WO2019163608A1 - 検査装置及び検査装置の動作方法 - Google Patents

検査装置及び検査装置の動作方法 Download PDF

Info

Publication number
WO2019163608A1
WO2019163608A1 PCT/JP2019/005134 JP2019005134W WO2019163608A1 WO 2019163608 A1 WO2019163608 A1 WO 2019163608A1 JP 2019005134 W JP2019005134 W JP 2019005134W WO 2019163608 A1 WO2019163608 A1 WO 2019163608A1
Authority
WO
WIPO (PCT)
Prior art keywords
inspection
dry air
dew point
room
valve
Prior art date
Application number
PCT/JP2019/005134
Other languages
English (en)
French (fr)
Inventor
康展 大須賀
紅樹 山本
Original Assignee
東京エレクトロン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東京エレクトロン株式会社 filed Critical 東京エレクトロン株式会社
Priority to US16/975,506 priority Critical patent/US11614477B2/en
Priority to CN201980013900.0A priority patent/CN111727496B/zh
Priority to KR1020207023798A priority patent/KR102527533B1/ko
Publication of WO2019163608A1 publication Critical patent/WO2019163608A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/2851Testing of integrated circuits [IC]
    • G01R31/2855Environmental, reliability or burn-in testing
    • G01R31/286External aspects, e.g. related to chambers, contacting devices or handlers
    • G01R31/2862Chambers or ovens; Tanks
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L22/00Testing or measuring during manufacture or treatment; Reliability measurements, i.e. testing of parts without further processing to modify the parts as such; Structural arrangements therefor
    • H01L22/30Structural arrangements specially adapted for testing or measuring during manufacture or treatment, or specially adapted for reliability measurements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K37/00Special means in or on valves or other cut-off apparatus for indicating or recording operation thereof, or for enabling an alarm to be given
    • F16K37/0025Electrical or magnetic means
    • F16K37/005Electrical or magnetic means for measuring fluid parameters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N25/00Investigating or analyzing materials by the use of thermal means
    • G01N25/56Investigating or analyzing materials by the use of thermal means by investigating moisture content
    • G01N25/66Investigating or analyzing materials by the use of thermal means by investigating moisture content by investigating dew-point
    • G01N25/68Investigating or analyzing materials by the use of thermal means by investigating moisture content by investigating dew-point by varying the temperature of a condensing surface
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/06Measuring leads; Measuring probes
    • G01R1/067Measuring probes
    • G01R1/073Multiple probes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/26Testing of individual semiconductor devices
    • G01R31/2601Apparatus or methods therefor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/2851Testing of integrated circuits [IC]
    • G01R31/2855Environmental, reliability or burn-in testing
    • G01R31/2872Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation
    • G01R31/2874Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation related to temperature
    • G01R31/2875Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation related to temperature related to heating
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/2851Testing of integrated circuits [IC]
    • G01R31/2855Environmental, reliability or burn-in testing
    • G01R31/2872Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation
    • G01R31/2874Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation related to temperature
    • G01R31/2877Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation related to temperature related to cooling
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/2851Testing of integrated circuits [IC]
    • G01R31/2855Environmental, reliability or burn-in testing
    • G01R31/2872Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation
    • G01R31/2881Environmental, reliability or burn-in testing related to electrical or environmental aspects, e.g. temperature, humidity, vibration, nuclear radiation related to environmental aspects other than temperature, e.g. humidity or vibrations
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L22/00Testing or measuring during manufacture or treatment; Reliability measurements, i.e. testing of parts without further processing to modify the parts as such; Structural arrangements therefor
    • H01L22/10Measuring as part of the manufacturing process
    • H01L22/14Measuring as part of the manufacturing process for electrical parameters, e.g. resistance, deep-levels, CV, diffusions by electrical means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N25/00Investigating or analyzing materials by the use of thermal means
    • G01N25/56Investigating or analyzing materials by the use of thermal means by investigating moisture content
    • G01N25/66Investigating or analyzing materials by the use of thermal means by investigating moisture content by investigating dew-point

Definitions

  • the present invention relates to an inspection apparatus and an operation method of the inspection apparatus.
  • an inspection apparatus includes a prober chamber that adjusts an object to be inspected placed on a mounting table to a predetermined temperature in a low temperature region and inspects the object to be inspected for electrical characteristics (for example, patents).
  • Reference 1 In this inspection device, in order to prevent condensation in the prober room, dry air is constantly supplied to the prober room, and the dew point in the prober room is monitored by a dew point meter provided in the prober room, thereby reducing the temperature in the prober room. The dew point is suitable for inspection.
  • an object of one embodiment of the present invention is to provide an inspection device capable of suppressing the consumption of dry air.
  • an inspection apparatus is an inspection apparatus capable of performing a high temperature inspection and a low temperature inspection on an object to be inspected, and an inspection room for inspecting the object to be inspected;
  • a dry air supply unit connected to the examination room via a first valve and supplying dry air into the examination room;
  • a dew point meter connected to the examination room via a second valve and measuring a dew point in the examination room;
  • a bypass pipe for connecting the dry air supply unit and the dew point meter via a third valve.
  • the consumption of dry air can be suppressed.
  • FIG. 1 is a schematic diagram illustrating an example of a prober apparatus according to an embodiment of the present invention.
  • the prober device 1 includes an examination room 10, a dry air supply unit 20, a dew point meter 30, a bypass pipe 40, and a control device 100, as shown in FIG.
  • the inspection chamber 10 is a chamber that accommodates a semiconductor wafer as an object to be inspected and performs an electrical characteristic inspection on the semiconductor wafer.
  • the examination room 10 has a structure that maintains hermeticity.
  • Electrical property inspection includes low temperature inspection, normal temperature inspection, and high temperature inspection.
  • the low temperature inspection means an inspection in which the temperature in the inspection chamber 10 is adjusted to less than 20 ° C. (for example, a low temperature such as ⁇ 60 ° C. or ⁇ 70 ° C.) and the electrical characteristics of the semiconductor wafer are measured.
  • the normal temperature inspection means an inspection in which the temperature in the inspection chamber 10 is adjusted to a temperature of 20 ° C. or higher and lower than 50 ° C. to measure the electrical characteristics of the semiconductor wafer.
  • the high temperature inspection means an inspection in which the temperature in the inspection chamber 10 is adjusted to 50 ° C. or more to measure the electrical characteristics of the semiconductor wafer.
  • a mounting table for mounting a semiconductor wafer In the inspection chamber 10, a mounting table for mounting a semiconductor wafer, a probe card disposed above the mounting table and having a plurality of probes, a plurality of electrode pads of the semiconductor wafer on the mounting table, and a plurality of probes And an alignment mechanism for performing the alignment.
  • the inspection room 10 Under the control of the control device 100, the inspection room 10 performs alignment between the plurality of electrode pads of the semiconductor wafer and the plurality of probes of the probe card after the mounting table and the alignment mechanism cooperate, and then the semiconductor wafer
  • the device is configured to inspect electrical characteristics of each device.
  • the dry air supply unit 20 is connected to the inspection room 10 via a pipe 22 and supplies dry air into the inspection room 10.
  • the pipe 22 is provided with a valve V1 that is a first valve.
  • the valve V ⁇ b> 1 is a solenoid valve, for example, and the opening / closing operation is controlled by the control device 100.
  • the dry air supply unit 20 communicates with the inside of the inspection chamber 10, and dry air is supplied from the dry air supply unit 20 into the inspection chamber 10.
  • valve V ⁇ b> 1 when the valve V ⁇ b> 1 is controlled to be closed, the communication between the dry air supply unit 20 and the inside of the inspection chamber 10 is blocked, and the supply of dry air from the dry air supply unit 20 to the inside of the inspection chamber 10 is stopped.
  • the dew point meter 30 is connected to the inspection room 10 via a pipe 32 and measures the dew point in the inspection room 10.
  • the pipe 32 is provided with a valve V2 that is a second valve.
  • the valve V ⁇ b> 2 is a solenoid valve, for example, and the opening / closing operation is controlled by the control device 100.
  • the valve V2 is controlled to be in the open state
  • the dew point meter 30 and the inside of the examination room 10 communicate with each other, and the gas in the examination room 10 is supplied to the dew point meter 30.
  • the dew point can be measured.
  • the dew point meter 30 may be, for example, a capacitance type dew point meter or a mirror surface dew point meter.
  • the bypass pipe 40 is a bypass line that directly connects the dry air supply unit 20 and the dew point meter 30 without going through the inspection room 10.
  • the bypass pipe 40 has a smaller diameter than, for example, the pipe 22 and the pipe 32.
  • the bypass pipe 40 is provided with a valve V3 which is a third valve.
  • the valve V ⁇ b> 3 is a solenoid valve, for example, and the opening / closing operation is controlled by the control device 100.
  • the valve V3 is controlled to be in the open state, the dry air supply unit 20 and the dew point meter 30 communicate with each other, and dry air is supplied from the dry air supply unit 20 to the dew point meter 30 without passing through the inspection chamber 10.
  • the valve V3 is controlled to be in the closed state, the communication between the dry air supply unit 20 and the dew point meter 30 is blocked, and the supply of dry air from the dry air supply unit 20 to the dew point meter 30 is stopped.
  • the control device 100 controls the operation of each part of the prober device 1.
  • the control device 100 controls the opening / closing operation of the valves V1, V2, and V3 according to the type of inspection (for example, low temperature inspection, normal temperature inspection, high temperature inspection) performed on the semiconductor wafer in the inspection chamber 10.
  • the control device 100 supplies the dry air from the dry air supply unit 20 to the dew point meter 30 via the bypass pipe 40 without supplying the dry air from the dry air supply unit 20 into the examination room 10.
  • V3 open / close operation is controlled.
  • the inspection room is stabilized until the dew point in which no condensation occurs in the inspection room 10 is stabilized.
  • the valves V1 and V2 are supplied so that the dry air supplied into the test chamber 10 is supplied to the dew point meter 30 connected to the test chamber 10.
  • V3 open / close operation is controlled.
  • the control device 100 supplies the dry air to the dew point meter 30 from the dry air supply unit 20 through the inspection chamber 10.
  • V2 and V3 are controlled.
  • valves V1, V2, and V3 are interposed in the pipe 22, the pipe 32, and the bypass pipe 40 is described as an example.
  • the valves V2 and V3 are configured by one valve. May be.
  • two valves are constituted by one valve, for example, a three-way valve can be used.
  • FIG. 2 is an explanatory diagram of the state of the prober device 1 when the room temperature / high temperature inspection is performed.
  • the control device 100 When the room temperature inspection or the high temperature inspection is performed on the semiconductor wafer in the inspection room 10, the control device 100 does not supply dry air from the dry air supply unit 20 into the inspection room 10, and bypass pipe 40 from the dry air supply unit 20.
  • the opening / closing operation of the valves V1, V2, and V3 is controlled so that dry air is supplied to the dew point meter 30 via the.
  • the control device 100 controls the valve V1 to be closed, the valve V2 to be closed, and the valve V3 to be opened.
  • the communication between the dry air supply unit 20 and the inside of the examination room 10 is cut off
  • the communication between the inside of the examination room 10 and the dew point meter 30 is cut off
  • the dry air supply unit 20 and the dew point meter 30 communicate with each other.
  • the dry air is supplied from the dry air supply unit 20 to the dew point meter 30 via the bypass pipe 40 without passing through the inside of the examination room 10 (see arrow A3 in FIG. 2).
  • the dew point meter 30 since the capacity of the bypass pipe 40 is smaller than the capacity of the inspection room 10, the consumption of dry air can be suppressed. Further, since the dew point meter 30 continues to be supplied with dry air having a low dew point (for example, ⁇ 75 ° C.) from the dry air supply unit 20, the dew point meter 30 maintains a dry state. On the other hand, since dry air is not supplied from the dry air supply unit 20 into the examination room 10, the dew point in the examination room 10 gradually increases due to a natural leak or the like with time, and may reach the outside air dew point. Even in this case, since the temperature in the inspection room 10 when the normal temperature inspection or the high temperature inspection is performed is higher than the outside air dew point, the inspection can be performed without causing condensation in the inspection room 10.
  • a low dew point for example, ⁇ 75 ° C.
  • the low temperature inspection can be performed from the state where the normal temperature inspection or the high temperature inspection can be performed on the semiconductor wafer in the inspection room 10 in an environment where the outside air dew point is + 8.0 ° C.
  • the dew point of the dry air supplied from the dry air supply unit 20 is ⁇ 75 ° C., for example.
  • FIG. 3 is an explanatory diagram of the state of the prober device 1 when switching from the normal temperature / high temperature test to the low temperature test.
  • the control device 100 When switching from the state in which the normal temperature inspection or the high temperature inspection can be performed on the semiconductor wafer in the inspection room 10 to the state in which the low temperature inspection can be performed, the control device 100 is stabilized until the dew point at which no dew condensation occurs in the inspection room 10. Dry air is supplied into the examination room 10. After the dew point in the inspection room 10 is stabilized, the control device 100 controls the valves V1, V2, and V3 so as to supply the dry air supplied into the inspection room 10 to the dew point meter 30 connected to the inspection room 10. Controls opening and closing operations. In the present embodiment, first, the control device 100 switches the valve V1 from the closed state to the open state while maintaining the valve V2 in the closed state and the valve V3 in the open state.
  • dry air is supplied from the dry air supply unit 20 into the examination chamber 10 in a state where the dry air is supplied from the dry air supply unit 20 to the dew point meter 30 via the bypass pipe 40 (see arrow A3 in FIG. 3). (See arrow A1 in FIG. 3).
  • the control device 100 switches the valve V2 to the open state and the valve V3 to the closed state.
  • the dry air supplied from the dry air supply unit 20 into the examination room 10 is supplied to the dew point meter 30 (see arrows A1 and A2 in FIG. 4).
  • Whether or not the dew point in the examination room 10 has been stabilized can be determined, for example, based on whether or not a predetermined time has elapsed since the valve V1 was switched from the closed state to the open state.
  • the predetermined time can be determined, for example, by calculating the relationship between the elapsed time since the valve V1 is switched from the closed state to the open state and the dew point in the examination room 10 in advance.
  • whether or not the dew point in the examination room 10 has been stabilized is provided by a dew point meter that can measure the dew point in the examination room 10 in addition to the dew point meter 30 and is measured by this separately provided dew point meter. You may judge based on a dew point.
  • the dry air in the examination room 10 is supplied to the dew point meter 30. Therefore, when switching from a state in which normal temperature inspection or high temperature inspection can be performed to a state in which low temperature inspection can be performed. It is possible to suppress the dew point meter 30 from condensing.
  • FIG. 4 is an explanatory diagram of the state of the prober device 1 when the low temperature inspection is performed.
  • the control device 100 supplies the valves V ⁇ b> 1, V ⁇ b> 2, and V ⁇ b> 2 to supply dry air from the dry air supply unit 20 to the dew point meter 30 through the inspection chamber 10. Controls the opening / closing operation of V3.
  • the control device 100 controls the valve V1 to be in an open state, the valve V2 to be in an open state, and the valve V3 to be in a closed state.
  • dry air is supplied from the dry air supply unit 20 into the examination room 10 (see arrow A1 in FIG. 4), and the dry air in the examination room 10 is supplied to the dew point meter 30 (see arrow A2 in FIG. 4). . Therefore, the dew point in the examination room 10 can be measured by the dew point meter 30.
  • the dew point meter 30 is inexpensive and a capacitance type dew point meter is often used because of its small size.
  • a low dew point for example, ⁇ 50 ° C.
  • a high dew point for example, + 20 ° C.
  • dry air with a low dew point is always supplied to the dew point meter 30 not only when a low temperature inspection is performed but also when a normal temperature inspection or a high temperature inspection is performed. Therefore, even when a capacitance type dew point meter is used, after switching from a state in which room temperature inspection or high temperature inspection can be performed to a semiconductor wafer in the inspection room 10 to a state in which low temperature inspection can be performed, a short time is required. Can be used for low temperature inspection.
  • the dew point meter 30 is connected to the inspection chamber 10 via the pipe 32 where the valve V2 is interposed, and the valve V3 is interposed. It is connected to the dry air supply unit 20 via the bypass pipe 40.
  • the dew point meter 30 is always in a standby state by supplying dry air to the dew point meter 30 via the bypass pipe 40, and only in the inspection room 10 when performing a low temperature measurement. Dry air can be supplied.
  • the conventional apparatus dry air is supplied to the inspection room 10 even when a normal temperature inspection or a high temperature inspection is performed, and the dry air is supplied to the dew point meter 30 via the pipe 32 so that the dew point meter 30 is in a standby state.
  • the amount of dry air consumed can be significantly suppressed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Computer Hardware Design (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Toxicology (AREA)
  • Power Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Testing Or Measuring Of Semiconductors Or The Like (AREA)
  • Testing Of Individual Semiconductor Devices (AREA)
  • Transplanting Machines (AREA)
  • Eye Examination Apparatus (AREA)
  • Automatic Analysis And Handling Materials Therefor (AREA)

Abstract

一実施形態の検査装置は、被検査体に対して高温検査及び低温検査を実施できる検査装置であって、前記被検査体の検査を行う検査室と、前記検査室に第1バルブを介して接続され、前記検査室内にドライエアを供給するドライエア供給部と、前記検査室に第2バルブを介して接続され、前記検査室内の露点を測定する露点計と、前記ドライエア供給部と前記露点計とを第3バルブを介して接続するバイパス配管と、を有する。

Description

検査装置及び検査装置の動作方法
 本発明は、検査装置及び検査装置の動作方法に関する。
 従来、載置台の上に載置された被検査体を低温領域の所定温度に調整して、被検査体に電気的特性検査を行うプローバ室を備える検査装置が知られている(例えば、特許文献1参照)。この検査装置では、プローバ室内で結露が生じないようにするため、ドライエアをプローバ室内へ常時供給すると共に、プローバ室内に設けられた露点計によりプローバ室内の露点を監視することで、プローバ室内を低温検査に適した露点に維持している。
特開2010-87090号公報
 しかしながら、上記の装置では、ドライエアをプローバ室内へ常時供給するため、ドライエアの消費量が多い。
 そこで、本発明の一態様では、ドライエアの消費量を抑制することができる検査装置を提供することを目的とする。
 上記目的を達成するため、本発明の一態様に係る検査装置は、被検査体に対して高温検査及び低温検査を実施できる検査装置であって、前記被検査体の検査を行う検査室と、前記検査室に第1バルブを介して接続され、前記検査室内にドライエアを供給するドライエア供給部と、前記検査室に第2バルブを介して接続され、前記検査室内の露点を測定する露点計と、前記ドライエア供給部と前記露点計とを第3バルブを介して接続するバイパス配管と、を有する。
 開示の検査装置によれば、ドライエアの消費量を抑制することができる。
本発明の実施形態に係るプローバ装置の一例を示す概略図 常温・高温検査を実施するときのプローバ装置の状態の説明図 常温・高温検査から低温検査へ切り替えるときのプローバ装置の状態の説明図 低温検査を実施するときのプローバ装置の状態の説明図
 以下、本発明を実施するための形態について図面を参照して説明する。なお、本明細書及び図面において、実質的に同一の構成については、同一の符号を付することにより重複した説明を省く。
 〔プローバ装置〕
 本発明の実施形態に係る検査装置についてプローバ装置を例に挙げて説明する。図1は、本発明の実施形態に係るプローバ装置の一例を示す概略図である。
 本発明の実施形態に係るプローバ装置1は、図1に示されるように、検査室10と、ドライエア供給部20と、露点計30と、バイパス配管40と、制御装置100と、を有する。
 検査室10は、内部に被検査体である半導体ウエハを収容して、半導体ウエハに対して電気的特性検査を実施するチャンバである。検査室10は、気密を保持する構造を有する。電気的特性検査は、低温検査、常温検査及び高温検査を含む。低温検査とは、検査室10内の温度を20℃未満(例えば-60℃や-70℃といった低温)に調整して半導体ウエハの電気的特性を測定する検査を意味する。常温検査とは、検査室10内の温度を20℃以上50℃未満の温度に調整して半導体ウエハの電気的特性を測定する検査を意味する。高温検査とは、検査室10内の温度を50℃以上に調整して半導体ウエハの電気的特性を測定する検査を意味する。
 検査室10内には、半導体ウエハを載置する載置台と、載置台の上方に配置され且つ複数のプローブを有するプローブカードと、載置台の上の半導体ウエハの複数の電極パッドと複数のプローブのアライメントを行うアライメント機構とが設けられている。検査室10は、制御装置100の制御下で、載置台とアライメント機構とが協働して、半導体ウエハの複数の電極パッドと、プローブカードの複数のプローブとのアライメントを行った後、半導体ウエハの各デバイスの電気的特性検査を行うように構成されている。
 ドライエア供給部20は、配管22を介して検査室10と接続されており、検査室10内にドライエアを供給する。配管22には、第1バルブであるバルブV1が介設されている。バルブV1は、例えばソレノイドバルブであり、制御装置100によって開閉動作が制御される。例えば、バルブV1が開状態に制御されると、ドライエア供給部20と検査室10内とが連通し、ドライエア供給部20から検査室10内にドライエアが供給される。一方、バルブV1が閉状態に制御されると、ドライエア供給部20と検査室10内との連通が遮断され、ドライエア供給部20から検査室10内へのドライエアの供給が停止される。
 露点計30は、配管32を介して検査室10と接続されており、検査室10内の露点を測定する。配管32には、第2バルブであるバルブV2が介設されている。バルブV2は、例えばソレノイドバルブであり、制御装置100によって開閉動作が制御される。例えば、バルブV2が開状態に制御されると、露点計30と検査室10内とが連通し、検査室10内のガスが露点計30に供給されるので、露点計30により検査室10内の露点が測定可能となる。一方、バルブV2が閉状態に制御されると、露点計30と検査室10内との連通が遮断され、検査室10内から露点計30へのガスの供給が停止される。露点計30は、例えば静電容量式露点計、鏡面冷却式露点計であってよい。
 バイパス配管40は、検査室10を経由せずにドライエア供給部20と露点計30とを直接的に接続するバイパスラインである。バイパス配管40は、例えば配管22及び配管32よりも小さい径を有する。バイパス配管40には、第3バルブであるバルブV3が介設されている。バルブV3は、例えばソレノイドバルブであり、制御装置100によって開閉動作が制御される。例えば、バルブV3が開状態に制御されると、ドライエア供給部20と露点計30とが連通し、ドライエア供給部20から検査室10を経由せずにドライエアが露点計30に供給される。一方、バルブV3が閉状態に制御されると、ドライエア供給部20と露点計30との連通が遮断され、ドライエア供給部20から露点計30へのドライエアの供給が停止される。
 制御装置100は、プローバ装置1の各部の動作を制御する。例えば、制御装置100は、検査室10内において半導体ウエハに対して実施する検査の種類(例えば低温検査、常温検査、高温検査)に応じてバルブV1,V2,V3の開閉動作を制御する。具体的には、例えば検査室10内において半導体ウエハに対して常温検査又は高温検査を実施する場合、検査室10内において結露が生じる恐れがない。よって、制御装置100は、ドライエア供給部20から検査室10内にドライエアを供給することなく、ドライエア供給部20からバイパス配管40を介して露点計30にドライエアを供給するように、バルブV1,V2,V3の開閉動作を制御する。また、例えば検査室10内において半導体ウエハに対して常温検査又は高温検査を実施できる状態から低温検査を実施できる状態へ切り替える場合、検査室10内に結露が生じない露点に安定化するまで検査室10内にドライエアを供給し、検査室10内の露点が安定化した後、検査室10内に供給されたドライエアを検査室10に接続された露点計30に供給するように、バルブV1,V2,V3の開閉動作を制御する。また、例えば検査室10内において半導体ウエハに対して低温検査を実施する場合、制御装置100は、ドライエア供給部20から検査室10内を介して露点計30にドライエアを供給するように、バルブV1,V2,V3の開閉動作を制御する。
 なお、図1では、配管22、配管32及びバイパス配管40にそれぞれバルブV1,V2,V3が介設されている場合を例に挙げて説明したが、例えばバルブV2,V3を1つのバルブで構成してもよい。2つのバルブを1つのバルブで構成する場合、例えば三方弁を用いることができる。
 〔プローバ装置の動作〕
 本発明の実施形態に係るプローバ装置1の動作の一例について説明する。以下に説明するプローバ装置1の動作は、制御装置100によって制御される。
 最初に、図2を参照して、外気露点が+8.0℃の環境下、検査室10内で常温検査又は高温検査を実施する場合について説明する。なお、ドライエア供給部20から供給されるドライエアの露点は例えば-75℃である。図2は、常温・高温検査を実施するときのプローバ装置1の状態の説明図である。
 検査室10内において半導体ウエハに対して常温検査又は高温検査を実施する場合、制御装置100は、ドライエア供給部20から検査室10内にドライエアを供給することなく、ドライエア供給部20からバイパス配管40を介して露点計30にドライエアを供給するように、バルブV1,V2,V3の開閉動作を制御する。本実施形態では、制御装置100は、バルブV1を閉状態、バルブV2を閉状態、バルブV3を開状態に制御する。これにより、ドライエア供給部20と検査室10内との連通が遮断され、検査室10内と露点計30との連通が遮断され、ドライエア供給部20と露点計30とが連通する。その結果、ドライエア供給部20から検査室10内を経由せずにバイパス配管40を介して露点計30にドライエアが供給される(図2の矢印A3を参照)。
 このとき、バイパス配管40の容量が検査室10の容量と比較して小さいので、ドライエアの消費量を抑制できる。また、露点計30にはドライエア供給部20から低い露点(例えば-75℃)のドライエアが供給され続けるので、露点計30は乾燥状態を維持する。一方、検査室10内にはドライエア供給部20からドライエアが供給されないので、検査室10内の露点は時間の経過と共に自然リーク等によって徐々に高くなり、外気露点に到達する場合がある。この場合であっても、常温検査又は高温検査を実施する際の検査室10内の温度は外気露点よりも高いため、検査室10内を結露させることなく検査を実施できる。
 次に、図3及び図4を参照して、外気露点が+8.0℃の環境下で、検査室10内において半導体ウエハに対して常温検査又は高温検査を実施できる状態から低温検査を実施できる状態へ切り替える場合について説明する。なお、ドライエア供給部20から供給されるドライエアの露点は例えば-75℃である。図3は、常温・高温検査から低温検査へ切り替えるときのプローバ装置1の状態の説明図である。
 検査室10内において半導体ウエハに対して常温検査又は高温検査を実施できる状態から低温検査を実施できる状態へ切り替える場合、制御装置100は、検査室10内に結露が生じない露点に安定化するまで検査室10内にドライエアを供給する。検査室10内の露点が安定化した後、制御装置100は、検査室10内に供給されたドライエアを検査室10に接続された露点計30に供給するように、バルブV1,V2,V3の開閉動作を制御する。本実施形態では、まず、制御装置100は、バルブV2を閉状態、バルブV3を開状態に維持した状態で、バルブV1を閉状態から開状態に切り替える。これにより、ドライエア供給部20からバイパス配管40を介して露点計30にドライエアが供給された状態で(図3の矢印A3を参照)、ドライエア供給部20から検査室10内にドライエアが供給される(図3の矢印A1を参照)。次いで、検査室10内の露点が安定化した後、制御装置100は、バルブV2を開状態、バルブV3を閉状態に切り替える。これにより、ドライエア供給部20から検査室10内に供給されたドライエアが露点計30に供給される(図4の矢印A1,A2を参照)。検査室10内の露点が安定化したか否かについては、例えばバルブV1を閉状態から開状態に切り替えてから所定時間が経過したか否かに基づいて判断することができる。所定時間は、例えば予めバルブV1を閉状態から開状態に切り替えてからの経過時間と検査室10内の露点との関係を算出しておくことで定めることができる。また、検査室10内の露点が安定化したか否かについては、露点計30とは別に検査室10内の露点を測定可能な露点計を設け、この別に設けられた露点計により測定される露点に基づいて判断してもよい。
 このように検査室10内の露点が安定化した後に検査室10内のドライエアが露点計30に供給されるので、常温検査又は高温検査を実施できる状態から低温検査を実施できる状態へ切り替える際に露点計30が結露することを抑制できる。
 次に、図4を参照して、外気露点が+8.0℃の環境下、検査室10内で低温検査を実施する場合について説明する。なお、ドライエア供給部20から供給されるドライエアの露点は例えば-75℃である。図4は、低温検査を実施するときのプローバ装置1の状態の説明図である。
 検査室10内において半導体ウエハに対して低温検査を実施する場合、制御装置100は、ドライエア供給部20から検査室10内を介して露点計30にドライエアを供給するように、バルブV1,V2,V3の開閉動作を制御する。本実施形態では、制御装置100は、バルブV1を開状態、バルブV2を開状態、バルブV3を閉状態に制御する。これにより、ドライエア供給部20から検査室10内にドライエアが供給され(図4の矢印A1を参照)、検査室10内のドライエアが露点計30に供給される(図4の矢印A2を参照)。そのため、露点計30により検査室10内の露点を測定できる。
 ところで、露点計30としては安価であり、サイズが小さいという理由から静電容量式露点計が用いられる場合が多い。しかしながら、静電容量式露点計はその測定原理に起因して水分が付着しやすく、離れにくい特性を有するため、高い露点(例えば+20℃)のガスを測定した後に低い露点(例えば-50℃)のガスを測定する場合、正確な露点を測定できるようになるまで長い時間(例えば数日)を要する。
 しかしながら、本発明の実施形態では、低温検査を実施する場合だけではなく、常温検査又は高温検査を実施する場合にも常に露点計30には低い露点のドライエアが供給される。そのため、静電容量式露点計を用いた場合であっても、検査室10内において半導体ウエハに対して常温検査又は高温検査を実施できる状態から低温検査を実施できる状態へ切り替えた後、短時間で低温検査を実施できる。
 以上に説明したように、本発明の実施形態に係る検査装置は、露点計30が、バルブV2が介設された配管32を介して検査室10に接続され、且つバルブV3が介設されたバイパス配管40を介してドライエア供給部20に接続されている。これにより、常温検査又は高温検査を実施する場合には常にバイパス配管40を介して露点計30にドライエアを供給することで露点計30をスタンバイ状態とし、低温測定を実施する場合だけ検査室10内にドライエアを供給できる。従来装置では、常温検査又は高温検査を実施する場合にもドライエアを検査室10へ供給し、配管32を介してドライエアを露点計30に供給し露点計30をスタンバイ状態にしていたため、大量のドライエアを消費していたが、本発明の実施形態に係る検査装置では、ドライエアの消費量を大幅に抑制できる。
 以上、本発明を実施するための形態について説明したが、上記内容は、発明の内容を限定するものではなく、本発明の範囲内で種々の変形及び改良が可能である。
 本国際出願は、2018年2月26日に出願した日本国特許出願第2018-032363号に基づく優先権を主張するものであり、当該出願の全内容を本国際出願に援用する。
1   プローバ装置
10  検査室
20  ドライエア供給部
22  配管
30  露点計
32  配管
40  バイパス配管
100 制御装置
V1  バルブ
V2  バルブ
V3  バルブ

Claims (6)

  1.  被検査体に対して高温検査及び低温検査を実施できる検査装置であって、
     前記被検査体の検査を行う検査室と、
     前記検査室に第1バルブを介して接続され、前記検査室内にドライエアを供給するドライエア供給部と、
     前記検査室に第2バルブを介して接続され、前記検査室内の露点を測定する露点計と、
     前記ドライエア供給部と前記露点計とを第3バルブを介して接続するバイパス配管と、
     を有する、
     検査装置。
  2.  前記検査室において前記被検査体に対して実施する検査の種類に応じて前記第1バルブ、前記第2バルブ及び前記第3バルブの開閉動作を制御する制御装置を有する、
     請求項1に記載の検査装置。
  3.  前記制御装置は、前記検査室において前記被検査体に対して高温検査を実施する場合、前記ドライエア供給部から前記検査室内にドライエアを供給することなく、前記ドライエア供給部から前記バイパス配管を介して前記露点計にドライエアを供給するように、前記第1バルブ、前記第2バルブ及び前記第3バルブの開閉動作を制御する、
     請求項2に記載の検査装置。
  4.  前記制御装置は、前記検査室において前記被検査体に対して低温検査を実施する場合、前記ドライエア供給部から前記検査室内を介して前記露点計にドライエアを供給するように、前記第1バルブ、前記第2バルブ及び前記第3バルブの開閉動作を制御する、
     請求項2に記載の検査装置。
  5.  前記制御装置は、前記検査室において前記被検査体に対して高温検査を実施できる状態から低温検査を実施できる状態へ切り替える場合、前記検査室内に結露が生じない露点に安定化するまで前記検査室内にドライエアを供給し、前記検査室の露点が安定化した後に前記検査室内に供給された前記ドライエアを前記検査室に接続された露点計に供給するように、前記第1バルブ、前記第2バルブ及び前記第3バルブの開閉動作を制御する、
     請求項2に記載の検査装置。
  6.  被検査体の検査を行う検査室と、前記検査室に接続され、前記検査室内にドライエアを供給するドライエア供給部と、前記検査室に接続され、前記検査室内の露点を測定する露点計と、前記ドライエア供給部と前記露点計とを接続するバイパス配管と、を有する検査装置の動作方法であって、
     前記被検査体に対して高温検査を実施する場合、前記ドライエア供給部から前記検査室にドライエアを供給することなく、前記ドライエア供給部から前記バイパス配管を介して前記露点計にドライエアを供給し、
     前記被検査体に対して前記高温検査を実施する状態から低温検査を実施する状態へ切り替える場合、前記検査室内に結露が生じない露点に安定化するまで前記検査室内にドライエアを供給し、前記検査室の露点が安定化した後に前記検査室内に供給された前記ドライエアを前記検査室に接続された露点計に供給し、
     前記検査室において前記被検査体に対して前記低温検査を実施する場合、前記ドライエア供給部から前記検査室内を介して前記露点計にドライエアを供給する、
     検査装置の動作方法。
PCT/JP2019/005134 2018-02-26 2019-02-13 検査装置及び検査装置の動作方法 WO2019163608A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US16/975,506 US11614477B2 (en) 2018-02-26 2019-02-13 Inspection device and method for operating inspection device
CN201980013900.0A CN111727496B (zh) 2018-02-26 2019-02-13 检查装置及检查装置的动作方法
KR1020207023798A KR102527533B1 (ko) 2018-02-26 2019-02-13 검사 장치

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018032363A JP7012558B2 (ja) 2018-02-26 2018-02-26 検査装置及び検査装置の動作方法
JP2018-032363 2018-02-26

Publications (1)

Publication Number Publication Date
WO2019163608A1 true WO2019163608A1 (ja) 2019-08-29

Family

ID=67687290

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/005134 WO2019163608A1 (ja) 2018-02-26 2019-02-13 検査装置及び検査装置の動作方法

Country Status (6)

Country Link
US (1) US11614477B2 (ja)
JP (1) JP7012558B2 (ja)
KR (1) KR102527533B1 (ja)
CN (1) CN111727496B (ja)
TW (1) TWI798355B (ja)
WO (1) WO2019163608A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220080393A (ko) 2020-12-07 2022-06-14 삼성전자주식회사 테스트 장치 및 방법

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004273967A (ja) * 2003-03-12 2004-09-30 Sumitomo Heavy Ind Ltd チャンバ温度制御方式
JP2005528781A (ja) * 2002-04-15 2005-09-22 イーアールエス エレクトロニック ゲーエムベーハー 半導体ウェハー及び/又はハイブリッドを調整する方法及び装置

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3435410B2 (ja) * 1996-05-09 2003-08-11 東京エレクトロン株式会社 低温試験装置及び低温試験方法
JP2000097890A (ja) * 1998-09-21 2000-04-07 Sony Corp ガス中の水分量測定装置およびクライオポンプ再生終了時の検知方法
JP2000294606A (ja) * 1999-04-07 2000-10-20 Nec Corp 半導体ウエハの検査装置
JP2002231777A (ja) * 2001-01-31 2002-08-16 Orion Mach Co Ltd 半導体ウェーハ用検査装置
JP3783075B2 (ja) * 2001-12-13 2006-06-07 東京エレクトロン株式会社 プローブ装置及びローダ装置
KR100486690B1 (ko) * 2002-11-29 2005-05-03 삼성전자주식회사 기판 이송 모듈의 오염을 제어할 수 있는 기판 처리 장치및 방법
CN100355161C (zh) * 2004-05-26 2007-12-12 夏普株式会社 氮化物半导体激光器件
JP4653588B2 (ja) * 2005-08-12 2011-03-16 株式会社オーク製作所 露光装置および露光方法
KR100789699B1 (ko) * 2006-10-10 2008-01-02 (주) 쎄믹스 고온 및 저온의 테스트 가능한 웨이퍼 프로버 장치
JP4867786B2 (ja) * 2007-05-18 2012-02-01 株式会社日立プラントテクノロジー 低露点圧縮空気製造装置
JP2009105339A (ja) 2007-10-25 2009-05-14 Mitsumi Electric Co Ltd 検査装置及び検査方法
JP5377915B2 (ja) * 2008-09-30 2013-12-25 東京エレクトロン株式会社 検査装置及び検査方法
KR20130032647A (ko) 2011-09-23 2013-04-02 삼성전자주식회사 웨이퍼 테스트 장치
US9389129B2 (en) * 2011-11-25 2016-07-12 Kamal Mahajan Device feedback sensor testing methodology for humidity and temperature probes
US9267875B2 (en) * 2013-11-21 2016-02-23 Medtronic Minimed, Inc. Accelerated life testing device and method
KR101357858B1 (ko) * 2013-12-04 2014-02-05 김한일 드라이룸의 노점온도 관리장치 및 방법
JP6500498B2 (ja) * 2015-02-27 2019-04-17 シンフォニアテクノロジー株式会社 搬送室及び搬送室のケミカルフィルタの湿度管理方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005528781A (ja) * 2002-04-15 2005-09-22 イーアールエス エレクトロニック ゲーエムベーハー 半導体ウェハー及び/又はハイブリッドを調整する方法及び装置
JP2004273967A (ja) * 2003-03-12 2004-09-30 Sumitomo Heavy Ind Ltd チャンバ温度制御方式

Also Published As

Publication number Publication date
KR102527533B1 (ko) 2023-04-28
JP7012558B2 (ja) 2022-01-28
CN111727496B (zh) 2024-03-19
TW201946170A (zh) 2019-12-01
CN111727496A (zh) 2020-09-29
JP2019149421A (ja) 2019-09-05
US20210132135A1 (en) 2021-05-06
US11614477B2 (en) 2023-03-28
TWI798355B (zh) 2023-04-11
KR20200113223A (ko) 2020-10-06

Similar Documents

Publication Publication Date Title
JP4070724B2 (ja) 温度調整方法及び検査測定装置
EP1950774A2 (en) Quantitative measurement of production and consumption of gases in power transformers and device
KR20130032647A (ko) 웨이퍼 테스트 장치
WO2019163608A1 (ja) 検査装置及び検査装置の動作方法
KR20140063849A (ko) 리크 테스트 방법 및 리크 테스트 장치
US6290274B1 (en) Vacuum system and method for securing a semiconductor wafer in a planar position
JP6370113B2 (ja) 圧力計の検査方法
CN204575583U (zh) 一种试验用脱碳退火炉炉内气氛露点检测装置
CN112857694A (zh) 移动式恒压密封性检测系统
TW200705594A (en) Semiconductor device and its manufacturing method
CN101901007B (zh) 电厂仪用压缩空气测控系统及其方法
CN207894599U (zh) 一种流量系数测试气路
KR100789699B1 (ko) 고온 및 저온의 테스트 가능한 웨이퍼 프로버 장치
CN201698224U (zh) 电厂仪用压缩空气测控系统
JP2019008989A (ja) ソケット及び検査治具
TWI812182B (zh) 晶圓檢查裝置、晶圓檢查方法以及探針台
JP2007071545A (ja) 漏洩検査装置及び方法
JP2001208637A (ja) 検査装置
JPH07286928A (ja) ヘリウムリークディテクタ
JPH0465967B2 (ja)
JPH0240515Y2 (ja)
CN208239035U (zh) 气密检测设备内部气路转换阀组装置
CN104697579A (zh) 一种低温容器综合性能检测设备
JP4356106B2 (ja) ジルコニア式酸素濃度計およびその起動方法
CN117782841A (zh) 一种湿度温度快速切换的动态热机械分析仪

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19756813

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20207023798

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19756813

Country of ref document: EP

Kind code of ref document: A1