WO2019031661A1 - Équipement de coulée et procédé de coulée - Google Patents

Équipement de coulée et procédé de coulée Download PDF

Info

Publication number
WO2019031661A1
WO2019031661A1 PCT/KR2017/015035 KR2017015035W WO2019031661A1 WO 2019031661 A1 WO2019031661 A1 WO 2019031661A1 KR 2017015035 W KR2017015035 W KR 2017015035W WO 2019031661 A1 WO2019031661 A1 WO 2019031661A1
Authority
WO
WIPO (PCT)
Prior art keywords
ladle
flow rate
casting
molten steel
inert gas
Prior art date
Application number
PCT/KR2017/015035
Other languages
English (en)
Korean (ko)
Inventor
김성줄
김욱
이영주
김용환
김성연
Original Assignee
주식회사 포스코
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 포스코 filed Critical 주식회사 포스코
Priority to CN201780094835.XA priority Critical patent/CN111107953A/zh
Priority to EP17920988.7A priority patent/EP3666416A4/fr
Priority to JP2020507054A priority patent/JP2020530399A/ja
Publication of WO2019031661A1 publication Critical patent/WO2019031661A1/fr

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/11Treating the molten metal
    • B22D11/116Refining the metal
    • B22D11/117Refining the metal by treating with gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D1/00Treatment of fused masses in the ladle or the supply runners before casting
    • B22D1/002Treatment with gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D1/00Treatment of fused masses in the ladle or the supply runners before casting
    • B22D1/002Treatment with gases
    • B22D1/005Injection assemblies therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring

Definitions

  • the present invention relates to a casting facility and a casting method, and more particularly, to a casting facility and a casting method capable of producing a clean steel.
  • inclusions such as alumina (Al 2 O 3 ) are produced in the ladle by the reaction between aluminum (Al) and oxygen (O 2 ) in the steel making process.
  • Al aluminum
  • O 2 oxygen
  • a vacuum degassing facility (Reinstahl Huten Maschinene Heraus, RH), a Ladle Furnace (LF)
  • An inert gas such as Ar gas is blown into molten steel to remove inclusions.
  • ladders containing molten steel whose temperature was raised by refining using a vacuum degassing facility (Reinstahl Huten Maschinene Heraus, RH) or ladle furnace (LF) were supported by a ladle turret, . That is, the ladle turret is provided with support portions on both sides of the swing tower on which the rabbles can be seated, and the rabbles are supported by the support portions. Then, by the rotation operation of the swing tower, the two ladders are alternately transferred to the upper portion of the turn-off display.
  • the ladders located on the top of the turn-off are the ladders participating in the casting, and the ladders located outside the turndish are the ladders waiting for the next casting.
  • Korean Utility Model Publication No. 1998-033102 discloses that Ar gas is supplied to ladles that are not in standby or in casting. This method can promote the separation of the inclusions present in the molten steel. However, there is a problem in that the generation of the molten metal is increased in the molten steel bath surface, and thus the generation of the re-inclusive inclusions is promoted.
  • Patent Document 1 Korean Registered Utility Model Publication No. KR0332894Y1
  • the present invention provides a casting facility and a casting method capable of reducing inclusions.
  • the present invention provides a casting facility and a casting method for reducing the generation of inclusions by blowing gas into the ladle in air or casting the turret.
  • the present invention provides a casting facility and a casting method for suppressing or preventing the generation of cracks.
  • a casting method is a process for casting ladle containing molten steel on the upper side of the turn-over side and the outside of the turn-side die, respectively. Supplying the molten steel of the ladle disposed at the casting position on the upper side of the turn-off to the turn-dish to perform casting; And injecting an inert gas into the ladle disposed at the casting position.
  • the step of blowing the inert gas into the ladle disposed at the casting position includes the steps of opening the ladle of the casting position by blowing an inert gas at a first flow rate into the ladle disposed at the casting position; And bubbling the inert gas at a lower flow rate than the first flow rate when casting for supplying molten steel with turning dicing is started after the ladle of the casting position is opened.
  • the inert gas blowing flow rate is decreased in accordance with the decrease of the molten steel height in the ladle of the casting position.
  • the initial gas injection flow amount (m 0 ) is 1 LPM or more and 20 LPM or less.
  • the step of introducing the inert gas into the ladle disposed at the standby position includes the steps of opening the ladle of the standby position by blowing inert gas at a first flow rate into the ladle disposed at the standby position; And bubbling the inert gas at a second flow rate lower than the first flow rate when casting for supplying the molten steel with the turn-by-turn is started after the ladle is opened at the standby position.
  • the first flow rate is 80 LPM or more and 200 LPM or less
  • the second flow rate is 1 LPM or more and 20 LPM or less.
  • the casting facility is a casting facility comprising: a tundish for temporarily storing molten steel; And a pair of supports for respectively supporting a pair of rails in which molten steel are accommodated, wherein the pair of supports are arranged alternately at a casting position on the upper side of the turn-indicator and a standby position outside the turn- ; A mold positioned below the tundish to solidify the molten steel supplied from the tundish; A ladle in the standby position and a ladle in the casting position, respectively, so that an inert gas is blown into each of the ladle supported at the standby position and the ladle supported at the casting position on the turret device.
  • the gas inlet device comprising: a first blow line connected to the ladle supported at the standby position; A second blow line connected to the ladle supported at said casting position; And a first supply line connected to the first blowing line for selectively supplying an inert gas to the first blowing line at a first flow rate for opening the ladle of the standby position and at a second flow rate smaller than the first flow rate, ; And a second supply part connected to the second blowing line for selectively supplying an inert gas to the second blowing line at a first flow rate for opening the ladle of the casting position and at a flow rate smaller than the first flow rate do.
  • the inert gas is supplied to the first blowing line at a first flow rate of 80 LPM or more and 200 LPM or less so that the inlet of the ladle of the standby position is opened,
  • the inert gas is supplied to the line at a second flow rate of 1 LPM or more and 20 LPM or less to bubble the ladle in the standby position.
  • the second supply unit supplies an inert gas to the second blowing line at a first flow rate of 80 LPM or more and 200 LPM or less so that the inlet of the ladle of the casting position is opened,
  • the inert gas is supplied to the second blowing line at a flow rate lower than the first flow rate, Reduce blowing flow.
  • inert gas is blown when the ladle is in the standby position on the turret apparatus and at the time of casting to supply molten steel in turn-off.
  • inclusions can be reduced compared with the prior art, and a clean steel can be produced. That is, when the lugs are in the waiting position, fine bubbling is performed after opening the ladle to reduce the occurrence of atmospheric inclusions.
  • inert gas into the ladle (L) during casting, it is possible to reduce inclusions in molten steel in the ladle during casting.
  • FIG. 1 is a view showing a main part of a casting installation according to an embodiment of the present invention
  • Figure 2 is a diagram illustrating ladders according to an embodiment of the present invention.
  • FIG. 3 is a schematic view showing a gas inlet apparatus according to an embodiment of the present invention.
  • FIG. 4 is a graph showing a method of blowing gas according to an embodiment of the present invention in a waiting ladle
  • FIG. 5 is a graph showing a method for injecting gas according to an embodiment of the present invention into a casting ladle
  • FIG. 6 is a graph showing the results of bubbling occurring during bubbling by the method according to the comparative example in ladders during casting
  • the present invention provides a casting facility for reducing or suppressing inclusions and occurrence of slag by blowing gas into a ladle in air and casting in a turret device, and a casting method using the same.
  • FIG. 1 is a block diagram of a casting facility according to an embodiment of the present invention
  • FIG. 2 is a view illustrating ladders according to an embodiment of the present invention.
  • 3 is a schematic view showing a gas-inserting apparatus according to an embodiment of the present invention.
  • Figure 4 is a graph illustrating a method for injecting gas into an idler ladle according to an embodiment of the present invention.
  • 5 is a graph illustrating a method for blowing gas in accordance with an embodiment of the present invention to a ladle under casting.
  • a casting installation includes a casting facility for supporting a pair of ladles L containing molten steel, a turret for moving a pair of ladles L by a rotating operation,
  • the apparatus 100 is provided with a tundish T for temporarily storing molten steel received from the ladle L moved upward and temporarily storing molten steel temporarily stored in the tundish T,
  • a plurality of segments 20 provided at a lower portion of the mold M for performing initial solidification of the cast steel and performing a series of molding operations while secondarily cooling the cast steel that has been primarily cooled
  • a gas introducing device 200 for introducing an inert gas into each of the ladle L positioned in correspondence with the upper side and the ladle L standing outside the turn dice T, respectively.
  • the shroud nozzle SN for supplying the molten steel of the ladle L in a turn-off state, the gate for controlling the communication between the ladle L and the shroud nozzle SN, And a nozzle mounting unit 30 connecting the nozzle and the shroud nozzle.
  • the ladle (L), the turret device (100), the turndish (T), the mold (M) and the segment (20) are similar to or the same as those of a general continuous casting facility, and a detailed description thereof will be omitted or briefly explained .
  • the turret apparatus 100 includes a swing tower 110 that is driven to rotate and a swing arm 110 that is extended in both directions around the swing tower 110 or disposed on both sides of the swing tower 110,
  • the ladle (L) includes a pair of supports 120 that can be supported or settled.
  • the pair of supporters 120 are alternately moved to the upper side of the turn-off direction by the rotation of the swing tower 110. That is, by the rotation of the swing tower 110, one support portion 120 of the pair of support portions 120 and the ladle L supported by the support portion 120 are positioned on the upper side of the turndisse T, The other support portion 120 and the ladle L supported by the support portion 120 are located outside the turndisse T.
  • the turret device 100 is not limited to the above-described embodiment, but can be applied to various configurations capable of supporting a pair of ladle L and alternately moving the turret device 100 to the upper side and the standby position of the turn- .
  • the ladle L forms an outer appearance and has an inner space capable of accommodating molten steel and has an opening (hereinafter referred to as a louver 321) capable of discharging molten steel at a lower portion thereof, And a top nozzle TN installed in the main body 310 so as to communicate with the inlet port 321.
  • the main body 310 is provided with an opening (not shown)
  • the body 310 may further include a plug 330 inserted into the body 310 to communicate with the body 310.
  • the inert gas is blown into each of the pair of ladles (L) supported by the turret device (100), thereby reducing or suppressing the generation of scum and inclusions as compared with the conventional art. That is, molten steel is supplied to the ladle (L) or the turn dish (T) supported on the support portion (120) corresponding to the upper side of the turn disc (T) among the pair of the support portions (120) of the turret device An inert gas is blown into each of the ladle (L) participating in the casting and the ladle (L) supported on the support (120) positioned outside the turn-dish (T). This will be described in terms of one ladle L.
  • inert gas is blown in a relatively small amount to reduce the generation of slag and inclusions, .
  • the inert gas flow rate is decreased while the molten steel is lowered or the bath surface is lowered, .
  • a gas-filling device 200 is provided for blowing an inert gas into the waiting ladle (L) that is seated in the turret device (100) and the ladle (L) participating in casting, and controls the gas flow rate.
  • the gas-filling apparatus 200 includes a first blowing line 210a connectable to a ladle L supported at a standby position, a second blowing line 210b connected to a ladle L supported at a casting position, A first gas storage part 220a for providing a high pressure inert gas, a second gas storage part 220b for providing a low pressure inert gas, first and second gas storage parts 220a and 220b, A first supplying part 230a connecting the first blowing line 210a to the first blowing line 210a and supplying the inert gas of each of the first and second gas storing parts 220a and 220b to the first blowing line 210a, A second blowing line 210b for supplying an inert gas of each of the first and second gas storing units 220a and 220b to the second blowing line 210b by connecting the gas storing units 220a and 220b and the second blowing line 210b, And a supply unit 230b.
  • first blowing line 210a is connectable and detachable to the ladle L take-in port 322 disposed at the standby position outside the turn-off T, and the second blowing line 210b is connected to the turn- ) To the ladle (L) take-in port 322 disposed at the upper casting position.
  • first and second blowing lines 210a and 210b may be in the form of a pipe capable of moving inert gas.
  • a first blowing valve 211a is provided on the extension path of the first blowing line 210a and a second blowing valve 211b is provided on the extension path of the second blowing line 210b.
  • the first supply part 230a includes a first supply line 231a having one end connected to the first gas storage part 220a and a second supply line 231b having one end connected to the second gas storage part 220b, A first supply valve 232a and a first flow rate control unit 233a provided on the extension path of the first supply line 231a and a second supply line 234b connected to the second supply line 234a, And a second supply valve 235a and a second flow rate control unit 236a provided on the extension path.
  • the other end of the first supply line 231a may be connected to the second supply line 234a so as to be located at the front end of the second supply valve 235a.
  • Each of the first and second supply lines 231a and 234a may be in the form of a pipe capable of moving inert gas.
  • the first supply valve 232a may be, for example, a motor valve.
  • the first flow rate controller 233a is connected to the rear end of the first supply valve 232a.
  • the second flow rate controller 236a is connected to the second supply valve 232a. It is preferable to be provided so as to be located at the rear end of the second opening 235b.
  • the second supply part 230b includes a third supply line 231b having one end connected to the first gas storage part 220a and one end connected to the second gas storage part 220b, The third supply valve 232b and the third flow rate control unit 233b provided on the extension path of the third supply line 231b and the fourth supply line 234b connected to the fourth supply line 234b connected to the fourth supply line 234b, And a fourth supply valve 235b and a fourth flow rate control unit 236b provided on the extension path.
  • the other end of the third supply line 231b may be connected to the fourth supply line 234b so as to be located at the front end of the fourth supply valve 235b.
  • Each of the third and fourth supply lines 231b and 234b may be in the form of a pipe capable of movement of an inert gas.
  • the third flow rate control section 233b is connected to the rear end of the third supply valve 232b and the fourth flow rate control section 236b is connected to the fourth supply valve 232b, It is preferable to be provided so as to be located at the rear end of the second opening 235b.
  • an inert gas for example, Ar gas is blown in both the atmosphere and the casting position while the ladle L is supported by the turret device by using the gas-introducing apparatus 200 as described above, Reduce or suppress the occurrence.
  • the gas introducing apparatus 200 is not limited to the above-described configuration, and can be changed into various configurations capable of supplying inert gas by adjusting the pressure and the flow rate to the first and second blowing lines 210a and 210b, respectively.
  • the casting method includes the steps of placing rails accommodating molten steel on the upper side of the turn-over side and the outer side of the turn-over side, supplying the molten steel in the turn- And introducing the inert gas into the ladle disposed in the casting position.
  • the ladle (L) containing molten steel is supported on the pair of supports 120 of the turret apparatus 100, respectively.
  • the ladle L corresponding to the upper side of the turn-dish T among the pair of the support parts 120 supplies the molten steel with the turn dish T to participate in the casting, (T), waiting for casting of the subsequent charge.
  • the Ar gas is first taken in at the first flow rate for the opening of the ladle (L).
  • the opening of the ladle L means that the gas is supplied into the ladle through the main body 310 or the plug 330 of the ladle L. After the ladle L is opened, It is possible to blow the gas into the ladle L.
  • the opening of the ladle L proceeds for a predetermined time from the start of gas blowing, for example, within 10 seconds from the time of gas blowing, and this section may be called an initial blowing section.
  • the gas in blowing the inert gas at the first flow rate into the waiting ladle L, the gas is blown at a first flow rate of 80 LPM or more and 200 LMP or less (5 to 5 Nm 3 / h)
  • the opening 322 is opened.
  • the gas pressure is controlled to be higher than 10 bar and lower than 20 bar, and is relatively higher than the pressure of the gas introduced after the opening To be supplied.
  • the intake port 322 may not be opened and Ar gas may not flow into the ladle L.
  • the flow rate of the initial inert gas exceeds 200 LPM, the ladle (L) intake port 322 is opened but causes instability of the molten steel bath surface of the ladle L, which may lead to operational instability, There is a problem that the area where the hot water is generated increases.
  • inert gas is taken in at a second flow rate for reducing the inclusion of the molten steel and the occurrence of nagging.
  • the gas flow rate is relatively small compared to the first flow rate at the time of opening the ladle (L).
  • the gas when the ladle (L) in the standby state is opened, the gas is blown at a second flow rate of 1 LPM or more and 20 LMP or less to reduce inclusions while bubbling the molten steel.
  • the pressure of the gas is supplied at a lower pressure than that of the ladle (L).
  • the pressure is not less than 2 bar and not more than 10 bar.
  • the second flow rate blown after the ladle (L) is opened is less than 1 LPM, the effect of reducing the inclusions by the inert gas bubbling may be low or not manifested.
  • the second flow rate blown after the ladle (L) is opened exceeds 10 LPM, there is a problem that the inhibition of the generation of the scalding on the molten steel bath surface is not effected, or the scavenging area becomes large. In the case where the nutflow area is large, the inclusions are mixed into the molten steel through the slag, which makes it difficult to manufacture the clean steel.
  • the description will be made using the gas drawing apparatus 200 of FIG. 3 for drawing gas into the ladle L in the standby position as follows.
  • the first supply valve for example, the motor valve
  • the second supply valve 235a closed to open the ladle L
  • the gas in the first inlet line 220a moves through the first supply line 231a, the second supply line 234a and the first blowing line 210a to be blown into the inlet port 322 of the ladle L in the stand- do.
  • the motor valve when the motor valve is opened, a gas having a high pressure exceeding 10 bar and less than 20 bar flows instantaneously along the first supply line 231a and the first flow rate control unit 233a is adjusted so that the gas of 80 LPM or more and 200 LPM or less . Therefore, the Ar gas is supplied to the waiting ladle (L) at a flow rate of not less than 10 bar and not more than 20 bar, not less than 80 LPM and not more than 200 LPM, and the ladle (L) is opened.
  • the first supply valve 232a When the ladle L is opened, the first supply valve 232a is closed and the operation of the first flow rate controller 233a is stopped.
  • the second supply valve 235a is opened and the second flow rate controller 236a is operated to supply Ar gas having a pressure of 2 bar or more and 10 bar or less and a flow rate of 1 LPM or more and 20 LPM or less to the second supply Line 234a and the first blowing line 210a to blow the Ar gas into the waiting ladle L.
  • Ar gas By injecting such Ar gas, the molten steel in the waiting ladle L is finely bubbled, whereby the inclusions in the molten steel in the waiting ladle can be reduced, and the generation of the slag can be suppressed.
  • the ladle L in the casting position continuously feeds the molten steel into the turn-dish T to participate in the casting.
  • the swing tower 110 of the turret apparatus 100 is rotated to move the ladle bubbled at the standby position to the upper side of the turn D, that is, to the standby position .
  • top nozzle TN of the ladle L and the shroud nozzle SN are fastened together, and the top nozzle TN and the shroud nozzle SN are communicated through the operation of the gate.
  • the molten steel in the ladle L is supplied to the turn-dish through the shroud nozzle SN and the nozzle (immersion nozzle 40) of the turn-dish T is transferred to the mold M and solidified, The castle is cast.
  • the second blowing line 210b is connected to the inlet of the ladle L moved to the casting position. Thereafter, Ar gas is supplied at a first flow rate for the opening of the ladle (L).
  • the opening of the ladle L proceeds for a predetermined time from the start of gas blowing, for example, it may be within 10 seconds from the gas blowing point.
  • the first flow rate in blowing the inert gas at the first flow rate into the ladle L of the casting position, the first flow rate may be 80 LPM or more and 200 LMP or less (5 to 5 Nm 3 / h) L is opened.
  • the gas pressure is more than 10 bar and not more than 20 bar so that it is supplied at a relatively higher pressure than the pressure of the gas introduced after the opening.
  • the intake port 322 may not be opened and the Ar gas may not flow into the ladle L.
  • the first flow rate exceeds 200 LPM
  • the ladle (L) intake port 322 is opened but causes instability of the molten steel bath surface of the ladle L, which may lead to operational instability, There is an increasing problem.
  • the gas blowing flow rate is a flow rate relatively smaller than the first flow rate when the ladle (L) is opened.
  • the gas when the ladle L in the casting position is opened, the gas is blown at a flow rate lower than the blowing flow rate at the time of opening, and the inclusions are reduced while the molten steel is being bubbled to suppress the generation of breakage.
  • the pressure of the gas is supplied at a lower pressure than that of the ladle (L).
  • the pressure is not less than 2 bar and not more than 10 bar.
  • the Ar gas blowing flow rate is varied in accordance with the decrease in the height of the molten steel in the ladle L or the height of the molten steel bath surface. More specifically, when the ladle L of the casting position is opened and the molten steel in the ladle L starts to be supplied in turn, the inert gas is blown into the ladle.
  • the current molten steel height L 1 in the ladle can be calculated in real time through the molten steel discharge preheating height, that is, the initial molten steel height L 0 , and the molten steel discharge speed.
  • the initial gas injection flow rate m 0 to be supplied to the ladle may be 1 LPM or more and 20 LPM or less
  • the pressure in the ladle L may be 2 bar or more To 10 bar or less.
  • the molten steel in the ladle may be generated at the start of casting.
  • the third supply valve for example, the motor valve
  • the second intake valve 211b are opened with the fourth supply valve 235b closed
  • the gas in the gas storage portion 220a moves through the third supply line 231b, the fourth supply line 234b and the second blowing line 210a to move to the inlet port 322 of the ladle L in the casting position ).
  • the motor valve is opened, a high-pressure gas of more than 10 bar and less than 20 bar flows instantaneously along the third supply line 231b, and the third flow rate controller 233b is controlled so that the gas of 80 LPM or more and 200 LPM or less . Therefore, the ladle L is opened by introducing Ar gas at a flow rate of 80 LPM or more and 200 LPM or less at a pressure of 10 bar or more and 20 bar or less to the ladle L at the casting position.
  • the molten steel of the ladle (L) at the casting position is started to be supplied to the turndisse (T).
  • the third supply valve 232b is closed and the operation of the third flow rate control part 233b is stopped.
  • the fourth supply valve 235b is opened and the fourth flow rate controller 236b is operated to supply Ar gas having a pressure of 2 bar or more and 10 bar or less and 20 LPM or less to the fourth supply line 234b, And the second blowing line 210b to blow Ar gas into the ladle L at the casting position.
  • the flow rate of the gas supplied to the ladle L is adjusted in accordance with the change in the height of the molten steel in the ladle L from the start of casting to the end of the casting using the fourth flow rate controller 236b. That is, as shown in Equations (1) and (5), the gas is blown while decreasing the flow rate with respect to the initial gas blowing flow rate according to the real time current molten steel height based on the molten steel height at the start of casting.
  • the molten steel in the waiting ladle L is finely bubbled, whereby the inclusions in the molten steel in the waiting ladle can be reduced, and the generation of the slag can be suppressed.
  • FIG. 6 is a graph showing the results of bubbling occurring during bubbling by the method according to the comparative example in ladders during casting.
  • the ladle shown in Fig. 6 one draw-in opening is provided, and two lobes are provided.
  • the molten steel is discharged from the two ladle openings in turn, and the Ar gas is blown into one plug.
  • a certain amount of Ar gas was supplied irrespective of the decrease in the molten steel height.
  • FIG. 6A shows a result obtained by blowing at a flow rate of 10 Nm 3 / h
  • FIG. 6B shows a result obtained at a flow rate of 5 Nm 3 /
  • the results are shown in Fig.
  • FIG. 7 is a graph showing the interposition quantity in each operation step as an inclusion index.
  • the amount of intervening material is calculated by the total oxygen content in the molten steel, and the results are compared with each other.
  • FIG. 7 is a graph showing the inclusion index in molten steel during molten steel treatment according to Comparative Examples and Examples.
  • the comparative example includes deoxidizing in a vacuum degassing facility, bubbling and bubbling the Ar gas into the ladle while raising the molten steel in the ladle furnace after deoxidization, waiting the ladle in which the molten steel is contained in the waiting position of the turret device, The ladle was moved to the upper side of the turn, and molten steel was supplied by turning to start the casting. During the casting, Ar gas was blown into the immersion nozzle while bubbling, and the molten steel in the turn-off was supplied to the mold, and inclusions were measured in the molten steel in the mold.
  • FIG. 1 At the bubbling stage where the Ar gas is blown into the ladle, the ladle in the standby position is positioned on the upper side of the turn-off side, and the molten steel is moved by turning to start the casting. During the casting, Ar gas was blown into the immersion nozzle while bubbling, and the molten steel in the turn-off was supplied to the mold, and inclusions were measured in the molten steel in the mold.
  • the amount of intervening material in the molten steel was measured at each step of the operation according to the comparative example and the example. 7 shows the amount of intervening material in the molten steel in the turn-off time in which no bubbling is performed.
  • the amount of intervening material in each operation stage was calculated by the total oxygen content in the molten steel.
  • the inclusion index was calculated based on the amount of the inclusion in the molten steel in the vacuum degassing facility.
  • the inclusion index decreases compared to the first and second comparative examples. More specifically, when the amount of interposition in the molten steel in the mold was compared, the amount of interposition in the examples was reduced by 30% as compared with the comparative example. That is, in the case of the comparative example and the example, bubbling was performed at the elevated temperature using the ladle furnace and bubbling was performed at the immersion nozzle. However, in the case of the embodiment in which ladle bubbling was performed in the atmosphere and casting in the turret apparatus, The amount of intervening material is smaller than that of the example. Therefore, in the case of using the casting method according to the embodiment, it is possible to cast clean steel with less occurrence of cracks due to inclusions, compared with the comparative example.
  • inert gas is blown when the ladle is in the standby position on the turret apparatus and at the time of casting to supply molten steel in turn-off.
  • inclusions can be reduced compared with the prior art, and a clean steel can be produced. That is, when the lugs are in the waiting position, fine bubbling is performed after opening the ladle to reduce the occurrence of atmospheric inclusions.
  • inert gas into the ladle (L) during casting, it is possible to reduce inclusions in molten steel in the ladle during casting.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Treatment Of Steel In Its Molten State (AREA)
  • Continuous Casting (AREA)

Abstract

L'invention concerne un procédé de coulage de dalles, comprenant les étapes consistant à : positionner respectivement, au niveau de la partie supérieure d'un panier de coulée et l'extérieur du panier de coulée, des poches de coulée ayant de l'acier fondu reçu à l'intérieur de celles-ci ; réaliser une coulée par fourniture, au panier de coulée, de l'acier fondu de la poche de coulée agencée au niveau de la position de coulée de la partie supérieure du panier de coulée ; et souffler un gaz inerte dans la poche de coulée agencée au niveau de la position de coulée. Par conséquent, selon un mode de réalisation de la présente invention, le gaz inerte est soufflé lorsque la poche de coulée est en position d'attente sur un appareil à tourelle et pendant la coulée dans laquelle de l'acier fondu est fourni au panier de coulée. Ainsi, les inclusions peuvent être plus réduites que celles dans un procédé de coulée classique, et de l'acier propre peut être fabriqué. C'est-à-dire que la génération d'inclusions dans l'air peut être réduite en effectuant un micro-bullage après l'ouverture de la poche de coulée lorsque la poche de coulée est en position d'attente. En outre, les inclusions de l'acier fondu à l'intérieur de la poche de coulée pendant la coulée peuvent être réduites par soufflage du gaz inerte dans la poche de coulée (L) pendant la coulée.
PCT/KR2017/015035 2017-08-08 2017-12-19 Équipement de coulée et procédé de coulée WO2019031661A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201780094835.XA CN111107953A (zh) 2017-08-08 2017-12-19 铸造设备和铸造方法
EP17920988.7A EP3666416A4 (fr) 2017-08-08 2017-12-19 Équipement de coulée et procédé de coulée
JP2020507054A JP2020530399A (ja) 2017-08-08 2017-12-19 鋳造設備及び鋳造方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2017-0100453 2017-08-08
KR1020170100453A KR101969111B1 (ko) 2017-08-08 2017-08-08 주조 설비 및 주조 방법

Publications (1)

Publication Number Publication Date
WO2019031661A1 true WO2019031661A1 (fr) 2019-02-14

Family

ID=65271699

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2017/015035 WO2019031661A1 (fr) 2017-08-08 2017-12-19 Équipement de coulée et procédé de coulée

Country Status (5)

Country Link
EP (1) EP3666416A4 (fr)
JP (1) JP2020530399A (fr)
KR (1) KR101969111B1 (fr)
CN (1) CN111107953A (fr)
WO (1) WO2019031661A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111644584A (zh) * 2020-07-25 2020-09-11 莱芜钢铁集团银山型钢有限公司 一种用于连铸钢包回转台底吹氩的软吹方法及控制装置

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200143915A (ko) 2019-06-17 2020-12-28 주식회사 포스코 연속 주조 장치

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4506814A (en) * 1981-10-02 1985-03-26 Innse Innocenti Santeustacchio S.P.A. Revolving-ladle turret for continuous casting plants
KR19980033102A (ko) 1993-10-23 1998-07-25 가네꼬히사시 계조 표시 시스템
KR200332894Y1 (ko) 2003-08-27 2003-11-10 조선내화 주식회사 래들의 가스 취입용 버블링 플러그
KR20090059928A (ko) * 2007-12-07 2009-06-11 주식회사 포스코 래들의 용강탕면 응고 층 용해방법
KR20090126625A (ko) * 2008-06-04 2009-12-09 주식회사 포스코 용강 유동 유도형 턴디쉬 및 이를 이용한 연속주조방법
CN102126000A (zh) * 2010-01-13 2011-07-20 鞍钢股份有限公司 连铸机钢水罐吹氩自动控制方法及装置
KR20150006859A (ko) * 2012-06-18 2015-01-19 제이에프이 스틸 가부시키가이샤 고청정도 강 주편의 제조 방법 및 턴디시

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050006882A (ko) * 2003-07-10 2005-01-17 주식회사 포스코 용강 보온 기능을 갖는 래들 터렛
JP2005103552A (ja) * 2003-09-26 2005-04-21 Daido Steel Co Ltd 連続鋳造方法
JP4357343B2 (ja) * 2004-04-12 2009-11-04 株式会社神戸製鋼所 溶鋼攪拌方法
CN1974795A (zh) * 2006-12-22 2007-06-06 江苏沙钢集团有限公司 精炼中吊转钢包方法及其精炼钢包回转台装置
CN101307374B (zh) * 2007-05-15 2010-09-08 宝山钢铁股份有限公司 钢液中非金属夹杂去除方法
CN103184315A (zh) * 2011-12-30 2013-07-03 斗山重工业株式会社 多孔塞、利用该多孔塞的高氮钢制造装置及方法
CN103302260A (zh) * 2013-06-14 2013-09-18 内蒙古包钢钢联股份有限公司 一种炼钢连铸工位钢水吹氩的方法
CN104630418B (zh) * 2015-01-15 2016-08-24 南京钢铁股份有限公司 一种高洁净度管线钢冶炼工艺
CN105215307A (zh) * 2015-11-10 2016-01-06 张侃 一种双层复合板的生产工艺及设备

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4506814A (en) * 1981-10-02 1985-03-26 Innse Innocenti Santeustacchio S.P.A. Revolving-ladle turret for continuous casting plants
KR19980033102A (ko) 1993-10-23 1998-07-25 가네꼬히사시 계조 표시 시스템
KR200332894Y1 (ko) 2003-08-27 2003-11-10 조선내화 주식회사 래들의 가스 취입용 버블링 플러그
KR20090059928A (ko) * 2007-12-07 2009-06-11 주식회사 포스코 래들의 용강탕면 응고 층 용해방법
KR20090126625A (ko) * 2008-06-04 2009-12-09 주식회사 포스코 용강 유동 유도형 턴디쉬 및 이를 이용한 연속주조방법
CN102126000A (zh) * 2010-01-13 2011-07-20 鞍钢股份有限公司 连铸机钢水罐吹氩自动控制方法及装置
KR20150006859A (ko) * 2012-06-18 2015-01-19 제이에프이 스틸 가부시키가이샤 고청정도 강 주편의 제조 방법 및 턴디시

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3666416A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111644584A (zh) * 2020-07-25 2020-09-11 莱芜钢铁集团银山型钢有限公司 一种用于连铸钢包回转台底吹氩的软吹方法及控制装置
CN111644584B (zh) * 2020-07-25 2022-04-22 莱芜钢铁集团银山型钢有限公司 一种用于连铸钢包回转台底吹氩的软吹方法及控制装置

Also Published As

Publication number Publication date
JP2020530399A (ja) 2020-10-22
EP3666416A1 (fr) 2020-06-17
CN111107953A (zh) 2020-05-05
KR101969111B1 (ko) 2019-04-15
KR20190016345A (ko) 2019-02-18
EP3666416A4 (fr) 2020-06-17

Similar Documents

Publication Publication Date Title
CA2360306C (fr) Prechauffage, fusion, raffinage et coulee d'une charge continue
KR100754567B1 (ko) 스트립 연속 주조 장치 및 그 사용방법
WO2019031661A1 (fr) Équipement de coulée et procédé de coulée
WO2014142597A1 (fr) Équipement de coulage et procédé de coulage utilisant celui-ci
WO2017213311A1 (fr) Appareil et procédé de traitement de masse fondue
CN110586887A (zh) 一种适合于高铝中低碳冷镦钢的连铸开浇方法
WO2017078336A1 (fr) Appareil et procédé de traitement d'acier fondu
JPH08323464A (ja) 溶鋼注入開始時の取鍋砂除去方法およびその装置
JP6841386B2 (ja) 鋼の連続鋳造開始方法
JP3093890B2 (ja) 非金属介在物の混入を抑制した連続注湯方法及び装置
JP2005103552A (ja) 連続鋳造方法
CN215033577U (zh) 一种炼钢浇注用的氩气保护装置
WO2019103494A1 (fr) Flux de moule, matériau en acier et procédé de fabrication de matériau en acier
WO2018008814A1 (fr) Gabarit de coulée et procédé de coulée l'utilisant
JP3114000B2 (ja) 連続鋳造設備
WO2020091288A1 (fr) Dispositif d'alimentation en métal en fusion et dispositif d'alimentation en métal en fusion
WO2018088753A1 (fr) Équipement de coulée et procédé de coulée l'utilisant
WO2019124858A1 (fr) Dispositif et procédé de régulation de débit
JPH03210948A (ja) タンディッシュ
JPH07145423A (ja) 真空脱ガス槽内に挿入する水冷ランスおよびその閉塞防止方法
JPH04354811A (ja) 走行,昇降および傾動自在な出銑樋
JP3787974B2 (ja) 溶融金属の連続鋳造方法
WO2020096391A1 (fr) Dispositif de réduction de compression
JP4066797B2 (ja) 真空脱ガス処理方法
JP2515541Y2 (ja) 炉底出鋼装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17920988

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020507054

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2017920988

Country of ref document: EP

Effective date: 20200309