WO2020183604A1 - ダイカスト装置のガス抜き装置及びガス抜き方法 - Google Patents

ダイカスト装置のガス抜き装置及びガス抜き方法 Download PDF

Info

Publication number
WO2020183604A1
WO2020183604A1 PCT/JP2019/009940 JP2019009940W WO2020183604A1 WO 2020183604 A1 WO2020183604 A1 WO 2020183604A1 JP 2019009940 W JP2019009940 W JP 2019009940W WO 2020183604 A1 WO2020183604 A1 WO 2020183604A1
Authority
WO
WIPO (PCT)
Prior art keywords
path
vacuum
cavity
degassing
sleeve
Prior art date
Application number
PCT/JP2019/009940
Other languages
English (en)
French (fr)
Inventor
巖 森川
Original Assignee
株式会社ダイエンジニアリング
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ダイエンジニアリング filed Critical 株式会社ダイエンジニアリング
Priority to CN201980071961.2A priority Critical patent/CN112996612A/zh
Priority to DE112019003928.8T priority patent/DE112019003928T5/de
Priority to JP2021504674A priority patent/JP7055522B2/ja
Priority to PCT/JP2019/009940 priority patent/WO2020183604A1/ja
Priority to US17/272,261 priority patent/US20210308749A1/en
Publication of WO2020183604A1 publication Critical patent/WO2020183604A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/14Machines with evacuated die cavity
    • B22D17/145Venting means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/06Permanent moulds for shaped castings
    • B22C9/067Venting means for moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/14Machines with evacuated die cavity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/20Accessories: Details
    • B22D17/32Controlling equipment

Definitions

  • the present invention relates to a degassing device and a degassing method for a die casting device.
  • Patent Document 1 discloses a device for preventing the entrainment of gas in the molten metal supplied to the cavity of the mold of the die casting device, and a method for removing the gas.
  • Patent Document 1 The method disclosed in Patent Document 1 is to remove gas from the vicinity of the molten metal before supplying it to the inside of the mold. Therefore, it is difficult to remove the air inside the cavity. Therefore, it is unlikely that the quality of die-cast products will be sufficiently improved.
  • the present invention has been made in view of the above circumstances, and provides a degassing device for a die casting device and a method for degassing a die casting device, which improves the quality of a die casting product by reliably removing air from the cavity.
  • the purpose is.
  • the degassing device measures the first path for injecting the molten metal into the cavity, the second path for degassing the cavity, and the degree of vacuum of the cavity.
  • the first control unit is obtained by measuring the degree of vacuum of the cavity from the third path when the first path opening / closing device is operated.
  • the difference between the vacuum arrival time and the second vacuum arrival time obtained by measuring the degree of vacuum of the cavity from the third path when the second switchgear is operated is the difference between the operation timing times.
  • the degassing device is provided with a vacuum suction groove inside the sleeve of the sleeve vacuum suction port for venting gas from the inside of the sleeve for injecting molten metal into the mold in the first path.
  • the length of the vacuum suction groove is shorter than the length of the sliding surface of the tip that pushes the molten metal inside the sleeve, and the width of the vacuum suction groove is 1/3 or less of the inner diameter of the sleeve.
  • a vacuum suction path closing device is further provided between the cavity and the second path opening / closing device, and the cross-sectional area of the sleeve vacuum suction port is the minimum cross-sectional area of the path of the vacuum suction path closing device. It is 1.5 to 2.0 times, and the cross-sectional area of the vacuum suction groove is 1.1 to 1.2 times the cross-sectional area of the sleeve vacuum suction port.
  • the degassing method measures the degree of vacuum of the cavity, the first path for injecting the molten metal into the cavity, the second path for degassing the cavity, and the third.
  • This is a method of evacuating gas from a die-casting mold having a path of It is obtained by measuring the degree of vacuum of the cavity when the first vacuum arrival time obtained by measuring the degree and the second path opening / closing device connecting the second path and the vacuum device are operated.
  • the first step which is the longest of the first vacuum arrival time and the second vacuum arrival time, is compared with the second vacuum arrival time and the difference is used as the operation timing time difference.
  • it has a degassing step of operating the second path opening / closing device first and operating the second or first path opening / closing device having a short vacuum arrival time after the lapse of the operation timing time difference.
  • the quality of die-cast products can be improved by surely removing air from the cavity.
  • Cross-sectional view of the degassing device, the mold, and the sleeve according to the first embodiment of the present invention Front view showing the cavity surface of the fixed mold used for the degassing device according to the first embodiment. Front view showing the cavity surface of the movable mold used in the degassing device according to the first embodiment. Sectional drawing of the sleeve used for the degassing device which concerns on Embodiment 1. AA cross section of the sleeve used in the degassing device according to the first embodiment (see FIG. 4). Sectional drawing of the sleeve used for the degassing device which concerns on Embodiment 1. Side view of the chip used for the sleeve used in the degassing device according to the first embodiment.
  • FIG. 1 shows a degassing device 14 of the die casting device according to the first embodiment of the present invention.
  • the degassing device 14 degass the inside of the cavity 9 and the sleeve 3 of the mold 13.
  • the degassing device 14 is connected to the mold 13 and the sleeve 3.
  • the vacuum degree measuring device 18 shown in FIG. 9 measures the vacuum degree of the cavity 9.
  • the vacuum degree measuring device 18 is connected to the mold 13.
  • the mold 13 is used in combination with the fixed mold 13A and the movable mold 13B.
  • the surface of the fixed mold 13A forming the cavity 9 is shown in FIG.
  • the surface of the movable mold 13B forming the cavity 9 is shown in FIG.
  • recesses such as grooves formed on the surface of each mold are combined, and the cavity 9 shown in FIG. 1 is formed inside the mold 13.
  • the runner 7 and the sprue gate 8 are formed.
  • a degassing gate 10 and a degassing groove 11 are formed.
  • a vacuum degree measuring groove 16 is formed.
  • the vacuum suction path closing device 12 is connected to the degassing groove 11 and is arranged inside the mold 13.
  • the vacuum degree measuring path closing device 17 is connected to the vacuum degree measuring groove 16 and arranged inside the mold 13.
  • the vacuum suction path closing device 12 includes a fixed vacuum suction path closing device 12A arranged on the fixed mold 13A, a movable vacuum suction path closing device 12B arranged on the movable mold 13B, and a vacuum. It has a suction path closing valve 12C.
  • the vacuum suction path closing valve 12C is arranged inside the fixed vacuum suction path closing device 12A, and moves in the axial direction by air pressure to open and close the path between the degassing groove 11 and the cavity vacuum suction pipe.
  • the vacuum degree measuring path closing device 17 includes a fixed vacuum degree measuring path closing device 17A arranged on the fixed mold 13A and a movable vacuum degree measuring path closing device 17B arranged on the movable mold 13B. And a vacuum degree measuring path closing valve 17C.
  • the vacuum degree measurement path closing valve 17C is arranged inside the fixed vacuum degree measurement path closing device 17A, and moves in the axial direction by air pressure to move the path between the vacuum degree measurement groove 16 and the negative pressure pressure gauge 18A. Opens and closes.
  • the sleeve 3 has a cylindrical shape with a collar.
  • the outer circumference of the shorter cylindrical portion is fitted into a hole made in the fixing mold 13A so that the axial direction is horizontal.
  • the inside of the sleeve 3 is connected to the cavity 9 through the runner 7 and the sprue gate 8 connected from the hole.
  • the longer cylindrical portion of the sleeve 3 protrudes from the mold 13.
  • a molten metal hot water supply port 2 for charging the molten metal 4A into the sleeve 3 is opened near the end of the cylindrical portion protruding from the mold 13 of the sleeve 3.
  • a tip 1 for pushing the molten metal 4A charged into the sleeve 3 into the mold 13 is inserted inside the sleeve 3.
  • the tip 1 is pushed into the cylinder of the sleeve 3 by the die casting device, the molten metal 4A inside the cylinder moves to the cavity 9 of the mold 13.
  • a sleeve vacuum suction port 5 is opened in the upper part of the sleeve 3 near the mold 13 side of the molten metal supply port 2 in order to remove gas from the inside of the sleeve 3.
  • a groove is formed in the vicinity of the opening inside the cylinder of the sleeve vacuum suction port 5.
  • the width direction length of the groove is the sleeve vacuum suction groove width L3 as shown in FIG. 5, and the axial length of the sleeve 3 is the sleeve vacuum suction groove length L1 as shown in FIG. Is.
  • the length of the sliding surface of the tip 1 is the tip sliding surface length L2.
  • the sleeve vacuum suction groove length L1 is smaller than the length L2 of the tip sliding surface 1A portion of the tip 1 shown in FIG.
  • the sleeve vacuum suction groove width L3 is 1/3 or less of the tip diameter D of the tip 1 shown in FIG.
  • the cross-sectional area of the sleeve vacuum suction port 5 is 1.5 to 2 times the minimum cross-sectional area of the path of the vacuum suction path closing device 12. It has been experimentally confirmed that this stabilizes the time for degassing from the cavity 9.
  • the cross-sectional area of the sleeve vacuum suction groove 6 is 1.1 to 1.2 times the cross-sectional area of the sleeve vacuum suction port 5. As a result, it has been experimentally confirmed that the gas suction level from the sleeve vacuum suction port 5 and the gas suction groove 6 from the sleeve vacuum suction groove 6 become the same, and the efficiency of removing gas is good.
  • the degassing device 14 is an example of a vacuum tank 14A as an example of a vacuum device and an example of a first path opening / closing device connected to the first path and arranged in the immediate vicinity of the vacuum tank 14A.
  • the sleeve vacuum suction solenoid 14B From the sleeve vacuum suction solenoid 14B, the sleeve vacuum suction pipe 14C arranged immediately after the sleeve vacuum suction solenoid 14B, the sleeve vacuum suction filter 14D arranged immediately after the sleeve vacuum suction pipe 14C, and the sleeve vacuum suction filter 14D.
  • the cavity vacuum suction pipe 14G arranged, the cavity vacuum suction filter 14H arranged immediately after the cavity vacuum suction pipe 14G, and the cavity vacuum suction arranged in the path from the cavity vacuum suction filter 14H to the vacuum suction path closing device 12 It has a pipe 14I.
  • the degassing device 14 is used to clean the sleeve vacuum suction filter 14D and the sleeve vacuum suction pipe 14E that operate to clean the sleeve vacuum pipe cleaning solenoid 14J, and the cavity vacuum suction filter 14H and the cavity vacuum suction pipe 14I. It has a cavity vacuum pipe cleaning solenoid 14M that operates.
  • the degassing device 14 has a vacuum suction closing solenoid 12D that operates the vacuum suction path closing valve 12C in the direction of closing the path from the degassing groove 11 in order to operate the vacuum suction path closing device 12. Further, it has a vacuum suction opening solenoid 12E that operates the vacuum suction path closing valve 12C in a direction of opening the path from the gas vent groove 11.
  • the vacuum degree measuring device 18 includes a negative pressure pressure gauge 18A connected to a third path, a vacuum control device 18B which is a control unit and receives a signal from the negative pressure pressure gauge 18A. It has a vacuum degree measurement path cleaning solenoid 18C that operates to clean the vacuum degree measurement path.
  • the vacuum degree measuring device 18 operates the vacuum degree measuring path closing valve 17C in the direction of closing the path from the vacuum degree measuring groove 16 in order to operate the vacuum degree measuring path closing device 17. It has a solenoid 17D. Further, it has a vacuum degree measurement path opening solenoid 17E that operates the vacuum degree measurement path closing valve 17C in a direction of opening a path from the vacuum degree measurement groove 16.
  • the degassing device 14 has two paths, a path for degassing from the degassing groove 11 side of the mold 13 and a path for degassing from the sleeve 3 side.
  • each path from the vacuum tank 14A to the cavity 9 has a different piping capacity and flow path resistance. Therefore, even if the sleeve vacuum suction solenoid 14B and the cavity vacuum suction solenoid 14F are opened at the same time, the time for actually starting to remove gas from the cavity 9 is different.
  • the piping capacity of the path for removing gas from the sleeve 3 side is large, the timing for removing gas from the cavity 9 is delayed from the timing for removing gas from the gas vent groove 11 side.
  • gas is first evacuated from the degassing groove 11, and then a predetermined time elapses, and then the gas is evacuated from the runner 7. Therefore, the gas existing in the cavity 9 moves from the gas vent gate 10 in the direction of the gas vent groove 11, then returns to the cavity 9 again, and moves from the sprue gate 8 to the runner 7. .. As a result, the time for removing gas from the cavity 9 is delayed. Then, degassing the cavity 9 is not in time for the die casting casting cycle, and casting is performed with insufficient degassing. As a result, casting defects such as shrinkage cavities are caused, and the quality of die-cast products is not improved.
  • the cavity 9 is sufficiently degassed to prevent casting defects such as shrinkage cavities and improve the quality of the die-cast product.
  • the tip 1 inserted inside the sleeve 3 is pushed by a die casting device (not shown), and the tip 1 reaches a position where the position signal A is emitted, that is, a position where the tip 1 closes the molten metal hot water supply port 2. Therefore, the sleeve vacuum suction solenoid 14B is operated. As a result, the path of the vacuum tank 14A and the cavity 9 is connected, and gas is discharged from the inside of the sleeve 3, the runner 7 and the cavity 9. A vacuum degree measuring device 18 is connected to the cavity 9. The vacuum degree measurement path opening solenoid 17E is activated, and the cavity 9 and the negative pressure pressure gauge 18A are connected. Starting from the timing when the sleeve vacuum suction solenoid 14B is turned on, the first vacuum arrival time until the negative pressure pressure gauge 18A starts to operate is measured. Then, let that time be T1.
  • the cavity vacuum suction solenoid 14F is operated while the tip 1 remains at the position where the position signal A is emitted. Further, the vacuum suction opening solenoid 12E is operated to move the vacuum suction path closing valve 12C. As a result, the path of the vacuum tank 14A and the cavity 9 is connected, and gas is discharged from the gas vent groove 11 and the cavity 9.
  • a vacuum degree measuring device 18 is connected to the cavity 9. The vacuum degree measurement path opening solenoid 17E is activated, and the cavity 9 and the negative pressure pressure gauge 18A are connected. Starting from the timing when the cavity vacuum suction solenoid 14F is turned on, the second vacuum arrival time until the negative pressure pressure gauge 18A starts to operate is measured. Then, let that time be T2.
  • T1 is larger than T2 as described above. Therefore, the value of T1-T2, which is the difference, is set as the operation timing time difference T. That is, after the sleeve vacuum suction solenoid 14B is operated, the cavity vacuum suction solenoid 14F is operated 10 hours after the operation timing time difference. Then, the timing of removing the gas from the cavity 9 becomes the same in the path for removing the gas from the gas vent groove 11 side and the path for removing the gas from the sleeve 3 side. As a result, the gas in the cavity 9 does not move excessively, the gas is sufficiently discharged from the cavity 9, and the degree of vacuum in the cavity 9 is improved.
  • FIG. 10 shows how the degree of vacuum in the cavity 9 changed between the case where there was a time difference in the timing of removing gas from the cavity 9 and the case where there was no time difference.
  • TIME on the horizontal axis represents the passage of time
  • the vertical axis represents the degree of vacuum.
  • the case where there is a time difference in the timing of removing the gas from the cavity 9 is NOT PROPER VACUM LINE
  • the case where there is no time difference in the timing of removing the gas from the cavity 9 is the PROPER VACUM LINE.
  • the difference in the timing of removing gas from the cavity 9 is the vacuum delay DELAY.
  • FIG. 1 shows a state showing the initial position of the die casting device. At this time, an appropriate amount of molten metal 4A for casting is charged into the sleeve 3 from the molten metal hot water supply port 2.
  • the tip 1 is pushed into the sleeve 3 and reaches the position where the position signal A is emitted as shown in FIG.
  • the molten metal hot water supply port 2 is closed by the tip 1, and air does not leak from the molten metal hot water supply port 2.
  • the water level of the molten metal 4A is raised by being pushed by the tip 1.
  • the space inside the sleeve 3 in which the molten metal 4A does not exist is referred to as the sleeve space 3A.
  • the vacuum control device 18B operates the sleeve vacuum suction solenoid 14B to release gas from the inside of the sleeve 3.
  • the vacuum control device 18B operates the cavity vacuum suction solenoid 14F and the vacuum suction open solenoid 12E to remove gas from the gas vent groove 11 side. After this, the tip 1 is pushed into the sleeve 3 at a relatively low speed.
  • the vacuum control device 18B When the position signal B is emitted, the vacuum control device 18B operates the sleeve vacuum suction solenoid 14B to stop the degassing from the sleeve 3. Further, the vacuum control device 18B operates the cavity vacuum suction solenoid 14F and the vacuum suction opening solenoid 12E to stop the gas from being discharged from the gas vent groove 11 side. At this time, the molten metal 4B is supposed to stop degassing before reaching the runner 7. The cavity 9 is evacuated by removing gas from the inside. After that, the tip 1 is pushed into the sleeve 3 at a relatively high speed.
  • the sleeve vacuum suction solenoid 14B is connected to the vacuum tank 14A at the timing of degassing the cavity 9 from the degassing groove 11 side and the timing of degassing the cavity 9 from the sleeve 3 side.
  • gas is simultaneously discharged from the cavity 9 to increase the degree of vacuum in the cavity 9 before the molten metal reaches the cavity 9. It prevents casting defects such as shrinkage cavities and improves the quality of die-cast products.
  • Hot water supply port 3 sleeve 3A, 3B, 3C sleeve space 4A, 4B molten metal 5
  • Sleeve vacuum suction port 6
  • Degassing gate 11 Degassing groove 12 Vacuum suction path closing device 12A fixed vacuum suction path closing device 12B movable vacuum suction path closing device 12C vacuum suction path closure valve 12D vacuum suction closed solenoid 12E Vacuum suction open solenoid 13 mold 13A fixed mold 13B movable mold 14

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

ガス抜き装置(14)は、溶湯をキャビティ(9)に注入する第1の経路と、前記キャビティ(9)からガスを抜く第2の経路と、前記キャビティ(9)の真空度を計測する第3の経路を有するダイカスト用の金型(13)から、ガスを抜くガス抜き装置(14)であって、前記ガス抜き装置(14)は、前記第1の経路と真空装置を接続する第1の経路開閉装置と、前記第2の経路と真空装置を接続する第2の経路開閉装置を有し、前記第1の経路開閉装置と、前記第2の経路開閉装置の作動タイミングに作動タイミング時間差を設けることができる制御部を有する。

Description

ダイカスト装置のガス抜き装置及びガス抜き方法
 本発明は、ダイカスト装置のガス抜き装置及びガス抜き方法に関する。
 ダイカストの製品を鋳造するときに、製品を金型から離れやすくするために金型に離型剤を塗布する。また、金型を移動するために金型に潤滑剤を塗布する。この離型剤及び潤滑剤が高温の溶湯に接触すると、燃焼してガスが発生する。このガスによって、ダイカスト製品に引け巣などが生じ、ダイカスト製品の品質を劣化させることが知られている。そのため、金型内部から空気を吸い出して、ダイカスト製品の品質を向上させる方法がとられている。この、金型からガスを抜くための装置が、ダイカスト装置のガス抜き装置である。
 例えば、特許文献1には、ダイカスト装置の金型のキャビティに供給する溶湯のガスの巻き込みを防止する装置、及びガスを抜く方法が開示されている。
特開2014-91159号公報
 特許文献1に開示された方法は、金型の内部に供給する前の溶湯近傍からガスを抜くものである。そのため、キャビティの内部にある空気を抜くことは困難である。従って、ダイカスト製品の品質を十分に向上させるものとは考えにくい。
 本発明は、上記実状に鑑みてなされたものであり、キャビティから確実に空気を抜くことで、ダイカスト製品の品質を向上させる、ダイカスト装置のガス抜き装置及びダイカスト装置のガスを抜く方法を提供することを目的とする。
 上記目的を達成するため、本発明に係るガス抜き装置は、溶湯をキャビティに注入する第1の経路と、前記キャビティからガスを抜く第2の経路と、前記キャビティの真空度を計測する第3の経路を有するダイカスト用の金型から、ガスを抜くガス抜き装置であって、前記ガス抜き装置は、前記第1の経路と真空装置を接続する第1の経路開閉装置と、前記第2の経路と真空装置を接続する第2の経路開閉装置を有し、前記第1の経路開閉装置と、前記第2の経路開閉装置の作動タイミングに作動タイミング時間差を設けることができる制御部を有する。
 例えば、本発明に係るガス抜き装置は、前記制御部は、前記第1の経路開閉装置を作動させたときに前記第3の経路から前記キャビティの真空度を測定して得られた第1の真空到達時間と、前記第2の開閉装置を作動させたときに前記第3の経路から前記キャビティの真空度を測定して得られた第2の真空到達時間との差分を、前記作動タイミング時間差とする。
 例えば、本発明に係るガス抜き装置は、前記第1の経路であって、溶湯を前記金型に注入するスリーブ内部からガスを抜くスリーブ真空吸引口の、前記スリーブ内部に真空吸引溝を設け、前記真空吸引溝の長さは前記スリーブ内部の溶湯を押し込むチップの摺動面の長さよりも短く、前記真空吸引溝の幅は前記スリーブの内径の1/3以下である。
 例えば、前記キャビティと前記第2の経路開閉装置との間に、さらに真空吸引経路閉鎖装置を有し、前記スリーブ真空吸引口の断面積は、前記真空吸引経路閉鎖装置の経路の最小断面積の1.5~2.0倍であり、前記真空吸引溝の断面積は、前記スリーブ真空吸引口の断面積の1.1~1.2倍である。
 上記目的を達成するため、本発明に係るガス抜き方法は、溶湯をキャビティに注入する第1の経路と、前記キャビティからガスを抜く第2の経路と、前記キャビティの真空度を計測する第3の経路を有するダイカスト用の金型からガスを抜く方法であって、ガス抜き装置の、前記第1の経路と真空装置を接続する第1の経路開閉装置を作動させたときに前記キャビティの真空度を測定して得られた第1の真空到達時間と、前記第2の経路と真空装置を接続する第2の経路開閉装置を作動させたときに前記キャビティの真空度を測定して得られた第2の真空到達時間とを比較し、その差分を作動タイミング時間差とする前工程と、前記第1の真空到達時間と前記第2の真空到達時間のうち、真空到達時間の長い前記第1又は第2の経路開閉装置を先に作動し、前記作動タイミング時間差経過後に真空到達時間の短い前記第2又は第1の経路開閉装置を作動する、ガス抜き工程を有する。
 この発明によれば、キャビティから確実に空気を抜くことで、ダイカスト製品の品質を向上させることが出来る。
本発明の実施の形態1に係るガス抜き装置と金型とスリーブの断面図 実施の形態1に係るガス抜き装置に用いる固定金型のキャビティ面を示す正面図 実施の形態1に係るガス抜き装置に用いる可動金型のキャビティ面を示す正面図 実施の形態1に係るガス抜き装置に用いるスリーブの断面図 実施の形態1に係るガス抜き装置に用いるスリーブのA-A断面(図4参照) 実施の形態1に係るガス抜き装置に用いるスリーブの断面図 実施の形態1に係るガス抜き装置に用いるスリーブに使用するチップの側面図 実施の形態1に係るガス抜き装置の、真空吸引経路閉鎖装置の断面図 実施の形態1に係るガス抜き装置の、真空制御装置の概略図 実施の形態1に係るガス抜き装置の、真空度測定結果を示す図
 以下、本発明の実施の形態に係るダイカスト装置のガス抜き装置と、ダイカスト装置のガスを抜く方法について説明する。
 (実施の形態1) 本発明の実施の形態1に係るダイカスト装置のガス抜き装置14を、図1に示す。ガス抜き装置14は、金型13のキャビティ9及びスリーブ3の内部からガスを抜くものである。ガス抜き装置14は、金型13及びスリーブ3に接続されている。また、図9に示す、真空度測定装置18は、キャビティ9の真空度を測定するものである。真空度測定装置18は、金型13に接続されている。
 金型13は、固定金型13Aと、可動金型13Bとを組み合わせて使用される。固定金型13Aの、キャビティ9を形成する面を図2に示す。可動金型13Bの、キャビティ9を形成する面を図3に示す。固定金型13Aと、可動金型13Bとを組み合わせることで、それぞれの金型の表面に形成された溝等の凹部が組み合わされて、金型13の内部に、図1に示す、キャビティ9と、第1の経路の例として、ランナー7及び湯口ゲート8が形成される。さらに、第2の経路の例として、ガス抜きゲート10、ガス抜き溝11が形成される。さらに、図9に示す、第3の経路の例として、真空度測定溝16が形成されている。
 真空吸引経路閉鎖装置12は、図1に示すように、ガス抜き溝11に連なって、金型13の内部に配されている。真空度測定経路閉鎖装置17は、図9に示すように、真空度測定溝16に連結されて、金型13の内部に配されている。
 真空吸引経路閉鎖装置12は、図8に示すように、固定金型13Aに配された固定真空吸引経路閉鎖装置12Aと、可動金型13Bに配された可動真空吸引経路閉鎖装置12Bと、真空吸引経路閉鎖弁12Cとを有する。真空吸引経路閉鎖弁12Cは、固定真空吸引経路閉鎖装置12Aの内部に配置され、自身が空気圧によって軸方向に移動することで、ガス抜き溝11とキャビティ真空吸引配管の間の経路を開閉する。
 真空度測定経路閉鎖装置17は、図9に示すように、固定金型13Aに配された固定真空度測定経路閉鎖装置17Aと、可動金型13Bに配された可動真空度測定経路閉鎖装置17Bと、真空度測定経路閉鎖弁17Cとを有する。真空度測定経路閉鎖弁17Cは、固定真空度測定経路閉鎖装置17Aの内部に配置され、自身が空気圧によって軸方向に移動することで、真空度測定溝16と負圧用圧力計18Aの間の経路を開閉する。
 スリーブ3は、図1に示すように、鍔付きの円筒形状である。スリーブ3の鍔を基準として、短い方の円筒部の外周は、固定金型13Aに開けられた穴に、軸方向が水平になるように、嵌合されている。スリーブ3の内部は、当該穴から連結されているランナー7及び湯口ゲート8を通じて、キャビティ9に連結されている。スリーブ3の長い方の円筒部は、金型13から突出している。スリーブ3の金型13から突出した円筒部の端部近傍に、溶湯4Aをスリーブ3の内部に投入するための、溶湯給湯口2が開けられている。スリーブ3の突出部側から、スリーブ3の内部に、スリーブ3に投入された溶湯4Aを、金型13に押し込むための、チップ1が挿入されている。チップ1が、ダイカスト装置によってスリーブ3の円筒内部に押し込まれると、円筒内部の溶湯4Aは、金型13のキャビティ9へ移動する。スリーブ3の上部であって、溶湯給湯口2よりも金型13側の近傍に、スリーブ3の内部からガスを抜くために、スリーブ真空吸引口5が開けられている。スリーブ真空吸引口5の、円筒内部の開口部近傍に、溝が形成されている。当該溝の、幅方向長さは、図5に示すように、スリーブ真空吸引溝幅L3であり、スリーブ3の軸方向の長さは、図6に示すように、スリーブ真空吸引溝長さL1である。チップ1の、摺動面の長さは、図7に示すように、チップ摺動面長さL2である。
 本実施の形態では、スリーブ真空吸引溝長さL1は、図7に示す、チップ1のチップ摺動面1A部分の長さL2よりも小さい。スリーブ真空吸引溝幅L3は、図4に示す、チップ1のチップ径Dの1/3以下である。
 本実施の形態では、スリーブ真空吸引口5の断面積は、真空吸引経路閉鎖装置12の経路の最小断面積の、1.5~2倍である。これによって、キャビティ9からガスを抜く時間が安定することを、実験により確認している。また、スリーブ真空吸引溝6の断面積は、スリーブ真空吸引口5の断面積の1.1~1.2倍である。これによって、スリーブ真空吸引口5からと、スリーブ真空吸引溝6からのガス吸引レベルが同等となり、ガスを抜く効率が良いことを、実験により確認している。
 ガス抜き装置14は、図1に示すように、真空装置の例としての真空タンク14Aと、第1の経路に接続する、真空タンク14Aの直近に配される第1の経路開閉装置の例としてのスリーブ真空吸引ソレノイド14Bと、スリーブ真空吸引ソレノイド14Bの直後に配されるスリーブ真空吸引配管14Cと、スリーブ真空吸引配管14Cの直後に配されるスリーブ真空吸引フィルター14Dと、スリーブ真空吸引フィルター14Dからスリーブ3のスリーブ真空吸引口5への経路に配されるスリーブ真空吸引配管14Eとを有する。さらに、ガス抜き装置14は、第2の経路に接続する、第2の経路開閉装置の例としての真空タンク14Aの直近に配されるキャビティ真空吸引ソレノイド14Fと、キャビティ真空吸引ソレノイド14Fの直後に配されるキャビティ真空吸引配管14Gと、キャビティ真空吸引配管14Gの直後に配されるキャビティ真空吸引フィルター14Hと、キャビティ真空吸引フィルター14Hから真空吸引経路閉鎖装置12への経路に配されるキャビティ真空吸引配管14Iとを有する。
 さらに、ガス抜き装置14は、スリーブ真空吸引フィルター14D及びスリーブ真空吸引配管14Eを清掃するために作動するスリーブ真空配管清掃ソレノイド14Jと、キャビティ真空吸引フィルター14H及びキャビティ真空吸引配管14Iを清掃するために作動するキャビティ真空配管清掃ソレノイド14Mとを有する。
 さらに、ガス抜き装置14は、真空吸引経路閉鎖装置12を作動させるために、真空吸引経路閉鎖弁12Cをガス抜き溝11からの経路を閉じる方向に作動させる、真空吸引閉ソレノイド12Dを有する。さらに、真空吸引経路閉鎖弁12Cをガス抜き溝11からの経路を開く方向に作動させる、真空吸引開ソレノイド12Eを有する。
 真空度測定装置18は、図9に示すように、第3の経路に接続する、負圧用圧力計18Aと、負圧用圧力計18Aからの信号を受ける、制御部である真空制御装置18Bと、真空度測定経路の清掃をするために作動する、真空度測定経路清掃ソレノイド18Cとを有する。
 さらに、真空度測定装置18は、真空度測定経路閉鎖装置17を作動させるために、真空度測定経路閉鎖弁17Cを真空度測定溝16からの経路を閉じる方向に作動させる、真空度測定経路閉ソレノイド17Dを有する。さらに、真空度測定経路閉鎖弁17Cを真空度測定溝16からの経路を開く方向に作動させる、真空度測定経路開ソレノイド17Eを有する。
 次に、本発明の実施の形態に係るガス抜き装置14を用いて、金型13のキャビティ9及びスリーブ3からガスを抜く方法を説明する。まずは、準備段階として、金型13の特性を計測する、前工程の説明である。
 ガス抜き装置14は、金型13のガス抜き溝11側からガスを抜く経路と、スリーブ3側からガスを抜く経路の、二つの経路を有する。このとき、真空タンク14Aから、キャビティ9へのそれぞれの経路は、配管容量や流路抵抗が異なる。そのため、スリーブ真空吸引ソレノイド14Bと、キャビティ真空吸引ソレノイド14Fを同時に開いたとしても、実際にキャビティ9からガスを抜き始める時間が異なる。本実施の形態では、スリーブ3側からガスを抜く経路の配管容量が大きいため、キャビティ9からガスを抜くタイミングは、ガス抜き溝11側からガスを抜くタイミングより遅れる。つまり、キャビティ9からは、まずガス抜き溝11からガスを抜き、その後所定の時間を経過してから、ランナー7からガスを抜くことになる。そのため、キャビティ9に存在したガスは、一旦ガス抜きゲート10からガス抜き溝11の方向へ移動した後、再度キャビティ9へ戻って、湯口ゲート8からランナー7の方向へ移動する、という動きをする。その結果、キャビティ9からガスを抜く時間が遅れてしまう。そして、キャビティ9からガスを抜くことが、ダイカストの鋳造サイクルに間に合わず、ガス抜きが不十分なまま鋳造をしてしまうことになる。それによって、引け巣などの鋳造不良を引き起こし、ダイカスト製品の品質が向上しない。
 そこで、キャビティ9から、二つの経路からガスを抜くタイミングが同じになるようにする。それによって、キャビティ9から充分にガスが抜かれ、引け巣などの鋳造不良を防止して、ダイカスト製品の品質を向上する。
 そのために、スリーブ真空吸引ソレノイド14Bと、キャビティ真空吸引ソレノイド14Fを同時に作動した場合に、ガス抜き溝11からガスを抜く経路と、スリーブ3からガスを抜く経路との間で、キャビティ9からガスを抜き始めるタイミングに、どの程度時間差が生じているのか測定する。その時間差に応じて、スリーブ真空吸引ソレノイド14Bと、キャビティ真空吸引ソレノイド14Fの作動タイミングに差を設けることによって、キャビティ9からガスを抜くタイミングを同じにするのである。
 それでは、スリーブ真空吸引ソレノイド14Bと、キャビティ真空吸引ソレノイド14Fを同時に開いた場合に、ガス抜き溝11からガスを抜く経路と、スリーブ3からガスを抜く経路の間で、どの程度時間差が生じているのか測定する方法について説明する。
 図示しないダイカスト装置によって、スリーブ3の内部に挿入されたチップ1が押し込まれ、チップ1が、ポジション信号Aを発する位置、すなわち、チップ1が溶湯給湯口2を塞ぐ位置に到達する。そこで、スリーブ真空吸引ソレノイド14Bを作動させる。その結果、真空タンク14Aとキャビティ9の経路がつながり、スリーブ3の内部、ランナー7及びキャビティ9からガスが抜かれる。キャビティ9には、真空度測定装置18が連結されている。真空度測定経路開ソレノイド17Eが作動して、キャビティ9と負圧用圧力計18Aは連結されている。スリーブ真空吸引ソレノイド14BをONするタイミングをスタートとして、負圧用圧力計18Aが作動し始めるまでの第1の真空到達時間を計測する。そして、その時間をT1とする。
 次に、ガス抜き溝11側からガスを抜く時間を計測する。チップ1はポジション信号Aを発する位置のままで、キャビティ真空吸引ソレノイド14Fを作動させる。さらに、真空吸引開ソレノイド12Eを作動させて、真空吸引経路閉鎖弁12Cを移動する。その結果、真空タンク14Aとキャビティ9の経路がつながり、ガス抜き溝11及びキャビティ9からガスが抜かれる。キャビティ9には、真空度測定装置18が連結されている。真空度測定経路開ソレノイド17Eが作動して、キャビティ9と負圧用圧力計18Aは連結されている。キャビティ真空吸引ソレノイド14FをONするタイミングをスタートとして、負圧用圧力計18Aが作動し始めるまでの第2の真空到達時間を計測する。そして、その時間をT2とする。
 本実施の形態では、前述の通りT1はT2よりも大きい。そこで、その差分であるT1-T2の値を、作動タイミング時間差Tとして設定する。つまり、スリーブ真空吸引ソレノイド14Bを作動さてから、作動タイミング時間差T時間後に、キャビティ真空吸引ソレノイド14Fを作動させる。そうすると、キャビティ9からガスを抜くタイミングが、ガス抜き溝11側からガスを抜く経路と、スリーブ3側からガスを抜く経路とで同じになる。その結果、キャビティ9のガスが余分な移動をする事がなくなり、キャビティ9から充分にガスが抜かれ、キャビティ9の真空度が向上する。
 キャビティ9からガスを抜くタイミングに時間差がある場合と、時間差が無い場合について、キャビティ9の真空度がどのように変化したかを、図10に示す。横軸のTIMEは時間経過を表し、縦軸は真空度を表す。キャビティ9からガスを抜くタイミングに時間差がある場合が、NOT PROPER VACUUM LINEであり、キャビティ9からガスを抜くタイミングに時間差が無い場合が、PROPER VACUUM LINEである。キャビティ9からガスを抜くタイミングの差が、真空遅延であるDELAYである。ダイカスト装置の鋳造工程サイクルにおいて、高速射出であるHIGH SPEED INJECTIONが始まってから充填完了であるCOMPLETE INJECTIONまでの時間は変わらないので、真空遅延であるDELAYが存在する場合は、NOT PROPER VACUUM LINEに表すように、到達する真空度が不十分である。その結果、キャビティ9のガス抜きが不十分で、引け巣などの鋳造不良を引き起こし、ダイカスト製品の品質が向上しない。
 次に、前述した準備段階で得られた作動タイミング時間差Tを用いて、ダイカスト装置で鋳造する工程を説明する。
 (初期位置)
 ダイカスト装置の初期位置を表す状態を図1とする。このとき、鋳造に適切な量の溶湯4Aが、溶湯給湯口2から、スリーブ3の内部に投入されている。
 (第1の位置)
 次に、チップ1がスリーブ3の内部に押し込まれ、図4に示す、ポジション信号Aを発する位置へ到達する。その時、溶湯給湯口2はチップ1によって塞がれて、溶湯給湯口2から空気は漏れない状態になっている。溶湯4Aはチップ1に押されることで、水位が上昇している。その時、スリーブ3の内部であって、溶湯4Aが存在しない空間を、スリーブ空間3Aとする。ポジション信号Aが発せられると、真空制御装置18Bは、スリーブ真空吸引ソレノイド14Bを作動させて、スリーブ3の内部からガスを抜く。作動タイミング時間差T時間経過後、真空制御装置18Bは、キャビティ真空吸引ソレノイド14Fと、真空吸引開ソレノイド12Eを作動させて、ガス抜き溝11側からガスを抜く。この後、チップ1は比較的低速で、スリーブ3の内部に押し込まれていく。
 (第2の位置)
 チップ1がさらにスリーブ3の内部に押し込まれ、図6に示す、ポジション信号Bを発する位置へ到達する。その時、スリーブ真空吸引口5はチップ1によって塞がれて、スリーブ真空吸引口5から空気は漏れない状態になっている。溶湯4Aはチップ1に、さらに押されることで、水位が上昇して溶湯4Bの状態になっている。その時、スリーブ3の内部であって、溶湯4Bが存在しない空間を、スリーブ空間3Bとする。ポジション信号Bが発せられると、真空制御装置18Bは、スリーブ真空吸引ソレノイド14Bを作動させて、スリーブ3からガスを抜くことを止める。さらに、真空制御装置18Bは、キャビティ真空吸引ソレノイド14Fと、真空吸引開ソレノイド12Eを作動させて、ガス抜き溝11側からガスを抜くことを止める。このとき、溶湯4Bが、ランナー7に到達する前に、ガスを抜くことを止めることになっている。キャビティ9は、内部からガスが抜かれて、真空になっている。その後、チップ1は比較的高速で、さらにスリーブ3の内部に押し込まれる。
 (第3の位置)
 チップ1がスリーブ3の奥まで押し込まれると、スリーブ3の内部にある溶湯4Bが、真空になっているキャビティ9に送り込まれ、その後金型13の内部で冷却されて固まる。以上がダイカスト装置による鋳造の1サイクルである。
 本実施の形態では、ガス抜き溝11側からキャビティ9のガスを抜くタイミングと、スリーブ3側からキャビティ9のガスを抜くタイミングとを、それぞれの経路を真空タンク14Aに接続するスリーブ真空吸引ソレノイド14Bと、キャビティ真空吸引ソレノイド14Fの作動タイミングに、作動タイミング時間差Tを設けることで、キャビティ9から同時にガスを抜くようにして、キャビティ9に溶湯が到達する前に、キャビティ9の真空度を高め、引け巣などの鋳造不良を防止して、ダイカスト製品の品質を向上するものである。 実験の結果、特許文献1に開示された発明のように、スリーブからのみガスを抜く方法に比べて、キャビティ9の真空度は2倍以上高くなることを確認した。その結果、鋳造不良の発現率が1/2以下になることを確認した。
 本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能とされるものである。また、上述した実施形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。
1        チップ

1A       チップ摺動面

1B       チップ裏面

2        溶湯給湯口

3        スリーブ

3A、3B、3C スリーブ空間

4A、4B    溶湯

5        スリーブ真空吸引口

6        スリーブ真空吸引溝

7        ランナー

8        湯口ゲート

9        キャビティ

10       ガス抜きゲート

11       ガス抜き溝

12       真空吸引経路閉鎖装置

12A      固定真空吸引経路閉鎖装置

12B      可動真空吸引経路閉鎖装置

12C      真空吸引経路閉鎖弁

12D      真空吸引閉ソレノイド

12E      真空吸引開ソレノイド

13       金型

13A      固定金型

13B      可動金型

14       ガス抜き装置

14A      真空タンク

14B      スリーブ真空吸引ソレノイド

14C      スリーブ真空吸引ソレノイド

14D      スリーブ真空吸引フィルター

14E      スリーブ真空吸引配管

14F      キャビティ真空吸引ソレノイド

14G      キャビティ真空吸引配管

14H      キャビティ真空吸引フィルター

14I      キャビティ真空吸引配管

14J      スリーブ真空配管清掃ソレノイド

16       真空度測定溝

17       真空度測定経路閉鎖装置

17A      固定真空度測定経路閉鎖装置

17B      可動真空度測定経路閉鎖装置

17C      真空度測定経路閉鎖弁

17D      真空度測定経路閉ソレノイド

17E      真空度測定経路開ソレノイド

18       真空度測定装置

18A      負圧用圧力計

18B      真空制御装置

18C      真空度測定経路清掃ソレノイド

Claims (5)

  1.  溶湯をキャビティに注入する第1の経路と、前記キャビティからガスを抜く第2の経路と、前記キャビティの真空度を計測する第3の経路を有するダイカスト用の金型から、ガスを抜くガス抜き装置であって、
     前記ガス抜き装置は、前記第1の経路と真空装置を接続する第1の経路開閉装置と、前記第2の経路と真空装置を接続する第2の経路開閉装置を有し、
     前記第1の経路開閉装置と、前記第2の経路開閉装置の作動タイミングに作動タイミング時間差を設けることができる制御部を有する、
     ガス抜き装置。
  2.  前記制御部は、前記第1の経路開閉装置を作動させたときに前記第3の経路から前記キャビティの真空度を測定して得られた第1の真空到達時間と、前記第2の開閉装置を作動させたときに前記第3の経路から前記キャビティの真空度を測定して得られた第2の真空到達時間との差分を、前記作動タイミング時間差とする、
     請求項1に記載のガス抜き装置。
  3.  前記第1の経路であって、溶湯を前記金型に注入するスリーブ内部からガスを抜くスリーブ真空吸引口の、前記スリーブ内部に真空吸引溝を設け、前記真空吸引溝の長さは前記スリーブ内部の溶湯を押し込むチップの摺動面の長さよりも短く、前記真空吸引溝の幅は前記スリーブの内径の1/3以下である、
     請求項1又は2に記載のガス抜き装置。
  4.  前記キャビティと前記第2の経路開閉装置との間に、さらに真空吸引経路閉鎖装置を有し、
     前記スリーブ真空吸引口の断面積は、前記真空吸引経路閉鎖装置の経路の最小断面積の1.5~2.0倍であり、前記真空吸引溝の断面積は、前記スリーブ真空吸引口の断面積の1.1~1.2倍である、
     請求項3に記載のガス抜き装置。
  5.  溶湯をキャビティに注入する第1の経路と、前記キャビティからガスを抜く第2の経路と、前記キャビティの真空度を計測する第3の経路を有するダイカスト用の金型からガスを抜く方法であって、
     ガス抜き装置の、前記第1の経路と真空装置を接続する第1の経路開閉装置を作動させたときに前記キャビティの真空度を測定して得られた第1の真空到達時間と、前記第2の経路と真空装置を接続する第2の経路開閉装置を作動させたときに前記キャビティの真空度を測定して得られた第2の真空到達時間とを比較し、その差分を作動タイミング時間差とする前工程と、
     前記第1の真空到達時間と前記第2の真空到達時間のうち、真空到達時間の長い前記第1又は第2の経路開閉装置を先に作動し、前記作動タイミング時間差経過後に真空到達時間の短い前記第2又は第1の経路開閉装置を作動する、ガス抜き工程を有する、
     ガス抜き方法。

     
PCT/JP2019/009940 2019-03-12 2019-03-12 ダイカスト装置のガス抜き装置及びガス抜き方法 WO2020183604A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201980071961.2A CN112996612A (zh) 2019-03-12 2019-03-12 压铸装置的抽气装置及抽气方法
DE112019003928.8T DE112019003928T5 (de) 2019-03-12 2019-03-12 Entgasungsvorrichtung einer druckgussvorrichtung und entgasungsverfahren
JP2021504674A JP7055522B2 (ja) 2019-03-12 2019-03-12 ダイカスト装置のガス抜き装置及びガス抜き方法
PCT/JP2019/009940 WO2020183604A1 (ja) 2019-03-12 2019-03-12 ダイカスト装置のガス抜き装置及びガス抜き方法
US17/272,261 US20210308749A1 (en) 2019-03-12 2019-03-12 Degassing device and degassing method for die-casting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/009940 WO2020183604A1 (ja) 2019-03-12 2019-03-12 ダイカスト装置のガス抜き装置及びガス抜き方法

Publications (1)

Publication Number Publication Date
WO2020183604A1 true WO2020183604A1 (ja) 2020-09-17

Family

ID=72427389

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/009940 WO2020183604A1 (ja) 2019-03-12 2019-03-12 ダイカスト装置のガス抜き装置及びガス抜き方法

Country Status (5)

Country Link
US (1) US20210308749A1 (ja)
JP (1) JP7055522B2 (ja)
CN (1) CN112996612A (ja)
DE (1) DE112019003928T5 (ja)
WO (1) WO2020183604A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5772766A (en) * 1980-10-27 1982-05-07 Takeshi Arai Molding method by vacuum die casting
JPS63157458U (ja) * 1987-03-31 1988-10-14
JP2014117741A (ja) * 2012-12-19 2014-06-30 Mazda Motor Corp 鋳造装置および鋳造方法
CN105414515A (zh) * 2015-11-26 2016-03-23 广东鸿图科技股份有限公司 一种卧式冷室真空压铸机的压铸机构及利用其进行压铸的方法
WO2018110024A1 (ja) * 2016-12-13 2018-06-21 宇部興産機械株式会社 鋳造装置用の射出装置及び鋳造方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08294763A (ja) * 1995-04-25 1996-11-12 Olympus Optical Co Ltd 真空ダイカスト装置
JP3490188B2 (ja) * 1995-06-08 2004-01-26 東芝機械株式会社 真空ダイカストにおける真空制御方法およびその装置
CN102950270B (zh) * 2012-11-09 2014-06-18 华中科技大学 一种压铸用多向抽真空装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5772766A (en) * 1980-10-27 1982-05-07 Takeshi Arai Molding method by vacuum die casting
JPS63157458U (ja) * 1987-03-31 1988-10-14
JP2014117741A (ja) * 2012-12-19 2014-06-30 Mazda Motor Corp 鋳造装置および鋳造方法
CN105414515A (zh) * 2015-11-26 2016-03-23 广东鸿图科技股份有限公司 一种卧式冷室真空压铸机的压铸机构及利用其进行压铸的方法
WO2018110024A1 (ja) * 2016-12-13 2018-06-21 宇部興産機械株式会社 鋳造装置用の射出装置及び鋳造方法

Also Published As

Publication number Publication date
JPWO2020183604A1 (ja) 2021-10-14
US20210308749A1 (en) 2021-10-07
DE112019003928T5 (de) 2021-05-20
JP7055522B2 (ja) 2022-04-18
CN112996612A (zh) 2021-06-18

Similar Documents

Publication Publication Date Title
WO2014097565A1 (ja) 鋳造装置および鋳造方法
WO2018110024A1 (ja) 鋳造装置用の射出装置及び鋳造方法
CN116748492A (zh) 压铸机及装配于压铸机的模具的气密检查方法
WO2020183604A1 (ja) ダイカスト装置のガス抜き装置及びガス抜き方法
JPH08294763A (ja) 真空ダイカスト装置
JP7143470B1 (ja) 鋳造金型の加熱方法および鋳造装置
KR20180001726A (ko) 고진공 다이캐스팅 금형 및 그를 이용한 isg 시스템용 요크 유닛의 제조 방법
JP2008246503A (ja) 鋳造方法及びダイカストマシン
JP6765401B2 (ja) ランナー構造
KR101387570B1 (ko) 자동차의 프런트필러용 고진공 다이캐스팅 방법
KR101387571B1 (ko) 밀폐공간이 캐비티보다 먼저 진공화되는 고진공 다이캐스팅 방법
JP2006026698A (ja) ダイカスト金型のキャビティ内圧力測定装置
JP2023005299A (ja) ダイカスト製造方法及び装置
JP2009061767A (ja) 射出プレス成形方法
JP2000225453A (ja) ガス抜き装置
JPS59309B2 (ja) 金型内のガス抜きをともなった射出成形法および金型用ガス抜き装置
KR101659535B1 (ko) 진공 사출금형
KR101359388B1 (ko) 고진공 다이캐스팅 방법
KR101387569B1 (ko) 캐비티 진공화단계보다 밀폐공간 진공화단계가 먼저 시작되는 고진공 다이캐스팅 방법
JP3898545B2 (ja) 鋳造方法、及びこれに用いる鋳造装置
JP2001047187A (ja) 金型鋳造用ガス抜き装置
KR20190033470A (ko) 다이캐스트 머신
JPH034299B2 (ja)
KR101359387B1 (ko) 고진공 다이캐스팅 방법
JPH0679428A (ja) ダイキャスト金型装置及びその鋳造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19918581

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021504674

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 19918581

Country of ref document: EP

Kind code of ref document: A1