WO2017042945A1 - ガイドレール固定装置 - Google Patents

ガイドレール固定装置 Download PDF

Info

Publication number
WO2017042945A1
WO2017042945A1 PCT/JP2015/075781 JP2015075781W WO2017042945A1 WO 2017042945 A1 WO2017042945 A1 WO 2017042945A1 JP 2015075781 W JP2015075781 W JP 2015075781W WO 2017042945 A1 WO2017042945 A1 WO 2017042945A1
Authority
WO
WIPO (PCT)
Prior art keywords
guide rail
rail
fixing device
bracket
guide
Prior art date
Application number
PCT/JP2015/075781
Other languages
English (en)
French (fr)
Inventor
府内 宣史
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to KR1020187008475A priority Critical patent/KR102213646B1/ko
Priority to JP2017538806A priority patent/JP6452830B2/ja
Priority to PCT/JP2015/075781 priority patent/WO2017042945A1/ja
Priority to DE112015006895.3T priority patent/DE112015006895T5/de
Priority to CN201580082858.XA priority patent/CN107949533B/zh
Priority to US15/754,041 priority patent/US10882718B2/en
Publication of WO2017042945A1 publication Critical patent/WO2017042945A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • B66B7/024Lateral supports
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/022Guideways; Guides with a special shape
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/02Cages, i.e. cars
    • B66B11/026Attenuation system for shocks, vibrations, imbalance, e.g. passengers on the same side
    • B66B11/0266Passive systems
    • B66B11/0273Passive systems acting between car and supporting frame

Definitions

  • This invention relates to a guide rail fixing device for an elevator.
  • a pair of guide rails that guide the raising and lowering of the car and the counterweight are installed over the entire lifting range of the car and the counterweight.
  • the guide rail is fixed to a beam or wall side bracket attached to the inner wall of the hoistway by rail clips, rail brackets, bolts, nuts, and spring seats which are guide rail fixing devices (for example, Patent Document 1, Patent Reference 2).
  • JP-A-6-239559 (2nd page, FIG. 1) Japanese Patent Laid-Open No. 6-255941 (page 5, FIG. 2) Japanese Utility Model Publication No. 3-72578 (6th page, Fig. 5)
  • the guide rail fixing device when a design error of the guide rail or the rail clip occurs, a sufficient frictional force may not be obtained between the guide rail and the guide rail fixing device. In this case, the guide rail may fall if the building with the elevator shakes greatly when an earthquake occurs or a strong wind blows.
  • the guide rail fixing device is fixed to the beam or wall side bracket attached to the inner wall of the hoistway.
  • the number of beams or wall side brackets attached to the inner wall of the hoistway increases. There was a problem that the installation cost in the building increased.
  • the present invention has been made to solve the above-described problems, and provides a guide rail fixing device that improves the frictional force with the guide rail without increasing the number of beams or wall-side brackets attached to the inner wall of the hoistway. obtain.
  • a guide rail fixing device includes: a rail bracket that abuts a bottom surface of a base portion of a guide rail that is disposed at a lowermost portion among a plurality of guide rails arranged in a line in an elevator hoistway; and the rail bracket.
  • a rail clip that clamps the base portion of the guide rail, a bottom surface of the base portion of the guide rail disposed at the lowermost portion and an upper end of the rail bracket, and a guide rail disposed at the lowermost portion with the rail clip.
  • a friction plate sandwiching the base.
  • the frictional force between the guide rail and the guide rail fixing device can be improved without increasing the number of beams or wall-side brackets attached to the inner wall of the hoistway.
  • FIG. 1 It is a plane sectional view of the elevator hoistway. It is a figure which shows the attachment method of the guide rail by the beam attachment method. It is a figure which shows the attachment method of the guide rail by the wall attachment method. It is the schematic of the guide rail fixing device which fixes the guide rail and guide rail which show Embodiment 1 of this invention to a hoistway. It is a front view of the guide rail fixing device shown in FIG. It is a side view of the guide rail fixing device shown in FIG. It is the schematic of the guide rail fixing device which fixes the guide rail arrange
  • FIG. 1 is a plan sectional view of a hoistway 1 of an elevator.
  • the car 2 and the counterweight 3 are supported by a rope (not shown).
  • the guide rails 4 are paired, and are installed over the entire length of the raising / lowering range of the car 2 and the counterweight 3 with the car 2 and the counterweight 3 interposed therebetween. Note that the guide rails 4 are fixed in a row, with a plurality of guide rails 4 extending over the entire lifting range of the car 2 and the counterweight 3.
  • FIG. 2 is a view showing a method of mounting the guide rail 4 by a beam mounting method.
  • each guide rail 4 is fixed to the beam 7 via a rail bracket 5 and a base plate 6.
  • the rail bracket 5 is a steel material having a L-shaped cross section with a horizontal portion 5a and a vertical portion 5b provided continuously from the horizontal portion 5a and extending vertically upward.
  • the vertical portion 5 b contacts the guide rail 4.
  • the base plate 6 is a plate material that is fixed to the lower surface of the horizontal portion 5 a of the rail bracket 5 by welding.
  • the beams 7 are, for example, H-shaped steel, and a plurality of beams 7 are provided apart from each other in the vertical direction on the inner wall 1a of the hoistway 1 so that the flange portion 7a is horizontal.
  • the upper surface of the flange portion 7 a located on the upper side of each beam 7 is fixed to the lower surface of the base plate 6 by welding.
  • the eye plate 8 is provided between the guide rails 4 to suppress vibration due to the step between the guide rails 4 when the car 2 and the counterweight 3 are moved up and down.
  • FIG. 3 is a view showing a method of mounting the guide rail 4 by a wall mounting method.
  • each guide rail 4 is fixed to the inner wall 1 a of the hoistway 1 via the rail bracket 5 and the wall side bracket 9.
  • the rail bracket 5 is the same as the rail bracket 5 used in the beam mounting method, and the vertical portion 5 b abuts on the guide rail 4.
  • the wall-side bracket 9 is a steel material having an L-shaped cross section with a horizontal portion 9a and a vertical portion 9b provided continuously from the horizontal portion 9a and extending vertically downward.
  • the horizontal portion 9a is fixed to the lower surface of the horizontal portion 5a of the rail bracket 5 by welding.
  • the vertical portion 9b is fixed to the inner wall 1a of the hoistway 1 with anchor bolts (not shown).
  • the eye plate 8 is provided between the guide rails 4 and vibrates due to the steps between the guide rails 4 when the car 2 and the counterweight 3 are moved up and down. Suppress.
  • the guide rail fixing device 100 will be described with reference to FIGS.
  • the beam mounting method will be described as an example, but the same applies to the wall mounting method.
  • FIG. 4 is a schematic view of the guide rail 4 and the guide rail fixing device 100 for fixing the guide rail 4 to the hoistway 1 in this embodiment.
  • FIG. 5 is a front view of FIG.
  • FIG. 6 is a side view of FIG.
  • the guide rail 4 includes a base portion 4a and a sliding portion 4b extending in the vertical direction from the center position of the base portion 4a, and has a T-shaped cross section.
  • the base 4a is arrange
  • the sliding part 4b is arrange
  • the guide rail 4 is fixed in the hoistway 1 by a guide rail fixing device 100 configured as follows.
  • the guide rail fixing device 100 includes a rail bracket 5, a rail clip 10, a bolt 11, a nut 12, and a spring seat 13.
  • the vertical portion 5 b of the rail bracket 5 abuts on the bottom surface of the base portion 4 a of the guide rail 4 facing the inner wall 1 a side of the hoistway 1.
  • the rail clip 10 abuts on both end portions in the width direction of the base portion 4a of the guide rail 4 respectively.
  • the bolt 11, the nut 12, and the spring seat 13 are configured so that the rail clip 10 and the rail bracket 5 are sandwiched between the rail clip 10 and the rail bracket 5 and the end portion in the width direction of the base portion 4a.
  • the vertical portion 5b of the rail bracket 5 and the rail clip 10 each have a bolt hole (not shown), and the bolt 11 is inserted through the bolt hole at the time of fastening.
  • FIG. 7 is a schematic view of a guide rail fixing device 100 for fixing the guide rail 4 arranged at the lowermost part in this embodiment.
  • FIG. 8 is a front view of FIG.
  • FIG. 9 is a side view of FIG.
  • the guide rail fixing device 100 includes a rail bracket 5, a rail clip 10, a bolt 11, a nut 12, a spring seat 13, and a friction plate 14.
  • the friction plate 14 has a rectangular shape, and the long side dimension is longer than the width dimension of the base portion 4 a of the guide rail 4.
  • the friction plate 14 comes into contact with the bottom surface of the base 4 a of the guide rail 4 facing the inner wall 1 a side of the hoistway 1. Further, the lower end of the friction plate 14 comes into contact with the upper end of the vertical portion 5 b of the rail bracket 5.
  • the friction plate 14 is fastened to the rail clip 10 by the bolt 11, the nut 12, and the spring seat 13 in a state where the end portion in the width direction of the base portion 4 a of the guide rail 4 is sandwiched with the rail clip 10.
  • the friction plate 14 and the rail clip 10 each have a bolt hole (not shown), and the bolt 11 is inserted through the bolt hole at the time of fastening.
  • the rail clip 10 that holds the base portion 4 a of the guide rail 4 with the friction plate 14 is the same as the rail clip 10 that holds the base portion 4 a with the rail bracket 5.
  • the bolt 11, nut 12, and spring seat 13 that fasten the rail clip 10 and the friction plate 14 are the same as the bolt 11, nut 12, and spring seat 13 that fasten the rail clip 10 and the rail bracket 5, respectively.
  • the guide rail 4 When a vertically downward force is applied to the guide rail 4 fixed by the guide rail fixing device 100 in this embodiment, the guide rail 4 is located above the rail bracket 5 and is a friction plate that contacts the upper end of the vertical portion 5b. 14 is held by the frictional force with the. For this reason, it is possible to prevent the guide rail 4 from falling.
  • the friction plate 14 is preferably formed of a plate material having a higher coefficient of friction than the rail bracket.
  • the friction plate 14 is preferably made of the same material as that of the rail bracket 5, and is provided with irregularities on the surface of the guide rail 4 that makes contact with the base portion 4 a so as to increase the coefficient of friction in the horizontal direction. Thereby, the frictional force between the guide rail 4 and the guide rail fixing device 100 can be further improved.
  • the friction plate 14 may be provided not only in the guide rail fixing device 100 that fixes the lowermost guide rail 4 but also in all the guide rail fixing devices 100, or in any number of guide rail fixing devices 100. May be. By adjusting the number of installed friction plates 14, the frictional force between the guide rail 4 and the guide rail fixing device 100 can be adjusted.
  • the guide rail fixing device 100 in this embodiment is provided with the friction plate 14 so as to contact the upper end of the vertical portion 5b above the rail bracket 5 that fixes the lowermost guide rail 4. Since the frictional force with the guide rail 4 is improved, the guide rail 4 can be prevented from falling without increasing the number of rail brackets 5 installed.
  • the friction coefficient of the surface of the friction plate 14 that contacts the bottom surface of the base portion 4a of the guide rail 4 is higher than the surface of the rail bracket 5 that contacts the bottom surface.
  • the guide rail 4 can be prevented from dropping without increasing the number of rail brackets 5 installed.
  • the guide rail fixing device 100 in this embodiment can improve the frictional force with the guide rail 4 without increasing the number of installation of the rail brackets 5, it is fixed to the inner wall 1a of the hoistway 1. It is not necessary to increase the number of beams 7 or wall side brackets 9 installed, and the guide rail 4 can be prevented from dropping without increasing the installation cost.
  • the guide rail fixing device 100 includes parts of the same type as the rail clip 10, the bolt 11, the nut 12, and the spring seat 13 that are used when the guide rail 4 is fixed in the hoistway 1. Since the frictional force with the guide rail 4 can be improved, the increase in the manufacturing cost and the installation cost due to the increase in the types of components can be suppressed.
  • the guide rail fixing device 100 in this embodiment is a rail that abuts against the bottom surface of the base 4a of the guide rail 4 arranged at the lowermost of the plurality of guide rails 4 arranged in a line in the hoistway 1 of the elevator.
  • the bracket 5 and the rail clip 10 which clamps the base part 4a of the guide rail 4 with the rail bracket 5 are provided.
  • the guide rail fixing device 100 abuts on the bottom surface of the base portion 4a of the guide rail 4 disposed at the lowermost portion and the upper end of the rail bracket 5, and the base portion 4a of the guide rail 4 disposed at the lowermost portion with the rail clip 10. And a friction plate 14 for sandwiching.
  • the guide rail fixing device 100 in this embodiment improves the frictional force with the guide rail 4 without increasing the number of beams 7 or wall-side brackets 9 fixed to the inner wall 1a of the hoistway 1. Can do.
  • the friction plate 14 has a friction coefficient of the surface abutting against the bottom surface of the base portion 4 a of the guide rail 4 of the base portion 4 a of the guide rail 4 of the rail bracket 5. It is higher than the surface that contacts the bottom surface. Thereby, the guide rail fixing device 100 can further improve the frictional force with the guide rail 4.
  • the rail clip 10 that clamps the base portion 4a of the guide rail 4 arranged at the lowermost portion with the friction plate 14 is connected to the rail rail 5 with the guide rail 4. It is the same kind as the rail clip 10 which clamps the base 4a.
  • the guide rail fixing apparatus 100 can suppress the increase in the kind of components, and can suppress the increase in manufacturing cost and installation cost.
  • the rail bracket 5 abuts on the bottom surface of the base portion 4a of each of the plurality of guide rails 4. Further, the rail clip 10 sandwiches the base portions 4 a of the plurality of guide rails 4 with the rail bracket 5. Further, the friction plate 14 is also provided on the guide rail 4 other than the guide rail 4 arranged at the lowermost part, and a rail bracket that contacts the bottom surface of the base portion 4a of the guide rail 4 and the bottom surface of the base portion 4a of the guide rail 4. 5 is in contact with the upper end of 5 and the base 4a of the guide rail 4 is clamped by the rail clip 10. Thereby, the guide rail fixing device 100 can adjust the frictional force with the guide rail 4 by changing the number of installed friction plates 14.
  • the friction plate 14 in this embodiment can also be installed on the existing guide rail 4. Thereby, for example, when the frictional force between the guide rail 4 and the guide rail fixing device 100 decreases with time, the frictional force can be improved by providing the necessary number of friction plates 14. It is not necessary to replace parts of the rail fixing device 100.

Abstract

昇降路(1)の内壁(1a)に取り付けるブラケット数を増加させることなく、ガイドレール(4)との摩擦力を向上させるガイドレール固定装置(100)を得る。 エレベーターの昇降路(1)内において列に並べられる複数のガイドレール(4)のうち最下部に配置されるガイドレール(4)の基部(4a)の底面に当接するレールブラケット(5)と、前記レールブラケット(5)とで前記ガイドレール(4)の基部(4a)を挟持するレールクリップ(10)と、前記最下部に配置されるガイドレール(4)の基部(4a)の底面及び前記レールブラケット(5)の上端に当接し、前記レールクリップ(10)とで前記最下部に配置されるガイドレール(4)の基部(4a)を挟持する摩擦板(14)とを備える。

Description

ガイドレール固定装置
 この発明は、エレベーター用のガイドレール固定装置に関する。
 エレベーターの昇降路内には、かご及びつり合いおもりの昇降をそれぞれ案内する一対のガイドレールが、かご及びつり合いおもりの昇降範囲の全長に渡り設置される。このガイドレールは、ガイドレール固定装置であるレールクリップ、レールブラケット、ボルト、ナット及びバネ座によって、昇降路内壁に取り付けられた梁または壁側ブラケットに固定されている(例えば、特許文献1、特許文献2)。
 また、高層建物に設けられる場合にあっては、建物の鉄骨の熱収縮、コンクリートのクリープ減少による収縮、あるいは建物への空調機等の設置による重量増加のための層間変位及び不同沈下等が発生すると、ガイドレールが湾曲したり座屈変形したりする恐れがある。そこで、ガイドレールの最下端と昇降路底部との間に隙間を設けてガイドレールを固定し、ガイドレールが変形するのを防止するガイドレール固定装置が知られている(例えば、特許文献3)。
特開平6-239559号公報(第2頁、第1図) 特開平6-255941号公報(第5頁、第2図) 実開平3-72578号公報(第6頁、第5図)
 従来のガイドレール固定装置にあっては、ガイドレールまたはレールクリップの設計誤差が生じた場合、ガイドレールとガイドレール固定装置との間に十分な摩擦力を得られないことがある。この場合、地震発生時または強風が吹いた時にエレベーターを備える建物が大きく揺れると、ガイドレールが落下する恐れがあった。
 ガイドレール固定装置を増加しガイドレールの固定箇所を増加すれば、ガイドレールとガイドレール固定装置との間の摩擦力を向上させることができる。しかしながら、ガイドレール固定装置は、昇降路内壁に取り付けられた梁または壁側ブラケットに固定されており、ガイドレールの固定箇所を増加する場合、昇降路内壁に取り付ける梁または壁側ブラケットの数が増加する等、建物での据付コストが増加するという問題があった。
 この発明は、前述の課題を解決するためになされたものであり、昇降路内壁に取り付ける梁または壁側ブラケットの数を増加させることなく、ガイドレールとの摩擦力を向上させるガイドレール固定装置を得る。
 この発明に係るガイドレール固定装置は、エレベーターの昇降路内において列に並べられる複数のガイドレールのうち最下部に配置されるガイドレールの基部の底面に当接するレールブラケットと、前記レールブラケットとで前記ガイドレールの基部を挟持するレールクリップと、前記最下部に配置されるガイドレールの基部の底面及び前記レールブラケットの上端に当接し、前記レールクリップとで前記最下部に配置されるガイドレールの基部を挟持する摩擦板とを備える。
 この発明によれば、昇降路内壁に取り付ける梁または壁側ブラケットの数を増加させることなく、ガイドレールとガイドレール固定装置との摩擦力を向上させることができる。
エレベーターの昇降路の平面断面図である。 梁取付方法によるガイドレールの取付方法を示す図である。 壁取付方法によるガイドレールの取付方法を示す図である。 この発明の実施の形態1を示すガイドレール及びガイドレールを昇降路に固定するガイドレール固定装置の概略図である。 図4に示すガイドレール固定装置の正面図である。 図4に示すガイドレール固定装置の側面図である。 この実施の形態1を示す最下部に配置されるガイドレールを固定するガイドレール固定装置の概略図である。 図7に示すガイドレール固定装置の正面図である。 図7に示すガイドレール固定装置の側面図である。
実施の形態1.
 図1は、エレベーターの昇降路1の平面断面図である。昇降路1内において、かご2及び釣り合いおもり3は、ロープ(図示せず)に釣支されている。ガイドレール4は、対になっており、かご2及び釣り合いおもり3をそれぞれ挟み込んで、かご2及び釣り合いおもり3の昇降範囲の全長に渡り設置される。なお、ガイドレール4は、それぞれ複数のガイドレール4が、かご2及び釣り合いおもり3の昇降範囲の全長に渡り、列に並べて固定される。
 図2は、梁取付方法によるガイドレール4の取付方法を示す図である。梁取付方法において、各ガイドレール4は、レールブラケット5及びベースプレート6を介して梁7に固定される。レールブラケット5は、水平部5aと水平部5aから連続して設けられ鉛直上方に延びる垂直部5bとで断面形状がL字型を成す鋼材である。垂直部5bは、ガイドレール4に当接する。ベースプレート6は、レールブラケット5の水平部5aの下面に溶接固定される板材である。梁7は、例えばH形鋼であり、フランジ部7aが水平になるように、昇降路1の内壁1aにおいて垂直方向に互いに離間して複数設けられる。各梁7において上側に位置するフランジ部7aの上面は、ベースプレート6の下面に溶接固定される。
 ガイドレール4間には目板8が設けられ、かご2及び釣り合いおもり3が昇降する際に、ガイドレール4間の段差により振動するのを抑制する。
 図3は、壁取付方法によるガイドレール4の取付方法を示す図である。壁取付方法において、各ガイドレール4は、レールブラケット5及び壁側ブラケット9を介して昇降路1の内壁1aに固定される。レールブラケット5は、梁取付方法で使用するレールブラケット5と同様であり、垂直部5bは、ガイドレール4に当接する。壁側ブラケット9は、水平部9aと水平部9aから連続して設けられ鉛直下方に延びる垂直部9bとで断面形状がL字型を成す鋼材である。水平部9aは、レールブラケット5の水平部5aの下面に溶接固定される。垂直部9bは、昇降路1の内壁1aにアンカーボルト(図示せず)で固定される。
 壁取付方法にあっても、梁取付方法と同様に、ガイドレール4間には目板8が設けられ、かご2及び釣り合いおもり3が昇降する際に、ガイドレール4間の段差により振動するのを抑制する。
 次に図4から図9に基づいて、この実施の形態におけるガイドレール固定装置100を説明する。以下、梁取付方法を例に説明するが、壁取付方法にあっても同様である。
 図4は、この実施の形態におけるガイドレール4及びガイドレール4を昇降路1に固定するガイドレール固定装置100の概略図である。図5は、図4の正面図である。図6は、図4の側面図である。
 ガイドレール4は、基部4aと、基部4aの中央位置から垂直方向に延びる摺動部4bとを備え、断面形状がT字型を成している。ガイドレール4は、基部4aが昇降路1の内壁1a側に、摺動部4bがかご2または釣り合いおもり3側に配置される。ガイドレール4は、以下で構成されるガイドレール固定装置100により昇降路1内に固定される。
 図4から図6において、ガイドレール固定装置100は、レールブラケット5、レールクリップ10、ボルト11、ナット12、バネ座13で構成される。レールブラケット5の垂直部5bは、ガイドレール4の基部4aの昇降路1の内壁1a側を向く底面に当接する。レールクリップ10は、ガイドレール4の基部4aの幅方向の両端部にそれぞれ当接する。ボルト11、ナット12、バネ座13は、ガイドレール4を固定する際に、レールクリップ10とレールブラケット5とで基部4aの幅方向の端部を挟持した状態でレールクリップ10とレールブラケット5とを締結するために使われる。レールブラケット5の垂直部5b及びレールクリップ10は、それぞれボルト穴(図示せず)を有しており、締結時にボルト11は、当該ボルト穴を挿通する。
 図7は、この実施の形態における最下部に配置されるガイドレール4を固定するガイドレール固定装置100の概略図である。図8は、図7の正面図である。図9は、図7の側面図である。
 図7から図9において、ガイドレール固定装置100は、レールブラケット5、レールクリップ10、ボルト11、ナット12、バネ座13、及び摩擦板14で構成される。摩擦板14は、矩形を成し、長辺寸法は、ガイドレール4の基部4aの幅寸法よりも長い。摩擦板14は、ガイドレール4の基部4aの昇降路1の内壁1a側を向く底面に当接する。また、摩擦板14の下端は、レールブラケット5の垂直部5bの上端に当接する。摩擦板14は、レールクリップ10とでガイドレール4の基部4aの幅方向の端部を挟持した状態で、ボルト11、ナット12、バネ座13によりレールクリップ10と締結される。摩擦板14及びレールクリップ10は、それぞれボルト穴(図示せず)を有しており、締結時にボルト11は、当該ボルト穴を挿通する。ここで、摩擦板14とでガイドレール4の基部4aを挟持するレールクリップ10は、レールブラケット5とで基部4aを挟持するレールクリップ10と同様である。また、レールクリップ10と摩擦板14とを締結するボルト11、ナット12、バネ座13は、レールクリップ10とレールブラケット5とを締結するボルト11、ナット12、バネ座13とそれぞれ同様である。
 この実施の形態におけるガイドレール固定装置100により固定されたガイドレール4に鉛直下向きの力が作用した場合、ガイドレール4は、レールブラケット5の上方に位置し垂直部5bの上端に当接する摩擦板14との摩擦力により保持される。このため、ガイドレール4が落下するのを防げる。
 ここで、摩擦板14は、レールブラケットよりも摩擦係数の高い板材で形成されるのが好ましい。もしくは、摩擦板14は、レールブラケット5と同じ材質から成り、ガイドレール4の基部4aと当接する面に凹凸を設け、水平方向の摩擦係数を高める構成とするのが好ましい。これにより、ガイドレール4とガイドレール固定装置100との摩擦力をより向上させることができる。
 なお、摩擦板14は、最下部のガイドレール4を固定するガイドレール固定装置100だけでなく、すべてのガイドレール固定装置100に設けても良いし、任意の数のガイドレール固定装置100に設けても良い。摩擦板14の設置枚数を調整することにより、ガイドレール4とガイドレール固定装置100との摩擦力を調整することができる。
 以上述べたように、この実施の形態におけるガイドレール固定装置100は、摩擦板14を、最下部のガイドレール4を固定するレールブラケット5の上方において垂直部5bの上端に当接するように設けることでガイドレール4との摩擦力を向上させているため、レールブラケット5の設置数を増やすことなくガイドレール4の落下を防ぐことができる。
 また、この実施の形態における固定装置100は、摩擦板14のガイドレール4の基部4aの底面と当接する面の摩擦係数がレールブラケット5の当該底面と当接する面よりも高くなっているので、レールブラケット5の設置数を増やすことなくガイドレール4の落下を防ぐことができる。
 また、この実施の形態におけるガイドレール固定装置100は、レールブラケット5の設置数を増やすことなく、ガイドレール4との摩擦力を向上することができるので、昇降路1の内壁1aに固定される梁7または壁側ブラケット9の設置数を増やす必要がなくなり、据付コストを増加させることなくガイドレール4の落下を防ぐことができる。
 さらに、この実施の形態におけるガイドレール固定装置100は、ガイドレール4を昇降路1内に固定する際に使用されるレールクリップ10、ボルト11、ナット12、及びバネ座13と同一種類の部品を用いてガイドレール4との摩擦力を向上させることができるので、部品の種類増加による製造コスト及び据付コストの増加を抑えることができる。
 また、この実施の形態におけるガイドレール固定装置100は、エレベーターの昇降路1内において列に並べられる複数のガイドレール4のうち最下部に配置されるガイドレール4の基部4aの底面に当接するレールブラケット5と、レールブラケット5とでガイドレール4の基部4aを挟持するレールクリップ10とを備える。さらに、ガイドレール固定装置100は、最下部に配置されるガイドレール4の基部4aの底面及びレールブラケット5の上端に当接し、レールクリップ10とで最下部に配置されるガイドレール4の基部4aを挟持する摩擦板14とを備える。これにより、この実施の形態におけるガイドレール固定装置100は、昇降路1の内壁1aに固定される梁7または壁側ブラケット9の設置数を増やすことなくガイドレール4との摩擦力を向上させることができる。
 また、この実施の形態におけるガイドレール固定装置100にあっては、摩擦板14は、ガイドレール4の基部4aの底面に当接する面の摩擦係数がレールブラケット5の当該ガイドレール4の基部4aの底面に当接する面よりも高い。これにより、ガイドレール固定装置100は、ガイドレール4との摩擦力をより向上させることができる。
 また、この実施の形態におけるガイドレール固定装置100にあっては、摩擦板14とで最下部に配置されるガイドレール4の基部4aを挟持するレールクリップ10は、レールブラケット5とでガイドレール4の基部4aを挟持するレールクリップ10と同一種類である。これにより、ガイドレール固定装置100は、部品の種類の増加を抑えることができ、製造コスト及び据付コストの増加を抑えることができる。
 また、この実施の形態におけるガイドレール固定装置100にあっては、レールブラケット5は、複数のガイドレール4それぞれの基部4aの底面に当接する。また、レールクリップ10は、レールブラケット5とで複数のガイドレール4それぞれの基部4aを挟持する。さらに、摩擦板14は、最下部に配置されるガイドレール4以外のガイドレール4にも設けられ、当該ガイドレール4の基部4aの底面及び当該ガイドレール4の基部4aの底面に当接するレールブラケット5の上端に当接し、レールクリップ10とで当該ガイドレール4の基部4aを挟持する。これにより、ガイドレール固定装置100は、摩擦板14の設置数を変更することにより、ガイドレール4との摩擦力を調整できる。
 なお、この実施の形態における摩擦板14は、既設のガイドレール4に対しても設置できる。これにより、例えば、経年に伴いガイドレール4とガイドレール固定装置100との摩擦力が低下した場合に、必要な数の摩擦板14を設けることにより、摩擦力を向上させることができるので、ガイドレール固定装置100の部品を交換する必要がなくなる。
 1 昇降路、1a 内壁、2 かご、3 釣り合いおもり、4 ガイドレール、4a 基部、4b 摺動部、5 レールブラケット、6 ベースプレート、7 梁、7a フランジ部、8 目板、9 壁側ブラケット、10 レールクリップ、11 ボルト、12 ナット、13 バネ座、14 摩擦板、100 ガイドレール固定装置

Claims (4)

  1.  エレベーターの昇降路内において列に並べられる複数のガイドレールのうち最下部に配置されるガイドレールの基部の底面に当接するレールブラケットと、
     前記レールブラケットとで前記ガイドレールの基部を挟持するレールクリップと、
     前記最下部に配置されるガイドレールの基部の底面及び前記レールブラケットの上端に当接し、前記レールクリップとで前記最下部に配置されるガイドレールの基部を挟持する摩擦板と
    を備えるガイドレール固定装置。
  2.  前記摩擦板は、前記ガイドレールの基部の底面に当接する面の摩擦係数が前記レールブラケットの当該ガイドレールの基部の底面に当接する面よりも高い請求項1に記載のガイドレール固定装置。
  3.  前記摩擦板とで前記最下部に配置されるガイドレールの基部を挟持する前記レールクリップは、前記レールブラケットとで前記ガイドレールの基部を挟持する前記レールクリップと同一種類である請求項1または請求項2に記載のガイドレール固定装置。
  4.  前記レールブラケットは、前記複数のガイドレールそれぞれの基部の底面に当接し、
     前記レールクリップは、前記レールブラケットとで前記複数のガイドレールそれぞれの基部を挟持し、
     前記摩擦板は、前記最下部に配置されるガイドレール以外のガイドレールにも設けられ、当該ガイドレールの基部の底面及び当該ガイドレールの基部の底面に当接する前記レールブラケットの上端に当接し、前記レールクリップとで当該ガイドレールの基部を挟持する請求項1から請求項3のいずれか一項に記載のガイドレール固定装置。
PCT/JP2015/075781 2015-09-11 2015-09-11 ガイドレール固定装置 WO2017042945A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
KR1020187008475A KR102213646B1 (ko) 2015-09-11 2015-09-11 가이드 레일 고정 장치
JP2017538806A JP6452830B2 (ja) 2015-09-11 2015-09-11 ガイドレール固定装置
PCT/JP2015/075781 WO2017042945A1 (ja) 2015-09-11 2015-09-11 ガイドレール固定装置
DE112015006895.3T DE112015006895T5 (de) 2015-09-11 2015-09-11 Führungsschienen-Befestigungsvorrichtung
CN201580082858.XA CN107949533B (zh) 2015-09-11 2015-09-11 导轨固定装置
US15/754,041 US10882718B2 (en) 2015-09-11 2015-09-11 Guide rail fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/075781 WO2017042945A1 (ja) 2015-09-11 2015-09-11 ガイドレール固定装置

Publications (1)

Publication Number Publication Date
WO2017042945A1 true WO2017042945A1 (ja) 2017-03-16

Family

ID=58239316

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/075781 WO2017042945A1 (ja) 2015-09-11 2015-09-11 ガイドレール固定装置

Country Status (6)

Country Link
US (1) US10882718B2 (ja)
JP (1) JP6452830B2 (ja)
KR (1) KR102213646B1 (ja)
CN (1) CN107949533B (ja)
DE (1) DE112015006895T5 (ja)
WO (1) WO2017042945A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017042945A1 (ja) * 2015-09-11 2017-03-16 三菱電機株式会社 ガイドレール固定装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5520708Y2 (ja) * 1974-12-26 1980-05-17
JP2000118909A (ja) * 1998-10-07 2000-04-25 Hitachi Building Systems Co Ltd エレベータガイドレールの補強装置
JP2001171941A (ja) * 1999-12-16 2001-06-26 Mitsubishi Electric Corp エレベータのガイドレール固定装置
JP2003335478A (ja) * 2002-05-17 2003-11-25 Toshiba Elevator Co Ltd レール荷重受けブラケット装置
JP5350062B2 (ja) * 2009-04-24 2013-11-27 株式会社日立製作所 エレベータ装置
JP5646064B2 (ja) * 2012-03-19 2014-12-24 三菱電機株式会社 エレベータ

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53114552A (en) * 1977-02-28 1978-10-06 Fujita Akiyama Machine for producing moulded artcles
JPS5838670U (ja) 1981-09-08 1983-03-14 株式会社東芝 エレベ−タのレ−ル補強ブラケツト
US4577729A (en) * 1984-12-05 1986-03-25 Westinghouse Electric Corp. Guide rail clamping assembly
JPH0372578A (ja) 1989-05-30 1991-03-27 Kansai Paint Co Ltd 缶内面用複層塗膜
JPH0442300Y2 (ja) 1990-11-07 1992-10-06
JPH06239559A (ja) 1993-02-15 1994-08-30 Hitachi Building Syst Eng & Service Co Ltd エレベーター用ガイドレールの取付装置
JPH06255941A (ja) 1993-03-02 1994-09-13 Toshiba Corp 昇降機レール取付け機構および昇降機レールの取付け方法
US6371249B1 (en) * 2000-06-02 2002-04-16 Otis Elevator Company Quick connector apparatus for elevator guide rail section
US6305615B1 (en) * 2000-08-16 2001-10-23 Otis Elevator Company Rail clip
JP4766773B2 (ja) 2001-05-15 2011-09-07 三菱電機株式会社 エレベーターの案内レール装置
EP1414730B1 (de) * 2001-07-30 2006-04-05 Inventio Ag Verfahren und vorrichtung zum befestigen einer führungsschiene
JP3961916B2 (ja) 2002-09-11 2007-08-22 株式会社日立ビルシステム エレベータガイドレールの固定装置
EP1997768A1 (en) * 2006-03-22 2008-12-03 Mitsubishi Denki Kabushiki Kaisha Support device for elevator guide rail
JP5098368B2 (ja) 2007-03-06 2012-12-12 三菱電機株式会社 エレベータ用レールクリップ
FI20090502A (fi) * 2009-12-22 2011-06-23 Kone Corp Hissi, johdekiinnike ja menetelmä
CN104159841B (zh) * 2012-03-09 2016-06-08 株式会社日立制作所 电梯的导轨安装装置
DE102015208288A1 (de) * 2015-05-05 2016-11-24 Thyssenkrupp Ag Lager zum Dämpfen von Schwingungen in Führungsschienen einer Aufzugsanlage
WO2017042945A1 (ja) * 2015-09-11 2017-03-16 三菱電機株式会社 ガイドレール固定装置
KR20180088861A (ko) * 2015-11-30 2018-08-07 오티스 엘리베이터 컴파니 엘리베이터 시스템용 레일 클립
KR102636759B1 (ko) * 2015-12-17 2024-02-14 인벤티오 아게 엘리베이터 레일들을 체결하기 위한 체결 모듈
WO2017103016A1 (de) * 2015-12-17 2017-06-22 Inventio Ag Befestigungseinrichtungen zum befestigen von aufzugsschienen
EP3393955A1 (en) * 2015-12-22 2018-10-31 Inventio AG Elevator guide rail attachment clip
EP3601135B1 (de) * 2017-03-28 2021-05-12 Inventio AG Verfahren zum befestigen einer schiene einer aufzugsanlage in einem aufzugsschacht
EP3575259A1 (en) * 2018-05-29 2019-12-04 KONE Corporation Elevator guide rail mounting arrangement and method for mounting an elevator guide rail
EP3636576A1 (en) * 2018-10-11 2020-04-15 Otis Elevator Company Elevator guide rail support assemblies

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5520708Y2 (ja) * 1974-12-26 1980-05-17
JP2000118909A (ja) * 1998-10-07 2000-04-25 Hitachi Building Systems Co Ltd エレベータガイドレールの補強装置
JP2001171941A (ja) * 1999-12-16 2001-06-26 Mitsubishi Electric Corp エレベータのガイドレール固定装置
JP2003335478A (ja) * 2002-05-17 2003-11-25 Toshiba Elevator Co Ltd レール荷重受けブラケット装置
JP5350062B2 (ja) * 2009-04-24 2013-11-27 株式会社日立製作所 エレベータ装置
JP5646064B2 (ja) * 2012-03-19 2014-12-24 三菱電機株式会社 エレベータ

Also Published As

Publication number Publication date
JPWO2017042945A1 (ja) 2018-01-18
KR20180048785A (ko) 2018-05-10
JP6452830B2 (ja) 2019-01-16
US20180251341A1 (en) 2018-09-06
CN107949533A (zh) 2018-04-20
CN107949533B (zh) 2022-03-25
US10882718B2 (en) 2021-01-05
DE112015006895T5 (de) 2018-05-24
KR102213646B1 (ko) 2021-02-08

Similar Documents

Publication Publication Date Title
JPWO2013140673A1 (ja) エレベータ
WO2017093777A1 (en) Rail clip for elevator systems
JP6452830B2 (ja) ガイドレール固定装置
JP5858751B2 (ja) エレベータのガイドレール支持構造
JP5984661B2 (ja) エレベータ用ガイドレール支持装置
CN112408150B (zh) 导轨支架组件
JP2016147721A (ja) エレベータのガイドレール支持構造
JP5898057B2 (ja) エレベーターの荷重支持ビーム保持装置
JP4279383B2 (ja) エレベータのガイドレール固定装置
JP4320534B2 (ja) 免震エレベータ装置及び免震エレベータのフェッシャープレート
WO2021014528A1 (ja) エレベータの据付方法及び据付治具
JP6716038B2 (ja) エレベータの釣合おもり装置
JP2007062949A (ja) ガイドレール支持構造およびガイドレール支持方法
WO2023053181A1 (ja) エレベーター
JP7400958B2 (ja) エレベーターの防振装置
JP5556595B2 (ja) ガイドレール最下端調整装置
JP6669610B2 (ja) エレベーター及びロープ支持機構
JP6260681B1 (ja) エレベータの揚重用部材の取付構造
JP2023519577A (ja) エレベータシステムのレールビークル用のユニバーサルコンソールおよびピットアセンブリ、レールシステム、ならびにレールシステムを位置合わせするための方法
WO2003043921A1 (fr) Elevateur
JP5900169B2 (ja) エレベーターの支持装置
JP6716092B2 (ja) エレベータ用ガイドレールの保持方法及び構造
JP2024004177A (ja) 制振構造
JP5146076B2 (ja) エレベータの乗場装置
JP2018184276A (ja) 乗客コンベア及び乗客コンベアのリニューアル方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15903607

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017538806

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15754041

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 112015006895

Country of ref document: DE

ENP Entry into the national phase

Ref document number: 20187008475

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 15903607

Country of ref document: EP

Kind code of ref document: A1