WO2017090130A1 - 制御装置、作業支援方法及びプログラム - Google Patents

制御装置、作業支援方法及びプログラム Download PDF

Info

Publication number
WO2017090130A1
WO2017090130A1 PCT/JP2015/083086 JP2015083086W WO2017090130A1 WO 2017090130 A1 WO2017090130 A1 WO 2017090130A1 JP 2015083086 W JP2015083086 W JP 2015083086W WO 2017090130 A1 WO2017090130 A1 WO 2017090130A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
event
control device
time
required time
Prior art date
Application number
PCT/JP2015/083086
Other languages
English (en)
French (fr)
Inventor
聡司 峯澤
矢部 正明
一郎 丸山
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2017552594A priority Critical patent/JP6628810B2/ja
Priority to PCT/JP2015/083086 priority patent/WO2017090130A1/ja
Publication of WO2017090130A1 publication Critical patent/WO2017090130A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services

Definitions

  • the present invention relates to a control device, a work support method, and a program.
  • Patent Documents 1 and 2 Conventionally, various technologies for supporting maintenance work of systems delivered to customers have been proposed (for example, Patent Documents 1 and 2).
  • a mobile terminal possessed by an operator is notified of a failure phenomenon that has occurred to a server that manages information related to maintenance work, etc., and data indicating a recovery procedure transmitted from the server is stored in the mobile terminal. It can be displayed and displayed to the worker.
  • the present invention has been made to solve the above-described problem, and an object of the present invention is to provide a control device or the like that can present to a user the time required for work when a work related to system management occurs. To do.
  • a control device that controls a system including at least one device, accepts an operation from a user via a user interface device, and presents information to the user, When an event related to management of the system occurs, required time acquisition means for acquiring a required time of work for the event; Display instruction means for instructing the user interface device to display the acquired required time.
  • the time required for work for this event can be presented to a user such as an operator.
  • FIG. 1 is a diagram illustrating an overall configuration of a device control system according to Embodiments 1 to 3 of the present invention.
  • FIG. 3 is a block diagram showing a hardware configuration of a control device according to Embodiments 1 to 3 of the present invention.
  • FIG. FIG. 6 is a diagram for explaining a database and the like stored in a secondary storage device included in the control device according to the first to third embodiments.
  • FIG. 6 is a diagram showing a configuration of required installation time information according to the first to third embodiments.
  • FIG. 5 is a diagram showing a configuration of recovery required time information according to the first to third embodiments.
  • FIG. 6 is a diagram illustrating a configuration of installation procedure information according to the first to third embodiments.
  • FIG. 6 is a diagram showing a configuration of restoration procedure information according to the first to third embodiments.
  • 2 is a block diagram illustrating a functional configuration of a control device according to Embodiment 1.
  • FIG. It is a figure which shows an example of the work assistance information screen of Embodiment 1,2.
  • FIG. 3 is a diagram for explaining a server according to the first to third embodiments. 3 is a flowchart illustrating a procedure of work support processing according to the first embodiment. It is a figure which shows an example of the error notification screen in the modification of Embodiment 1. It is a block diagram which shows the function structure of the control apparatus which concerns on Embodiment 2.
  • FIG. 10 is a flowchart (part 1) illustrating a procedure of work support processing according to the second embodiment.
  • FIG. 10 is a flowchart (part 2) illustrating a procedure of work support processing according to the second embodiment. It is a block diagram which shows the function structure of the control apparatus which concerns on Embodiment 3.
  • FIG. It is a figure which shows an example of the work assistance information screen of Embodiment 3. It is a figure which shows an example of the misoperation warning screen displayed in other embodiment. It is a figure which shows an example of the delay warning screen displayed in other embodiment. It is a figure which shows an example of the communication status screen displayed in other embodiment. It is a figure which shows an example of the work assistance information screen of other embodiment. It is a figure which shows an example of the detailed procedure screen displayed in other embodiment.
  • FIG. 1 is a diagram showing an overall configuration of a device control system 1 according to Embodiment 1 of the present invention.
  • the device control system 1 is a so-called HEMS (Home Energy Management System) system that manages electric power used in a general home.
  • HEMS Home Energy Management System
  • the device control system 1 includes a control device 2, an operation terminal 3, a plurality of devices 4 (devices 4-1, 4-2, etc, And a router 5.
  • the control device 2 is installed at an appropriate location in the house H, monitors the power consumed in this home (demand area), and displays the power consumption status via the operation terminal 3. Further, the control device 2 performs operation control of each device 4 and monitoring of an operation state. Details of the control device 2 will be described later.
  • the device 4 (devices 4-1, 4-2,...) Is, for example, an electric device such as an air conditioner, an illuminator, a floor heating system, a refrigerator, an IH (Induction Heating) cooker, a television, or a water heater.
  • Each device 4 is installed in a house H (including a site) and connected to a power line that supplies power from a commercial power source, a power generation facility, a power storage facility, etc. (none shown), and a wireless network (not shown)
  • the communication device 2 is communicably connected to the control device 2.
  • This wireless network is, for example, a network conforming to ECHONET Lite. Depending on the specifications of the device 4, it may be connected to this wireless network via an external communication adapter (not shown).
  • the operation terminal 3 (user interface device) includes an input device such as a push button, a touch panel, and a touch pad, a display device such as an organic EL display and a liquid crystal display, and a communication interface, for example, a smartphone or a tablet terminal. Mobile devices.
  • the operation terminal 3 communicates with the control device 2 in accordance with a known communication standard such as Wi-Fi (registered trademark), Wi-SUN (registered trademark), or a wired LAN.
  • the operation terminal 3 receives an operation from the user and transmits information indicating the received operation content to the control device 2. Further, the operation terminal 3 receives the information transmitted from the control device 2 and presented to the user, and displays the received information.
  • the operation terminal 3 plays a role as an interface (user interface) with the user.
  • the router 5 is a broadband router, and is connected to the control device 2 via a LAN cable so as to be communicable.
  • the control device 2 includes a CPU (Central Processing Unit) 20, a wide area communication interface 21, a home communication interface 22, a ROM (Read Only Memory) 23, a RAM (Random Access Memory) 24, Secondary storage device 25. These components are connected to each other via a bus 26.
  • the CPU 20 controls the control device 2 in an integrated manner. Details of functions realized by the CPU 20 will be described later.
  • the wide area communication interface 21 includes a NIC (Network Interface Card controller) for wide area communication, and is connected to the network N via the router 5 to perform data communication with other devices such as the server 6.
  • the in-home communication interface 22 includes a NIC for wireless communication with each device 4 via the above-described wireless network, and a NIC for wireless communication or wired communication with the operation terminal 3.
  • the ROM 23 stores a plurality of firmware, data used when executing these firmware, and the like.
  • the RAM 24 is used as a work area for the CPU 20.
  • the secondary storage device 25 includes an EEPROM (Electrically-Erasable-Programmable-Read-Only Memory), a readable / writable nonvolatile semiconductor memory such as a flash memory, a hard disk drive, and the like. As shown in FIG. 3, the secondary storage device 25 stores an installation required time DB 250, a recovery required time DB 251, an installation procedure DB 252, a recovery procedure DB 253, a work support program 254, and the like. In addition to this, the secondary storage device 25 is used at the time of execution of a program for monitoring the power consumed in this home, a program for controlling the operation of each device 4, and these programs. Store the data.
  • EEPROM Electrically-Erasable-Programmable-Read-Only Memory
  • a readable / writable nonvolatile semiconductor memory such as a flash memory, a hard disk drive, and the like.
  • the secondary storage device 25 stores an installation required time DB 250, a recovery required time DB 251, an installation procedure
  • the installation required time DB 250 (first database) is a database in which information (installation required time information) about the time required for the installation work of the control device 2, the device 4, the router 5, and the like is registered.
  • the required installation time information is information including items such as “installation code”, “occurrence factor”, “name”, and “required time” as shown in FIG.
  • “Installation code” stores a list of numbers and alphabets for uniquely identifying the contents of the installation work.
  • the “occurrence factor” stores information indicating the cause of the installation work.
  • the information indicating the cause of occurrence includes, for example, an operation content indicating the start of the installation work by the worker via the operation terminal 3.
  • Name stores a character string (text) that simply represents the contents of the installation work. For example, “controller installation work” and “air conditioner installation work” are stored in the “name”.
  • Required time information indicating the time (in minutes) required for the installation work is stored.
  • the data format of “installation code”, “occurrence factor”, and “required time” may be either binary or text.
  • the required recovery time DB 251 (first database) is a database in which information (recovery required time information) about the time required for recovery work for a failure that has occurred in the device control system 1 is registered. As shown in FIG. 5, the recovery required time information is information including items such as “failure code”, “phenomenon”, “name”, and “required time”.
  • the fault code stores a list of numbers and alphabets for uniquely identifying the content of the fault.
  • “Phenomenon” information indicating a phenomenon at the time of occurrence of the failure is stored.
  • the information indicating the phenomenon includes an error that can be detected by the control device 2, specifically, a communication error with the server 6, a communication error with the device 4, information indicating an abnormal operation of the device 4, and the like.
  • the information indicating the phenomenon includes an operation content indicating notification of the occurrence of the failure by the operator via the operation terminal 3.
  • the “name” stores a character string (text) that simply represents the content of the failure. For example, “server communication error” or the like is stored in “name”.
  • Required time information indicating the time (in minutes) required for the restoration work is stored.
  • the data format of “fault code”, “phenomenon”, and “required time” may be either binary or text.
  • the installation procedure DB 252 (second database) is a database in which information indicating the procedure of installation work (installation procedure information) is registered.
  • the installation procedure information is information including items such as “installation code” and “work procedure” as shown in FIG.
  • the procedure of the installation work is stored as text.
  • the controller ie, the control device 2
  • “(1) Register the device”, “(2) Set the power measurement”, “(3) User "Etc.” is stored in the "work procedure”.
  • text indicating the procedure itself is not stored, but information (pointer) indicating the storage location (memory address) of the text in the secondary storage device 25 is stored in binary. It may be.
  • the recovery procedure DB 253 (second database) is a database in which information (recovery procedure information) indicating a procedure of recovery work for a failure that has occurred in the device control system 1 is registered.
  • the recovery procedure information is information including items such as “failure code” and “work procedure”.
  • the procedure of the recovery work for the failure is stored in text.
  • the “work procedure” in the recovery procedure information does not store text indicating the procedure itself, but stores the text in the secondary storage device 25.
  • Information (pointer) indicating (memory address) may be stored in binary.
  • the work support program 254 is a computer program executed by the CPU 20.
  • a process that detects the occurrence of an installation work or a failure, generates work support information corresponding to the detected installation work or the content of the failure, and displays the work support information on the operation terminal 3 is described.
  • the control device 2 functionally includes a user interface processing unit 200, a device control unit 201, an event detection unit 202, a required time acquisition unit 203, a procedure acquisition unit 204, a work A support information generation unit 205, a display instruction unit 206, and a DB update unit 207 are provided.
  • Each of these functional units is realized by the CPU 20 executing a program such as the work support program 254 described above.
  • the user interface processing unit 200 performs user interface processing via the operation terminal 3. That is, the user interface processing unit 200 receives an operation from the user via the operation terminal 3. Further, the user interface processing unit 200 transmits information to be presented to the user to the operation terminal 3.
  • the device control unit 201 periodically acquires the operation state of each device 4 and stores data indicating the acquired operation state in the secondary storage device 25. In addition, the device control unit 201 controls the operation of each device 4 according to a condition set in advance according to the time zone and the day of the week, or a condition set as appropriate through the operation terminal 3 by the user.
  • the event detection unit 202 detects the occurrence of an event related to management of the device control system 1.
  • the event mentioned here includes the occurrence of installation work and the occurrence of a failure. That is, the event detection unit 202 detects the occurrence of installation work and the occurrence of a failure.
  • the event detection unit 202 monitors the operation of the operator via the operation terminal 3 and detects the occurrence of the installation work.
  • the event detection unit 202 monitors the operation state of each device 4 acquired by the device control unit 201 and the communication state with the server 6, and detects the occurrence of a failure. Furthermore, the event detection unit 202 monitors the operation of the operator via the operation terminal 3 and detects the occurrence of a failure.
  • the required time acquisition unit 203 refers to the installation required time DB 250 or the recovery required time DB 251 and acquires the name and required time corresponding to the event.
  • the procedure acquisition unit 204 refers to the installation procedure DB 252 or the recovery procedure DB 253 and acquires a work procedure corresponding to the event.
  • the work support information generation unit 205 generates work support information based on the name and required time acquired by the required time acquisition unit 203 and the work procedure acquired by the procedure acquisition unit 204.
  • the display instruction unit 206 instructs the operation terminal 3 to display the work support information generated by the work support information generation unit 205.
  • An example of a screen (work support information screen) displayed on the operation terminal 3 in response to such an instruction is shown in FIG.
  • the DB update unit 207 updates each DB (database) stored in the secondary storage device 25, that is, the installation required time DB 250, the recovery required time DB 251, the installation procedure DB 252, and the recovery procedure DB 253.
  • the update data for each DB is acquired by downloading from the server 6.
  • the server 6 is a so-called cloud server for HEMS that is managed by a vendor of the control device 2 or the like.
  • the server 6 is communicably connected to a device control system in a plurality of homes, that is, a device control system 1 installed in each of a plurality of houses H via a network N.
  • the server 6 holds a master DB corresponding to each of the installation required time DB 250, the recovery required time DB 251, the installation procedure DB 252, and the recovery procedure DB 253.
  • the control device 2 is shipped, the contents of each DB held by the control device 2 are the same as the contents of each master DB held by the server 6 at that time.
  • the server 6 distributes an update notification of the DB to the home device control system 1.
  • the DB update unit 207 When receiving the update notification, the DB update unit 207 receives update data indicated by the update notification from the server 6 in a preset time zone (update time zone).
  • This update time zone is a time zone in which the processing load of the control device 2 is predicted to be smaller than other time zones, and is set in advance by a user (a resident of the house H, a worker, or the like). Note that the update time zone may be automatically set by the DB update unit 207.
  • the DB update unit 207 inquires of the user via the operation terminal 3 whether or not to update the DB, and immediately receives an update instruction from the user. Reception may be started.
  • FIG. 11 is a flowchart showing a procedure of work support processing executed by the control device 2. This work support process is executed every time the event detection unit 202 detects the occurrence of an event related to the management of the device control system 1.
  • the required time acquisition unit 203 refers to the installation required time DB 250 and acquires the name and required time corresponding to the detected event.
  • the procedure acquisition unit 204 refers to the installation procedure DB 252 and acquires a work procedure corresponding to the detected event (step S103).
  • the required time acquisition unit 203 refers to the recovery required time DB 251 and detects it.
  • the name corresponding to the event and the required time are acquired (step S104).
  • the procedure acquisition unit 204 refers to the recovery procedure DB 253 and acquires a work procedure corresponding to the detected event (step S105).
  • the work support information generation unit 205 generates work support information based on the acquired name, required time, and work procedure (step S106).
  • the display instruction unit 206 instructs the operation terminal 3 to display the generated work support information (step S107). As a result, a work support information screen as shown in FIG. 9 is displayed on the operation terminal 3.
  • the control device 2 when the control device 2 detects the occurrence of an installation operation or the occurrence of a failure, the time required for the installation operation or the recovery corresponding to the failure Present the time required for the work to the worker. For this reason, the worker can easily grasp the time required for the work. As a result, for example, an accurate work schedule can be formulated, and work efficiency can be improved.
  • control device 2 presents the installation procedure or the restoration procedure to the worker in addition to the required time. For this reason, the worker can easily and accurately grasp the procedure of the work, and can perform the work quickly and accurately.
  • control device 2 when the occurrence of a failure is detected, the control device 2 does not immediately display the operation support information screen for the recovery operation corresponding to the failure on the operation terminal 3, but an error notification screen as shown in FIG. May be displayed on the operation terminal 3.
  • the control device 2 displays the work support information screen for the restoration work on the operation terminal 3. Good.
  • Embodiment 2 (Embodiment 2) Subsequently, Embodiment 2 of the present invention will be described.
  • components and the like that are common to the first embodiment are denoted by the same reference numerals, and description thereof is omitted.
  • control device 2 further has a function of measuring the time of installation work or recovery work by the operator and notifying the server 6 of the time measured in addition to the function of the control device 2 of the first embodiment. .
  • the work support process described in the work support program 254 of the present embodiment detects the occurrence of an installation work or the occurrence of a failure, and generates work support information corresponding to the detected installation work or the content of the failure. And processing to display on the operation terminal 3 and processing to measure the working time and notify the server 6.
  • a work time timer 208 and a work time notification unit 209 are provided in the control device 2 of the present embodiment. Newly added.
  • the work time measuring unit 208 measures the time from the start to the end of the installation work or the recovery work (that is, the work time). Specifically, the work time counting unit 208 starts timing when the event detection unit 202 detects the occurrence of installation work.
  • the work time counting unit 208 starts time measurement when the operator presses the “Yes” button on the error notification screen shown in FIG.
  • the operator when the worker finishes the installation work or the recovery work, the operator performs an operation indicating the end of the work (work end operation) via the operation terminal 3, and the work end operation is performed.
  • the work time timing unit 208 ends the time measurement.
  • the work time notifying unit 209 transmits data (work time data) indicating the measured work time to the server 6 when the time measurement by the work time measuring unit 208 is completed.
  • the work time data includes information indicating the work time, user authentication information, and a controller ID (identification) of the control device 2.
  • the user authentication information is information for authenticating the representative user registered as the owner of the control device 2, and is information including a user ID and a password.
  • the controller ID is, for example, a manufacturing number, a serial number, or the like, and is information for enabling the control device 2 to be identified between the same products, and the control device 2 is a genuine product of the manufacturer. It is information indicating that there is.
  • FIGS. 14 and 15 are flowcharts showing a procedure of work support processing executed by the control device 2 of the present embodiment. This work support process is executed every time the event detection unit 202 detects the occurrence of an event related to the management of the device control system 1.
  • the required time acquisition unit 203 refers to the installation required time DB 250 and acquires the name and required time corresponding to the detected event.
  • the procedure acquisition unit 204 refers to the installation procedure DB 252 and acquires a work procedure corresponding to the detected event (step S203).
  • the work support information generation unit 205 generates work support information based on the acquired name, required time, and work procedure (step S204).
  • the display instruction unit 206 instructs the operation terminal 3 to display the generated work support information (step S205). As a result, a work support information screen as shown in FIG. 9 is displayed on the operation terminal 3.
  • the work time counting unit 208 starts time measurement in synchronization with the detection of the occurrence of installation work (step S206).
  • the work time timer 208 ends the time measurement (step S208).
  • the work time notifying unit 209 transmits work time data indicating the measured work time (that is, the installation work time) to the server 6 (step S209).
  • step S201 when the detected event does not indicate the occurrence of installation work (step S201; NO), that is, when the occurrence of a failure is indicated, the event detection unit 202 displays an error notification message as shown in FIG. Display is instructed to the operation terminal 3 (step S210).
  • step S211 when the operator presses the “No” button (step S211; YES), the control device 2 ends the work support process.
  • step S212 when the “Yes” button is pressed by the operator (step S212; YES), the required time acquisition unit 203 refers to the recovery required time DB 251 to specify the name and required time corresponding to the detected event. Obtain (step S213). Further, the procedure acquisition unit 204 refers to the recovery procedure DB 253 and acquires a work procedure corresponding to the detected event (step S214).
  • the work support information generation unit 205 generates work support information based on the acquired name, required time, and work procedure (step S215).
  • the display instruction unit 206 instructs the operation terminal 3 to display the generated work support information (step S216).
  • the work time counting unit 208 immediately starts counting in synchronization with the pressing operation of the “Yes” button by the operator (step S217). Then, when the operator performs a work end operation indicating the end of the recovery work (step S218; YES), the work time timer 208 ends the time measurement (step S219).
  • the work time notifying unit 209 transmits work time data indicating the measured work time (that is, recovery work time) to the server 6 (step S220).
  • the control device 2 measures the time of installation work or recovery work by the worker and notifies the server 6 of the time measured.
  • the server 6 can collect actual work time from the device control system 1 in each home. For this reason, the server 6 can improve the accuracy of the required time in the master DB by using these collected actual work times.
  • each home control device 2 can also improve the accuracy of the installation required time DB 250 and the recovery required time DB 251 by appropriately receiving the latest update data.
  • Embodiment 3 (Embodiment 3) Subsequently, Embodiment 3 of the present invention will be described. Note that, in the following description, the same reference numerals are given to components common to Embodiments 1 and 2, and the description thereof is omitted.
  • control device 2 further has a function of updating a work support information screen displayed on the operation terminal 3 in accordance with the progress of the installation work or the recovery work, in addition to the function of the control device 2 of the second embodiment. .
  • a progress acquisition unit 210 is newly added compared to the functional configuration of the control device 2 of the second embodiment (see FIG. 13).
  • the progress acquisition unit 210 acquires the progress of installation work or recovery work by the worker. More specifically, when the installation work or the recovery work is started by the worker, the progress acquisition unit 210 monitors the operation content of the worker and configures each item (work item) constituting the work procedure corresponding to the work. It is determined whether or not the contents of is implemented. When it is determined that the content of one work item has been executed, the progress acquisition unit 210 calculates the progress rate of the work. Although the method for calculating the progress rate is arbitrary, for example, the ratio of the number of completed work items to the total number of work items may be regarded as the progress rate.
  • the progress acquisition unit 210 acquires the work time up to the present time counted by the work time counting unit 208. Then, the progress acquisition unit 210 calculates the remaining work time based on the calculated progress rate and the acquired work time up to the present time. For example, the progress acquisition unit 210 calculates the expected work time from the start to the end of the work by dividing the work time up to the current time by the progress rate. Then, the progress acquisition unit 210 may calculate the remaining work time (remaining expected work time) by subtracting the work time up to the current time from the calculated expected work time.
  • the work support information generation unit 205 updates the content of the work support information based on the acquisition result obtained by the progress acquisition unit 210.
  • the display instruction unit 206 instructs the operation terminal 3 to display the work support information updated by the work support information generation unit 205.
  • FIG. 17 shows an example of a work support information screen displayed on the operation terminal 3 in response to such an instruction.
  • the control device 2 instructs the operation terminal 3 to display work support information including information indicating the progress of installation work or recovery work. . For this reason, the worker can easily grasp the degree of the current progress, and the worker's work consciousness can be improved.
  • control device 2 may further include an erroneous operation notification unit that notifies an operator of the occurrence of an erroneous operation.
  • the erroneous operation notification unit determines whether the operation by the operator is correct based on a work procedure corresponding to the work, and an incorrect operation, that is, an operation different from the work procedure. Is performed, an erroneous operation warning screen as shown in FIG. 18 is displayed on the operation terminal 3.
  • control device 2 may further include a delay notification unit that notifies the worker of the work delay.
  • the delay notification unit displays a delay warning screen as shown in FIG.
  • the control device 2 displays a screen (communication result) indicating the communication result with each device 4 and the server 6 as shown in FIG. 20 in response to a request from the worker.
  • Status screen may be displayed on the operation terminal 3.
  • a record indicating a normal communication result may be hidden on the communication status screen.
  • control device 2 may instruct the operation terminal 3 to display the time required for the work instead of displaying the work support information described above.
  • the required time may be set. For example, when the proficiency level is shown in three ways of beginner, intermediate and advanced, the required time for the beginner is the longest and the required time for the advanced is the shortest.
  • the worker inputs his / her proficiency level via the operation terminal 3 when starting the installation work or the recovery work.
  • the event detection unit 202 notifies the required time acquisition unit 203 of the proficiency level input by the user together with the content of the event.
  • the required time acquisition part 203 can acquire the required time according to the skill level of the operator from the installation required time DB 250 or the recovery required time DB 251.
  • the required time may be set in In this case, the work support information screen (see FIG. 9) displayed on the operation terminal 3 displays the required time for each work item (1) to (3).
  • control device 2 may cause the operation terminal 3 to display a screen (detailed procedure screen) for presenting a detailed work procedure to the worker.
  • the control device 2 instructs the operation terminal 3 to display the work items in a selectable manner on the work support information screen (see FIG. 21). Then, when any work item is selected by the user, the control device 2 instructs the operation terminal 3 to display a detailed procedure screen corresponding to the selected work item, as shown in FIG.
  • control device 2 may notify the server 6 of the content of the failure. Further, the control device 2 records the operation details of the recovery work performed by the operator from the occurrence of the failure, and when the operation can be recovered, the recorded operation details of the recovery work and the time required for the recovery operation are recorded. The included data may be uploaded to the server 6. In this way, the server 6 can efficiently collect information about recovery work for a new failure, and the master DB can be enriched.
  • control device 2 When an event that is not registered in the control device 2 occurs (occurrence of installation work or failure), the control device 2 transmits information about the required time and / or work procedure corresponding to the event to the server. 6 may be requested.
  • control device 2 may further include an input device for accepting an operation from the user and a display device for presenting information to the user.
  • control device 2 is installed in the house H.
  • the control device 2 may be installed outside the house H.
  • the server 6 may function as the control device 2.
  • the router 5 and the server 6 cooperate to play the role of the control device 2.
  • the CPU 20 executes a program such as the work support program 254, so that each functional unit (see FIGS. 8, 13, and 16) of the control device 2 is realized.
  • all or part of the functional units of the control device 2 may be realized by dedicated hardware.
  • the dedicated hardware is, for example, a single circuit, a composite circuit, a programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a combination thereof.
  • the present invention is not limited to a house, and can be employed as a technology that supports installation work and recovery work in an equipment control system installed in, for example, an office building or a factory.
  • the program executed by the control device 2 is a CD-ROM (Compact Disc Read Only Memory), DVD (Digital Versatile Disc), MO (Magneto-Optical Disk), USB memory, memory card, or the like. It is also possible to store and distribute in a computer-readable recording medium. Then, by installing such a program on a specific or general-purpose computer, it is possible to cause the computer to function as the control device 2 in each of the above embodiments.
  • the above program may be stored in a disk device or the like included in a server device on a communication network such as the Internet, and may be downloaded onto a computer, for example, superimposed on a carrier wave.
  • the above-described processing can also be achieved by starting and executing a program while transferring it via a communication network.
  • the above-described processing can also be achieved by executing all or part of the program on the server device and executing the program while the computer transmits and receives information regarding the processing via the communication network.
  • the present invention can be suitably employed in a system that manages the operation of equipment installed in a building.
  • 1 device control system 2 control device, 3 operation terminal, 4-1, 4-2 device, 5 router, 6 server, 10 power generation facility, 20 CPU, 21 wide area communication interface, 22 in-home communication interface, 23 ROM, 24 RAM , 25 secondary storage device, 26 bus, 200 user interface processing unit, 201 device control unit, 202 event detection unit, 203 required time acquisition unit, 204 procedure acquisition unit, 205 work support information generation unit, 206 display instruction unit, 207 DB update unit, 208 work time counting unit, 209 work time notification unit, 210 progress acquisition unit, 250 installation required time DB, 251 recovery required time DB, 252 installation procedure DB, 253 recovery procedure DB, 254 work support program

Landscapes

  • Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

制御装置(2)は、少なくとも1つの機器(4-1,4-2)を含む機器制御システム(1)を制御し、操作端末(3)を介して、ユーザから操作を受け付けると共に、ユーザに情報を提示する。制御装置(2)は、機器制御システム(1)の管理に関するイベントが発生すると、発生したイベントに対する作業の所要時間を取得する。そして、制御装置(2)は、取得した所要時間の表示を操作端末(3)に指示する。

Description

制御装置、作業支援方法及びプログラム
 本発明は、制御装置、作業支援方法及びプログラムに関する。
 従来、顧客に納入したシステム等の保守作業を支援するための技術が種々提案されている(例えば、特許文献1,2)。
 これらの技術では、作業者が所持する携帯端末から、保守作業に関する情報を管理するサーバ等に、発生した障害の現象等が通知され、サーバ等から送信された復旧手順を示すデータを当該携帯端末に表示させ、作業者に提示できるようにしている。
 これにより、作業者は、印刷された手順書等を携行する必要なく、保守作業のための適切な情報を迅速且つ容易に確認できるため、保守作業の効率化が図れる。
特開2003-44611号公報 特開2011-100190号公報
 ところで、上記のような保守作業において、作業者は、メーカが委託したメンテナンス会社から派遣されるのが一般的である。このため、業務的観点から、作業者は、当該保守作業に必要とされる時間が、どの程度なのかを意識して作業することが求められる。しかしながら、保守作業は多岐にわたり、各々の保守作業の所要時間を正確に覚えておくことは困難であり、現実的でない。
 本発明は、上記課題を解決するためになされたものであり、システムの管理に関する作業が発生する際、当該作業の所要時間をユーザに提示することができる制御装置等を提供することを目的とする。
 上記目的を達成するため、本発明に係る制御装置は、
 少なくとも1つの機器を含むシステムを制御し、ユーザインタフェース装置を介して、ユーザから操作を受け付けると共に、ユーザに情報を提示する制御装置であって、
 前記システムの管理に関するイベントが発生すると、前記イベントに対する作業の所要時間を取得する所要時間取得手段と、
 前記取得された所要時間の表示を前記ユーザインタフェース装置に指示する表示指示手段と、を備える。
 本発明によれば、例えば、設置作業の発生や障害の発生等のシステムの管理に関するイベントが発生すると、このイベントに対する作業の所要時間を作業者等のユーザに提示することができる。
本発明の実施形態1~3に係る機器制御システムの全体構成を示す図である。 本発明の実施形態1~3に係る制御装置のハードウェア構成を示すブロック図である。 実施形態1~3に係る制御装置が備える二次記憶装置に記憶されるデータベース等を説明するための図である。 実施形態1~3の設置所要時間情報の構成を示す図である。 実施形態1~3の復旧所要時間情報の構成を示す図である。 実施形態1~3の設置手順情報の構成を示す図である。 実施形態1~3の復旧手順情報の構成を示す図である。 実施形態1に係る制御装置の機能構成を示すブロック図である。 実施形態1,2の作業支援情報画面の一例を示す図である。 実施形態1~3のサーバについて説明するための図である。 実施形態1の作業支援処理の手順を示すフローチャートである。 実施形態1の変形例におけるエラー通知画面の一例を示す図である。 実施形態2に係る制御装置の機能構成を示すブロック図である。 実施形態2の作業支援処理の手順を示すフローチャート(その1)である。 実施形態2の作業支援処理の手順を示すフローチャート(その2)である。 実施形態3に係る制御装置の機能構成を示すブロック図である。 実施形態3の作業支援情報画面の一例を示す図である。 他の実施形態において表示される誤操作警告画面の一例を示す図である。 他の実施形態において表示される遅延警告画面の一例を示す図である。 他の実施形態において表示される通信状況画面の一例を示す図である。 他の実施形態の作業支援情報画面の一例を示す図である。 他の実施形態において表示される詳細手順画面の一例を示す図である。
 以下、本発明の実施形態について図面を参照して詳細に説明する。
(実施形態1)
 図1は、本発明の実施形態1に係る機器制御システム1の全体構成を示す図である。機器制御システム1は、一般家庭で使用される電力の管理を行う、いわゆる、HEMS(Home Energy Management System)と呼ばれるシステムである。
 図1に示すように、機器制御システム1は、制御装置2と、操作端末3と、複数の機器4(機器4-1,4-2,…)と、ルータ5と、を備える。制御装置2は、家屋H内の適切な場所に設置され、この家庭(需要地)において消費される電力の監視を行い、電力の消費状況を操作端末3を介して表示する。また、制御装置2は、各機器4の動作制御や動作状態の監視などを行う。制御装置2の詳細については後述する。
 機器4(機器4-1,4-2,…)は、例えば、エアコン、照明器、床暖房システム、冷蔵庫、IH(Induction Heating)調理器、テレビ、給湯機等の電気機器である。各機器4は、家屋H(敷地も含む)内に設置され、商用電源、発電設備や蓄電設備等(何れも図示せず)からの電力を供給する電力線に接続されると共に、図示しない無線ネットワークを介して、制御装置2と通信可能に接続する。この無線ネットワークは、例えば、エコーネットライト(ECHONET Lite)に準じたネットワークである。なお、機器4の仕様によっては、外付けの通信アダプタ(図示せず)を介して、この無線ネットワークに接続されるようにしてもよい。
 操作端末3(ユーザインタフェース装置)は、押しボタン、タッチパネル、タッチパッド等の入力デバイスと、有機ELディスプレイ、液晶ディスプレイ等の表示デバイスと、通信インタフェースと、を備えた、例えば、スマートフォンやタブレット端末等の携帯機器である。操作端末3は、制御装置2と、Wi-Fi(登録商標)、Wi-SUN(登録商標)や有線LAN等の周知の通信規格に則った通信を行う。操作端末3は、ユーザからの操作を受け付け、受け付けた操作内容を示す情報を制御装置2に送信する。また、操作端末3は、制御装置2から送信された、ユーザに提示するための情報を受信し、受信した情報を表示する。このように、操作端末3は、ユーザとのインタフェース(ユーザインタフェース)としての役割を担う。
 ルータ5は、ブロードバンドルータであり、制御装置2とLANケーブルを介して通信可能に接続されている。
 制御装置2は、図2に示すように、CPU(Central Processing Unit)20と、広域通信インタフェース21と、宅内通信インタフェース22と、ROM(Read Only Memory)23と、RAM(Random Access Memory)24と、二次記憶装置25と、を備える。これらの構成部は、バス26を介して相互に接続される。CPU20は、この制御装置2を統括的に制御する。CPU20によって実現される機能の詳細については後述する。
 広域通信インタフェース21は、広域通信するためのNIC(Network Interface Card controller)を備え、ルータ5を介してネットワークNに接続し、サーバ6等の他の装置とデータ通信を行う。宅内通信インタフェース22は、上述した無線ネットワークを介して各機器4と無線通信するためのNICと、操作端末3と無線通信又は有線通信するためのNICを含んで構成される。
 ROM23は、複数のファームウェアやこれらのファームウェアの実行時に使用されるデータ等を記憶する。RAM24は、CPU20の作業領域として使用される。
 二次記憶装置25は、EEPROM(Electrically Erasable Programmable Read-Only Memory)、フラッシュメモリ等の読み書き可能な不揮発性の半導体メモリやハードディスクドライブ等から構成される。二次記憶装置25は、図3に示すように、設置所要時間DB250、復旧所要時間DB251、設置手順DB252、復旧手順DB253、作業支援プログラム254等を記憶する。なお、二次記憶装置25は、この他にも、この家庭で消費される電力を監視するためのプログラムや各機器4の動作を制御するためのプログラム、そして、これらのプログラムの実行時に使用されるデータ等を記憶する。
 設置所要時間DB250(第1のデータベース)は、制御装置2、機器4、ルータ5等の設置作業に要する時間についての情報(設置所要時間情報)が登録されたデータベースである。設置所要時間情報は、図4に示すように、「設置コード」、「発生要因」、「名称」、「所要時間」等の項目からなる情報である。
 「設置コード」には、設置作業の内容を一意に識別するための数字とアルファベットの羅列が格納される。「発生要因」には、当該設置作業の発生要因を示す情報が格納される。発生要因を示す情報には、例えば、操作端末3を介した作業者による当該設置作業の開始を示す操作内容が含まれる。
 「名称」には、当該設置作業の内容を簡単に表した文字列(テキスト)が格納される。例えば、“コントローラの設置作業”や“エアコンの取り付け作業”等が「名称」に格納される。
 「所要時間」には、当該設置作業に要する時間(分単位)を示す情報が格納される。「設置コード」、「発生要因」及び「所要時間」のデータ形式は、バイナリ又はテキストの何れであってもよい。
 復旧所要時間DB251(第1のデータベース)は、機器制御システム1で発生した障害に対する復旧作業に要する時間についての情報(復旧所要時間情報)が登録されたデータベースである。復旧所要時間情報は、図5に示すように、「障害コード」、「現象」、「名称」、「所要時間」等の項目からなる情報である
 「障害コード」には、障害の内容を一意に識別するための数字とアルファベットの羅列が格納される。「現象」には、当該障害の発生時の現象を示す情報が格納される。現象を示す情報には、制御装置2で検出可能なエラー、具体的には、サーバ6との通信エラー、機器4との通信エラー、機器4の動作異常を示す情報等が含まれる。また、この他、現象を示す情報には、操作端末3を介した作業者による当該障害の発生の通知を示す操作内容も含まれる。
「名称」には、当該障害の内容を簡単に表した文字列(テキスト)が格納される。例えば、“サーバ通信エラー”等が「名称」に格納される。
 「所要時間」には、当該復旧作業に要する時間(分単位)を示す情報が格納される。「障害コード」、「現象」及び「所要時間」のデータ形式は、バイナリ又はテキストの何れであってもよい。
 設置手順DB252(第2のデータベース)は、設置作業の手順を示す情報(設置手順情報)が登録されたデータベースである。設置手順情報は、図6に示すように、「設置コード」、「作業手順」等の項目からなる情報である。
 「作業手順」には、当該設置作業の手順がテキストで格納される。例えば、コントローラ(即ち、制御装置2)の設置作業の場合では、“(1)機器を登録して下さい。”、“(2)電力計測の設定を行って下さい。”、“(3)ユーザを登録して下さい。”等が「作業手順」に格納される。なお、「作業手順」には、手順そのものを示すテキストが格納されるのではなく、二次記憶装置25における当該テキストの格納先(メモリアドレス)を示す情報(ポインタ)がバイナリで格納されるようにしてもよい。
 復旧手順DB253(第2のデータベース)は、機器制御システム1で発生した障害に対する復旧作業の手順を示す情報(復旧手順情報)が登録されたデータベースである。復旧手順情報は、図7に示すように、「障害コード」、「作業手順」等の項目からなる情報である。この「作業手順」には、当該障害に対する復旧作業の手順がテキストで格納される。なお、上記の設置手順情報における「作業手順」と同様、復旧手順情報の「作業手順」には、手順そのものを示すテキストが格納されるのではなく、二次記憶装置25における当該テキストの格納先(メモリアドレス)を示す情報(ポインタ)がバイナリで格納されるようにしてもよい。
 図3に戻り、作業支援プログラム254は、CPU20によって実行されるコンピュータ・プログラムである。作業支援プログラム254には、設置作業の発生や障害の発生を検出し、検出した設置作業あるいは障害の内容に対応する作業支援情報を生成して操作端末3に表示させる処理(作業支援処理)について記述されている。
 続いて、制御装置2の機能について説明する。制御装置2は、機能的には、図8に示すように、ユーザインタフェース処理部200と、機器制御部201と、イベント検出部202と、所要時間取得部203と、手順取得部204と、作業支援情報生成部205と、表示指示部206と、DB更新部207と、を備える。これらの各機能部は、CPU20によって前述した作業支援プログラム254等のプログラムが実行されることで実現される。
 ユーザインタフェース処理部200は、操作端末3を介したユーザインタフェース処理を行う。即ち、ユーザインタフェース処理部200は、ユーザからの操作を操作端末3を介して受け付ける。また、ユーザインタフェース処理部200は、ユーザに提示するための情報を操作端末3に送信する。
 機器制御部201は、周期的に各機器4の動作状態を取得し、取得した動作状態を示すデータを二次記憶装置25に保存する。また、機器制御部201は、時間帯や曜日に応じて予め設定された条件、あるいは、ユーザにより操作端末3を介して適宜設定された条件に従って、各機器4の動作を制御する。
 イベント検出部202は、機器制御システム1の管理に関するイベントの発生を検出する。ここでいうイベントには、設置作業の発生と、障害の発生とが含まれる。つまり、イベント検出部202は、設置作業の発生と、障害の発生とを検出する。イベント検出部202は、作業者による操作端末3を介した操作を監視して、設置作業の発生を検出する。
 また、イベント検出部202は、機器制御部201により取得された各機器4の動作状態やサーバ6との通信状態を監視して、障害の発生を検出する。さらに、イベント検出部202は、作業者による操作端末3を介した操作を監視して、障害の発生を検出する。
 所要時間取得部203は、イベント検出部202によりイベントの発生が検出されると、設置所要時間DB250又は復旧所要時間DB251を参照して、当該イベントに対応する名称及び所要時間を取得する。
 手順取得部204は、イベント検出部202によりイベントの発生が検出されると、設置手順DB252又は復旧手順DB253を参照して、当該イベントに対応する作業手順を取得する。
 作業支援情報生成部205は、所要時間取得部203により取得された名称及び所要時間と、手順取得部204により取得された作業手順とに基づいて、作業支援情報を生成する。
 表示指示部206は、作業支援情報生成部205により生成された作業支援情報の表示を操作端末3に指示する。かかる指示を受けて操作端末3で表示される画面(作業支援情報画面)の一例を図9に示す。
 DB更新部207は、二次記憶装置25に記憶されている各DB(データベース)、即ち、設置所要時間DB250、復旧所要時間DB251、設置手順DB252、復旧手順DB253の更新を行う。各DBの更新用データは、サーバ6からのダウンロードにより取得される。サーバ6は、制御装置2の販売元等によって管理される、HEMS用のいわゆるクラウドサーバである。
 サーバ6は、図10に示すように、複数の家庭における機器制御システム、即ち、複数の家屋Hにそれぞれ導入されている機器制御システム1とネットワークNを介して通信可能に接続される。サーバ6は、設置所要時間DB250、復旧所要時間DB251、設置手順DB252、復旧手順DB253のそれぞれに対応するマスタDBを保持する。制御装置2の出荷時において、当該制御装置2が保持する各DBの内容は、その時点でサーバ6が保時する各マスタDBの内容と同一である。サーバ6は、何れかのマスタDBにおいて内容の変更が発生すると、当該DBの更新通知を各家庭の機器制御システム1に配信する。
 DB更新部207は、上記の更新通知を受けると、予め設定された時間帯(更新時間帯)にサーバ6から当該更新通知で示される更新用データを受信する。この更新時間帯は、制御装置2の処理負荷が他の時間帯に比べて小さくなることが予測される時間帯であり、予めユーザ(家屋Hの住人や作業者等)により設定されている。なお、更新時間帯は、DB更新部207によって自動的に設定されるようにしてもよい。
 あるいは、DB更新部207は、上記の更新通知を受けると、DBを更新するか否かを操作端末3を介してユーザに問い合わせて、ユーザにより更新の指示を受けた場合、直ちに更新用データの受信を開始してもよい。
 図11は、制御装置2にて実行される作業支援処理の手順を示すフローチャートである。この作業支援処理は、イベント検出部202によって機器制御システム1の管理に関するイベントの発生が検出される度に実行される。
 検出されたイベントが、設置作業の発生を示す場合(ステップS101;YES)、所要時間取得部203は、設置所要時間DB250を参照して、検出されたイベントに対応する名称及び所要時間を取得する(ステップS102)。また、手順取得部204は、設置手順DB252を参照して、検出されたイベントに対応する作業手順を取得する(ステップS103)。
 一方、検出されたイベントが、設置作業の発生を示すものでない場合(ステップS101;NO)、即ち、障害の発生を示す場合、所要時間取得部203は、復旧所要時間DB251を参照して、検出されたイベントに対応する名称及び所要時間を取得する(ステップS104)。また、手順取得部204は、復旧手順DB253を参照して、検出されたイベントに対応する作業手順を取得する(ステップS105)。
 作業支援情報生成部205は、取得された名称、所要時間及び作業手順に基づいて、作業支援情報を生成する(ステップS106)。表示指示部206は、生成された作業支援情報の表示を操作端末3に指示する(ステップS107)。これにより、操作端末3には、図9に示すような作業支援情報画面が表示される。
 以上説明したように、本発明の実施形態1に係る機器制御システム1では、制御装置2は、設置作業の発生又は障害の発生を検出すると、当該設置作業の所要時間又は当該障害に対応する復旧作業の所要時間を作業者に提示する。このため、作業者は、当該作業の所要時間を容易に把握することができる。その結果、例えば、精度良い作業スケジュールを立案でき、業務の効率化が図れる。
 また、制御装置2は、上記の所要時間に加え、当該設置作業の手順又は当該復旧作業の手順を作業者に提示する。このため、作業者は、当該作業の手順を容易且つ正確に把握することができ、当該作業を迅速且つ正確に行うことが可能となる。
 なお、制御装置2は、障害の発生を検出した際、当該障害に対応する復旧作業についての作業支援情報画面を直ちに操作端末3に表示させるのではなく、図12に示すような、エラー通知画面を操作端末3に表示させてもよい。
 このエラー通知画面では、障害の発生元と障害コードとが表示されると共に、復旧作業を開始するか否かを作業者に問い合わせるためのGUI(Graphical User Interface)ボタン(“はい”,“いいえ”ボタン)が設けられている。
 そして、上記のエラー通知画面において、作業者により“はい”ボタンが押下操作されれた場合に、制御装置2は、当該復旧作業についての作業支援情報画面を操作端末3に表示させるようにしてもよい。
(実施形態2)
 続いて、本発明の実施形態2について説明する。なお、以下の説明において、実施形態1と共通する構成要素等については、同一の符号を付し、その説明を省略する。
 本実施形態では、制御装置2は、実施形態1の制御装置2が有する機能に加え、作業者による設置作業又は復旧作業の時間を計時し、計時した時間をサーバ6に通知する機能をさらに有する。
 このため、本実施形態の作業支援プログラム254に記述される作業支援処理には、設置作業の発生や障害の発生を検出し、検出した設置作業あるいは障害の内容に対応する作業支援情報を生成して操作端末3に表示させる処理と、作業時間を計時してサーバ6に通知する処理とが含まれる。
 図13に示すように、本実施形態の制御装置2では、実施形態1の制御装置2の機能構成(図8参照)と比較して、作業時間計時部208と、作業時間通知部209とが新たに追加されている。
 作業時間計時部208は、設置作業又は復旧作業の開始から終了までの時間(即ち、作業時間)を計時する。具体的には、作業時間計時部208は、イベント検出部202によって設置作業の発生が検出されると、計時を開始する。
 また、作業時間計時部208は、図12に示すエラー通知画面において、作業者により“はい”ボタンが押下操作されると、計時を開始する。
 なお、本実施形態では、作業者は、設置作業又は復旧作業を終えると、作業の終了を示す操作(作業終了操作)を操作端末3を介して行うものとし、かかる作業終了操作が行われると、作業時間計時部208は、計時を終了する。
 作業時間通知部209は、作業時間計時部208による計時が終了すると、計時された作業時間を示すデータ(作業時間データ)をサーバ6に送信する。この作業時間データには、作業時間を示す情報と、ユーザの認証情報と、当該制御装置2のコントーラID(identification)とが含まれる。ユーザの認証情報とは、当該制御装置2の所有者として登録された代表ユーザを認証するための情報であり、ユーザIDとパスワードからなる情報である。また、コントーラIDとは、例えば、製造番号やシリアル番号等であり、当該制御装置2を同一製品間で識別できるようにするための情報であると共に、当該制御装置2が当該メーカの正規品であることを示す情報である。
 図14及び図15は、本実施形態の制御装置2にて実行される作業支援処理の手順を示すフローチャートである。この作業支援処理は、イベント検出部202によって機器制御システム1の管理に関するイベントの発生が検出される度に実行される。
 検出されたイベントが、設置作業の発生を示す場合(ステップS201;YES)、所要時間取得部203は、設置所要時間DB250を参照して、検出されたイベントに対応する名称及び所要時間を取得する(ステップS202)。また、手順取得部204は、設置手順DB252を参照して、検出されたイベントに対応する作業手順を取得する(ステップS203)。
 作業支援情報生成部205は、取得された名称、所要時間及び作業手順に基づいて、作業支援情報を生成する(ステップS204)。表示指示部206は、生成された作業支援情報の表示を操作端末3に指示する(ステップS205)。これにより、操作端末3には、図9に示すような作業支援情報画面が表示される。
 また、作業時間計時部208は、設置作業の発生の検出と同期して計時を開始する(ステップS206)。そして、作業者により、設置作業の終了を示す作業終了操作が行われると(ステップS207;YES)、作業時間計時部208は、計時を終了する(ステップS208)。作業時間通知部209は、計時された作業時間(即ち、設置作業時間)を示す作業時間データをサーバ6に送信する(ステップS209)。
 一方、検出されたイベントが、設置作業の発生を示すものでない場合(ステップS201;NO)、即ち、障害の発生を示す場合、イベント検出部202は、図12に示すような、エラー通知メッセージの表示を操作端末3に指示する(ステップS210)。
 このエラー通知メッセージにおいて、作業者により“いいえ”ボタンが押下操作されると(ステップS211;YES)、制御装置2は、作業支援処理を終了する。一方、作業者により“はい”ボタンが押下操作されると(ステップS212;YES)、所要時間取得部203は、復旧所要時間DB251を参照して、検出されたイベントに対応する名称及び所要時間を取得する(ステップS213)。また、手順取得部204は、復旧手順DB253を参照して、検出されたイベントに対応する作業手順を取得する(ステップS214)。
 作業支援情報生成部205は、取得された名称、所要時間及び作業手順に基づいて、作業支援情報を生成する(ステップS215)。表示指示部206は、生成された作業支援情報の表示を操作端末3に指示する(ステップS216)。
 また、作業時間計時部208は、作業者による“はい”ボタンの押下操作に同期して直ちに計時を開始する(ステップS217)。そして、作業者により、復旧作業の終了を示す作業終了操作が行われると(ステップS218;YES)、作業時間計時部208は、計時を終了する(ステップS219)。作業時間通知部209は、計時された作業時間(即ち、復旧作業時間)を示す作業時間データをサーバ6に送信する(ステップS220)。
 以上説明したように、本発明の実施形態2に係る機器制御システム1では、制御装置2は、作業者による設置作業又は復旧作業の時間を計時し、計時した時間をサーバ6に通知する。このようにすることで、サーバ6は、実際の作業時間を各家庭の機器制御システム1から収集することができる。このため、サーバ6は、これらの収集した実際の作業時間を使用して、マスタDBにおける所要時間の精度を高めることができる。その結果、各家庭の制御装置2においても、最新の更新用データを適宜受信することで、設置所要時間DB250及び復旧所要時間DB251の精度を高めることができる。
 また、作業者による実際の作業時間がサーバ6に通知されることで、当該作業者の派遣元の企業等において、作業者の業務実績を適切に管理することが可能となる。
(実施形態3)
 続いて、本発明の実施形態3について説明する。なお、以下の説明において、実施形態1,2と共通する構成要素等については、同一の符号を付し、その説明を省略する。
 本実施形態では、制御装置2は、実施形態2の制御装置2が有する機能に加え、設置作業又は復旧作業の進捗に応じて操作端末3に表示させる作業支援情報画面を更新する機能をさらに有する。
 図16に示すように、本実施形態の制御装置2では、実施形態2の制御装置2の機能構成(図13参照)と比較して、進捗取得部210が新たに追加されている。
 進捗取得部210は、作業者による設置作業又は復旧作業の進捗状況を取得する。より詳細には、進捗取得部210は、作業者により設置作業又は復旧作業が開始されると、作業者の操作内容を監視し、当該作業に対応する作業手順を構成する各項目(作業項目)の内容が実施されたか否かを判別する。そして、一の作業項目の内容が実施されたと判別すると、進捗取得部210は、当該作業の進捗率を算出する。進捗率の算出方法は任意であるが、例えば、全作業項目数に対する実施済みの作業項目数の割合を進捗率とみなしてもよい。
 また、進捗取得部210は、作業時間計時部208により計時された現時点までの作業時間を取得する。そして、進捗取得部210は、算出した進捗率と、取得した現時点までの作業時間とに基づいて、残りの作業時間を算出する。この算出方法も任意であるが、例えば、進捗取得部210は、現時点までの作業時間を進捗率で除算することで作業の開始から終了までの予想作業時間を算出する。そして、進捗取得部210は、算出した予想作業時間から現時点までの作業時間を差し引くことで残りの作業時間(残りの予想作業時間)を算出してもよい。
 作業支援情報生成部205は、進捗取得部210による上記の取得結果に基づいて、作業支援情報の内容を更新する。表示指示部206は、作業支援情報生成部205により更新された作業支援情報の表示を操作端末3に指示する。かかる指示を受けて操作端末3で表示される作業支援情報画面の一例を図17に示す。
 以上説明したように、本発明の実施形態3に係る機器制御システム1では、制御装置2は、設置作業又は復旧作業の進捗を示す情報も含めた作業支援情報の表示を操作端末3に指示する。このため、作業者に現在の進捗の程度を容易に把握させることができ、作業者の業務意識の向上が図れる。
 なお、本発明は、上記の各実施形態に限定されず、本発明の要旨を逸脱しない範囲での種々の変更は勿論可能である。
 例えば、制御装置2は、誤操作の発生を作業者に報知する誤操作報知部をさらに備えるようにしてもよい。この誤操作報知部は、設置作業又は復旧作業が開始されると、当該作業に対応する作業手順に基づいて作業者による操作の正否を判別し、正しくない操作、即ち、当該作業手順とは異なる操作が行われた場合に、図18に示すような誤操作警告画面を操作端末3に表示させる。
 また、制御装置2は、作業の遅延を作業者に報知する遅延報知部をさらに備えるようにしてもよい。この遅延報知部は、作業時間が所要時間を一定時間以上超過した場合、図19に示すような遅延警告画面を操作端末3に表示させる。
 また、コントローラ(即ち、制御装置2)の設置作業において、制御装置2は、作業者からの要求に応じて、図20に示すような各機器4、サーバ6との通信結果を示す画面(通信状況画面)を操作端末3に表示させてもよい。この場合、通信状況画面において、正常な通信結果を示すレコードは非表示にする等してもよい。
 また、制御装置2は、設置作業又は復旧作業が発生した際、上述した作業支援情報の表示ではなく当該作業の所要時間の表示を操作端末3に指示してもよい。
 また、設置所要時間DB250に登録される設置所要時間情報(図4参照)と、復旧所要時間DB251に登録される復旧所要時間情報(図5参照)において、作業者の習熟度に応じた複数通りの所要時間が設定されるようにしてもよい。例えば、習熟度が、初級者、中級者及び上級者の3通りで示される場合、初級者用の所要時間が最も長く、上級者用の所要時間が最も短くなる。
 このように作業者の習熟度に応じた複数通りの所要時間が設定されている場合、作業者は、設置作業又は復旧作業を開始する際、操作端末3を介して自己の習熟度を入力する。イベント検出部202は、イベントの発生を検出すると、イベントの内容と共にユーザにより入力された習熟度を所要時間取得部203に通知する。これにより、所要時間取得部203は、設置所要時間DB250又は復旧所要時間DB251から作業者の習熟度に応じた所要時間を取得することができる。
 また、設置所要時間DB250に登録される設置所要時間情報(図4参照)と、復旧所要時間DB251に登録される復旧所要時間情報(図5参照)において、対応する作業手順を構成する作業項目毎に所要時間が設定されるようにしてもよい。この場合、操作端末3で表示される作業支援情報画面(図9参照)には、(1)~(3)の作業項目毎に所要時間が表示される。
 また、制御装置2は、詳細な作業手順を作業者に提示するための画面(詳細手順画面)を操作端末3に表示させるようにしてもよい。この場合、制御装置2は、作業支援情報画面において作業項目を選択可能に表示するように操作端末3に指示する(図21参照)。そして、ユーザにより何れかの作業項目が選択されると、制御装置2は、図22に示すように、選択された作業項目に対応する詳細手順画面の表示を操作端末3に指示する。
 また、制御装置2に登録されていない障害が発生した場合、制御装置2は、当該障害の内容についてサーバ6に通知するようにしてもよい。さらに、制御装置2は、当該障害の発生から作業者が行った復旧作業の操作内容を記録し、復旧できた場合には、記録した復旧作業の操作内容と当該復旧作業に要した時間とを含むデータをサーバ6にアップロードするようにしてもよい。このようにすると、サーバ6は、新たな障害に対する復旧作業についての情報を効率的に収集でき、マスタDBの充実化が図れる。
 また、制御装置2に登録されていないイベントが発生(設置作業の発生又は障害の発生)した場合、制御装置2は、当該イベントに対応する所要時間及び/又は作業手順についての情報の送信をサーバ6に要求するようにしてもよい。
 また、制御装置2が、ユーザからの操作を受け付けるための入力デバイスと、ユーザに情報を提示するための表示デバイスをさらに含んで構成されるようにしてもよい。
 また、上記の実施形態では、制御装置2が家屋Hに設置された場合について説明したが、制御装置2を家屋Hの外に設置するようにしてもよい。例えば、サーバ6を制御装置2として機能させてもよい。この場合、ルータ5とサーバ6とが協調して制御装置2の役割を果たす。
 上記の実施形態では、CPU20によって作業支援プログラム254等のプログラムが実行されることで、制御装置2の各機能部(図8,13,16参照)が実現された。しかし、制御装置2の機能部の全部又は一部が、専用のハードウェアで実現されるようにしてもよい。専用のハードウェアとは、例えば、単一回路、複合回路、プログラム化されたプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)、又は、これらの組み合わせ等である。
 また、本発明は、家屋のみに限らず、例えば、オフィスビルや工場等において設置される機器制御システムにおける設置作業や復旧作業を支援する技術として採用することが可能である。
 また、上記各実施形態において、制御装置2によって実行されるプログラムは、CD-ROM(Compact Disc Read Only Memory)、DVD(Digital Versatile Disc)、MO(Magneto-Optical Disk)、USBメモリ、メモリカード等のコンピュータ読み取り可能な記録媒体に格納して配布することも可能である。そして、かかるプログラムを特定の又は汎用のコンピュータにインストールすることによって、当該コンピュータを上記各実施形態における制御装置2として機能させることも可能である。
 また、上記のプログラムをインターネット等の通信ネットワーク上のサーバ装置が有するディスク装置等に格納しておき、例えば、搬送波に重畳させて、コンピュータにダウンロード等するようにしてもよい。また、通信ネットワークを介してプログラムを転送しながら起動実行することによっても、上述の処理を達成することができる。さらに、プログラムの全部又は一部をサーバ装置上で実行させ、その処理に関する情報をコンピュータが通信ネットワークを介して送受信しながらプログラムを実行することによっても、上述の処理を達成することができる。
 なお、上述の機能を、OS(Operating System)が分担して実現する場合又はOSとアプリケーションとの協働により実現する場合等には、OS以外の部分のみを上記の記録媒体に格納して配布してもよく、また、コンピュータにダウンロード等してもよい。
 本発明は、広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能である。また、上述した実施形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。
 本発明は、建物内に設置された機器の動作を管理するシステムに好適に採用され得る。
 1 機器制御システム、2 制御装置、3 操作端末、4-1,4-2 機器、5 ルータ、6 サーバ、10 発電設備、20 CPU、21 広域通信インタフェース、22 宅内通信インタフェース、23 ROM、24 RAM、25 二次記憶装置、26 バス、200 ユーザインタフェース処理部、201 機器制御部、202 イベント検出部、203 所要時間取得部、204 手順取得部、205 作業支援情報生成部、206 表示指示部、207 DB更新部、208 作業時間計時部、209 作業時間通知部、210 進捗取得部、250 設置所要時間DB、251 復旧所要時間DB、252 設置手順DB、253 復旧手順DB、254 作業支援プログラム

Claims (12)

  1.  少なくとも1つの機器を含むシステムを制御し、ユーザインタフェース装置を介して、ユーザから操作を受け付けると共に、ユーザに情報を提示する制御装置であって、
     前記システムの管理に関するイベントが発生すると、前記イベントに対する作業の所要時間を取得する所要時間取得手段と、
     前記取得された所要時間の表示を前記ユーザインタフェース装置に指示する表示指示手段と、を備える、制御装置。
  2.  前記イベントを識別する識別情報と、前記イベントに対する作業の所要時間とが対応付けられた第1のデータベースをさらに備え、
     前記所要時間取得手段は、前記イベントが発生すると、前記第1のデータベースを参照して前記イベントに対応する所要時間を取得する、請求項1に記載の制御装置。
  3.  前記第1のデータベースを更新するためのデータをサーバから受信するデータベース更新手段をさらに備える、請求項2に記載の制御装置。
  4.  前記イベントに対する作業の開始から終了までの時間を前記サーバに通知する作業時間通知手段をさらに備える、請求項3に記載の制御装置。
  5.  前記イベントに対する作業において遅延が発生した場合にユーザに報知する遅延報知手段をさらに備える、請求項1から4の何れか1項に記載の制御装置。
  6.  前記イベントが発生すると、前記イベントに対する作業の手順を取得する手順取得手段をさらに備え、
     前記表示指示手段は、前記取得された所要時間と前記取得された手順を含む作業支援情報の表示を前記ユーザインタフェース装置に指示する、請求項1から5の何れか1項に記載の制御装置。
  7.  前記イベントを識別する識別情報と、前記イベントに対する作業の手順とが対応付けられた第2のデータベースをさらに備え、
     前記手順取得手段は、前記イベントが発生すると、前記第2のデータベースを参照して前記イベントに対応する手順を取得する、請求項6に記載の制御装置。
  8.  前記イベントに対する作業の進捗状況を取得する進捗取得手段をさらに備え、
     前記作業支援情報には、前記取得された進捗状況がさらに含まれる、請求項6又は7に記載の制御装置。
  9.  前記イベントに対する作業においてユーザの操作の正否を判別し、正しくない操作が行われた場合にユーザに報知する誤操作報知手段をさらに備える、請求項6から8の何れか1項に記載の制御装置。
  10.  少なくとも1つの機器を含むシステムを制御する制御装置であって、
     ユーザインタフェース手段と、
     前記システムの管理に関するイベントが発生すると、前記イベントに対する作業の所要時間を取得する所要時間取得手段と、
     前記取得された所要時間の表示を前記ユーザインタフェース手段に指示する表示指示手段と、を備える、制御装置。
  11.  システムの管理に関するイベントが発生すると、前記イベントに対する作業の所要時間を取得し、
     前記取得された所要時間の表示をユーザインタフェース装置に指示する、作業支援方法。
  12.  コンピュータを、
     システムの管理に関するイベントが発生すると、前記イベントに対する作業の所要時間を取得する所要時間取得手段、
     前記取得された所要時間の表示をユーザインタフェース装置に指示する表示指示手段、として機能させる、プログラム。
PCT/JP2015/083086 2015-11-25 2015-11-25 制御装置、作業支援方法及びプログラム WO2017090130A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2017552594A JP6628810B2 (ja) 2015-11-25 2015-11-25 制御装置、作業支援方法及びプログラム
PCT/JP2015/083086 WO2017090130A1 (ja) 2015-11-25 2015-11-25 制御装置、作業支援方法及びプログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/083086 WO2017090130A1 (ja) 2015-11-25 2015-11-25 制御装置、作業支援方法及びプログラム

Publications (1)

Publication Number Publication Date
WO2017090130A1 true WO2017090130A1 (ja) 2017-06-01

Family

ID=58764404

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/083086 WO2017090130A1 (ja) 2015-11-25 2015-11-25 制御装置、作業支援方法及びプログラム

Country Status (2)

Country Link
JP (1) JP6628810B2 (ja)
WO (1) WO2017090130A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017228271A (ja) * 2016-06-17 2017-12-28 株式会社リコー 情報処理システム、機器、プログラム及び情報処理装置
JP2020149139A (ja) * 2019-03-11 2020-09-17 株式会社Nttファシリティーズ 作業支援システム、作業支援方法、及びプログラム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0877260A (ja) * 1994-09-09 1996-03-22 Hitachi Electron Service Co Ltd 障害対策支援システム
JP2005122707A (ja) * 2003-09-24 2005-05-12 Toshiba Corp 保守管理方法及び保守管理システム
JP2011159218A (ja) * 2010-02-03 2011-08-18 Mitsubishi Heavy Ind Ltd トラブル対処支援システム、トラブル対処支援方法、及びプログラム

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002007600A (ja) * 2000-06-26 2002-01-11 Hitachi Chem Co Ltd 構造物の巡回管理方法、巡回管理支援装置、巡回管理支援システム、巡回管理用データ構造を記録した記録媒体、及び巡回管理支援プログラムを記録した記録媒体
JP2005284386A (ja) * 2004-03-26 2005-10-13 Ricoh Co Ltd プロジェクト立案支援方法及びプロジェクト立案支援プログラム
JP2010191642A (ja) * 2009-02-17 2010-09-02 Seiko Epson Corp 作業管理方法、プログラム及び作業管理システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0877260A (ja) * 1994-09-09 1996-03-22 Hitachi Electron Service Co Ltd 障害対策支援システム
JP2005122707A (ja) * 2003-09-24 2005-05-12 Toshiba Corp 保守管理方法及び保守管理システム
JP2011159218A (ja) * 2010-02-03 2011-08-18 Mitsubishi Heavy Ind Ltd トラブル対処支援システム、トラブル対処支援方法、及びプログラム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017228271A (ja) * 2016-06-17 2017-12-28 株式会社リコー 情報処理システム、機器、プログラム及び情報処理装置
JP2020149139A (ja) * 2019-03-11 2020-09-17 株式会社Nttファシリティーズ 作業支援システム、作業支援方法、及びプログラム

Also Published As

Publication number Publication date
JPWO2017090130A1 (ja) 2018-04-26
JP6628810B2 (ja) 2020-01-15

Similar Documents

Publication Publication Date Title
JP5520807B2 (ja) 住宅用電気機器メンテナンス管理装置及び住宅用電気機器メンテナンスシステム
EP3407197B1 (en) Device management apparatus, management program update method and program
JP5197690B2 (ja) 停電復旧支援システム及び停電復旧支援方法
JPWO2016016931A1 (ja) エネルギー管理コントローラ、エネルギー管理方法及びプログラム
WO2017090130A1 (ja) 制御装置、作業支援方法及びプログラム
WO2017033282A1 (ja) 制御装置、イベント情報表示方法及びプログラム
JP5792029B2 (ja) 停電時対処要否判定システム
JP6547631B2 (ja) 監視装置、監視システム、監視方法、補正情報作成装置、補正情報作成方法及びプログラム
KR20170015262A (ko) 모듈을 대응하는 인버터에 자동으로 연관시키기 위한 방법 및 관련 모듈 및 발전 시스템
JP2013034146A (ja) ネットワークシステム
JP2014002660A (ja) 保守部品生産管理装置及び保守部品生産管理方法
WO2015182217A1 (ja) 監視システム、監視機器、サーバ、監視機器の動作方法、サーバの動作方法、及び、プログラム
JP6373513B2 (ja) 制御装置、充電情報表示方法及びプログラム
JP6617589B2 (ja) 機器管理方法および機器管理装置
JP5731077B2 (ja) 情報管理方法
JP2019008439A (ja) 情報提供方法及び情報提供プログラム
WO2016152699A1 (ja) 情報処理システム、情報処理方法、およびプログラム
JP2017169320A (ja) 太陽光発電装置の制御装置、サーバ、太陽光発電システム、情報配信方法、太陽光発電装置の制御方法およびプログラム
WO2015008639A1 (ja) 制御装置、機器管理システム、通知メッセージ表示方法及びプログラム
JP6385599B2 (ja) エネルギー管理装置、電力情報表示方法及びプログラム
US10650314B2 (en) Device management method and device management apparatus
JP6265835B2 (ja) 情報処理装置、診断順序決定方法及び制御プログラム
JP2018073114A (ja) 情報管理装置、及び、情報管理システム
JP4018652B2 (ja) 暖房器の管理システム及び暖房器の管理方法
WO2015015778A1 (ja) 情報提示方法、情報提示プログラム及び情報提示システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15909249

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017552594

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15909249

Country of ref document: EP

Kind code of ref document: A1