系は、例えば、世界測地座標系である。世界測地座標系は、地球の重心に原点をおき、X軸をグリニッジ子午線と赤道との交点の方向にとり、Y軸を東経90度の方向にとり、そしてZ軸を北極の方向にとる三次元直交XYZ座標系である。
 情報取得部50aは、施工中、すなわち、アスファルトフィニッシャ100の前進中に、測定範囲内の新設舗装体NPの表面の出来形を測定できるように構成されている。
 情報取得部50aは、舗装面上に段差が存在するか否かを判定してもよい。この場合、情報取得部50aは、段差の存否の判定結果を表示装置52に表示させてもよい。また、情報取得部50aは、段差が存在すると判定した場合、その段差の位置に関する情報を表示させてもよい。
 情報取得部50aは、後方情報取得装置51Cとしての撮像装置が撮像した画像に画像処理を施すことで、段差の存否を判定してもよい。この場合、撮像装置は、例えば、単眼カメラ、ステレオカメラ、赤外線カメラ、距離画像カメラ、又はLIDAR等である。画像処理は、例えば、二値化処理、エッジ検出処理、及びハフ変換処理等である。
 情報取得部50aは、新設舗装体NPの表面の凹凸の大きさが所定値を上回る場合、その旨を表示装置52に表示させてもよい。この場合、情報取得部50aは、不図示の音声出力装置から警報を出力させてもよい。
 クラウン装置駆動部50bは、センタークラウン装置26及びスロープクラウン装置27の少なくとも一方を駆動するように構成されている。本実施形態では、クラウン装置駆動部50bは、油圧ポンプ、油圧モータ、及び制御弁等を利用してセンタークラウン装置26及びスロープクラウン装置27を個別に動作させる。具体的には、クラウン装置駆動部50bは、アスファルトフィニッシャ100の操作者による不図示の入力装置を介した指令に応じてセンタークラウン装置26及びスロープクラウン装置27を個別に動作させる。クラウン装置駆動部50bは、操作者による指令とは別に、コントローラ50からの制御指令に応じてセンタークラウン装置26及びスロープクラウン装置27を個別に且つ自律的に動作させてもよい。
 レベリングシリンダ駆動部50cは、レベリングシリンダ28を駆動するように構成されている。レベリングシリンダ駆動部50cは、油圧ポンプ及び制御弁等を利用してレベリングシリンダ28を動作させる。具体的には、レベリングシリンダ駆動部50cは、アスファルトフィニッシャ100の操作者による入力装置を介した指令に応じてレベリングシリンダ28を動作させる。レベリングシリンダ駆動部50cは、操作者による指令とは別に、コントローラ50からの制御指令に応じてレベリングシリンダ28を自律的に動作させてもよい。
 スクリード昇降部50dは、スクリード昇降装置29を駆動するように構成されている。スクリード昇降装置29は、前側スクリード30によって締め固められた舗装面と後側スクリード31によって締め固められた舗装面との間に形成される段差を解消するために後側スクリード31を上下動させる機構である。段差の解消は、コントローラ50によって検知された段差がその後も継続的に形成されてしまうのを防止することを意味する。既に形成されてしまった段差は、例えば、均し作業用のレーキ、ロードローラ又はプレートコンパクタ等を用いて取り除かれる。
 スクリード昇降部50dは、油圧ポンプ、油圧モータ、及び制御弁等を利用してスクリード昇降装置29を動作させる。具体的には、スクリード昇降部50dは、アスファルトフィニッシャ100の操作者による入力装置を介した指令に応じてスクリード昇降装置29を動作させる。スクリード昇降部50dは、操作者による指令とは別に、コントローラ50からの制御指令に応じてスクリード昇降装置29を自律的に動作させてもよい。
 前側スクリード30によって形成された舗装面と、後側スクリード31によって形成された舗装面との間に段差が生じていることを検知した場合、コントローラ50は、例えば、スクリード昇降部50dに対して制御指令を出力してもよい。この場合、スクリード昇降部50dは、コントローラ50からの制御指令に応じてスクリード昇降装置29を動作させ、段差を消失させるようにする。スクリード昇降部50dは、例えば、左スクリード昇降装置29Lを動作させることで、左前側スクリード30Lによって締め固められた舗装面と左後側スクリード31Lによって締め固められた舗装面との間に形成された段差を解消するために左後側スクリード31Lを上下動させる。より具体的には、スクリード昇降部50dは、コントローラ50からの制御指令に応じ、左スクリード昇降装置29Lを構成している油圧アクチュエータとしてのスクリード昇降用モータを回転させ、左後側スクリード31Lに取り付けられた回転・直動変換機構を駆動して左後側スクリード31Lを上下動させる。右スクリード昇降装置29Rを動作させる場合についても同様である。
 モールドボード昇降部50eは、モールドボード昇降装置24を駆動するように構成されている。モールドボード昇降装置24は、後側スクリード31による抱え込み量を調整するためにモールドボード43を上下動させる機構である。
 モールドボード昇降部50eは、油圧ポンプ、油圧モータ、及び制御弁等を利用してモールドボード昇降装置24を動作させる。具体的には、モールドボード昇降部50eは、アスファルトフィニッシャ100の操作者による入力装置を介した指令に応じてモールドボード昇降装置24を動作させる。モールドボード昇降部50eは、操作者による指令とは別に、コントローラ50からの制御指令に応じてモールドボード昇降装置24を自律的に動作させてもよい。
 コントローラ50は、例えば、左情報取得装置51Lの出力に基づいて左後側スクリード31Lによる抱え込み量が多すぎる或いは少なすぎると判定した場合、モールドボード昇降部50eに対して制御指令を出力してもよい。この場合、モールドボード昇降部50eは、コントローラ50からの制御指令に応じてモールドボード昇降装置24によるモールドボード43の高さの調整を実行させる。具体的には、モールドボード昇降部50eは、左外側昇降装置24LD及び左内側昇降装置24LPにより左モールドボード43Lを昇降させて左モールドボード43Lの下を通過する舗装材PVの量を調整することで、左後側スクリード31Lによる抱え込み量を調整する。右後側スクリード31Rによる抱え込み量を調整する場合についても同様である。
 上述のように、コントローラ50は、モールドボード昇降装置24、センタークラウン装置26、スロープクラウン装置27、レベリングシリンダ28、及びスクリード昇降装置29の少なくとも1つを自律的に制御してもよい。或いは、操作者は、モールドボード昇降装置24、センタークラウン装置26、スロープクラウン装置27、レベリングシリンダ28、及びスクリード昇降装置29の少なくとも1つを手動で制御してもよい。
 次に、図3A及び図3Bを参照し、後側スクリード31による抱え込み量が多すぎること又は少なすぎることをコントローラ50が検知したときにコントローラ50によって表示装置52に表示される画面GXについて説明する。図3A及び図3Bは、画面GXの2つの表示例を示す。具体的には、図3Aは、左後側スクリード31Lによる抱え込み量が所定の下限値より小さいことが検知されたときに表示される画面GXである。図3Bは、右後側スクリード31Rによる抱え込み量が所定の上限値より大きいことが検知されたときに表示される画面GXである。
 図3A及び図3Bに示す画面GXは、共通の図形として、機体図形GM、舗装材図形GP、及び路面図形GRを含む。
 機体図形GMは、アスファルトフィニッシャ100の上面視を表している。本実施形態では、機体図形GMは、アスファルトフィニッシャ100の機体全体の上面視を表している。
 舗装材図形GPは、スクリード3によって締め固められる前の舗装材PVの上面視を表している。本実施形態では、舗装材図形GPは、左後側スクリード31Lによって抱え込まれている舗装材PVを表す左舗装材図形GPLと、右後側スクリード31Rによって抱え込まれている舗装材PVを表す右舗装材図形GPRとを含む。そして、舗装材図形GPは、舗装材PVの量が多い部分と舗装材PVの量が少ない部分とを操作者が区別できるように表している。具体的には、舗装材図形GPは、舗装材PVの量が多い部分を細かい(濃い)梨地模様で表し、舗装材PVの量が少ない部分を粗い(薄い)梨地模様で表している。但し、舗装材図形GPは、色の違い、模様の違い、及び、輝度の違い等の少なくとも1つを利用し、舗装材PVの量が多い部分と舗装材PVの量が少ない部分とを操作者が区別できるように表してもよい。
 路面図形GRは、新設舗装体NPの上面視を表している。本実施形態では、路面図形GRは、新設舗装体NPを斜線模様で表している。
 図3Aは、図形G11及びG21を含む。図形G11は、左後側スクリード31Lによる抱え込み量が適量でないときに表示される。本実施形態では、図形G11は、「舗装材不足!」といった現在発生している異常状態に関する文字情報を含む警告表示である。
 図形G21は、左後側スクリード31Lによる抱え込み量が適量でないときに表示される。本実施形態では、図形G21は、現在発生している異常状態を解消するために取られる措置に関する情報を含む吹き出しであり、測定範囲ZL(図1B参照。)の位置を指し示している。図形G21は、例えば、「左モールドボードを上昇」といった文字情報を表示することで、コントローラ50によって左モールドボード43Lの全体が自律的に上昇させられることをアスファルトフィニッシャ100の操作者に伝えることができる。
 図3Bは、図形G12及びG22を含む。図形G12は、右後側スクリード31Rによる抱え込み量が適量でないときに表示される。本実施形態では、図形G12は、「舗装材過多!」といった現在発生している異常状態に関する文字情報を含む警告表示である。
 図形G22は、右後側スクリード31Rによる抱え込み量が適量でないときに表示される。本実施形態では、図形G22は、現在発生している異常状態を解消するために取られる措置に関する情報を含む吹き出しであり、測定範囲ZR(図1B参照。)の左端部の位置を指し示している。図形G22は、例えば、「右モールドボードの左端を下降」といった文字情報を表示することで、コントローラ50によって右モールドボード43Rの左端(近位端)が自律的に下降させられることをアスファルトフィニッシャ100の操作者に伝えることができる。
 次に、図4を参照し、後側スクリード31による抱え込み量を調整するためにコントローラ50がモールドボード43の高さを調整する処理(以下、「高さ調整処理」とする。)について説明する。図4は、高さ調整処理のフローチャートである。コントローラ50は、例えば、アスファルトフィニッシャ100が前進している際に、所定の制御周期で繰り返しこの高さ調整処理を実行する。
 最初に、コントローラ50は、抱え込み量が左側で不足しているか否かを判定する(ステップST1)。本実施形態では、コントローラ50の情報取得部50aは、左情報取得装置51LとしてのLIDARの出力に基づき、左後側スクリード31Lによる抱え込み量が所定の下限値を下回っているか否かを判定する。
 抱え込み量が左側で不足していると判定した場合(ステップST1のYES)、コントローラ50は、左モールドボード43Lを上昇させる(ステップST2)。左モールドボード43Lの下を通過する舗装材PVの量を増大させることで左後側スクリード31Lによる抱え込み量の不足を解消するためである。本実施形態では、情報取得部50aは、モールドボード昇降部50eに対し、左モールドボード43Lを上昇させるための制御指令を出力する。モールドボード昇降部50eは、情報取得部50aからの制御指令に応じて左モールドボード昇降装置24Lを動作させて左モールドボード43Lを上昇させる。
 抱え込み量が左側で不足していないと判定した場合(ステップST1のNO)、コントローラ50は、抱え込み量が左側で余っているか否かを判定する(ステップST3)。本実施形態では、情報取得部50aは、左情報取得装置51LとしてのLIDARの出力に基づき、左後側スクリード31Lによる抱え込み量が所定の上限値を上回っているか否かを判定する。
 抱え込み量が左側で余っていると判定した場合(ステップST3のYES)、コントローラ50は、左モールドボード43Lを下降させる(ステップST4)。左モールドボード43Lの下を通過する舗装材PVの量を低減させることで左後側スクリード31Lによる抱え込み量の過多を解消するためである。本実施形態では、情報取得部50aは、モールドボード昇降部50eに対し、左モールドボード43Lを下降させるための制御指令を出力する。モールドボード昇降部50eは、情報取得部50aからの制御指令に応じて左モールドボード昇降装置24Lを動作させて左モールドボード43Lを下降させる。
 抱え込み量が左側で余っていないと判定した場合(ステップST3のNO)、コントローラ50は、ステップST4を実行することなく、ステップST5を実行する。
 コントローラ50は、抱え込み量が左側で余っているか否かを判定した後で、抱え込み量が左側で不足しているか否かを判定するように構成されていてもよい。或いは、コントローラ50は、抱え込み量が左側で余っているか否か及び不足しているか否かを同時に判定してもよい。
 その後、コントローラ50は、抱え込み量が右側で不足しているか否かを判定する(ステップST5)。本実施形態では、情報取得部50aは、右情報取得装置51RとしてのLIDARの出力に基づき、右後側スクリード31Rによる抱え込み量が所定の下限値を下回っているか否かを判定する。
 抱え込み量が右側で不足していると判定した場合(ステップST5のYES)、コントローラ50は、右モールドボード43Rを上昇させる(ステップST6)。右モールドボード43Rの下を通過する舗装材PVの量を増大させることで右後側スクリード31Rによる抱え込み量の不足を解消するためである。本実施形態では、情報取得部50aは、モールドボード昇降部50eに対し、右モールドボード43Rを上昇させるための制御指令を出力する。モールドボード昇降部50eは、情報取得部50aからの制御指令に応じて右モールドボード昇降装置24Rを動作させて右モールドボード43Rを上昇させる。
 抱え込み量が右側で不足していないと判定した場合(ステップST5のNO)、コントローラ50は、抱え込み量が右側で余っているか否かを判定する(ステップST7)。本実施形態では、情報取得部50aは、右情報取得装置51RとしてのLIDARの出力に基づき、右後側スクリード31Rによる抱え込み量が所定の上限値を上回っているか否かを判定する。
 抱え込み量が右側で余っていると判定した場合(ステップST7のYES)、コントローラ50は、右モールドボード43Rを下降させる(ステップST8)。右モールドボード43Rの下を通過する舗装材PVの量を低減させることで右後側スクリード31Rによる抱え込み量の過多を解消するためである。本実施形態では、情報取得部50aは、モールドボード昇降部50eに対し、右モールドボード43Rを下降させるための制御指令を出力する。モールドボード昇降部50eは、情報取得部50aからの制御指令に応じて右モールドボード昇降装置24Rを動作させて右モールドボード43Rを下降させる。
 抱え込み量が右側で余っていないと判定した場合(ステップST7のNO)、コントローラ50は、ステップST8を実行することなく、今回の高さ調整処理を終了させる。
 コントローラ50は、抱え込み量が右側で余っているか否かを判定した後で、抱え込み量が右側で不足しているか否かを判定するように構成されていてもよい。或いは、コントローラ50は、抱え込み量が右側で余っているか否か及び不足しているか否かを同時に判定してもよい。
 コントローラ50は、抱え込み量が右側で不足しているか否か及び余っているか否か、並びに、抱え込み量が左側で不足しているか否か及び余っているか否かを全て判定した後で、左モールドボード43L及び右モールドボード43Rのそれぞれをどのように昇降させるかを決定してもよい。
 上述の構成により、コントローラ50は、後側スクリード31による抱え込み量の過不足を自律的に調整することで、舗装面の品質低下を抑制できる。コントローラ50は、舗装面の平坦性及び舗装体の均質性等の少なくとも1つを向上させることができるためである。
 アスファルトフィニッシャ100は、後側スクリード31による抱え込み量の過不足を自動的に検知した上で、その過不足が解消されるように、モールドボード43を自律的に上下動させることができる。そのため、アスファルトフィニッシャ100は、例えば、舗装材PVが後側スクリード31を乗り越えて後側スクリード31の後方に溢れ出すのを防止できる。或いは、アスファルトフィニッシャ100は、例えば、舗装材PVの不足に起因する窪み等の荒れが舗装面に生じてしまうのを防止できる。
 また、アスファルトフィニッシャ100は、モールドボード昇降装置24の手動操作に関する操作者の熟練度に左右されることなく、平坦且つ均質な新設舗装体NPを形成できる。そのため、アスファルトフィニッシャ100は、形成される舗装体の品質を一定レベル以上で維持できる。
 なお、アスファルトフィニッシャ100は、後側スクリード31による抱え込み量の過不足の発生を事前に予測した上で、その過不足を未然に防止できるように、モールドボード43を自律的に上下動させてもよい。この場合、コントローラ50は、所定期間にわたって継続的に記憶された情報取得装置51の出力に基づいて後側スクリード31による抱え込み量の過不足の発生を事前に予測してもよい。
 上述のように、本発明の実施形態に係るアスファルトフィニッシャ100は、トラクタ1と、トラクタ1の前側に設置されて舗装材を受け入れるホッパ2と、ホッパ2内の舗装材をトラクタ1の後側へ給送するコンベアCVと、コンベアCVにより給送された舗装材をトラクタ1の後側で敷き拡げるスクリュSCと、スクリュSCの後側で舗装材PVを締め固めるスクリード3と、スクリード3の前部に取り付けられるモールドボード43と、モールドボード43を上下動させる昇降装置としてのモールドボード昇降装置24と、スクリード3によって抱え込まれた舗装材PVに関する情報を取得する情報取得装置51と、制御装置としてのコントローラ50と、を備えている。スクリード3は、車長方向にずらして配置される前側スクリード30と後側スクリード31とを含む。そして、コントローラ50は、情報取得装置51が取得した情報に基づいてモールドボード昇降装置24を動作させてモールドボード43の高さを調整するように構成されている。
 この構成により、アスファルトフィニッシャ100は、後側スクリード31による舗装材PVの抱え込み量が所定の範囲内に収まるように抱え込み量を調整できる。そのため、アスファルトフィニッシャ100は、過剰な抱え込み量に起因する舗装材PVの新設舗装体NP上への溢れ出し、及び、抱え込み量の不足に起因する窪み等による舗装面の荒れ等を防止することで舗装面の品質低下を抑制できる。その結果、アスファルトフィニッシャ100は、舗装面の補修に関する作業を削減でき、舗装工事の全体としての作業効率を高めることができる。
 コントローラ50は、典型的には、情報取得装置51が取得した情報に基づいて後側スクリード31による抱え込み量が所定の下限値よりも小さいと判定した場合に、モールドボード43を上昇させるように構成されている。後側スクリード31による抱え込み量を増やすためである。
 また、コントローラ50は、典型的には、情報取得装置51が取得した情報に基づいて後側スクリード31による抱え込み量が所定の上限値よりも大きいと判定した場合に、モールドボード43を下降させるように構成されている。後側スクリード31による抱え込み量を減らすためである。
 抱え込み量は、例えば、路盤RBに対する舗装材PVの山の高さで表されてもよく、情報取得装置51としてのLIDARの基準点と舗装材PVの山の頂点との間の鉛直距離で表されてもよい。
 或いは、抱え込み量は、舗装材PVの体積で表されてもよい。具体的には、右後側スクリード31Rによる抱え込み量は、例えば、右前側スクリード30Rと、右後側スクリード31Rと、右サイドプレート41Rと、右モールドボード43Rとで囲まれた空間内に蓄えられた舗装材PVの体積で表されてもよい。
 スクリード3は、例えば、前側スクリード30、左後側スクリード31L、及び右後側スクリード31Rを含む。この場合、モールドボード43は、左後側スクリード31Lに対応する左モールドボード43Lと、右後側スクリード31Rに対応する右モールドボード43Rとを含む。そして、コントローラ50は、左モールドボード43L及び右モールドボード43Rのそれぞれの高さを独立して調整できるように構成されている。
 この構成により、アスファルトフィニッシャ100は、左後側スクリード31Lによる舗装材PVの抱え込み量と、右後側スクリード31Rによる舗装材PVの抱え込み量とを別々に調整できる。そのため、アスファルトフィニッシャ100は、抱え込み量の過不足の状態が左右で異なる場合にも柔軟に対応できる。例えば、アスファルトフィニッシャ100は、左後側スクリード31Lの伸縮度合いと右後側スクリード31Rの伸縮度合いとが異なる場合にも柔軟に対応できる。
 昇降装置は、モールドボード43の一端を上下動させる第1昇降装置と、前記モールドボードの他端を上下動させる第2昇降装置とを含んでいてもよい。具体的には、上述の実施形態で示すように、昇降装置としてのモールドボード昇降装置24は、左モールドボード43Lの左端(遠位端)を上下動させる左外側昇降装置24LDと、左モールドボード43Lの右端(近位端)を上下動させる左内側昇降装置24LPとを含んでいてもよい。同様に、昇降装置としてのモールドボード昇降装置24は、右モールドボード43Rの右端(遠位端)を上下動させる右外側昇降装置24RDと、右モールドボード43Rの左端(近位端)を上下動させる右内側昇降装置24RPとを含んでいてもよい。
 この構成により、アスファルトフィニッシャ100は、例えば、右モールドボード43Rの左端(近位端)の高さと右端(遠位端)の高さとを異ならせることができる。すなわち、アスファルトフィニッシャ100は、例えば図3Bに示すような、右後側スクリード31Rの前方右側における抱え込み量が適量であるにもかかわらず前方左側における抱え込み量が多すぎる場合にも適切に対応できる。この場合、アスファルトフィニッシャ100は、右モールドボード43Rの右端(遠位端)の高さを維持したまま、左端(近位端)を下降させることで、右後側スクリード31Rの前方右側における抱え込み量を適量に維持しながら、前方左側における抱え込み量を減らすことができる。
 上述の実施形態では、情報取得装置51はLIDARである。但し、情報取得装置51は、単眼カメラであってもよく、単眼カメラとLIDARの組み合わせであってもよい。或いは、情報取得装置51は、ステレオカメラ、距離センサ、ミリ波レーダ、超音波センサ、レーザレーダ、レーザスキャナ、距離画像カメラ、又はレーザレンジファインダ等であってもよく、それらの任意の組み合わせであってもよい。この構成により、アスファルトフィニッシャ100は、比較的簡単な構成で舗装面の品質低下を抑制できる。
 以上、本発明の好ましい実施形態が説明された。しかしながら、本発明は、上述した実施形態に限定されることはない。上述した実施形態は、本発明の範囲を逸脱することなしに、種々の変形又は置換等が適用され得る。また、上述の実施形態を参照して説明された特徴のそれぞれは、技術的に矛盾しない限り、適宜に組み合わされてもよい。
 例えば、上述の実施形態では、コントローラ50は、抱え込み量の過不足を自動的に検知した上でモールドボード43を上下動させてその過不足を自律的に解消するように構成されている。しかしながら、コントローラ50は、抱え込み量の過不足を検知したことを操作者に知らせた上で、モールドボード43の上下動を操作者に促すように構成されていてもよい。この場合、コントローラ50は、音、光及び振動等の少なくとも1つを用い、操作者によるモールドボード昇降装置24の手動操作を支援してもよい。
 本願は、2019年3月29日に出願した日本国特許出願2019-066400号に基づく優先権を主張するものであり、この日本国特許出願の全内容を本願に参照により援用する。
 1・・・トラクタ 1G・・・ガイドレール 1S・・・運転席 2・・・ホッパ 3・・・スクリード 3A・・・レベリングアーム 5・・・後輪 6・・・前輪 24・・・モールドボード昇降装置 25・・・スクリードリフトシリンダ 26・・・センタークラウン装置 27・・・スロープクラウン装置 28・・・レベリングシリンダ 29・・・スクリード昇降装置 30・・・前側スクリード 31・・・後側スクリード 41・・・サイドプレート 42・・・スクリードステップ 43・・・モールドボード 50・・・コントローラ 50a・・・情報取得部 50b・・・クラウン装置駆動部 50c・・・レベリングシリンダ駆動部 50d・・・スクリード昇降部 50e・・・モールドボード昇降部 51・・・情報取得装置 52・・・表示装置 53・・・通信装置 100・・・アスファルトフィニッシャ AP・・・地物 CV・・・コンベア NP・・・新設舗装体 PV・・・舗装材 RB・・・路盤 SC・・・スクリュ

Claims (6)

  1.  トラクタと、
     前記トラクタの前側に設置されて舗装材を受け入れるホッパと、
     前記ホッパ内の舗装材を前記トラクタの後側へ給送するコンベアと、
     前記コンベアにより給送された舗装材を前記トラクタの後側で敷き拡げるスクリュと、
     前記スクリュの後側で舗装材を締め固めるスクリードと、
     前記スクリードの前部に取り付けられるモールドボードと、
     前記モールドボードを上下動させる昇降装置と、
     前記スクリードによって抱え込まれた舗装材に関する情報を取得する情報取得装置と、
     制御装置と、を備え、
     前記スクリードは、車長方向にずらして配置される前側スクリードと後側スクリードとを含み、
     前記制御装置は、前記情報取得装置が取得した情報に基づいて前記昇降装置を動作させて前記モールドボードの高さを調整する、
     アスファルトフィニッシャ。
  2.  前記制御装置は、前記情報取得装置が取得した情報に基づいて前記スクリードによる抱え込み量が所定の下限値よりも小さいと判定した場合に、前記モールドボードを上昇させる、
     請求項1に記載のアスファルトフィニッシャ。
  3.  前記制御装置は、前記情報取得装置が取得した情報に基づいて前記スクリードによる抱え込み量が所定の上限値よりも大きいと判定した場合に、前記モールドボードを下降させる、
     請求項1に記載のアスファルトフィニッシャ。
  4.  前記スクリードは、前側スクリード、左後側スクリード、及び右後側スクリードを含み、
     前記モールドボードは、前記左後側スクリードに対応する左モールドボードと、前記右後側スクリードに対応する右モールドボードと、を含み、
     前記制御装置は、前記左モールドボード及び前記右モールドボードのそれぞれの高さを独立して調整できるように構成されている、
     請求項1に記載のアスファルトフィニッシャ。
  5.  前記昇降装置は、前記モールドボードの一端を上下動させる第1昇降装置と、前記モールドボードの他端を上下動させる第2昇降装置と、を含む、
     請求項1に記載のアスファルトフィニッシャ。
  6.  前記情報取得装置は、カメラ又はLIDARである、
     請求項1に記載のアスファルトフィニッシャ。
PCT/JP2020/013111 2019-03-29 2020-03-24 アスファルトフィニッシャ WO2020203489A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2021511509A JP7275254B2 (ja) 2019-03-29 2020-03-24 アスファルトフィニッシャ
EP20783985.3A EP3951062A4 (en) 2019-03-29 2020-03-24 ASPHALT PAVER
CN202080021363.7A CN113597489A (zh) 2019-03-29 2020-03-24 沥青滚平机
CN202311552774.0A CN117702580A (zh) 2019-03-29 2020-03-24 沥青滚平机
JP2023076049A JP2023087053A (ja) 2019-03-29 2023-05-02 アスファルトフィニッシャ

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019066400 2019-03-29
JP2019-066400 2019-03-29

Publications (1)

Publication Number Publication Date
WO2020203489A1 true WO2020203489A1 (ja) 2020-10-08

Family

ID=72668012

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/013111 WO2020203489A1 (ja) 2019-03-29 2020-03-24 アスファルトフィニッシャ

Country Status (4)

Country Link
EP (1) EP3951062A4 (ja)
JP (2) JP7275254B2 (ja)
CN (2) CN113597489A (ja)
WO (1) WO2020203489A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323870A (zh) * 2022-08-03 2022-11-11 民航机场建设工程有限公司 机场道面超平卷材过渡层砂浆找平机械及施工找平方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3713247B2 (ja) * 2002-02-25 2005-11-09 住友建機製造株式会社 舗装機械に於けるアスファルト合材量の調整装置
US20120282026A1 (en) * 2011-05-06 2012-11-08 Atherton Dwayne L Combination gravel spreader/paver geo-textile fabric installer apparatus
JP2017160636A (ja) * 2016-03-08 2017-09-14 住友建機株式会社 アスファルトフィニッシャ
WO2019026830A1 (ja) * 2017-08-01 2019-02-07 住友建機株式会社 アスファルトフィニッシャ
WO2019031318A1 (ja) * 2017-08-08 2019-02-14 住友建機株式会社 道路機械
JP2019066400A (ja) 2017-10-04 2019-04-25 新東エスプレシジョン株式会社 検査装置及び検査方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008316A (ja) * 1998-06-26 2000-01-11 Sumitomo Constr Mach Co Ltd 道路舗設機のスクリード装置
JP3383908B2 (ja) * 1999-06-15 2003-03-10 住友建機製造株式会社 アスファルトフィニッシャ等の道路舗設車両のスクリード装置
US20020110419A1 (en) * 2001-02-15 2002-08-15 Robert Batty Height control arrangement for a strike-off plate
JP2008190180A (ja) * 2007-02-02 2008-08-21 Sumitomo (Shi) Construction Machinery Manufacturing Co Ltd 舗装機械におけるモールドボードの上下位置調整装置
DE102010004785A1 (de) * 2009-11-24 2011-05-26 Dynapac Gmbh Verfahren und Straßenfertiger zur Herstellung eines Straßenbelags
JP5637933B2 (ja) * 2011-05-20 2014-12-10 住友建機株式会社 スクリード装置の伸縮モールドボード上下調整機構
US9004811B2 (en) * 2012-02-24 2015-04-14 Caterpillar Paving Products Inc. Systems and methods for aiming asphalt material feed sensors
US9476168B2 (en) * 2014-08-29 2016-10-25 Caterpillar Paving Products Inc. Asphalt paver temperature alert system for asphalt compactor operator
JP6419521B2 (ja) * 2014-10-10 2018-11-07 住友建機株式会社 道路機械

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3713247B2 (ja) * 2002-02-25 2005-11-09 住友建機製造株式会社 舗装機械に於けるアスファルト合材量の調整装置
US20120282026A1 (en) * 2011-05-06 2012-11-08 Atherton Dwayne L Combination gravel spreader/paver geo-textile fabric installer apparatus
JP2017160636A (ja) * 2016-03-08 2017-09-14 住友建機株式会社 アスファルトフィニッシャ
WO2019026830A1 (ja) * 2017-08-01 2019-02-07 住友建機株式会社 アスファルトフィニッシャ
WO2019031318A1 (ja) * 2017-08-08 2019-02-14 住友建機株式会社 道路機械
JP2019066400A (ja) 2017-10-04 2019-04-25 新東エスプレシジョン株式会社 検査装置及び検査方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323870A (zh) * 2022-08-03 2022-11-11 民航机场建设工程有限公司 机场道面超平卷材过渡层砂浆找平机械及施工找平方法
CN115323870B (zh) * 2022-08-03 2023-08-01 民航机场建设工程有限公司 机场道面超平卷材过渡层砂浆找平机械及施工找平方法

Also Published As

Publication number Publication date
CN117702580A (zh) 2024-03-15
JP2023087053A (ja) 2023-06-22
JPWO2020203489A1 (ja) 2020-10-08
EP3951062A1 (en) 2022-02-09
EP3951062A4 (en) 2022-05-11
JP7275254B2 (ja) 2023-05-17
CN113597489A (zh) 2021-11-02

Similar Documents

Publication Publication Date Title
CN108699805B (zh) 机动平路机的控制方法以及机动平路机
CN108699784B (zh) 具有作为导航辅助的投影仪的筑路机
US11053667B2 (en) Control system for work vehicle, method for setting trajectory of work implement, and work vehicle
US11422563B2 (en) Control system for work vehicle, method for setting trajectory of work implement, and work vehicle
CN109914203B (zh) 路面整修机及用于自动控制路面整修机的调平缸的拉点高度的方法
US20220002953A1 (en) Asphalt finisher
CN105714649A (zh) 框架变形控制
JP7445591B2 (ja) 道路機械
EP4056758B1 (de) Verfahren zum fertigen eines strassenbelags und asphaltiersystem
JP2023087053A (ja) アスファルトフィニッシャ
JP2018095363A (ja) 作業車両
JP7366702B2 (ja) 合成距離画像の作成方法、土砂採取モニター用画像の作成方法、及び、合成距離画像の作成装置
WO2020203475A1 (ja) アスファルトフィニッシャ
US20210148064A1 (en) Asphalt finisher and management device for road construction machine
AU2018258521A1 (en) Control system for work vehicle, method, and work vehicle
WO2022210978A1 (ja) アスファルトフィニッシャ、及び路面舗装システム
US10889942B2 (en) Method and system for positioning screed plates
CN116964272A (zh) 沥青滚平机及路面铺路系统
JP2001004376A (ja) 作業機械管理装置
CN116892150A (zh) 道路机械的控制系统
CN116892149A (zh) 道路机械的控制系统
CN103161186A (zh) 平地机铲刀角度监测找平系统及其实现方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20783985

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021511509

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020783985

Country of ref document: EP

Effective date: 20211029