WO2015193933A1 - 熱延工場巻取り設備のロール - Google Patents

熱延工場巻取り設備のロール Download PDF

Info

Publication number
WO2015193933A1
WO2015193933A1 PCT/JP2014/003307 JP2014003307W WO2015193933A1 WO 2015193933 A1 WO2015193933 A1 WO 2015193933A1 JP 2014003307 W JP2014003307 W JP 2014003307W WO 2015193933 A1 WO2015193933 A1 WO 2015193933A1
Authority
WO
WIPO (PCT)
Prior art keywords
layer
roll
hot rolling
less
hardness
Prior art date
Application number
PCT/JP2014/003307
Other languages
English (en)
French (fr)
Inventor
司城 浩一
Original Assignee
日鉄住金ハード株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日鉄住金ハード株式会社 filed Critical 日鉄住金ハード株式会社
Priority to JP2016528656A priority Critical patent/JP6433496B2/ja
Priority to PCT/JP2014/003307 priority patent/WO2015193933A1/ja
Priority to US15/035,124 priority patent/US9962748B2/en
Priority to KR1020167013159A priority patent/KR101951810B1/ko
Priority to TW103123607A priority patent/TW201600187A/zh
Publication of WO2015193933A1 publication Critical patent/WO2015193933A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C47/00Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C47/00Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
    • B21C47/02Winding-up or coiling
    • B21C47/04Winding-up or coiling on or in reels or drums, without using a moving guide
    • B21C47/06Winding-up or coiling on or in reels or drums, without using a moving guide with loaded rollers, bolts, or equivalent means holding the material on the reel or drum
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C47/00Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
    • B21C47/24Transferring coils to or from winding apparatus or to or from operative position therein; Preventing uncoiling during transfer
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/22Ferrous alloys, e.g. steel alloys containing chromium with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/24Ferrous alloys, e.g. steel alloys containing chromium with vanadium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/28Ferrous alloys, e.g. steel alloys containing chromium with titanium or zirconium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/30Ferrous alloys, e.g. steel alloys containing chromium with cobalt
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C4/00Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge
    • C23C4/02Pretreatment of the material to be coated, e.g. for coating on selected surface areas
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C4/00Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge
    • C23C4/04Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge characterised by the coating material
    • C23C4/06Metallic material
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C4/00Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge
    • C23C4/04Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge characterised by the coating material
    • C23C4/06Metallic material
    • C23C4/067Metallic material containing free particles of non-metal elements, e.g. carbon, silicon, boron, phosphorus or arsenic
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C13/00Rolls, drums, discs, or the like; Bearings or mountings therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • B21B2001/225Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length by hot-rolling
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese

Definitions

  • the present invention relates to a roll of a hot rolling factory winding equipment, and particularly to a composition of a coating layer coated on the roll surface.
  • Patent Document 1 is mass%, C: 0.15%, Si: 0.40%, Mn: 1.80%, Cr: 3.0%, Mo: 2.0%, V: 0.80% , Ni: 2.0%, Co: 1.0%, the underlaying layer which the remainder consists of Fe and unavoidable impurities is disclosed.
  • Patent Document 2 is mass%, C: 0.25%, Si: 0.5%, Mn: 1.2%, Cr: 13.0%, Mo: 0.7%, Ni: 1.5%
  • An underlaying layer is disclosed that includes Fe and the inevitable impurities.
  • Patent Document 3 includes C: 0.26%, Si: 0.32%, Mn: 1.13%, Cr: 13.3%, Mo: 0.74%, Ni: 1.16%, and the balance Disclosed is an underlay layer composed of Fe and inevitable impurities.
  • this invention makes the shore hardness of a foundation overlay layer 60 or more in the roll of a hot rolling factory winding equipment provided with the upper surface self-fluxing alloy sprayed layer and the foundation overlay layer on the roll surface. With the goal.
  • the roll of the hot rolling factory winding equipment is (1) a base overlay layer on the body surface of the roll, and carbide particles dispersed on the base overlay layer. It is a roll of a hot rolling factory winding equipment in which a self-fluxing alloy sprayed layer is formed, and the underlaying layer has a Shore hardness of 60 or more and is in mass%, C: 0.4 to 1.0, It is characterized by comprising an Fe-based built-up layer containing Si: 2.0 or less, Mn: 3.0 or less, Cr: 1.0 to 15.0, and Nb: 0.5 to 5.0.
  • the underlaying layer further contains one or more of Mo, V, Co, W and Ti, and Mo: 0.1-5. 0, V: 0.1 to 3.0, Co: 0.5 to 5.0, W: 0.5 to 5.0, Ti: 0.1 to 1.0.
  • the underlaying layer has a Shore hardness of 60 or more even when the self-fluxing alloy sprayed layer is fused a plurality of times.
  • the Shore hardness of the underlying overlay layer is set to 60 or more. Can do.
  • Fig. 1 is a schematic diagram of the hot rolling factory winding equipment.
  • the hot rolling mill winding equipment is located in the front stage of a plurality of coilers 3 that wind up a high temperature steel sheet 10 of 400 to 900 ° C. that has been rolled to a fixed size by a finish rolling mill and each coiler 3.
  • Upper and lower pinch rolls 1 and 2 are provided.
  • the plurality of coilers 3 and the upper and lower pinch rolls 1 and 2 are provided on the same rolling line.
  • the coiler 3 includes a mandrel 4 that winds up the steel plate 10, and a plurality of wrapper rolls 5 that are arranged around the mandrel 4 and press the steel plate 10 against the mandrel 4.
  • the upper and lower pinch rolls 1 and 2 are configured to change the direction of the steel sheet 10 conveyed from the finish rolling mill to the coiler 3 side obliquely below and wind it around the coiler 3 or to convey the steel sheet 10 on the downstream side as it is.
  • the coiler 3 is wound up.
  • the upper and lower pinch rolls 1 and 2 also have a function of applying a backward tension to the steel plate 10 so that the coiler 3 can stably wind the steel plate 10.
  • An underlaying layer is formed on the surface of the roll body of the pinch rolls 1 and 2 and the wrapper roll 5 described above, and a self-fluxing alloy sprayed layer in which carbide particles are dispersed is formed on the underlaying layer.
  • an iron-type metal can be used for the roll base material used for these pinch rolls 1 and 2 and the wrapper roll 5, that is, a roll base roll of a hot rolling factory.
  • a welding alloy in which 3 to 60 wt% of carbide particles are dispersed in the base metal can be used.
  • the base metal Ni-based metal, Co-based metal, and Fe-based metal can be used. Abrasion resistance is increased by dispersing 3 to 60 wt% of carbide particles. When the amount of carbide particles added is less than 3 wt%, the distribution of carbide particles in the structure tends to be unevenly distributed due to the relationship between the size of the added carbide particles and the minute amount added, and sufficient wear resistance cannot be ensured.
  • the added amount of carbide particles exceeds 60 wt%, the cost is increased due to a decrease in the yield of the carbide, and cracks may be generated in the manufacturing process due to a decrease in the toughness of the coating itself, resulting in a fusing failure of the sprayed layer.
  • Carbides that can be granulated as a spraying material such as one or more of WC, W m C n , Cr 3 C 2 , NbC, VC, MoC, TiC, and SiC, can be used as the carbide dispersed in the welding alloy.
  • a spraying material such as one or more of WC, W m C n , Cr 3 C 2 , NbC, VC, MoC, TiC, and SiC
  • the carbide dispersed in the welding alloy can be used as the carbide dispersed in the welding alloy.
  • the wear resistance, thermal shock resistance, and slip seizure resistance characteristics of each roll can be changed.
  • a material suitable for the conditions of the hot rolling factory winding equipment can be appropriately selected.
  • a self-fluxing alloy sprayed layer is formed by fusing the above-mentioned welding alloy.
  • the fusing process is a process of reheating and remelting the sprayed powder after spraying. Even if this fusing process is performed a plurality of times, the shore hardness (Hs) of the foundation overlay layer of this embodiment does not become less than 60. That is, when fusing the welding alloy of the upper ground, the base overlay layer receives the heat, but in the base overlay layer disclosed in Patent Documents 1 to 3, the base overlay layer is heated multiple times. , Shore hardness (Hs) is greatly reduced.
  • the Shore hardness (Hs) does not decrease to less than 60, so it is recessed in the upper self-fluxing alloy sprayed layer, Cracks are less likely to occur.
  • the underlaying layer of the present embodiment has a Shore hardness of 60 or more, and by mass%, C: 0.4 to 1.0, Si: 2.0 or less, Mn: 3.0 or less, Cr : 1.0 to 15.0, and Nb: 0.5 to 5.0.
  • C 0.4 to 1.0
  • Si 2.0 or less
  • Mn 3.0 or less
  • Cr 1.0 to 15.0
  • Nb 0.5 to 5.0.
  • Si 2.0 or less When Si exceeds 2.0% by mass, cracks occur during welding, and toughness and hardness decrease. In order to deoxidize the weld metal, it is preferable to add at least 0.2 of Si.
  • Mn 3.0 or less If Mn exceeds 3.0 mass%, hardness will fall. In addition, in order to deoxidize a molten metal, it is preferable to add Mn at least 0.5 mass% or more.
  • Cr 1.0-15.0
  • the upper part self-fluxing alloy sprayed layer is fused, Cr is heated to the austenite region by receiving the fusing heat, and cooled after fusing, so that the structure changes from an austenite structure to a martensite structure. Hardness is improved.
  • the Cr content is less than 1% by mass, the above-described effects cannot be obtained.
  • the content of Cr exceeds 15% by mass, the austenite structure increases and the hardness greatly decreases.
  • the Cr content is 8.0% by mass or less. By limiting the Cr content to 8% by mass or less, a decrease in hardness due to an increase in the austenite structure can be sufficiently suppressed.
  • Nb 0.5 to 5.0
  • C is contained in an amount of 0.4% or more
  • cracks are likely to occur.
  • the addition of Nb can suppress the generation of cracks due to the addition of a large amount of C.
  • carbides of NbC are precipitated during the overlay welding, preventing a decrease in hardness due to fusing heat, and preventing coarsening of crystal grains and softening resistance.
  • the Nb content is less than 0.5% by mass, the above-described effects cannot be obtained.
  • the Nb content exceeds 5.0% by mass, the hardness decreases. That is, when Nb exceeds 5%, the amount of decrease in C in the matrix increases, and conversely, the hardness decreases.
  • the underlaying layer may further contain one or more of Mo, V, Co, W, and Ti. These contents are in mass%, Mo: 0.1 to 5.0, V: 0.1 to 3.0, Co: 0.5 to 5.0, W: 0.5 to 5.0, Ti: 0.1 to 1.0 can be set.
  • Mo 0.1 to 5.0 Mo has the effect of increasing the high temperature hardness, but there is no effect if it is less than 0.1%. If added over 5.0%, the effect is saturated, and a remarkable hardness improvement effect cannot be expected.
  • V 0.1 to 3.0 V has the effect of increasing the high temperature hardness, but there is no effect if it is less than 0.1%. If it exceeds 3.0%, the effect is saturated, and a remarkable hardness improvement effect cannot be expected.
  • Co 0.5 to 5.0 Co has the effect of increasing the high temperature hardness, but if it is less than 0.5%, there is no effect. If it exceeds 5.0%, the effect is saturated, and a remarkable hardness improvement effect cannot be expected. Further, since Co is expensive, the upper limit is set to 5.0%.
  • W 0.5-5.0 W has the effect of increasing the high temperature hardness, but there is no effect if it is less than 0.5%. If it exceeds 5.0%, the effect is saturated, and a remarkable hardness improvement effect cannot be expected.
  • Ti 0.1 to 1.0 By adding Ti, carbides composed of TiC are precipitated and crystal grain coarsening is prevented. If it is less than 0.1%, there is no effect. On the other hand, if it exceeds 1.0%, the yield of Ti is remarkably deteriorated.
  • the present invention will be described more specifically with reference to examples.
  • Table 1 the Shore hardness of the rolls having various compositions was examined. After spraying and fusing a predetermined sprayed material, the sprayed coating was removed by turning, and the hardness of the surface of the underlying overlay layer was measured with a Shore hardness meter.
  • the upper sprayed layer was formed by spraying a Ni-based self-fluxing alloy sprayed material in which carbide particles are dispersed by a gas flame spraying method. Moreover, the frequency

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Coating By Spraying Or Casting (AREA)
  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

ロールの胴部表面に下地肉盛層と、該下地肉盛層の上に炭化物粒子を分散した自溶合金溶射層を形成した熱延工場巻取り設備のロールであって、前記下地肉盛層は、ショア硬さが60以上であり、質量%で、C:0.4~1.0、Si:2.0以下、Mn:3.0以下、Cr:1.0~15.0、Nb:0.5~5.0含有するFeベースの肉盛層からなることを特徴とする熱延工場巻取り設備のロール。

Description

熱延工場巻取り設備のロール
 本発明は、熱延工場巻取り設備のロールに関し、特にロール表面に被覆される被覆層の組成に関するものである。
 熱延工場巻取り設備に設けられるロールは、通板材との摺動および通板材突入時の衝撃により摩耗を引き起こすため、ロール表面に下地肉盛層を形成するとともに、この上に上地自溶合金溶射層を形成してロールを保護することが知られている(例えば、特許文献1乃至3参照)。
 特許文献1は、質量%で、C:0.15%、Si:0.40%、Mn:1.80%、Cr:3.0%、Mo:2.0%、V:0.80%、Ni:2.0%、Co:1.0%含み、残部がFe及び不可避的不純物からなる下地肉盛層を開示する。特許文献2は、質量%で、C:0.25%、Si:0.5%、Mn:1.2%、Cr:13.0%、Mo:0.7%、Ni:1.5%含み、残部がFe及び不可避的不純物からなる下地肉盛層を開示する。特許文献3は、C:0.26%、Si:0.32%、Mn:1.13%、Cr:13.3%、Mo:0.74%、Ni:1.16%含み、残部がFe及び不可避的不純物からなる下地肉盛層を開示する。
特開昭55-140710号公報 特開平8-121464号公報 特開平9-67054号公報
 近年、熱延工場巻き取りの通板材質の変化により(例えば、ハイカーボン材、高張力鋼板、厚板材の増加、縞板巻き取りロールへの適用などが考えられる)、下地肉盛層に要求される硬度が以前に増して向上している。しかしながら、上述の各特許文献に記載された下地肉盛層は、ショア硬さが50以上で、60に満たないため、通板時に板材が当接することにより、上地自溶合金溶射層に凹み、割れが発生する。
 また、近年、上地自溶合金溶射層に対して複数回のフュージング処理が実施される場合がある。本発明者等が、上述の各特許文献に記載された上地自溶合金溶射層に複数回のフュージング処理を実施したところ、下地肉盛層の硬さが大幅に低下してしまうことがわかった。
 そこで、本願発明は、上地自溶合金溶射層と、下地肉盛層とをロール表面に備えた熱延工場巻取り設備のロールにおいて、下地肉盛層のショア硬さを60以上にすることを目的とする。
 上記課題を解決するために、本願発明に係る熱延工場巻取り設備のロールは、(1)ロールの胴部表面に下地肉盛層と、該下地肉盛層の上に炭化物粒子を分散した自溶合金溶射層を形成した熱延工場巻取り設備のロールであって、前記下地肉盛層は、ショア硬さが60以上であり、質量%で、C:0.4~1.0、Si:2.0以下、Mn:3.0以下、Cr:1.0~15.0、Nb:0.5~5.0含有するFeベースの肉盛層からなることを特徴とする。
 (2)上記(1)の構成において、前記下地肉盛層は、さらに、Mo、V、Co、W及びTiのうち1種以上を含有し、質量%で、Mo:0.1~5.0、V:0.1~3.0、Co:0.5~5.0、W:0.5~5.0、Ti:0.1~1.0であることを特徴とする。
 (3)上記(1)又は(2)の構成において、前記下地肉盛層は、前記自溶合金溶射層を複数回フュージングした場合であっても、ショア硬さが60以上であることを特徴とする。
 本願発明によれば、上地自溶合金溶射層と、下地肉盛層とをロール表面に備えた熱延工場巻取り設備のロールにおいて、下地肉盛層のショア硬さを60以上にすることができる。
熱延工場巻取り設備の概略図である。
 図1は、熱延工場巻取り設備の概略図である。同図を参照して、熱延工場巻取り設備は、仕上げ圧延機にて定寸に圧延された400~900℃の高温鋼板10を巻き取る複数のコイラー3および各コイラー3の前段に位置する上、下ピンチロール1、2を備える。これら複数のコイラー3および上、下ピンチロール1、2は、同一の圧延ラインに設けられる。
 コイラー3は、鋼板10を巻き取るマンドレル4、およびマンドレル4の周囲に配置されて鋼板10をマンドレル4に押し付ける複数のラッパーロール5を備える。上、下ピンチロール1、2は、仕上げ圧延機から搬送される鋼板10を、斜め下方のコイラー3側に方向転換させて該コイラー3に巻き取らせるか、そのまま水平に搬送して下流側のコイラー3に巻き取らせる。上、下ピンチロール1、2は、コイラー3が鋼板10を安定して巻き取れるように鋼板10に後方への張力を付与する機能も有する。
 上述のピンチロール1、2及びラッパーロール5のロール胴部表面には下地肉盛層が形成されており、この下地肉盛層の上に炭化物粒子を分散した自溶合金溶射層が形成されている。なお、これらのピンチロール1、2及びラッパーロール5、つまり、熱延工場の巻き取り設備のロールに用いられるロール母材には、鉄系の金属を用いることができる。
 自溶合金溶射層には、例えば、ベース金属中に炭化物粒子が3~60wt%分散含有された溶着合金を用いることができる。ベース金属には、Ni系の金属、Co系の金属、Fe系の金属を用いることができる。炭化物粒子を3~60wt%分散含有させることで、耐摩耗性が高まる。炭化物粒子の添加量が3wt%未満では、添加炭化物粒子の大きさ及び微小添加量との関係で、組織中の炭化物粒子分布が偏分布となりやすく、十分な耐摩耗性を確保することができない。
 また、炭化物粒子の添加量が60wt%超になると、炭化物の歩留まり低下によるコスト高になるとともに、皮膜自体の靭性低下による製作過程での割れ発生、溶射層のフュージング不良を招くおそれがある。
 溶着合金に分散する炭化物には、WC、W、Cr、NbC、VC、MoC、TiC、SiCの1種以上など、溶射材料として造粒可能な炭化物を使用することができる。これにベース金属としてのNi系金属、Co系金属、Fe系金属のいずれかを組み合わせることにより、各ロールの耐摩耗性、耐熱衝撃性、耐スリップ焼付の各特性を変化させることができる。その結果、熱延工場巻取り設備の条件に適合した材料を適宜選択することができる。
 上述の溶着合金にフュージング処理を施すことで、自溶合金溶射層が形成される。フュージング処理は、溶射パウダーの溶射後に、これを再加熱して、再溶融させる処理のことである。本実施形態の下地肉盛層は、このフュージング処理を複数回実施しても、ショア硬さ(Hs)が60未満とならない。すなわち、上地の溶着合金をフュージングすると、下地肉盛層がその熱を受熱するが、特許文献1乃至3に開示された下地肉盛層では、下地肉盛層が複数回加熱されることで、ショア硬さ(Hs)が大きく低下する。一方、本実施形態の組成を満足する下地肉盛層では、フュージング処理の熱を受熱しても、ショア硬さ(Hs)が60未満に低下しないため、上地自溶合金溶射層に凹み、割れが発生しにくくなる。
 すなわち、本実施形態の下地肉盛層は、ショア硬さが60以上であり、質量%で、C:0.4~1.0、Si:2.0以下、Mn:3.0以下、Cr:1.0~15.0、Nb:0.5~5.0含有するFeベースの肉盛層からなる。以下、下地肉盛層の成分限定理由について説明する。
 C:0.4~1.0
 Cは、肉盛層の機械的強度、硬度を向上させるために必要である。しかしながら、1.0質量%を超えると、肉盛溶接時に割れが発生する。
 Si:2.0以下
 Siは、2.0質量%を超えると、溶接時に割れが発生し、靭性及び硬度が低下する。なお、溶接金属を脱酸するためにSiは少なくとも0.2以上添加するのが好ましい。
 Mn:3.0以下
 Mnは、3.0質量%を超えると、硬度が低下する。なお、溶融金属を脱酸するためにMnは少なくとも0.5質量%以上添加するのが好ましい。
 Cr:1.0~15.0
 Crは、上地自溶合金溶射層をフュージングした際に、そのフュージング熱を受熱してオーステナイト領域まで昇温され、フュージング後に冷却されることにより、組織がオーステナイト組織からマルテンサイト組織に変わるため、硬度が向上する。Crの含有量が1質量%未満になると、上述の効果が得られない。Crの含有量が15質量%を超えると、オーステナイト組織が多くなり硬度が大きく低下する。好ましくは、Crの含有量は8.0質量%以下である。Crの含有量を8質量%以下に制限することにより、オーステナイト組織の増大による硬度低下を、十分に抑制することができる。
 Nb:0.5~5.0
 Cを0.4%以上含有させると割れが生じやすくなるが、Nbを添加することにより、Cを多量添加することによる割れの発生を抑制することができる。また、肉盛溶接時にNbCからなる炭化物が析出し、フュージング熱による硬さ低下を防止でき、結晶粒の粗大化防止と軟化抵抗が得られる。Nbの含有量が0.5質量%未満になると、上述の効果が得られない。Nbの含有量が5.0質量%を超えると、硬度が低下する。すなわち、Nbが5%を超えるとマトリクス中のCの減少量が多くなり、逆に硬さが低下する。
 前記下地肉盛層は、さらに、Mo、V、Co、W、Tiのうち1種以上を含有していてもよい。これらの含有量は、質量%で、Mo:0.1~5.0、V:0.1~3.0、Co:0.5~5.0、W:0.5~5.0、Ti:0.1~1.0とすることができる。
 Mo:0.1~5.0
 Moは高温硬度を増す効果があるが、0.1%未満だと効果がない。5.0%超添加だとその効果は飽和し、著しい硬度向上効果が望めない。
 V:0.1~3.0
 Vは高温硬度を増す効果があるが、0.1%未満だと効果がない。3.0%超だとその効果は飽和し、著しい硬度向上効果が望めない。
 Co:0.5~5.0
 Coは高温硬度を増す効果があるが、0.5%未満だと効果がない。5.0%超だとその効果は飽和し、著しい硬度向上効果が望めない。またCoは高価であるため、上限値を5.0%とした。
 W:0.5~5.0
 Wは高温硬度を増す効果があるが、0.5%未満だと効果がない。5.0%超だとその効果は飽和し、著しい硬度向上効果が望めない。
 Ti:0.1~1.0
 Tiを添加することにより、結晶粒粗大化防止とTiCからなる炭化物が析出する。0.1%未満だと効果がない。また、1.0%超だと、Tiの歩留りが著しく悪くなる。
 以下、実施例を示して、本発明についてより具体的に説明する。表1に示す通り、種々の組成からなるロールについてショア硬さを調べた。所定の溶射材料を溶射して、フュージングした後、溶射皮膜を旋削加工で取り除き、下地肉盛層表面の硬さをショア硬度計で測定した。上地溶射層は、炭化物粒子を分散したNi基自溶合金溶射材料をガスフレーム溶射法で溶射することにより形成した。また、上地溶射層に対するフュージング処理の回数を3回とした。
 ショア硬さが60以上であって、かつ、割れが発生しなかった場合には、合格として○で評価した。割れの有無に関わらず、ショア硬さが60未満の場合には、不合格として×で評価した。ショア硬さの大小に関わらず、割れが発生した場合には、不合格として×で評価した。
Figure JPOXMLDOC01-appb-T000001
  
 さらに、実施例2、24~27、比較例7、8について、フュージング回数を1回、2回、3回、4回、5回と変化させて、それぞれについてショア硬さを調べた。その試験結果を表2に示す
Figure JPOXMLDOC01-appb-T000002
 比較例7,8はフュージング回数が増加するのに応じて、著しくショア硬さが低下した。比較例7では、フュージング回数が2回以上になるとショア硬さが60未満に低下した。比較例8では、フュージング回数が3回以上になるとショア硬さが60未満に低下した。一方、本発明の実施例2、24~27はフュージング回数の増加によるショア硬さの低下量が小さく、フュージング回数が5回に達しても、60以上のショア硬さを確保することができた。

Claims (3)

  1.  ロールの胴部表面に下地肉盛層と、該下地肉盛層の上に炭化物粒子を分散した自溶合金溶射層を形成した熱延工場巻取り設備のロールであって、
     前記下地肉盛層は、ショア硬さが60以上であり、質量%で、C:0.4~1.0、Si:2.0以下、Mn:3.0以下、Cr:1.0~15.0、Nb:0.5~5.0含有するFeベースの肉盛層からなることを特徴とする熱延工場巻取り設備のロール。
  2.  前記下地肉盛層は、さらに、Mo、V、Co、W及びTiのうち1種以上を含有し、質量%で、Mo:0.1~5.0、V:0.1~3.0、Co:0.5~5.0、W:0.5~5.0、Ti:0.1~1.0であることを特徴とする請求項1に記載の熱延工場巻取り設備のロール。
  3.  前記下地肉盛層は、前記自溶合金溶射層を複数回フュージングした場合であっても、
    ショア硬さが60以上であることを特徴とする請求項1又は2に記載の熱延工場巻取り設備のロール。
     
PCT/JP2014/003307 2014-06-19 2014-06-19 熱延工場巻取り設備のロール WO2015193933A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2016528656A JP6433496B2 (ja) 2014-06-19 2014-06-19 熱延工場巻取り設備のロール
PCT/JP2014/003307 WO2015193933A1 (ja) 2014-06-19 2014-06-19 熱延工場巻取り設備のロール
US15/035,124 US9962748B2 (en) 2014-06-19 2014-06-19 Roll for winding equipment in hot rolling factory
KR1020167013159A KR101951810B1 (ko) 2014-06-19 2014-06-19 열연공장 권취설비의 롤
TW103123607A TW201600187A (zh) 2014-06-19 2014-07-09 熱軋工廠捲繞設備的輥子

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/003307 WO2015193933A1 (ja) 2014-06-19 2014-06-19 熱延工場巻取り設備のロール

Publications (1)

Publication Number Publication Date
WO2015193933A1 true WO2015193933A1 (ja) 2015-12-23

Family

ID=54934969

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/003307 WO2015193933A1 (ja) 2014-06-19 2014-06-19 熱延工場巻取り設備のロール

Country Status (5)

Country Link
US (1) US9962748B2 (ja)
JP (1) JP6433496B2 (ja)
KR (1) KR101951810B1 (ja)
TW (1) TW201600187A (ja)
WO (1) WO2015193933A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102218880B1 (ko) * 2019-11-25 2021-02-23 주식회사 에이프로젠케이아이씨 단조설비용 부재의 내마모성 및 내열성이 우수한 하드페이싱층 형성방법 및 이를 이용하여 제조된 단조설비용 부재
CN112410673B (zh) * 2020-11-18 2023-01-31 宝钢轧辊科技有限责任公司 超高强度钢板轧制用高速钢轧辊及其制造方法
CN115354225A (zh) * 2022-08-11 2022-11-18 昆明理工大学 原位自生陶瓷颗粒增强钢复合滚刀刀圈及制备方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56152945A (en) * 1980-04-25 1981-11-26 Nippon Steel Corp Wear-resistant roll for hot rolling
JPS6332543B2 (ja) * 1979-05-11 1988-06-30 Nitsutetsu Haado Kk
JP2002348638A (ja) * 2001-05-23 2002-12-04 Nippon Steel Hardfacing Co Ltd 熱間耐摩耗性および耐熱亀裂性にすぐれた連続鋳造用および熱間圧延用ロール
JP2008291300A (ja) * 2007-05-23 2008-12-04 Nippon Steel Hardfacing Co Ltd 耐圧痕性に優れたロール

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55140710A (en) 1979-04-16 1980-11-04 Nippon Tungsten Co Ltd Manufacture of silicon carbide fine powder
US4727740A (en) * 1981-09-04 1988-03-01 Mitsubishi Kinzoku Kabushiki Kaisha Thermal and wear resistant tough nickel based alloy guide rolls
JPS5976696A (ja) * 1982-10-26 1984-05-01 Nittetsu Hard Kk 耐摩耗性・耐熱亀裂性を有する巾圧延機用ロ−ル
JPS6086243A (ja) * 1983-10-18 1985-05-15 Nippon Steel Corp 耐摩耗性ロ−ル
US5270124A (en) * 1989-06-30 1993-12-14 The Broken Hill Proprietary Co., Ltd. Composite roll
JP2848646B2 (ja) 1989-10-23 1999-01-20 株式会社フジコ− 熱間圧延設備に於けるコイラ用ロールの製造法
JPH08121464A (ja) 1994-10-24 1996-05-14 Nittetsu Hard Kk 熱延工場巻取機用ロール
JPH08232058A (ja) * 1995-02-27 1996-09-10 Kobe Steel Ltd ダイカスト用部材及びその製造方法
JP3376484B2 (ja) 1995-08-30 2003-02-10 日鉄ハード株式会社 熱延工場巻取設備各ロール
JPH11267731A (ja) * 1998-03-24 1999-10-05 Nippon Steel Hardfacing Co Ltd 熱延工場用ロールおよびローラー
DE10019042A1 (de) * 2000-04-18 2001-11-08 Edelstahl Witten Krefeld Gmbh Stickstofflegierter, sprühkompaktierter Stahl, Verfahren zu seiner Herstellung und Verbundwerkstoff hergestellt aus dem Stahl
US7491910B2 (en) * 2005-01-24 2009-02-17 Lincoln Global, Inc. Hardfacing electrode
WO2011151929A1 (ja) * 2010-05-31 2011-12-08 トーカロ株式会社 熱間圧延設備用ロールおよびその製造方法
JP5724426B2 (ja) 2011-02-08 2015-05-27 Jfeスチール株式会社 熱延鋼帯巻取装置用ロール
CN103192197B (zh) 2013-03-21 2015-12-02 中冶焊接科技有限公司 一种堆焊复合制造工作辊的盖面堆焊材料及其制备方法
CN103785976A (zh) 2013-12-13 2014-05-14 天津大学 一种热轧辊堆焊埋弧药芯焊丝及其制备方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6332543B2 (ja) * 1979-05-11 1988-06-30 Nitsutetsu Haado Kk
JPS56152945A (en) * 1980-04-25 1981-11-26 Nippon Steel Corp Wear-resistant roll for hot rolling
JP2002348638A (ja) * 2001-05-23 2002-12-04 Nippon Steel Hardfacing Co Ltd 熱間耐摩耗性および耐熱亀裂性にすぐれた連続鋳造用および熱間圧延用ロール
JP2008291300A (ja) * 2007-05-23 2008-12-04 Nippon Steel Hardfacing Co Ltd 耐圧痕性に優れたロール

Also Published As

Publication number Publication date
JPWO2015193933A1 (ja) 2017-04-20
KR20170020302A (ko) 2017-02-22
TW201600187A (zh) 2016-01-01
US9962748B2 (en) 2018-05-08
JP6433496B2 (ja) 2018-12-05
US20160271667A1 (en) 2016-09-22
KR101951810B1 (ko) 2019-02-25

Similar Documents

Publication Publication Date Title
US7256369B2 (en) Composite wires for coating substrates and methods of use
JP3376484B2 (ja) 熱延工場巻取設備各ロール
JP6359518B2 (ja) 低Si含有量鋼ストリップ
CN102744528B (zh) 药芯焊丝、制作热卷箱弯曲辊的方法和热卷箱弯曲辊
JP6433496B2 (ja) 熱延工場巻取り設備のロール
JP6433493B2 (ja) 熱延工場巻取り設備のロール
EP3239322B1 (en) Hot-rolled steel sheet for high strength galvanized steel sheet, having excellent surface quality, and method for producing same
JP5976535B2 (ja) 熱間圧延設備用ロールの製造方法
JP5859175B2 (ja) 肉盛用溶接材料、矯正ロール、ガイドロール、搬送ロール及び金敷き
EP3239323B1 (en) Hot-rolled steel sheet for high strength galvanized steel sheet, having excellent surface quality, and method for producing same
GB2354259A (en) Low alloy build up material
JPH11267731A (ja) 熱延工場用ロールおよびローラー
JP2016222983A (ja) 原油槽用鋼、原油槽及び原油槽の防食方法
JP4774786B2 (ja) 炉内構造物被覆用溶射被膜およびその形成方法
JP2996148B2 (ja) 冷間圧延用ワークロールとその製造方法
JP6771429B2 (ja) 厚鋼板およびその製造方法
JP4712203B2 (ja) 腰折れ欠陥のない連続溶融めっき鋼板の製造方法
JPS6024297A (ja) 継目無鋼管製管用ガイドシユ−
JP2927143B2 (ja) 熱間圧延用ロール材
JPH08246059A (ja) 熱間圧延ロール
JPH05271874A (ja) 耐摩耗性熱間圧延用ロール材質

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14895108

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016528656

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15035124

Country of ref document: US

ENP Entry into the national phase

Ref document number: 20167013159

Country of ref document: KR

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112016010582

Country of ref document: BR

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14895108

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 112016010582

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20160510