WO2010067421A1 - 紙幣入金処理装置及び紙幣入金処理方法 - Google Patents
紙幣入金処理装置及び紙幣入金処理方法 Download PDFInfo
- Publication number
- WO2010067421A1 WO2010067421A1 PCT/JP2008/072333 JP2008072333W WO2010067421A1 WO 2010067421 A1 WO2010067421 A1 WO 2010067421A1 JP 2008072333 W JP2008072333 W JP 2008072333W WO 2010067421 A1 WO2010067421 A1 WO 2010067421A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- banknote
- banknotes
- unit
- binding
- current transaction
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07D—HANDLING OF COINS OR VALUABLE PAPERS, e.g. TESTING, SORTING BY DENOMINATIONS, COUNTING, DISPENSING, CHANGING OR DEPOSITING
- G07D11/00—Devices accepting coins; Devices accepting, dispensing, sorting or counting valuable papers
- G07D11/50—Sorting or counting valuable papers
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07D—HANDLING OF COINS OR VALUABLE PAPERS, e.g. TESTING, SORTING BY DENOMINATIONS, COUNTING, DISPENSING, CHANGING OR DEPOSITING
- G07D11/00—Devices accepting coins; Devices accepting, dispensing, sorting or counting valuable papers
- G07D11/20—Controlling or monitoring the operation of devices; Data handling
- G07D11/32—Record keeping
- G07D11/34—Monitoring the contents of devices, e.g. the number of stored valuable papers
Definitions
- the present invention relates to a banknote depositing processing apparatus and a banknote depositing processing method for classifying and collecting deposited banknotes of consecutive deposit transactions for each denomination and totaling the number of deposited banknotes for each denomination in units of transactions.
- banknote deposit processing having a banknote accumulation function and a banknote counting function for collecting and collecting deposited banknotes of continuous deposit transactions for each denomination and totaling the number of deposited banknotes for each denomination in units of transactions.
- the device is widely known.
- a denomination identifying unit that identifies the denomination of the banknote
- a stacker that classifies and accumulates banknotes for each banknote denomination
- a counting unit that counts the number of banknotes for each banknote denomination
- a failure recovery processing unit that separately manages the number of unconfirmed banknotes that are currently traded and the number of banknotes that have been accumulated in the stacker, that is, the final number of banknotes that is the previous trade before the current trade.
- Patent Literature 1 even if a failure such as jam jam occurs, after the failure is resolved, an unconfirmed bill that is the current transaction in the device, and a confirmed bill that is the previous transaction.
- the collected banknotes are reintroduced into the hopper, and the collection and collection operations of the collected banknotes are executed again based on the total amount of banknotes for the current transaction and the previous transaction, and the collected banknotes are selected according to the denomination. Since the stacker sequentially sorts and accumulates, even if a failure occurs, it is possible to return to the banknote accumulation state before the failure recovery.
- the counting means for counting the inserted banknotes the sealing means for sealing the banknotes counted by the counting means into small bundles every predetermined number, and the fractional banknotes not sealed
- collecting means for accumulating storage means for storing the number of fractional banknotes, and extraction of fractional banknotes being accumulated in the accumulating means, the fractional banknotes and the current banknote are collected and the collected banknotes are tabulated.
- the conventional banknote deposit processing apparatus has a banknote bundling function for bundling a specific denomination of banknotes every predetermined number, if a fault occurs during the current transaction, The banknotes for the previous transaction and the current transaction in this device are collected, and after these collected banknotes are reintroduced into the hopper, the collected and collected banknotes are classified and accumulated again.
- bundled banknotes are created, when collecting banknotes for the current transaction, it is necessary to dismantle all the bundled banknotes including the banknotes for that transaction. The work burden of the operator who re-injects the battery is heavy.
- the present invention has been made in view of the above points.
- the purpose of the present invention is to reduce the chance of disassembling a bundled banknote at the time of failure recovery, even if a banknote bundling function is added. It is providing the banknote deposit processing apparatus and the banknote deposit processing method which made the handling property of the transaction classification in a bundled banknote favorable, aiming at the significant improvement of this.
- a banknote deposit processing apparatus for determining the number of deposited banknotes in a continuous deposit transaction on a transaction basis, A transport unit that feeds and transports banknotes that have been thrown in by the input unit, and a banknote stacking unit that sequentially classifies and stacks banknotes of specific denominations to be bound among banknotes that are transported sequentially by the transport unit;
- the number of banknotes to be bundled classified and accumulated in the bundle of banknotes to be bundled is counted as the number of banknotes to be bundled as an undetermined number of banknotes received, and the number of banknotes to be bundled that has been classified and accumulated in the banknotes to be bundled bundle is
- the banknote binding unit for binding the predetermined number of banknotes to be bound, and the unconfirmed in the current transaction among the banknotes to be bound according to the binding timing of the predetermined number of bank
- the control section controls the driving of the transport section that re-transports the banknotes re-inserted into the insertion section.
- the control unit determines the current After clearing the undetermined number of banknotes deposited in the transaction and re-inserting all banknotes in the device into the input unit, the banknotes for the previous fraction immediately before the current transaction being registered and managed by the determination unit Is left in the bundling target banknote accumulating unit, and the conveyance unit for reconveying the banknote reintroduced into the insertion unit is driven and controlled.
- the banknote deposit processing apparatus detects the cancel operation of the current transaction in the configuration according to claim 1 of the present application, and the undetermined number of banknotes deposited in the current transaction. Clearing the number of banknotes received, and after re-inserting the banknotes including the banknotes in the current transaction and / or the banknotes for the undetermined banknotes into the input unit, the provisional confirmation in the current transaction And while rejecting the unconfirmed banknote from this device, re-inject into this input part to leave the banknotes of the previous fraction immediately before the current transaction being registered and managed by the confirmation part in the binding target banknote stacking part.
- a control unit that drives and controls the transport unit that re-transports the banknotes that have been used.
- the banknote deposit processing apparatus of Claim 5 of this application WHEREIN: When the cancellation operation of the said present transaction is detected in the structure of this application Claim 4, the guidance display of the bundle number of all the bundled banknotes in the said present transaction is carried out. A display unit is provided.
- the binding timing corresponds to a timing at which the predetermined number of bills are bound at the bill binding unit.
- the binding timing reaches a predetermined number of banknotes to be bound that are classified and accumulated in the banknote stacking unit for binding. It corresponds to the timing.
- banknote deposit processing apparatus in the configuration according to claim 1 of the present application, when the determination unit detects a transaction completion operation, banknotes accumulated in the binding target banknote stacking unit according to a predetermined setting. The registration was managed with the previous fraction being zero.
- the banknote deposit processing apparatus of this-application Claim 9 WHEREIN: The structure of Claim 1 of this application WHEREIN: The classification
- the undetermined banknote deposit number of the classified banknote stacking unit in the current transaction is temporarily confirmed at the banknote withdrawal timing, and when the confirmation unit detects the transaction completion operation,
- the tentatively confirmed banknote depositing number and the unconfirmed banknote depositing number of the binding target banknote stacking part in the current transaction are determined as the total banknote depositing number of the binding target banknote stacking part in the current transaction, and the current transaction
- the tentatively confirmed banknote deposit number and the undetermined banknote deposit number of the classified banknote stacking unit are determined as the total banknote depositing number of the classified banknote stacking unit in the current transaction, and are accumulated in the binding target banknote stacking unit.
- the banknote stacking number being stacked in the classified banknote stacking unit is registered and managed as the previous fraction of the sorted banknote stacking unit.
- the control unit determines the current After clearing the undetermined banknote deposit number of the bundled banknote stacking unit and the classified banknote stacking unit in a transaction, and re-inserting all banknotes in the device into the input unit, it is registered in the determination unit Banknotes for the previous fraction of the classified banknote stacking unit immediately before the current transaction and for leaving the banknotes for the previous fraction of the binding target banknote stacking unit immediately before the current transaction being managed, Is left in the classified banknote stacking unit, and the transport unit that re-transports the banknotes re-inserted into the insertion unit is driven and controlled.
- a bill deposit processing method for determining the number of bills to be deposited in a continuous deposit transaction on a transaction basis, and a step of inserting bills ,
- a transport step for paying out and transporting the banknotes inserted in this insertion step one by one, and a banknote stacking step for sequentially classifying and stacking banknotes of specific denominations to be bound among the banknotes sequentially transported in this transport step
- bundling target banknote counting step for counting the number of banking target banknotes classified and collected in this binding target banknote stacking step as an unconfirmed banknote depositing number, and the binding target banknotes classified and accumulated in the binding target banknote stacking step
- a banknote binding step for binding the predetermined number of banknotes to be bound when the number of sheets reaches a predetermined number; Tentatively confirming the undetermined banknote deposit number in the current transaction among the banknotes to be bundled, and detecting the transaction completion operation,
- the banknote deposit processing method classifies and accumulates the banknotes transported in the transport step according to denominations other than the specific denomination.
- An accumulation step, and a classified banknote counting step for totalizing the number of undetermined banknotes classified and accumulated in the classified banknote accumulation step, and the temporary confirmation step is a predetermined classified and accumulated in the classified banknote accumulation step.
- the tentatively determined banknote deposit number and the unconfirmed banknote deposit number of the binding target banknote accumulation step in the current transaction are the binding target paper in the current transaction. And confirming as the total number of banknotes deposited in the stacking step, the tentatively determined banknote depositing number in the current transaction and the undetermined banknote depositing number in the current transaction While confirming as the number of banknotes deposited, registering and managing the banknote stacking number of the binding target banknote stacking step as the previous fraction of the binding target banknote stacking step, and managing the banknote stacking number of the classification banknote stacking step of the classification banknote stacking step Registered and managed as a fraction of the previous time.
- the number of banknotes to be bound is tabulated as an unconfirmed banknote deposit number, and the banknotes are bound according to a predetermined number of banknote binding timings.
- the undetermined number of banknotes deposited in the current transaction is provisionally confirmed, so even if a banknote binding function that binds a predetermined number of banknotes is added, the handling of transaction categories in bundled banknotes is good For example, even if there is a bundled banknote in the current transaction, it is already bundled, instead of re-injecting all the banknotes of the current transaction and the previous transaction into the input part when recovering from a failure in the current transaction. Since it is only necessary to re-insert unconfirmed banknotes into the input section without dismantling the banknotes, the work load can be greatly improved.
- the temporarily confirmed banknote deposit number and the undetermined banknote deposit number in the current transaction are determined as the total banknote deposit number of the current transaction, and are bundled. Since the banknote stacking number being stacked in the target banknote stacking unit is registered and managed as the previous fraction, even if the banknote binding function is added, the current transaction and the previous transaction among the banknotes to be bound according to the transaction completion operation Of course, it is possible to determine the number of banknotes deposited for all deposited banknotes in the current transaction.
- the banknote deposit processing apparatus when detecting the cancel operation of the current transaction, the provisionally determined number of banknote deposits and undetermined banknotes in the current transaction After clearing the number of deposits and re-inserting the bundled banknotes including the banknotes currently in transaction and / or the banknotes for the undetermined banknotes into the input unit, the temporary and undetermined banknotes in the current transaction are While rejecting from this device, the banknotes re-inserted into this insertion part are re-conveyed in order to leave the banknotes for the previous fraction immediately before the current transaction being registered and managed in the confirmation part in the binding target banknote accumulation part. All banknote deposit transactions that are currently being transacted can be canceled.
- the banknote deposit processing apparatus in addition to the effect of claim 1 of the present application, according to the binding timing at which the number of banknotes to be bundled classified and accumulated in the bundled banknote stacking unit reaches a predetermined number. Of the banknotes to be bound, the undetermined banknote deposit number in the current transaction can be provisionally confirmed.
- the determination unit when the determination unit detects a transaction completion operation, the determination unit accumulates the binding target bill accumulation unit according to a predetermined setting. Since the previous bill is urged to be registered and managed as zero, the fraction can be extracted for each transaction according to a predetermined setting.
- the banknote deposit processing apparatus in addition to the effect of claim 1 of the present application, when the sampling of a predetermined number of banknotes classified and accumulated in the classified banknote stacking unit is detected, the current transaction is performed at the banknote sampling timing. Since the undetermined number of banknote deposits in the classified banknote stacking unit is temporarily determined, even when linked with the sorted banknote stacking unit, the handling of the transaction classification in the bundled banknotes can be improved.
- the temporarily confirmed banknote deposit number and the undetermined banknote deposit number of the bundle target banknote stacking part in the current transaction are bundled in the current transaction. Confirm the total number of banknotes deposited in the stacking unit, and confirm the number of temporarily deposited banknotes in the classified banknote stacking unit in the current transaction and the number of undetermined banknotes deposited as the total number of banknotes deposited in the grouped banknote stacking unit in the current transaction.
- the banknotes in the apparatus are excluded from the bundled banknotes and the extracted banknotes from the sorted banknote stacking unit. After re-injection, the banknotes reintroduced into this input part are re-conveyed, so even if linked with the classified banknote stacking part, if there are already banknotes in the transaction, the bundled banknotes are disassembled. Without doing this, it is possible to return to the banknote accumulation state at the time of provisional confirmation immediately before the current transaction only by re-inserting all the banknotes in the present apparatus except the bundled banknotes into the input unit.
- the bundled banknote stacking unit and the classification banknote stacking unit in the current transaction While clearing the tentatively confirmed banknote deposit number and the undetermined banknote deposit number, in addition to all the banknotes being accumulated in the classified banknote accumulation unit, all the bundled banknotes including the banknotes currently in the transaction, After re-inserting the banknotes that have been extracted from the classified banknote stacking unit and / or the banknotes for the undetermined banknote deposit amount, While rejecting unconfirmed banknotes from this device, leaving the banknotes for the previous fraction of the binding target banknote stacking unit immediately before the current transaction being registered and managed by the determination unit in the binding target banknote stacking unit, and , The current take In order to leave the banknotes of the previous fraction of the immediately preceding classified banknote stacking unit in the sorted banknote stacking unit, since
- the number of banknotes to be bound is tabulated as an unconfirmed number of banknotes deposited and bound according to the binding timing of a predetermined number of banknotes.
- the number of bills to be confirmed in the current transaction is tentatively confirmed, so even if a banknote bundling function for bundling a predetermined number of banknotes is added, the handling of transaction classification in bundled banknotes For example, even when there is a bundled banknote in the current transaction, instead of re-injecting all the banknotes of the current transaction and the previous transaction when recovering from a failure in the current transaction, Since it is only necessary to re-insert unconfirmed banknotes without dismantling, the work load can be greatly improved.
- the banknote deposit processing method when a transaction completion operation is detected, the tentatively confirmed banknote deposit number and the undetermined banknote deposit number in the current transaction are confirmed as the total banknote deposit number of the current transaction, and are bound. Since the banknote stacking number being stacked in the target banknote stacking step is registered and managed as the previous fraction, even if a banknote binding function is added, the current transaction and the previous transaction among the banknotes to be bound according to the transaction completion operation Of course, it is possible to determine the number of banknotes deposited for all deposited banknotes in the current transaction.
- the temporarily-determined number of banknote deposits and the undetermined banknote stacking step in the current transaction is confirmed as the total banknote deposit number of the banknote accumulation step in the current transaction, and the provisionally confirmed banknote deposit quantity and the unconfirmed banknote deposit number of the classified banknote accumulation step in the current transaction are While confirming as the total number of banknotes deposited in the classified banknote stacking step, registering and managing the banknote stacking number of the binding banknote stacking step as the previous fraction of the binding banknote stacking step, and classifying the banknote stacking number of the sorted banknote stacking step Since it was registered and managed as the previous fraction of the banknote stacking step, the transaction was completed even when linked to the banknote stacking step.
- FIG. 1 is an explanatory diagram showing a schematic configuration of the banknote deposit processing apparatus of the present embodiment.
- FIG. 2 is a block diagram showing a schematic configuration inside the banknote deposit processing apparatus.
- FIG. 3 is a flowchart showing the processing operation of the control unit related to the deposited banknote classification and accumulation process of the banknote deposit processing apparatus.
- FIG. 4 is an explanatory diagram simply showing state transitions of the binding target banknote stacking unit, the binding side counter unit, and the binding side display unit that are involved in normal transactions.
- FIG. 5 is a flowchart showing the processing operation of the control unit related to the failure recovery process of the banknote deposit processing apparatus.
- FIG. 6 is an explanatory diagram simply showing state transitions of the binding target banknote stacking unit, the binding side counter unit, and the binding side display unit that are involved during failure recovery.
- FIG. 7 is a flowchart showing the processing operation of the control unit related to the transaction cancellation process of the banknote deposit processing apparatus.
- FIG. 8 is an explanatory diagram simply showing state transitions of the binding target banknote stacking unit, the binding side counter unit, and the binding side display unit that are involved in the transaction cancellation.
- summary of a present Example will total the number of banknotes to be bound as an unconfirmed banknote deposit quantity, and bind them according to the timing of binding a predetermined number of banknotes. Among the banknotes, the number of undetermined banknote deposits in the current transaction is temporarily confirmed.
- the number of banknotes deposited for all deposited banknotes in the current transaction as well as the banknotes to be bundled in the current transaction and the previous transaction as well as the banknotes to be bundled are determined. be able to.
- FIG. 1 is an explanatory diagram showing a schematic configuration of the banknote depositing processing apparatus of the present embodiment
- FIG. 2 is a block diagram showing a schematic configuration inside the banknote depositing processing apparatus.
- the banknote deposit processing apparatus 1 shown in FIG. 1 deposits transaction banknotes continuously, classifies and accumulates these deposited banknotes for each denomination, and totals the number of deposited banknotes for each denomination, It has a banknote binding apparatus 3 that binds banknotes of a specific denomination classified by the banknote processing apparatus 2 in units of a predetermined number of sheets, and determines the number of banknotes received in a payment transaction in units of transactions.
- the banknote handling apparatus 2 transports the banknotes fed out by the hopper unit 11 that feeds transaction banknotes into the apparatus, the feeding unit 12 that feeds the banknotes put into the hopper unit 11 in units of one sheet, and the feeding unit 12.
- the transport unit 13, the denomination identifying unit 14 for identifying the denomination of the banknotes transported by the transport unit 13, and the banknotes transported by the transport unit 13 are directed to any one of the front surface and the back surface.
- a reversing unit 15 for reversing banknotes.
- the banknote processing apparatus 2 classifies and accumulates the banknotes transported by the transport unit 13, and corresponds to, for example, six stackers 16 corresponding to banknote denominations, denominations corresponding to the stackers 16, and banknote binding apparatuses 3. And a reject unit 17 that rejects banknotes not corresponding to the specific denomination.
- a reject unit 17 that rejects banknotes not corresponding to the specific denomination.
- banknote denominations 1 US dollar, 2 US dollars, 5 US dollars, 10 US dollars, 20 US dollars, 50 US dollars, and 100 US dollars.
- the banknote handling apparatus 2 includes, for example, among the six stackers 16, the first stacker 16A is 2 USD, the second stacker 16B is 5 USD, the third stacker 16C is 10 USD, the fourth stacker 16D is 20 USD, The fifth stacker 16E is classified and accumulated into 50 US dollars and the sixth stacker 16F is classified into 100 US dollars.
- the banknote binding apparatus 3 includes two binding target banknote stacking sections 21 that classify and stack a specific denomination, for example, one US dollar banknote, through the transport section 13 inside the banknote processing apparatus 2, and these two binding target banknote stacking.
- a specific denomination for example, one US dollar banknote
- the banknote binding unit 22 that binds 100 banknotes and the binding target banknote stacking unit 21 are stacked. It has a bundled banknote transport unit 23 that transports 100 banknotes to the banknote binding unit 22 as banknotes to be bound.
- the binding banknote transporting unit 23 collects 100 US dollar banknotes stacked on the binding target banknote stacking unit 21 as a banknote bundle extraction unit. 100 dollars of 1 US dollar banknote is conveyed to the banknote binding part 22 through the raising / lowering operation of the banknote bundle extraction part which was picked up and held by (not shown) and 100 dollars of 1 US dollar banknote was extracted and held.
- the banknote binding unit 22 binds 100 US dollar bills when 100 US dollar bills are transported through the binding banknote transport unit 23. In addition, let us bundle 100 US dollar bills as bundled bills.
- the banknote binding device 3 conveys the bundled banknote stacking unit 25 that stacks the banknotes bundled in the banknote binding unit 22 and the banknotes bundled in the banknote binding unit 22 to the bundled banknote stacking unit 25. And a bundled banknote transport unit 24.
- FIG. 2 is a block diagram showing a schematic configuration inside the banknote deposit processing apparatus 1.
- the banknote deposit processing apparatus 1 shown in FIG. 2 receives various commands in addition to the denomination identifying unit 14, a stacker side mechanical mechanism 30 inside the banknote processing apparatus 2, a binding side mechanical mechanism 40 inside the banknote binding apparatus 3. It has the operation part 50 to input, the drive control part 110 which drive-controls the stacker side mechanical mechanism 30 and the bundling side mechanical mechanism 40, and the control part 100 which controls this banknote deposit processing apparatus 1 whole.
- the stacker-side mechanical mechanism 30 includes a stacker-side detection sensor unit 31 that detects a state inside the stacker 16 in addition to the feeding unit 12, the transport unit 13, and the reversing unit 15.
- the stacker side detection sensor unit 31 is arranged for each stacker 16 such as the first to sixth stackers 16A to 16F, and stacker side bill counting unit 31A for counting the number of banknotes accumulated in the stacker 16, and the stacker 16 inside.
- a bill withdrawal detection unit 31B that detects withdrawal of all bills.
- the binding side mechanical mechanism 40 includes a binding side detection sensor unit 41 that detects the state inside the binding target banknote stacking unit 21 in addition to the banknote binding unit 22, the bundled banknote transport unit 23, and the bundled banknote transport unit 24. Yes.
- the binding side detection sensor unit 41 counts the number of banknotes accumulated inside the binding target banknote stacking unit 21 and the number of banknotes being stacked on the binding target banknote stacking unit 21 through the binding side banknote counting unit 41A. And a predetermined number detection unit 41B for detecting that the number has reached 100.
- the operation unit 50 includes a transaction completion key 51 for instructing completion of the deposit transaction, a cancel key 52 for instructing cancellation of the current transaction, and a failure recovery key 53 for instructing failure recovery during the transaction.
- the failure recovery key 53 is classified after a failure such as a jam jam occurs in the banknote deposit processing apparatus 1 during a transaction, and then returns to the bill accumulation state immediately before the current transaction or immediately after the previous transaction. This corresponds to a key for starting a failure recovery process (see FIG. 5), which will be described later, for continuing the accumulation.
- the cancel key 52 corresponds to a key for starting a transaction canceling process (see FIG. 7), which will be described later, which cancels the current transaction and returns to the banknote accumulation state immediately after the previous transaction.
- the banknote deposit processing apparatus 1 stores various information related to the stacking-side banknote stacking unit 21 and the stacker-side counter 60 that registers various types of stacking-related banknote stacking information in the stacker 16.
- the stacker-side counter unit 60 is disposed, for example, for each of the first to sixth stackers 16A to 16F.
- the stacker side unconfirmed counter 61 sequentially adds and registers the number of unconfirmed banknotes that are sequentially accumulated in the stacker 16 during the current transaction, that is, the stacker side unconfirmed number.
- the stacker-side temporary confirmation counter 62 determines the number of unconfirmed banknotes accumulated in each stacker 16 as the number of deposited banknotes in the current transaction according to the banknote extraction timing or the predetermined number arrival timing at a predetermined number during the current transaction. Temporarily confirming, and adding and registering the provisionally confirmed number of banknotes as a stacker-side provisionally confirmed number.
- the banknote sampling timing with a predetermined number of sheets corresponds to the detection timing of the banknote sampling detection unit 31B, and the predetermined number of sheets arrival timing is set to a predetermined number, for example, 100 for each stacker 16, and the banknotes of the stacker 16 are set in advance. This corresponds to the timing when the number of stacked sheets reaches a predetermined number.
- the stacker-side unconfirmed counter 61 subtracts the added registered number of sheets from the stacker-side unconfirmed number being registered when the stacker-side temporary confirmed number 62 is added and registered.
- the stacker side confirmation counter 63 uses the addition result of the stacker side temporary confirmation number and stacker side unconfirmed number of banknotes accumulated in each stacker 16 as the number of deposited banknotes of the current transaction corresponding to the stacker type. The determined number of banknotes is registered as the stacker side determined number.
- the stacker-side cumulative counter 64 registers the cumulative number of stacker-side determined sheets accumulated in the stacker 16 as the stacker-side cumulative number.
- the stacker-side previous fraction counter 65 sets the previous number of banknotes accumulated in the stacker 16 as the previous fraction, and registers the previous fraction.
- the stacker side display unit 80 is arranged for each of the first to sixth stackers 16A to 16F, for example, and a stacker side accumulated number display unit 81 that displays the accumulated number of accumulated transactions accumulated in the stacker 16;
- the stacker 16 has a stacker-side currently accumulated number display portion 82 for displaying the number of accumulated banknotes currently accumulated, and an information display portion 83 for displaying various guidance.
- the stacker-side accumulated number display unit 81 displays the result of adding the stacker-side unconfirmed number registered in the stacker-side unconfirmed counter 61 and the stacker-side provisionally confirmed number registered in the stacker-side temporary confirmed counter 62 during the transaction. It is displayed as the number of sheets.
- the binding side counter unit 70 includes a binding side unconfirmed counter 71, a binding side temporary determination counter 72, a binding side determination counter 73, a binding side cumulative counter 74, and a binding side previous fraction counter 75 of the binding target banknote stacking unit 21. is doing.
- the binding side unconfirmed counter 71 sequentially adds and registers the number of unconfirmed banknotes that are sequentially stacked in the binding target banknote stacking unit 21 during the current transaction, that is, the binding side unconfirmed number.
- the binding-side temporary confirmation counter 72 uses the number of unconfirmed banknotes accumulated in the binding target banknote stacking unit 21 as the number of deposited banknotes for the current transaction according to the banknote binding timing of the banknote binding unit 22 during the current transaction. Temporarily confirming, and adding and registering the temporarily confirmed number of banknotes as a binding side temporarily confirmed number.
- the binding side undetermined counter 71 subtracts the added registration number from the stacker side undetermined number being registered when the binding side tentative confirmation counter 72 adds and registers the binding side temporary confirmed number.
- the binding side confirmation counter 73 indicates the addition result of the binding side unconfirmed number and the binding side temporary confirmation number of the banknotes being accumulated in the binding target banknote stacking unit 21 for the specific denomination in the current transaction. This is confirmed as the number of deposited banknotes, and the determined number of banknotes is registered as the determined number of binding side.
- the binding side previous fraction counter 75 sets the previous number of banknotes accumulated in the binding target banknote accumulation unit 21 as the previous fraction, and registers the previous fraction.
- the binding side cumulative counter 74 registers the cumulative number of specific denomination banknotes as the binding side cumulative number.
- the binding side display unit 90 displays the number of banknotes being displayed in a binding side 91 for displaying the number of banknotes related to the banknote of a specific denomination currently being traded, and the number of banknotes currently being stacked in the binding target banknote stacking unit 21.
- the binding-side transaction bill count display unit 91 adds the result of adding the binding-side undetermined number registered in the binding-side undetermined counter 71 and the binding-side tentative fixed number registered in the binding-side tentative confirmation counter 72. It is displayed as the number of sheets.
- the bundling-side current accumulated number display unit 92 displays the number of accumulated banknotes currently being accumulated on the bundled banknote accumulating unit 21.
- the drive control unit 110 drives and controls the transport unit 13 so that the banknote is classified and accumulated in the stacker 16 of the corresponding denomination in the banknote processing apparatus 2.
- the transport unit 13 is driven and controlled to classify and stack the banknotes within the binding target banknote stacking unit 21 in the banknote binding device 3. .
- control part 100 respond
- the provisional determinator 101 sets the undetermined number of 100-sided banknotes stacked in the binding target banknote stacking unit 21 as the number of deposited banknotes of the specific denomination currently being traded, according to the banknote bundling timing currently being traded.
- the unfixed number on the binding side is added and registered in the binding-side temporary confirmation counter 72 as the binding-side temporary confirmation number.
- the provisional confirmation unit 101 determines whether or not the stacker side of the banknotes currently stacked on the stacker 16 currently being transacted according to the banknote sampling timing or the predetermined number arrival timing of the banknote sampling detector 31B during the current transaction.
- the determined banknote number is provisionally confirmed as the deposited banknote number of the stacker-compatible denomination currently being traded, and the stacker side unconfirmed banknote number is added and registered in the stacker side temporary confirmation counter 62 as the stacker side temporary confirmed number.
- the determination unit 102 registers the binding side temporary fixed number registered in the binding side temporary determination counter 72 to complete the current transaction.
- the result of adding the undetermined number on the binding side being registered in the binding-side undetermined counter 71 is confirmed as the number of banknotes of the specific denomination currently being traded, and the result of the addition is determined as the final number on the binding side of the current transaction This is registered in the confirmation counter 73.
- the confirmation unit 102 registers the bundle-side confirmed number of the current transaction in the binding-side confirmation counter 73, the confirmation unit 102 registers the number of banknotes stacked in the binding target banknote stacking unit 21 as the previous fraction in the binding-side previous fraction counter 75. Is.
- the confirmation unit 102 detects a transaction completion operation during the current transaction, for each stacker 16, the confirmation unit 102 is registering in the stacker side temporary confirmation number 62 registered in the stacker side temporary confirmation counter 62 and in the stacker side unconfirmed counter 61.
- the result of adding the undetermined number on the stacker side is determined as the number of deposited banknotes of the denomination corresponding to the current transaction, and the addition result is registered in the stacker side determination counter 63 as the determined number on the stacker side.
- the confirming unit 102 registers the stacker-side confirmed number of the current transaction in the stacker-side confirmed counter 63, the confirming unit 102 registers the number of banknotes accumulated in the stacker 16 in the stacker-side previous fraction counter 65 as the previous fraction.
- the confirmation unit 102 outputs the number of banknotes deposited for each denomination in the current transaction to the binding side confirmation counter 73 with the binding side confirmation number being registered and each stacker side confirmation number being registered to each stacker side confirmation number. become.
- the confirming unit 102 registers the binding-side determined number registered in the binding-side determined counter 73, adds the binding-side cumulative number up to the previous transaction to the registered binding-side cumulative counter 74, and updates the binding-side cumulative number. To do.
- the determination unit 102 stores the stacker-side fixed number currently registered in the stacker-side determination counter 63, and the stacker-side total counter that is registering the stacker-side cumulative number of stacked banknotes up to the previous transaction. 64 is added and registered, and the cumulative number on the stacker side is updated.
- control unit 100 includes a failure recovery processing unit 104 that executes a processing operation related to the failure recovery processing, and a transaction cancellation processing unit 105 that executes a processing operation related to the transaction cancellation processing.
- the transaction cancel processing unit 105 determines whether the current transaction is based on the number of binding side temporary confirmations registered in the binding side temporary confirmation counter 72. It is determined whether or not a bundled banknote including a banknote exists, and if a bundled banknote is present, the guidance display of the number of bundled banknotes including the banknote of the current transaction is displayed on the information display unit 83, and the bundled banknote Is not displayed, guidance is displayed on the information display section 83 that there is no bundled banknote including the banknote of the current transaction.
- the operator Based on the guidance display being displayed on the information display unit 83, for example, the operator recognizes the number of bundled banknotes including banknotes of the current transaction, disassembles the bundled banknotes for the number of bundles, and the banknotes to be bound. An undetermined number of banknotes stacked on the stacking unit 21 and all banknotes stacked on the stacker 16 are collected, and these collected banknotes are re-inserted into the hopper unit 11.
- the transaction cancellation processing unit 105 starts the sorting and stacking operation of the re-inserted collected banknotes via the drive control unit 110, and the banknote stacking number being stacked in the binding target banknote stacking unit 21 is being registered in the binding side previous fraction counter 75. , And whether or not the number of banknotes accumulated in each stacker 16 has reached the previous fraction being registered in the stacker-side previous fraction counter 65 is monitored.
- the transaction cancellation processing unit 105 sorts and collects the collected banknotes that have been thrown in again, the number of banknotes stacked in the binding target banknote stacking unit 21 reaches the previous fraction being registered in the binding side previous fraction counter 75. Thereafter, even if a banknote of a specific denomination corresponding to the binding target banknote stacking unit 21 is detected until the sorting and stacking operation of all collected banknotes is completed, the banknote is rejected to the reject unit 17.
- the transaction cancellation processing unit 105 during the sorting and stacking operation of the re-inserted collected banknotes, has reached the previous fraction that is being registered in the stacker-side previous fraction counter 65. In this case, even if a banknote of a denomination corresponding to the stacker 16 is detected until the operation of classifying and collecting all the collected banknotes is completed, the banknote is rejected to the reject unit 17.
- the transaction cancellation processing unit 105 collects all the deposited banknotes currently being transacted from the reject unit 17 according to the classification and accumulation operation of the collected banknotes that have been re-injected, and returns the banknotes to the accumulated state immediately before the start of the current transaction. It is something that can be done.
- the operator removes the failure and then removes the bundled banknote and the banknote extracted from the stacker 16 to determine the unconfirmed banknote accumulated in the binding target banknote stacking unit 21. And all the banknotes currently accumulate
- the temporary recovery determination unit 103 temporarily determines the current transaction. It is determined whether or not there exists.
- the failure recovery processing unit 104 starts the classification and accumulation operation of the re-inserted recovered banknotes when the temporary determination exists in the current transaction in the temporary determination determination unit 103 and the temporary determination is temporary determination based on the banknote binding timing. It monitors whether or not the number of stacked stackers 16 without provisional determination has reached the previous fraction being registered in the previous fraction counter 65 on the stacker side.
- the stacker side fraction sheet number of the last transaction is displayed on the stacker side present accumulation number display part 82 minusly.
- the stacker side current accumulated number display section 82 displays “ ⁇ 70” as minus.
- the stacker side current stack number display section 82 displays “ ⁇ 70” ⁇ “ ⁇ 69” ⁇ “ ⁇ 68” ⁇ .
- the stacker side current accumulated number display section 82 switches from the minus display to the normal display when the accumulated number of the stacker 16 reaches the previous fraction, that is, the accumulated number display “70” currently accumulated in the stacker 16. It will be. As a result, the operator can recognize the insufficient number of banknotes until returning to the banknote stacking state at the previous provisional confirmation time by visually checking the display on the stacker side current stacking number display section 82.
- the failure recovery processing unit 104 immediately before the current transaction It is possible to return to the bill accumulation state at the time of provisional confirmation.
- the failure recovery processing unit 104 re-injects the temporary confirmation when the temporary confirmation exists in the current transaction in the temporary confirmation determination unit 103 and the provisional confirmation is provisional confirmation at a predetermined number of banknote extraction timing or a predetermined number of times arrival timing.
- the collected and collected banknotes are collected and accumulated, and the number of banknotes accumulated in the bundled banknote stacking unit 21 reaches the previous fraction registered in the previous-side fractional counter 75 and there is no provisional confirmation in the current transaction. It monitors whether or not the number of banknotes accumulated in the stacker 16 has reached the previous fraction being registered in the previous fraction counter 65 on the stacker side.
- the control unit 100 has described the minus display of the stacker-side currently accumulated number display unit 82 when starting the sorting and accumulating operation of the re-inserted collected banknotes. The same applies to the display unit 92.
- the binding side current accumulated number display unit 92 displays “ ⁇ 70” minus.
- the bundling-side current accumulated number display unit 92 changes from “ ⁇ 70” ⁇ “ ⁇ 69” ⁇ “ ⁇ 68” ⁇ ... ⁇ “ ⁇ 1” every time the collected banknotes are accumulated in the bundling target banknote accumulating unit 21.
- the normal display is displayed from the minus display, that is, the stacking number display “70” currently being stacked on the binding target banknote stacking section 21. Will be switched to.
- the failure recovery processing unit 104 performs the sorting and stacking operation of the collected banknotes that have been re-inserted, the banknote stacking number being stacked in the binding target banknote stacking unit 21 reaches the previous fraction being registered in the binding-side previous fraction counter 75. This means that the banknote stacking state of the binding target banknote stacking unit 21 at the time point immediately before temporary confirmation has been returned.
- the failure recovery processing unit 104 reaches the previous fraction registered in the stacker-side previous fraction counter 65 during the classification and accumulation operation of the re-inserted collected bills. In this case, when the addition result of the stacker-side temporary fixed number at the previous temporary determination time and the stacker-side cumulative number of the previous transaction is reached, the banknote accumulation state of each stacker 16 at the previous temporary determination time is returned.
- the failure recovery processing unit 104 is registering the number of banknotes accumulated in the binding target banknote accumulating unit 21 in the binding side previous fraction counter 75. Whether or not the accumulated number of banknotes accumulated in the stacker 16 that has not been temporarily determined reaches the previous fraction registered in the stacker-side previous fraction counter 65.
- the failure recovery processing unit 104 when the collected banknotes that have been re-injected are classified and stacked, when the number of banknotes stacked in the binding target banknote stacking unit 21 reaches the previous fraction, the binding target banknote stacking unit at the start of the current transaction It has returned to the banknote accumulation state of 21.
- the failure recovery processing unit 104 reaches the previous fraction registered in the stacker-side previous fraction counter 65 during the classification and accumulation operation of the re-inserted collected bills. In this case, the banknote accumulation state of each stacker 16 at the start of the current transaction is returned.
- the banknote deposit processing apparatus 1 described in the claims of the present application is the banknote deposit processing apparatus 1, the input section is the hopper section 11, the transport section is the transport section 13 and the bundled banknote transport section 23, and the binding target banknote stacking section is the binding target banknote stacking section 21.
- the binding target bill counting unit is the binding side bill counting unit 41A
- the banknote binding unit is the banknote binding unit 22
- the temporary determination unit is the temporary determination unit 101
- the determination unit is the determination unit 102.
- the temporary confirmation determination unit is the temporary confirmation determination unit 103
- the control unit is the drive control unit 110
- the display unit is the information display unit 83
- the classified banknote stacking unit is the stacker 16, and the classified banknote.
- the counting unit corresponds to the stacker-side bill counting unit 31A.
- FIG. 3 is a flowchart showing the processing operation of the control unit 100 related to the deposited banknote classification and accumulation process of the banknote deposit processing apparatus 1.
- 3 is a process of counting the number of deposited banknotes for each denomination in transaction units.
- the operator executes the transaction start operation after inserting the deposited banknote of the current transaction into the hopper unit 11.
- the control unit 100 inside the banknote depositing processing apparatus 1 sequentially classifies the banknotes inserted into the hopper unit 11 for each denomination, and sequentially stacks the banknotes on the binding target banknote stacking unit 21 or the stacker 16 according to the denomination.
- the control unit 100 determines whether or not a transaction completion operation in the current transaction has been detected through the transaction completion key 51 (step S11).
- control unit 100 determines whether or not a banknote is detected through the denomination identifying unit 14 on the conveyance path (Step S12).
- Step S13 the control unit 100 determines whether or not the banknote is a specific denomination.
- the control unit 100 determines that the banknote is a binding target banknote, and drives and controls the transport unit 13 to stack the banknote on the binding target banknote stacking unit 21 ( Step S14).
- the control unit 100 adds and registers the binding side unconfirmed number of sheets in the current transaction to the binding side unconfirmed counter 71 (step S15).
- the binding-side bill counting unit 41A increments the binding-side unconfirmed counter by +1 as the binding-side unconfirmed number every time bills are stacked on the binding target bill stacking unit 21.
- step S16 When the controller 100 adds and registers the binding-side unconfirmed number in the current transaction in the binding-side unconfirmed counter 71, the number of stacked banknotes being stacked in the binding target banknote stacking unit 21 through the predetermined number detection unit 41B becomes a predetermined number. It is determined whether or not it has been reached (step S16).
- step S16 When the number of stacked banknotes being stacked in the binding target banknote stacking unit 21 reaches a predetermined number (Yes in step S16), the control unit 100 transfers a predetermined number of banknotes to the banknote binding unit 22 through the binding banknote transporting unit 23. Then, a predetermined number of banknotes are bundled (step S17).
- the control unit 100 sets a predetermined number of banknotes bundled in the banknote binding unit 22 as bundled banknotes, conveys the bundled banknotes to the bundled banknote stacking unit 25 through the bundled banknote transport unit 24, and binds them.
- the banknotes are stacked on the bundled banknote stacking unit 25 (step S18).
- the temporary confirmation unit 101 in the control unit 100 has the predetermined number of binding-side unconfirmed sheets registered in the binding-side unconfirmed counter 71 in the current transaction at the time of banknote binding of the banknote binding unit 22 in step S17.
- the amount is temporarily confirmed as the number of banknotes deposited for a specific denomination, and the unconfirmed number on the binding side is added and registered in the binding side temporary confirmation counter 72 as the binding side temporary confirmation number (step S19), and the transaction completion operation for the current transaction is detected.
- the process proceeds to step S11 to determine whether or not it has been done.
- the control unit 100 adds the registered number from the binding-side undetermined number being registered in the binding-side undetermined counter 71. You will reduce the minutes.
- control part 100 determines whether a banknote is a denomination corresponding to a stacker, when a banknote is not a specific denomination in step S13 (step S13 negative) (step S20).
- the control unit 100 accumulates the banknote on the stacker 16 corresponding to the banknote denomination through the transport unit 13 (Step S21).
- the control unit 100 adds and registers the stacker-side undetermined number in the current transaction to the stacker-side undetermined counter 61 (step S22).
- the stacker-side bill counting unit 31A increments the stacker-side unconfirmed counter 61 by +1 as the stacker-side unconfirmed number each time a bill is stacked on the stacker 16.
- control unit 100 determines whether or not a bill withdrawal has been detected through the bill withdrawal detection unit 31B (step S23).
- the temporary confirmation unit 101 determines whether or not the number of banknotes stacked in the banknote sampling stacker 16 has reached a predetermined number when it detects banknote sampling (step S23: Yes) (step S23A). When the number of banknotes accumulated in the banknote sampling stacker 16 reaches a predetermined number (Yes in step S23A), the temporary determination unit 101 determines each stacker side unconfirmed counter 61 at the time of banknote sampling timing or the predetermined number of times arrival timing in the current transaction.
- the stacker side undetermined number currently registered in the stacker is provisionally confirmed as the number of banknotes deposited for the stacker type, and the stacker side undetermined number is added and registered in the stacker side temporary confirmation counter 62 as the stacker side temporary definite number (step S24). Then, the process proceeds to step S11 to determine whether or not a transaction completion operation for the current transaction has been detected.
- the control unit 100 adds and registers from the stacker-side undetermined counter 61 in the stacker-side undetermined counter 61. The number of sheets will be reduced.
- the confirmation unit 102 inside the control unit 100 detects a transaction completion operation for the current transaction (Yes in step S11), the binding side temporary fixed number and the binding side being registered in the binding side temporary determination counter 72 in the current transaction.
- the addition result of the binding-side unconfirmed number registered in the unconfirmed counter 71 is confirmed as the number of banknotes deposited for a specific denomination, and the addition result is registered in the binding-side confirmation counter 73 as the binding-side fixed number in the current transaction ( Step S26).
- the confirming unit 102 adds and registers the binding-side determined number in the current transaction as the binding-side cumulative number in the binding-side cumulative counter 74 (step S27).
- the confirming unit 102 adds the result of adding the stacker-side tentative fixed number registered in the stacker-side tentative fixed counter 62 of each stacker 16 in the current transaction and the stacker-side undetermined number registered in the stacker-side undetermined counter 61.
- the banknote deposit amount of the stacker-compatible denomination is confirmed, and the addition result is registered in the stacker side confirmation counter 63 as the stacker side determined number in the current transaction (step S28).
- the confirming unit 102 adds and registers the stacker side determined number in the current transaction to the stacker side total counter 64 as the stacker side total number (step S29).
- the confirming unit 102 registers the banknote stacking number being stacked in the binding target banknote stacking unit 21 as the previous fraction in the binding side previous fraction counter 75, and sets the stacker side banknote stacking number as the previous fraction in the stacker side previous fraction counter 65. Register (step S30).
- the confirmation unit 102 includes a binding-side temporary confirmation counter 72, a binding-side undetermined counter 71, a binding-side undetermined counter 71, a stacker-side tentative counter 62 stacker-side tentative confirmation sheet 62, and a stacker-side undetermined counter 61. Is cleared (step S31), the current transaction is completed, and the processing operation shown in FIG. 3 is terminated.
- step S12 If the banknote is not detected in step S12 (No in step S12), the control unit 100 proceeds to step S11 to determine whether or not a transaction completion operation has been detected.
- step S16 when the number of stacked banknotes being stacked on the binding target banknote stacking unit 21 has not reached the predetermined number in step S16 (No in step S16), the control unit 100 determines whether or not a transaction completion operation has been detected. To make a determination, the process proceeds to step S11.
- step S23 If the banknote withdrawal is not detected in step S23 (No in step S23), the control unit 100 proceeds to step S11 to determine whether or not a transaction completion operation has been detected.
- Step S32 the control unit 100 conveys the banknote to the reject unit 17 (Step S32), and proceeds to Step S11.
- Step S23A When the number of banknotes stacked in the banknote sampling stacker 16 has not reached the predetermined number in Step S23A (No in Step S23A), the control unit 100 clears the undetermined number of the stacker 16 at the time of sampling (Step S23A). S33), the process proceeds to step S11.
- the undetermined number of binding sides registered in the binding side undetermined counter 71 in the current transaction at the time of banknote binding at the banknote binding unit 22 is temporarily set as the number of banknotes deposited for a specific denomination.
- the unfixed number of the binding side is confirmed and added and registered in the binding side temporary determination counter 72 as the binding side temporary fixed number. That is, the work burden after that can be reduced by tentatively confirming the deposit of the specific denomination in the current transaction at the time of banknote bundling.
- the banknote sampling timing or the predetermined number attainment timing in the current transaction is reached.
- the stacker-side unconfirmed number of sheets registered in each stacker-side unconfirmed counter 61 is provisionally confirmed as a banknote deposit amount of the stacker-compatible denomination, and the stacker-side unconfirmed number of sheets is set as the stacker-side unconfirmed number of sheets to the stacker side temporary confirmation counter 62 Add and register. That is, it is possible to reduce the subsequent work load by provisionally confirming the deposit of the denomination corresponding to the stacker in the current transaction at the time of banknote sampling timing or the predetermined number of times arrival timing.
- the tentatively confirmed banknote deposit number and the unconfirmed banknote deposit number in the current transaction are confirmed as the total banknote deposit number of the current transaction, and the bundle target banknote accumulation unit
- the bundle target banknote accumulation unit In addition to registering and managing the number of banknotes accumulated in 21 as the previous fraction and registering and managing the number of banknotes accumulated in the stacker 16 as the previous fraction, of the banknotes to be bundled according to the transaction completion operation
- FIG. 4 is an explanatory diagram simply showing state transitions of the binding target banknote stacking unit 21, the binding side counter unit 70, and the binding side display unit 90 that are involved in normal transactions.
- the banknote stacking number in the binding target banknote stacking unit 21 is Because it is “0”, the binding side unconfirmed counter 71 is “0”, the binding side cumulative counter 74 is “0”, the binding side previous fraction counter 75 is “0”, the binding side temporary confirmation counter 72 is “100”, and the binding The side currently accumulated number display unit 92 displays “0”, and the binding side transaction bill number display unit 91 displays “100” (status 3).
- the binding side unconfirmed counter 71 is “70”.
- the binding side temporary confirmation counter 72 is" 100 "
- the binding side cumulative counter 74 is” 0 "
- the binding side previous fraction counter 75 is” 0 "
- the binding side transaction bill number display 91 is" 170 "
- the binding side The currently accumulated number display portion 92 displays “70” (status 4).
- the binding side unconfirmed counter 71 is “0”, and the binding side temporary confirmation is made.
- the counter 72 is “0”
- the binding side cumulative counter 74 is “170”
- the binding side previous fraction counter 75 is “70”
- the binding side bill number display unit 91 is “0”
- the binding side currently accumulated number display unit 92 Displays "70" (status 5).
- the banknote stacking number in the binding target banknote stacking unit 21 is Because it is “0”, the binding side unconfirmed counter 71 is “0”, the binding side temporary confirmation counter 72 is “30”, the binding side previous fraction counter 75 is “70”, and the binding side cumulative counter 74 is “170”.
- the side transaction bill number display portion 91 “30” is displayed, and on the bundling side current accumulated number display portion 92, “0” is displayed (status 8).
- the binding side unconfirmed counter 71 is “60”.
- the binding side temporary confirmation counter 72 is” 30 "
- the binding side cumulative counter 74 is” 170 "
- the binding side previous fraction counter 75 is” 70 "
- the binding side transaction bill number display 91 is” 90 "
- the binding side The currently accumulated number display portion 92 displays “60” (status 9).
- the number of banknotes accumulated in the binding target banknote stacking unit 21 is “60”, so that the binding side unconfirmed counter 71 is “0”, and the binding side temporary confirmation is made.
- the counter 72 is “0”
- the bundling side cumulative counter 74 is “260”
- the bundling side previous fraction counter 75 is “60”
- the bundling side transaction bill number display unit 91 is “0”
- FIG. 5 is a flowchart showing the processing operation of the control unit 100 related to the failure recovery processing of the banknote deposit processing apparatus 1.
- the control unit 100 shown in FIG. 5 determines whether or not the key operation of the failure recovery key 53 is detected after the collected banknotes are re-inserted into the hopper unit 11 (step S41).
- Step S42 the temporary determination determination unit 103 determines whether or not there is temporary determination in the current transaction.
- the failure recovery processing unit 104 determines whether or not the provisional confirmation is provisional confirmation based on the banknote bundling timing when the provisional confirmation exists in the current transaction (Yes in Step S42) (Step S43).
- the failure recovery processing unit 104 determines the number of binding side unconfirmed sheets of the binding side unconfirmed counter 71 and the number of stacker side unconfirmed counters of the stacker side unconfirmed counter 61. Is cleared (step S44), and the classification and accumulation operation for the collected banknotes inserted into the hopper 11 is started (step S45).
- control unit 100 sequentially identifies the collected banknotes in accordance with the start of the collection and sorting operation of the collected banknotes, and determines the bundled banknote stacking unit 21, the stacker 16, or the reject unit 17 according to the banknote denomination. Will be transported.
- the failure recovery processing unit 104 determines whether or not the number of stacked stackers 16 that are not tentatively determined in the current transaction has reached the previous fraction (step S46).
- the failure recovery processing unit 104 ends the processing operation shown in FIG. 5 when the number of stacked stackers 16 that have not been tentatively determined in the current transaction has reached the previous fraction (Yes at Step S46).
- step S46 the failure recovery processing unit 104 proceeds to step S46 until the number of stacked stackers reaches the addition result. Continue the monitoring process.
- the banknote stacking unit 21 and the stackers 16 that are to be bound can be returned to the banknote stacking state at the time of provisional confirmation immediately before the banknote binding timing.
- the failure recovery processing unit 104 determines that the provisional confirmation is provisional confirmation based on a predetermined number of banknote extraction timing or a predetermined number of sheets arrival timing (Step S47), clearing the binding-side unconfirmed number of the binding-side unconfirmed counter 71 and the stacker-side unconfirmed number of the stacker-side unconfirmed counter 61 (Step S48), and performing the sorting and accumulating operation for the collected banknotes inserted into the hopper unit 11. Start (step S49).
- the failure recovery processing unit 104 determines whether or not the accumulated number of banknotes being accumulated in the bundled banknote accumulating unit 21 has reached the previous fraction, and the accumulated number of stackers 16 that have not been tentatively determined in the current transaction has reached the previous fraction. Is determined (step S50).
- the failure recovery processing unit 104 when the accumulated number of banknotes being accumulated in the bundled banknote accumulating unit 21 has reached the previous fraction, and the accumulated number of stackers 16 that are not tentatively determined within the current transaction has reached the previous fraction (step). S50 Yes), the processing operation shown in FIG. As a result, in the binding target banknote stacking unit 21 and each stacker 16, it is possible to return to the banknote stacking state at the time of the provisional confirmation immediately before the predetermined number of banknote extraction timings or the predetermined number of sheets arrival timing.
- the failure recovery processing unit 104 determines that the number of stacked banknotes being stacked in the binding target banknote stacking unit 21 has not reached the previous fraction, or the number of stacked stackers 16 that are not tentatively determined in the current transaction is the previous fraction. If not reached (No in step S50), the monitoring process in step S50 is continued until the number of stacked sheets reaches a specific number.
- the failure recovery processing unit 104 determines the number of unfixed sheets on the binding side of the unconfirmed counter 71 on the binding side and the number of unconfirmed sheets on the stacker side of the stacker-side unconfirmed counter 61. Is cleared (step S51), and the classification and accumulation operation for the collected banknotes inserted into the hopper unit 11 is started (step S52).
- the failure recovery processing unit 104 determines whether or not the accumulated number of banknotes being accumulated in the binding target banknote accumulating unit 21 has reached the previous fraction and whether the accumulated number of banknotes being accumulated in each stacker 16 has reached the previous fraction. (Step S53).
- the failure recovery processing unit 104 when the accumulated number of banknotes being accumulated in the binding target banknote accumulating unit 21 has reached the previous fraction, and the accumulated number of banknotes being accumulated in each stacker 16 has reached the previous fraction (Yes in step S53). ), The processing operation shown in FIG. As a result, the binding target banknote stacking unit 21 and each stacker 16 have returned to the banknote stacking state at the start of the current transaction.
- the failure recovery processing unit 104 has not reached the previous fraction of the number of banknotes being stacked in the banknote stacking unit 21 to be bundled, or has reached the previous fraction of the banknotes being stacked in each stacker 16. If not (No at Step S53), the monitoring process at Step S53 is continued until the number of stacked sheets reaches a specific number.
- Step S41 when the operation of the failure recovery key 53 is not detected in Step S41 (No in Step S41), the control unit 100 ends the processing operation illustrated in FIG.
- the classification and accumulation operation for the collected banknotes thrown into the hopper unit 11 when the temporary confirmation immediately before the current transaction is the temporary confirmation of the banknote bundling timing
- the number of banknotes accumulated in the stacker 16 that has not been provisionally reached reaches the previous fraction registered in the stacker-side previous fraction counter 65, even if a bundled banknote exists in the current transaction, Without disassembling the bundled banknotes, it is possible to return to the banknote accumulation state at the time of provisional confirmation immediately before the current transaction by simply re-inserting all banknotes in the apparatus except the bundled banknotes into the hopper unit 11. .
- the failure recovery process when a failure occurs, after the failure is resolved, the recovery that has been thrown into the hopper 11 when the provisional confirmation immediately before the current transaction is the provisional confirmation of the banknote sampling timing or the predetermined number arrival timing at the predetermined number
- the number of stacked banknotes being stacked in the banknote stacking unit 21 reaches the previous fraction, and the number of stacked stackers 16 that have not been provisionally confirmed in the current transaction reaches the previous fraction.
- the sorting and accumulating operation for the collected banknotes input into the hopper unit 11 is started, and the bundled banknote stacking unit 21 is started.
- the accumulated number of banknotes being accumulated has reached the previous fraction, and when the accumulated number of banknotes being accumulated in each stacker 16 has reached the previous fraction, all the banknotes in the apparatus are simply reinserted into the hopper unit 11. It is possible to return to the accumulated state of banknotes at the start of the current transaction.
- FIG. 6 is an explanatory diagram simply showing state transitions of the binding target banknote stacking unit 21, the binding side counter unit 70, and the binding side display unit 90 that are involved during failure recovery.
- the number of banknotes stacked in the binding target banknote stacking unit 21 is “80”, but the binding side unconfirmed counter 71 is “0”, and the binding side temporary confirmation counter 72. Is “0”, the binding side cumulative counter 74 is “170”, the binding side previous fraction counter 75 is “70”, the binding side transaction bill number display portion 91 is “10”, and the binding side current accumulated number display portion 92 is “ ⁇ ”will be displayed (status 13). In addition, it is in the state of waiting for obstacle elimination and banknote collection
- the banknote stacking number in the binding target banknote stacking unit 21 is “0”.
- the unconfirmed counter 71 is “0”
- the binding-side temporary confirmation counter 72 is “0”
- the binding-side cumulative counter 74 is “170”
- the binding-side previous fraction counter 75 is “70”
- the binding-side transaction bill number display unit 91 Is “0”
- the bundling side current accumulated number display section 92 displays “ ⁇ 70” (status 14).
- the binding side unconfirmed counter 71 is “0” and the binding side temporary confirmation counter 72 is “0”.
- the binding side cumulative counter 74 is" 170 ", the binding side previous fraction counter 75 is” 70 ", the binding side transaction bill number display unit 91 is” 0 ", and the binding side currently accumulated number display unit 92 is” -69 ". Is displayed (status 15).
- the classification and accumulation operation for the collected banknotes is sequentially continued.
- the binding side unconfirmed counter 71 is “0”
- the binding side temporary determination counter 72 is “0”
- the binding side cumulative counter 74 is “ 170
- the binding side previous fraction counter 75 is “70”
- the binding side transaction bill number display unit 91 is “0”
- the binding side current accumulated number display unit 92 is “ ⁇ 1” (status 16). ).
- the binding side unconfirmed counter 71 is “1”
- the binding side temporary determination counter 72 is “0”
- the binding side cumulative counter 74 is “ 170
- the binding side previous fraction counter 75 is “70”
- the binding side transaction bill number display unit 91 is “1”
- the binding side current accumulated number display unit 92 is “71” (status 18).
- the binding side unconfirmed counter 71 is “0” and the binding side temporary confirmation counter 72 is “0”.
- the binding side cumulative counter 74 displays “180”
- the binding side previous fraction counter 75 displays “80”
- the binding side transaction bill number display unit 91 displays “0”
- the binding side current accumulated number display unit 92 displays “80”.
- FIG. 7 is a flowchart showing the processing operation of the control unit 100 related to the transaction canceling process of the banknote deposit processing apparatus 1.
- the transaction cancellation process shown in FIG. 7 is a process for canceling the current transaction and returning all deposited banknotes currently being transacted.
- the control unit 100 determines whether or not a transaction cancel operation of the cancel key 52 has been detected (step S61).
- the transaction cancel processing unit 105 determines the current transaction based on the binding side temporary fixed number of the binding side temporary fixed counter 72 in the current transaction. It is determined whether or not there is a bundled banknote including a minute banknote (step S62).
- the transaction cancellation processing unit 105 displays information on the number of bundled banknotes to be disassembled in relation to the current transaction based on the binding-side temporary fixed number.
- the guidance is displayed on the part 83 (step S63). The operator collects the bundled banknotes for the number of bundles from the bundled banknote stacking unit 25 based on the number of bundles displayed on the information display unit 83 and disassembles the bundled banknotes for the number of bundles. is there.
- the transaction cancellation processing unit 105 displays a guidance on the information display unit 83 that there is no bundled banknotes to be dismantled in the current transaction. (Step S64).
- the transaction cancellation processing unit 105 displays guidance on the information display unit 83 in step S63 or step S64, and then determines the number of binding side unconfirmed sheets of the binding side unconfirmed counter 71, the number of binding side temporarily confirmed sheets of the binding side temporary confirmed counter 72, The stacker-side undetermined number of the stacker-side undetermined counter 61 and the stacker-side tentatively-determined counter 62 are cleared (step S65).
- the operator collects all the banknotes disassembled based on the guidance display in step S63, all the banknotes that are unconfirmed being accumulated in the binding target banknote stacking unit 21, and all the banknotes that are being accumulated in each stacker 16, and these collected banknotes are collected.
- the hopper unit 11 is recharged.
- step S66 When the transaction cancellation processing unit 105 detects the re-insertion of the collected banknotes into the hopper unit 11 (step S66), the transaction cancellation processing unit 105 starts the classification and accumulation operation of the collected banknotes inserted into the hopper unit 11 (step S67).
- the accumulated number of banknotes being accumulated in the binding target banknote accumulating unit 21 reaches the previous fraction being registered in the binding-side previous fraction counter 75, and the accumulated number of banknotes being accumulated in each stacker 16 is It is determined whether or not the previous fraction has been reached (step S68).
- the transaction cancellation processing unit 105 determines that the number of stacked banknotes being stacked in the binding target banknote stacking unit 21 has reached the previous fraction and the number of stacked banknotes being stacked in each stacker 16 has reached the previous fraction (Yes in step S68). ), The processing operation shown in FIG. As a result, the binding target banknote stacking unit 21 and each stacker 16 have returned to the banknote stacking state immediately before the start of the current transaction.
- the transaction cancellation processing unit 105 has not reached the previous fraction of the banknotes stacked in the banknote stacking unit 21, or has reached the previous fraction of banknotes stacked in each stacker 16. If not (No at Step S68), the monitoring process at Step S68 is continued until the number of stacked sheets reaches a specific number.
- the transaction cancellation processing unit 105 collects all the collected banknotes until the accumulated number of banknotes accumulated in the binding target banknote accumulating unit 21 reaches the previous fraction and the accumulated number of banknotes accumulated in each stacker 16 reaches the previous fraction. Are sequentially classified and accumulated, but are classified into the specific denomination banknotes that are already classified into the binding target banknote stacking unit 21 that has already reached the binding side undetermined number, and the stacker 16 that has already reached the cumulative number of stackers on the previous transaction. Even if a denomination banknote is detected, the banknote is rejected to the reject unit 17 without executing the banknote classification and accumulation on the binding target banknote stacking unit 21 or the stacker 16.
- the bundled banknote stacking unit 21 and each stacker 16 can return to the banknote stacking state immediately before the start of the current transaction and collect the inserted banknotes after the start of the current transaction from the reject unit 17.
- the sorting and stacking operation for the collected banknotes is started, and the stacking number of banknotes stacked in the binding target banknote stacking unit 21 reaches the previous fraction, and each stacker 16 All the collected banknotes are sequentially sorted and collected until the number of banknotes being stacked reaches the previous fraction, but the specific denomination banknotes to be classified into the binding target banknote stacking unit 21 that has already reached the previous fraction on the binding side. Or, when a denomination banknote to be classified into the stacker 16 that has already reached the previous fraction on the stacker side is detected, the banknote is rejected without performing the banknote classification and accumulation on the binding target banknote stacking unit 21 or the stacker 16.
- FIG. 8 is an explanatory diagram simply showing state transitions of the binding target banknote stacking unit 20, the binding side counter unit 80, and the binding side display unit 90 involved when canceling a transaction.
- the number of banknotes accumulated in the banknote stacking unit 21 to be bound is “70”, so that the binding side unconfirmed counter 71 is “0”, the binding side temporary confirmation counter 72 is “0”, The binding side cumulative counter 74 displays “170”, the binding side previous fraction counter 75 displays “70”, the binding side transaction bill number display unit 91 displays “0”, and the binding side current accumulated number display unit 92 displays “70”. (Status 31).
- the banknote stacking number in the binding target banknote stacking unit 21 is Because it is “0”, the binding side unconfirmed counter 71 is “0”, the binding side temporary confirmation counter 72 is “30”, the binding side previous fraction counter 75 is “70”, and the binding side cumulative counter 74 is “170”.
- the side bill number display unit 91 on the side transaction displays “30”, and the binding side current accumulated number display unit 92 displays “0” (status 32A).
- the number of banknotes accumulated in the binding target banknote stacking unit 21 is “0”
- the binding side unconfirmed counter 71 is “0”
- the binding side temporary confirmation counter 72 is “0”
- the binding side cumulative counter 74 is “170”
- the binding side previous fraction counter 75 is “70”
- the binding side transaction bill number display portion 91 is “0”
- the binding side current accumulated number display portion 92 is “ ⁇ ”.
- 70 is displayed (status 33). Based on the display guidance, the operator collects all the banknotes that are being stacked in the binding target banknote stacking unit 21, puts these recovered banknotes into the hopper unit 11, and starts a sorting and stacking operation for the recovered banknotes.
- the binding side unconfirmed counter 71 is “0” and the binding side temporary confirmation counter 72 is “0”.
- the binding side cumulative counter 74 is" 170 ", the binding side previous fraction counter 75 is” 70 ", the binding side transaction bill number display unit 91 is” 0 ", and the binding side currently accumulated number display unit 92 is” -69 ". Is displayed (status 34).
- the classification and accumulation operation for the collected banknotes is sequentially continued.
- the binding side unconfirmed counter 71 is “0”
- the binding side temporary determination counter 72 is “0”
- the binding side cumulative counter 74 is “ 170
- the binding side previous fraction counter 75 is “70”
- the binding side transaction bill number display unit 91 is “0”
- the binding side current accumulated number display unit 92 is “ ⁇ 1” (status 35).
- the number of banknotes to be bundled is counted as an undetermined banknote deposit number, and the undetermined banknote deposit number in the current transaction among the banknotes to be bundled according to the binding timing of 100 banknotes.
- a banknote bundling function for bundling 100 banknotes is added, the handling of transaction categories in a bundled banknote can be improved, and for example, when a failure is restored in a current transaction.
- the undetermined banknote is hopped without dismantling the bundled banknote. Since it is only necessary to re-enter the unit 11, the work load can be greatly improved.
- the provisionally confirmed banknote deposit number and the unconfirmed banknote deposit number in the current transaction are determined as the total banknote deposit number of the current transaction, and are accumulated in the binding target bill accumulation unit 21. Since the number of banknotes in the bank is registered and managed as the previous fraction, even if the banknote binding function is added, according to the transaction completion operation, the banknotes to be bundled in the current transaction and the previous transaction are classified according to the transaction completion operation. Of course, the number of banknotes deposited for all deposited banknotes in the current transaction can be determined.
- the undetermined banknotes of the banknote accumulation unit 21 to be bundled in the current transaction are Since it is only necessary to re-enter the unit 11, the work load can be greatly improved.
- all the banknotes of the binding target banknote stacking unit 21 in the current transaction are obtained from the temporarily determined banknote depositing number and the unconfirmed banknote depositing number of the binding target banking stacking unit 21 in the current transaction.
- the provisionally confirmed banknote deposit number and the undetermined bill deposit number of the stacker 16 in the current transaction are confirmed as the total banknote deposit number of the stacker 16 in the current transaction, and the binding target banknote stacking unit 21 Since the banknote stacking number being stacked is registered and managed as the previous fraction of the banknote stacking unit 21 to be bundled, even if it is linked to the stacker 16, the current transaction and The number of banknotes deposited for all banknotes in the current transaction can be determined as well as the classification of the number of banknotes deposited in the previous transaction.
- a failure recovery operation is detected in the current transaction, and when there is provisional confirmation in the current transaction, the undetermined number of banknotes deposited in the binding target banknote stacking unit 21 and the stacker 16 in the current transaction is cleared.
- the re-introduced banknotes are re-conveyed. If there is a bundled banknote in the transaction, all the banknotes in this device, except for the bundled banknote, are re-inserted into the hopper 11 without disassembling the bundled banknote. It is possible to return to the banknote accumulation state at the time of provisional confirmation.
- the undetermined banknote deposit amount of the binding target banknote stacking unit 21 and the stacker 16 in the current transaction is cleared.
- the banknotes for the previous fraction immediately before the current transaction under registration management are reintroduced into the hopper unit 11 so as to remain in the binding target banknote accumulating unit 21.
- the current transaction can be started simply by re-inserting all the banknotes in this device into the hopper unit 11. It is possible to return to the banknote accumulation state immediately before.
- the temporarily-determined banknote depositing number and the undetermined banknote depositing number of the binding target banknote stacking unit 21 and the stacker 16 in the current transaction are cleared, and the stacker 16
- the banknotes that are currently bundled including the banknotes currently being traded and / or the banknotes for the number of undetermined banknotes deposited are reintroduced into the hopper unit 11 and then the banknotes to be bundled within the current deal 21 and the stacker 16 are temporarily rejected and unconfirmed banknotes are rejected from the apparatus, and the final fraction immediately before the current transaction being registered and managed by the determination unit 102 is left in the binding target banknote stacking unit 21. Since the banknotes re-introduced into the hopper unit 11 are re-conveyed, even if linked with the stacker 16, it is possible to cancel all banknote deposit transactions currently being transacted.
- the guidance display displays the number of bundles of all the bundled banknotes in the current transaction. It is possible to recognize the number of bundles of all bundled banknotes of the current transaction that should be dismantled upon cancellation.
- control unit 100 is provided inside the banknote depositing processing apparatus 1, but it may be provided either inside the banknote handling apparatus 2 inside the banknote depositing processing apparatus 1 or inside the banknote binding apparatus 3. good.
- the undetermined banknote deposit number in the current transaction is temporarily determined among the banknotes to be bound.
- the undetermined number of banknotes deposited in the current transaction may be temporarily determined according to the timing when the number of banknotes stacked in the binding target banknote stacking unit 21 reaches a predetermined number.
- the undetermined number of banknotes deposited in the current transaction may be temporarily determined at the timing when the banknote bundle is clamped from the banknote stacking unit 21 through the banknote bundle extraction unit.
- the determination unit 102 prompts removal of the banknotes accumulated in the binding target banknote stacking unit 21 according to a predetermined setting, and registers and manages the previous fraction as zero.
- the fraction can be extracted for each transaction according to a predetermined setting.
- each component of each device illustrated is functionally described, and is not necessarily physically configured as illustrated, and a specific aspect of each device is illustrated. Needless to say, it cannot be limited.
- CPU Central Processing Unit
- MPU Micro Processing Unit
- MCU Micro Controller Unit
- all or any part of the program may be executed on a program that is analyzed and executed by a microcomputer) or on hardware based on wired logic.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Basic Packing Technique (AREA)
- Pile Receivers (AREA)
Abstract
Description
11 ホッパ部
13 搬送部
16 スタッカ
21 結束対象紙幣集積部
22 紙幣結束部
23 結束紙幣搬送部
31A スタッカ側紙幣集計部
31B 紙幣抜取検出部
41A 結束側紙幣集計部
41B 所定枚数検出部
83 情報表示部
100 制御部
101 仮確定部
102 確定部
103 仮確定判定部
104 障害復旧処理部
105 取引キャンセル処理部
110 駆動制御部
Claims (15)
- 連続した入金取引の入金紙幣枚数を取引単位で確定する紙幣入金処理装置であって、
紙幣を投入する投入部と、
この投入部にて投入した紙幣を一枚単位で繰出搬送する搬送部と、
この搬送部で順次搬送した紙幣の内、結束対象の特定金種の紙幣を順次分類集積する結束対象紙幣集積部と、
この結束対象紙幣集積部に分類集積した前記結束対象の紙幣枚数を未確定の紙幣入金枚数として集計する結束対象紙幣集計部と、
前記結束対象紙幣集積部に分類集積した前記結束対象の紙幣枚数が所定枚数に到達した場合、前記所定枚数分の結束対象の紙幣を結束する紙幣結束部と、
前記所定枚数分の紙幣の結束タイミングに応じて、結束する紙幣の内、現在取引内の前記未確定の紙幣入金枚数を仮確定する仮確定部と、
取引完了操作を検出すると、現在取引内の前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数を現在取引の全紙幣入金枚数として確定すると共に、前記結束対象紙幣集積部に集積中の紙幣集積枚数を前回端数として登録管理する確定部と
を有することを特徴とする紙幣入金処理装置。 - 前記現在取引内で障害復旧操作を検出した場合、前記現在取引内に前記仮確定が存在するか否かを判定する仮確定判定部と、
前記現在取引内に前記仮確定が存在する場合、前記現在取引内の前記未確定の紙幣入金枚数をクリアすると共に、前記結束済み紙幣を除く、本装置内の全紙幣を前記投入部に再投入した後、この投入部に再投入した紙幣を再搬送する前記搬送部を駆動制御する制御部と
を有することを特徴とする請求項1記載の紙幣入金処理装置。 - 前記制御部は、
前記仮確定判定部にて前記現在取引内に前記仮確定が存在しない場合、前記現在取引内の前記未確定の紙幣入金枚数をクリアすると共に、本装置内の全紙幣を前記投入部に再投入した後、前記確定部にて登録管理中の前記現在取引直前の前回端数分の紙幣を前記結束対象紙幣集積部に残すべく、この投入部に再投入した紙幣を再搬送する前記搬送部を駆動制御することを特徴とする請求項2記載の紙幣入金処理装置。 - 前記現在取引のキャンセル操作を検出した場合、前記現在取引内の前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数をクリアすると共に、前記現在取引内の紙幣を含む結束済み紙幣及び/又は未確定の紙幣入金枚数分の紙幣を前記投入部に再投入した後、前記現在取引内の前記仮確定及び前記未確定の紙幣を本装置からリジェクトしながら、前記確定部にて登録管理中の前記現在取引直前の前回端数分の紙幣を前記結束対象紙幣集積部に残すべく、この投入部に再投入した紙幣を再搬送する前記搬送部を駆動制御する制御部を有することを特徴とする請求項1記載の紙幣入金処理装置。
- 前記現在取引のキャンセル操作を検出した場合、前記現在取引内の全ての結束済み紙幣の束数をガイダンス表示する表示部を有することを特徴とする請求項4記載の紙幣入金処理装置。
- 前記結束タイミングは、
前記紙幣結束部にて前記所定枚数分の紙幣を結束したタイミングに相当することを特徴とする請求項1記載の紙幣入金処理装置。 - 前記結束タイミングは、
前記結束対象紙幣集積部に分類集積した前記結束対象の紙幣枚数が所定枚数に到達したタイミングに相当することを特徴とする請求項1記載の紙幣入金処理装置。 - 前記確定部は、
取引完了操作を検出すると、所定の設定により、前記結束対象紙幣集積部に集積した紙幣の抜取りを促し、前記前回端数をゼロとして登録管理することを特徴とする請求項1記載の紙幣入金処理装置。 - 前記搬送部にて搬送した紙幣を前記特定金種以外の金種に応じて分類集積する分類紙幣集積部と、
この分類紙幣集積部に分類集積した前記金種毎の未確定の紙幣枚数として集計する分類紙幣集計部とを有し、
前記仮確定部は、
前記分類紙幣集積部に分類集積した所定枚数の紙幣の抜取を検出した場合、紙幣抜取タイミングで現在取引内の前記分類紙幣集積部の前記未確定の紙幣入金枚数を仮確定すると共に、
前記確定部は、
前記取引完了操作を検出すると、前記現在取引内の前記結束対象紙幣集積部の前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数を現在取引内の前記結束対象紙幣集積部の全紙幣入金枚数として確定すると共に、前記現在取引内の前記分類紙幣集積部の前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数を現在取引内の前記分類紙幣集積部の全紙幣入金枚数として確定すると共に、前記結束対象紙幣集積部に集積中の紙幣集積枚数を前記結束対象紙幣集積部の前回端数として登録管理すると共に、前記分類紙幣集積部に集積中の紙幣集積枚数を前記分類紙幣集積部の前回端数として登録管理することを特徴とする請求項1記載の紙幣入金処理装置。 - 前記現在取引内で障害復旧操作を検出した場合、前記現在取引内に前記仮確定が存在するか否かを判定する仮確定判定部と、
前記現在取引内に前記仮確定が存在する場合、前記現在取引内の前記結束対象紙幣集積部及び前記分類紙幣集積部の前記未確定の紙幣入金枚数をクリアすると共に、前記結束済み紙幣及び前記分類紙幣集積部からの前記抜取済み紙幣を除く、本装置内の全紙幣を前記投入部に再投入した後、この投入部に再投入した紙幣を再搬送する前記搬送部を駆動制御する制御部と
を有することを特徴とする請求項9記載の紙幣入金処理装置。 - 前記制御部は、
前記仮確定判定部にて前記現在取引内に前記仮確定が存在しない場合、前記現在取引内の前記結束対象紙幣集積部及び前記分類紙幣集積部の前記未確定の紙幣入金枚数をクリアすると共に、本装置内の全紙幣を前記投入部に再投入した後、前記確定部にて登録管理中の、前記現在取引直前の前記結束対象紙幣集積部の前回端数分の紙幣を前記結束対象紙幣集積部に残すべく、及び、前記現在取引直前の前記分類紙幣集積部の前回端数分の紙幣を当該分類紙幣集積部に残すべく、この投入部に再投入した紙幣を再搬送する前記搬送部を駆動制御することを特徴とする請求項10記載の紙幣入金処理装置。 - 前記現在取引のキャンセル操作を検出した場合、前記現在取引内の前記結束対象紙幣集積部及び前記分類紙幣集積部の前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数をクリアすると共に、前記分類紙幣集積部に集積中の全紙幣の他に、本装置内の前記現在取引内の紙幣を含む全ての結束済み紙幣、前記分類紙幣集積部からの抜取済み紙幣、及び/又は、未確定の紙幣入金枚数分の紙幣を前記投入部に再投入した後、前記現在取引内の前記結束対象紙幣集積部及び前記分類紙幣集積部の前記仮確定及び前記未確定の紙幣を本装置からリジェクトしながら、前記確定部にて登録管理中の、前記現在取引直前の前記結束対象紙幣集積部の前回端数分の紙幣を前記結束対象紙幣集積部に残すべく、及び、前記現在取引直前の前記分類紙幣集積部の前回端数分の紙幣を当該分類紙幣集積部に残すべく、この投入部に再投入した紙幣を再搬送する前記搬送部を駆動制御する制御部を有することを特徴とする請求項9記載の紙幣入金処理装置。
- 前記現在取引のキャンセル操作を検出した場合、前記現在取引内の紙幣を含む全ての結束済み紙幣の束数をガイダンス表示する表示部を有することを特徴とする請求項12記載の紙幣入金処理装置。
- 連続した入金取引の入金紙幣枚数を取引単位で確定する紙幣入金処理方法であって、
紙幣を投入する投入ステップと、
この投入ステップにて投入した紙幣を一枚単位で繰出搬送する搬送ステップと、
この搬送ステップで順次搬送した紙幣の内、結束対象の特定金種の紙幣を順次分類集積する結束対象紙幣集積ステップと、
この結束対象紙幣集積ステップに分類集積した前記結束対象の紙幣枚数を未確定の紙幣入金枚数として集計する結束対象紙幣集計ステップと、
前記結束対象紙幣集積ステップに分類集積した前記結束対象の紙幣枚数が所定枚数に到達した場合、前記所定枚数分の結束対象の紙幣を結束する紙幣結束ステップと、
前記所定枚数分の紙幣の結束タイミングに応じて、結束する紙幣の内、現在取引内の前記未確定の紙幣入金枚数を仮確定する仮確定ステップと、
取引完了操作を検出すると、現在取引内の前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数を現在取引の全紙幣入金枚数として確定すると共に、前記結束対象紙幣集積部に集積中の紙幣集積枚数を前回端数として登録管理する確定ステップと
を含むことを特徴とする紙幣入金処理方法。 - 前記搬送ステップにて搬送した紙幣を前記特定金種以外の金種に応じて分類集積する分類紙幣集積ステップと、
この分類紙幣集積ステップに分類集積した前記金種毎の未確定の紙幣枚数として集計する分類紙幣集計ステップとを含み、
前記仮確定ステップは、
前記分類紙幣集積ステップに分類集積した所定枚数の紙幣の抜取を検出した場合、紙幣抜取タイミングで現在取引内の前記分類紙幣集積ステップの前記未確定の紙幣入金枚数を仮確定すると共に、
前記確定ステップは、
前記取引完了操作を検出すると、前記現在取引内の前記結束対象紙幣集積ステップの前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数を現在取引内の前記結束対象紙幣集積ステップの全紙幣入金枚数として確定すると共に、前記現在取引内の前記分類紙幣集積ステップの前記仮確定の紙幣入金枚数及び前記未確定の紙幣入金枚数を現在取引内の前記分類紙幣集積ステップの全紙幣入金枚数として確定すると共に、前記結束対象紙幣集積ステップの紙幣集積枚数を前記結束対象紙幣集積ステップの前回端数として登録管理すると共に、前記分類紙幣集積ステップの紙幣集積枚数を前記分類紙幣集積ステップの前回端数として登録管理することを特徴とする請求項14記載の紙幣入金処理方法。
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010541913A JP5291723B2 (ja) | 2008-12-09 | 2008-12-09 | 紙幣入金処理装置及び紙幣入金処理方法 |
US13/133,735 US8356747B2 (en) | 2008-12-09 | 2008-12-09 | Banknote deposit transaction apparatus and banknote deposit transaction method |
PCT/JP2008/072333 WO2010067421A1 (ja) | 2008-12-09 | 2008-12-09 | 紙幣入金処理装置及び紙幣入金処理方法 |
EP08878720.5A EP2357620B1 (en) | 2008-12-09 | 2008-12-09 | Paper currency receiving-treating apparatus, and paper currency receiving-treating method |
CN200880132209.6A CN102239509B (zh) | 2008-12-09 | 2008-12-09 | 纸币入款处理装置和纸币入款处理方法 |
US13/732,485 US9027829B2 (en) | 2008-12-09 | 2013-01-02 | Banknote handling apparatus having a sorted-banknote stacking device and bundling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2008/072333 WO2010067421A1 (ja) | 2008-12-09 | 2008-12-09 | 紙幣入金処理装置及び紙幣入金処理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010067421A1 true WO2010067421A1 (ja) | 2010-06-17 |
Family
ID=42242432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2008/072333 WO2010067421A1 (ja) | 2008-12-09 | 2008-12-09 | 紙幣入金処理装置及び紙幣入金処理方法 |
Country Status (5)
Country | Link |
---|---|
US (1) | US8356747B2 (ja) |
EP (1) | EP2357620B1 (ja) |
JP (1) | JP5291723B2 (ja) |
CN (1) | CN102239509B (ja) |
WO (1) | WO2010067421A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102982612A (zh) * | 2011-09-07 | 2013-03-20 | 株式会社东芝 | 纸张类处理装置 |
WO2014174632A1 (ja) | 2013-04-25 | 2014-10-30 | グローリー株式会社 | 紙葉類処理システム及び紙葉類処理方法 |
JPWO2021079502A1 (ja) * | 2019-10-25 | 2021-04-29 | ||
RU2799115C1 (ru) * | 2019-10-25 | 2023-07-04 | Лорел Бэнк Машинз Ко., Лтд. | Процессор приема денежных средств |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1980393A1 (en) * | 2007-04-13 | 2008-10-15 | Kba-Giori S.A. | Method and system for producing notes of securities |
US9027829B2 (en) * | 2008-12-09 | 2015-05-12 | Glory Ltd. | Banknote handling apparatus having a sorted-banknote stacking device and bundling device |
CN103646460A (zh) * | 2008-12-09 | 2014-03-19 | 光荣株式会社 | 纸币入款装置和纸币处理装置 |
US8573405B2 (en) * | 2009-08-31 | 2013-11-05 | Ncr Corporation | Media depository |
JP5996284B2 (ja) | 2012-06-07 | 2016-09-21 | グローリー株式会社 | 紙葉類処理装置 |
CN103514661B (zh) * | 2013-10-18 | 2015-09-02 | 上海古鳌电子科技股份有限公司 | 清分扎把一体机 |
CN104167051A (zh) * | 2014-04-30 | 2014-11-26 | 昆山古鳌电子机械有限公司 | 纸币交易装置以及纸币交易系统 |
KR101729389B1 (ko) | 2015-04-23 | 2017-05-02 | 주식회사 엘지씨엔에스 | 금융기기 |
CN110171595A (zh) * | 2019-05-20 | 2019-08-27 | 黄友平 | 通信方法和装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61296494A (ja) * | 1985-06-25 | 1986-12-27 | 株式会社東芝 | 結束装置付入金集計機 |
JPH09153168A (ja) | 1995-11-30 | 1997-06-10 | Toshiba Corp | 現金処理機 |
JP3922425B2 (ja) | 2000-08-30 | 2007-05-30 | グローリー株式会社 | 紙幣入金処理機 |
Family Cites Families (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58190772U (ja) * | 1982-06-16 | 1983-12-19 | 株式会社東芝 | 入出金装置 |
JPS5911490A (ja) * | 1982-07-12 | 1984-01-21 | 株式会社東芝 | 入出金装置 |
JPS59184989A (ja) * | 1983-04-04 | 1984-10-20 | 株式会社東芝 | 区分集積装置 |
JP2507326B2 (ja) * | 1986-06-17 | 1996-06-12 | 株式会社東芝 | 結束装置付集計機 |
JP3332533B2 (ja) * | 1993-07-08 | 2002-10-07 | 株式会社東芝 | 紙幣処理装置 |
JPH0737138A (ja) * | 1993-07-16 | 1995-02-07 | Toshiba Corp | 貨幣処理装置 |
US7232024B2 (en) * | 1996-05-29 | 2007-06-19 | Cunnins-Allison Corp. | Currency processing device |
US6502052B1 (en) | 1998-02-19 | 2002-12-31 | Kabushiki Kaisha Toshiba | Note bundle managing apparatus to store and count note bundles |
JP2003216999A (ja) * | 2002-01-22 | 2003-07-31 | Toshiba Corp | 紙葉類処理装置 |
WO2003107282A2 (en) * | 2002-06-13 | 2003-12-24 | Cummins-Allison Corp. | Currency processing and strapping systems and methods for using the same |
US20040083149A1 (en) * | 2002-10-24 | 2004-04-29 | Jones William J. | Multiple stage currency processing system |
JP5060019B2 (ja) * | 2004-09-29 | 2012-10-31 | 株式会社東芝 | ヘッダーカードの処理システム |
US7628279B2 (en) * | 2004-10-04 | 2009-12-08 | Glory Kogyo Kabushiki Kaisha | Currency sorter |
EP1643462A3 (en) * | 2004-10-04 | 2007-04-18 | Glory Kogyo Kabushiki Kaisha | Currency sorter |
US7779982B2 (en) * | 2006-09-07 | 2010-08-24 | Cummins-Allison Corp. | Currency processing and strapping systems and methods |
US8074806B2 (en) * | 2006-10-06 | 2011-12-13 | Glory Ltd. | Banknote handling apparatus |
JP4889456B2 (ja) | 2006-11-24 | 2012-03-07 | 日立オムロンターミナルソリューションズ株式会社 | 紙幣入出金装置および紙幣入出金装置制御方法 |
JP2008250955A (ja) * | 2007-03-30 | 2008-10-16 | Toshiba Corp | 紙葉類処理システム、紙葉類処理装置、仕切りカード、及び紙葉類処理方法 |
US20090057093A1 (en) * | 2007-08-27 | 2009-03-05 | Glory Ltd. | Bill/coin processing system |
US20090184034A1 (en) * | 2008-01-17 | 2009-07-23 | Kazuhiro Doi | Methods and systems for sorting bank notes, providing a change fund and balancing revenue |
WO2009107207A1 (ja) * | 2008-02-27 | 2009-09-03 | グローリー株式会社 | 紙幣処理装置 |
US20090229949A1 (en) * | 2008-03-14 | 2009-09-17 | Glory Ltd., A Corporation Of Japan | Verification system and banknote-and-coin handling system |
WO2009118838A1 (ja) * | 2008-03-26 | 2009-10-01 | グローリー株式会社 | 貨幣処理装置 |
US8056305B1 (en) * | 2008-09-30 | 2011-11-15 | Bank Of America Corporation | Automatic strapping and bagging of funds |
EP2402918A4 (en) * | 2009-02-27 | 2013-01-02 | Glory Kogyo Kk | DEVICE FOR SORTING AND BINDER PROCESSING OF BANKNOTES |
JP5433680B2 (ja) * | 2009-03-10 | 2014-03-05 | グローリー株式会社 | 紙幣結束装置及び紙幣結束方法 |
JP5351957B2 (ja) * | 2009-03-26 | 2013-11-27 | グローリー株式会社 | 紙幣分類結束処理装置及び紙幣分類集積設定方法 |
JP5631571B2 (ja) * | 2009-09-28 | 2014-11-26 | グローリー株式会社 | 紙幣処理装置 |
JP5416526B2 (ja) * | 2009-09-29 | 2014-02-12 | グローリー株式会社 | 紙幣処理装置及び結束紙幣投出方法 |
JP2011113152A (ja) * | 2009-11-24 | 2011-06-09 | Glory Ltd | 紙幣処理装置、紙幣分類方法及び紙幣分類プログラム |
-
2008
- 2008-12-09 EP EP08878720.5A patent/EP2357620B1/en active Active
- 2008-12-09 WO PCT/JP2008/072333 patent/WO2010067421A1/ja active Application Filing
- 2008-12-09 JP JP2010541913A patent/JP5291723B2/ja active Active
- 2008-12-09 US US13/133,735 patent/US8356747B2/en active Active
- 2008-12-09 CN CN200880132209.6A patent/CN102239509B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61296494A (ja) * | 1985-06-25 | 1986-12-27 | 株式会社東芝 | 結束装置付入金集計機 |
JPH09153168A (ja) | 1995-11-30 | 1997-06-10 | Toshiba Corp | 現金処理機 |
JP3922425B2 (ja) | 2000-08-30 | 2007-05-30 | グローリー株式会社 | 紙幣入金処理機 |
Non-Patent Citations (1)
Title |
---|
See also references of EP2357620A4 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102982612A (zh) * | 2011-09-07 | 2013-03-20 | 株式会社东芝 | 纸张类处理装置 |
US9472039B2 (en) | 2011-09-07 | 2016-10-18 | Kabushiki Kaisha Toshiba | Paper sheet handling apparatus |
WO2014174632A1 (ja) | 2013-04-25 | 2014-10-30 | グローリー株式会社 | 紙葉類処理システム及び紙葉類処理方法 |
CN105164734A (zh) * | 2013-04-25 | 2015-12-16 | 光荣株式会社 | 纸张处理系统以及纸张处理方法 |
US9972157B2 (en) | 2013-04-25 | 2018-05-15 | Glory Ltd. | Paper sheet handling system and paper sheet handling method |
JPWO2021079502A1 (ja) * | 2019-10-25 | 2021-04-29 | ||
WO2021079502A1 (ja) * | 2019-10-25 | 2021-04-29 | ローレルバンクマシン株式会社 | 貨幣入金処理装置 |
JP7209982B2 (ja) | 2019-10-25 | 2023-01-23 | ローレルバンクマシン株式会社 | 貨幣入金処理装置 |
RU2799115C1 (ru) * | 2019-10-25 | 2023-07-04 | Лорел Бэнк Машинз Ко., Лтд. | Процессор приема денежных средств |
Also Published As
Publication number | Publication date |
---|---|
US20110240734A1 (en) | 2011-10-06 |
JP5291723B2 (ja) | 2013-09-18 |
EP2357620B1 (en) | 2013-07-24 |
CN102239509B (zh) | 2014-01-15 |
JPWO2010067421A1 (ja) | 2012-05-17 |
US8356747B2 (en) | 2013-01-22 |
EP2357620A1 (en) | 2011-08-17 |
CN102239509A (zh) | 2011-11-09 |
EP2357620A4 (en) | 2012-05-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5291723B2 (ja) | 紙幣入金処理装置及び紙幣入金処理方法 | |
JP5430082B2 (ja) | 自動取引装置 | |
JP4870091B2 (ja) | 紙幣入金処理機 | |
KR102202966B1 (ko) | 보충회수박스가 구비된 계원용 환류식 금융자동화기기 및 그에 적용되는 지폐 처리 방법 | |
JP5821585B2 (ja) | 紙幣処理装置 | |
JP5322770B2 (ja) | 紙幣処理装置 | |
JP5760984B2 (ja) | 紙幣処理装置 | |
TW200813897A (en) | Paper sheet handling system | |
JP2002074464A (ja) | 紙幣入金処理機 | |
JP2013025438A (ja) | 紙幣処理装置 | |
WO2018008205A1 (ja) | 紙幣処理装置及び方法 | |
JP4534728B2 (ja) | 現金処理装置 | |
JP2016133935A (ja) | 紙葉類処理システム及び紙葉類処理方法 | |
WO2014174632A1 (ja) | 紙葉類処理システム及び紙葉類処理方法 | |
JP5630521B2 (ja) | 自動取引装置 | |
JP2012178058A (ja) | 現金処理装置 | |
JP6027785B2 (ja) | 紙幣処理装置 | |
JP2005099887A (ja) | 現金処理機およびそのプログラム | |
JP6500647B2 (ja) | 紙幣処理装置 | |
JP6589387B2 (ja) | 媒体整理装置 | |
WO2009122501A1 (ja) | 紙幣処理装置 | |
JP6944279B2 (ja) | 貨幣処理装置 | |
JP6384158B2 (ja) | 現金処理装置 | |
JP6451183B2 (ja) | 紙幣処理装置 | |
JP2021140451A (ja) | 貨幣処理装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200880132209.6 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08878720 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2010541913 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2008878720 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13133735 Country of ref document: US |