WO2020095420A1 - 情報処理装置及び異常可視化システム - Google Patents

情報処理装置及び異常可視化システム Download PDF

Info

Publication number
WO2020095420A1
WO2020095420A1 PCT/JP2018/041547 JP2018041547W WO2020095420A1 WO 2020095420 A1 WO2020095420 A1 WO 2020095420A1 JP 2018041547 W JP2018041547 W JP 2018041547W WO 2020095420 A1 WO2020095420 A1 WO 2020095420A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
abnormality
smart
smart meter
smart meters
Prior art date
Application number
PCT/JP2018/041547
Other languages
English (en)
French (fr)
Inventor
岡田 武
延弘 石井
Original Assignee
中国電力株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国電力株式会社 filed Critical 中国電力株式会社
Priority to JP2019500901A priority Critical patent/JP6521202B1/ja
Priority to PCT/JP2018/041547 priority patent/WO2020095420A1/ja
Priority to CN201880097520.5A priority patent/CN112703744B/zh
Priority to JP2019197789A priority patent/JP7400354B2/ja
Publication of WO2020095420A1 publication Critical patent/WO2020095420A1/ja
Priority to US17/178,870 priority patent/US11483634B2/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B23/00Alarms responsive to unspecified undesired or abnormal conditions
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/60Arrangements in telecontrol or telemetry systems for transmitting utility meters data, i.e. transmission of data from the reader of the utility meter
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment

Definitions

  • the present invention relates to an information processing device and an abnormality visualization system.
  • Patent Document 1 It is known to use a smart meter to detect the occurrence of a power failure in a distribution system (for example, Patent Document 1).
  • An object of the present invention is to provide an information processing device and an abnormality visualization system capable of discriminating a power failure due to a loss of the function of a smart meter.
  • an information processing device of the present invention is based on a receiving unit that receives information about a plurality of smart meters and a reception status of information from each of the plurality of smart meters.
  • a plurality of smart meters each for determining whether there is an abnormality of the smart meter, and an output unit for outputting information indicating the presence or absence of each of the plurality of smart meters, the receiving unit,
  • the control unit receives information from the plurality of smart meters in one predetermined time period, and the control unit has an abnormality in the smart meter for which information has not been obtained for a second predetermined time longer than the first predetermined time.
  • the second predetermined time is determined to be n times the first predetermined time, and n is 2 or more.
  • a storage unit that stores information indicating the locations of the plurality of smart meters is provided, and the output unit outputs a map image indicating the locations of the smart meters in which an abnormality has occurred.
  • the plurality of smart meters includes an acquisition unit that acquires information indicating whether or not there is an abnormality in a distribution system connected to a facility that detects the amount of power used, and the storage unit includes the plurality of smart meters. Further storing information indicating a correspondence relationship between each smart meter and the distribution system, the output unit, information indicating the relationship between the presence or absence of abnormality of the distribution system and the presence or absence of abnormality of each of the plurality of smart meters. Output.
  • the control unit is the smart meter when the information is not obtained from the smart meter that detects the amount of power used in a facility where the connected distribution system has no abnormality for the second predetermined time or more. It is determined that there is an abnormality in the.
  • an extraction device for extracting a smart meter for which information has not been obtained for the second predetermined time or more out of the plurality of smart meters is interposed in a transmission / reception path of information about the plurality of smart meters.
  • an aggregating device that relays information transmitted from a part or all of the plurality of smart meters is interposed in a transmission / reception path of information regarding the plurality of smart meters.
  • a relay device that stores information indicating whether there is an abnormality in the aggregation device is interposed in a transmission / reception path of information regarding the plurality of smart meters.
  • the control unit is a smart meter in which an aggregation device having no abnormality is present in a transmission / reception path, and the abnormality has occurred in the smart meter for which information has not been obtained for a second predetermined time or longer. To do.
  • an abnormality visualization system of the present invention includes a plurality of smart meters that transmit information indicating the amount of power used in a first predetermined time period, and a plurality of the smart meters. Based on information from at least one of the aggregation device that relays information transmitted from all or all of them, a relay device that stores information indicating whether there is an abnormality in the aggregation device, and at least one of the plurality of smart meters and the aggregation device.
  • a distribution information providing device that stores information indicating whether or not there is an abnormality, and the extraction device and the distribution information providing device that are provided so as to be communicable with each other.
  • An abnormality visualization system comprising an abnormality visualization device that outputs a map image showing the location of a smart meter in which an abnormality has occurred based on information from the information providing device, and an abnormality visualization system comprising information from each of the plurality of smart meters.
  • the visualization device has a storage unit that stores information indicating the locations of the plurality of smart meters and information indicating the correspondence relationship between each of the plurality of smart meters and the distribution system, and there is no abnormality in the connected distribution system. If no information is obtained from the smart meter that detects the amount of power used by the facility for the second predetermined time or longer, it is determined that the smart meter has an abnormality.
  • the second predetermined time is n times the first predetermined time, n is 2 or more, and the control unit is a smart device in which an aggregation device having no abnormality is present in a transmission / reception path. It is determined that an abnormality has occurred in the smart meter, which is the meter and has not obtained the information for the second predetermined time or longer.
  • FIG. 1 is a block diagram showing an example of the main configuration of the disaster information visualization system of the embodiment.
  • FIG. 2 is a diagram showing a configuration example of the aggregation device information DB.
  • FIG. 3 is a diagram showing a configuration example of the measurement information DB.
  • FIG. 4 is a diagram illustrating an example of data indicating a reception status of information from each of a plurality of smart meters.
  • FIG. 5 is a diagram showing a configuration example of the system information DB.
  • FIG. 6 is a diagram showing a configuration example of the instrument location information DB.
  • FIG. 7 is a table showing an example of a smart meter determined to have an abnormality based on the data of FIGS. 4 and 6.
  • FIG. 8 is a table showing another example of the smart meter determined to have an abnormality based on the data of FIGS. 4 and 6.
  • FIG. 9 is a diagram showing an output example of information indicating presence / absence of abnormality of each of a plurality of smart meters.
  • FIG. 10 is a diagram showing an output example of information indicating the relationship between the presence / absence of abnormality of each of the plurality of smart meters and the state of the distribution system.
  • FIG. 11 is a flowchart showing an example of the flow of data processing by the disaster information visualization system.
  • FIG. 12 is a block diagram showing a main configuration example of a disaster information visualization system having a configuration different from that of FIG.
  • FIG. 1 is a block diagram showing an example of the main configuration of a disaster information visualization system 1 of the embodiment.
  • the disaster information visualization system 1 includes a plurality of smart meters 10, a plurality of aggregation devices 20, a head end system (HES) 30, a meter data management system (MDMS: Meter Data Management System) 40, The distribution information providing device 50 and the disaster information visualization device 60 are included.
  • the disaster information visualization system 1 is an embodiment of an abnormality visualization system that determines presence / absence of abnormality of each of the plurality of smart meters 10 and outputs information indicating presence / absence of abnormality of each of the plurality of smart meters 10.
  • the smart meter 10 is an electric energy meter having a function of measuring the amount of electric power used in a facility to which electric power is supplied via a distribution system and transmitting information indicating the amount of electric power used through communication.
  • each of the plurality of smart meters 10 is individually provided for each contract regarding the use of electric power, and individually measures the amount of electric power used at a power supply destination defined by the contract.
  • Examples of the facility include, but are not limited to, houses and factories, and any facility that can be contracted for the use of electric power may be used.
  • the smart meter 10 includes a used power amount acquisition unit 11, a control unit 12, a first communication unit 13, and a second communication unit 14.
  • the used power amount acquisition unit 11 calculates the used power amount by multiplying the input conversion unit that generates a signal having a level according to the current and voltage flowing through the power supply path provided with the smart meter 10, based on the level of the signal. And a multiplying circuit for integrating the used electric energy calculated by the multiplying circuit, a display unit for displaying the measured used electric energy, and the like.
  • the used power amount acquisition unit 11 of the embodiment outputs information indicating the used power amount integrated by the integration circuit. In the embodiment, the information indicating the amount of power used functions as information about the smart meter 10.
  • the specific configuration of the used power amount acquisition unit 11 illustrated here is merely an example, and the present invention is not limited to this.
  • the control unit 12 includes a CPU (Central Processing Unit) or an arithmetic circuit for performing the same arithmetic as the CPU, and a memory circuit for storing and expanding software programs and data (hereinafter, referred to as programs) read by the arithmetic circuit. Equipped with.
  • the control unit 12 performs various processes for controlling the operation of the smart meter 10.
  • the first communication unit 13 transmits to the aggregating device 20, information indicating the power consumption output by the power consumption acquisition unit 11.
  • the first communication unit 13 includes a WNIC (Wireless network interface card) for wirelessly communicating with the aggregation device 20.
  • the first communication unit 13 transmits information to the aggregation device 20 by wireless communication using a wireless local network (WLAN: Wireless Local Area Network).
  • WLAN Wireless Local Area Network
  • the multi-hop communication is provided in the wireless communication path from the first communication unit 13 to the aggregation device 20. That is, the smart meter 10 is provided so as to be able to transmit information via another configuration having the same configuration as the first communication unit 13. Examples of the other configuration include another smart meter 10 that is different from the smart meter 10 that transmits information, or another aggregation device 20 that is different from the aggregation device 20 that is the transmission target. It is not excluded that a wired communication path is used as the communication path between the first communication unit 13 and the aggregation device 20. If a wired communication path can be installed in a part or all of the communication path between the first communication unit 13 and the aggregation device 20, the wired communication path may be provided.
  • the second communication unit 14 transmits to the HES 30 the information indicating the power consumption output by the power consumption acquisition unit 11.
  • the information transmission path by the second communication unit 14 is a preliminary transmission path when the information transmission by the first communication unit 13 is not established.
  • the second communication unit 14 includes a communication circuit for performing wireless communication used as a communication standard for mobile phones.
  • the second communication unit 14 transmits information to the HES 30 by wireless communication using a mobile phone communication network.
  • the data flow DF2 to the aggregation device 20 by the second communication unit 14 is illustrated.
  • a smart meter ID (IDentification) described later is added to the data transmitted and received in the data flow DF1 and the data flow DF2.
  • the smart meter ID is unique identification information individually assigned to each of the plurality of smart meters 10.
  • the added smart meter ID is the smart meter ID assigned to the smart meter 10 that is the transmission source.
  • the smart meter ID is held by a storage circuit included in the control unit 12, for example.
  • the control unit 12 controls the measurement timing of the used power amount by the used power amount acquisition unit 11 and the control related to the transmission of the information indicating the used power amount using the first communication unit 13 and the second communication unit 14.
  • the control unit 12 causes the used power amount acquisition unit 11 to measure the used power amount at a predetermined cycle (for example, a 30-minute cycle), and causes the first communication unit 13 to transmit information.
  • a predetermined cycle for example, a 30-minute cycle
  • the control unit 12 causes the second communication unit 14 to transmit the information.
  • the aggregation device 20 receives the information about the smart meter 10 transmitted from the smart meter 10 and transmits the information to the HES 30.
  • Information is transmitted from a plurality of smart meters 10 to one aggregation device 20. That is, the aggregation device 20 aggregates the information from the plurality of smart meters 10 and collectively transmits the information to the HES 30. 1 and 12, the apparent numbers of the smart meters 10 and the aggregation devices 20 are the same, but generally, the number of the aggregation devices 20 is smaller than the number of the smart meters 10. The number of aggregation devices 20 may be one. In this way, the aggregation device 20 relays information transmitted from some or all of the plurality of smart meters 10.
  • the aggregation device 20 includes a first communication unit 21, a control unit 22, and a third communication unit 23.
  • the first communication unit 21 has a configuration functionally similar to that of the first communication unit 13, and receives the information transmitted from the plurality of smart meters 10.
  • the control unit 22 has a configuration functionally similar to that of the control unit 12, and performs various processes for controlling the operation of the aggregation device 20.
  • the third communication unit 23 has a functionally similar configuration to the first communication unit 13. Under the control of the control unit 22, the third communication unit 23 transmits the information received by the first communication unit 21 to the HES 30.
  • the information from the plurality of smart meters 10 received by the first communication unit 21 indicates the amount of electric power used, which is individually measured by the plurality of smart meters 10.
  • the control unit 22 performs a process of aggregating the power consumption amounts individually measured by the plurality of smart meters 10 and transmitting the power consumption amounts to the third communication unit 23.
  • Information that indicates at least one of transmission time and reception time of information from the smart meter 10 is individually added to the aggregated data.
  • the transmission time of the information from the smart meter 10 may be added to the information, or the control unit 22 may add the reception time of the information from the smart meter 10. Or both may be implemented. Even if the information is aggregated by the control unit 22, the correspondence between each smart meter ID, the power consumption, and at least one of the information transmission time and the information reception time is maintained.
  • the data flow DF3 to the HES 30 by the third communication unit 23 is illustrated.
  • the aggregation device ID is added to the data transmitted and received in the data flow DF3.
  • the aggregation device ID is unique identification information individually assigned to each of the plurality of aggregation devices 20.
  • the added aggregation device ID is the aggregation device ID assigned to the aggregation device 20 of the transmission source.
  • the aggregation device ID is held by a storage circuit included in the control unit 22, for example.
  • the processing capacity is a processing speed, a communication speed, a communicable range, or the like.
  • the control units such as the control unit 12 and the control unit 22, the communication speed and the communicable range are irrelevant.
  • the HES 30 aggregates the information transmitted from the multiple aggregation devices 20 and transmits it to the MDMS 40.
  • the HES 30 also stores and holds information regarding the plurality of aggregation devices 20.
  • the HES 30 includes a second communication unit 31, a third communication unit 32, a control unit 33, a storage unit 34, a fourth communication unit 35, and a fifth communication unit 36.
  • the second communication unit 31 has a functionally similar configuration to the second communication unit 14, and receives the information transmitted from the smart meter 10 by the second communication unit 14.
  • the information received by the second communication unit 31 indicates the amount of power used by the smart meter 10.
  • the third communication unit 32 has a configuration that is functionally similar to the first communication unit 13 and the third communication unit 23, and receives the information transmitted from the aggregation device 20 by the third communication unit 23.
  • the information received by the third communication unit 32 indicates the amount of electric power used, which is collected by the control unit 22 and individually measured by the plurality of smart meters 10.
  • the control unit 33 is functionally similar to the control unit 12 and the control unit 22, and performs various processes for controlling the operation of the HES 30.
  • the storage unit 34 includes a storage device that stores information for the HES 30 to function as an aggregation device information database (DB: Data Base) 34a.
  • DB Data Base
  • FIG. 2 is a diagram showing a configuration example of the aggregation device information DB 34a.
  • the record of the aggregation device information DB 34a includes information according to a plurality of items (columns) such as an aggregation device ID, information acquisition time, and history information. Although the items of the aggregation device ID, the information acquisition time, and the history information are illustrated in FIG. 2, the aggregation device information DB 34a may include further items.
  • the information registered in the item of the aggregation device ID is the aggregation device ID individually assigned to each of the plurality of aggregation devices 20.
  • “SS000001”, “SS000002”, and “SS000003” illustrated in FIG. 2 are identification information assigned to different aggregation devices 20, respectively.
  • the information registered in the item of information acquisition time indicates the time when the second communication unit 31 receives the information from the aggregation device 20.
  • the year (yyyy) / month (mm) / day (dd) / hour (tt) / minute (mm) is adopted as the information acquisition time format, but the format is not limited to this. Seconds and seconds after the decimal point may be further included.
  • the information registered in the history information item indicates whether the information from the aggregation device 20 has been normally received by the second communication unit 31.
  • the HES 30 normally receives the information from the aggregation device 20 to which the identification information registered in the aggregation device ID item is assigned, at the time registered in the information acquisition time item, "Normal" is registered in the information item, and "error” is registered otherwise.
  • the information acquisition time is also engraved in a 30-minute cycle.
  • the one-line record including one aggregation device ID, one information acquisition time, and one history information in the aggregation device information DB 34a illustrated in FIG. 2 indicates the information acquisition time from the aggregation device 20 to which the aggregation device ID is assigned. Shows the reception status of information in.
  • the aggregation device information DB 34a indicates a plurality of records. A plurality of records including the same aggregation device ID in the aggregation device information DB 34a indicate the reception status of information at different information acquisition times.
  • the control unit 33 uses the time when the information is received by the third communication unit 32 as the information acquisition time and associates the aggregation device added to the information with the reception status of the information and registers the record in the aggregation device information DB 34a. Perform processing. Further, the control unit 33 performs a process of aggregating the power consumptions individually measured by the plurality of smart meters 10 received by the second communication unit 31 and the third communication unit 32 and transmitting the aggregated power amounts to the fourth communication unit 35. .. Similar to the aggregation by the control unit 22, information indicating at least one of the transmission time and the reception time of the information from the smart meter 10 is individually added to the data aggregated by the control unit 33. Further, even when the information is collected by the control unit 33, the association between each smart meter ID, the power consumption, and at least one of the information transmission time and the information reception time is maintained.
  • the fourth communication unit 35 transmits, to the MDMS 40, information indicating the amount of power used, which is received by the second communication unit 31 and the third communication unit 32 and individually measured by the plurality of smart meters 10.
  • the fourth communication unit 35 has a configuration including a communication circuit for communicating with the MDMS 40, such as a NIC (Network Interface Card), and transmits information to the MDMS 40 via a communication line provided between the MDMS 40 and the MDMS 40. To do.
  • the data flow DF4 to the MDMS 40 by the fourth communication unit 35 is illustrated.
  • the HES 30 that functions as a relay device that stores information indicating whether or not there is an abnormality in the aggregation device 20 intervenes in the transmission / reception path of information regarding the plurality of smart meters 10.
  • the fifth communication unit 36 transmits a part or all of the information registered in the aggregate device information DB 34a to the disaster information visualization device 60.
  • the fifth communication unit 36 has a configuration including a communication circuit for communicating with the disaster information visualization device 60, such as an NIC, and the disaster information is transmitted via a communication line provided between the fifth communication unit 36 and the disaster information visualization device 60. The information is transmitted to the visualization device 60.
  • the control unit 33 performs a process of transmitting a part or all of the information registered in the aggregation device information DB 34a to the fifth communication unit 36.
  • the control unit 33 When transmitting a part of the information registered in the aggregation device information DB 34a, the control unit 33 extracts the information of the record whose history information is “error” and causes the fifth communication unit 36 to transmit the extracted information.
  • FIG. 1 a data flow DF5 to the disaster information visualization device 60 by the fifth communication unit 36 is illustrated.
  • the control unit 33 may check whether the information received from all the smart meters 10 is obtained from the information received by the third communication unit 32.
  • the HES 30 holds the smart meter IDs of all the smart meters 10 and the setting information including the transmission information to the second communication unit 14 of the smart meter 10 to which these smart IDs are assigned.
  • the setting information may be stored in the storage circuit of the control unit 33, may be stored in the storage unit 34, or may be stored in another storage device or storage circuit (not shown) included in the HES 30. Good.
  • the control unit 33 indicates the presence / absence of information transmission from the aggregation device 20 and the amount of power consumption associated with each smart meter ID of all the smart meters 10 when the information is transmitted from the aggregation device 20. Check if the information is included.
  • the second communication unit 31 of the assigned smart meter 10 makes a call for requesting information from the second communication unit 31.
  • the smart meter 10 transmits information indicating the amount of power used through the second communication unit 14.
  • the MDMS 40 stores and retains information regarding a plurality of smart meters 10 transmitted from HES 30.
  • the MDMS 40 also transmits some or all of the information regarding the plurality of smart meters 10 to the disaster information visualization device 60.
  • the MDMS 40 includes a fourth communication unit 41, a control unit 42, a storage unit 43, and a sixth communication unit 44.
  • the fourth communication unit 41 has a configuration functionally similar to the fourth communication unit 35 and receives the information transmitted from the HES 30.
  • the control unit 42 has a functionally similar configuration to the control unit 12, the control unit 22, and the control unit 33, and performs various processes for controlling the operation of the MDMS 40.
  • the storage unit 43 includes a storage device that stores information for the MDMS 40 to function as the measurement information DB 43a.
  • FIG. 3 is a diagram showing a configuration example of the measurement information DB 43a.
  • the record of the measurement information DB 43a includes information according to a plurality of items (columns) such as a smart meter ID, information acquisition time, and the number of instructions.
  • a smart meter ID such as a smart meter ID
  • information acquisition time such as a smart meter ID
  • number of instructions such as a smart meter ID
  • FIG. 3 exemplifies items of the smart meter ID, the information acquisition time, and the number of instructions
  • the measurement information DB 43a may include further items.
  • the information registered in the item of smart meter ID is a smart meter ID individually assigned to each of the plurality of smart meters 10.
  • “SM000001”, “SM00002”, and “SM000003” illustrated in FIG. 2 are identification information assigned to different smart meters 10.
  • the information registered in the item of information acquisition time indicates the time when the information from the HES 30 is received by the fourth communication unit 41, for example.
  • the year (yyyy) / month (mm) / day (dd) / hour (tt) / minute (mm) is adopted as the information acquisition time format, but the format is not limited to this. Seconds and seconds after the decimal point may be further included.
  • the information registered in the information acquisition time item is at least one of the transmission time and the reception time of the information from the smart meter 10, which is added to the information collected by the control unit 22 and the control unit 33. Good.
  • the information registered in the number of instructions field is a numerical value that indicates the amount of power used.
  • the amount of power used is represented by the numerical value of the number of instructions.
  • the MDMS 40 transmits the number of instructions included in the information from the smart meter 10 to which the identification information registered in the smart meter ID item is assigned, via the aggregation device 20 and the HES 30 (or only the HES 30). If received normally, "normal” is registered in the designated number item, and if not, "error" is registered.
  • the information acquisition time is also engraved in a 30-minute cycle.
  • the information from the smart meter 10 included in the information that the MDMS 40 receives from the HES 30 has a predetermined number format (numerical information) due to data corruption or the like. ) Has been in an inappropriate state.
  • the control unit 42, the smart meter ID, and the information acquisition time of the information from the smart meter 10 "Error" is associated and registered as a record in the measurement information DB 43a.
  • Another example of the case where "error" is registered in the item of the indicated number is the case where the MDMS 40 is registered as a smart meter ID record not included in the information received from the HES 30. That is, when the information indicating the amount of power used to be transmitted from the smart meter 10 in a predetermined cycle is not transmitted from the smart meter 10 or if the transmission / reception fails even if it is transmitted, the information received from the HES 30 is added to the information. Does not include information associated with the smart meter ID of the smart meter 10. In this case, the control unit 42 associates the smart meter ID, the information acquisition time of the cycle, and the “error” and registers them as a record in the measurement information DB 43a.
  • the MDMS 40 has a time corresponding to the smart meter IDs of all the smart meters 10 that transmit information and the cycle in which the information is transmitted from the smart meter 10 (the time registered at the information acquisition time). Holds setting information indicating.
  • the setting information may be stored in the storage circuit of the control unit 42, may be stored in the storage unit 43, or may be stored in another storage device or storage circuit (not shown) included in the MDMS 40. Good.
  • the control unit 42 receives the information from the HES 30 by the fourth communication unit 41, the control unit 42 checks whether the information from the smart meter IDs of all the smart meters 10 transmitting the information is included in the information from the HES 30. To do.
  • the found smart meter ID When the smart meter ID not included in the information from the HES 30 is found, the found smart meter ID, the information acquisition time corresponding to the found cycle, and the “error” are associated with each other and the measurement information DB 43a is associated. Register as a record.
  • FIG. 4 is a diagram showing an example of data indicating the reception status of information from each of the plurality of smart meters 10.
  • the contents of the data in FIG. 4 correspond to the measurement information DB 43a shown in FIG.
  • the transmission / reception processing of information from the smart meter 10 and the registration in the measurement information DB 43a are similarly performed at a time before 7:30 and a time after 9:00.
  • the instruction number “0222160” is normally obtained at the timing of 7:30 on April 1, 2018. That is, from the smart meter 10 to which the smart meter ID “SM000002” is assigned, information indicating the amount of power used is normally transmitted and received at 7:30 on April 1, 2018. On the other hand, at each timing of 8:00, 8:30, and 9:00, the number of instructions is "error". That is, during the period from 8:00 to 9:00 on April 1, 2018, whether the smart meter 10 to which the smart meter ID “SM000001” is assigned has not transmitted information indicating the power consumption, Sending and receiving has failed even if it is done.
  • the indicated number is “7:30, 8:00, 8:30, 9:00” on April 1, 2018 at each timing. "Error”. That is, during the period from 7:30 to 9:00 on April 1, 2018, the smart meter 10 to which the smart meter ID "SM000001" is assigned is not transmitting information indicating the amount of power used, Sending and receiving has failed even if it is done.
  • the sixth communication unit 44 transmits a part or all of the information registered in the measurement information DB 43a to the disaster information visualization device 60.
  • the sixth communication unit 44 has a configuration including a communication circuit for communicating with the disaster information visualization device 60, such as NIC, and the disaster information is transmitted via a communication line provided between the sixth communication unit 44 and the disaster information visualization device 60. The information is transmitted to the visualization device 60.
  • the control unit 42 performs a process of transmitting a part or all of the information registered in the measurement information DB 43a to the sixth communication unit 44. When transmitting a part of the information registered in the measurement information DB 43a, the control unit 42 causes the sixth communication unit 44 to extract the information of the record in which the number of instructions is “error”.
  • FIG. 1 illustrates a data flow DF6 by the sixth communication unit 44 to the disaster information visualization device 60.
  • the distribution information providing device 50 stores information indicating whether or not there is an abnormality in the distribution system connected to the facility where the plurality of smart meters 10 detect the amount of power used.
  • the power distribution information providing device 50 includes a control unit 51, a storage unit 52, and a seventh communication unit 53.
  • the control unit 51 has a functionally similar configuration to the control unit 12, the control unit 22, the control unit 33, and the control unit 42, and performs various processes for controlling the operation of the power distribution information providing apparatus 50.
  • the storage unit 52 includes a storage device that stores information for the power distribution information providing device 50 to function as the system information DB 52a.
  • FIG. 5 is a diagram showing a configuration example of the system information DB 52a.
  • the record of the system information DB 52a includes information according to a plurality of items (columns) such as a drop-in pole ID, an energization state, and the like.
  • FIG. 5 exemplifies the entry pillar ID and the energized state item, the system information DB 52a may include further items.
  • the information registered in the entry column ID item is identification information individually assigned to each of the plurality of entry columns.
  • the lead-in pole here is a so-called electric wire lead-in pole that is provided in the power distribution system and functions as one configuration for supplying electric power.
  • “HH000001”, “HH000002”, and “HH000003” illustrated in FIG. 2 are identification information assigned to different retracting columns.
  • the information registered in the energized state item indicates whether energization is normally performed through the service pillar. For example, in the example shown in FIG. 5, since energization is normally performed in the lead-in pillars to which the lead-in pillar IDs of “HH000001” and “HH000002” are assigned, the energization of the records associated with these lead-in pillar IDs is performed. The status is "normal”. On the other hand, since the energization is not normally performed in the service pillar to which the service pillar ID of “HH000003” is assigned, the energized state of the record associated with the service pillar ID is “error”. In this way, the system information DB 52a can be used as information indicating whether or not there is an abnormality in the distribution system connected to the facility where the plurality of smart meters 10 detect the amount of power used.
  • the seventh communication unit 53 transmits a part or all of the information registered in the system information DB 52a to the disaster information visualization device 60.
  • the seventh communication unit 53 has a configuration including a communication circuit for communicating with the disaster information visualization device 60, such as an NIC, and the disaster information is transmitted via a communication line provided between the seventh communication unit 53 and the disaster information visualization device 60.
  • the information is transmitted to the visualization device 60.
  • the control unit 51 performs a process of transmitting a part or all of the information registered in the system information DB 52a to the seventh communication unit 53.
  • the control unit 51 extracts the information of the record in which the energization state is "error" and causes the seventh communication unit 53 to transmit the information.
  • FIG. 1 a data flow DF7 to the disaster information visualization device 60 by the seventh communication unit 53 is illustrated.
  • the communication lines used in the data flow DF4, the data flow DF5, the data flow DF6, and the data flow DF7 may be a local area network (LAN), or a public communication line network such as the Internet is used. It may be one. Further, the form of the communication line may be wired or wireless. It may be wired, wireless, or a combination of wired and wireless.
  • the forms of the communication lines used in the data flow DF4, the data flow DF5, the data flow DF6, and the data flow DF7 may be individual forms, or some or all may be common forms.
  • the disaster information visualization device 60 is an information processing device that outputs information indicating whether or not each of the plurality of smart meters 10 is abnormal.
  • the disaster information visualization device 60 includes a fifth communication unit 61, a sixth communication unit 62, a seventh communication unit 63, a control unit 64, a storage unit 65, and a power failure / disaster information output unit 66.
  • the fifth communication unit 61 is functionally similar to the fifth communication unit 36, and receives the information transmitted from the HES 30.
  • the sixth communication unit 62 has a functionally similar configuration to the sixth communication unit 44, and receives the information transmitted from the MDMS 40.
  • the seventh communication unit 63 has a functionally similar configuration to the seventh communication unit 53, and receives the information transmitted from the power distribution information providing apparatus 50.
  • the control unit 64 has a functionally similar configuration to the control unit 12, the control unit 22, the control unit 33, the control unit 42, and the control unit 51, and performs various processes for controlling the operation of the disaster information visualization device 60. To do.
  • the storage unit 65 includes a storage device that stores information for the disaster information visualization device 60 to function as the instrument location information DB 65a.
  • FIG. 6 is a diagram showing a configuration example of the instrument location information DB 65a.
  • the record of the instrument location information DB 65a includes information corresponding to a plurality of items (columns) such as a smart meter ID, a lead-in pole ID, and a mounting position.
  • a smart meter ID such as a smart meter ID
  • a lead-in pole ID such as a lead-in pole ID
  • a mounting position such as a smart meter ID, a lead-in pole ID, and a mounting position.
  • FIG. 6 exemplifies the items of the smart meter ID, the lead-in pole ID, and the attachment position
  • the aggregation device information DB 34a may include further items.
  • the information registered in the item of smart meter ID in the meter location information DB 65a is a smart meter ID individually assigned to each of the plurality of smart meters 10 as with the same item in the measurement information DB 43a.
  • the information registered in the entry column ID item of the instrument location information DB 65a is identification information individually assigned to each of the plurality of entry columns, like the same item in the system information DB 52a.
  • the information registered in the attachment position item indicates the position where the smart meter 10 is attached.
  • FIG. 6 illustrates a case where the position where the smart meter 10 is attached is represented by latitude and longitude, the present invention is not limited to this, and the position where the smart meter 10 is attached can be specified. If it is information, the specific format of the information does not matter.
  • One record included in the meter location information DB 65a is a smart meter ID of the smart meter 10 and a service pole of a service pole used in a power distribution system in which the smart meter 10 to which the smart meter ID is assigned measures the amount of power used.
  • the ID is associated with the mounting position of the smart meter 10 to which the smart meter ID is assigned.
  • the power distribution system in which the smart meter 10 to which the smart meter ID of “SM000001” is assigned measures the amount of power used includes a drop pole to which the drop pole ID of “HH000001” is assigned, and “latitude x1.xxxxxxx, longitude”. yy1.yyyyyy ”.
  • the meter location information DB 65a including the mounting positions can be used as information indicating the locations of the plurality of smart meters 10. That is, the storage unit 65 stores information indicating whereabouts of the plurality of smart meters 10.
  • the control unit 64 determines whether or not there is an abnormality in each of the plurality of smart meters 10 based on the reception status of information from each of the plurality of smart meters 10. Specifically, the control unit 64 receives the information transmitted from the sixth communication unit 44 by the sixth communication unit 62, and thereby the information indicating the power consumption amount transmitted from each of the plurality of smart meters 10 is displayed. Get some or all. The control unit 64 determines whether or not there is an abnormality in each of the plurality of smart meters 10 based on the information of the record in which the number of instructions is “error” among the acquired information.
  • the second predetermined time is n times the time (for example, 30 minutes) corresponding to a predetermined cycle (for example, 30-minute cycle).
  • n is 2 or more.
  • n may be an integer value or may include a value below the decimal point.
  • the “first predetermined time” in the embodiment is the time corresponding to the predetermined cycle.
  • FIG. 7 is a table showing an example of the smart meter 10 determined to have an abnormality based on the data of FIGS. 4 and 6.
  • the control unit 64 attaches the mounting position associated with the smart meter ID of the smart meter 10 determined to have an abnormality from the information transmitted from the power distribution information providing device 50 and received by the seventh communication unit 63. Read out.
  • the control unit 64 extracts, as the information of the smart meter 10 in which the abnormality has occurred, the smart meter ID of the smart meter 10 determined to have the abnormality and the mounting position associated with the smart meter ID.
  • FIG. 8 is a table showing another example of the smart meter 10 in which it is determined that an abnormality has occurred based on the data of FIGS. 4 and 6.
  • the control unit 64 extracts the smart meter ID of the smart meter 10 determined to have an abnormality and the mounting position associated with the smart meter ID.
  • control unit 64 determines that the smart meter 10 to which the smart meter ID of “SM000001”, in which the designated number is normally registered at 8:00 on April 1, 2018, is normal, is normal. ..
  • n 3. Even if there is, the determination result by the control unit 64 is as shown in FIG. By setting n to be larger, it is possible to more accurately extract the smart meter 10 that is more likely to continuously have an abnormality.
  • FIG. 9 is a diagram showing an output example of information indicating presence / absence of abnormality of each of the plurality of smart meters 10.
  • the power outage / disaster information output unit 66 functions as an output unit that outputs information indicating the presence / absence of abnormality of each of the plurality of smart meters 10.
  • the power outage / disaster information output unit 66 of the embodiment outputs a map image showing the location of the smart meter 10 in which an abnormality has occurred, as shown in FIG. 9, for example.
  • the map image data used for output may be map image data that can be acquired from the outside using a communication network such as the Internet, or may be a storage circuit provided in the control unit 64, the storage unit 65, or another storage not shown. It may be map image data stored in the device.
  • the position of the smart meter 10 determined to have an abnormality is shown in the map image as a black dot SME indicating the smart meter 10 with “data collection not possible”. Further, in FIG. 9, the normal position of the smart meter 10 that is not determined to have an abnormality is shown in the map image as a mask dot SMU indicating the smart meter 10 of “data collection possible”. The position of each of these smart meters 10 is shown in the map image with reference to the mounting position of the meter location information DB 65a. In this way, the disaster information visualization device 60 of the embodiment functions as an abnormality visualization device that outputs a map image showing the location of the smart meter 10 in which an abnormality has occurred.
  • control unit 64 reads out the mounting positions of the plurality of smart meters 10 from the instrument location information DB 65a and identifies the points corresponding to the positions of the plurality of smart meters 10 in the map image.
  • the control unit 64 sets the point corresponding to the position of the smart meter 10 determined to be abnormal as the black point SME among the specified points, and sets the point corresponding to the position of the smart meter 10 that is not so as the mask dot SMU. To generate a map image.
  • the power outage / disaster information output unit 66 includes, for example, a display device that outputs the map image generated by the control unit 64.
  • the power outage / disaster information output unit 66 displays the map image.
  • the power outage / disaster information output unit 66 may include a communication device that delivers a map image to be displayed on an external display device.
  • the smart meter 10 determined to have an abnormality is handled as if it was provided in the house collapse range due to an earthquake, fire or other disaster. Therefore, in the example shown in FIG. 9, the boundary line of the house collapse range A1 is along the boundary line between the black dot SME and the mask dot SMU. There is a black dot SME in the house collapse area A1, and there is a mask dot SMU outside the house collapse area A1. This is because there is a high possibility that the smart meter 10 for which information has not been obtained for the second predetermined time or longer is involved in the collapse of the house caused by the disaster, is damaged, is washed away, and has lost its function.
  • the control unit 64 treats the smart meter 10 for which information has not been obtained for the second predetermined time or longer as the smart meter 10 that has lost its function due to the disaster, and is shown in FIG. You may output such as.
  • the disaster information visualization device 60 includes a communication unit that can acquire information from a disaster detection warning system such as an earthquake detection warning system and a fire detection warning system (not shown). Then, when the information indicating the occurrence of the disaster is acquired through the communication unit, the presence or absence of abnormality of each of the plurality of smart meters 10 is determined based on the reception status of the information from each of the plurality of smart meters 10. judge.
  • the conditions for determining that the smart meter 10 has an abnormality may be further added.
  • the smart meter 10 in which an abnormality has occurred may be determined by further using information regarding the presence or absence of an abnormality in the distribution system.
  • the power outage / disaster information output unit 66 may output information indicating the relationship between the presence / absence of abnormality of the power distribution system and the presence / absence of abnormality of each of the plurality of smart meters 10.
  • the seventh communication unit 63 functions as an acquisition unit that acquires information indicating whether there is an abnormality in the distribution system connected to the facility where the plurality of smart meters 10 detect the amount of power used.
  • the instrument location information DB 65a functions as information indicating the correspondence relationship between each of the plurality of smart meters 10 and the power distribution system.
  • FIG. 10 is a diagram showing an output example of information indicating the relationship between the presence / absence of abnormality of each of the plurality of smart meters 10 and the state of the distribution system.
  • the lead-in pole ID whose energization state is “error” is extracted from the information transmitted from the power distribution information providing device 50 and received by the seventh communication unit 63.
  • the control unit 64 generates a map image in a display mode in which the smart meter 10 to which the extracted service pole ID and the smart meter ID associated in the instrument location information DB 65a are assigned is included in the power transmission system suspension range A2. ..
  • the black spot SME included in the power transmission system stop range A is not limited to the abnormality of the smart meter 10, and there is a possibility that transmission / reception of information indicating the amount of power used is impossible due to the abnormality of the power distribution system. Is suggested.
  • the control unit 64 controls the smart meter 10 to which the smart meter ID associated with the lead-in pole ID whose energization state is "error" and the meter location information DB 65a is assigned as a black dot SME. May be displayed on the map image in different aspects.
  • the smart meter 10 to which the smart pole ID having the energized state of “error” and the smart meter ID associated with the instrument location information DB 65a is assigned as the smart meter 10 determined to have an abnormality. You may distinguish.
  • the control unit 64 when the control unit 64 has not obtained the information for the second predetermined time or longer from the smart meter 10 that detects the amount of power used in the facility in which the connected power distribution system (for example, the service pole) has no abnormality, The smart meter 10 may be determined to have an abnormality.
  • control unit 64 determines that the smart meter 10 in which the aggregation device 20 having no abnormality is present in the transmission / reception path and the information has not been obtained for the second predetermined time or longer has an abnormality.
  • aggregation device ID is further added as an item of the instrument location information DB 65a.
  • the information registered in the item of “aggregation device ID” in the instrument location information DB 65a is the aggregation device ID assigned to the aggregation device 20 through which the smart meter 10 transmits information.
  • a normal route is set in advance for the aggregation device 20 through which the smart meter 10 transmits information, and the information from the smart meter 10 is transmitted to the HES 30 via the aggregation device 20 according to the normal route. If it is performed, it is determined to be normal.
  • the control unit 64 extracts, from the information transmitted from the HES 30 and received by the fifth communication unit 61, the aggregation device ID whose history information is “error” for a predetermined time or more.
  • the predetermined time may be the second predetermined time or a time different from the second predetermined time.
  • the control unit 64 is a smart meter 10 to which a smart meter ID that is not associated with the extracted aggregation device ID and the meter location information DB 65a is assigned, and that has not been obtained information for a second predetermined time or longer. It is determined that the meter 10 is abnormal.
  • FIG. 11 is a flowchart showing an example of the flow of data processing by the disaster information visualization system 1.
  • the control unit 33 confirms reception of information from the aggregation device 20 (step S1).
  • the control unit 33 confirms whether or not the information indicating the amount of power used has been successfully received (step S2).
  • the control unit 33 is associated with each of the smart meter IDs of all the smart meters 10 when the information is transmitted from the aggregation device 20 and when the information is transmitted from the aggregation device 20. Check whether the information showing the amount of power used is included.
  • the second communication unit 31 of the assigned smart meter 10 makes a call for requesting information from the second communication unit 31.
  • the smart meter 10 transmits information indicating the amount of power used through the second communication unit 14.
  • the control unit 33 confirms the reception of information from the smart meter 10 (step S3).
  • the confirmation of the reception of the information in steps S1 and S3 is a confirmation process of whether or not the information indicating the amount of power used is normally obtained, and "the state in which the normal information is obtained is confirmed. It's not a confirmation.
  • the control unit 33 registers a record in the aggregation device information DB 34a based on the information received by the third communication unit 32 (step S4). Further, the control unit 33 performs a process of aggregating the power consumptions individually measured by the plurality of smart meters 10 received by the second communication unit 31 and the third communication unit 32 and transmitting the aggregated power amounts to the fourth communication unit 35. ..
  • the control unit 42 registers a record in the measurement information DB 43a based on the information received by the fourth communication unit 41 (step S5).
  • the control unit 42 or the control unit 64 extracts information (missing information) of the smart meter 10 for which information has not been obtained for the second predetermined time or longer, based on the measurement information DB 43a (step S6).
  • the control unit 64 acquires system information based on the information transmitted from the power distribution information providing device 50 and received by the seventh communication unit 63 (step S7). Based on the missing information and the system information, the control unit 64 extracts the smart meter 10 for which no information has been obtained for the second predetermined time or longer as the smart meter 10 in the power failure (step S8).
  • the power outage / disaster information output unit 66 outputs, for example, as shown in FIG. 10, for displaying information on the smart meter 10 in power outage (step S9).
  • a plurality of smart meters are received based on a receiving unit (sixth communication unit 62) that receives information about the plurality of smart meters 10 and a reception status of information from each of the plurality of smart meters 10.
  • a control unit 64 for determining the presence / absence of abnormality of each of 10 and an output unit (power failure / disaster information output unit 66) for outputting information indicating the presence / absence of abnormality of each of the plurality of smart meters 10.
  • the reception unit (sixth communication unit 62) receives information from the plurality of smart meters 10 in the first predetermined time period.
  • the control unit 64 determines that an abnormality has occurred in the smart meter 10 for which information has not been obtained for a second predetermined time longer than the second predetermined time.
  • the second predetermined time is n times the first predetermined time. Therefore, it is determined that the smart meter 10 for which information has not been obtained continuously for a plurality of times has an abnormality. For this reason, it is possible to more accurately extract the smart meter 10 that is more likely to have an abnormality continuously. Therefore, it is possible to determine the power failure due to the loss of the function of the smart meter 10.
  • the storage unit 65 is provided for storing information indicating the locations of the plurality of smart meters 10.
  • the output unit (power failure / disaster information output unit 66) outputs a map image showing the location of the smart meter 10 in which an abnormality has occurred. Therefore, the location of the smart meter 10 in which an abnormality has occurred can be visually grasped as a position on the map image.
  • the smart meter 10 includes an acquisition unit (seventh communication unit 63) that acquires information indicating whether or not there is an abnormality in the distribution system connected to the facility that detects the amount of power used.
  • the storage unit 65 further stores information indicating a correspondence relationship between each of the plurality of smart meters 10 and the power distribution system.
  • the output unit (power failure / disaster information output unit 66) outputs information indicating the relationship between the presence / absence of abnormality of the power distribution system and the presence / absence of abnormality of each of the plurality of smart meters 10. Therefore, it becomes possible to grasp the relationship between the cause of the abnormality in which information about the smart meter 10 is not obtained and the presence / absence of abnormality in the distribution system.
  • control unit 64 causes an abnormality in the smart meter 10 when information has not been obtained for a second predetermined time or longer from the smart meter 10 that detects the amount of electric power used in the facility where the connected distribution system has no abnormality. By determining that the abnormality has occurred, it is possible to more reliably determine that the cause of the abnormality is in the smart meter 10.
  • the aggregating device 20 that relays the information transmitted from a part or all of the plurality of smart meters 10 is interposed, so that the information from the plurality of smart meters 10 is transmitted. It is possible to make the transmission route of a variety of routes.
  • the relay device (HES 30) that stores the information indicating the presence / absence of abnormality of the aggregation device 20 is provided in the transmission / reception path of the information regarding the plurality of smart meters 10, so that the information indicating the presence / absence of abnormality of the aggregation device 20 is displayed. In consideration of this, it becomes possible to determine the smart meter 10 in which an abnormality has occurred.
  • control unit 64 determines that there is an abnormality in the smart meter 10 in which the aggregation device 20 having no abnormality is present in the transmission / reception path and the information has not been obtained for the second predetermined time or longer. Thus, it is possible to more reliably determine that the cause of the abnormality is in the smart meter 10.
  • the control unit 42 when transmitting a part of the information registered in the measurement information DB 43a, the control unit 42 extracts the information of the smart meter ID in which the record in which the number of instructions is “error” continues for the second predetermined time or longer. Then, the sixth communication unit 44 may be made to transmit.
  • the MDMS 40 functions as an extraction device that extracts the smart meter 10 for which information has not been obtained for the second predetermined time or longer from the plurality of smart meters 10.
  • the control unit 64 determines that an abnormality has occurred in the smart meter 10 to which the smart meter ID included in the information received from the MDMS 40 is assigned. In this case, the processing load on the control unit 64 can be further reduced.
  • the “information indicating whether or not there is an abnormality in each of the plurality of smart meters 10” output by the power outage / disaster information output unit 66 is not limited to the map image.
  • the power outage / disaster information output unit 66 may include a communication device that externally distributes information including the smart meter ID and the mounting position as shown in FIGS. 7 and 8.
  • the external device or system outputs information in an arbitrary form based on the information.
  • an external device may generate a map image as shown in FIG.
  • the power failure / disaster information output unit 66 and an external device or system provided so as to be communicable with the power failure / disaster information output unit 66 outputs information about the smart meter 10 in which an abnormality has occurred in the form of voice, mail, or the like. You may.
  • one of the set of the second communication unit 14 and the second communication unit 31 or the set of the first communication unit 13, the aggregation device 20, and the third communication unit 32 can be omitted.
  • the HES 30, the MDMS 40, the power distribution information providing device 50, and the disaster information visualization device 60 shown in FIG. 1 are each one device, but some or all of them are systems that are combinations of a plurality of devices. May be. Further, some or all of the HES 30, the MDMS 40, and the distribution information providing device 50 may be integrated in the same device as the disaster information visualization device 60.
  • FIG. 12 is a block diagram showing a main configuration example of a disaster information visualization system having a configuration different from that of FIG.
  • the disaster information visualization device 70 shown in FIG. 12 is an information processing device having the functions of the HES 30, the MDMS 40, the distribution information provision device 50, and the disaster information visualization device 60 described with reference to FIG. That is, the control unit 71 has the functions of the control unit 33, the control unit 42, the control unit 51, and the sixth communication unit 62.
  • the data flow DF4, the data flow DF5, and the data flow DF6 are omitted, and the disaster information visualization device 70 includes a smart device using the data flow DF2 and the data flow DF3 for the second communication unit 31 and the third communication unit 32.
  • Information from the meter 10 and the aggregation device 20 is transmitted.
  • the configurations corresponding to the fourth communication unit 35, the fifth communication unit 36, the fourth communication unit 41, and the sixth communication unit 44 are omitted.

Abstract

情報処理装置は、複数のスマートメータに関する情報を受信する受信部と、複数のスマートメータの各々からの情報の受信状況に基づいて、複数のスマートメータの各々の異常の有無を判定する制御部と、複数のスマートメータの各々の異常の有無を示す情報を出力する出力部と、を備え、制御部は、第2所定時間以上情報が得られていないスマートメータに異常が生じていると判定する。

Description

情報処理装置及び異常可視化システム
 本発明は、情報処理装置及び異常可視化システムに関する。
 配電系統における停電の発生の検知にスマートメータを利用することが知られている(例えば、特許文献1)。
特開2015-233278号公報
 スマートメータの機能が損なわれた場合、当該スマートメータで使用電力量が計量される系統における給電が停止することによる停電が発生することがある。しかしながら、特許文献1に記載の方法では、停電がスマートメータの機能が損なわれたことによる停電であるかどうかを判定することが困難であった。
 本発明では、スマートメータの機能が損なわれたことによる停電を判別可能な情報処理装置及び異常可視化システムを提供することを目的とする。
 上述した課題を解決し、目的を達成するために、本発明の情報処理装置は、複数のスマートメータに関する情報を受信する受信部と、前記複数のスマートメータの各々からの情報の受信状況に基づいて、前記複数のスマートメータの各々の異常の有無を判定する制御部と、前記複数のスマートメータの各々の異常の有無を示す情報を出力する出力部と、を備え、前記受信部は、第1所定時間周期で前記複数のスマートメータからの情報を受信し、前記制御部は、前記第1所定時間よりも長い第2所定時間以上情報が得られていないスマートメータに異常が生じていると判定し、前記第2所定時間は、前記第1所定時間のn倍であり、nは、2以上である。
 本発明の望ましい態様として、前記複数のスマートメータの所在を示す情報を記憶する記憶部を備え、前記出力部は、異常が生じているスマートメータの所在を示す地図画像を出力する。
 本発明の望ましい態様として、前記複数のスマートメータが使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報を取得する取得部を備え、前記記憶部は、前記複数のスマートメータの各々と前記配電系統との対応関係を示す情報をさらに記憶し、前記出力部は、配電系統の異常の有無と前記複数のスマートメータの各々の異常の有無との関連を示す情報を出力する。
 本発明の望ましい態様として、前記制御部は、接続されている配電系統に異常がない施設の使用電力量を検出するスマートメータから前記第2所定時間以上情報が得られていない場合に当該スマートメータに異常が生じていると判定する。
 本発明の望ましい態様として、前記複数のスマートメータに関する情報の送受信経路には、前記複数のスマートメータのうち前記第2所定時間以上情報が得られていないスマートメータを抽出する抽出装置が介在する。
 本発明の望ましい態様として、前記複数のスマートメータに関する情報の送受信経路には、前記複数のスマートメータの一部又は全部から送信される情報を中継する集約装置が介在する。
 本発明の望ましい態様として、前記複数のスマートメータに関する情報の送受信経路には、前記集約装置の異常の有無を示す情報を記憶する中継装置が介在する。
 本発明の望ましい態様として、前記制御部は、異常がない集約装置が送受信経路に介在するスマートメータであって、第2所定時間以上情報が得られていないスマートメータに異常が生じていると判定する。
 上述した課題を解決し、目的を達成するために、本発明の異常可視化システムは、第1所定時間周期で使用電力量を示す情報を送信する複数のスマートメータと、前記複数のスマートメータの一部又は全部から送信される情報を中継する集約装置と、前記集約装置の異常の有無を示す情報を記憶する中継装置と、前記複数のスマートメータ及び前記集約装置の少なくとも一方からの情報に基づいて、第1所定時間周期よりも長い第2所定時間以上情報が得られていないスマートメータを抽出する抽出装置と、前記複数のスマートメータが使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報を記憶する配電情報提供装置と、前記抽出装置及び前記配電情報提供装置と通信可能に設けられ、前記抽出装置及び前記配電情報提供装置からの情報に基づいて異常が生じているスマートメータの所在を示す地図画像を出力する異常可視化装置と、を備える異常可視化システムであって、前記複数のスマートメータの各々からの情報の受信状況に基づいて、前記複数のスマートメータの各々の異常の有無を判定する制御部と、前記複数のスマートメータの各々の異常の有無を示す情報を出力する出力部と、を備え、前記異常可視化装置は、前記複数のスマートメータの所在を示す情報及び前記複数のスマートメータの各々と前記配電系統との対応関係を示す情報を記憶する記憶部と、接続されている配電系統に異常がない施設の使用電力量を検出するスマートメータから前記第2所定時間以上情報が得られていない場合に当該スマートメータに異常が生じていると判定する制御部とを備え、前記第2所定時間は、前記第1所定時間のn倍であり、nは、2以上であり、前記制御部は、異常がない集約装置が送受信経路に介在するスマートメータであって、第2所定時間以上情報が得られていないスマートメータに異常が生じていると判定する。
 本発明によれば、スマートメータの機能が損なわれたことによる停電を判別可能になる。
図1は、実施形態の災害情報可視化システムの主要構成例を示すブロック図である。 図2は、集約装置情報DBの構成例を示す図である。 図3は、計測情報DBの構成例を示す図である。 図4は、複数のスマートメータの各々からの情報の受信状況を示すデータの例を示す図である。 図5は、系統情報DBの構成例を示す図である。 図6は、計器所在情報DBの構成例を示す図である。 図7は、図4及び図6のデータに基づいて異常が生じていると判定されたスマートメータの一例を示す表図である。 図8は、図4及び図6のデータに基づいて異常が生じていると判定されたスマートメータの別の一例を示す表図である。 図9は、複数のスマートメータの各々の異常の有無を示す情報の出力例を示す図である。 図10は、複数のスマートメータの各々の異常の有無と配電系統の状態との関係を示す情報の出力例を示す図である。 図11は、災害情報可視化システムによるデータ処理の流れの一例を示すフローチャートである。 図12は、図1とは異なる構成による災害情報可視化システムの主要構成例を示すブロック図である。
 次に、本発明の実施形態を、図面を参照して詳細に説明する。図1は、実施形態の災害情報可視化システム1の主要構成例を示すブロック図である。災害情報可視化システム1は、複数のスマートメータ10と、複数の集約装置20と、ヘッドエンドシステム(HES:Head End System))30と、メータデータ管理システム(MDMS:Meter Data Management System)40と、配電情報提供装置50と、災害情報可視化装置60とを含む。災害情報可視化システム1は、複数のスマートメータ10の各々の異常の有無を判定して複数のスマートメータ10の各々の異常の有無を示す情報を出力する異常可視化システムの一実施形態である。
 スマートメータ10は、配電系統を介して電力が供給される施設の使用電力量を計量し、通信を介して当該使用電力量を示す情報を送信する機能を備えた電力量計である。複数のスマートメータ10の各々は、例えば、電力の利用に関する契約毎に個別に設けられ、契約が定める電力供給先における使用電力量を個別に計量する。施設として、例えば家屋、工場等が挙げられるがこれに限られるものでなく、電力の利用について契約可能な対象であればよい。スマートメータ10は、使用電力量取得部11と、制御部12と、第1通信部13と、第2通信部14とを備える。
 使用電力量取得部11は、スマートメータ10が設けられた電力供給経路を流れる電流及び電圧に応じたレベルの信号を生じさせる入力変換部、当該信号のレベルに基づいて使用電力量を乗算で算出する乗算回路、乗算回路が算出した使用電力量を積算する積算回路、計量された使用電力量を表示する表示部等を含む。実施形態の使用電力量取得部11は、積算回路が積算した使用電力量を示す情報を出力する。実施形態において、使用電力量を示す情報は、スマートメータ10に関する情報として機能する。ここで例示した使用電力量取得部11の具体的構成はあくまで一例であってこれに限られるものでない。
 制御部12は、CPU(Central Processing Unit)又はCPUと同様の演算を行うための演算回路及び演算回路により読み出されるソフトウェア・プログラム及びデータ(以下、プログラム等と記載)を記憶及び展開する記憶回路等を備える。制御部12は、スマートメータ10の動作を制御するための各種の処理を行う。
 第1通信部13は、使用電力量取得部11が出力する使用電力量を示す情報を集約装置20に送信する。第1通信部13は、無線で集約装置20と通信するためのWNIC(Wireless network interface card)を備える。第1通信部13は、ワイヤレスローカルネットワーク(WLAN:Wireless Local Area Network)を利用した無線通信で集約装置20に情報を送信する。図1及び後述する図12では、第1通信部13による集約装置20へのデータフローDF1を図示している。
 実施形態では、第1通信部13から集約装置20への無線通信経路においてマルチホップ通信を利用可能に設けられる。すなわち、スマートメータ10は、第1通信部13と同様の構成を備える他の構成を介して情報を送信可能に設けられる。当該他の構成の例として、情報を送信するスマートメータ10とは異なる他のスマートメータ10又は送信対象となる集約装置20とは異なる他の集約装置20等が挙げられる。なお、第1通信部13と集約装置20との通信経路として、有線通信経路を採用することは排除されない。第1通信部13と集約装置20との通信経路の一部又は全部に有線通信経路を敷設可能な場合、有線通信経路を設けてもよい。
 第2通信部14は、使用電力量取得部11が出力する使用電力量を示す情報をHES30に送信する。第2通信部14による情報の送信経路は、第1通信部13による情報の送信が成立しない場合の予備的な送信経路である。第2通信部14は、携帯電話の通信規格として利用されている無線通信を行うための通信回路を備える。第2通信部14は、携帯電話の通信網を利用した無線通信でHES30に情報を送信する。
 図1及び図12では、第2通信部14による集約装置20へのデータフローDF2を図示している。実施形態では、データフローDF1及びデータフローDF2で送受信されるデータに、後述するスマートメータID(IDentification)が付加されている。スマートメータIDは、複数のスマートメータ10の各々に個別に割り当てられた固有の識別情報である。付加されるスマートメータIDは、送信元のスマートメータ10に割り当てられているスマートメータIDである。スマートメータIDは、例えば制御部12が含む記憶回路によって保持されている。
 使用電力量取得部11による使用電力量の計測タイミングの制御及び第1通信部13、第2通信部14を利用した使用電力量を示す情報の送信に関する制御は、制御部12が行う。実施形態では、制御部12は、予め定められた周期(例えば、30分周期)で使用電力量取得部11に使用電力量の計測を行わせ、第1通信部13による情報の送信を行う。第1通信部13による情報の送信が成立しなかった場合、制御部12は、第2通信部14による情報の送信を行う。
 集約装置20は、スマートメータ10から送信されるスマートメータ10に関する情報を受信し、HES30に送信する。1つの集約装置20には、複数のスマートメータ10から情報が送信される。すなわち、集約装置20は、複数のスマートメータ10からの情報を集約してHES30に一括送信する。図1及び図12では、スマートメータ10と集約装置20の見かけ上の数が同一であるが、一般的には集約装置20の数は、スマートメータ10の数よりも少ない。集約装置20は、1つでもよい。このように、集約装置20は、複数のスマートメータ10の一部又は全部から送信される情報を中継する。
 集約装置20は、第1通信部21と、制御部22と、第3通信部23とを備える。第1通信部21は、第1通信部13と機能的に同様の構成を備え、複数のスマートメータ10から送信された情報を受信する。制御部22は、制御部12と機能的に同様の構成を備え、集約装置20の動作を制御するための各種の処理を行う。第3通信部23は、第1通信部13と機能的に同様の構成を備える。第3通信部23は、制御部22の制御下で、第1通信部21が受信した情報をHES30に送信する。第1通信部21が受信した複数のスマートメータ10からの情報は、複数のスマートメータ10が個別に計測した使用電力量を示す。制御部22は、複数のスマートメータ10が個別に計測した使用電力量を集約して第3通信部23に送信させる処理を行う。
 集約されたデータには、スマートメータ10からの情報の送信時刻及び受信時刻の少なくとも一方を示す情報が個別に付加されている。第1通信部13によって情報が送信される時点で当該情報にスマートメータ10からの情報の送信時刻が付加されていてもよいし、スマートメータ10からの情報の受信時刻を制御部22が付加してもよいし、その両方が実施されてもよい。なお、制御部22によって情報が集約されても、個々のスマートメータIDと使用電力量と情報の送信時刻及び受信時刻の少なくとも一方との対応付けは維持されている。
 図1及び図12では、第3通信部23によるHES30へのデータフローDF3を図示している。実施形態では、データフローDF3で送受信されるデータに、集約装置IDが付加されている。集約装置IDは、複数の集約装置20の各々に個別に割り当てられた固有の識別情報である。付加される集約装置IDは、送信元の集約装置20に割り当てられている集約装置IDである。集約装置IDは、例えば制御部22が含む記憶回路によって保持されている。
 なお、機能的に同様の構成とは、同じ機能を奏することが可能であることをさし、処理能力及び具体的な回路構成等に関して同一である必要はない。ここでいう処理能力とは、処理速度、通信速度、通信可能範囲等である。制御部12、制御部22等の制御部の場合、通信速度、通信可能範囲については無関係である。
 HES30は、複数の集約装置20から送信された情報を集約してMDMS40に送信する。また、HES30は、複数の集約装置20に関する情報を記憶、保持する。HES30は、第2通信部31と、第3通信部32と、制御部33と、記憶部34と、第4通信部35と、第5通信部36とを備える。
 第2通信部31は、第2通信部14と機能的に同様の構成を備え、第2通信部14によってスマートメータ10から送信された情報を受信する。第2通信部31が受信する情報は、スマートメータ10が計測した使用電力量を示す。第3通信部32は、第1通信部13及び第3通信部23と機能的に同様の構成を備え、第3通信部23によって集約装置20から送信された情報を受信する。第3通信部32が受信する情報は、制御部22によって集約された、複数のスマートメータ10が個別に計測した使用電力量を示す。
 制御部33は、制御部12及び制御部22と機能的に同様の構成を備え、HES30の動作を制御するための各種の処理を行う。記憶部34は、HES30が集約装置情報データベース(DB:Data Base)34aとして機能するための情報を記憶する記憶装置を備える。
 図2は、集約装置情報DB34aの構成例を示す図である。集約装置情報DB34aのレコードは、集約装置ID、情報取得時刻、履歴情報等、複数の項目(カラム)に応じた情報を含む。図2では、集約装置ID、情報取得時刻及び履歴情報の項目を例示しているが、集約装置情報DB34aは、さらなる項目を含んでいてもよい。
 集約装置IDの項目に登録されている情報は、複数の集約装置20の各々に個別に割り当てられた集約装置IDである。図2に例示する「SS000001」、「SS000002」、「SS000003」はそれぞれ異なる集約装置20に割り当てられる識別情報である。
 情報取得時刻の項目に登録されている情報は、第2通信部31によって集約装置20からの情報を受信した時刻を示す。図2では、情報取得時刻のフォーマットとして、西暦年(yyyy)/月(mm)/日(dd)/時(tt)/分(mm)が採用されているが、これに限られるものでない。秒及び小数点以下の秒がさらに含まれていてもよい。
 履歴情報の項目に登録されている情報は、第2通信部31によって集約装置20からの情報が正常に受信されたかを示す。図2では、HES30が、集約装置IDの項目に登録されている識別情報を割り当てられた集約装置20からの情報を、情報取得時刻の項目に登録されている時刻に正常に受信した場合、履歴情報の項目に「正常」が登録され、そうでない場合に「エラー」が登録される。実施形態では、スマートメータ10からの情報の送信が30分周期で行われるため、情報取得時刻も30分周期で刻まれる。
 図2に示す集約装置情報DB34aにおける1つの集約装置ID、1つの情報取得時刻及び1つの履歴情報を含む1行のレコードは、当該集約装置IDを割り当てられた集約装置20からの当該情報取得時刻における情報の受信状況を示す。集約装置情報DB34aは、複数のレコードを示す。集約装置情報DB34aにおいて同一の集約装置IDを含む複数のレコードは、それぞれ異なる情報取得時刻における情報の受信状況を示す。
 制御部33は、第3通信部32により情報を受信した時刻を情報取得時刻として、当該情報に付加されている集約装置と当該情報の受信状況を対応付けて集約装置情報DB34aにレコードを登録する処理を行う。また、制御部33は、第2通信部31、第3通信部32によって受信された複数のスマートメータ10が個別に計測した使用電力量を集約して第4通信部35に送信させる処理を行う。制御部22による集約と同様、制御部33によって集約されたデータには、スマートメータ10からの情報の送信時刻及び受信時刻の少なくとも一方を示す情報が個別に付加されている。また、制御部33によって情報が集約されても、個々のスマートメータIDと使用電力量と情報の送信時刻及び受信時刻の少なくとも一方との対応付けは維持されている。
 第4通信部35は、第2通信部31、第3通信部32によって受信された複数のスマートメータ10が個別に計測した使用電力量を示す情報をMDMS40に送信する。第4通信部35は、例えばNIC(Network Interface Card)等、MDMS40と通信を行うための通信回路を含む構成を備え、MDMS40との間に設けられた通信回線を経由してMDMS40に情報を送信する。図1では、第4通信部35によるMDMS40へのデータフローDF4を図示している。このように、実施形態では、複数のスマートメータ10に関する情報の送受信経路に、集約装置20の異常の有無を示す情報を記憶する中継装置として機能するHES30が介在する。
 第5通信部36は、集約装置情報DB34aに登録されている情報の一部又は全部を災害情報可視化装置60に送信する。第5通信部36は、例えばNIC等、災害情報可視化装置60と通信を行うための通信回路を含む構成を備え、災害情報可視化装置60との間に設けられた通信回線を経由して災害情報可視化装置60に情報を送信する。制御部33は、集約装置情報DB34aに登録されている情報の一部又は全部を第5通信部36に送信させる処理を行う。集約装置情報DB34aに登録されている情報の一部を送信する場合、制御部33は、履歴情報が「エラー」であるレコードの情報を抽出して第5通信部36に送信させる。図1では、第5通信部36による災害情報可視化装置60へのデータフローDF5を図示している。
 なお、制御部33は、第3通信部32によって受信した情報で全てのスマートメータ10からの情報が得られたかチェックするようにしてもよい。この場合、HES30は、全てのスマートメータ10のスマートメータIDと、これらのスマートIDが割り当てられたスマートメータ10の第2通信部14に対する発信情報を含む設定情報を保持している。当該設定情報は、制御部33の記憶回路に記憶されていてもよいし、記憶部34に記憶されていてもよいし、HES30が備える図示しない他の記憶装置又は記憶回路に記憶されていてもよい。制御部33は、集約装置20からの情報の送信の有無及び集約装置20からの情報の送信があった場合に全てのスマートメータ10のスマートメータIDの各々と対応付けられた使用電力量を示す情報が含まれているか確認する。情報が得られていないスマートメータ10のスマートメータID、集約装置20からの情報において使用電力量を示す情報が破損等により読み取り不可能であるスマートメータIDがあった場合、これらのスマートメータIDが割り当てられたスマートメータ10の第2通信部14に対して第2通信部31から情報を要求するための発信を行う。スマートメータ10は、当該発信に応じて、第2通信部14を介して使用電力量を示す情報を送信する。
 MDMS40は、HES30から送信された、複数のスマートメータ10に関する情報を記憶、保持する。また、MDMS40は、複数のスマートメータ10に関する情報の一部又は全部を災害情報可視化装置60に送信する。MDMS40は、第4通信部41と、制御部42と、記憶部43と、第6通信部44とを備える。
 第4通信部41は、第4通信部35と機能的に同様の構成を備え、HES30から送信された情報を受信する。制御部42は、制御部12、制御部22及び制御部33と機能的に同様の構成を備え、MDMS40の動作を制御するための各種の処理を行う。記憶部43は、MDMS40が計測情報DB43aとして機能するための情報を記憶する記憶装置を備える。
 図3は、計測情報DB43aの構成例を示す図である。計測情報DB43aのレコードは、スマートメータID、情報取得時刻、指示数等、複数の項目(カラム)に応じた情報を含む。図3では、スマートメータID、情報取得時刻及び指示数の項目を例示しているが、計測情報DB43aは、さらなる項目を含んでいてもよい。
 スマートメータIDの項目に登録されている情報は、複数のスマートメータ10の各々に個別に割り当てられたスマートメータIDである。図2に例示する「SM000001」、「SM000002」、「SM000003」はそれぞれ異なるスマートメータ10に割り当てられる識別情報である。
 情報取得時刻の項目に登録されている情報は、例えば、第4通信部41によってHES30からの情報を受信した時刻を示す。図2では、情報取得時刻のフォーマットとして、西暦年(yyyy)/月(mm)/日(dd)/時(tt)/分(mm)が採用されているが、これに限られるものでない。秒及び小数点以下の秒がさらに含まれていてもよい。また、情報取得時刻の項目に登録される情報は、制御部22、制御部33に集約された情報に付加されている、スマートメータ10からの情報の送信時刻及び受信時刻の少なくとも一方であってもよい。
 指示数の項目に登録されている情報は、使用電力量を示す数値である。実施形態では、使用電力量は、指示数の数値で表される。図3では、MDMS40が、スマートメータIDの項目に登録されている識別情報を割り当てられたスマートメータ10からの情報に含まれる指示数を、集約装置20及びHES30(又はHES30のみ)を経由して、正常に受信した場合、指示数の項目に「正常」が登録され、そうでない場合に「エラー」が登録される。実施形態では、スマートメータ10からの情報の送信が30分周期で行われるため、情報取得時刻も30分周期で刻まれる。
 指示数の項目に「エラー」が登録される場合の一例として、MDMS40がHES30から受信した情報に含まれるスマートメータ10からの情報が、データ破損等によって予め定められた指示数のフォーマット(数値情報)に対して不適切な状態になっていた場合が挙げられる。この場合、当該スマートメータ10からの情報に付加されたスマートメータIDが適切に読み取れる状態であれば、制御部42は、当該スマートメータIDと、当該スマートメータ10からの情報の情報取得時刻と、「エラー」とを対応付けて計測情報DB43aのレコードとして登録する。
 指示数の項目に「エラー」が登録される場合の他の一例として、MDMS40がHES30から受信した情報に含まれないスマートメータIDのレコードとして登録される場合が挙げられる。すなわち、予め定められた周期でスマートメータ10から送信されるべき使用電力量を示す情報がスマートメータ10から送信されていないか、送信されていても送受信に失敗した場合、HES30から受信した情報には、当該スマートメータ10のスマートメータIDと対応付けられた情報が含まれない。この場合、制御部42は、当該スマートメータIDと、当該周期の情報取得時刻と、「エラー」とを対応付けて計測情報DB43aのレコードとして登録する。この場合に対応するため、MDMS40は、情報を送信してくる全てのスマートメータ10のスマートメータID及びスマートメータ10から情報が送信される周期に対応する時刻(情報取得時刻に登録される時刻)を示す設定情報を保持している。当該設定情報は、制御部42の記憶回路に記憶されていてもよいし、記憶部43に記憶されていてもよいし、MDMS40が備える図示しない他の記憶装置又は記憶回路に記憶されていてもよい。制御部42は、第4通信部41によってHES30からの情報を受信すると、情報を送信してくる全てのスマートメータ10のスマートメータIDからの情報が当該HES30からの情報に含まれているかをチェックする。当該HES30からの情報に含まれていないスマートメータIDが発見された場合、発見されたスマートメータIDと、発見された周期に対応する情報取得時刻と、「エラー」とを対応付けて計測情報DB43aのレコードとして登録する。
 図4は、複数のスマートメータ10の各々からの情報の受信状況を示すデータの例を示す図である。なお、図4のデータの内容は、図3に示す計測情報DB43aに対応している。実際には、7:30よりも前の時刻及び9:00よりも後の時刻についても同様にスマートメータ10からの情報の送受信処理及び計測情報DB43aへの登録が行われる。
 図4に示す例の場合、「SM000001」のスマートメータIDが割り当てられたスマートメータ10からは、2018年4月1日の7:30、8:00、8:30、9:00の各々のタイミングで「030467」、「030468」、「030469」、「030470」の指示数が正常に得られている。すなわち、「SM000001」のスマートメータIDが割り当てられたスマートメータ10からは、2018年4月1日の7:30から9:00までの間、使用電力量を示す情報の送受信が30分周期で正常に行われている。
 また、「SM000002」のスマートメータIDが割り当てられたスマートメータ10からは、2018年4月1日の7:30のタイミングで「022160」の指示数が正常に得られている。すなわち、「SM000002」のスマートメータIDが割り当てられたスマートメータ10からは、2018年4月1日の7:30の時点では使用電力量を示す情報の送受信が正常に行われている。一方、8:00、8:30、9:00の各々タイミングでは、指示数が「エラー」になっている。すなわち、2018年4月1日の8:00から9:00までの間、「SM000001」のスマートメータIDが割り当てられたスマートメータ10から使用電力量を示す情報の送信が行われていないか、行われていても送受信に失敗している。
 また、「SM000003」のスマートメータIDが割り当てられたスマートメータ10からは、2018年4月1日の7:30、8:00、8:30、9:00の各々のタイミングで指示数が「エラー」になっている。すなわち、2018年4月1日の7:30から9:00までの間、「SM000001」のスマートメータIDが割り当てられたスマートメータ10から使用電力量を示す情報の送信が行われていないか、行われていても送受信に失敗している。
 第6通信部44は、計測情報DB43aに登録されている情報の一部又は全部を災害情報可視化装置60に送信する。第6通信部44は、例えばNIC等、災害情報可視化装置60と通信を行うための通信回路を含む構成を備え、災害情報可視化装置60との間に設けられた通信回線を経由して災害情報可視化装置60に情報を送信する。制御部42は、計測情報DB43aに登録されている情報の一部又は全部を第6通信部44に送信させる処理を行う。計測情報DB43aに登録されている情報の一部を送信する場合、制御部42は、指示数が「エラー」であるレコードの情報を抽出して第6通信部44に送信させる。図1では、第6通信部44による災害情報可視化装置60へのデータフローDF6を図示している。
 配電情報提供装置50は、複数のスマートメータ10が使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報を記憶する。配電情報提供装置50は、制御部51と、記憶部52と、第7通信部53とを備える。
 制御部51は、制御部12、制御部22、制御部33及び制御部42と機能的に同様の構成を備え、配電情報提供装置50の動作を制御するための各種の処理を行う。記憶部52は、配電情報提供装置50が系統情報DB52aとして機能するための情報を記憶する記憶装置を備える。
 図5は、系統情報DB52aの構成例を示す図である。系統情報DB52aのレコードは、引込柱ID、通電状態等、複数の項目(カラム)に応じた情報を含む。図5では、引込柱ID及び通電状態の項目を例示しているが、系統情報DB52aは、さらなる項目を含んでいてもよい。
 引込柱IDの項目に登録されている情報は、複数の引込柱の各々に個別に割り当てられた識別情報である。ここでいう引込柱は、配電系統に設けられて電力を供給するための一構成として機能する所謂電線引込柱である。図2に例示する「HH000001」、「HH000002」、「HH000003」はそれぞれ異なる引込柱に割り当てられる識別情報である。
 通電状態の項目に登録されている情報は、引込柱を介した通電が正常に行われているかを示す。例えば、図5に示す例では、「HH000001」及び「HH000002」の引込柱IDが割り当てられた引込柱では通電が正常に行われているため、これらの引込柱IDと対応付けられたレコードの通電状態が「正常」になっている。一方、「HH000003」の引込柱IDが割り当てられた引込柱では通電が正常に行われていないため、当該引込柱IDと対応付けられたレコードの通電状態が「エラー」になっている。このように、系統情報DB52aは、複数のスマートメータ10が使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報として利用可能である。
 第7通信部53は、系統情報DB52aに登録されている情報の一部又は全部を災害情報可視化装置60に送信する。第7通信部53は、例えばNIC等、災害情報可視化装置60と通信を行うための通信回路を含む構成を備え、災害情報可視化装置60との間に設けられた通信回線を経由して災害情報可視化装置60に情報を送信する。制御部51は、系統情報DB52aに登録されている情報の一部又は全部を第7通信部53に送信させる処理を行う。系統情報DB52aに登録されている情報の一部を送信する場合、制御部51は、通電状態が「エラー」であるレコードの情報を抽出して第7通信部53に送信させる。図1では、第7通信部53による災害情報可視化装置60へのデータフローDF7を図示している。
 データフローDF4、データフローDF5、データフローDF6及びデータフローDF7で利用される通信回線は、ローカルエリアネットワーク(LAN:Local Area Network)であってもよいし、インターネット等の公衆通信回線網を利用したものであってもよい。また、当該通信回線の形態は、有線、無線のいずれであるかを問わない。有線であってもよいし、無線であってもよいし、有線と無線の組み合わせであってもよい。データフローDF4、データフローDF5、データフローDF6及びデータフローDF7で利用される通信回線の形態は、それぞれ個別の形態であってもよいし、一部又は全部が共通の形態であってもよい。
 災害情報可視化装置60は、複数のスマートメータ10の各々の異常の有無を示す情報を出力する情報処理装置である。災害情報可視化装置60は、第5通信部61と、第6通信部62と、第7通信部63と、制御部64と、記憶部65と、停電・災害情報出力部66と、を備える。
 第5通信部61は、第5通信部36と機能的に同様の構成を備え、HES30から送信された情報を受信する。第6通信部62は、第6通信部44と機能的に同様の構成を備え、MDMS40から送信された情報を受信する。第7通信部63は、第7通信部53と機能的に同様の構成を備え、配電情報提供装置50から送信された情報を受信する。
 制御部64は、制御部12、制御部22、制御部33、制御部42及び制御部51と機能的に同様の構成を備え、災害情報可視化装置60の動作を制御するための各種の処理を行う。記憶部65は、災害情報可視化装置60が計器所在情報DB65aとして機能するための情報を記憶する記憶装置を備える。
 図6は、計器所在情報DB65aの構成例を示す図である。計器所在情報DB65aのレコードは、スマートメータID、引込柱ID、取付位置等、複数の項目(カラム)に応じた情報を含む。図6では、スマートメータID、引込柱ID及び取付位置の項目を例示しているが、集約装置情報DB34aは、さらなる項目を含んでいてもよい。
 計器所在情報DB65aのスマートメータIDの項目に登録されている情報は、計測情報DB43aの同一項目と同様、複数のスマートメータ10の各々に個別に割り当てられたスマートメータIDである。計器所在情報DB65aの引込柱IDの項目に登録されている情報は、系統情報DB52aの同一項目と同様、複数の引込柱の各々に個別に割り当てられた識別情報である。
 取付位置の項目に登録されている情報は、スマートメータ10が取り付けられている位置を示す。図6では、スマートメータ10が取り付けられている位置が緯度及び経度で表されている場合を例示しているがこれに限られるものでなく、スマートメータ10が取り付けられている位置を特定可能な情報であれば具体的な情報の形式は問われない。
 計器所在情報DB65aに含まれる1つのレコードは、スマートメータ10のスマートメータIDと、当該スマートメータIDが割り当てられたスマートメータ10が使用電力量を計測する配電系統で使用される引込柱の引込柱IDと、当該スマートメータIDが割り当てられたスマートメータ10の取付位置とを対応付けている。例えば、「SM000001」のスマートメータIDが割り当てられたスマートメータ10が使用電力量を計測する配電系統は、「HH000001」の引込柱IDが割り当てられた引込柱を含み、「緯度x1.xxxxx、経度yy1.yyyyy」に取り付けられている。このように、取付位置を含む計器所在情報DB65aは、複数のスマートメータ10の所在を示す情報として利用可能である。すなわち、記憶部65は、複数のスマートメータ10の所在を示す情報を記憶する。
 制御部64は、複数のスマートメータ10の各々からの情報の受信状況に基づいて、複数のスマートメータ10の各々の異常の有無を判定する。具体的には、制御部64は、第6通信部44から送信された情報を第6通信部62によって受信することで、複数のスマートメータ10の各々から送信された使用電力量を示す情報の一部又は全部を取得する。制御部64は、取得された情報のうち、指示数が「エラー」であるレコードの情報に基づいて、複数のスマートメータ10の各々の異常の有無を判定する。
 実施形態では、第2所定時間以上情報が得られていないスマートメータ10に異常が生じていると判定する。ここで、第2所定時間は、予め定められた周期(例えば、30分周期)に対応する時間(例えば、30分)のn倍である。nは、2以上である。nは、整数値であってもよいし、小数点以下の値を含んでもよい。このように、実施形態における「第1所定時間」は、予め定められた周期に対応する時間である。以下、制御部64による複数のスマートメータ10の各々の異常の有無の判定について、図4、図7及び図8を参照して例示的に説明する。
 図7は、図4及び図6のデータに基づいて異常が生じていると判定されたスマートメータ10の一例を示す表図である。n=3の場合、制御部64は、30分×3=90分(1時間半)以上情報が得られていないスマートメータ10に異常が生じていると判定する。図4では、2018年4月1日9:00時点で、90分前に該当する7:30から指示数が「エラー」であるスマートメータIDは、「SM000003」である。このため、n=3の場合、2018年4月1日9:00時点で、制御部64は、「SM000003」のスマートメータIDが割り当てられたスマートメータ10に異常が生じていると判定する。
 制御部64は、配電情報提供装置50から送信されて第7通信部63によって受信された情報から、異常が生じていると判定されたスマートメータ10のスマートメータIDと対応付けられている取付位置を読み出す。制御部64は、異常が生じているスマートメータ10の情報として、異常が生じていると判定されたスマートメータ10のスマートメータID及び当該スマートメータIDと対応付けられている取付位置を抽出する。
 一方、2018年4月1日7:30時点で指示数が正常に登録されている「SM000001」及び「SM000002」のスマートメータIDが割り当てられたスマートメータ10については、制御部64は、正常であると判定する。
 図8は、図4及び図6のデータに基づいて異常が生じていると判定されたスマートメータ10の別の一例を示す表図である。n=2の場合、制御部64は、30分×2=60分(1時間)以上情報が得られていないスマートメータ10に異常が生じていると判定する。図4では、2018年4月1日9:00時点で、60分前に該当する8:00から指示数が「エラー」であるスマートメータIDは、「SM000002」及び「SM000003」である。このため、n=2の場合、2018年4月1日9:00時点で、制御部64は、「SM000002」及び「SM000003」のスマートメータIDが割り当てられたスマートメータ10に異常が生じていると判定する。上述した通り、制御部64は、異常が生じていると判定されたスマートメータ10のスマートメータID及び当該スマートメータIDと対応付けられている取付位置を抽出する。
 一方、2018年4月1日8:00時点で指示数が正常に登録されている「SM000001」のスマートメータIDが割り当てられたスマートメータ10については、制御部64は、正常であると判定する。
 なお、図示しないが、2018年4月1日9:30時点で「SM000002」及び「SM000003」のスマートメータIDと対応付けられた指示数が引き続き「エラー」であれば、n=3の場合であっても、制御部64による判定結果は、図8のようになる。nをより大きく設定することで、継続的に異常が生じている可能性がより高いスマートメータ10をより高精度に抽出できる。
 図9は、複数のスマートメータ10の各々の異常の有無を示す情報の出力例を示す図である。停電・災害情報出力部66は、複数のスマートメータ10の各々の異常の有無を示す情報を出力する出力部として機能する。実施形態の停電・災害情報出力部66は、例えば図9に示すように、異常が生じているスマートメータ10の所在を示す地図画像を出力する。出力に用いられる地図画像データは、インターネット等の通信網を利用して外部から取得可能な地図画像データであってもよいし、制御部64が備える記憶回路、記憶部65又は他の図示しない記憶装置に記憶されている地図画像データであってもよい。
 図9では、異常が生じていると判定されたスマートメータ10の位置が「データ収集不可」のスマートメータ10を示す黒点SMEとして地図画像内に示されている。また、図9では、異常が生じていると判定されなかった正常なスマートメータ10の位置が「データ収集可」のスマートメータ10を示すマスクドットSMUとして地図画像内に示されている。これらのスマートメータ10の各々の位置は、計器所在情報DB65aの取付位置を参照して地図画像内に示される。このように、実施形態の災害情報可視化装置60は、異常が生じているスマートメータ10の所在を示す地図画像を出力する異常可視化装置として機能する。
 実施形態では、制御部64は、計器所在情報DB65aから複数のスマートメータ10の各々の取付位置を読み出して地図画像内における複数のスマートメータ10の各々の位置に対応する点を特定する。制御部64は、特定された点のうち、異常が生じていると判定されたスマートメータ10の位置に対応する点を黒点SMEとし、そうでないスマートメータ10の位置に対応する点をマスクドットSMUとした地図画像を生成する。
 実施形態では、停電・災害情報出力部66は、例えば、制御部64が生成した地図画像を出力する表示装置を備える。停電・災害情報出力部66は、当該地図画像を表示する。なお、停電・災害情報出力部66は、外部の表示装置に表示させる地図画像を配信する通信装置を備えていてもよい。
 実施形態では、異常が生じていると判定されたスマートメータ10は、地震、火災その他の災害による家屋倒壊範囲に設けられていたものとして取り扱われる。このため、図9に示す例では、家屋倒壊範囲A1の境界線が、黒点SMEとマスクドットSMUとの境界線に沿っている。家屋倒壊範囲A1内に黒点SMEがあり、家屋倒壊範囲A1外にマスクドットSMUがある。これは、第2所定時間以上情報が得られていないスマートメータ10は、災害によって生じた家屋の倒壊に巻き込まれて損壊、流失等を生じ、機能を喪失した可能性が高いことによる。なお、制御部64は、災害の発生を検知した場合に、第2所定時間以上情報が得られていないスマートメータ10を災害により機能を喪失したスマートメータ10として扱い、図9又は後述する図10のような出力を行ってもよい。この場合、災害情報可視化装置60は、図示しない地震検知警報システム、火災検知警報システム等の災害検知警報システムからの情報を取得可能な通信部を備える。そして、当該通信部を介して災害の発生を示す情報が取得された場合に、複数のスマートメータ10の各々からの情報の受信状況に基づいて、複数のスマートメータ10の各々の異常の有無を判定する。
 なお、スマートメータ10に異常が生じていると判定される場合の条件は、さらに追加されてもよい。例えば、配電系統の異常の有無に関する情報をさらに用いて異常が生じているスマートメータ10を判定するようにしてもよい。この場合、停電・災害情報出力部66は、配電系統の異常の有無と複数のスマートメータ10の各々の異常の有無との関連を示す情報を出力するようにしてもよい。この場合、第7通信部63は、複数のスマートメータ10が使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報を取得する取得部として機能する。また、計器所在情報DB65aは、複数のスマートメータ10の各々と配電系統との対応関係を示す情報として機能する。
 図10は、複数のスマートメータ10の各々の異常の有無と配電系統の状態との関係を示す情報の出力例を示す図である。図10に示す例では、配電情報提供装置50から送信されて第7通信部63によって受信された情報において、通電状態が「エラー」である引込柱IDが抽出される。制御部64は、抽出された引込柱IDと計器所在情報DB65aにおいて対応付けられているスマートメータIDが割り当てられているスマートメータ10を送電系統停止範囲A2内に含める表示態様の地図画像を生成する。これによって、送電系統停止範囲A内に含まれる黒点SMEは、スマートメータ10の異常に限られず、配電系統の異常によって使用電力量を示す情報の送受信が不可能になっている可能性があることが示唆される。
 スマートメータ10に異常が生じていると判定される場合の条件として配電系統の異常の有無に関する情報が用いられる例は、図10に示す例に限られない。例えば、制御部64は、制御部64は、通電状態が「エラー」である引込柱IDと計器所在情報DB65aにおいて対応付けられているスマートメータIDが割り当てられているスマートメータ10を、黒点SMEとは異なる態様の点で地図画像に表示させるようにしてもよい。すなわち、通電状態が「エラー」である引込柱IDと計器所在情報DB65aにおいて対応付けられているスマートメータIDが割り当てられているスマートメータ10を、異常が生じていると判定されるスマートメータ10と区別するようにしてもよい。言い換えれば、制御部64は、接続されている配電系統(例えば、引込柱)に異常がない施設の使用電力量を検出するスマートメータ10から第2所定時間以上情報が得られていない場合に当該スマートメータ10に異常が生じていると判定するようにしてもよい。
 また、制御部64は、異常がない集約装置20が送受信経路に介在するスマートメータ10であって、第2所定時間以上情報が得られていないスマートメータ10に異常が生じていると判定するようにしてもよい。この場合、例えば、計器所在情報DB65aの項目として「集約装置ID」がさらに追加される。計器所在情報DB65aにおける「集約装置ID」の項目に登録される情報は、スマートメータ10が情報を送信するために経由する集約装置20に割り当てられた集約装置IDである。すなわち、スマートメータ10が情報を送信するために経由する集約装置20は予め正常ルートが定められており、当該正常ルートに従った集約装置20を経由してスマートメータ10からの情報がHES30に送信された場合に正常であると判定される。制御部64は、HES30から送信されて第5通信部61によって受信された情報のうち、履歴情報が所定時間以上「エラー」である集約装置IDを抽出する。当該所定時間は、第2所定時間であってもよいし、第2所定時間とは異なる時間であってもよい。制御部64は、抽出された集約装置IDと計器所在情報DB65aにおいて対応付けられていないスマートメータIDを割り当てられたスマートメータ10であって、かつ、第2所定時間以上情報が得られていないスマートメータ10に異常が生じていると判定する。
 図11は、災害情報可視化システム1によるデータ処理の流れの一例を示すフローチャートである。制御部33は、集約装置20からの情報の受信を確認する(ステップS1)。制御部33は、使用電力量を示す情報の受信に成功したか確認する(ステップS2)。具体的には、制御部33は、集約装置20からの情報の送信の有無及び集約装置20からの情報の送信があった場合に全てのスマートメータ10のスマートメータIDの各々と対応付けられた使用電力量を示す情報が含まれているか確認する。情報が得られていないスマートメータ10のスマートメータID、集約装置20からの情報において使用電力量を示す情報が破損等により読み取り不可能であるスマートメータIDがあった場合、これらのスマートメータIDが割り当てられたスマートメータ10の第2通信部14に対して第2通信部31から情報を要求するための発信を行う。スマートメータ10は、当該発信に応じて、第2通信部14を介して使用電力量を示す情報を送信する。制御部33は、スマートメータ10からの情報の受信を確認する(ステップS3)。
 なお、ステップS1、ステップS3の情報の受信の確認とは、使用電力量を示す情報が正常に得られたかどうかの確認処理であって、「正常な情報が得られた状態が確定したことの確認」ではない。
 制御部33は、第3通信部32によって受信された情報に基づいて、集約装置情報DB34aにレコードを登録する(ステップS4)。また、制御部33は、第2通信部31、第3通信部32によって受信された複数のスマートメータ10が個別に計測した使用電力量を集約して第4通信部35に送信させる処理を行う。
 制御部42は、第4通信部41によって受信された情報に基づいて、計測情報DB43aにレコードを登録する(ステップS5)。制御部42又は制御部64は、計測情報DB43aに基づいて、第2所定時間以上情報が得られていないスマートメータ10の情報(欠測情報)を抽出する(ステップS6)。また、制御部64は、配電情報提供装置50から送信されて第7通信部63によって受信された情報によって、系統情報を取得する(ステップS7)。制御部64は、欠測情報及び系統情報に基づいて、第2所定時間以上情報が得られていないスマートメータ10を停電中のスマートメータ10として抽出する(ステップS8)。停電・災害情報出力部66は、例えば図10に示すように、停電中のスマートメータ10に関する情報を表示するための出力を行う(ステップS9)。
 以上、実施形態によれば、複数のスマートメータ10に関する情報を受信する受信部(第6通信部62)と、複数のスマートメータ10の各々からの情報の受信状況に基づいて、複数のスマートメータ10の各々の異常の有無を判定する制御部64と、複数のスマートメータ10の各々の異常の有無を示す情報を出力する出力部(停電・災害情報出力部66)と、を備える。受信部(第6通信部62)は、第1所定時間周期で複数のスマートメータ10からの情報を受信する。制御部64は、第2所定時間よりも長い第2所定時間以上情報が得られていないスマートメータ10に異常が生じていると判定する。第2所定時間は、第1所定時間のn倍である。従って、複数回連続で情報が得られていないスマートメータ10が異常を生じていると判定されることになる。このため、継続的に異常が生じている可能性がより高いスマートメータ10をより高精度に抽出できる。従って、スマートメータ10の機能が損なわれたことによる停電を判別可能になる。
 また、複数のスマートメータ10の所在を示す情報を記憶する記憶部65を備える。出力部(停電・災害情報出力部66)は、異常が生じているスマートメータ10の所在を示す地図画像を出力する。従って、異常が生じているスマートメータ10の所在を地図画像上の位置として視覚的に把握可能になる。
 また、複数のスマートメータ10が使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報を取得する取得部(第7通信部63)を備える。記憶部65は、複数のスマートメータ10の各々と配電系統との対応関係を示す情報をさらに記憶する。出力部(停電・災害情報出力部66)は、配電系統の異常の有無と複数のスマートメータ10の各々の異常の有無との関連を示す情報を出力する。従って、スマートメータ10に関する情報が得られない異常の原因と配電系統の異常の有無との関係を把握可能になる。
 また、制御部64は、接続されている配電系統に異常がない施設の使用電力量を検出するスマートメータ10から第2所定時間以上情報が得られていない場合に当該スマートメータ10に異常が生じていると判定することで、異常の原因がスマートメータ10にあることをより確実に判定可能になる。
 また、複数のスマートメータ10に関する情報の送受信経路には、複数のスマートメータ10の一部又は全部から送信される情報を中継する集約装置20が介在することで、複数のスマートメータ10からの情報の送信経路をより多岐な経路にすることができる。
 また、複数のスマートメータ10に関する情報の送受信経路には、集約装置20の異常の有無を示す情報を記憶する中継装置(HES30)が介在することで、集約装置20の異常の有無を示す情報を加味して異常が生じているスマートメータ10の判定が可能になる。
 また、制御部64は、異常がない集約装置20が送受信経路に介在するスマートメータ10であって、第2所定時間以上情報が得られていないスマートメータ10に異常が生じていると判定することで、異常の原因がスマートメータ10にあることをより確実に判定可能になる。
 なお、上記の実施形態はあくまで一例であり、本発明の技術的特徴を逸脱しない範囲内において適宜変更可能である。
 例えば、計測情報DB43aに登録されている情報の一部を送信する場合、制御部42は、指示数が「エラー」であるレコードが第2所定時間以上継続しているスマートメータIDの情報を抽出して第6通信部44に送信させるようにしてもよい。この場合、MDMS40は、複数のスマートメータ10のうち第2所定時間以上情報が得られていないスマートメータ10を抽出する抽出装置として機能する。また、この場合、制御部64は、MDMS40から受信した情報に含まれるスマートメータIDが割り当てられたスマートメータ10に異常が生じていると判定する。この場合、制御部64の処理負荷をより低減することができる。
 また、停電・災害情報出力部66が出力する「複数のスマートメータ10の各々の異常の有無を示す情報」は、地図画像に限られない。例えば、停電・災害情報出力部66は、図7、図8に示すようなスマートメータIDと取付位置とを含む情報を外部に配信する通信装置を備えていてもよい。この場合、外部の装置又はシステムは、当該情報に基づいて任意の形態で情報を出力する。例えば、外部の装置が図9に示すような地図画像を生成してもよい。また、停電・災害情報出力部66及び停電・災害情報出力部66と通信可能に設けられた外部の装置又はシステムは、音声、メールその他の形式で異常が生じているスマートメータ10に関する情報を出力してもよい。
 また、第2通信部14及び第2通信部31の組又は第1通信部13、集約装置20及び第3通信部32の組の一方は省略可能である。
 また、図1に示すHES30、MDMS40、配電情報提供装置50及び災害情報可視化装置60は、それぞれ1つの装置であるが、これらの一部又は全部は、それぞれが複数の装置の組み合わせによるシステムであってもよい。また、HES30、MDMS40及び配電情報提供装置50の一部又は全部が災害情報可視化装置60と同一の装置に統合されていてもよい。
 図12は、図1とは異なる構成による災害情報可視化システムの主要構成例を示すブロック図である。図12に示す災害情報可視化装置70は、図1を参照して説明したHES30、MDMS40、配電情報提供装置50及び災害情報可視化装置60の機能を具備する情報処理装置である。すなわち、制御部71は、制御部33、制御部42、制御部51及び第6通信部62の機能を具備する。
 図12に示す例では、データフローDF4、データフローDF5及びデータフローDF6は省略され、災害情報可視化装置70が備える第2通信部31及び第3通信部32に対するデータフローDF2及びデータフローDF3によってスマートメータ10及び集約装置20からの情報が送信される。これに伴い、第4通信部35、第5通信部36、第4通信部41、第6通信部44に対応する構成は省略される。
 また、図2等を参照して説明した各種のDBに登録されている各種の情報の具体的な文字列はあくまで模式的な例示であって、これに限定されるものでなく、同様の意味を示す他の文字列、記号等に置換可能である。
1   災害情報可視化システム
10  スマートメータ
20  集約装置
30  HES
34a 集約装置情報DB
40  MDMS
43a 計測情報DB
50  配電情報提供装置
52a 系統情報DB
60,70 災害情報可視化装置
61  第5通信部
62  第6通信部
63  第7通信部
64,71 制御部
65  記憶部
65a 計器所在情報DB
66  停電・災害情報出力部

Claims (9)

  1.  複数のスマートメータに関する情報を受信する受信部と、
     前記複数のスマートメータの各々からの情報の受信状況に基づいて、前記複数のスマートメータの各々の異常の有無を判定する制御部と、
     前記複数のスマートメータの各々の異常の有無を示す情報を出力する出力部と、を備え、
     前記受信部は、第1所定時間周期で前記複数のスマートメータからの情報を受信し、
     前記制御部は、前記第1所定時間よりも長い第2所定時間以上情報が得られていないスマートメータに異常が生じていると判定し、
     前記第2所定時間は、前記第1所定時間のn倍であり、
     nは、2以上である
     情報処理装置。
  2.  前記複数のスマートメータの所在を示す情報を記憶する記憶部を備え、
     前記出力部は、異常が生じているスマートメータの所在を示す地図画像を出力する
     請求項1に記載の情報処理装置。
  3.  前記複数のスマートメータが使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報を取得する取得部を備え、
     前記記憶部は、前記複数のスマートメータの各々と前記配電系統との対応関係を示す情報をさらに記憶し、
     前記出力部は、配電系統の異常の有無と前記複数のスマートメータの各々の異常の有無との関連を示す情報を出力する
     請求項2に記載の情報処理装置。
  4.  前記制御部は、接続されている配電系統に異常がない施設の使用電力量を検出するスマートメータから前記第2所定時間以上情報が得られていない場合に当該スマートメータに異常が生じていると判定する
     請求項3に記載の情報処理装置。
  5.  前記複数のスマートメータに関する情報の送受信経路には、前記複数のスマートメータのうち前記第2所定時間以上情報が得られていないスマートメータを抽出する抽出装置が介在する
     請求項1から4のいずれか一項に記載の情報処理装置。
  6.  前記複数のスマートメータに関する情報の送受信経路には、前記複数のスマートメータの一部又は全部から送信される情報を中継する集約装置が介在する
     請求項1から5のいずれか一項に記載の情報処理装置。
  7.  前記複数のスマートメータに関する情報の送受信経路には、前記集約装置の異常の有無を示す情報を記憶する中継装置が介在する
     請求項6に記載の情報処理装置。
  8.  前記制御部は、異常がない集約装置が送受信経路に介在するスマートメータであって、第2所定時間以上情報が得られていないスマートメータに異常が生じていると判定する
     請求項7に記載の情報処理装置。
  9.  第1所定時間周期で使用電力量を示す情報を送信する複数のスマートメータと、
     前記複数のスマートメータの一部又は全部から送信される情報を中継する集約装置と、
     前記集約装置の異常の有無を示す情報を記憶する中継装置と、
     前記複数のスマートメータ及び前記集約装置の少なくとも一方からの情報に基づいて、第1所定時間周期よりも長い第2所定時間以上情報が得られていないスマートメータを抽出する抽出装置と、
     前記複数のスマートメータが使用電力量を検出する施設に接続されている配電系統の異常の有無を示す情報を記憶する配電情報提供装置と、
     前記抽出装置及び前記配電情報提供装置と通信可能に設けられ、前記抽出装置及び前記配電情報提供装置からの情報に基づいて異常が生じているスマートメータの所在を示す地図画像を出力する異常可視化装置と、を備える異常可視化システムであって、
     前記複数のスマートメータの各々からの情報の受信状況に基づいて、前記複数のスマートメータの各々の異常の有無を判定する制御部と、
     前記複数のスマートメータの各々の異常の有無を示す情報を出力する出力部と、を備え、
     前記異常可視化装置は、
     前記複数のスマートメータの所在を示す情報及び前記複数のスマートメータの各々と前記配電系統との対応関係を示す情報を記憶する記憶部と、
     接続されている配電系統に異常がない施設の使用電力量を検出するスマートメータから前記第2所定時間以上情報が得られていない場合に当該スマートメータに異常が生じていると判定する制御部とを備え、
     前記第2所定時間は、前記第1所定時間のn倍であり、
     nは、2以上であり、
     前記制御部は、異常がない集約装置が送受信経路に介在するスマートメータであって、第2所定時間以上情報が得られていないスマートメータに異常が生じていると判定する
     異常可視化システム。
PCT/JP2018/041547 2018-11-08 2018-11-08 情報処理装置及び異常可視化システム WO2020095420A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2019500901A JP6521202B1 (ja) 2018-11-08 2018-11-08 情報処理装置及び異常可視化システム
PCT/JP2018/041547 WO2020095420A1 (ja) 2018-11-08 2018-11-08 情報処理装置及び異常可視化システム
CN201880097520.5A CN112703744B (zh) 2018-11-08 2018-11-08 信息处理装置和异常可视化系统
JP2019197789A JP7400354B2 (ja) 2018-11-08 2019-10-30 情報処理装置、異常可視化システム及び異常可視化処理方法
US17/178,870 US11483634B2 (en) 2018-11-08 2021-02-18 Information processing device and anomaly visualizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/041547 WO2020095420A1 (ja) 2018-11-08 2018-11-08 情報処理装置及び異常可視化システム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/178,870 Continuation US11483634B2 (en) 2018-11-08 2021-02-18 Information processing device and anomaly visualizing system

Publications (1)

Publication Number Publication Date
WO2020095420A1 true WO2020095420A1 (ja) 2020-05-14

Family

ID=66655686

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/041547 WO2020095420A1 (ja) 2018-11-08 2018-11-08 情報処理装置及び異常可視化システム

Country Status (4)

Country Link
US (1) US11483634B2 (ja)
JP (2) JP6521202B1 (ja)
CN (1) CN112703744B (ja)
WO (1) WO2020095420A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2973071B1 (en) * 2013-03-15 2020-05-06 Fluke Corporation Automatic recording and graphing of measurement data
JP6521202B1 (ja) 2018-11-08 2019-05-29 中国電力株式会社 情報処理装置及び異常可視化システム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000207671A (ja) * 1999-01-14 2000-07-28 Mitsubishi Electric Corp 遠隔自動検針・負荷監視制御システムの中央処理装置
JP2018106645A (ja) * 2016-12-28 2018-07-05 東京電力ホールディングス株式会社 認証システム、認証方法、および、所在地コード生成装置
JP2018117455A (ja) * 2017-01-18 2018-07-26 中部電力株式会社 消費電力量監視装置

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5568399A (en) * 1995-01-31 1996-10-22 Puget Consultants Inc. Method and apparatus for power outage determination using distribution system information
US6259972B1 (en) * 1998-01-16 2001-07-10 Enghouse Systems Usa, Inc. Method for processing and disseminating utility outage information
US7739138B2 (en) * 2003-05-19 2010-06-15 Trimble Navigation Limited Automated utility supply management system integrating data sources including geographic information systems (GIS) data
JP2005210205A (ja) * 2004-01-20 2005-08-04 Toshiba Corp 伝送制御装置及び伝送方法
US20070183369A1 (en) * 2006-02-03 2007-08-09 Bruce Angelis System for verifying restored outages, such as in the field outage restoration of public utilities using automatic meter reading (AMR)
US7830874B2 (en) * 2006-02-03 2010-11-09 Itron, Inc. Versatile radio packeting for automatic meter reading systems
JP2007318471A (ja) * 2006-05-26 2007-12-06 Mitsubishi Electric Building Techno Service Co Ltd 通信システム異常検出装置
US7853417B2 (en) * 2007-01-30 2010-12-14 Silver Spring Networks, Inc. Methods and system for utility network outage detection
JP5446986B2 (ja) 2010-02-24 2014-03-19 三菱電機株式会社 停電判定装置
JP5202661B2 (ja) * 2011-02-03 2013-06-05 アンリツ株式会社 スマートメータ評価装置及びスマートメータの評価方法
CN104081724A (zh) * 2012-01-30 2014-10-01 三菱电机株式会社 设备管理装置、设备管理系统、设备管理方法以及程序
EP2905629A4 (en) * 2012-10-01 2016-05-25 Fujitsu Ltd DEVICE FOR MANAGING A POWER DISTRIBUTION, ERROR DETECTION METHOD AND ERROR IDENTIFICATION PROGRAM
EP2905869B1 (en) 2012-10-01 2019-06-19 Fujitsu Limited Power distribution management device, display control method, and display control program
JP2014150647A (ja) * 2013-01-31 2014-08-21 Chugoku Electric Power Co Inc:The 停電区間判定システム
JP6168444B2 (ja) * 2013-02-13 2017-07-26 パナソニックIpマネジメント株式会社 検針システム、通信装置、スマートメータ
JP6127755B2 (ja) * 2013-06-13 2017-05-17 オムロン株式会社 情報処理装置、情報処理装置の制御方法および制御プログラム
US20150350260A1 (en) 2014-05-30 2015-12-03 General Electric Company Systems and methods for managing infrastructure systems
JP6357414B2 (ja) * 2014-12-24 2018-07-11 京セラ株式会社 エネルギー管理システム、制御方法、スマートメータおよびエネルギー管理装置
JP6115560B2 (ja) * 2014-12-26 2017-04-19 トヨタ自動車株式会社 負圧センサ異常検出装置及び内燃機関の制御装置
JP6448384B2 (ja) * 2015-01-20 2019-01-09 シャープ株式会社 テレメータシステム及び通信装置
US10164431B2 (en) * 2015-03-17 2018-12-25 General Electric Technology Gmbh Outage management and prediction for a power grid system
JP6570879B2 (ja) * 2015-05-26 2019-09-04 株式会社東芝 通信システム、スマートメータ、ゲートウェイ装置及び通信プログラム
JP6494448B2 (ja) * 2015-06-29 2019-04-03 日東工業株式会社 配電線異常監視システム
WO2017068996A1 (ja) * 2015-10-19 2017-04-27 株式会社ノーリツ 通信アダプタ
JP6794864B2 (ja) 2017-02-14 2020-12-02 中国電力株式会社 停電情報配信システム
JP6521202B1 (ja) 2018-11-08 2019-05-29 中国電力株式会社 情報処理装置及び異常可視化システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000207671A (ja) * 1999-01-14 2000-07-28 Mitsubishi Electric Corp 遠隔自動検針・負荷監視制御システムの中央処理装置
JP2018106645A (ja) * 2016-12-28 2018-07-05 東京電力ホールディングス株式会社 認証システム、認証方法、および、所在地コード生成装置
JP2018117455A (ja) * 2017-01-18 2018-07-26 中部電力株式会社 消費電力量監視装置

Also Published As

Publication number Publication date
CN112703744B (zh) 2023-12-29
US20210176541A1 (en) 2021-06-10
US11483634B2 (en) 2022-10-25
JP6521202B1 (ja) 2019-05-29
JP2020078241A (ja) 2020-05-21
JP7400354B2 (ja) 2023-12-19
CN112703744A (zh) 2021-04-23
JPWO2020095420A1 (ja) 2021-02-15

Similar Documents

Publication Publication Date Title
JP5952127B2 (ja) 配電系統の断線事故検出方法および配電設備管理システム
US9373247B2 (en) Disaster monitoring and pre-warning system and method thereof
WO2020095420A1 (ja) 情報処理装置及び異常可視化システム
WO2018168077A1 (ja) 配電網モニタリングシステムおよび配電網モニタリング装置
JP2015154338A (ja) 通信システム、および、通信方法
JP2010130168A (ja) 検針システム
CN105279919A (zh) 一种用电信息采集系统
JP6438875B2 (ja) ネットワーク監視装置およびネットワーク監視方法
JP2017194362A (ja) 地震対策システム
JP2010026907A (ja) 検針システム
JP2017151802A (ja) 携帯端末を用いた警報器の点検システム、及び、これを用いた点検方法
CN103875209A (zh) 用于楼宇对讲系统的快速检测并定位故障的方法及其系统
CN107180390B (zh) 用于数据处理的设备
US11120454B2 (en) Industrial internet of things (IIoT) method for customer alerts pertaining to instrumentation
JP2012022434A (ja) 保守システム、保守装置および保守方法
JP2013081292A (ja) 計測情報伝送システム
JP2019176269A (ja) 監視システム、監視方法、及びプログラム
JP2019008430A (ja) 住宅設備機器修理作業支援システム
JP7331336B2 (ja) 設備管理システム
CN109557897B (zh) 通知控制装置、通知控制系统、通知控制方法及存储介质
JP4480567B2 (ja) 災害情報収集・提供システム
JP5245996B2 (ja) メータ検針システム
KR101782943B1 (ko) 사물인터넷을 통합 적용한 산업용보일러 시스템 관리 및 a/s 장치 및 방법
JP2016110297A (ja) ビル設備機器の遠隔監視サーバ及び遠隔監視システム
JP2005234815A (ja) 検針情報管理システム、同システムで使用可能なコンテナ、及び検針情報管理方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2019500901

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18939513

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18939513

Country of ref document: EP

Kind code of ref document: A1