WO2015199362A1 - 접합식 플로팅 도크 및 확장 플로팅 도크 - Google Patents
접합식 플로팅 도크 및 확장 플로팅 도크 Download PDFInfo
- Publication number
- WO2015199362A1 WO2015199362A1 PCT/KR2015/005840 KR2015005840W WO2015199362A1 WO 2015199362 A1 WO2015199362 A1 WO 2015199362A1 KR 2015005840 W KR2015005840 W KR 2015005840W WO 2015199362 A1 WO2015199362 A1 WO 2015199362A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- deck
- floating dock
- partition wall
- fixed partition
- bonded
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C1/00—Dry-docking of vessels or flying-boats
- B63C1/02—Floating docks
Definitions
- the present invention relates to bonded floating docks and extended floating docks.
- drying and launching are also performed in a floating dock at sea rather than a land dock.
- the floating dock has a ballast tank therein. When water is injected into the ballast tank, the floating dock sinks, and when water is discharged from the ballast tank, the floating dock floats offshore.
- the floating dock has a long rectangular shape in one direction, so that a square vessel or offshore facility is being built on land or in a separate offshore floating dock.
- Korean Patent Publication No. KR 10-2011-0030754 discloses an expandable floating dock that can accommodate the hull block by mounting the extensions on both sides.
- the extended floating dock of the prior document it is limited to parts and various mechanical devices that can be accommodated in the extended portion, and there is a limit that cannot be utilized for the construction of a ship larger than the size of the floating dock.
- the present invention is to provide a bonded floating dock that can be utilized for the construction of square vessels or offshore installations as well as square vessels or offshore installations.
- the present invention is to provide a bonded floating dock that is coupled to each other through a simple coupling structure to enable the drying of large and square offshore structures / ships.
- a deck on which a construction operation of a marine facility or a ship is carried out a fixed partition wall is installed on one side of the deck, the movement is installed to move between the other side of the deck and the fixed partition wall A hull portion including a partition wall; And a joining part provided on an opposite side to an installation position of the fixed partition wall among side surfaces of the hull part.
- the mobile bulkhead In a single operation, the mobile bulkhead is fixed to the other side of the deck, and when the mobile bulkhead is joined to another floating dock, the mobile bulkhead can be moved to the fixed bulkhead side.
- a wheel may be mounted below the movable partition, and a rail capable of driving the wheel may be installed on an upper surface of the deck.
- Fixing means for restraining movement of the wheel may be detachably installed on the other side of the deck or on the front surface of the fixed partition wall.
- the wheel may be provided with braking means for restraining the rotation of the wheel.
- the joint part may include a plurality of joint bars extending in the vertical direction, arranged side by side in the horizontal direction, and the joint bars may have a columnar shape having a trapezoid or a triangle in cross section.
- a first deck a first fixed partition installed on one side of the first deck, the first side which is movably installed between the other side of the first deck and the first fixed partition.
- a first bonded floating dock including a first hull portion including a movable partition wall and a first joining portion provided on an opposite side to an installation position of the first fixed partition wall of the side of the first hull portion;
- a second joining floating dock including a second joining part provided on an opposite side to the installation position of the second fixed partition wall of the side of the second hull part, wherein the first joining part and the second joining part are engaged with each other. And the first bonded floating dock and the second bonded floating dock are joined to each other, and the first movable partition wall and the second movable partition wall are moved to the first fixed partition wall and the second fixed partition wall, respectively, so that the first floating partition dock The deck and the second deck are connected to provide an extended floating dock that forms an extended deck.
- a first fixing groove and a second fixing groove are formed in the first deck and the second deck, respectively, and fixing means having fixing protrusions at both ends thereof include the first fixing groove and the second fixing groove. It can be fitted in the coupling to prevent the separation of the first bonded floating dock and the second bonded floating dock.
- FIG. 1 is a perspective view of a bonded floating dock according to an embodiment of the present invention.
- FIG. 2 is a perspective view showing a state in which the bonded floating dock is bonded.
- 3 is a plan view of the bonded floating dock.
- FIG. 4 is a view showing a bonding process of the bonded floating dock.
- first and second may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another.
- ... unit a unit that processes at least one function or operation, which may be implemented by hardware or software or a combination of hardware and software.
- FIG. 1 is a perspective view of a bonded floating dock according to an embodiment of the present invention
- Figure 2 is a perspective view showing the bonded floating dock bonded state
- Figure 3 is a plan view of the bonded floating dock
- Figure 4 is a bonding It is a figure which shows the bonding process of a floating type dock.
- first and second bonded floating docks 100a and 100b show first and second bonded floating docks 100a and 100b, first and second hull portions 110a and 110b, first and second decks 120a and 120b, and first and second 2 fixed barrier ribs 130a and 130b, first and second movable bulkheads 140a and 140b, first and second rails 125a and 125b, first and second wheels 145a and 145b, first and second 2 junctions 150a, 150b, extended floating dock 200, and extended deck 220 are shown.
- Bonded floating dock according to an embodiment of the present invention is basically used for the construction of rectangular vessels or offshore installations, and can be extended to the deck by joining with other bonded floating dock to expand the deck large square vessel Or it can be used for drying of marine facilities, its use is characterized in that it can be diversified.
- the first bonded floating dock 100a and the second bonded floating dock 100b have the same shape and function, and hereinafter, the first bonded floating dock 100a will be described with reference to the center.
- the first bonded floating dock 100a includes a first hull portion 110a and a first bonding portion 150a.
- the first hull part 110a is a part for performing a construction of a ship or an offshore facility, and includes a first deck 120a and a first deck 120a in which many blocks necessary for the construction of a ship are placed and perform a construction operation.
- the first fixed partition wall 130a is installed at one side of the first deck 120a, and the first movable partition wall 140a is installed to be movable between the first fixed partition wall 130a.
- ballast tanks in which seawater flows in or out is disposed inside the first hull portion 110a, particularly the first deck 120a, of the first bonded floating dock 100a.
- the first hull portion 110a When the seawater is injected into the ballast tank, the first hull portion 110a is submerged under the sea level, and when the seawater is discharged from the ballast tank, the first hull portion 110a is floated above the sea level.
- the first hull portion 110a has a yaw-shaped cross section, and the center of the ship or offshore installation The first deck 120a in which the drying operation is performed is formed.
- the drying operation is performed by joining with the second bonded floating dock 100b.
- the deck on which this is carried out is extended so that a smooth drying operation can be performed.
- a first joining portion 150a is provided on a side of the first hull portion 110a of the first joined floating dock 100a.
- a plurality of joining bars extending in the vertical direction on the lower side of the first deck 120a are arranged side by side in the horizontal direction in the first joining part 150a.
- the joining bar may have a shape and arrangement that can be engaged when viewed from above for joining the second joining floating dock 100b to the joining bar.
- the case has a rectangular pillar shape having a trapezoidal cross section, but according to the embodiment, it may be a triangular pillar shape.
- first junction portion 150a of the first bonded floating dock 100a and the second junction portion 150b of the second bonded floating dock 100b meet each other and are coupled to each other, the first junction portion 150a and the first junction portion 150a
- the two joints 150b may be engaged to be firmly coupled without a gap.
- the surface of the bonding bar may be attached with a cushioning means (not shown) to mitigate the impact during the bonding process and to prevent damage.
- the first moving partition 140a is installed to be movable on the upper side of the lower side on which the first junction part 150a is provided, and the first fixed partition 130a is installed on the opposite side.
- the first moving partition 140a is provided with a first wheel 145a at a lower portion thereof, such that the first wheel 145a is disposed along the first rail 125a provided at the upper surface of the first deck 120a. By traveling, the first movable partition wall 140a may be moved toward the first fixed partition wall 130a.
- the first movable partition 140a When the first bonded floating dock 100a performs a drying operation alone, the first movable partition 140a is fixed to an upper side of the first deck 120a in which the first joining part 150a is provided, and thus the first hull part
- the cross section of the 110a has a yaw shape, and in the expanded floating dock 200 in which two bonded floating docks 100a and 100b are coupled, the first movable partition wall 140a and the second movement are provided.
- the partition wall 140b may move toward the first fixed partition wall 130a and the second fixed partition wall 130b, respectively, so that the expansion deck 220 may be formed in the expansion floating dock 200.
- Fixing means capable of fixing the first movable partition wall 140a to a side portion of the upper surface of the first deck 120a provided with the first junction part 150a or the front part of the first fixed partition wall 130a is provided. It is provided to be able to move or fix the first moving partition (140a) as needed.
- the fixing means for example, there may be a fixed neck which is detachably installed before and after the moving direction of the first wheel 145a and restrains the movement of the first wheel 145a.
- the first wheel 145a of the first moving partition 140a itself is provided with braking means (not shown) for restraining the rotation of the first wheel 145a, so that the first moving partition 140a is fixed at a desired position.
- the first bonded floating dock (100a) can be built alone of the rectangular marine installations or ships, a large square offshore installation or ship in the state bonded with the other bonded floating dock (100b) Drying of (1) becomes possible.
- FIG. 4 a bonding process as an expansion floating dock 200, which is a combination, is shown.
- the two bonded floating docks 100a and 100b are positioned so that the bonding portions 150a and 150b face each other (see FIG. 4A).
- the joints 150a and 150b are coupled to each other by moving toward each other (see FIG. 4B).
- the hull is connected to one, but the deck is separated into two.
- the expansion deck 220 is formed to form the large square offshore installation or the vessel 1. It is possible to secure a working space that can be dried.
- ballasting operations of the first bonded floating dock 100a and the second bonded floating dock 100b are performed in conjunction with each other so that the extended deck 220 is horizontal. can do.
- fixing grooves are formed in the first deck 120a and the second deck 120b, respectively, and fixing means (not shown) having fixing protrusions at both ends are both decks 120a and 120b. It is possible to prevent the separation of the first bonded floating dock (100a) and the second bonded floating dock (100b) by fitting into the fixing groove of the.
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (7)
- 갑판과, 상기 갑판의 일 측부에 설치되는 고정격벽과, 상기 갑판의 타 측부와 상기 고정격벽 사이를 이동 가능하게 설치되는 이동격벽을 포함하는 선체부; 및상기 선체부의 측면 중 상기 고정격벽의 설치위치 반대편에 마련되는 접합부를 포함하는 접합식 플로팅 도크.
- 제1항에 있어서,단독 작업 시에는 상기 이동격벽이 상기 갑판의 타 측부에 고정되며,타 접합식 플로팅 도크와 접합되는 경우에는 상기 이동격벽이 상기 고정격벽 측으로 이동되는 접합식 플로팅 도크.
- 제1항에 있어서,상기 이동격벽의 하부에는 휠이 장착되어 있으며,상기 갑판의 상부면에는 상기 휠이 주행 가능한 레일이 설치되는 접합식 플로팅 도크.
- 제3항에 있어서,상기 갑판의 타 측부 혹은 상기 고정격벽의 전면부에 상기 휠의 이동을 구속하는 고정수단이 설치되는 접합식 플로팅 도크.
- 제1항에 있어서,상기 접합부는 상기 상하 방향으로 길게 연장된 복수개의 접합 바가 수평 방향으로 나란히 배열되고,상기 접합 바는 단면이 사다리꼴 혹은 삼각형인 기둥 형상으로 형성되는 접합식 플로팅 도크.
- 제1 갑판, 상기 제1 갑판의 일 측부에 설치되는 제1 고정격벽, 상기 제1 갑판의 타 측부와 상기 제1 고정격벽 사이를 이동 가능하게 설치되는 제1 이동격벽을 포함하는 제1 선체부와, 상기 제1 선체부의 측면 중 상기 제1 고정격벽의 설치위치 반대편에 마련되는 제1 접합부를 포함하는 제1 접합식 플로팅 도크; 및제2 갑판, 상기 제2 갑판의 일 측부에 설치되는 제2 고정격벽, 상기 제2 갑판의 타 측부와 상기 제2 고정격벽 사이를 이동 가능하게 설치되는 제2 이동격벽을 포함하는 제2 선체부와, 상기 제2 선체부의 측면 중 상기 제2 고정격벽의 설치위치 반대편에 마련되는 제2 접합부를 포함하는 제2 접합식 플로팅 도크를 포함하되,상기 제1 접합부와 상기 제2 접합부가 서로 치합되어 상기 제1 접합식 플로팅 도크와 상기 제2 접합식 플로팅 도크가 접합되고, 상기 제1 이동격벽과 상기 제2 이동격벽이 각각 상기 제1 고정격벽과 상기 제2 고정격벽으로 이동되어 상기 제1 갑판과 상기 제2 갑판이 연결됨으로써 확장 갑판을 형성하는 확장 플로팅 도크.
- 제6항에 있어서,상기 제1 갑판과 상기 제2 갑판에는 각각 제1 고정용 홈과 제2 고정용 홈이 형성되고,양 단부에 고정돌기를 구비하는 고정수단이 상기 제1 고정용 홈과 상기 제2 고정용 홈에 끼움 결합함으로써, 상기 제1 접합식 플로팅 도크와 상기 제2 접합식 플로팅 도크의 분리를 방지하는 확장 플로팅 도크.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016575322A JP6379229B2 (ja) | 2014-06-24 | 2015-06-10 | 接合式フローティングドックおよび拡張フローティングドック |
SG11201610841QA SG11201610841QA (en) | 2014-06-24 | 2015-06-10 | Junction type floating dock and extended floating dock |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2014-0077008 | 2014-06-24 | ||
KR1020140077008A KR101617190B1 (ko) | 2014-06-24 | 2014-06-24 | 접합식 플로팅 도크 및 확장 플로팅 도크 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2015199362A1 true WO2015199362A1 (ko) | 2015-12-30 |
Family
ID=54938396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2015/005840 WO2015199362A1 (ko) | 2014-06-24 | 2015-06-10 | 접합식 플로팅 도크 및 확장 플로팅 도크 |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP6379229B2 (ko) |
KR (1) | KR101617190B1 (ko) |
SG (1) | SG11201610841QA (ko) |
WO (1) | WO2015199362A1 (ko) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108327469A (zh) * | 2018-03-23 | 2018-07-27 | 王宗慧 | 一种可水陆两用的移动作业平台 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2744413C2 (ru) * | 2019-05-13 | 2021-03-09 | Федеральное государственное казенное военное образовательное учреждение высшего образования "Военный учебно-научный центр Военно-Морского Флота "Военно-морская академия им. Адмирала Флота Советского Союза Н.Г. Кузнецова" | Плавучий док |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090017001A (ko) * | 2007-08-13 | 2009-02-18 | 주식회사 씨포트 | 조립식 도크의 연결장치 |
KR101058393B1 (ko) * | 2011-06-21 | 2011-08-22 | 김종군 | 도크 겸용 작업선 |
KR20130049598A (ko) * | 2011-11-04 | 2013-05-14 | 대우조선해양 주식회사 | 드라이 도크 내 부분 진수를 위한 장치와 그 방법 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5123994A (ja) * | 1974-08-20 | 1976-02-26 | Kawasaki Heavy Ind Ltd | Furooteingudotsuku |
JPS5839277Y2 (ja) * | 1978-09-08 | 1983-09-05 | 日立造船株式会社 | 浮体構造物の連結係止装置 |
JPS6018481A (ja) * | 1983-07-08 | 1985-01-30 | Hitachi Zosen Corp | 2隻の既存タンカから浮ドツクを建造する方法 |
JPS61183295U (ko) * | 1985-05-09 | 1986-11-15 | ||
JPH03220086A (ja) * | 1990-01-25 | 1991-09-27 | Mitsubishi Heavy Ind Ltd | コンテナー甲板積み装置 |
JP4195559B2 (ja) * | 2001-12-28 | 2008-12-10 | 三菱重工業株式会社 | 複合浮体システム、及び、浮体要素間の連結方法 |
US8176868B2 (en) * | 2006-01-18 | 2012-05-15 | Lei Han | System and method for connecting marine bodies |
US20110030754A1 (en) | 2009-08-06 | 2011-02-10 | Laird Technologies, Inc. | Thermoelectric modules and related methods |
-
2014
- 2014-06-24 KR KR1020140077008A patent/KR101617190B1/ko active IP Right Grant
-
2015
- 2015-06-10 JP JP2016575322A patent/JP6379229B2/ja not_active Expired - Fee Related
- 2015-06-10 WO PCT/KR2015/005840 patent/WO2015199362A1/ko active Application Filing
- 2015-06-10 SG SG11201610841QA patent/SG11201610841QA/en unknown
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090017001A (ko) * | 2007-08-13 | 2009-02-18 | 주식회사 씨포트 | 조립식 도크의 연결장치 |
KR101058393B1 (ko) * | 2011-06-21 | 2011-08-22 | 김종군 | 도크 겸용 작업선 |
KR20130049598A (ko) * | 2011-11-04 | 2013-05-14 | 대우조선해양 주식회사 | 드라이 도크 내 부분 진수를 위한 장치와 그 방법 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108327469A (zh) * | 2018-03-23 | 2018-07-27 | 王宗慧 | 一种可水陆两用的移动作业平台 |
Also Published As
Publication number | Publication date |
---|---|
KR20160000475A (ko) | 2016-01-05 |
KR101617190B1 (ko) | 2016-05-19 |
JP6379229B2 (ja) | 2018-08-22 |
JP2017520454A (ja) | 2017-07-27 |
SG11201610841QA (en) | 2017-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011136449A1 (ko) | 유조선의 화물창 구조 | |
JPS6285756A (ja) | 双胴船 | |
WO2020141797A1 (ko) | 해상 구조물용 부력체 | |
WO2015199362A1 (ko) | 접합식 플로팅 도크 및 확장 플로팅 도크 | |
WO2017159999A2 (ko) | 보이드 스페이스를 구비한 선박 화물창 | |
KR20030087995A (ko) | 양현하역용 하역장치 | |
US20080196655A1 (en) | Vessels | |
WO2015068885A1 (ko) | 롤링을 방지하는 복합 다기능 피이 부잔교 | |
KR100914385B1 (ko) | 대형블럭의 플로팅도크 탑재방법 및 이를 이용한해상건조공법 | |
KR101785080B1 (ko) | 부유식 해양구조물용 계류장치 | |
CN108455460B (zh) | 一种潜艇水上检修平台 | |
RU2224680C1 (ru) | Способ ремонта плавучей полупогружной буровой платформы | |
KR100827462B1 (ko) | 이동식 플로팅 안벽 | |
CN102963509A (zh) | 30万干船坞并联建造船只出坞的牵引方法 | |
WO2011078420A1 (ko) | 부유식 하이브리드 이동항구 | |
CN113386918A (zh) | 一种深水半潜式生产平台下浮体及其与组块的合龙方法 | |
WO2010074493A2 (ko) | 부유식 하이브리드 이동항구 | |
Sablok et al. | Disconnectable Concrete Spar FPSO | |
US6591773B1 (en) | Protective fendering system for off-shore cargo transferring surface ships | |
WO2011059134A1 (ko) | 모바일 택시 견인 트레인 | |
KR20150008271A (ko) | 부력 장치 | |
US3010418A (en) | Marine pipeline installation | |
JPH0692287A (ja) | ポンツーン進水方法 | |
JP6701487B2 (ja) | 揚陸船、揚陸船の建造方法 | |
KR200312005Y1 (ko) | 부두의 선박 종접안시설 구조 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15812702 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2016575322 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 10/05/2017) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 15812702 Country of ref document: EP Kind code of ref document: A1 |