WO2015056837A1 - 복합 다기능 피이 부잔교 - Google Patents

복합 다기능 피이 부잔교 Download PDF

Info

Publication number
WO2015056837A1
WO2015056837A1 PCT/KR2013/011365 KR2013011365W WO2015056837A1 WO 2015056837 A1 WO2015056837 A1 WO 2015056837A1 KR 2013011365 W KR2013011365 W KR 2013011365W WO 2015056837 A1 WO2015056837 A1 WO 2015056837A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
space
flotation
water
bridge
Prior art date
Application number
PCT/KR2013/011365
Other languages
English (en)
French (fr)
Inventor
최연호
Original Assignee
주식회사 혁신
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 혁신 filed Critical 주식회사 혁신
Publication of WO2015056837A1 publication Critical patent/WO2015056837A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/24Bridges or similar structures, based on land or on a fixed structure and designed to give access to ships or other floating structures
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/40Plastics

Definitions

  • the present invention relates to a composite multifunctional buzan bridge, and more particularly relates to the construction of a buzan bridge, which is more stable even in storms, waves, and the like, in which construction is easy and manufacturing cost is not high.
  • a busan bridge structure is installed to form a constant moving path or space part in the sea, a river, or a lake near a coast or in a water body, and the busan bridge structure is a floating bridge, a floating dock, a yacht marina. It is used for the purpose of dock, dock, etc.
  • Korean Utility Model Publication No. 20-1999-0033349 is buoyancy by sealing both ends of the buoyant pipe and a pair of top cover and bottom
  • the upper cover and the lower cover are bolted up and down with the floating pipes positioned between the covers, and the floating pipes are fixedly fastened by the upper cover and the lower cover, and the pair of upper covers are connected in a line.
  • Disclosed is a technique of forming a prefabricated structure used as a cage facility by forming a moving path and the like in the upper part of the upper cover is assembled and fastened to the upper plate.
  • the Buzan Bridge using the conventional flotation pipe is light and has a problem such as overturning due to a storm. There is also a problem of severe rocking by waves and the like.
  • a method of installing a separate structure to lower the center of gravity of the Buzan Bridge has been attempted, but this has a problem in that construction is inconvenient and increases the manufacturing cost.
  • the present invention aims to solve the above problems, and it is an object of the present invention to build a Buzan bridge, which is more stable even in storms, waves, and the like, in which construction is easy and manufacturing cost is not high, using a flotation pipe.
  • the present invention provides a bujan bridge, comprising a plurality of floating pipes, an upper structure, and a pipe connecting member connecting the plurality of floating pipes and the upper structure, wherein at least one of the plurality of floating pipes is A partition wall having a first space and a second space therein, and a pipe cover member for sealing the first space is coupled to an end portion of the floating pipe including the partition wall, and the second space has a higher density than air. Characterized in that the material is filled.
  • the present invention is a bujan bridge, a buoyant pipe having a partition therein forming a first space and a second space therein, a pipe cover member fastened to an end of the buoyant pipe and sealing the first space; And, it characterized in that it comprises a pipe connecting member for connecting the support pipe and the upper structure.
  • the present invention is a flotation pipe connected to the upper structure through a pipe connecting member, a partition wall forming a first space and a second space therein, and a pipe cover fastened to an end of the flotation pipe and sealing the first space. It is another feature to include a member.
  • FIG. 1 is a front view of a Byzan bridge structure according to an embodiment of the present invention.
  • FIG. 2 is a side view of the Byzan bridge structure shown in FIG. 1;
  • FIG. 3 is a side cross-sectional view of the flotation pipe shown in FIG. 1,
  • FIG 4 is a front view of the bracket shown in Figure 1
  • FIG. 5 is a view for explaining the connection structure of the bracket shown in FIG.
  • FIG. 6 is a view for explaining the upper structure shown in FIG.
  • FIG. 7 is a perspective view of the scaffold shown in FIG. 1.
  • FIG. 1 is a front view of a byzan bridge structure 1 according to the present embodiment
  • FIG. 2 is a side view.
  • the buzan bridge structure 1 in the present embodiment includes a plurality of floating pipes 4, an upper structure 40, and a pipe connecting the floating pipe 4 and the upper structure 40.
  • the connecting member 2 is provided.
  • the flotation pipe 4 includes a partition wall 3 forming an upper space 31 and a lower space 32 therein and may be made of polyethylene (PE) or the like. Can be.
  • a cap 5 which seals the upper space 31 and opens the lower space 32, is engaged by the fitting jaw 33.
  • the cap 5 has a fitting groove 24 into which the partition 3 is fitted and a water passage 15 through which water passes.
  • the watertight bulkhead 8 is inserted into the upper space 31 in preparation for water that may enter between the fitting jaw 33 and the support pipe 4.
  • the cap 5 may have a conical shape, a hemispherical shape, or the like, and may be made of PE or the like.
  • the lower space 32 may be filled with a material having a higher density than air such as water through the water hole 15.
  • a stopper (not shown) may be fitted to the water hole 15 to prevent the flow of the filled water.
  • Float pipe 4 is formed with a partition wall 3 in the horizontal direction to the inside and the upper space 31 and the lower space 32 to be partitioned, and the front and rear of the support pipe 4, respectively, the water flow in the lower portion
  • the cap 5 in which the ball 15 is drilled is assembled and fastened.
  • water is filled only in the lower space 32 of the flotation pipe 4 through the water hole 15 in the state of being floated on the water surface.
  • the water filled in the lower space 32 lowers the center of gravity of the sub-zan bridge structure 1 as if the weight is installed at the lower part of the sub-bridge structure 1, and thus the sub-bridge structure 1 becomes more stable against waves.
  • the pipe connecting member 2 is composed of a bracket 30 as shown in FIG.
  • Bracket 30 has a trapezoidal frame shape when viewed from the front as shown, one or a plurality of pipe through-holes 19 are formed at regular intervals in the left and right directions at the inner side so that the flotation pipe 4 is interposed therebetween. ( ⁇ ⁇ ) becomes.
  • An anti-rotation groove 20 is formed in the upper portion of the pipe through-hole 19 so as to communicate with the pipe through-hole 19 to prevent the flotation pipe 4 from rotating in a state interposed through the pipe through-hole 19. do.
  • the bracket 30 is installed inside the support 21 in the form of a grid to prevent the bracket 30 from being twisted by an external impact.
  • a plurality of brackets 20 are coupled to secure a suitable width to the upper structure, and for this purpose, after connecting the coupling protrusion 16 to the coupling groove 17 of the other bracket as shown in FIG. ) Is fastened between the coupling protrusion 16 and the coupling groove 17.
  • the anti-separation band 9 is alternately mounted on the right side and the left side of the bracket 30 to prevent the floating pipe 4 mounted in the pipe through hole 19 from being separated in the left and right directions.
  • the support pipe 4 is made of synthetic resin such as polyethylene, and is disposed in a straight line before and after the pipe through-holes 19 formed in the plurality of brackets 30 positioned at predetermined intervals in the front-rear direction as shown in FIGS. It penetrates and is inserted.
  • the support pipe 4 is formed so that the partition wall 3 is formed in the horizontal direction on the inner side so as to be partitioned up and down, and the caps 5 through which the water holes 15 are perforated in the lower sides of the support pipe 4 are respectively opened. Assembly is fastened.
  • the flotation pipe 4 is filled with water only in the lower space 32 of the flotation pipe 4 through the water hole 15 in the state of being floated in the water so that the lower space 32 serves as a counterweight.
  • the cap 5 may be a convex hemispherical case shape or a truncated cone shape.
  • An end portion of the partition plate 23 is formed with a fitting groove 24 into which the end of the partition 3 is fitted.
  • the upper space 31 of the inner partition 3 of the flotation pipe 4 is kept in a closed state to have a constant flotation force in the water.
  • Water is filled in the lower space 32 of the inner partition 3 of the flotation pipe 4 through a water hole 15 drilled in the lower portion of the cap 5 while the flotation pipe 4 floats in water.
  • the flow of the flotation pipe 4 is prevented by the water contained therein, so that the Buzan Bridge structure 1 is stably balanced even in strong waves and storms.
  • the connecting portion of the cap 5 fitted to the front and rear of the flotation pipe 4 and the flotation pipe 4 is firmly bonded by an adhesive or the like so that the cap 5 is detached from the flotation pipe 4 by strong wind or waves. The separation can be prevented.
  • water is injected into the lower space 32 of the flotation pipe 4 by inserting a closed cock (not shown) into the water hole 15 drilled in the cap 5 to block the water hole 15. Since it is not filled, it is possible to increase the buoyancy of the byzantine bridge structure (1).
  • a closed cock (not shown) into the water hole 15 drilled in the cap 5 to block the water hole 15. Since it is not filled, it is possible to increase the buoyancy of the byzantine bridge structure (1).
  • the sealing cock 21 to the water supply hole 15 in a state in which only a portion of the water filled in the lower space 32 can adjust the specific gravity of the role of the float and weight of the floating pipe (4).
  • FIG. 6 is a view showing the upper structure 40 according to the present embodiment.
  • the upper part of the pipe connecting member 2 is formed with a pedestal 7 formed of PE or the like by a fixing bolt 13.
  • the cleat 10 is coupled by a fixing bolt 11 penetrating the upper plate and the scaffold 7 of the pipe connecting member (2).
  • the shock protector 6 is coupled to the upper surface and the side by the fixing bolt 14.
  • the scaffold 7 is a perspective view showing the structure of the scaffold 7.
  • the scaffold 7 is made of a synthetic resin material such as polyethylene, and is arranged to be spaced apart at regular intervals in the front-rear direction in a state of being vertically placed.
  • the scaffold 7 is provided with a drain hole 34 in the vertical direction, so that the water on the scaffold 7 is discharged downward.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 복합 다기능 PE 부잔교에 관한 것이다. 본 발명에 의한 PE 부잔교는 복수의 부양 파이프와, 상부 구조물과, 상기 복수의 부양 파이프와 상기 상부 구조물을 연결하는 파이프 연결부재를 포함한다. 복수의 부양 파이프 중 적어도 하나는 내부에 제1 공간과 제2 공간을 형성하는 격벽을 구비한다. 격벽을 구비하는 부양 파이프의 단부에는 제1 공간을 밀폐하는 파이프 덮개 부재가 결합된다. 제2 공간에는 물이 채워진다. 본 발명에 의하면 폭풍우, 파도 등에서도 보다 안정감 있으면서도 제조비용이 높지 않은 부잔교를 시공이 용이하게 구축할 수 있다.

Description

복합 다기능 피이 부잔교
본 발명은 복합 다기능 부잔교에 관한 것으로서, 특히 폭풍우, 파도 등에서도 보다 안정감 있으면서도 시공이 편하고 제조비용이 높지 않은 부잔교를 부양 파이프를 이용하여 구축하는 것에 관련된다.
일반적으로 바다나 강 또는 호수의 해안 인근이나 수역 내에 일정한 이동로나 공간부를 형성하기 위하여 부잔교(浮棧橋) 구조물을 설치하며, 부잔교 구조물은 부양 교량(floating bridge), 부양 도크(floating dock), 요트 계류장, 부두 선착장 등의 용도로 사용된다.
부잔교 구조물 중 수면에 부양되는 파이프를 이용하여 조립설치되는 종래 기술로서, 대한민국 공개실용신안공보 제20-1999-0033349호에는 부양 파이프의 양쪽 끝 부분을 밀봉하여 부력화하고 여러 쌍의 상부 덮개와 하부 덮개 사이에 각각 부양 파이프를 위치시킨 상태에서 상부 덮개와 하부 덮개를 상하 볼트 체결하고, 상부 덮개와 하부 덮개에 의해 부양 파이프가 각각 고정 체결되도록 하며, 여러 쌍의 상부 덮개는 일렬로 연결되어 있고 이러한 상부 덮개의 상부에는 상판용 트라스가 조립 체결되어 수상에 이동로 등을 형성하여 가두리시설 등으로 사용되는 조립식 구조물을 구성하는 기술이 개시되어 있다.
그러나 종래 부양 파이프를 이용한 부잔교는 가벼워서 폭풍우 등에 의해 뒤집어지는 등의 문제가 있다. 또한 파도 등에 의해 심하게 요동하는 문제가 있다. 이러한 문제와 관련하여 부잔교의 무게중심을 아래로 내리기 위해 별도의 구조물을 설치하는 방법이 시도되고 있으나 이는 시공이 불편하고 제조비용을 상승시키는 문제가 있다.
본 발명은 상기와 같은 문제점들을 해결하기 위한 것으로 폭풍우, 파도 등에서도 보다 안정감 있으면서도 시공이 편하고 제조비용이 높지 않은 부잔교를 부양 파이프를 이용하여 구축하는 것을 목적으로 한다.
이러한 목적과 관련하여 본 발명은 부잔교로서, 복수의 부양 파이프와, 상부 구조물과, 상기 복수의 부양 파이프와 상기 상부 구조물을 연결하는 파이프 연결부재를 포함하며, 상기 복수의 부양 파이프 중 적어도 하나는 내부에 제1 공간과 제2 공간을 형성하는 격벽을 구비하고, 상기 격벽을 구비하는 부양 파이프의 단부에는 상기 제1 공간을 밀폐하는 파이프 덮개 부재가 결합되며, 상기 제2 공간에는 공기보다 밀도가 높은 물질이 채워지는 것을 일 특징으로 한다.
또한 본 발명은 부잔교로서, 내부에 제1 공간과 제2 공간을 형성하는 격벽을 구비하는 부양 파이프와, 상기 부양 파이프의 단부에 체결되며 상기 제1 공간을 밀폐하는 파이프 덮개 부재와, 상부 구조물과, 상기 부양 파이프와 상기 상부 구조물을 연결하는 파이프 연결부재를 포함하는 것을 다른 특징으로 한다.
또한 본 발명은 파이프 연결부재를 통해 상부 구조물에 연결되는 부양 파이프로서, 내부에 제1 공간과 제2 공간을 형성하는 격벽과, 상기 부양 파이프의 단부에 체결되며 상기 제1 공간을 밀폐하는 파이프 덮개 부재를 포함하는 것을 또 다른 특징으로 한다.
전술한 바와 같은 본 발명에 의하면 폭풍우, 파도 등에서도 보다 안정감 있으면서도 시공이 편하고 제조비용이 높지 않은 부잔교를 구축할 수 있다.
도 1은 본 발명의 일 실시예에 의한 부잔교 구조물의 정면도이고,
도 2는 도 1에 도시된 부잔교 구조물의 측면도이며,
도 3은 도 1에 도시된 부양 파이프의 측단면도이고,
도 4는 도 1에 도시된 브라켓의 정면도이며,
도 5는 도 1에 도시된 브라켓의 연결구조를 설명하는 도면이고,
도 6은 도 1에 도시된 상부 구조물을 설명하는 도면이며,
도 7은 도 1에 도시된 발판의 사시도이다.
이하, 첨부된 도면들을 참조하여 본 발명의 실시예들을 보다 상세하게 설명하고자 한다. 다만, 실시예들을 설명함에 있어서 본 발명이 속하는 기술 분야에 잘 알려져 있고, 본 발명과 직접적으로 관련이 없는 기술 내용에 대해서는 가급적 설명을 생략한다. 이는 불필요한 설명을 생략함으로써 본 발명의 핵심을 흐리지 않고 더욱 명확히 전달하기 위함이다.
먼저 도 1은 본 실시예에 의한 부잔교 구조물(1)의 정면도이고, 도 2는 측면도이다. 도 1에 도시된 바와 같이, 본 실시예에서의 부잔교 구조물(1)은 복수의 부양 파이프(4)와, 상부 구조물(40)과, 부양 파이프(4)와 상부 구조물(40)을 연결하는 파이프 연결부재(2)을 구비한다.
부양 파이프(4)는 도 3에 도시된 바와 같이, 내부에 상부 공간(31)과 하부 공간(32)를 형성하는 격벽(3)을 구비하며, 폴리에티렌(polyethylene : PE) 등으로 제조될 수 있다. 부양 파이프(4)의 단부에는 상부 공간(31)을 밀폐하고 하부 공간(32)를 개방하는 캡(5)이 끼움턱(33)에 의해 결합된다. 캡(5)은 격벽(3)이 끼워지는 끼움홈(24)과 물을 통과시키는 통수공(15)를 구비한다. 상부 공간(31)의 안쪽에는 끼움턱(33)과 부양 파이프(4) 사이로 들어올 수 있는 물에 대비하여 수밀 격벽(8)이 삽입된다. 캡(5)은 원뿔형, 반구형 등의 형상을 가지며 PE 등으로 제조될 수 있다. 하부 공간(32)에는 통수공(15)을 통해 물과 같이 공기보다 밀도가 높은 물질이 채워질 수 있다. 통수공(15)을 통해 하부 공간(32)에 물이 채워진 후에는 채워진 물의 유동을 방지하는 마개(도시되지 않음)가 통수공(15)에 끼워질 수 있다.
부양 파이프(4)는 내측에 수평 방향으로 격벽(3)이 형성되어 상부 공간(31)과 하부 공간(32)으로 상하구획되도록 되어 있으며, 부양 파이프(4)의 개방된 전후방에는 각각 하부에 통수공(15)이 천공된 캡(5)이 조립 체결된다. 이로써 수면 위에 부양된 상태에서 통수공(15)를 통해 부양 파이프(4)의 하부 공간(32)에만 물이 채워진다. 하부 공간(32)에 채워진 물은 무게추를 부잔교 구조물(1)의 하부에 설치한 것과 같이 부잔교 구조물(1)의 무게중심을 내려 부잔교 구조물(1)이 파도 등에도 좀더 안정되게 한다.
파이프 연결부재(2)는 도 4에 도시된 바와 같은 브라켓(30)로 구성된다. 브라켓(30)은 도시된 바와 같이 정면에서 볼 때 사다리꼴 형태의 틀 형상이며, 내측에는 하나 또는 복수개의 파이프 관통홀(19)이 좌우 방향으로 일정 간격으로 형성되어 있어 부양 파이프(4)가 관통 개재(介在)된다. 파이프관통홀(19)의 상부에는 파이프관통홀(19)와 연통되게 회전방지 홈(20)이 형성되어 있어서 부양 파이프(4)가 파이프관통홀(19)에 관통 개재된 상태에서 회전하는 것을 방지한다. 브라켓(30)은 내부에 지지대(21)를 격자 형태로 설치하여 외부 충격에 의해 브라켓(30)이 뒤틀리는 것을 방지한다.
상부 구조물에 적합한 폭을 확보하기 위하여 복수의 브라켓(20)이 결합되는데, 이를 위해 도 5에 도시된 바와 같이 결합돌기(16)를 다른 브라켓의 결합홈(17)에 끼운 후에 브라켓 연결볼트(12)를 결합돌기(16)와 결합홈(17) 사이에 체결한다. 이탈방지밴드(9)는 브라켓(30)의 오른쪽 측면과 왼쪽 측면에 교대로 장착되므로써 파이프관통홀(19)에 장착된 부양 파이프(4)가 좌우 방향으로 이탈되는 것을 방지한다.
부양 파이프(4)는 폴리에틸렌 등의 합성수지재질로 되어 있으며 도 1 내지 2에 도시된 바와 같이 전후 방향으로 일정 간격으로 위치되는 복수개의 브라켓(30)에 형성된 파이프관통홀(19)에 전후 일직선상으로 관통되어 삽입 개재된다. 부양 파이프(4)는 내측에 수평방향으로 격벽(3)이 형성되어 상하 구획되도록 되어 있으며, 부양 파이프(4)의 개방된 전후방에는 각각 하부에 통수공(15)가 천공된 캡(5)이 조립 체결된다. 부양 파이프(4)는 물에 부양된 상태에서 통수공(15)를 통해 부양 파이프(4)의 하부 공간(32)에만 물이 채워져 하부 공간(32)이 균형추의 역할을 하게 한다. 캡(5)은 볼록한 반구형의 케이스 형상 또는 끝이 잘린 원뿔 형상일 수 있다. 격판(23)의 끝 부분에는 격벽(3)의 끝단이 끼움결합되는 끼움홈(24)이 형성되어 있다. 이로써 부양 파이프(4)의 내측 격벽(3)의 상부 공간(31)은 밀폐된 상태로 유지되어 수중에서 일정한 부양력을 지니도록 되어 있다. 부양 파이프(4)의 내측 격벽(3)의 하부 공간(32)에는 부양 파이프(4)가 물에 띄워진 상태에서 캡(5)의 하부에 천공된 통수공(15)를 통해 물이 채워지면서 내부에 담겨진 물에 의해 부양 파이프(4)의 유동이 방지되어 강한 파도나 풍랑에도 부잔교 구조물(1)이 요동치지 않고 안정되게 균형을 유지하도록 되어 있다.
부양 파이프(4)의 전후방에 끼움결합된 캡(5)과 부양 파이프(4)의 연결 부분은 접착제 등에 의해 견고하에 접착되어 강한 풍랑이나 파도에 의해 부양 파이프(4)로부터 캡(5)이 이탈 분리되는 것을 방지할 수 있다.
필요에 따라서 캡(5)에 천공된 통수공(15)에 밀폐코크(도시되지 않음)를 끼움 결합하여 통수공(15)를 차단하므로써, 부양 파이프(4)의 하부 공간(32)에 물을 채우지 않아 부잔교 구조물(1)의 부양력을 증대시킬 수 있다. 또한 하부 공간(32)에 물을 일부만 채운 상태에서 통수공(15)에 밀폐코크(21)를 끼움 결합하여 부양 파이프(4)의 부유체와 무게추의 역할의 비중을 조절할 수 있다.
도 6은 본 실시예에 의한 상부 구조물(40)을 도시한 도면이다. 도시된 바와 같이, 파이프 연결부재(2)의 상부에는 PE 등으로 형성된 발판(7)이 고정볼트(13)에 의해 결합된다. 클리트(10)는 파이프 연결부재(2)의 상판과 발판(7)을 관통하는 고정볼트(11)에 의해 결합된다. 파이프 연결부재(2)의 상부 모서리에는 상면과 측면에 충격보호대(6)가 고정볼트(14)에 의해 결합된다.
도 7은 발판(7)의 구조를 도시하는 사시도이다. 발판(7)은 폴리에틸렌 등의 합성수지재질로 되어 있으며 수직으로 놓여진 상태로 전후 방향으로 복수개가 일정 간격으로 이격되게 위치되도록 되어 있다. 발판(7)에는 수직 방향으로 배수공(34)이 설치되어 있어서, 발판(7) 상부의 물이 아래로 배출되도록 한다.

Claims (6)

  1. 복수의 부양 파이프와,
    상부 구조물과,
    상기 복수의 부양 파이프와 상기 상부 구조물을 연결하는 파이프 연결부재를 포함하며,
    상기 복수의 부양 파이프 중 적어도 하나는 내부에 제1 공간과 제2 공간을 형성하는 격벽을 구비하고
    상기 격벽을 구비하는 부양 파이프의 단부에는 상기 제1 공간을 밀폐하는 파이프 덮개 부재가 결합되는 것을 특징으로 하는 부잔교.
  2. 제 1항에 있어서,
    상기 제2 공간에는 물이 채워지는 것을 특징으로 하는 부잔교.
  3. 제 1항에 있어서,
    상기 부양 파이프는 PE 파이프인 것을 특징으로 하는 부잔교.
  4. 제 1항에 있어서,
    상기 제1 공간에는 수밀 격벽이 설치되는 것을 특징으로 하는 부잔교.
  5. 내부에 제1 공간과 제2 공간을 형성하는 격벽을 구비하는 부양 파이프와,
    상기 부양 파이프의 단부에 체결되며 상기 제1 공간을 밀폐하는 파이프 덮개 부재와,
    상부 구조물과,
    상기 부양 파이프와 상기 상부 구조물을 연결하는 파이프 연결부재를
    포함하는 것을 특징으로 하는 부잔교.
  6. 파이프 연결부재를 통해 상부 구조물에 연결되는 부양 파이프에 있어서,
    내부에 제1 공간과 제2 공간을 형성하는 격벽과,
    상기 부양 파이프의 단부에 체결되며 상기 제1 공간을 밀폐하는 파이프 덮개 부재를
    포함하는 것을 특징으로 하는 부양 파이프.
PCT/KR2013/011365 2013-10-15 2013-12-09 복합 다기능 피이 부잔교 WO2015056837A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2013-0122325 2013-10-15
KR1020130122325A KR101450732B1 (ko) 2013-10-15 2013-10-15 복합 다기능 피이 부잔교

Publications (1)

Publication Number Publication Date
WO2015056837A1 true WO2015056837A1 (ko) 2015-04-23

Family

ID=51997675

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2013/011365 WO2015056837A1 (ko) 2013-10-15 2013-12-09 복합 다기능 피이 부잔교

Country Status (2)

Country Link
KR (1) KR101450732B1 (ko)
WO (1) WO2015056837A1 (ko)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101674453B1 (ko) * 2015-01-27 2016-11-10 주식회사 대성에프앤비 조립식 해상구조물
KR101536278B1 (ko) * 2015-02-04 2015-07-13 주식회사 마린코리아 추가부력체를 설치할 수 있는 부력체지지홀더와 이를 이용한 해상부유구조물
KR101686824B1 (ko) 2015-02-25 2016-12-16 강남규 충격완화기능이 있는 브라켓을 이용한 해상부유구조물
CN107366223A (zh) * 2017-07-25 2017-11-21 深圳市中兰环保科技股份有限公司 一种浮动盖浮桥
KR101806193B1 (ko) * 2017-08-10 2017-12-07 주식회사 지엔씨 롤링을 저감하며 복원성을 높인 해상부유구조물
KR102166067B1 (ko) 2020-04-02 2020-10-15 김난영 강도 보강된 부력 파이프를 구비하는 피이 부잔교
KR102220041B1 (ko) 2020-08-11 2021-02-24 최연호 부잔교의 유실 방지를 위한 부양파이프용 보호링 구조

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037914A (ja) * 1996-07-26 1998-02-13 Mitsubishi Heavy Ind Ltd バネ付き設定ボルト
JP2003063482A (ja) * 2001-08-22 2003-03-05 Nkk Corp 鋼板コンクリートハイブリッド浮体
KR200367519Y1 (ko) * 2004-08-11 2004-11-12 김형기 수상 부양식 어/패류 가두리형 양식장의 프레임
KR100956519B1 (ko) * 2007-12-07 2010-05-06 주식회사 국민씨아이 스냅핏 착탈 조립식 중공단면 섬유강화 복합소재 데크를이용한 부잔교
KR100958856B1 (ko) * 2009-08-24 2010-05-20 국태주 합성수지관을 이용한 부교

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037914A (ja) * 1996-07-26 1998-02-13 Mitsubishi Heavy Ind Ltd バネ付き設定ボルト
JP2003063482A (ja) * 2001-08-22 2003-03-05 Nkk Corp 鋼板コンクリートハイブリッド浮体
KR200367519Y1 (ko) * 2004-08-11 2004-11-12 김형기 수상 부양식 어/패류 가두리형 양식장의 프레임
KR100956519B1 (ko) * 2007-12-07 2010-05-06 주식회사 국민씨아이 스냅핏 착탈 조립식 중공단면 섬유강화 복합소재 데크를이용한 부잔교
KR100958856B1 (ko) * 2009-08-24 2010-05-20 국태주 합성수지관을 이용한 부교

Also Published As

Publication number Publication date
KR101450732B1 (ko) 2014-10-14

Similar Documents

Publication Publication Date Title
WO2015056837A1 (ko) 복합 다기능 피이 부잔교
RU2752839C1 (ru) Подводный транспортный тоннель
KR100977015B1 (ko) 콘크리트 부유체 및 이를 이용한 부유조립체
WO2015163618A1 (ko) 해상 부유구조물용 부력파이프 연결소켓
CN201850541U (zh) 防污屏
WO2018058975A1 (zh) 带延伸筒体的直筒式浮式平台和泳圈式浮筒组
CN205293002U (zh) 模块化浮筒码头
CN102985681B (zh) 用在海浪能装置的水面下反应体
WO2015056838A1 (ko) 푼툰을 이용한 부유식 해상 구조물
CN109295920B (zh) 一种极端海况下具备可沉浮功能的浮箱-轮胎型浮式防波堤单元及防波堤系统
WO2015068885A1 (ko) 롤링을 방지하는 복합 다기능 피이 부잔교
WO2017065462A1 (ko) 부력체 및 이를 이용한 해상부유구조물
KR20190042135A (ko) 높이 조절식 부력체를 이용한 수상 태양광 발전시스템
WO2013165078A1 (ko) 블럭식 부유체를 가진 심해용 부유식 풍력 발전기
RU2133690C1 (ru) Плавучее устройство
CN114852273A (zh) 一种钢架浮筒式海上光伏平台
KR20110139963A (ko) 수중 부유식 방파제
US4636114A (en) Buoyancy-supported struts for ocean platforms
CN112078739B (zh) 一种半潜平台
CN202914866U (zh) 浮子阀
KR101402763B1 (ko) 수상시설용 롤링피칭 감쇠장치
KR101311166B1 (ko) 단위 부유블럭을 이용한 부유 조립체
CN201140781Y (zh) 可移式浮动游泳池
CN216874533U (zh) 一种养殖网箱
KR101094520B1 (ko) 부유식 방파제

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13895566

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13895566

Country of ref document: EP

Kind code of ref document: A1