WO2020137801A1 - スクリューコンベヤのオーガの組立方法 - Google Patents

スクリューコンベヤのオーガの組立方法 Download PDF

Info

Publication number
WO2020137801A1
WO2020137801A1 PCT/JP2019/049830 JP2019049830W WO2020137801A1 WO 2020137801 A1 WO2020137801 A1 WO 2020137801A1 JP 2019049830 W JP2019049830 W JP 2019049830W WO 2020137801 A1 WO2020137801 A1 WO 2020137801A1
Authority
WO
WIPO (PCT)
Prior art keywords
divided body
auger
casing
screw conveyor
divided
Prior art date
Application number
PCT/JP2019/049830
Other languages
English (en)
French (fr)
Inventor
誠 小田
隆雄 伊藤
Original Assignee
川崎重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 川崎重工業株式会社 filed Critical 川崎重工業株式会社
Priority to KR1020217022003A priority Critical patent/KR102550965B1/ko
Priority to EP19906101.1A priority patent/EP3904243A4/en
Priority to CN201980084298.XA priority patent/CN113226956B/zh
Publication of WO2020137801A1 publication Critical patent/WO2020137801A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G33/00Screw or rotary spiral conveyors
    • B65G33/24Details
    • B65G33/32Adaptations of bearings or couplings for supporting and connecting screws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G33/00Screw or rotary spiral conveyors
    • B65G33/24Details
    • B65G33/26Screws
    • B65G33/265Screws with a continuous helical surface
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G33/00Screw or rotary spiral conveyors
    • B65G33/08Screw or rotary spiral conveyors for fluent solid materials
    • B65G33/14Screw or rotary spiral conveyors for fluent solid materials comprising a screw or screws enclosed in a tubular housing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G33/00Screw or rotary spiral conveyors
    • B65G33/24Details
    • B65G33/26Screws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2812/00Indexing codes relating to the kind or type of conveyors
    • B65G2812/05Screw-conveyors
    • B65G2812/0505Driving means, constitutive elements or auxiliary devices
    • B65G2812/0511Conveyor screws
    • B65G2812/0527Conveyor screws characterised by the configuration, e.g. hollow, toothed

Definitions

  • the present invention relates to a method for assembling an auger of a screw conveyor.
  • the ribbon type screw conveyor has an advantage that a larger lump (for example, gravel) can be conveyed as compared with a shaft type screw conveyor.
  • the applicant of the present application proposed a screw conveyor including an auger having a special shape in the application (Japanese Patent Application No. 2017-137814) prior to the present application.
  • the auger is configured so that the mutually facing wing surfaces of the adjacent winding portions of the plurality of winding portions arranged in the axial direction form a semi-circular curve in a cross section including the center line of the auger.
  • the through hole is not formed in the center of the auger when the screw conveyor is viewed from the axial direction. Therefore, the water blocking performance can be enhanced.
  • the auger does not have a central axis, when dividing the auger into a plurality of divided bodies and welding them at a place of use (for example, a construction site) to assemble the auger, It is difficult to match them, in other words, to secure the straightness of the center line of the auger.
  • an object of the present invention is to provide an auger assembling method capable of ensuring the straightness of the center line of the auger when the auger divided bodies are welded to each other.
  • the method for assembling an auger of the screw conveyor according to the present invention is characterized in that the auger has a plurality of axially-arranged orbiting portions whose adjoining wing surfaces face each other at the center of the auger.
  • a first divided body that is configured to form a semi-circular curve in a cross section including a line and that includes a first divided body that has at least one winding portion, and a second divided body that has at least one winding portion, and temporary assembly
  • the first divided body and the second divided body are arranged so as to form a continuous spiral, and the outer peripheral surface of the circumscribed portion of the first divided body and the circulated portion of the second divided body.
  • the center of the first divided body and the center of the second divided body are aligned with each other based on the outer peripheral surface of the first divided body, and in that state between the revolving portion of the first divided body and the revolving portion of the second divided body.
  • a plurality of supports extending in the axial direction of the auger are welded to the orbital portion of the first divided body and the orbital portion of the second divided body, and each of the plurality of supports is The first half and the second half are fastened by bolts, and the bolts are removed from each of the plurality of supports welded to the orbital portion of the first divided body and the orbital portion of the second divided body.
  • first half and the second half of each of the plurality of supports are fastened with bolts, and in that state, the first half is fastened.
  • the divided body and the second divided body are welded together.
  • the “circulation part” refers to a unit component part that spirals 360 degrees around the center line of the auger.
  • the relative positional relationship between the first divided body and the second divided body which is adjusted with high accuracy at the temporary assembly place can be reproduced at the main assembly place. Therefore, it is possible to secure the straightness of the center line of the auger when welding the first divided body and the second divided body.
  • the first divided body and the second divided body may be arranged in a tubular casing that houses the auger. According to this structure, the first divided body and the second divided body can be supported by using the casing at the temporary assembly place.
  • the distance from the inner peripheral surface of the casing to the outer peripheral surface of the revolving portion of the first divided body and the inner peripheral surface of the casing. To the outer peripheral surface of the orbiting portion of the second divided body may be matched. According to this configuration, it is not necessary to use a special positioning stand for matching the center of the first divided body with the center of the second divided body. Therefore, the assembly cost of the auger can be reduced.
  • the casing includes a maintenance lid that constitutes a part of the casing, and when the first divided body and the second divided body are lined up at the temporary assembly location, the maintenance lid of the casing is removed to remove the casing.
  • An opening may be formed in the opening, and the division surfaces of the first divided body and the second divided body may be positioned in the opening. According to this configuration, the work of aligning the center of the first divided body with the center of the second divided body and the subsequent welding work of the support to the first divided body and the second divided body are facilitated through the opening of the casing. It can be carried out.
  • the first divided body and the second divided body may be arranged in a cylindrical casing that houses the auger.
  • the casing can be used to support the first divided body and the second divided body at the main assembly place.
  • the casing includes a maintenance lid that constitutes a part of the casing, and when the first half and the second half of each of the plurality of supports are fastened at the main assembly place, maintenance of the casing is performed.
  • the lid may be removed to form an opening in the casing, and the division surfaces of the first divided body and the second divided body may be positioned in the opening. According to this configuration, the fastening work between the first half and the second half and the subsequent welding work between the first divided body and the second divided body can be easily performed through the opening of the casing.
  • FIG. 4 is a sectional view taken along line IV-IV in FIG. 2.
  • FIG. 1 shows a screw conveyor 1 including an auger 3 assembled by an assembly method according to an embodiment of the present invention.
  • the screw conveyor 1 includes, in addition to the spiral auger 3, a tubular casing 2 that houses the auger 3.
  • the casing 2 includes a removable maintenance lid 20 that forms a part of the casing 2.
  • the casing 2 is divided into a plurality of pipes 21 arranged in the axial direction. Flanges are provided at both ends of each pipe 21, and the flanges of adjacent pipes 21 are fastened together by bolts and nuts (not shown).
  • one of the pipes 21 is divided into a lower half 22 and an upper half 23. Flange is also provided at both circumferential ends of the lower half 22 and the upper half 23, and these flanges are fastened together by bolts and nuts (not shown).
  • the upper half 23 is the maintenance lid 20.
  • the configuration of the maintenance lid 20 can be changed as appropriate.
  • the auger 3 includes a plurality of winding portions 31 arranged in the axial direction.
  • Each orbiting portion 31 has wing surfaces 32 and 33 facing in mutually opposite directions, and an outer peripheral surface 34 that has a circular shape when viewed from the axial direction of the auger 3.
  • the wing surface 33 facing the right direction is the conveying surface
  • the wing surface 32 facing the left direction is the non-conveying surface.
  • the auger 3 is configured such that the wing surfaces 32 and 33 of the adjacent orbiting portions 31 facing each other form a semi-circular curve in a cross section including the center line L of the auger 3.
  • the semi-circular curve does not intersect the center line L.
  • the minimum distance D2 from the center line L to the semi-circular curve is preferably 1/20 or less of the diameter D1 of the auger 3, and more preferably 1/40 or less of D1.
  • the cross-sectional shape of the auger 3 in the direction orthogonal to the axial direction is a shape that extends straight from the center line L outward in the radial direction, as shown in FIG.
  • the cross-sectional shape of the auger 3 in the direction orthogonal to the axial direction is the same at any position in the axial direction of the auger 3.
  • the shape of the auger 3 is such that the cross-sectional shapes shown in FIG. 4 are arranged in a spiral shape.
  • the auger 3 is divided at the division surface 30 into a first division body 3A and a second division body 3B.
  • Each of the first divided body 3A and the second divided body 3B has at least one winding portion 31.
  • the auger 3 may be divided into three or more divided bodies.
  • each of the first divided body 3A and the second divided body 3B is manufactured by casting.
  • the individual divided portions 31 may be produced by casting, and the divided portions 31 may be welded to each other to produce each of the first divided body 3A and the second divided body 3B.
  • the first divided body 3A and the second divided body 3B are welded to each other. Thereby, the auger 3 is assembled.
  • a method of welding the first divided body 3A and the second divided body 3B (a method of assembling the auger 3) will be described in detail.
  • the first divided body 3A and the second divided body 3B are arranged so that they form a continuous spiral.
  • the joint surface of the first divided body 3A and the joint surface of the second divided body 3B are opposed to each other.
  • the joint surface of the first divided body 3A and the joint surface of the second divided body 3B are surfaces along the above-mentioned divided surface 30, and a gap filled with a bead at the time of welding is formed between the joint surfaces. There is.
  • the first divided body 3A and the second divided body 3B are arranged in the casing 2 at the temporary assembly place.
  • the maintenance lid 20 of the casing 2 is removed to form an opening in the casing 2, and the first divided body 3A and the second divided body are formed in the opening.
  • the dividing surface 30 of the body 3B is positioned.
  • FIG. 9 is an image diagram of when the first divided body 3A and the second divided body 3B are actually arranged in the casing 2, the first divided body 3A and the second divided body 3B are mounted on the inner peripheral surface of the casing 2. Place.
  • the first divided body After adjusting the relative positional relationship between the first divided body 3A and the second divided body 3B so that the center of the first divided body 3A and the center of the second divided body 3B coincide with each other, in that state, the first divided body A plurality of (four in this embodiment, as shown in FIG. 4) supports 4 are arranged between the orbiting portion 31 of the body 3A and the orbiting portion 31 of the second divided body 3B, and the supports 4 are the first. Welding is performed on the circulating portion 31 of the divided body 3A and the circulating portion 31 of the second divided body 3B.
  • Each support 4 extends in the axial direction of the auger 3.
  • each support 4 is formed by fastening the first half 41 and the second half 42 with bolts 5 and nuts 6. If a screw hole is formed in one of the first half 41 and the second half 42, the nut 6 is unnecessary.
  • each of the first half 41 and the second half 42 includes a rod and a flange, and the flange is provided with a plurality of holes through which the bolt 5 is inserted.
  • the bolt 5 is removed to separate each support 4 into a first half 41 and a second half 42. .. Then, the first divided body 3A with the first half 41 and the second divided body 3B with the second half are transported from the temporary assembly place to the main assembly place (for example, a construction site).
  • first half 41 and the second half 42 of each support 4 are fastened with bolts 5 and nuts 6, and in that state the first divided body 3A and the second divided body 3B are welded. After welding is complete, remove all supports 4 from the assembled auger 3.
  • the first divided body 3A and the second divided body 3B are arranged in the casing 2 at the main assembly place. Then, when fastening the first half 41 and the second half 42 of each support 4, the maintenance lid 20 of the casing 2 is removed to form an opening in the casing 2, and the first divided body 3A and the first divided body 3A are formed in the opening.
  • the dividing surface 30 of the two-divided body 3B is positioned.
  • the relative positional relationship between the first divided body 3A and the second divided body 3B adjusted with high accuracy at the temporary assembly place can be reproduced at the main assembly place. Therefore, it is possible to secure the straightness of the center line L of the auger 3 when welding the first divided body 3A and the second divided body 3B.
  • the first divided body 3A and the second divided body 3B are lined up at the temporary assembly place, the first divided body 3A and the second divided body 3A are inserted into the opening in which the maintenance lid 20 of the casing 2 is removed. Since the dividing surface 30 of the divided body 3B is positioned, the work of aligning the center of the first divided body 3A with the center of the second divided body 3B and the subsequent first divided body 3A and second divided body 3B of the support 4 The welding work can be easily performed through the opening of the casing 2.
  • the first split body 3A is inserted into the opening of the maintenance lid 20 of the casing 2 removed. Since the dividing surface 30 of the second divided body 3B is positioned, the fastening work between the first half 41 and the second half 42 and the subsequent welding work between the first divided body 3A and the second divided body 3B are performed by the casing 2 Can be easily done through the opening.
  • the casing 2 it is not always necessary to use the casing 2 to adjust the relative positional relationship between the first divided body 3A and the second divided body 3B.
  • the outer peripheral surface 34 of the orbiting portion 31 of the first divided body 3A and the outer periphery of the orbiting portion 31 of the second divided body 3B extending over the first divided body 3A and the second divided body 3B.
  • Special positioning mounts may be used that contact both sides 34.
  • the center of the first divided body 3A and the second divided body as described above are divided. There is no need to use a special positioning cradle to match the center of the body 3B. Therefore, the assembly cost of the auger 3 can be reduced. Further, by disposing the first divided body 3A and the second divided body 3B in the casing 2, it is possible to support the first divided body 3A and the second divided body 3B using the casing 2 at the temporary assembly place.
  • the assembled auger 3 is inserted into the casing 2 after welding the first divided body 3A and the second divided body 3B within the starting riser. May be.
  • the casing 2 is used at the main assembly place to utilize the first divided body 3A and the first divided body 3A.
  • the two-divided body 3B can be supported.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Screw Conveyors (AREA)
  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

スクリューコンベヤのオーガの組立方法では、仮組立場所にて、オーガの第1分割体と第2分割体とをそれらが連続した螺旋状となるように並べるとともに、第1分割体の周回部分の外周面と第2分割体の周回部分の外周面を基準にして第1分割体の中心と第2分割体の中心とを一致させ、その状態で複数のサポートを第1分割体の周回部分および第2分割体の周回部分に溶接し、第1分割体の周回部分および第2分割体の周回部分に溶接された複数のサポートのそれぞれを第1ハーフと第2ハーフとに分割し、本組立場所にて、複数のサポートのそれぞれにおける第1ハーフと第2ハーフとを締結し、その状態で第1分割体と第2分割体とを溶接する。

Description

スクリューコンベヤのオーガの組立方法
 本発明は、スクリューコンベヤのオーガの組立方法に関する。
 スクリューコンベヤとしては、直線状の中心軸に螺旋状のオーガが取り付けられた軸付き式のものと、中心軸を有さないリボン式のものとがある(例えば、特許文献1参照)。リボン式のスクリューコンベヤは、軸付き式のスクリューコンベヤに比べて、より大きな塊(例えば、礫)を搬送できるという利点がある。
特開2011-69157号公報
 しかしながら、リボン式のスクリューコンベヤは、軸方向から見たときに、オーガの中心に通し穴が形成される。従って、搬送物が水分を多く含む場合には、止水性が低いという問題がある。
 そこで、本件出願の出願人は、本件出願に先立つ出願(特願2017-137814号)において、特殊な形状のオーガを含むスクリューコンベヤを提案した。そのオーガは、軸方向に並ぶ複数の周回部分のうちの隣り合う周回部分の互いに対向する羽面が当該オーガの中心線を含む断面において半円弧状の曲線を形成するように構成されている。このような形状のオーガを含むスクリューコンベヤでは、スクリューコンベヤを軸方向から見たときにオーガの中心に通し穴が形成されない。従って、止水性を高めることができる。
 ところで、上記のオーガは中心軸を有しないので、オーガを複数の分割体に分割し、それらを使用場所(例えば、工事現場)で溶接してオーガを組み立てる際に、複数の分割体の中心を一致させること、換言すればオーガの中心線の真直度を確保することが困難である。
 そこで、本発明は、オーガの分割体を互いに溶接する際にオーガの中心線の真直度を確保することができるオーガの組立方法を提供することを目的とする。
 前記課題を解決するために、本発明のスクリューコンベヤのオーガの組立方法は、前記オーガは、軸方向に並ぶ複数の周回部分のうちの隣り合う周回部分の互いに対向する羽面が当該オーガの中心線を含む断面において半円弧状の曲線を形成するように構成されているとともに、少なくとも1つの周回部分を有する第1分割体と、少なくとも1つの周回部分を有する第2分割体を含み、仮組立場所にて、前記第1分割体と前記第2分割体とをそれらが連続した螺旋状となるように並べるとともに、前記第1分割体の周回部分の外周面と前記第2分割体の周回部分の外周面を基準にして前記第1分割体の中心と前記第2分割体の中心とを一致させ、その状態で前記第1分割体の周回部分と前記第2分割体の周回部分との間に前記オーガの軸方向に延びる複数のサポートを配置して当該複数のサポートを前記第1分割体の周回部分および前記第2分割体の周回部分に溶接し、前記複数のサポートのそれぞれは、第1ハーフと第2ハーフとがボルトによって締結されたものであり、前記第1分割体の周回部分および前記第2分割体の周回部分に溶接された前記複数のサポートのそれぞれを、前記ボルトを取り外して前記第1ハーフと前記第2ハーフとに分割し、本組立場所にて、前記複数のサポートのそれぞれにおける前記第1ハーフと前記第2ハーフとをボルトによって締結し、その状態で前記第1分割体と前記第2分割体とを溶接する、ことを特徴とする。
 ここで、「周回部分」とは、オーガの中心線回りに360度螺旋状に旋回する単位構成部分をいう。
 上記の構成によれば、仮組立場所において高精度に調整された第1分割体と第2分割体の相対位置関係を本組立場所において再現することができる。従って、第1分割体と第2分割体とを溶接する際にオーガの中心線の真直度を確保することができる。
 前記仮組立場所では、前記オーガを収容する筒状のケーシング内に前記第1分割体および前記第2分割体を配置してもよい。この構成によれば、仮組立場所においてケーシングを利用して第1分割体および第2分割体を支持することができる。
 前記第1分割体の中心と前記第2分割体の中心とを一致させるときは、前記ケーシングの内周面から前記第1分割体の周回部分の外周面までの距離と前記ケーシングの内周面から前記第2分割体の周回部分の外周面までの距離とを一致させてもよい。この構成によれば、第1分割体の中心と第2分割体の中心とを一致させるための特別な位置決め用架台を使用する必要がない。従って、オーガの組立コストを低減することができる。
 前記ケーシングは、当該ケーシングの一部を構成するメンテナンス蓋を含み、前記仮組立場所にて前記第1分割体と前記第2分割体とを並べるときは、前記ケーシングのメンテナンス蓋を取り外して前記ケーシングに開口を形成し、前記開口内に前記第1分割体と前記第2分割体の分割面を位置させてもよい。この構成によれば、第1分割体の中心と第2分割体の中心とを一致させる作業およびその後のサポートの第1分割体および第2分割体への溶接作業を、ケーシングの開口を通じて容易に行うことができる。
 前記本組立場所では、前記オーガを収容する筒状のケーシング内に前記第1分割体および前記第2分割体を配置してもよい。この構成によれば、本組立場所においてケーシングを利用して第1分割体および第2分割体を支持することができる。
 前記ケーシングは、当該ケーシングの一部を構成するメンテナンス蓋を含み、前記本組立場所にて前記複数のサポートのそれぞれにおける前記第1ハーフと前記第2ハーフとを締結するときは、前記ケーシングのメンテナンス蓋を取り外して前記ケーシングに開口を形成し、前記開口内に前記第1分割体と前記第2分割体の分割面を位置させてもよい。この構成によれば、第1ハーフと第2ハーフとの締結作業およびその後の第1分割体と第2分割体との溶接作業を、ケーシングの開口を通じて容易に行うことができる。
 本発明によれば、オーガの分割体を互いに溶接する際にオーガの中心線の真直度を確保することができる。
本発明の一実施形態に係る組立方法により組み立てられるオーガを含むスクリューコンベヤの側面図である。 ケーシングの一部が取り外された状態のスクリューコンベヤの断面図である。 オーガの断面図である。 図2のIV-IV線に沿った断面図である。
 図1に、本発明の一実施形態に係る組立方法により組み立てられるオーガ3を含むスクリューコンベヤ1を示す。スクリューコンベヤ1は、螺旋状のオーガ3の他に、オーガ3を収容する筒状のケーシング2を含む。
 ケーシング2は、当該ケーシング2の一部を構成する、取り外し可能なメンテナンス蓋20を含む。具体的に、ケーシング2は、軸方向に並ぶ複数のパイプ21に分割されている。各パイプ21の両端部にはフランジが設けられており、隣り合うパイプ21のフランジ同士がボルトおよびナット(図示せず)によって締結される。さらに、パイプ21のうちの1つは、下部ハーフ22と上部ハーフ23とに分割されている。下部ハーフ22および上部ハーフ23の周方向の両端部にもフランジが設けられており、これらのフランジ同士がボルトおよびナット(図示せず)によって締結される。本実施形態では、上部ハーフ23がメンテナンス蓋20である。ただし、メンテナンス蓋20の構成は適宜変更可能である。
 オーガ3は、図2および図3に示すように、軸方向に並ぶ複数の周回部分31を含む。各周回部分31は、互いに反対方向を向く羽面32,33と、オーガ3の軸方向から見たときに円形状となる外周面34を有する。図2において搬送物を左から右に搬送する場合、右方向を向く羽面33が搬送面であり、左方向を向く羽面32が非搬送面である。
 オーガ3は、隣り合う周回部分31の互いに対向する羽面32,33が当該オーガ3の中心線Lを含む断面において半円弧状の曲線を形成するように構成されている。その半円弧状の曲線は、中心線Lとは交わらない。中心線Lから半円弧状の曲線までの最小距離D2は、オーガ3の直径D1の1/20以下であることが望ましく、D1の1/40以下であることがより望ましい。
 オーガ3の軸方向と直交する方向の断面形状は、図4に示すように、中心線Lから真っ直ぐに径方向外向きに延びる形状である。オーガ3の軸方向と直交する方向の断面形状は、オーガ3の軸方向のどの位置でも同じである。換言すれば、オーガ3の形状は、図4に示す断面形状が螺旋状に並んだものである。
 本実施形態では、図2および図3に示すように、オーガ3が、分割面30にて、第1分割体3Aと第2分割体3Bとに分割されている。第1分割体3Aおよび第2分割体3Bのそれぞれは、少なくとも1つの周回部分31を有する。ただし、オーガ3は、3つ以上の分割体に分割されてもよい。
 例えば、第1分割体3Aおよび第2分割体3Bのそれぞれは、鋳造によって製作される。あるいは、個々の周回部分31が鋳造によって製作され、それらの周回部分31が互いに溶接されることによって第1分割体3Aおよび第2分割体3Bのそれぞれが製作されてもよい。
 第1分割体3Aと第2分割体3Bとは互いに溶接される。これによりオーガ3が組み立てられる。以下、第1分割体3Aと第2分割体3Bとを溶接する方法(オーガ3の組立方法)について詳細に説明する。
 まず、仮組立場所(例えば、工場)にて、第1分割体3Aと第2分割体3Bとをそれらが連続した螺旋状となるように並べる。換言すれば、第1分割体3Aの接合面と第2分割体3Bの接合面とを対向させる。第1分割体3Aの接合面および第2分割体3Bの接合面は、上述した分割面30に沿う面であり、それらの接合面の間には、溶接時にビードで埋められる隙間が成形されている。
 本実施形態では、図2に示すように、仮組立場所において第1分割体3Aおよび第2分割体3Bをケーシング2内に配置する。そして、第1分割体3Aと第2分割体3Bとを並べるときは、ケーシング2のメンテナンス蓋20を取り外してケーシング2に開口を形成し、その開口内に、第1分割体3Aと第2分割体3Bの分割面30を位置させる。
 ついで、第1分割体3Aの周回部分31の外周面34と第2分割体3Bの周回部分31の外周面34を基準にして、第1分割体3Aの中心と第2分割体3Bの中心とを一致させる。
 本実施形態では、第1分割体3Aの中心と第2分割体3Bの中心とを一致させるとき、図4に示すようにオーガ3の両側で、ケーシング2の内周面から第1分割体3Aの周回部分31の外周面34までの距離G1と、ケーシング2の内周面から第2分割体3Bの周回部分31の外周面34までの距離G2とを一致させる。なお、図4では、オーガ3の下方にもケーシング2の内周面とオーガ3との間に隙間が図示されているが、図4はケーシング2の中心とオーガ3の中心とを一致させたときのイメージ図であり、実際に第1分割体3Aおよび第2分割体3Bをケーシング2内に配置するときは、第1分割体3Aおよび第2分割体3Bをケーシング2の内周面上に載置する。
 第1分割体3Aの中心と第2分割体3Bの中心とが一致するように第1分割体3Aと第2分割体3Bとの相対位置関係を調整した後は、その状態で、第1分割体3Aの周回部分31と第2分割体3Bの周回部分31との間に複数(本実施形態では、図4に示すように3つ)のサポート4を配置し、それらのサポート4を第1分割体3Aの周回部分31および第2分割体3Bの周回部分31に溶接する。
 各サポート4は、オーガ3の軸方向に延びている。また、各サポート4は、第1ハーフ41と第2ハーフ42とがボルト5およびナット6によって締結されたものである。なお、第1ハーフ41と第2ハーフ42の一方にネジ穴を形成すれば、ナット6は不要である。
 より詳しくは、第1ハーフ41および第2ハーフ42のそれぞれは、ロッドおよびフランジを含み、そのフランジにボルト5に挿通される複数の穴が設けられている。
 サポート4を第1分割体3Aの周回部分31および第2分割体3Bの周回部分31に溶接した後は、ボルト5を取り外して各サポート4を第1ハーフ41と第2ハーフ42とに分離する。その後、第1ハーフ41付きの第1分割体3Aと第2ハーフ付きの第2分割体3Bを仮組立場所から本組立場所(例えば、工事現場)へ輸送する。
 本組立場所では、各サポート4の第1ハーフ41と第2ハーフ42とをボルト5およびナット6によって締結し、その状態で第1分割体3Aと第2分割体3Bとを溶接する。溶接完了後、組み立てられたオーガ3から全てのサポート4を取り除く。
 本実施形態では、図2に示すように、本組立場所において第1分割体3Aおよび第2分割体3Bをケーシング2内に配置する。そして、各サポート4の第1ハーフ41と第2ハーフ42とを締結するときは、ケーシング2のメンテナンス蓋20を取り外してケーシング2に開口を形成し、その開口内に第1分割体3Aと第2分割体3Bの分割面30を位置させる。
 以上説明したような組立方法であれば、仮組立場所において高精度に調整された第1分割体3Aと第2分割体3Bの相対位置関係を本組立場所において再現することができる。従って、第1分割体3Aと第2分割体3Bとを溶接する際にオーガ3の中心線Lの真直度を確保することができる。
 また、本実施形態では、仮組立場所にて第1分割体3Aと第2分割体3Bとを並べるときに、ケーシング2のメンテナンス蓋20が取り外された開口内に第1分割体3Aと第2分割体3Bの分割面30を位置させるので、第1分割体3Aの中心と第2分割体3Bの中心とを一致させる作業およびその後のサポート4の第1分割体3Aおよび第2分割体3Bへの溶接作業を、ケーシング2の開口を通じて容易に行うことができる。
 さらに、本実施形態では、本組立場所にて各サポート4の第1ハーフ41と第2ハーフ42とを締結するときに、ケーシング2のメンテナンス蓋20が取り外された開口内に第1分割体3Aと第2分割体3Bの分割面30を位置させるので、第1ハーフ41と第2ハーフ42との締結作業およびその後の第1分割体3Aと第2分割体3Bとの溶接作業を、ケーシング2の開口を通じて容易に行うことができる。
 (変形例)
 本発明は上述した実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲で種々の変形が可能である。
 例えば、仮組立場所では、必ずしもケーシング2を利用して第1分割体3Aと第2分割体3Bとの相対位置関係を調整する必要はない。例えば、ケーシング2の代わりに、第1分割体3Aと第2分割体3Bとに跨って延びる、第1分割体3Aの周回部分31の外周面34と第2分割体3Bの周回部分31の外周面34の双方に接触するような特別な位置決め用架台が用いられてもよい。
 ただし、前記実施形態のようにケーシング2を利用して第1分割体3Aと第2分割体3Bとの相対位置関係を調整すれば、上述したような第1分割体3Aの中心と第2分割体3Bの中心とを一致させるための特別な位置決め用架台を使用する必要がない。従って、オーガ3の組立コストを低減することができる。また、ケーシング2内に第1分割体3Aおよび第2分割体3Bを配置すれば、仮組立場所においてケーシング2を利用して第1分割体3Aおよび第2分割体3Bを支持することができる。
 また、本組立場所では、必ずしもケーシング2内で第1分割体3Aおよび第2分割体3Bを溶接する必要はない。例えば、シールド掘進機の発進立抗が十分に大きな場合には、発進立抗内で第1分割体3Aおよび第2分割体3Bを溶接した後に、組み立てられたオーガ3をケーシング2内に挿入してもよい。
 ただし、前記実施形態のように、本組立場所においてケーシング2内に第1分割体3Aおよび第2分割体3Bを配置すれば、本組立場所においてケーシング2を利用して第1分割体3Aおよび第2分割体3Bを支持することができる。
 1  スクリューコンベヤ
 2  ケーシング
 20 メンテナンス蓋
 3  オーガ
 30 分割面
 3A 第1分割体
 3B 第2分割体
 31 周回部分
 32,33 羽面
 34 外周面
 4  サポート
 41 第1ハーフ
 42 第2ハーフ
 5  ボルト

Claims (6)

  1.  スクリューコンベヤのオーガの組立方法であって、
     前記オーガは、軸方向に並ぶ複数の周回部分のうちの隣り合う周回部分の互いに対向する羽面が当該オーガの中心線を含む断面において半円弧状の曲線を形成するように構成されているとともに、少なくとも1つの周回部分を有する第1分割体と、少なくとも1つの周回部分を有する第2分割体を含み、
     仮組立場所にて、前記第1分割体と前記第2分割体とをそれらが連続した螺旋状となるように並べるとともに、前記第1分割体の周回部分の外周面と前記第2分割体の周回部分の外周面を基準にして前記第1分割体の中心と前記第2分割体の中心とを一致させ、その状態で前記第1分割体の周回部分と前記第2分割体の周回部分との間に前記オーガの軸方向に延びる複数のサポートを配置して当該複数のサポートを前記第1分割体の周回部分および前記第2分割体の周回部分に溶接し、
     前記複数のサポートのそれぞれは、第1ハーフと第2ハーフとがボルトによって締結されたものであり、
     前記第1分割体の周回部分および前記第2分割体の周回部分に溶接された前記複数のサポートのそれぞれを、前記ボルトを取り外して前記第1ハーフと前記第2ハーフとに分割し、
     本組立場所にて、前記複数のサポートのそれぞれにおける前記第1ハーフと前記第2ハーフとをボルトによって締結し、その状態で前記第1分割体と前記第2分割体とを溶接する、
    スクリューコンベヤのオーガの組立方法。
  2.  前記仮組立場所では、前記オーガを収容する筒状のケーシング内に前記第1分割体および前記第2分割体を配置する、請求項1に記載のスクリューコンベヤのオーガの組立方法。
  3.  前記第1分割体の中心と前記第2分割体の中心とを一致させるときは、前記ケーシングの内周面から前記第1分割体の周回部分の外周面までの距離と前記ケーシングの内周面から前記第2分割体の周回部分の外周面までの距離とを一致させる、請求項2に記載のスクリューコンベヤのオーガの組立方法。
  4.  前記ケーシングは、当該ケーシングの一部を構成するメンテナンス蓋を含み、
     前記仮組立場所にて前記第1分割体と前記第2分割体とを並べるときは、前記ケーシングのメンテナンス蓋を取り外して前記ケーシングに開口を形成し、前記開口内に前記第1分割体と前記第2分割体の分割面を位置させる、請求項2または3に記載のスクリューコンベヤのオーガの組立方法。
  5.  前記本組立場所では、前記オーガを収容する筒状のケーシング内に前記第1分割体および前記第2分割体を配置する、請求項1~4の何れか一項に記載のスクリューコンベヤのオーガの組立方法。
  6.  前記ケーシングは、当該ケーシングの一部を構成するメンテナンス蓋を含み、
     前記本組立場所にて前記複数のサポートのそれぞれにおける前記第1ハーフと前記第2ハーフとを締結するときは、前記ケーシングのメンテナンス蓋を取り外して前記ケーシングに開口を形成し、前記開口内に前記第1分割体と前記第2分割体の分割面を位置させる、請求項5に記載のスクリューコンベヤのオーガの組立方法。
PCT/JP2019/049830 2018-12-27 2019-12-19 スクリューコンベヤのオーガの組立方法 WO2020137801A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
KR1020217022003A KR102550965B1 (ko) 2018-12-27 2019-12-19 스크류 컨베이어의 오거의 조립 방법
EP19906101.1A EP3904243A4 (en) 2018-12-27 2019-12-19 AUGER ASSEMBLY METHOD FOR SCREW CONVEYOR
CN201980084298.XA CN113226956B (zh) 2018-12-27 2019-12-19 螺旋输送机的螺旋杆的组装方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-245156 2018-12-27
JP2018245156A JP6505308B1 (ja) 2018-12-27 2018-12-27 スクリューコンベヤのオーガの組立方法

Publications (1)

Publication Number Publication Date
WO2020137801A1 true WO2020137801A1 (ja) 2020-07-02

Family

ID=66324242

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/049830 WO2020137801A1 (ja) 2018-12-27 2019-12-19 スクリューコンベヤのオーガの組立方法

Country Status (5)

Country Link
EP (1) EP3904243A4 (ja)
JP (1) JP6505308B1 (ja)
KR (1) KR102550965B1 (ja)
CN (1) CN113226956B (ja)
WO (1) WO2020137801A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102021103824A1 (de) 2021-02-18 2022-08-18 Harburg-Freudenberger Maschinenbau Gmbh Fördereinrichtung für eine Vorrichtung zum Pressen und Vorrichtung zum Pressen

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4629072B1 (ja) * 1967-12-13 1971-08-24
JPS58189294U (ja) * 1982-06-09 1983-12-15 日立造船株式会社 シ−ルド掘進機
JPH0516720U (ja) * 1991-08-23 1993-03-02 王子製紙株式会社 スクリユーフイーダーの構造
JPH10252390A (ja) * 1997-03-13 1998-09-22 Taisei Corp シールド掘進機の排土機構
JP2002526281A (ja) * 1998-10-02 2002-08-20 クラップ ワーナー アンド プフライドラー コーポレイション スクリュー押出機のミキシングエレメント
JP3097490U (ja) * 2003-04-28 2004-01-29 原田 紘一 搬送スクリューと該搬送スクリューを利用した搬送装置
JP2011069157A (ja) 2009-09-28 2011-04-07 Ihi Corp スクリューコンベアの排土口ゲート装置
US20110317510A1 (en) * 2010-06-23 2011-12-29 Entek Manufacturing, Inc. Restoration of worn metallic extrusion processing elements
JP2017137814A (ja) 2016-02-04 2017-08-10 株式会社Subaru サーモスタット故障検出装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4691818A (en) * 1986-01-27 1987-09-08 The Laitram Corp. Concealed drive coupling for use with modular screw conveyor
US5370464A (en) * 1993-05-17 1994-12-06 Cpc International Inc. Adjustable bearing support assembly
KR20090106031A (ko) * 2008-04-04 2009-10-08 주식회사 한성환경기연 체결 장착수단을 일체로 구비한 무축 스크류
CN101654184A (zh) * 2008-08-20 2010-02-24 钱尧翎 一种单管螺旋输送机
JP2010135746A (ja) 2008-10-29 2010-06-17 Panasonic Electric Works Co Ltd 半導体発光素子およびその製造方法、発光装置
JP5498037B2 (ja) * 2009-03-12 2014-05-21 株式会社神戸製鋼所 スクリュコンベア
JP5940716B1 (ja) * 2015-06-17 2016-06-29 株式会社神鋼環境ソリューション スクリューポンプ、およびその製造方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4629072B1 (ja) * 1967-12-13 1971-08-24
JPS58189294U (ja) * 1982-06-09 1983-12-15 日立造船株式会社 シ−ルド掘進機
JPH0516720U (ja) * 1991-08-23 1993-03-02 王子製紙株式会社 スクリユーフイーダーの構造
JPH10252390A (ja) * 1997-03-13 1998-09-22 Taisei Corp シールド掘進機の排土機構
JP2002526281A (ja) * 1998-10-02 2002-08-20 クラップ ワーナー アンド プフライドラー コーポレイション スクリュー押出機のミキシングエレメント
JP3097490U (ja) * 2003-04-28 2004-01-29 原田 紘一 搬送スクリューと該搬送スクリューを利用した搬送装置
JP2011069157A (ja) 2009-09-28 2011-04-07 Ihi Corp スクリューコンベアの排土口ゲート装置
US20110317510A1 (en) * 2010-06-23 2011-12-29 Entek Manufacturing, Inc. Restoration of worn metallic extrusion processing elements
JP2017137814A (ja) 2016-02-04 2017-08-10 株式会社Subaru サーモスタット故障検出装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3904243A4

Also Published As

Publication number Publication date
KR102550965B1 (ko) 2023-07-04
KR20210103507A (ko) 2021-08-23
JP6505308B1 (ja) 2019-04-24
CN113226956A (zh) 2021-08-06
EP3904243A4 (en) 2022-09-21
JP2020104978A (ja) 2020-07-09
EP3904243A1 (en) 2021-11-03
CN113226956B (zh) 2022-10-21

Similar Documents

Publication Publication Date Title
CN203956413U (zh) 筒体环焊缝组对焊接用工装
US5630669A (en) Split bearing, cage for split or non-split bearing and method of cutting a member of a split bearing
WO2020137801A1 (ja) スクリューコンベヤのオーガの組立方法
JP2012191842A (ja) 回転体用の分割型チューニングリング
CN101358546A (zh) 转子对中系统和方法
CN105773219A (zh) 一种适用于轴类工件的加工工装
JP2010190324A (ja) 軌道部材および軌道部材の製造方法
RU2545869C2 (ru) Способ сварки для валов при вертикальной оси вращения
JP6222784B2 (ja) 継手
US20170159699A1 (en) Flex shaft
KR20200047105A (ko) 휠 베어링 조립체
EP3046480B1 (en) A drum in a shaft of a brush roller and a drum segment.
CN112996602B (zh) 研磨机
TW201632735A (zh) 渦捲式流體機械
JP5940716B1 (ja) スクリューポンプ、およびその製造方法
KR100934962B1 (ko) 강관 절단 장치
RU2213661C1 (ru) Разборная оправка для изготовления деталей цилиндрической формы
US1221087A (en) Construction of turbine and like rotors.
RU2006118402A (ru) Устройство для непрерывного изготовления труб из композиционно-волокнистого материала и способ изготовления устройства
JP6453135B2 (ja) 偏心揺動型の歯車装置
JP2015040529A (ja) スクリューポンプおよび製作方法
JP7393277B2 (ja) 集水井の補修方法
JPS5999112A (ja) すべり軸受
JP2003221996A (ja) ライナープレート立坑の内巻き型補強リング構造
JP7328814B2 (ja) 帯巻き重ね体保持装置及びその使用方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19906101

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20217022003

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2019906101

Country of ref document: EP

Effective date: 20210727