WO2010029871A1 - 砕石杭形成用のアタッチメントおよびそのアタッチメントを備える砕石杭形成装置 - Google Patents

砕石杭形成用のアタッチメントおよびそのアタッチメントを備える砕石杭形成装置 Download PDF

Info

Publication number
WO2010029871A1
WO2010029871A1 PCT/JP2009/065228 JP2009065228W WO2010029871A1 WO 2010029871 A1 WO2010029871 A1 WO 2010029871A1 JP 2009065228 W JP2009065228 W JP 2009065228W WO 2010029871 A1 WO2010029871 A1 WO 2010029871A1
Authority
WO
WIPO (PCT)
Prior art keywords
crushed stone
pipe casing
attachment
ground
filling material
Prior art date
Application number
PCT/JP2009/065228
Other languages
English (en)
French (fr)
Inventor
俊典 酒井
芳春 森
哲也 尾鍋
Original Assignee
国立大学法人三重大学
株式会社 尾鍋組
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国立大学法人三重大学, 株式会社 尾鍋組 filed Critical 国立大学法人三重大学
Publication of WO2010029871A1 publication Critical patent/WO2010029871A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Definitions

  • the present invention relates to an apparatus for improving the ground, and more particularly to an attachment for improving a ground by forming a crushed stone pile in the ground and a crushed stone pile forming apparatus including the attachment.
  • the gravel drain method is a method in which filling material, which is granular material such as gravel, crushed stone, and concrete shell, is poured into the ground in a columnar shape and compacted.
  • the gravel drain method is generally performed using a double auger provided with a double rotation mechanism in which a casing and a thrust screw in the casing rotate in opposite directions.
  • the double auger makes it possible to put the filling material into the ground using the space in the casing, and to compact the filling material with the thrust force of the thrust screw.
  • the gravel drain method can suppress liquefaction by forming a drainage path of pore water that causes liquefaction in the event of an earthquake with a filling material and sufficiently compacting the filling material.
  • Japanese Patent Laid-Open No. 2002-105942 proposes a method of compacting the filling material by using a double auger and raising and lowering the thrust screw relative to the pipe casing in a predetermined cycle. (Eg summary or paragraph 0030). According to this method, it is described that sufficient filling of the filling material can be realized without causing vibration and noise during the filling of the filling material, and the liquefaction phenomenon can be surely prevented. (For example, paragraphs 0036 to 0040).
  • This invention aims at providing the technique which throws in a filling material efficiently in the method of forming a columnar object in the ground with a filling material.
  • a first configuration example provides an attachment for forming a crushed stone pile that is inserted into the ground to form a space and forms a crushed stone pile in the space while ascending from the ground.
  • This attachment includes a cylindrical portion and an opening / closing lid.
  • a crushed stone injection hole which is at least one long hole having a long axis in the central axis direction, is formed on the side surface.
  • the open / close lid can block the crushed stone insertion hole from the outside of the cylindrical portion.
  • the attachment of the first configuration example has a cylindrical portion with a crushed stone injection hole formed on the side surface, crushed stone can be input from the side surface of the cylindrical portion to form a crushed stone pile in the ground.
  • This crushed stone input hole is at least one long hole having a long axis in the direction of the rotation axis. The position can be fixed with respect to the ground. Thereby, work efficiency can be improved.
  • the cylindrical portion has an open / close lid that closes the crushed stone input hole from the outside of the cylindrical portion, the crushed stone input hole is closed by the pressure outside the cylindrical portion in the ground, and intrusion of earth and sand can be suppressed. . Thereby, the formation operation of a simple and efficient crushed stone pile is realizable.
  • the attachment may be configured so that the attachment itself has both a digging function and a crushed stone pile forming function, or configured to form a crushed stone pile by inserting the attachment into a separately drilled hole.
  • the crushed stone has a broad meaning and includes natural crushed stones, natural objects such as gravel and sand, or artificial objects such as concrete fragments, waste tiles, and mines.
  • natural objects are used, soil contamination due to ground improvement can be prevented, and the need for future removal of artifacts can be eliminated in advance by not leaving the artifacts in the ground. Therefore, there is an advantage that the decline in the asset value of the land can be suppressed.
  • waste such as concrete fragments is used, there is an advantage that the waste can be effectively used as a material for ground improvement.
  • the second configuration example further includes a spiral portion in the attachment of the first configuration example.
  • the spiral portion is connected to a driving device that generates a rotational driving force in the forward direction and the reverse direction. From the drive device, the ground is excavated by the input rotation in the normal direction, and the pressure is applied to the crushed stone by the input rotation in the reverse direction.
  • the cylindrical portion makes the spiral portion and the rotation axis substantially the same, surrounds the rotation shaft of the spiral portion from the outer periphery, and restrains the relative positional relationship in the axial direction with respect to the spiral portion, while It is coupled so that it can rotate.
  • the attachment of the second configuration example is capable of excavating a hole for forming a crushed stone pile in the spiral portion when driven in the forward rotation direction (excavation direction), while in the spiral portion when driven in the reverse direction (pressure application direction). Crushed stone can be pressurized.
  • the cylindrical part is coupled to the helical part so as to constrain the relative positional relationship in the axial direction, so that the driving force for raising the cylindrical part is reduced by utilizing the reaction force from the crushed stone. It is also possible to make it.
  • the attachment of the second configuration example can consistently perform main operations from excavation to formation of crushed stone piles. Furthermore, since the cylindrical portion is rotatably coupled to the spiral portion, it is possible to direct the pressure input hole in a certain direction even if the spiral portion rotates during the formation of the crushed stone pile. .
  • the spiral portion protrudes from the tip of the cylindrical portion, and the protruding portion has a drilling blade that drills a drilling region wider than the inner diameter of the cylindrical portion.
  • the load on the cylindrical portion during excavation can be reduced, and in the compacting operation of the crushed stone, compaction can be performed on the top surface of the crushed stone pile over the portion of the cylindrical portion.
  • the cylindrical part may or may not be equipped with an excavating blade, but if it is not equipped, the load on the cylindrical part can be significantly reduced. A great degree of design freedom can be given.
  • the fourth configuration example is the attachment of the third configuration example, and further includes a rotational driving force transmission unit and a reverse prevention mechanism.
  • the rotational driving force transmission unit rotates in response to the input of rotational driving force in the forward rotation direction to the spiral portion, and the cylindrical portion rotates integrally with the spiral portion, and according to input of rotational driving force in the reverse direction to the spiral portion
  • the rotational driving force is transmitted only to the spiral side.
  • the inversion prevention mechanism prevents the inversion of the cylindrical portion.
  • the cylindrical portion has a spiral fin formed so as to raise the earth and sand around the cylindrical portion in accordance with the rotation in the forward rotation direction.
  • the attachment of the fourth configuration example is in an operating state in which the spiral portion and the cylindrical portion automatically rotate as a unit in driving in the forward rotation direction (excavation direction).
  • excavation direction excavated earth and sand can be discharged
  • reverse direction pressure application direction
  • pressure can be applied to the crushed stone at the spiral portion, and the cylindrical portion can automatically stop rotating to fix the crushed stone input position.
  • smooth excavation and simple crushed stone pile forming work can be realized.
  • a force in a direction in which the opening / closing lid closes the crushed stone insertion hole is applied from the ground by the rotation of the cylindrical portion in the normal rotation direction. Since it is comprised so that the intrusion of the earth and sand into the cylindrical part at the time of rotation at the time of excavation can be reduced notably.
  • the sixth configuration example further includes a surface protection plate that has a pressure surface substantially parallel to the ground surface and is movable in the direction of the rotation axis. The loosening of the ground near the ground surface can be effectively prevented in advance.
  • the seventh configuration example is an attachment according to any one of the first to sixth configuration examples, and further includes a crushed stone input device that inputs crushed stone into the crushed stone input hole.
  • the crushed stone charging device includes an open holding member, a crushed stone receiving unit, and a crushed stone moving rod.
  • the open holding member supports the open / close lid to open the crushed stone input hole.
  • the crushed stone receiving unit receives the given crushed stone.
  • the crushed stone moving rod moves the crushed stone from the crushed stone receiving unit to the opened crushed stone input hole.
  • the crushed stone moving hoe has a crushed stone moving casket main body connected to the crushed stone receiving unit, and a crushed stone throwing adapter.
  • the crushed stone throwing adapter is pivotally connected to the crushed stone moving dredge main body, and the tip position and the tip enabling the movement of the crushed stone from the crushed stone moving dredger main body to the crushed stone throwing hole by making the tip approach the crushed stone throwing hole
  • the part has a plurality of operating states including a retracted state in which the part is retracted from the crushed stone introduction hole and the cylindrical part is rotatable.
  • the attachment of the seventh configuration example has a plurality of operating states including a retracted state in which the cylindrical portion can be rotated by retreating from the crushed stone insertion hole and a charged state in which the crushed stone can be moved when the cylindrical portion is stopped. Since it has a crushed stone throwing device, it is not necessary to move the crushed stone receiving part of the crushed stone throwing device from the time of excavation to the time of crushed stone pile formation. Furthermore, since the retracted state and the input state are automatically switched according to the input state of the crushed stone, an operation error can be prevented in advance. Thereby, while being able to reduce a burden of an operator notably, the reliability of construction can be improved.
  • the eighth configuration example provides a crushed stone pile forming apparatus for forming a crushed stone pile containing crushed stone in the ground.
  • the crushed stone pile forming apparatus includes an attachment and a driving device.
  • the attachment is one of the first to seventh configuration examples.
  • the driving device drives the attachment by generating a rotational driving force in the forward direction and the reverse direction.
  • this invention is not restricted to the above-mentioned apparatus, For example, it can implement
  • the first configuration example can realize a simple and efficient formation work of a crushed stone pile.
  • the second configuration example can perform all main operations from excavation to formation of a crushed stone pile.
  • the load on the cylindrical portion during excavation can be reduced to give a large degree of design freedom for the formation of the long hole in the cylindrical portion. Can be compacted against the upper surface of the crushed stone pile.
  • the fourth configuration example can realize smooth excavation and simple crushed stone pile forming work.
  • the fifth configuration example can significantly reduce the intrusion of earth and sand during rotation during excavation.
  • loosening of the ground near the ground surface can be effectively prevented in advance.
  • the seventh configuration example makes it unnecessary to move the crushed stone input position, and can significantly improve workability.
  • Explanatory drawing which shows the structure of the crushed stone pile forming apparatus 100 which concerns on 1st Example of this invention.
  • Explanatory drawing which shows the figure which looked at the attachment T of 1st Example from another angle.
  • Sectional drawing which shows the structure of the pipe casing 12 and the inner screw auger 29 of 1st Example.
  • the flowchart which shows the process of the crushed stone pile formation method which concerns on 1st Example of this invention.
  • FIG. The enlarged view which shows the press board 110 of 1st Example, and the structure of the vicinity.
  • Explanatory drawing which shows the crushed stone pile formation apparatus 100 in an excavation preparation process.
  • the top view which shows the state of the pipe casing 12 and the crushed stone charging device 330 before crushed stone preliminary
  • throwing-in The top view which shows the state of the pipe casing 12 at the time of crushed stone preliminary
  • FIG. Explanatory drawing which shows the crushed stone pile formation apparatus 100 in an excavation process.
  • Explanatory drawing which shows the crushed stone pile forming apparatus 100 in a crushed stone formation process.
  • Explanatory drawing which shows the state of the crushed stone input apparatus 330 in a crushed stone formation process.
  • Explanatory drawing which shows the crushed stone pile forming apparatus 100 in a construction completion process.
  • Explanatory drawing which shows the schematic whole of the crushed stone pile forming apparatus 100a which concerns on 2nd Example of this invention.
  • Schematic front view of FIG. FIG. 19 is an enlarged sectional view taken along line 3-3 in FIG. The enlarged view which extracts and shows the lower end part of FIG.
  • the top view of FIG. FIG. 18 is an enlarged sectional view taken along line 6-6 of FIG. Sectional drawing corresponding to FIG. 22 which shows the open state of an opening-and-closing door.
  • the front view which extracts and shows an opening-and-closing door.
  • Sectional drawing which extracts and shows the relationship between the inner screw auger of a core rod, and a pipe casing.
  • the enlarged front view which extracts and shows the inner screw auger of a core rod.
  • the side view of FIG. The bottom view of FIG.
  • the top view corresponding to FIG. 21 which shows the injection
  • the side view of FIG. FIG. 30 is an enlarged sectional view taken along line 15-15 in FIG. 29;
  • FIG. 30 is an enlarged sectional view taken along line 16-16 in FIG. 29;
  • FIG. 30 is an enlarged sectional view taken along line 17-17 in FIG. 29;
  • FIG. 29 which shows the insertion state of the insert material injection chute with respect to the insert material receiving port.
  • FIG. 19 is an enlarged sectional view taken along line 19-19 in FIG. The top view which shows the deformation
  • the side view of FIG. The front view which extracts and shows the rolling roller of a surrounding frame. Sectional drawing which extracts and shows a one-way clutch mechanism.
  • FIG. 24 is an enlarged sectional view taken along line 24-24 of FIG.
  • FIG. 25 is an enlarged sectional view taken along line 25-25 in FIG. 40. Sectional drawing corresponding to FIG. 41 which shows the reverse rotation state of a core rod.
  • the side view which extracts and shows the braking mechanism of a pipe casing.
  • FIG. 19 is an enlarged sectional view taken along line 19-19 in FIG.
  • the side view of FIG. The front view which extracts and shows the rolling roller of a surrounding frame. Section
  • FIG. 44 is an enlarged sectional view taken along line 28-28 in FIG. 43.
  • FIG. 46 is an enlarged sectional view taken along the line 30-30 in FIG.
  • Explanatory drawing which shows the attachment preparation state to a construction machine.
  • Explanatory drawing which shows the excavation action process of the ground.
  • Explanatory drawing which shows the creation completion state of a digging hole.
  • Explanatory drawing which shows the raising action process from FIG.
  • Sectional drawing which shows the inner screw auger and pipe casing of a modification.
  • Sectional drawing which shows the inner screw auger and pipe casing of a modification.
  • the bottom view which shows the inner screw auger and pipe casing of a modification.
  • the present invention can also be realized as a preferred embodiment by including the following features alone or in combination.
  • the inner screw auger 29 (an example of a spiral portion) includes an upper blade portion 29a, a middle blade portion 29b, and a lower blade portion 29c that gradually change greatly as the rotation diameter goes downward, and the lower blade portion 29c. Only the bottom end of the pipe casing 12 is exposed.
  • the open / close door D is made of an elastically deformable film material such as rubber or synthetic resin.
  • (Characteristic 3) In the opening / closing door D, at least one of the reinforcing metal bone 18 and the reinforcing cloth 17 is embedded and integrated.
  • the attachment includes a construction management device TC (an example of a control device) that monitors the construction state (for example, excavation depth and excavation torque) of the crushed stone pile and alerts the operator.
  • FIG. 1 is an explanatory diagram showing a configuration of a crushed stone pile forming apparatus 100 according to the first embodiment of the present invention.
  • the crushed stone pile forming apparatus 100 includes a small ground improvement machine M as a construction machine, and an attachment T attached to the small ground improvement machine M.
  • the small ground improvement machine M includes a ground improvement machine body structure 1, a cabin 7 as a driver's seat, a crawler 6 that is an endless track that can move on rough terrain with low ground pressure, and construction. And an outrigger 5 that suppresses the swing of the small ground improvement machine M at the time.
  • the small ground improvement machine M further includes, as a configuration for operating the attachment T, a rotation driving source 11 that supplies a rotation driving force to the attachment T via the motor output shaft 27, and a leader 4 having a lifting guide rail 9.
  • a leader mounting base 2 for supporting the leader 4 a hydraulic cylinder 3 for operating the inclination of the leader 4, and an extension pedestal 10 formed integrally with the leader 4 at the lower end of the leader 4. ing.
  • FIG. 2 is an explanatory view showing a view of the attachment T of the first embodiment viewed from another angle.
  • the attachment T includes a pipe casing 12 (an example of a cylindrical portion) provided with fins 13, an inner screw auger 29 (an example of a spiral portion), and an anti-sway of the pipe casing 12.
  • the arm 39 (FIG. 1) and the construction management apparatus TC (FIG. 1) which manages the construction state by the attachment T are provided.
  • the pipe casing 12 is formed with a filling material receiving port 14 (an example of a crushed stone input hole) (FIG. 1) and is closed by an open / close lid D, the details of which will be described later.
  • FIG. 3 is a cross-sectional view showing the configuration of the pipe casing 12 and the inner screw auger 29 of the first embodiment.
  • the inner screw auger 29 is configured integrally with the rotary input shaft 26 and the core rod 22.
  • the rotation input shaft 26 is connected to the motor output shaft 27 of the rotation drive source 11.
  • the rotation input shaft 26 rotates in accordance with the rotation driving force of the motor output shaft 27 and transmits the rotation driving force to the inner screw auger 29 through the core rod 22 integrally coupled.
  • the core rod 22 is rotatably coupled to the pipe casing 12 by a bearing tube 23 and a radiation stay 24, and has a common rotating shaft with the pipe casing 12.
  • the pipe casing 12 has helical fins 13 around the pipe casing 12.
  • the fin 13 has a spiral shape in the same direction as the spiral of the inner screw auger 29. That is, when excavating, the pipe casing 12 and the inner screw auger 29 rotate in the same direction. Thereby, excavated earth and sand generated by excavation of the inner screw auger 29 is conveyed to the ground surface by the fins 13.
  • a donut auger (double auger) (not shown) is widely known as an excavator equipped with such a double rotation mechanism.
  • the donut auger is used as a double reversing mechanism to construct a pile with high vertical accuracy by reducing the load on the leader 4 and the small ground improvement machine M by rotating the casing and the screw in the casing in reverse. It is well known that Therefore, it is contrary to the technical common knowledge of those skilled in the art to set the spiral shape in the same direction as in this embodiment.
  • the pipe casing 12 and the inner screw auger 29 of the first embodiment are different from the conventional donut auger in the following points. That is, in the conventional donut auger, a drilling blade is also provided at the tip of the pipe casing, whereas a tip of the pipe casing 12 of the first embodiment is not provided with a drilling blade.
  • the inner screw auger 29 of the first embodiment has a diameter capable of excavating a range corresponding to the diameter of the pipe casing 12 with the lower blade portion 29c of the tip projecting from the pipe casing 12.
  • the essential difference of such a mechanism has an organic relationship with the formation of the filling material receiving port 14 in the pipe casing 12.
  • the formation of the filling material receiving port 14 on the side surface of the pipe casing 12 reduces the rigidity and strength of the pipe casing 12, so that excavation by the pipe casing 12 itself is extremely difficult.
  • the inventor of the present application reduces the rigidity and strength required for the pipe casing 12 by excavating the inner screw auger 29 during excavation and using the pipe casing 12 for transporting excavated soil. It is letting me. In this way, this configuration realizes a unique excavation method in which the inner screw auger 29 excavates the ground, and the earth and sand generated by the excavation are discharged to the ground surface via the outside of the pipe casing 12 by the fins 13.
  • the attachment T further includes a one-way clutch mechanism (described later) between the rotary input shaft 26 and the core rod 22 inside the top cover case 55.
  • the one-way clutch mechanism automatically enters an operating state in which the inner screw auger 29 and the pipe casing 12 rotate as a unit when driving in the rotational direction during excavation.
  • the excavated earth and sand can be discharged to the ground by the fins 13 included in the pipe casing 12 from the earth and sand excavated by the inner screw auger 29 as described above.
  • the attachment T is attached to the small ground improvement machine M in the following form as shown in FIG.
  • the enclosure frame 32 and the crushed stone throwing device 330 included in the attachment T are coupled to the extension pedestal 10 of the small ground improvement machine M by a mounting plate 37 and a support arm 39, respectively.
  • the inner screw auger 29 of the attachment T is connected to the rotational drive source 11 of the small ground improvement machine M through the rotational input shaft 26 and the motor output shaft 27.
  • the hanger stay 64 of the small ground improvement machine M together with the cam protrusion 63, constitutes a reverse prevention mechanism for allowing the pipe casing 12 to rotate only in one direction.
  • the crushed stone pile forming apparatus 100 having such a configuration can form a crushed stone pile in the ground by a process described below.
  • FIG. 4 is a flowchart showing the steps of the method for forming a crushed stone pile according to the first embodiment of the present invention.
  • step S100 the operator executes a pile core alignment process in the state shown in FIG.
  • the pile core positioning step is a step of aligning the tip of the inner screw auger 29 with the center of the crushed stone pile forming position so that the crushed stone pile can be formed at a preset crushed stone pile forming position. This alignment is performed by adjusting the position and direction of the small ground improvement machine M by driving the crawler 6.
  • the operator further operates the outrigger 5 (FIG. 1) to fix the position of the small ground improvement machine M.
  • swiveling and position shift of the small ground improvement machine M at the time of construction can be suppressed.
  • the operator confirms the verticality of the leader 4 with respect to the direction of gravity and makes fine adjustments as necessary.
  • the operator After confirming the verticality, the operator lowers the press plate 110 (an example of a surface protection plate) to the ground as shown in FIG.
  • the reason why the press plate 110 is grounded is to suppress loosening of the surface layer near the ground surface at the start of excavation.
  • FIG. 6 is an enlarged view showing the configuration of the press plate 110 (before descending) of the first embodiment and the vicinity thereof.
  • the attachment T further includes a hydraulic actuator 111 that moves the press plate 110 up and down.
  • the hydraulic actuator 111 is supported by the extension leg 10 that is integrally formed at the lower end of the leader 4.
  • the press plate 110 can pressurize the ground surface around the excavation hole excavated by the attachment T.
  • the excavation preparation process is a preparation process for excavation, and includes a reference position setting process, a casing lowering process, and a crushed stone preliminary charging process.
  • the reference position setting step is a step of setting a position that serves as a reference for excavation depth during excavation.
  • the operator sets a reference position by making a predetermined input (for example, pressing a button (not shown)) to the construction management device TC while the press plate 110 is in contact with the ground surface. Can do.
  • the casing lowering step is a step of lowering until the lower end of the pipe casing 12 contacts the ground surface. As a result, as shown in FIG. 7, the lower end of the pipe casing 12 is sealed off by the ground surface in a state where the tip of the inner screw auger 29 has entered the ground and the attachment T is fixed to the ground surface. .
  • the raising / lowering amount of the pipe casing 12 can be measured by, for example, a potentiometer (not shown) included in the reader 4.
  • the crushed stone preliminary charging step is a step of preliminarily charging crushed stone from the crushed stone charging device 330 through the medium insertion material receiving port 14. According to the experiment of the inventor of the present invention, it has been confirmed that the amount of crushed stone is preferably about 50 cm ( ⁇ 10 cm) from the lower end of the pipe casing 12.
  • the input crushed stone closes the lower end of the pipe casing 12 during excavation by the attachment T, and prevents the excavation soil from entering the pipe casing 12.
  • crushed stone has a broad meaning and includes natural crushed stones, natural objects such as gravel and sand, or artifacts such as concrete fragments, waste tiles, and mines.
  • FIG. 8 is a side view showing the state of the pipe casing 12 and the crushed stone throwing device 330 before the crushed stone preliminary throwing.
  • FIG. 9 is a plan view showing a state of the pipe casing 12 and the crushed stone throwing device 330 before the crushed stone preliminary throwing.
  • the crushed stone throwing device 330 feeds the filling material supplied to the filling material accommodation hopper 33 into the pipe casing 12 through the filling material charging chute 34 (an example of a crushed stone moving rod main body).
  • the filling material is introduced into the pipe casing 12 from the filling material receiving port 14 formed on the side surface of the pipe casing 12.
  • the insertion into the filling material receiving port 14 is performed using an open support member 331 and a crushed stone throwing adapter 332 equipped in the crushed stone throwing device 330.
  • the pipe casing 12 is formed with a filling material receiving port 14 as a long hole (rectangular in this embodiment) having a major axis in the rotation axis direction (Z-axis direction) of the pipe casing 12.
  • the filling material receiving port 14 is closed from the outside of the pipe casing 12 by a planar opening / closing lid D formed of an elastic body.
  • the opening / closing lid D is fastened to the pipe casing 12 by a fixing portion Df that is one side of the end portion of the intermediate insertion material receiving port 14 in the leading side of the pipe casing 12 in the screwing direction F, and is opened at the other side. Has been.
  • the opening / closing lid D does not necessarily need to be made of an elastic body, and does not need to be flat. However, if it is made of an elastic body, it is deformed along the shape of the filling material receiving port 14 or the attached earth and sand by the pressure from the ground, so that high confidentiality can be realized. And confirmed by. On the other hand, if the opening / closing lid D has a flat shape, it can be manufactured more easily than when it is formed in a three-dimensional shape. The configuration of the opening / closing lid D will be described in detail in the second embodiment.
  • the crushed stone charging device 330 supplies the medium-filling material from the medium-filling material charging chute 34 to the medium-filling material receiving port 14 using an open support member 331 and a crushed stone charging adapter 332 having the following configuration.
  • the open support member 331 includes an open support member base 331b fixed to the filling material input chute 34, and a swing support portion coupled to the open support member base 331b by a hinge (not shown) so as to be rotatable about the Z axis. 331a.
  • the crushed stone throwing adapter 332 is connected to a crushed stone throwing adapter base 332b fixed to the filling material throwing chute 34 and a hinge (not shown) coupled to the crushed stone throwing adapter base 332b so as to be rotatable about the X axis.
  • An adapter portion 332a and a biasing weight 332c attached to the turning adapter portion 332a are provided.
  • the urging weight 332 c is urged upward so that the turning adapter portion 332 a closes the outlet of the filling material charging chute 34.
  • the pipe casing 12 can rotate without receiving the interference of the crushed stone charging device 330.
  • the turning adapter portion 332a is urged upward by the urging weight 332c as described above so as to close the outlet of the filling material charging chute 34.
  • the turning support portion 331a is configured to turn so as to automatically retract even if it contacts the pipe casing 12 when the pipe casing 12 rotates. The urging may be performed by a spring.
  • the configuration in which the cross-sectional shape of the pipe casing 12 is non-circular is intended to overturn the technical common sense of those skilled in the art at the time of filing. If a through-hole is formed on the side of the pipe casing 12, it is difficult to ensure the secrecy of the pipe casing 12 and it is difficult to prevent intrusion of earth and sand, and in addition, the rigidity and strength of the pipe casing 12 are reduced. It was not even considered as a virtually impossible configuration.
  • the spiral fins are missing at a portion of 20% or more of the outer diameter, it is considered that the discharge of earth and sand becomes difficult.
  • the cross-sectional shape of the pipe casing 12 is a non-circular shape, it is considered that excavation itself becomes difficult because the torque at the time of excavation increases excessively in combination with the sediment discharge performance.
  • FIG. 10 is a side view showing the state of the pipe casing 12 and the crushed stone charging adapter 332 at the time of preliminary charging of crushed stone.
  • FIG. 11 is a plan view showing the state of the pipe casing 12 and the crushed stone throwing device 330 at the time of preliminary crushed stone throwing.
  • the open support member 331 is not shown in order to make the state of the crushed stone input adapter 332 easier to see.
  • the operator manually opens and closes the opening / closing lid D, which is an elastic body, and engages and holds the opening / closing lid D with the turning support portion 331a.
  • the operator after confirming the holding state, throws the crushed stone into the stuffing material accommodation hopper 33.
  • the thrown crushed stone flows into the filling material throwing chute 34 and pushes the turning adapter portion 332a with its weight.
  • the turning adapter part 332a is turned by the weight of the crushed stone, and the tip thereof is inserted into the insert material receiving port 14. Thereby, crushed stone is thrown into the inside of the pipe casing 12.
  • step S300 the operator executes an excavation process as shown in FIG.
  • the excavation process is a process of excavation while monitoring the excavation depth.
  • the excavation depth is monitored as the amount of protrusion of the tip position of the pipe casing 12 from the reference position of the lower end of the press plate 110 (grounded to the ground surface).
  • This reference position is a position set as a reference used in the construction management apparatus TC in step S200.
  • the monitoring of the excavation depth is performed as a measurement of the relative position between the press plate 110 and the pipe casing 12, and is input to the construction management device TC in real time.
  • the construction management device TC records the output torque to the attachment T and the excavation depth during excavation as time series data.
  • the construction management device TC alerts the operator by voice. In response to this voice, the operator raises the press plate 110 away from the ground surface. The reason why the press plate 110 is kept in contact with the ground surface from the start of excavation to a predetermined depth is to suppress loosening of the ground around the excavation hole due to the start of excavation.
  • the operator executes an excavation completion process as shown in FIG.
  • the excavation completion step is a step of ending excavation in response to reaching a preset maximum depth.
  • the comparatively strong formation is a formation having a magnitude greater than that of which the earth strength (for example, N value) is set in advance. Reaching a relatively strong formation can be detected in accordance with, for example, an increase in output torque to the attachment T during excavation or a decrease in excavation speed (amount of excavation depth per unit time).
  • Such excavation completion method was created by the inventor of the present application, and can substantially increase the earth bearing strength by the crushed stone pile formed in the excavation hole. Specifically, if the excavation is terminated upon reaching a preset maximum depth, the peripheral frictional force of the crushed stone pile can be sufficiently increased. This is because the crushed stone pile is long enough and the diameter changes according to the formation change. On the other hand, if excavation is completed in response to reaching a relatively strong formation, the crushed stone pile can be supported by a relatively strong formation. The effect of the ground improvement based on it will also be show
  • the crushed stone pile forming step is a step of forming a crushed stone pile by charging and pressurizing crushed stone into a space formed by excavation.
  • the input of crushed stone can be performed by the same method as the crushed stone preliminary input process.
  • the input of the crushed stone may be continuously performed with respect to the filling material accommodation hopper 33 by, for example, a belt conveyor, or may be intermittently performed by a power shovel. Pressurization of the crushed stone is performed by rotating the inner screw auger 29 in the direction opposite to that during excavation.
  • the amount of pressure applied to the crushed stone is indirectly controlled by monitoring the magnitude of the driving torque of the inner screw auger 29.
  • the construction management device TC alerts the operator by voice each time the driving torque of the inner screw auger 29 reaches the set upper limit torque. In response to this, the operator raises the inner screw auger 29 by a predetermined amount (for example, 10 cm).
  • the inner screw auger 29 is lifted by an endless transmission chain provided in the leader 4 and its revolving drive motor (not shown). The ascending driving force is reduced by the reaction force from the crushed stone pile generated due to the rotation of the inner screw auger 29.
  • the pipe casing 12 is coupled to the inner screw auger 29 so as to restrain the relative positional relationship in the rotation axis direction, the pipe casing 12 is lifted together with the inner screw auger 29. Since formation of the crushed stone pile is managed by such a method, it is possible to form a crushed stone pile of stable quality regardless of whether the crushed stone is continuously or intermittently charged.
  • FIG. 15 is an explanatory view showing a state of the crushed stone charging device 330 in the crushed stone pile forming step.
  • the pipe casing 12 and the inner screw auger 29 are gradually raised in accordance with the formation of the crushed stone pile, but the crushed stone is thrown in with the medium stuffing material accommodation hopper 33 fixed at a position near the ground. Can be performed continuously. This is because the filling material receiving port 14 is a long hole having a long axis in the direction of the rotation axis of the pipe casing 12 and is closed by an opening / closing lid D of an elastic body.
  • the filling material receiving port 14 is firmly closed by receiving an underground pressure by an open / close lid D that is closed from the outside of the pipe casing 12 in the ground, but is exposed to the ground and the underground pressure disappears. This is because it is automatically opened by the turning support portion 331a.
  • Such a configuration has the following advantages. (1) Since the crushed stone input position can be set to a low position, the gravity center position of the crushed stone pile forming apparatus 100 can be lowered, and the crushed stone supply position can be lowered. Thereby, construction with a small and light small ground improvement machine M, monitoring of a crushed stone replenishment state from above, and safe crushed stone replenishment can be made possible. (2) Since the position of the intermediate filling material accommodation hopper 33 can be fixed, the crushed stone can be easily supplied to the intermediate filling material accommodation hopper 33. Thereby, for example, it is possible to avoid repeated processes such as moving the medium-filling material accommodation hopper to a low position to replenish crushed stones, and raising the medium-filling material accommodation hopper.
  • the amount of crushed stone falling in the pipe casing 12 can be reduced.
  • the pipe casing 12 rises and is exposed to the ground, the amount of crushed stone falls, so noise during construction is remarkable. It is possible to reduce it.
  • Such a feature has a remarkable effect of enabling efficient work particularly in a narrow area or a residential area.
  • the crushed stone pile formed in a present Example has a remarkable effect on the ground improvement for houses, it turns out that this structure is especially suitable for the ground improvement for houses.
  • the construction management device TC alerts the operator by voice.
  • the operator lowers the press plate 110 in response to this voice.
  • the press plate 110 pressurizes excavated earth and sand formed around the excavation hole from above, thereby effectively preventing in advance the loosening of the ground near the ground surface at the time of crushed stone formation, and sufficient crushed stone near the surface layer. Compaction can be realized effectively. Thereby, after formation of a crushed stone pile, it becomes possible to reduce the necessity of the compaction operation
  • the rotational speed of the inner screw auger 29 is reduced to reduce the formation speed of the crushed stone pile. Therefore, the loosening of the ground near the ground surface at the time of crushed stone formation can be suppressed more effectively.
  • step S600 the operator executes a construction completion process as shown in FIG.
  • the construction completion process is a post-treatment after the formation of each crushed stone pile.
  • the construction completion process is a process including a press plate raising process, a casing raising process, a leader tilting process, and an outrigger raising process.
  • the open support member 331 and the like are omitted in order to make the state of the crushed stone throwing adapter 332 easier to see.
  • the press plate raising step is performed by the operator operating the hydraulic actuator 111 after confirming that the tip of the inner screw auger 29 is exposed from the ground.
  • the casing raising step is a step of separating the tip of the inner screw auger 29 from the ground surface by raising the pipe casing 12.
  • the leader tilting step is a step of bringing the gravity center position of the crushed stone pile forming apparatus 100 closer to the centroid position on the lower surface of the crawler 6 by tilting the attachment T away from the ground surface in the direction of the small ground improvement machine M.
  • the outrigger raising step is a step in which the outrigger 5 is raised to enable the crawler 6 to move the small ground improvement machine M.
  • the crushed stone pile forming apparatus 100 of the first embodiment has the pipe casing 12 in which the filling material receiving port 14 is formed on the side surface. Pile can be formed. Since the medium filling material receiving port 14 is a long hole having a long axis in the direction of the rotation axis, the range of the length of the medium filling material receiving port 14 in the long axis direction even if the pipe casing 12 rises as the crushed stone pile is formed. By fixing the crushed stone input position, work efficiency can be improved.
  • the filling material receiving port 14 is formed as a single continuous long hole, but may be formed as a plurality of long holes divided in the middle.
  • the pipe casing 12 has an open / close lid that closes the filling material receiving port 14 from the outside of the pipe casing 12, the filling material receiving port 14 is closed in the ground by the pressure outside the pipe casing 12, Infiltration of earth and sand can be suppressed. Thereby, the formation operation of a simple and efficient crushed stone pile is realizable.
  • FIGS. 17 to 19 show an overall outline of a crushed stone pile forming apparatus 100a (also referred to as an embedding apparatus in the present specification) according to the second embodiment of the present invention, and (M) is used for ground improvement.
  • Pile drivers, building pillars, power shovels, backhoes, and other suitable small construction machines (base machines) that are installed and fixed on the site, with the leader mounting base (2) and hydraulic cylinders attached to the fuselage frame (1)
  • a fixed long leader (4), outrigger (5), traveling crawler (6), cabin (7), etc. which are adjusted and supported in a suspended state, are equipped.
  • the press plate 110 and the hydraulic actuator 111 are deleted, and the configuration of the crushed stone throwing apparatus 330 is changed. Unlike the apparatus 100, it is common in other configurations.
  • the leader (4) is provided with an endless transmission chain (not shown) and its revolving drive motor, and a lifting platform (8) connected and integrated with the transmission chain is a lifting guide rail on the leader (4) side.
  • the elevator is moved up and down along (9).
  • (10) is a rigid extension pedestal that is integrally suspended from the lower end of the leader (4)
  • (11) is a rotational drive source that is assembled and integrated with the elevator (8), and is a hydraulic motor. It consists of a motor and an electric motor, and directly drives a core rod (core rod) described later.
  • (12) is a pipe casing (sheath tube) for creating a planned excavation hole (G) in soft ground (E) such as sandy material, and has a constant length (about 6 m) and diameter (about 32 cm). ) And a thickness (about 6 mm) of steel pipe, and a fin (13) having a constant pitch (about 20 cm) (hereinafter also referred to as an outer screw auger) is removed from the circumferential surface by a constant height of about 4 cm. Projected in one direction.
  • the outer screw auger (13) exerts the driving force during excavation to create an excavation hole (G) with a hole diameter of about 40 cm, and the ground (E) excavated from the ground (E) Discharge up to itself.
  • a crushed stone input hole (14) (hereinafter also referred to as a medium-filling material receiving port) that expands by about 90 degrees ( ⁇ ) is formed as a substantially rectangular shape extending in the vertical direction.
  • the left and right pair of the door mounting plate (15) and the door receiving seat (16) facing each other from the opening edge is integrally projected inward, so that the opening width of the filling material receiving port (14) is increased.
  • (W1) is narrowly limited to about 13.5 cm.
  • (D) is a corresponding rectangular opening / closing door that covers the above-mentioned filling material receiving port (14) and is made of an elastically deformable film material such as rubber or synthetic resin, as shown in FIGS. It has a constant band width (W2) (about 22 cm) and thickness (t) (about 13 mm), including a reinforcing cloth (17) that prevents tearing and a plurality of parallel reinforcing metal bones that prevent breakage and the like. (18) is embedded and integrated.
  • W2 band width
  • t thickness
  • a part of the circumferential surface of the pipe casing (12) serves as a rectangular filling material receiving port (14) in which the outer screw auger (13) is cut out. It is flattened by (D).
  • (21) is a door pressing plate, which extends in parallel with the door mounting plate (15).
  • (22) is a core rod that hangs along the rotation axis of the pipe casing (12) for a longer time than this, and is made of a steel pipe having a constant diameter (about 8 cm).
  • Reference numeral (23) denotes a bearing tube of the core rod (22), which is fixedly supported to a midway height position in the pipe casing (12) through several stages of radiation stays (24) as shown in FIG. .
  • the radiation stay (24) projects radially from the core rod bearing tube (23), and the filling material (25) received in the pipe casing (12) is clogged or bridged inside. The phenomenon is not caused.
  • the average particle size of natural crushed stone, gravel, concrete debris, waste tile, or mine used as the filling material (25) is about 2 to 4 cm.
  • the upper end portion of the core rod (22) serves as a rotation input shaft (26) and is connected to a motor output shaft (27) of the rotation drive source (11) assembled to the lifting platform (8).
  • the core rod (22) can be extracted and disassembled when not in use.
  • the lower end portion of the core rod (22) in a suspended state from the rotation drive source (11) performs a leading action during excavation as a cone tip (28).
  • (29) is an inner screw auger that is integrally projected outwardly by about 3 pitches from the lower end of the circumferential surface of the core rod (22) to a certain length (L2) (about 40 to 60 cm).
  • L2 a certain length (about 40 to 60 cm).
  • the upper blade portion (29a), the middle blade portion (29b), and the lower blade portion (29c) that gradually change greatly as the rotation diameter goes downward.
  • the maximum rotating diameter (d) is approximately equal to that of the outer screw auger (13) in the pipe casing (12), and the bore diameter is about 40 cm. (G) can be created.
  • the lower blade portion (29c) of the inner screw auger (29) is a radially symmetrical type as two pieces having a clearance angle ( ⁇ ) of about 20 to 40 degrees (or a cutting edge angle of about 100 to 140 degrees). While being distributed, the excavation blade (30) protrudes obliquely downward integrally from the two blades.
  • the filling material (25) is introduced into the pipe casing (12), and only the core rod (22) is moved in the reverse direction (R) from the time of excavation.
  • the lower surface of the lower blade portion (29c) that maintains the clearance angle ( ⁇ ) in the inner screw auger (29) includes the lower surface of the excavating blade (30).
  • the insert material (25) is pressed downward and laterally (in the radial direction) based on the clearance angle ( ⁇ ), and the insert material (25) is tightened with high density. Can be hardened.
  • the excavated earth and sand (A) that has previously closed the lower surface of the opening of the pipe casing (12) is pushed out by the reverse rotation of the core rod (22) and dropped off, and the pipe casing (12)
  • the filling material (25) thrown into the inside is along the blade portions (29a), (29b), and (29c) of the inner screw auger (29) that gradually increases as the rotational diameter of the core rod (22) goes downward.
  • the pipe casing (12) smoothly flows down to the opened lower surface, and the core rod (22) does not easily receive excessive rotational resistance.
  • the average particle size of the filling material (25) is about 2 to 4 cm
  • the hole diameter of the drilling hole (G) is about 40 cm
  • the clearance angle ( ⁇ ) is about 20 to 40 degrees.
  • the lower blade portion (29c) of the inner screw auger (29) in the core rod (22) is shaped as two blades with an excavating blade (30). You may model as mentioned above. However, one blade is not preferable because the core rod (22) may run out.
  • the leader (4) of the construction machine (M) for ground improvement has already stated that the rigid extension pedestal (10) is suspended integrally, but the extension pedestal (10) A surrounding frame (32) for steadying the pipe casing and an insert material charging chute (34) equipped with an insert material storage hopper (33) are attached and installed, and has a constant ground height (h) (approximately
  • the medium filling material (25) can be loaded into the pipe casing (12) from the medium filling material charging chute (34) which is in a fixed positioning state at 40 to 60 cm).
  • the surrounding frame (32) for stabilizing the pipe casing is made of a steel plate curved in a substantially C shape in plan view, and is a door relief that opens sideways.
  • (36) is a body surface reinforcing rib of the surrounding frame (32), and (37) is a pair of parallel mounting plates that project rearward and integrally from the body surface of the surrounding frame (32). 38) is detachably attached to the extension pedestal (10) of the leader (4).
  • the filling material charging chute (34) has a funnel shape having a stepped inclined surface having a constant dimension (y) (about 10 cm), and a large funnel-shaped filling material containing hopper as shown in FIG. (33) is detachably inserted and fitted.
  • the storage hopper (33) and the charging chute (34) of the filling material (25) may of course be large-sized products prepared in advance and integrated.
  • the uneven slope of the constant dimension (y) prevents clogging and bridging due to concentration of the filling material (25).
  • the square bottom tube (41) of the filling material charging chute (34) is the door relief notch (35) of the pipe casing steadying surrounding frame (32). Will be maintained in a tilted state of a side-down inclined correctly directed.
  • the inclination angle is about 35 degrees as an example.
  • the filling material charging chute (34) is a slide mouth tube that is slidably inserted into the square bottom tube (41) of the above-mentioned filling material charging chute (34) so that the operator can move it as shown in FIGS. 29 to 32. Close to the filling material receiving port (14) of the pipe casing (12) or inserted into the filling material receiving port (14) as shown in FIGS. 34 and 35, and the open / close door (D) is opened. Will be kept.
  • (43) is a triangular shoe attached to and integrated with the bottom surface of the slide mouth tube (42), which smoothly elastically deforms the open / close door (D) and maintains its stable open state.
  • (44) is an adjustment hook lever of the slide mouth tube (42), and a plurality of concave grooves (45) carved therein are selected as locking pins (46) protruding from the slide mouth tube (42). The positioning of the slide mouth tube (42) is adjusted by locking it together.
  • (47) is a pivot pin for the adjustment hook lever (44).
  • the insert material feeding chute (34) on which the insert material containing hopper (33) is mounted is attached to the extension pedestal (10) hanging from the leader (4).
  • the intermediate material storage hopper (33) and the medium insert material input chute (34) are moved separately from the construction machine (M) as a transport vehicle. You may decide so that you can.
  • the surrounding casing (32) for stabilizing the pipe casing that has been described with reference to FIGS. 20, 21, and 29 to 32 is curved in a substantially C-shape in plan view from the steel plate.
  • the surrounding frame (32) is composed of a pair of upper and lower fixed-side surrounding frame pieces (32r) (32r) attached to the extension pedestal (10) of the leader (4) and a pair of upper and lower sides facing each other.
  • the free-side surrounding frame pieces (32f) (32f) are vertically divided, and the fixed-side surrounding frame pieces (32r) (32r) and the free-side surrounding frame pieces (32f) (32f) are paired with a pair of upper and lower pivot pins.
  • (48) According to (48), it is assembled so as to be freely opened and closed. (49) and (49) are a pair of upper and lower lock pins which are kept in their closed state, and if they are removed, they can be opened around the pivot pins (48) and (48).
  • the pair of upper and lower fixed-side surrounding frame pieces (32r) and (32r) and the pair of upper and lower free-side surrounding frame pieces (32f) and (32f) are respectively separated by relatively thin vertical fixing frames (50) and (50).
  • two idler rollers (51) and (51) each made of a steel pipe thicker than this also have the above-mentioned fixed-side surrounding frame piece.
  • (32r) (32r) and the free-side surrounding frame pieces (32f) (32f) are vertically supported by each other in a vertical state, and the idle rollers (51) (51) are connected to the pipes.
  • each of the free-rolling rollers (51) and (51) is notched in the fixed-side surrounding frame pieces (32r) and (32r) by loosening the fixing nuts (52) and (52) of the upper end screw shaft portion.
  • the grooves (53) (53) and the free-side surrounding frame pieces (32f) (32f) can be removed from the drop-through holes (54) (54) and exchanged.
  • FIGS. 36 to 38 are substantially the same as the surrounding frame (32) of FIGS. 29 to 32, and therefore, only the corresponding reference numerals are entered. Detailed description thereof will be omitted.
  • the pipe casing (12) and the core rod (22) suspended in the interior thereof are connected by transmission through a one-way clutch mechanism (C), and the pipe casing (12) and the core rod are excavated when the ground (E) is excavated. (22) and the screw augers (13) and (29) are driven to rotate together in the screwing direction (F) (right rotation as viewed from above).
  • the pipe casing (12) is not rotated at the time of charging and compaction, and only the core rod (22) is driven to rotate (rotate counterclockwise as viewed from above) in the direction (R) opposite to that at the time of excavation. .
  • FIG. 39 to FIG. 42 which shows the one-way clutch mechanism (C) extracted
  • (55) is a top cover having a substantially inverted U-shaped cross section which is integrally attached to the upper end of the pipe casing (12).
  • a bearing (56) that allows relative rotation is interposed and installed at the intersection of the horizontal upper surface of the case and the core rod (22) that passes through the upper surface. For this reason, even if the core rod (22) is driven to rotate, the pipe casing (12) is not rotated together with the core rod (22) and is kept in its free state.
  • (57) is a horizontal driving arm projecting horizontally from the vicinity of the upper end of the core rod (22) along the diameter line of the pipe casing (12) and its top cover case (55), (58) Is a driven ring integrally projecting inwardly from the circumferential surface of the top cover case (55) as a relational state facing the upper position of the driving arm (57).
  • the holes (59) and (59) are distributed.
  • corresponding claw-shaped connecting claws (60), (60) are inserted in a suspended state from above into each claw receiving square hole (59), (59) of the driven ring (58).
  • (61) (61) is a horizontal drop-off preventing flange integrally projecting from the upper end of each of the connecting claws (60) (60), and (62) (62) are horizontal upper surfaces of the top cover case (55).
  • a compression coil spring that is set between the upper and lower surfaces facing each of the connecting claws (60) and (60), and the lower ends of the connecting claws (60) and (60) that have received a downward biasing force are It is always exposed downward from the driven ring (58) of the top cover case (55).
  • each of the connecting claws (60) (60) is a core rod that is rotated to the right (see arrows (F) in FIGS. 40 and 41) in relation to the rotational directionality of the core rod (22).
  • the front surface in contact with the driving arm (57) on the (22) side forms the transmission vertical surfaces (60f) and (60f) that engage with each other, it rotates counterclockwise (see arrow (R) in FIG. 42).
  • the rear surface in contact with the driving arm (57) on the core rod (22) side is shaped as a non-transmission arc surface (60r) (60r) that does not engage with each other.
  • the pipe casing (12) in the free state is stopped once in a stable manner, and the filling material receiving port (14) covered with the open / close door (D) and the filling material charging chute (34).
  • a braking mechanism (B) for positioning and positioning so that the middle square-shaped bottom cylinder (41) of the center is correctly aligned with itself is also installed on the top surface of the top cover case (55) in the pipe casing (12). Has been.
  • 43 to 46 show a braking mechanism (B) of the pipe casing (12), and (63) and (63) are arranged horizontally as a pair aligned on the diameter line of the top cover case (55).
  • This is a cam protrusion raised integrally from the upper surface, and is formed into a non-isosceles triangle having two sides of the front surfaces (63f) and (63f) with a gentle inclination angle and the rear surfaces (63r) and (63r) with a steep inclination angle. It is shaped.
  • a pair of hanger stays (64) (64) having a bifurcated fork shape project integrally from the lifting platform (8) toward the upper surface of the top cover case (55).
  • (65) (65) is pivotally attached to the projecting tip (lower end) of each hanger stay (64) (64) via a horizontal through pin (66) (66) so as to be undulating and rotatable.
  • the toe portion can come into contact with the cam protrusions (63) and (63) on the top cover case (55) side by its own weight.
  • the slide port tube (42) of the rectangular bottom tube (41) is inserted into the open / close door (D) of the above-mentioned filling material receiving port (14) as shown in FIGS. Lock.
  • the open / close door (D) is in an open state partially elastically deformed as shown in FIGS. 29 to 32 only at the height position where the slide tube (42) is inserted and locked.
  • the filling material (25) in the filling material containing hopper (33) can be reliably charged from the charging chute (34) into the pipe casing (12).
  • the filling material receiving port (14) and its open / close door (D) extend along the vertical direction of the pipe casing (12), the filling material is received after excavation of the ground (E).
  • the pipe casing (12) is moved up and down in the open state in which the slide mouth tube (42) of the insert material charging chute (34) is still inserted and locked into the open / close door (D) of the mouth (14).
  • (8) can be pulled up, and the filling material (25) is continuously fed into the pipe casing (12) in the process.
  • the chute (34), the hopper (33) and the like for putting the filling material (25) into the pipe casing (12) need not be moved up and down along the pipe casing (12).
  • the loading material (25) can be loaded and accommodated by a cargo handling machine such as the hopper (33) backhoe. it can.
  • the insert material (25) falls from the charging chute (34) to the inside of the pipe casing (12) by itself, but a special device such as a pusher or feeder is used. It is also possible to forcibly feed the filling material (25) into the pipe casing (12).
  • the ground improvement drain pile embedding device has the above-described configuration, and when burying a drain pile by this, work according to the following process sequence.
  • the construction machine (M) in which the pipe casing (12) and the core rod (22) are suspended from the lifting platform (8) is installed on the soft ground (E) to be improved as shown in FIG.
  • the core rod (22) and the pipe casing (12) are rotated (right-rotated) together in the screwing direction (F) of the screw augers (13) and (29) by the rotation drive source (11). And begin excavating the ground (E).
  • wing part (29c) is provided with the excavation blade (30), and the earth and sand (A) which excavated the ground (E) together with the outer screw auger (13) of the said pipe casing (12). Is discharged to the ground surface, so that a drilling hole (G) having a hole diameter of about 40 cm can be formed.
  • an opening / closing door (D) of the filling material receiving port (14) is installed on the circumferential surface of the pipe casing (12) as a rectangle extending in the vertical direction, and is limited to the installation portion. Since the outer screw auger (13) is missing, the excavated earth and sand (A) dropped here is pressed and compacted with high density by the outer screw auger (13) of the rotating pipe casing (12). 49, and there is also an effect that a stable excavation hole (G) having a uniform hole diameter as shown in FIG. 49 can be formed.
  • the open / close door (D) of the elastic membrane material attached to the pipe casing (12) receives the pressure of the excavated earth and sand and keeps the filling material receiving port (14) in a sealed state. There is no risk of dirt or mud entering the interior.
  • the lower blade portion (29c) forming the inner screw auger (29) of the core rod (22) has the same maximum rotational diameter (d) as the outer screw auger (13) of the pipe casing (12),
  • the filling material (25) having a clearance angle ( ⁇ ) of about 20 to 40 degrees and discharged into the excavation hole (G) is pressed and compacted downward and in the radial direction (lateral direction).
  • the filling material (25) can be consolidated in the excavation hole (G), and a high-strength drain pile (P) can be obtained.
  • the degree of compaction (supporting force in the formation) of the filling material (25) is determined by the rotational torque (for example, about 300 to 500 m-Kg) acting on the rotational drive source (11) of the core rod (22). Elevating platform on which the core rod (22) and the pipe casing (12) are suspended every time the predetermined degree of compaction is confirmed, which can be obtained from the numerical values displayed on the digital recording unit of the construction machine (M). (8) is pulled up by a certain stroke (about 10 to 30 cm) as shown in FIG. 50, and this is repeated to the ground surface.
  • the rotational torque for example, about 300 to 500 m-Kg
  • the insert material (25) in the pipe casing (12) is sequentially dropped and released into the excavation hole (G) of the ground (E).
  • the filling material (25) is pressed and compacted downward and radially (laterally) by the compaction cam surface (31) of the lower blade portion (29c) forming the inner screw auger (29) of the core rod (22). Yes, this action is repeated.
  • FIG. 52 shows an improved ground obtained as a foundation of a house by burying a large number of such drain piles (P) in a distributed state at a required interval.
  • the crushed stone pile forming apparatus 100a can be implemented, for example, as the following aspect.
  • the first aspect is A pipe casing in which an open / close door is attached to the inside insert receiving port cut out along the vertical direction of the circumferential surface from which the outer screw auger protrudes; A core rod that is shaped so that the lower end portion of a certain length that hangs along the rotation axis of the pipe casing projects as an inner screw auger for compaction
  • the pipe casing is provided with a medium-filling material charging chute that is installed and fixed so as to be directed from a certain ground height to the medium-filling material receiving port of the pipe casing, While the above pipe casing and core rod are rotationally driven together in the screw auger screwing direction, the ground is excavated, After that, open the open / close door of the pipe casing that was stopped, and keep the above-mentioned insert material charging chute close to or inserted into the insert material receiving port, By rotating and driving only the core rod in the direction opposite to that during excavation, the discharge
  • a rigid extension pedestal is integrally suspended,
  • the extension pedestal is attached and fixed to the surrounding frame for pipe casing steadying and the insert material chute, respectively,
  • the slide mouth tube which was inserted into the square bottom tube of the inner filling material chute so as to be able to move forward and backward, was oriented in a downwardly inclined manner from the door escape notch of the surrounding frame to the inner insertion material receiving port of the pipe casing. It is an embedding device of the drain pile for ground improvement of the 1st mode characterized by this.
  • the pipe casing steady frame is vertically divided into a pair of upper and lower fixed side frame pieces that are attached to the extension pedestal of the leader, and a pair of upper and lower free side frame pieces that face each other.
  • the open / close door of the filling material receiving port is shaped into a substantially rectangular shape extending from the elastically deformable membrane material to the vertical direction of the pipe casing,
  • the ground improvement drain pile embedding apparatus is characterized in that only one of the long sides is pivotally attached to a corresponding opening edge of the filling material receiving port.
  • the inner screw auger of the core rod is only about 3 pitches, and the shape is formed from the upper blade portion, the middle blade portion, and the lower blade portion that gradually change greatly as the rotating diameter goes downward, As the maximum rotating diameter of the lower blade portion is approximately equal to that of the outer screw auger in the pipe casing, the lower surface of the opening of the pipe casing is exposed in a covering state that restricts narrowly,
  • the ground pile drainage embedding device characterized in that the lower blade portion of the inner screw auger is divided into two pieces symmetrically distributed to give a clearance angle of about 20 to 40 degrees. is there.
  • the sixth aspect is a motor output shaft of a rotational drive source that is suspended from a lifting platform along a leader equipped with a construction machine for ground improvement, suspended from a pipe casing and a core rod, and assembled to the lifting platform, While connecting and integrating with the rotation input shaft of the core rod,
  • the one-way clutch mechanism that rotates the pipe casing and the core rod in the same direction when excavating the ground, and rotates only the core rod in the direction opposite to that when excavating when inserting the filling material into the pipe casing and compacting it.
  • the pipe casing is not rotated in the same reverse direction as the core rod, and the insert material receiving port corresponds to the insert material input chute.
  • a braking mechanism for a pipe casing that stops positioning in a matching relationship state,
  • a ground pile improvement burial device according to the first aspect, wherein the ground pile is installed on the top surface of a top cover case in the pipe casing.
  • the medium filling material charging chute faces a fixed state from a certain ground height position to the medium filling material receiving port that is notched and extended along the vertical direction of the pipe casing, While the pipe casing is stopped, the inside insert material charging chute is slid to keep the open door of the inside insert receiving port open, and the inside material is inserted into the pipe casing. Since the insertion of the filling material is smoothly performed even when the pipe casing is being pulled up, a device for operating the conventional skip bucket and other filling material charging device to move up and down and a special troublesome operation by the operator. Operation becomes unnecessary. As a result, it is remarkably beneficial for the ground improvement work performed using a small construction machine.
  • an opening / closing door for the insert material receiving port is mounted along the vertical direction on the circumferential surface of the pipe casing, and the pipe casing forms a flat surface without an outer screw auger at the mounting portion.
  • the fallen excavated earth and sand can be pressed and consolidated with high density by the rotating outer screw auger, which helps to prevent the collapse of the excavated hole.
  • the inner screw auger that forms the lower end of the core rod will also rotate in the same direction.
  • the earth and sand and the insert material are discharged from the lower surface of the opening of the pipe casing into the excavation hole and are securely compacted by the inner screw auger, so that a high-density drain pile can be obtained.
  • the lower end portion of the pipe casing suspended from the lifting platform that is lifted and lowered along the leader of the construction machine is attached to the extension pedestal so as to surround the steady rest.
  • the pipe insert chute for the pipe casing's insert material receiving port also has a constant ground height fixedly supported by the extension pedestal.
  • the configuration of the third aspect is adopted as the surrounding frame for pipe casing steadying
  • the plurality of free-rolling rollers surrounding the pipe casing literally play a free-rotating action, so
  • the free side enclosure frame piece can be released from the fixed enclosure frame piece, and the work to remove adhering earth and sand and pipes
  • the assembling work of the surrounding frame with respect to the casing can be easily performed.
  • the opening / closing door of the filling material receiving port is made of an elastically deformable film material, so that the filling material receiving port of the pipe casing is reliably received by receiving earth pressure during excavation. It can be applied in a sealed state, and has an effect of preventing not only excavated earth and sand but also intrusion of muddy water.
  • the upper and lower mutual gaps between the lower end portion of the pipe casing and the lower blade portion of the inner screw auger are quickly closed by earth and sand when excavating the ground, and are excessively excessive.
  • the lower blade portion having the maximum rotation diameter of the inner screw auger is moved from the lower end of the pipe casing. Based on the clearance angle, the released filling material is pressed and consolidated in the downward and lateral directions (radial direction), and a high-strength drain pile compacted from the filling material is obtained.
  • the pipe casing can be driven to rotate in the same direction as the core rod by the one-way clutch mechanism even if the rotational drive source is one united and integrated directly with the core rod. There is.
  • the pipe casing is not rotated in the same reverse direction as the core rod only when the core rod is driven to rotate in the reverse direction to the excavation of the ground. It is possible to reliably and efficiently operate the filling material into the pipe casing, and to release the filling material into the excavation hole without biting it, and it is possible to smoothly compact and consolidate it. Helps improve durability.
  • the tip 29c (lower blade portion) of the inner screw auger protrudes from the gas pipe casing, and the rear portion of the inner screw auger 29 is disposed in the pipe casing 12, for example, 53 to 55 may be configured such that the entire inner screw auger 29v is exposed outside the pipe casing 12.
  • the pipe casing 12 should just be comprised so that the rotating shaft of the inner screw augers 29 and 29v may be enclosed from outer periphery.
  • the configuration in which only the tip protrudes as in each of the above-described embodiments has an advantage that it is possible to realize efficient crushed stone pressurization using the spiral structure inside the pipe casing 12. .
  • the integrated processing from the excavation to the formation of the crushed stone pile is realized by using the attachment, and the crushed stone pile is constructed with the quality of the crushed stone pile hardly depending on the skill of the operator. It is possible.
  • the construction method very adaptable to the quality assurance (quality assurance based on the validity of a process) by the method of special process management (ISO9000) is realizable.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

 本発明は、地中に挿入されて空間を形成し、前記地中から上昇しつつ前記空間に砕石杭を形成する砕石杭形成用のアタッチメントを提供する。このアタッチメントは、円筒部と、開閉蓋と、備える。円筒部は、中心軸方向に長軸を有する少なくとも一つの長孔である砕石投入孔が側面に形成されている。開閉蓋は、前記砕石投入孔を前記円筒部の外部方向から塞ぐことができる。

Description

砕石杭形成用のアタッチメントおよびそのアタッチメントを備える砕石杭形成装置
 本出願は、2008年9月9日に出願された日本国特許出願第2008-230516号と、2009年3月25日に出願された日本国特許出願第2009-073586号と、2009年8月21日に出願された日本国特許出願第2009-192063号と、に基づく優先権を主張する。これらの出願の全ての内容はこの明細書中に参照により援用されている。
 本発明は、地盤を改良するための装置に関し、特に地中に砕石杭を形成して地盤を改良するためのアタッチメントおよびそのアタッチメントを備える砕石杭形成装置に関する。
 液状化対策の地盤改良工法として、従来からグラベルドレーン工法が提案されている。グラベルドレーン工法とは、砂利、砕石、コンクリート殻といった粒状物である中詰材を地中に柱状に投入して締固めする工法である。グラベルドレーン工法は、一般にケーシングとケーシング内のスラストスクリュウが相逆回転する二重回転機構を備えたダブルオーガを使用して行われる。ダブルオーガは、ケーシング内の空間を利用して地中に中詰材を投入することを可能とし、スラストスクリュウの押圧力で中詰材の締固めを行うことができる。グラベルドレーン工法は、地震時において液状化現象の原因となる間隙水の排出路を中詰材で形成するとともに、中詰材の締固めを十分に行うことで液状化を抑制することができる。
 このように、グラベルドレーン工法では、中詰材の締固めを十分に行うことが要請されるので、振動や静圧を利用して中詰材を締固めするための種々の方法が提案されている。たとえば特開2002-105942号公報には、ダブルオーガを使用し、所定のサイクルでパイプケーシングに対して相対的にスラストスクリュウを昇降させることによって、中詰材の締固めを行う方法が提案されている(たとえば要約や段落0030)。この方法によれば、中詰材の締固め時の振動や騒音を伴うことなく、十分な中詰材の締固めが実現でき、液状化現象を確実に防止することができると記載されている(たとえば段落0036乃至0040)。
 しかし、従来は、パイプケーシングへの中詰材の投入の効率化という観点からは未検討であった。
 本発明は、中詰材で地中に柱状物を形成する方法において、効率的に中詰材を投入する技術を提供することを目的とする。
 本発明は、以下の構成や態様として例示される技術を提供することができる。
 第1構成例は、地中に挿入されて空間を形成し、前記地中から上昇しつつ前記空間に砕石杭を形成する砕石杭形成用のアタッチメントを提供する。このアタッチメントは、円筒部と、開閉蓋と、備える。円筒部には、中心軸方向に長軸を有する少なくとも一つの長孔である砕石投入孔が側面に形成されている。開閉蓋は、前記砕石投入孔を前記円筒部の外部方向から塞ぐことができる。
 第1構成例のアタッチメントは、砕石投入孔が側面に形成された円筒部を有するので、円筒部の側面から砕石を投入して地中に砕石杭を形成することができる。この砕石投入孔は回転軸の方向に長軸を有する少なくとも一つの長孔なので、砕石杭の形成に伴って円筒部が上昇しても砕石投入孔の長軸方向の長さの範囲で砕石投入位置を地上に対して固定することができる。これにより、作業の効率化を図ることができる。一方、円筒部は、砕石投入孔を円筒部の外部方向から塞ぐ開閉蓋を有するので、地中においては円筒部の外部の圧力で砕石投入孔が閉鎖され、土砂の浸入を抑制することができる。これにより、簡易かつ効率的な砕石杭の形成作業を実現させることができる。
 なお、アタッチメントは、アタッチメント自体が掘削機能と砕石杭形成機能の双方を有するように構成しても良いし、あるいは別途掘削された孔にアタッチメントを挿入して砕石杭を形成するように構成しても良い。また、砕石は、広い意味を有し、自然砕石や砂利、砂といった自然物、あるいはコンクリートの破片、廃瓦、鉱津といった人工物などを含む。ただし、自然物を使用すれば、地盤改良に起因する土壌汚染を防止することができるとともに、地中に人工物を残存させないことによって将来的な人工物の撤去の必要性を予め排除することもできるので、土地の資産価値の下落を抑制することができるという利点がある。一方、コンクリートの破片等の廃棄物を使用すれば、地盤改良の材料として廃棄物を有効利用することができるという利点がある。
 第2構成例は、第1構成例のアタッチメントにおいて、さらに、螺旋部を備える。螺旋部は、正転方向と反転方向の回転駆動力を発生させる駆動装置に接続されている。駆動装置から、入力された正転方向の回転で地中を掘削し、入力された反転方向の回転で砕石に圧力を印加する。一方、円筒部が、螺旋部と回転軸をほぼ共通にし、螺旋部の回転軸を外周から包囲し、螺旋部に対して軸方向の相対的な位置関係を拘束しつつ、螺旋部に対して回転可能に結合されている。
 第2構成例のアタッチメントは、正転方向(掘削方向)の駆動においては螺旋部で砕石杭形成用の孔を掘削することができる一方、反転方向(圧力印加方向)の駆動においては螺旋部で砕石を加圧することができる。一方、円筒部は、螺旋部に対して軸方向の相対的な位置関係を拘束するように結合されているので、砕石からの反力を利用して円筒部の上昇のための駆動力を軽減させることも可能である。
 このように、第2構成例のアタッチメントは、掘削から砕石杭の形成までの主要な作業を一貫して行うことができる。さらに、円筒部は、螺旋部に対して回転可能に結合されているので、砕石杭形成中に螺旋部が回転していても加圧投入孔を一定の方向に向けておくことも可能である。
 第3構成例のアタッチメントは、第2構成例のアタッチメントにおいて、螺旋部が、円筒部の先端から突出し、この突出した部分に円筒部の内径よりも広い掘削領域を掘削する掘削刃を有するので、掘削時の円筒部の負荷を小さくすることができるとともに、砕石の締め固め作業においては円筒部の部分にまで渡って砕石杭の上面に対して締め固めを行うことができる。円筒部には、掘削刃を装備しても装備しなくても良いが、装備しなければ円筒部への負荷を顕著に低減することができるので、円筒部への長孔の形成に対して大きな設計自由度を与えることができる。
 第4構成例は、第3構成例のアタッチメントにおいて、さらに、回転駆動力伝達部と、反転防止機構とを備える。回転駆動力伝達部は、螺旋部への正転方向の回転駆動力の入力に応じて円筒部が螺旋部と一体となって回転し、螺旋部への反転方向の回転駆動力の入力に応じて螺旋部側にのみ回転駆動力を伝達する。反転防止機構は、円筒部の反転を防止する。一方、円筒部が、正転方向の回転に応じて円筒部の周囲の土砂を上昇させるように形成された螺旋状のフィンを有する。
 第4構成例のアタッチメントは、正転方向(掘削方向)の駆動においては、自動的に螺旋部と円筒部が一体として回転する作動状態となる。これにより、螺旋部で掘削した土砂を円筒部が有するフィンで地上に掘削土砂を排出することができる。一方、反転方向(圧力印加方向)の駆動においては、螺旋部で砕石に圧力を印加するとともに、円筒部が自動的に回転を停止して砕石投入位置を固定させることができる。この結果、円滑な掘削と簡易な砕石杭の形成作業とを実現させることができる。
 第5構成例は、第1ないし第4のいずれかの構成例のアタッチメントにおいて、開閉蓋が、円筒部の正転方向の回転によって、砕石投入孔を閉鎖する方向の力が地中から印加されるように構成されているので、掘削の際の回転時における円筒部内への土砂の浸入を顕著に低減させることができる。
 第6構成例は、第1ないし第5のいずれかの構成例のアタッチメントにおいて、さらに、地表面にほぼ平行な圧力面を有し、回転軸の方向に移動可能な表層保護板を備えるので、地表面近傍の地盤の緩みを予め効果的に防止することができる。
 第7構成例は、第1ないし第6のいずれかの構成例のアタッチメントにおいて、さらに、砕石投入孔に砕石を投入する砕石投入装置を備える。砕石投入装置は、開放保持部材と、砕石受領部と、砕石移動樋と、を備える。開放保持部材は、開閉蓋を支持して砕石投入孔を開放状態とする。砕石受領部は、与えられた砕石を受け取る。砕石移動樋は、砕石受領部から開放状態の砕石投入孔に砕石を移動させる。砕石移動樋が、砕石受領部に接続された砕石移動樋本体と、砕石投入アダプタと、を有する。砕石投入アダプタは、砕石移動樋本体に回動可能に接続され、先端部を砕石投入孔に接近させることによって砕石移動樋本体から砕石投入孔への砕石の移動を可能とする投入位置と、先端部が砕石投入孔から退避して円筒部を回転可能とする退避状態と、を含む複数の作動状態を有する。砕石投入アダプタが、円筒部の停止時において開放保持部材によって開閉蓋が開放状態とされているときに、砕石投入アダプタに加えられる砕石の重量に応じて投入位置となり、重量の消失に応じて退避状態とするための付勢部を有する。
 第7構成例のアタッチメントは、砕石投入孔から退避して円筒部を回転可能とする退避状態と、円筒部の停止時に砕石の移動を可能とする投入状態と、を含む複数の作動状態を有する砕石投入装置を有するので、掘削時から砕石杭形成時まで砕石投入装置の砕石受領部を移動させる必要がない。さらに、退避状態と投入状態とは、砕石の投入状態に応じて自動的に切り替えられるので、予め操作ミスを防止することができる。これにより、オペレータの負担を顕著に軽減することができるとともに、施工の信頼性を高めることができる。
 第8構成例は、地中に砕石を含む砕石杭を形成する砕石杭形成装置を提供する。この砕石杭形成装置は、アタッチメントと駆動装置とを備える。アタッチメントは、第1ないし第7のいずれか1つの構成例のものである。駆動装置は、正転方向と反転方向の回転駆動力を発生させてアタッチメントを駆動する。
 なお、本発明は、上述の装置に限られず、たとえば砕石杭形成方法、砕石杭形成装置を制御する制御装置といった種々の構成で実現することができる。
 第1構成例は、簡易かつ効率的な砕石杭の形成作業を実現させることができる。第2構成例は、掘削から砕石杭の形成までの主要な作業の全て行うことができる。第3構成例は、掘削時の円筒部の負荷を小さくして円筒部への長孔の形成に対して大きな設計自由度を与えることができるとともに、砕石の締め固め作業においては円筒部の部分にまで渡って砕石杭の上面に対して締め固めを行うことができる。第4構成例は、円滑な掘削と簡易な砕石杭の形成作業とを実現させることができる。第5構成例は、掘削の際の回転時における土砂の浸入を顕著に低減させることができる。第6構成例は、地表面近傍の地盤の緩みを予め効果的に防止することができる。第7構成例は、砕石投入位置の移動を不要とし、作業性を顕著に改善させることができる。
本発明の第1実施例に係る砕石杭形成装置100の構成を示す説明図。 第1実施例のアタッチメントTを別の角度から見た図を示す説明図。 第1実施例のパイプケーシング12とインナースクリューオーガー29の構成を示す断面図。 本発明の第1実施例に係る砕石杭形成方法の工程を示すフローチャート。 プレス板110の接地状態における砕石杭形成装置100を示す説明図。 第1実施例のプレス板110とその近傍の構成を示す拡大図。 掘削準備工程における砕石杭形成装置100を示す説明図。 砕石予備投入前におけるパイプケーシング12および砕石投入装置330の状態を示す側面図。 砕石予備投入前におけるパイプケーシング12および砕石投入装置330の状態を示す平面図。 砕石予備投入時におけるパイプケーシング12および砕石投入アダプタ332の状態を示す側面図。 砕石予備投入時におけるパイプケーシング12および砕石投入装置330の状態を示す平面図。 掘削工程における砕石杭形成装置100を示す説明図。 掘削完了工程における砕石杭形成装置100を示す説明図。 砕石形成工程における砕石杭形成装置100を示す説明図。 砕石形成工程における砕石投入装置330の状態を示す説明図。 施工完了工程における砕石杭形成装置100を示す説明図。 本発明の第2実施例に係る砕石杭形成装置100aの概略全体を示す説明図。 図17の概略正面図 図18の3-3線に沿う拡大断面図。 図18の下端部を抽出して示す拡大図。 図20の平面図。 図17の6-6線に沿う拡大断面図。 開閉扉の開放状態を示す図22に対応する断面図。 開閉扉を抽出して示す正面図。 コアーロッドのインナースクリューオーガーとパイプケーシングとの関係を抽出して示す断面図。 コアーロッドのインナースクリューオーガーを抽出して示す拡大正面図。 図26の側面図。 図26の底面図。 パイプケーシングに対する中込め材の投入状態を示す図21に対応する平面図。 図29の側面図。 図29の15-15線に沿う拡大断面図。 図29の16-16線に沿う拡大断面図。 図29の17-17線に沿う拡大断面図。 中込め材受け入れ口に対する中込め材投入シュートの差し込み状態を示す図29と対応する平面図。 図34の19-19線に沿う拡大断面図。 振れ止め用包囲枠の変形実施形態を示す平面図。 図36の側面図。 包囲枠の遊転ローラーを抽出して示す正面図。 ワンウエイクラッチ機構を抽出して示す断面図。 図39の24-24線に沿う拡大断面図。 図40の25-25線に沿う拡大断面図。 コアーロッドの逆回転状態を示す図41に対応する断面図。 パイプケーシングの制動機構を抽出して示す側面図。 図43の28-28線に沿う拡大断面図。 パイプケーシングの停止状態を示す図43に対応する側面図。 図45の30-30線に沿う拡大断面図。 建設機械への取付準備状態を示す説明図。 地盤の掘削作用過程を示す説明図。 掘削穴の造成終了状態を示す説明図。 図49からの引き上げ作用過程を示す説明図。 ドレーン杭の埋設終了状態を示す説明図。 ドレーン杭の埋設による住宅の地盤改良状態を示す説明図。 変形例のインナースクリューオーガーとパイプケーシングを示す断面図。 変形例のインナースクリューオーガーとパイプケーシングを示す断面図。 変形例のインナースクリューオーガーとパイプケーシングを示す底面図。
 本発明は、たとえば以下の特徴を単独あるいは組み合わせて備えることによって好ましい形態として実現することもできる。
(特徴1)インナースクリューオーガー29(螺旋部の一例)は、回転直径が下方へ行く程徐々に大きく変化した上段羽根部29aと中段羽根部29b並びに下段羽根部29cを具備し、下段羽根部29cだけがパイプケーシング12の下端部から露出ている。
(特徴2)開閉扉Dは、ゴムや合成樹脂などの弾性変形可能な膜材から構成されている。
(特徴3)開閉扉Dには、補強金属骨18と補強布17の少なくとも一方が埋設一体化されている。
(特徴4)アタッチメントは、砕石杭の施工状態(たとえば掘削深度や掘削トルク)を監視し、オペレータに注意を喚起する施工管理装置TC(制御装置の一例)を備えている。
 以下では、上述の特徴を踏まえて本発明の作用や効果を明確に説明するために、本発明の実施の形態を、次のような順序に従って説明する。
A.本発明の第1実施例に係る砕石杭形成装置の構成と施工方法:
B.本発明の第2実施例に係る砕石杭形成装置の構成と施工方法:
C.変形例:
A.本発明の第1実施例に係る砕石杭形成装置の構成と施工方法:
 図1は、本発明の第1実施例に係る砕石杭形成装置100の構成を示す説明図である。砕石杭形成装置100は、建設機械としての小型地盤改良機Mと、小型地盤改良機Mに装着されたアタッチメントTと、を備えている。小型地盤改良機Mは、図1に示されるように、地盤改良機本体構造1と、運転席としてのキャビン7と、低接地圧で不整地を移動可能な無限軌道であるクローラ6と、施工時において小型地盤改良機Mの揺動を抑制するアウトリガー5と、を備える。
 小型地盤改良機Mは、さらに、アタッチメントTを操作するための構成として、アタッチメントTにモーター出力軸27を介して回転駆動力を供給する回転駆動源11と、昇降ガイドレール9を有するリーダー4と、リーダー4を支持するためのリーダー取付ベース2と、リーダー4の傾きを操作する油圧シリンダー3と、リーダー4の下端部においてリーダー4と一体的に形成されている延長脚柱10と、を備えている。
 図2は、第1実施例のアタッチメントTを別の角度から見た図を示す説明図である。アタッチメントTは、図1および図2に示されるように、フィン13が設けられたパイプケーシング12(円筒部の一例)と、インナースクリューオーガー29(螺旋部の一例)と、パイプケーシング12の振れ止め用の包囲枠32と、二股のフォーク形状を有するハンガーステー64(図1)と、カム凸子63を有するトップカバーケース55と、砕石投入装置330と、取付プレート37(図1)と、支持アーム39(図1)と、アタッチメントTによる施工状態を管理する施工管理装置TC(図1)と、を備えている。パイプケーシング12には、中込め材受け入れ口14(砕石投入孔の一例)が形成され(図1)、開閉蓋Dによって塞がれているが、その詳細については後述する。
 図3は、第1実施例のパイプケーシング12とインナースクリューオーガー29の構成を示す断面図である。インナースクリューオーガー29の構成は、第2実施例に詳細に開示されているが、ここでも簡単に説明する。インナースクリューオーガー29は、回転入力軸26およびコアーロッド22と一体的に構成されている。回転入力軸26は、回転駆動源11のモーター出力軸27に接続されている。回転入力軸26は、モーター出力軸27の回転駆動力に応じて回転し、その回転駆動力を一体的に結合されたコアーロッド22を介してインナースクリューオーガー29に伝達する。
 コアーロッド22は、軸受け管23と放射ステー24とでパイプケーシング12に回転可能に結合され、パイプケーシング12と回転軸を共通にしている。一方、パイプケーシング12は、その周囲に螺旋状のフィン13を有している。フィン13は、インナースクリューオーガー29の螺旋と同一方向の螺旋形状を有している。すなわち、掘削する際には、パイプケーシング12とインナースクリューオーガー29は、同一方向に回転することになる。これにより、インナースクリューオーガー29の掘削によって生じた掘削土砂がフィン13によって地表に運搬されることになる。
 なお、このような二重回転機構を備える掘削装置として、図示しないドーナツオーガ(ダブルオーガ)が広く知られている。しかし、ドーナツオーガは、ケーシングとケーシング内スクリューを相互に逆回転させることによって、リーダー4や小型地盤改良機Mの負荷を軽減して、鉛直精度の高い杭を施工するために二重反転機構としていることが周知である。したがって、本実施例のように、螺旋形状を同一方向とすることは、当業者の技術常識に反するものである。
 さらに、第1実施例のパイプケーシング12およびインナースクリューオーガー29は、以下の点においても従来のドーナツオーガと相違する。すなわち、従来のドーナツオーガでは、パイプケーシング側の先端にも掘削刃が装備されているのに対して、第1実施例のパイプケーシング12の先端部には掘削刃が装備されていない。一方、第1実施例のインナースクリューオーガー29は、その先端の下段羽根部29cがパイプケーシング12から突出して、パイプケーシング12の直径に相当する範囲を掘削可能な径を有している。このように、第1実施例における掘削のメカニズムは、従来のドーナツオーガのものと根底から相違するものであることが分かる。
 このようなメカニズムの本質的相違は、パイプケーシング12への中込め材受け入れ口14の形成と有機的な関係を有している。パイプケーシング12の側面への中込め材受け入れ口14の形成は、パイプケーシング12の剛性や強度を低下させるので、パイプケーシング12自体による掘削を極めて困難とする。しかし、本願発明者は、掘削時においては、掘削をインナースクリューオーガー29に担当させるとともに、パイプケーシング12を掘削土砂の運搬に利用することによって、パイプケーシング12に必要とされる剛性や強度を低減させているのである。このように、本構成は、インナースクリューオーガー29が地中を掘削し、この掘削によって生じた土砂をフィン13によってパイプケーシング12の外側を経由させて地表に排出するというユニークな掘削方法を実現しているのである。これにより、パイプケーシング12への中込め材受け入れ口14の形成が実用的に可能となるのである。ただし、パイプケーシング12への掘削刃の装備を完全に排除するものではなく、パイプケーシング12側に補助的な掘削刃を装備するようにしても良い。このようにしても掘削時のパイプケーシング12の負担を軽減することができるからである。
 アタッチメントTは、本実施例では、さらに、トップカバーケース55の内部において、回転入力軸26とコアーロッド22との間にワンウエイクラッチ機構(後述)を備えている。ワンウエイクラッチ機構は、掘削時の回転方向の駆動においては、自動的にインナースクリューオーガー29とパイプケーシング12が一体として回転する作動状態となる。これにより、上述のようにインナースクリューオーガー29で掘削した土砂をパイプケーシング12が有するフィン13で地上に掘削土砂を排出することができる。一方、掘削時の回転方向と逆方向の回転駆動においては、インナースクリューオーガー29で砕石に圧力を印加するとともに、パイプケーシング12が自動的に回転を停止して中込め材受け入れ口14の回転方向の位置を固定させることができる。なお、ワンウエイクラッチ機構(回転駆動力伝達部の一例)の詳細については第2実施例で詳述する。
 アタッチメントTは、図1に示されるように、以下のような形態で小型地盤改良機Mに装着されている。アタッチメントTが有する包囲枠32と砕石投入装置330は、それぞれ取付プレート37と支持アーム39とによって小型地盤改良機Mの延長脚柱10に結合されている。アタッチメントTのインナースクリューオーガー29は、回転入力軸26とモーター出力軸27とを介して、小型地盤改良機Mの回転駆動源11に接続されている。一方、小型地盤改良機Mのハンガーステー64は、カム凸子63とともに、パイプケーシング12が一方向にのみ回転するようにするための反転防止機構を構成している。このような構成を有する砕石杭形成装置100は、次に説明する工程によって地中に砕石杭を形成することができる。
 図4は、本発明の第1実施例に係る砕石杭形成方法の工程を示すフローチャートである。ステップS100では、オペレータは、図1に示される状態において、杭芯位置合わせ工程を実行する。杭芯位置合わせ工程とは、予め設定された砕石杭形成位置に砕石杭を形成することができるように、インナースクリューオーガー29の先端を砕石杭形成位置の中心に合わせる工程である。この位置合わせは、クローラ6の駆動によって小型地盤改良機Mの位置と方向を調整することによって行われる。
 杭芯位置合わせ工程では、オペレータは、さらに、アウトリガー5(図1)を操作して小型地盤改良機Mの位置を固定する。これにより、施工時における小型地盤改良機Mの揺動や位置ずれを抑制することができる。オペレータは、アウトリガー5による小型地盤改良機Mの固定を確認した後に、リーダー4の重力方向に対する鉛直性を確認し、必要に応じて微調整を行う。
 オペレータは、鉛直性を確認した後に、図5に示されるように、プレス板110(表層保護板の一例)を地表まで下降させて接地させる。プレス板110を接地させるのは、掘削開始時における地表面近傍の表層部のゆるみを抑制するためである。
 図6は、第1実施例のプレス板110(下降前)とその近傍の構成を示す拡大図である。アタッチメントTは、さらに、プレス板110を昇降させる油圧アクチュエータ111を備えている。油圧アクチュエータ111は、リーダー4の下端部において一体的に形成されている延長脚柱10に支持されている。プレス板110は、アタッチメントTによって掘削される掘削孔の周囲の地表を加圧することができる。
 ステップS200では、オペレータは、図7に示されるように、掘削準備工程を実行する。掘削準備工程とは、掘削するための準備工程であって、基準位置設定工程と、ケーシング下降工程と、砕石予備投入工程と、を含む工程である。基準位置設定工程は、掘削の際の掘削深さの基準となる位置を設定する工程である。基準位置設定工程では、オペレータは、プレス板110が地表に接地した状態において、施工管理装置TCに所定の入力(たとえばボタン(図示せず)を押す。)を行うことによって基準位置を設定することができる。
 ケーシング下降工程は、パイプケーシング12の下端が地表に接地するまで下降させる工程である。これにより、図7に示されるように、インナースクリューオーガー29の先端部が地中に侵入して地表にアタッチメントTが固定された状態において、パイプケーシング12の下端が地表によって封鎖されることになる。パイプケーシング12の昇降量は、たとえばリーダー4が有する図示しないポテンショメータによって計測することができる。
 砕石予備投入工程は、砕石投入装置330から中込め材受け入れ口14を介して砕石を予備的に投入する工程である。投入される砕石の量は、本発明の発明者の実験によれば、パイプケーシング12の下端から50cm(±10cm)程度とすることが好ましいことが確認されている。投入された砕石は、アタッチメントTによる掘削時にパイプケーシング12の下端を閉塞し、パイプケーシング12の内部への掘削土砂の侵入を防止する。本明細書では、砕石は、広い意味を有し、自然砕石や砂利、砂といった自然物、あるいはコンクリートの破片、廃瓦、鉱津といった人工物などを含む。ただし、自然物を使用すれば、地盤改良に起因する土壌汚染を防止することができるとともに、地中に人工物を残存させないことによって将来的な人工物の撤去の必要性を予め排除することもできるので、土地の資産価値の下落を抑制することができるという利点がある。一方、コンクリートの破片等の廃棄物を使用すれば、地盤改良の材料として廃棄物を有効利用することができるという利点がある。
 図8は、砕石予備投入前におけるパイプケーシング12および砕石投入装置330の状態を示す側面図である。図9は、砕石予備投入前におけるパイプケーシング12および砕石投入装置330の状態を示す平面図である。砕石投入装置330は、中込め材収容ホッパー33に供給された中込め材を中込め材投入シュート34(砕石移動樋本体の一例)を介して、パイプケーシング12の内部に投入する。パイプケーシング12の内部への中込め材の投入は、パイプケーシング12の側面に形成された中込め材受け入れ口14から行われる。中込め材受け入れ口14への投入は、砕石投入装置330に装備された開放支持部材331および砕石投入アダプタ332と、を利用して行われる。
 パイプケーシング12には、パイプケーシング12の回転軸方向(Z軸方向)を長軸とする長孔(本実施例では矩形)としての中込め材受け入れ口14が形成されている。中込め材受け入れ口14は、弾性体で形成されている平面形状の開閉蓋Dによってパイプケーシング12の外部方向から塞がれている。開閉蓋Dは、パイプケーシング12の螺進方向Fの先行側の中込め材受け入れ口14の端部側の一辺である固定部Dfでパイプケーシング12に締結されているとともに、他の辺で開放されている。これにより、パイプケーシング12の掘削時の回転によって、中込め材受け入れ口14を閉鎖する方向の力が地盤から印加されるので、掘削の際の回転時における土砂や水の浸入を顕著に低減させることができる。
 開閉蓋Dは、必ずしも弾性体で構成する必要は無く、また、平坦である必要もない。ただし、弾性体で構成すると、地盤からの圧力で中込め材受け入れ口14の形状や付着した土砂等に沿って変形するので、高い機密性を実現することができることが本願発明者の試験と解析とによって確認された。一方、開閉蓋Dを平坦形状とすれば、3次元形状で形成する場合よりも簡易に製造することができる。なお、開閉蓋Dの構成については、第2実施例で詳しく説明する。
 砕石投入装置330は、以下の構成を有する開放支持部材331および砕石投入アダプタ332を使用して中込め材投入シュート34から中込め材受け入れ口14に中込め材を供給する。開放支持部材331は、中込め材投入シュート34に固定された開放支持部材ベース331bと、開放支持部材ベース331bに対してZ軸回りに回転可能にヒンジ(図示省略)で結合された旋回支持部331aと、を備えている。一方、砕石投入アダプタ332は、中込め材投入シュート34に固定された砕石投入アダプタベース332bと、砕石投入アダプタベース332bに対してX軸回りに回転可能にヒンジ(図示省略)で結合された旋回アダプタ部332aと、旋回アダプタ部332aに装着された付勢錘332cと、を備えている。付勢錘332cは、旋回アダプタ部332aが中込め材投入シュート34の出口を閉鎖するように上方方向に付勢されている。
 図8および図9から分かるように、砕石予備投入前における砕石投入装置330の状態では、パイプケーシング12は、砕石投入装置330の干渉を受けることなく回転することができる。この状態では、旋回アダプタ部332aは、前述のように付勢錘332cによって中込め材投入シュート34の出口を閉鎖するように上方方向に付勢されている。一方、旋回支持部331aは、パイプケーシング12の回転時において、仮にパイプケーシング12に接触しても自動的に退避するように旋回するように構成されている。なお、付勢は、バネによって行ってもよい。
 このように、地盤の掘削に使用するパイプケーシング12を側方向から貫通する中込め材受け入れ口14を形成する構成や、中込め材受け入れ口14を塞ぐ開閉蓋Dを簡易に製造可能な平坦形状とすることによってパイプケーシング12の断面形状を非円形とする構成は、出願時の当業者の技術常識を根底から覆すものである。パイプケーシング12の側方に貫通孔を形成すると、パイプケーシング12の機密性の確保を困難として土砂や水の浸入を防ぐことが困難で、加えてパイプケーシング12の剛性や強度を低下させるので、事実上不可能な構成として検討すらされていなかった。さらに、パイプケーシング12の外径の一部において、たとえば本実施例では、外径の20%以上の部分で螺旋形状のフィンが欠落しているので、土砂の排出も困難になると考えられる。しかも、パイプケーシング12の断面形状を非円形とすると、土砂の排出性とも相俟って掘削時のトルクが過度に上昇するので、掘削自体が困難になると考えられていたからである。
 図10は、砕石予備投入時におけるパイプケーシング12および砕石投入アダプタ332の状態を示す側面図である。図11は、砕石予備投入時におけるパイプケーシング12および砕石投入装置330の状態を示す平面図である。なお、図10では、砕石投入アダプタ332の状態を見えやすくするために開放支持部材331の図示が省略されている。砕石予備投入では、オペレータは、前準備として弾性体である開閉蓋Dを手で開けるとともに、開閉蓋Dを旋回支持部331aに係合させて保持させる。
 オペレータは、保持状態を確認した後に、中込め材収容ホッパー33に砕石を投入する。投入された砕石は、中込め材投入シュート34に流れ、その重量で旋回アダプタ部332aを押すことになる。旋回アダプタ部332aは、砕石の重量によって旋回し、その先端が中込め材受け入れ口14に挿入されることになる。これにより、砕石は、パイプケーシング12の内部に投入されることになる。
 このような構成を採用することによって、掘削時から砕石杭形成時まで砕石投入装置330の中込め材収容ホッパー33を移動させる必要がなくなる。さらに、退避状態と投入状態は、砕石の投入状態に応じて自動的に切り替えられるので、予め操作ミスを防止することができる。これにより、オペレータの負担を顕著に軽減することができるとともに、施工の信頼性を高めることができる。
 ステップS300では、オペレータは、図12に示されるように、掘削工程を実行する。掘削工程は、掘削深度を監視しつつ掘削を行う工程である。掘削深度は、本実施例では、プレス板110の下端(地表に接地)の基準位置からのパイプケーシング12の先端位置の突出量として監視される。この基準位置は、ステップS200において、施工管理装置TCで使用される基準として設定された位置である。掘削深度の監視は、プレス板110とパイプケーシング12の相対的な位置の計測として行われ、施工管理装置TCにリアルタイムで入力される。施工管理装置TCは、時系列データとして掘削時のアタッチメントTへの出力トルクと掘削深度とを記録する。
 施工管理装置TCは、掘削深度が予め設定された所定の深度(たとえば1m)に達したら、音声でオペレータに注意を喚起する。オペレータは、この音声に応じて、プレス板110を上昇させて地表から離す。掘削開始から所定の深度までの間において、プレス板110を地表に接地させた状態で維持するのは、掘削開始に起因する掘削孔の周囲の地盤の緩みを抑制するためである。
 ステップS400では、オペレータは、図13に示されるように、掘削完了工程を実行する。掘削完了工程とは、原則として、予め設定された最大深度への到達に応じて掘削を終了させる工程である。ただし、オペレータは、予め設定された最大深度へ到達する前であっても、比較的に強固な地層への到達に応じて掘削を完了させることもできる。比較的に強固な地層は、地耐力(たとえばN値)が予め設定された以上の大きさを有する地層である。比較的に強固な地層への到達は、たとえば掘削時のアタッチメントTへの出力トルクの上昇や掘削速度(単位時間当たりの掘削深度の量)の低下に応じて検知することができる。
 このような掘削完了の方法は、本願発明者によって創作されたもので、掘削孔に形成される砕石杭による地耐力を実質的に顕著に上昇させることができる。具体的には、予め設定された最大深度への到達に応じて掘削を終了させれば、砕石杭の周面摩擦力を十分に大きくすることができる。砕石杭が十分に長くかつ地層変化に応じて直径が変化するからである。一方、比較的に強固な地層への到達に応じて掘削を完了すれば、砕石杭を比較的に強固な地層によって支えることができるので、砕石杭を基礎杭として利用する杭基礎としての考え方に基づく地盤改良の効果をも奏することになる。このような効果は、たとえば要求される長期許容応力度が比較的小さい木造住宅(必要長期許容応力度が20kN/m乃至30kN/m程度:木造住宅工事共通仕様書)において得に顕著な効果を奏する。一方、たとえば鉄骨造や鉄筋コンクリートの住宅(必要長期許容応力度が100kN/mを超える場合を含む。)に対しても、たとえば単位面積当たりの砕石杭の数や砕石杭の直径、砕石杭形成時のインナースクリューオーガー29の駆動トルクといったパラメータの調整によって対応することができるという広い適応性をも有している。
 ステップS500では、オペレータは、図14に示されるように、砕石形成工程を実行する。砕石杭形成工程は、掘削によって形成された空間に砕石を投入・加圧して砕石杭を形成する工程である。砕石の投入は、砕石予備投入工程と同様の方法で行うことができる。砕石の投入は、中込め材収容ホッパー33に対して、たとえばベルトコンベアによって継続的に行っても良いし、あるいはパワーショベルによって断続的に行っても良い。砕石の加圧は、インナースクリューオーガー29を掘削時とは逆方向に回転させることによって行われる。
 砕石の加圧量は、インナースクリューオーガー29の駆動トルクの大きさを監視することによって間接的に制御される。施工管理装置TCは、インナースクリューオーガー29の駆動トルクが設定された上限トルクに達する毎に、音声でオペレータに注意を喚起する。オペレータは、これに応じて所定量(たとえば10cm)だけインナースクリューオーガー29を上昇させる。インナースクリューオーガー29の上昇は、リーダー4には備えられた無端な伝動チェーンとその回走駆動モーター(図示省略)によって行われる。上昇駆動力は、インナースクリューオーガー29の回転に起因して発生する砕石杭からの反力によって軽減される。パイプケーシング12は、インナースクリューオーガー29に対して回転軸方向の相対的な位置関係を拘束するように結合されているので、インナースクリューオーガー29とともに上昇することになる。このような方法で砕石杭の形成が管理されているので、砕石の投入が継続的であっても断続的であっても、安定した品質の砕石杭を形成することができる。
 図15は、砕石杭形成工程における砕石投入装置330の状態を示す説明図である。砕石杭形成工程では、砕石杭の形成に応じてパイプケーシング12およびインナースクリューオーガー29が徐々に上昇するにも拘わらず、中込め材収容ホッパー33を地上付近の位置に固定したままで砕石の投入を連続して行うことができる。中込め材受け入れ口14がパイプケーシング12の回転軸の方向に長軸を有する長孔であるとともに、弾性体の開閉蓋Dで塞がれているからである。中込め材受け入れ口14は、地中においてはパイプケーシング12の外部方向から塞ぐ開閉蓋Dで地中圧を受けて強固に閉鎖されているが、地上に露出して地中圧が消滅するとともに旋回支持部331aによって自動的に開かれるからである。
 このような構成は、以下のような利点を有している。
(1)砕石投入位置を低い位置とすることができるので、砕石杭形成装置100の重心位置を低下させるとともに、砕石補給位置を低くすることもできる。これにより、小型軽量な小型地盤改良機Mでの施工と、上方からの砕石補給状態の監視と、安全な砕石補給と、を可能とすることができる。
(2)中込め材収容ホッパー33の位置を固定することができるので、中込め材収容ホッパー33への砕石の補給が容易となる。これにより、たとえば中込め材収容ホッパーを低位置に移動させて砕石を補給し、中込め材収容ホッパーを上昇させて投入といった繰り返し工程を回避することができる。
(3)パイプケーシング12内での砕石の落下量を小さくすることができ、特にパイプケーシング12が上昇して地上に露出するにしたがって、砕石の落下量が小さくなるので、施工時の騒音を顕著に低減させることが可能となる。
 このような特徴は、特に狭小地や住宅地での効率的な作業を可能とするという顕著な効果を奏する。さらに、本実施例で形成される砕石杭は、住宅用の地盤改良に顕著な効果を奏するので、本構成は、住宅用の地盤改良に特に適していることが分かる。
 このようにして、インナースクリューオーガー29の深度が予め設定された深度(たとえば1m)に達すると、施工管理装置TCは、音声でオペレータに注意を喚起する。オペレータは、この音声に応じて、プレス板110を下降させる。プレス板110は、掘削孔の周囲に形成された掘削土砂を上方から加圧することによって、砕石形成時の地表面近傍の地盤の緩みを予め効果的に防止するとともに、表層付近の十分な砕石の締固めを効果的に実現することができる。これにより、砕石杭形成後において、たとえばランマー転圧といった表層の締固め作業の必要性を低減させることが可能となる。
 さらに、インナースクリューオーガー29が上昇し、掘削深度が予め設定された深度(たとえば0.5m)に達すると、インナースクリューオーガー29の回転速度を低下させて砕石杭の形成速度を低下させる。これにより、さらに効果的に砕石形成時の地表面近傍の地盤の緩みを抑制することができる。
 ステップS600では、オペレータは、図16に示すように、施工完了工程を実行する。施工完了工程は、各砕石杭の形成後における後処理である。施工完了工程は、プレス板上昇工程と、ケーシング上昇工程と、リーダー傾斜工程と、アウトリガー上昇工程と、を含む工程である。なお、図16では、砕石投入アダプタ332の状態を見えやすくするために開放支持部材331等が省略されている。
 プレス板上昇工程は、インナースクリューオーガー29の先端部が地中から露出することを確認した後に、オペレータが油圧アクチュエータ111を操作することによって行われる。ケーシング上昇工程は、パイプケーシング12を上昇させることによってインナースクリューオーガー29の先端部を地表から離す工程である。リーダー傾斜工程とは、地表から離れたアタッチメントTを小型地盤改良機Mの方向に傾斜させることによって、砕石杭形成装置100の重心位置をクローラ6の下面の図心位置に近づける工程である。アウトリガー上昇工程は、アウトリガー5を上昇させてクローラ6による小型地盤改良機Mの移動を可能とする工程である。
 このように、第1実施例の砕石杭形成装置100は、中込め材受け入れ口14が側面に形成されたパイプケーシング12を有するので、パイプケーシング12の側面から砕石を投入して地中に砕石杭を形成することができる。中込め材受け入れ口14は回転軸の方向に長軸を有する長孔なので、砕石杭の形成に伴ってパイプケーシング12が上昇しても中込め材受け入れ口14の長軸方向の長さの範囲で砕石投入位置を固定して作業の効率化を図ることができる。なお、本実施例では、中込め材受け入れ口14は、連続した単一の長孔として形成されているが、たとえば途中で分断された複数の長孔として形成してもよい。
 一方、パイプケーシング12は、中込め材受け入れ口14をパイプケーシング12の外部方向から塞ぐ開閉蓋を有するので、地中においてはパイプケーシング12の外部の圧力で中込め材受け入れ口14が閉鎖され、土砂の浸入を抑制することができる。これにより、簡易かつ効率的な砕石杭の形成作業を実現させることができる。
B.本発明の第2実施例に係る砕石杭形成装置の構成と施工方法:
 図17~図19はその本発明の第2実施例に係る砕石杭形成装置100a(本明細書では、埋設装置とも呼ばれる。)の概略全体を示しており、(M)は地盤改良用として施工現場に据え付け固定される杭打ち機や建柱車、パワーショベル、バックホー、その他の適当な小型建設機械(ベースマシン)であって、その機体フレーム(1)へリーダー取付ベース(2)と油圧シリンダー(3)により、垂立状態に調整支持される一定の長いリーダー(4)やアウトリガー(5)、走行用クローラ(6)、キャビン(7)などを装備している。なお、第2実施例の砕石杭形成装置100aは、プレス板110と油圧アクチュエータ111とが削除されるとともに、砕石投入装置330の構成が変更されている点で、第1実施例の砕石杭形成装置100と相違し、他の構成において共通する。
 上記リーダー(4)には図外の無端な伝動チェーンとその回走駆動モーターが設置されており、伝動チェーンと連結一体化された昇降台(8)が、リーダー(4)側の昇降ガイドレール(9)に沿って昇降作動されるようになっている。(10)はそのリーダー(4)の下端部から一体的に垂下された剛性な延長脚柱、(11)は上記昇降台(8)に組み付け一体化された回転駆動源であって、油圧モーターや電動モーターなどから成り、後述のコアーロッド(芯粁)を直接に回転駆動する。
 (12)は砂質などの軟弱な地盤(E)へ予定の掘削穴(G)を造成するためのパイプケーシング(鞘管)であって、一定な長さ(約6m)と直径(約32cm)並びに厚み(約6mm)の鋼管から成り、その円周面からは一定なピッチ(約20cm)のフィン(13)(以下では、アウタースクリューオーガーとも呼ばれる。)が約4cmの一定高さだけ外向き一体的に突設されている。茲に、アウタースクリューオーガー(13)は掘削時の推進力を発揮して、穴径が約40cmの掘削穴(G)を造成すると共に、地盤(E)の掘削した土砂(A)を地表面まで自づと排出する。
 但し、上記パイプケーシング(12)の円周面における上端部と下端部とを除くほぼ全体の一定長さ分(L1)(約5.5m)に亘っては、図17~図23のような約90度(α)だけ拡開する砕石投入孔(14)(以下では、中込め材受け入れ口とも呼ばれる。)が、上下方向に沿い延在するほぼ長方形として切り欠き列設されている。しかも、その開口縁部から扉取付プレート(15)と扉受け止め座(16)との向かい合う左右一対が、内向き一体的に張り出されることにより、上記中込め材受け入れ口(14)の開口幅(W1)が約13.5cmとして狭く限定されている。
 (D)は上記中込め材受け入れ口(14)を施蓋する対応的な長方形の開閉扉であって、ゴムや合成樹脂などの弾性変形可能な膜材から成り、図22~図24のような一定の帯幅(W2)(約22cm)と厚み(t)(約13mm)を有するが、これには引き裂けなどを防ぐ補強布(17)と、折損などを防ぐ複数の平行な補強金属骨(18)とが埋設一体化されている。
 そして、このような開閉扉(D)における左右何れか一方の基端部(長辺)が上記扉取付プレート(15)へ、点在分布する複数の固定ボルト(19)とナット(20)を介して枢着されており、上記パイプケーシング(12)がアウタースクリューオーガー(13)の螺進方向(F)へ回転(上方から見て右回転)される地盤(E)の掘削時に、残る他方の先端部(長辺)が上記扉受け止め座(16)によって受け止められ、そのパイプケーシング(12)の中込め材受け入れ口(14)を密閉状態に保つこととなる関係にある。
 つまり、上記パイプケーシング(12)における円周面の一部はアウタースクリューオーガー(13)の切り欠かれた長方形な中込め材受け入れ口(14)として、これを施蓋する弾性膜材の開閉扉(D)により扁平化されているのである。(21)は扉押えプレートであり、上記扉取付プレート(15)と平行に延在することは言うまでもない。
 他方、(22)は上記パイプケーシング(12)の回転軸線上に沿って、これよりも長く垂立するコアーロッド(芯杵)であり、一定な直径(約8cm)の鋼管から成る。(23)はそのコアーロッド(22)の軸受け管であり、上記パイプケーシング(12)内の中途高さ位置へ図19のように、数段の放射ステー(24)を介して固定支持されている。
 茲に、放射ステー(24)はコアーロッド用軸受け管(23)から放射状に張り出しており、上記パイプケーシング(12)に受け入れられた中込め材(25)が、その内部での目詰まり現象やブリッジ現象などを起さないようになっている。尚、中込め材(25)として使用される自然砕石や砂利、コンクリートの破片、廃瓦、鉱津などの平均的な粒度は、約2~4cmである。
 コアーロッド(22)の上端部は回転入力軸(26)として、上記昇降台(8)に組み付けられている回転駆動源(11)のモーター出力軸(27)へ、適当なチャッキング機構(図示省略)によって連結一体化されるようになっており、その不使用時にはコアーロッド(22)を抜き取り分解することも可能である。
 上記回転駆動源(11)からの吊持状態にあるコアーロッド(22)の下端部は、錐先(28)として掘削時の先導作用を営なむことになる。(29)は上記コアーロッド(22)の円周面における下端部から一定長さ分(L2)(約40~60cm)に亘って、約3ピッチだけ外向き一体的に張り出し造形されたインナースクリューオーガーであり、その回転直径が下方へ行く程徐々に大きく変化した上段羽根部(29a)と中段羽根部(29b)並びに下段羽根部(29c)を具備している。
 又、インナースクリューオーガー(29)の下段羽根部(29c)だけは上記パイプケーシング(12)の下端部から露出しており、そのパイプケーシング(12)の開口下面を狭く制限する被覆状態にある。しかも、その最大の回転直径(d)が図25~図28から明白なように、上記パイプケーシング(12)におけるアウタースクリューオーガー(13)のそれとほぼ等しい寸法として、穴径が約40cmの掘削穴(G)を造成できるようになっている。
 更に、上記インナースクリューオーガー(29)の下段羽根部(29c)は約20~40度の逃げ角(β)(又は約100~140度の刃先角)を有する言わば2枚として、放射対称型に振り分けられていると共に、その2枚羽根からは掘削刃(30)が斜め下向き一体的に突出されてもいる。
 つまり、上記パイプケーシング(12)とコアーロッド(22)とをそのスクリューオーガー(13)(29)の螺進方向(F)へ、一緒に回転(上方から見て右回転)させれば、そのコアーロッド(22)におけるインナースクリューオーガー(29)の下段羽根部(29c)が掘削刃(30)と相侯って、地盤(E)を容易に掘削するようになっており、その際パイプケーシング(12)の開口下面はインナースクリューオーガー(29)の下段羽根部(29c)によって、狭く制限された被覆状態にあるため、地盤(E)の掘削された土砂(A)が図25のように、パイプケーシング(12)の内部へ侵入し難く目詰まりし、その侵入した土砂はインナースクリューオーガー(29)の上段羽根部(29a)まで到達するや、自づと落下して、上記パイプケーシング(12)の開口下面を閉塞してしまう結果、地盤(E)の掘削を支障なく進行させることができるのである。
 他方、上記パイプケーシング(12)の回転(右回転)を一旦停止させて、その内部へ中込め材(25)を投入し、上記コアーロッド(22)だけを掘削時との逆方向(R)へ回転(上方から見て左回転)させれば、そのインナースクリューオーガー(29)における上記逃げ角(β)を保つ下段羽根部(29c)の下面が、掘削刃(30)の下面も含む全体的な圧密カム面(31)として、その逃げ角(β)に基き中込め材(25)を下方と横方向(径方向)へ押し付けることになり、その中込め材(25)を高密度に締め固めることができる。
 その場合、上記パイプケーシング(12)の開口下面を先に閉塞している掘削土砂(A)は、コアーロッド(22)の逆回転により自づと押し出され脱落すると共に、そのパイプケーシング(12)の内部に投入された中込め材(25)は、コアーロッド(22)における回転直径が下方へ行く程徐々に大きくなるインナースクリューオーガー(29)の羽根部(29a)(29b)(29c)に沿って、上記パイプケーシング(12)の開口した下面まで円滑に流れ落ちることとなり、そのコアーロッド(22)がいたづらに過大な回転抵抗を受けることもない。
 尚、図例では中込め材(25)の粒径が平均的に約2~4cm、掘削穴(G)の穴径が約40cm、上記逃げ角(β)が約20~40度であることとの関係上、コアーロッド(22)におけるインナースクリューオーガー(29)の下段羽根部(29c)を掘削刃(30)付きの2枚羽根として造形しているが、その放射対称分布型の3枚羽根以上に造形しても良い。もっとも、1枚羽根ではコアーロッド(22)の芯振れするおそれがあるため、好ましくない。
 地盤改良用となる建設機械(M)のリーダー(4)からは、剛性な延長脚柱(10)が一体的に垂下されている旨を既述したが、その延長脚柱(10)にはパイプケーシング振れ止め用の包囲枠(32)と、中込め材収容ホッパー(33)を搭載した中込め材投入シュート(34)とが付属設置されており、一定な地上高さ(h)(約40~60cm)での位置決め固定状態にある中込め材投入シュート(34)から、上記パイプケーシング(12)の内部へ中込め材(25)を投入し得るようになっている。
 即ち、パイプケーシング振れ止め用の包囲枠(32)は図20、図21や図19~図31に示すように、平面視のほぼC字形に湾曲された鋼板から成り、横向きに開口する扉逃し切欠(35)を有している。(36)はその包囲枠(32)の胴面補強リブ、(37)は同じく包囲枠(32)の胴面から後向き一体的に張り出す平行な一対の取付プレートであり、複数の固定ボルト(38)を介して上記リーダー(4)の延長脚柱(10)へ、着脱自在に取り付けられている。
 又、中込め材投入シュート(34)は一定寸法(y)(約10cm)の段違い傾斜面を有する漏斗形であって、これに上方から図33のような大きい漏斗形の中込め材収容ホッパー(33)が、着脱自在に差し込み嵌合されている。但し、その中込め材(25)の収容ホッパー(33)と投入シュート(34)は、予じめの連続一体的に作成された大型品であっても勿論良い。上記一定寸法(y)の段違い傾斜面は、中込め材(25)の集中による目詰まり現象やブリッジ現象を予防する。
 (39)は上記中込め材投入シュート(34)の底部から一体的に張り出し延長された複数の剛性な支持アームであり、複数の固定ピン(40)を介して上記リーダー(4)の延長脚柱(10)へ、やはり着脱自在に取り付けられている。その取付使用状態では図20、図21から明白なように、中込め材投入シュート(34)の角形底筒(41)が上記パイプケーシング振れ止め用包囲枠(32)の扉逃し切欠(35)を正しく指向した横下がりの傾斜姿勢状態に保たれることとなる。その傾斜角度は一例として約35度である。
 (42)は上記中込め材投入シュート(34)の角形底筒(41)へ進退自在に差し込み套嵌されたスライド口筒であり、これを作業者が図29~図32のように、上記パイプケーシング(12)の中込め材受け入れ口(14)へ近づけるか、又は図34、図35のように中込め材受け入れ口(14)の内部へ差し込んで、その開閉扉(D)を開放状態に保つこととなる。
 (43)はそのスライド口筒(42)の底面に付属一体化された三角シューであり、開閉扉(D)を滑らかに弾性変形させて、その安定な開放状態を維持する。(44)はスライド口筒(42)の調整フックレバーであり、これに刻成された複数の凹溝(45)を、スライド口筒(42)から突出する係止ピン(46)へ、択一的に係止させることによって、そのスライド口筒(42)の位置決め調整を行なうようになっている。(47)は上記調整フックレバー(44)の枢支ピンである。
 尚、図例では中込め材収容ホッパー(33)が搭載された中込め材投入シュート(34)を、リーダー(4)から垂下する延長脚柱(10)へ取り付けているが、パイプケーシング(12)の内部へ中込め材(25)を投入できる限り、その中込め材収容ホッパー(33)並びに中込め材投入シュート(34)を建設機械(M)と別個な運搬車として、地表面を移動できるように定めても良い。
 先の図20、図21や図29~図32に基いて説明したパイプケーシング振れ止め用の包囲枠(32)は、鋼板から平面視のほぼC字形に湾曲形成されているが、これに代えて、図36~図38の変形実施形態に示すような包囲枠(32)の構成を採用することが好ましい。
 つまり、その変形実施形態では包囲枠(32)を、上記リーダー(4)の延長脚柱(10)へ取り付けられる上下一対の固定側包囲枠片(32r)(32r)と、これと向かい合う上下一対の自由側包囲枠片(32f)(32f)に縦割りして、その固定側包囲枠片(32r)(32r)と自由側包囲枠片(32f)(32f)とを上下一対の枢支ピン(48)(48)により、開閉自在に組み付けている。(49)(49)はその閉合状態に保つ上下一対のロックピンであり、これを抜き取れば、枢支ピン(48)(48)の廻りに開くことができるようになっている。
 そのため、パイプケーシング(12)に付着した土砂の掻き取り作業や、パイプケーシング(12)とその包囲枠(32)との組立作業などを、容易に便利良く行なえるのである。
 更に、上下一対の固定側包囲枠片(32r)(32r)同士や上下一対の自由側包囲枠片(32f)(32f)同士は、各々比較的細い垂立固定杵(50)(50)によって連結一体化されているが、その垂立固定杵(50)(50)に加えて、これより太い鋼管から成る遊転ローラー(51)(51)の2本づつも、上記固定側包囲枠片(32r)(32r)同士や自由側包囲枠片(32f)(32f)同士の上下相互間へ、各々垂立状態に軸支されており、その遊転ローラー(51)(51)が上記パイプケーシング(12)を包囲する状態に臨むため、万一パイプケーシング(12)が振れ動いて、その包囲枠(32)の遊転ローラー(51)(51)に接触するも、上記パイプケーシング(12)の回転に抵抗を与えるおそれや、メタルタッチによる騒音を発生するおそれが一切なく、更に付着した士砂の排除作業もすばやく安楽に行なえる。
 その場合、上記遊転ローラー(51)(51)の各個は、その上端ネジ軸部の固定ナット(52)(52)を緩めることにより、固定側包囲枠片(32r)(32r)の切欠き凹溝(53)(53)と自由側包囲枠片(32f)(32f)の落し入れ貫通孔(54)(54)から抜き出し交換することができる。
 尚、図36~図38の変形実施形態におけるその他の構成は、図29~図32などの上記包囲枠(32)と実質的に同一であるため、その対応的な符号を記入するにとどめて、その詳細な説明を省略する。
 上記パイプケーシング(12)とその内部に垂立するコアーロッド(22)とは、ワンウエイクラッチ機構(C)を介して伝動連結されており、地盤(E)の掘削時にはパィプケーシング(12)とコアーロッド(22)とをそのスクリューオーガー(13)(29)の螺進方向(F)へ、一緒に回転(上方から見て右回転)駆動するようになっている一方、中込め材(25)の投入とその締め固め時にはパイプケーシング(12)を回転させず、コァーロッド(22)だけを上記掘削時との逆方向(R)へ、回転(上方から見て左回転)駆動するようになっている。
 即ち、そのワンウエイクラッチ機構(C)を抽出して示した図39~図42において、(55)は上記パイプケーシング(12)の上端部に被着一体化された断面ほぼ倒立U字形のトップカバーケースであり、その水平な上面とこれを貫通するコアーロッド(22)との交叉部には、相対回転を許すベアリング(56)が介挿設置されている。そのため、上記コアーロッド(22)が回転駆動されても、パイプケーシング(12)はこれと一緒に連れ廻らず、そのフリー状態に保たれる。
 (57)は上記コアーロッド(22)の上端部付近からパイプケーシング(12)やそのトップカバーケース(55)の直径線上に沿って、横向き一体的に張り出された水平な原動アーム、(58)はその原動アーム(57)の上段位置に臨む関係状態として、上記トップカバーケース(55)の円周面から内向き一体的に張り出された従動リングであり、これには一対の爪受け入れ角孔(59)(59)が開口分布されている。
 そして、その従動リング(58)の各爪受け入れ角孔(59)(59)には対応的な角軸形の連結爪(60)(60)が、上方から吊り下げ状態に差し込まれている。(61)(61)はその各連結爪(60)(60)の上端部から一体的に張り出す水平な脱落防止フランジ、(62)(62)は上記トップカバーケース(55)の水平な上面と、その各連結爪(60)(60)との向かい合う上下相互間に介挿セットされた圧縮コイルバネであり、これによる押し下げ付勢力を受けた連結爪(60)(60)の下端部が、常時トップカバーケース(55)の従動リング(58)から下向きに露出している。
 しかも、その各連結爪(60)(60)の露出下端部は上記コアーロッド(22)における回転方向性との関係上、その右回転(図40、図41の矢印(F)参照)されるコアーロッド(22)側の原動アーム(57)と接触する前面が、互いに係合する伝動垂直面(60f)(60f)をなすに比して、逆に左回転(図42の矢印(R)参照)されるコアーロッド(22)側の原動アーム(57)と接触する後面は、互いに係合しない非伝動円弧面(60r)(60r)として造形されている。
 つまり、既述したように、コアーロッド(22)が右回転された時には、その原動アーム(57)と連結爪(60)(60)との係合作用を介して、パイプケーシング(12)が図40、図41のようにコアーロッド(22)と一緒に右回転する一方、コアーロッド(22)が逆に左回転された時には、その原動アーム(57)が図42のように連結爪(60)(60)を押し上げ通過するため、パイプケーシング(12)は一緒に連れ廻らず、そのフリー状態になる。
 更に言えば、そのフリー状態になるパイプケーシング(12)を一旦安定良く停止させて、上記開閉扉(D)による施蓋状態の中込め材受け入れ口(14)と中込め材投入シュート(34)の就中角形底筒(41)とが、自づと正しく対応合致するように位置決め規定するための制動機構(B)も、上記パイプケーシング(12)におけるトップカバーケース(55)の上面に設置されている。
 即ち、図43~図46はそのパイプケーシング(12)の制動機構(B)を示しており、(63)(63)は上記トップカバーケース(55)の直径線上に並ぶ一対として、その水平な上面から一体的に隆起されたカム凸子であり、緩やかな傾斜角度の前面(63f)(63f)と急な傾斜角度の後面(63r)(63r)とを2辺とした非二等辺三角形に造形されている。
 又、上記昇降台(8)からはトップカバーケース(55)の上面に向かって、二叉フォーク状をなすハンガーステー(64)(64)の一対が一体的に張り出されている。(65)(65)はその各ハンガーステー(64)(64)の張り出し先端部(下端部)へ、水平な貫通ピン(66)(66)を介して起伏的な回動自在に枢着された逆止爪であり、その爪先部が自重によって上記トップカバーケース(55)側のカム凸子(63)(63)と接触し得るようになっている。
 そして、コアーロッド(22)とパイプケーシング(12)がそのスクリューオーガー(13)(29)の螺進方向(F)へ、一緒に回転(右回転)駆動されると、上記トップカバーケース(55)におけるカム凸子(63)(63)の前面(63f)(63f)が図43、図44のように、昇降台(8)側の逆止爪(65)(65)を押し上げて通過し、パイプケーシング(12)は支障なく回転し続け、地盤(E)を掘削することができる。
 その地盤(E)を予定深さ(Z)まで掘削し終えたならば、上記パイプケーシング(12)をそのまま同じ方向(F)へ回転(右回転)続行して、そのトップカバーケース(55)におけるカム凸子(63)(63)の前面(63f)(63f)により一旦押し上げられた昇降台(8)側の逆止爪(65)(65)が、図43の仮想線に示す如く自重で下降した時に、上記パイプケーシング(12)の回転(右回転)を停止するのである。
 その停止時に、パイプケーシング(12)の中込め材受け入れ口(14)と中込め材投入シュート(34)の就中角形底筒(41)とが、対応合致した位置決め状態となるように予じめ関係設定されているのであり、そのため角形底筒(41)のスライド口筒(42)を図29~図32のように、上記中込め材受け入れ口(14)の開閉扉(D)へ差し込み係止させる。
 そうすれば、上記開閉扉(D)はそのスライド口筒(42)の差し込み係止された高さ位置においてのみ、図29~図32のような部分的に弾性変形された開放状態となり、中込め材収容ホッパー(33)内の中込め材(25)をその投入シュート(34)から、パイプケーシング(12)の内部へ確実に投入することができる。
 その後、コアーロッド(22)が逆方向(R)へ回転(左回転)駆動されると、上記トップカバーケース(55)におけるカム凸子(63)(63)の後面(63r)(63r)が図45、図46のように、昇降台(8)側の逆止爪(65)(65)に受け止められるため、そのパイプケーシング(12)が中込め材(25)を介して、コアーロッド(22)と一緒に回転(左回転)するおそれはない。
 更に言えば、中込め材受け入れ口(14)とその開閉扉(D)はパイプケーシング(12)の上下方向に沿って延在しているため、地盤(E)の掘削後、中込め材受け入れ口(14)の開閉扉(D)へ上記中込め材投入シュート(34)のスライド口筒(42)が依然差し込み係止された開扉状態のままで、そのパイプケーシング(12)を昇降台(8)によって引き上げることができ、その過程において中込め材(25)がパイプケーシング(12)の内部へ連続的に投入されることになる。その結果、パイプケーシング(12)の内部へ中込め材(25)を投入するためのシュート(34)やホッパー(33)などを、そのパイプケーシング(12)に沿って昇降作動させる必要がない。
 上記シュート(34)やホッパー(33)は一定な地上高さ位置での固定状態にあるため、そのホッパー(33)ヘバックホーなどの荷役機械によって、中込め材(25)を投入・収容させることができる。
 尚、図例では中込め材(25)がその投入シュート(34)からパイプケーシング(12)の内部へ、自づと落下するようになっているが、特別なプッシャーやフィーダーなどの機械器具を用いて、その中込め材(25)をパイプケーシング(12)の内部へ強制的に送り込んでも良い。
 本発明に係る地盤改良用ドレーン杭の埋設装置は上記構成を備えており、これによってドレーン杭を埋設するに当っては、次の工程順序に従って作業する。
 即ち、先ず昇降台(8)からパイプケーシング(12)やコアーロッド(22)が吊持された状態にある建設機械(M)を、図47のように改良すべき軟弱な地盤(E)へ据え付け固定した上、コアーロッド(22)とパイプケーシング(12)とを回転駆動源(11)により、スクリューオーガー(13)(29)の螺進方向(F)へ一緒に回転(右回転)駆動し乍ら下降させて、地盤(E)を掘削し始めるのである。
 その掘削過程ではコアーロッド(22)の先端部(下端部)に付属しているインナースクリューオーガー(29)と、パイプケーシング(12)とが同一方向(F)へ一緒に回転するため、土砂はコアーロッド(22)のインナースクリューオーガー(29)により、パイプケーシング(12)の内部へ引き込み上昇されず、そのパイプケーシング(12)の下端部と上記インナースクリューオーガー(29)における下段羽根部(29c)との上下相互間隙を、図25や図48のような目詰まり状態に閉塞することになる。
 しかも、その下段羽根部(29c)は掘削刃(30)を備えており、上記パイプケーシング(12)のアウタースクリューオーガー(13)と相侯って、地盤(E)を掘削した土砂(A)が地表面まで排出されることになるため、穴径が約40cmの掘削穴(G)を造成することができる。
 又、上記パイプケーシング(12)の円周面には中込め材受け入れ口(14)の開閉扉(D)が、上下方向に沿い延在する長方形として設置されており、その設置部分に限っては上記アウタースクリューオーガー(13)が欠落しているため、ここに落下した掘削土砂(A)を、回転するパイプケーシング(12)のアウタースクリューオーガー(13)によって、周囲へ高密度に押し付け締め固めることができ、図49のような穴径の均一に安定した掘削穴(G)を造成し得る効果もある。
 尚、パイプケーシング(12)に付属している弾性膜材の開閉扉(D)は、掘削した土砂の圧力を受けて、中込め材受け入れ口(14)を密閉状態に保っているため、その内部へ土砂や泥水などが侵入するおそれはない。
 そして、地盤(E)を予定の設計深さ(Z)(約5m)まで掘削し終えたならば、上記コアーロッド(22)とパイプケーシング(12)の回転(右回転)をそのまま一旦続行することにより、上記パイプケーシング(12)の円周面に列設されている中込め材受け入れ口(14)を、リーダー(4)の延長脚柱(10)に付属固定されている中込め材投入シュート(34)の就中角形底筒(41)と対応合致するように、そのパイプケーシング(12)を位置決め停止させた上、中込め材投入シュート(34)のスライド口筒(42)により上記中込め材受け入れ口(14)の開閉扉(D)を開放状態に保って、図29~図32や図34、図35のように、そのパイプケーシング(12)の中込め材受け入れ口(14)へ上記スライド口筒(42)を近づけるか又は差し込んで、中込め材(25)をその投入シュート(34)のスライド口筒(42)からパイプケーシング(12)の内部へ投入する。
 それから、次にコアーロッド(22)を上記掘削時との逆方向(R)へ回転(左回転)駆動するのであり、そうすればコアーロッド(22)のインナースクリューオーガー(29)も同一方向(R)へ回転するため、上記パイプケーシング(12)との上下相互間隙に目詰まりしていた掘削土砂(A)が脱落し、引き続いてパイプケーシング(12)の内部から中込め材(25)が掘削穴(G)へ放出されることになる。
 その際、上記コアーロッド(22)のインナースクリューオーガー(29)を形作っている下段羽根部(29c)は、パイプケーシング(12)のアウタースクリューオーガー(13)とほぼ同じ最大回転直径(d)と、約20~40度の逃げ角(β)を有し、その掘削穴(G)へ放出された中込め材(25)を、下方と径方向(横方向)へ押し付け締め固めることになる。その結果、掘削穴(G)に中込め材(25)を圧密することができ、高強度なドレーン杭(P)を得られる。
 このような中込め材(25)の締め固め度合い(地層での支持力)は、コアーロッド(22)の回転駆動源(11)に作用する回転トルク(例えば約300~500m-Kg)を、その建設機械(M)のデジタル記録部に表示される数値から知得でき、その所定の締め固め度合いを確認する毎に、上記コアーロッド(22)とパイプケーシング(12)が吊持されている昇降台(8)を、図50のように一定のストローク(約10~30cm)づつ引き上げ、これを地表面まで繰り返すのである。
 つまり、引き上げる毎に上記パイプケーシング(12)内の中込め材(25)が、地盤(E)の掘削穴(G)へ自づと順次落下・放出されることになり、その放出された中込め材(25)はコアーロッド(22)のインナースクリューオーガー(29)を形作っている下段羽根部(29c)の圧密カム面(31)によって、下方と径方向(横方向)へ押し付け締め固められるのであり、このような作用が反復される。
 そして、上記コアーロッド(22)におけるインナースクリューオーガー(29)の下段羽根部(29c)が、図51のように地表面まで引き上げられれば、茲に中込め材(29)から成るドレーン杭(P)の埋設作業が完了する。図52はこのようなドレーン杭(P)の多数を所要間隔での分布状態に埋設することにより、住宅の基礎として得られた改良地盤を示している。
 第2実施例に係る砕石杭形成装置100aは、たとえば以下の態様として実施することができる。第1の態様は、
 アウタースクリューオーガーが突出する円周面の上下方向に沿って切り欠かれた中込め材受け入れ口へ、その施蓋状態に開閉扉を取り付けたパイプケーシングと、
 そのパイプケーシングの回転軸線上に沿って垂立する一定長さの下端部が、中込め材締め固め用のインナースクリューオーガーとして張り出し造形されたコアーロッドと、
 上記パイプケーシングの中込め材受け入れ口へ一定の地上高さから指向するように据え付け固定された中込め材投入シュートとを備え、
 上記パイプケーシングとコアーロッドとをそのスクリューオーガーの螺進方向へ一緒に回転駆動し乍ら、地盤を掘削し、
 その後停止させたパイプケーシングの開閉扉を開き、その中込め材受け入れ口へ上記中込め材投入シュートを近づけた状態又は差し込んだ状態に保って、
 上記コアーロッドだけを掘削時との逆方向へ回転駆動することにより、上記中込め材投入シュートからパイプケーシングの内部へ投入した中込め材の放出・締め固めと、そのパイプケーシングの引き上げとを繰り返すように定めたことを特徴とする地盤改良用ドレーン杭の埋設装置である。
 第2の態様は、地盤改良用となる建設機械が装備したリーダーの下端部から、剛性な延長脚柱を一体的に垂下させて、
 その延長脚柱にパイプケーシング振れ止め用の包囲枠と、中込め材投入シュートとを各々取り付け固定すると共に、
 その中込め材投入シュートの角形底筒へ進退自在に差し込み套嵌したスライド口筒を、上記包囲枠の扉逃し切欠からパイプケーシングの中込め材受け入れ口へ、横下がりの傾斜状態に指向させたことを特徴とする第1の態様の地盤改良用ドレーン杭の埋設装置である。
 第3の態様は、パイプケーシング振れ止め用の包囲枠をリーダーの延長脚柱へ取り付けられる上下一対の固定側包囲枠片と、これと向かい合う上下一対の自由側包囲枠片に縦割りして、
 その固定側包囲枠片と自由側包囲枠片とを上下一対の枢支ピンにより開閉状態に組み付けると共に、
 上記固定側包囲枠片同士や自由側包囲枠片同士の上下相互間へ、複数本づつの遊転ローラーを垂立状態に軸支したことを特徴とする第2の態様の地盤改良用ドレーン杭の埋設装置である。
 第4の態様は、中込め材受け入れ口の開閉扉を弾性変形可能な膜材から、パイプケーシングの上下方向へ延在するほぼ長方形に造形して、
 その一方の長辺だけを上記中込め材受け入れ口の対応的な開口縁部へ枢着したことを特徴とする第1の態様の地盤改良用ドレーン杭の埋設装置である。
 第5の態様は、コアーロッドのインナースクリューオーガーを約3ピッチだけとして、回転直径が下方へ行く程徐々に大きく変化する上段羽根部と中段羽根部並びに下段羽根部から形作り、
 その下段羽根部の最大回転直径をパイプケーシングにおけるアウタースクリューオーガーのそれとほぼ等しい寸法として、そのパイプケーシングの開口下面を狭く制限する被覆状態に露出させると共に、
 上記インナースクリューオーガーの下段羽根部を放射対称型に振り分けられた2枚として、約20~40度の逃げ角を与えたことを特徴とする第1の態様の地盤改良用ドレーン杭の埋設装置である。
 第6の態様は、地盤改良用となる建設機械が装備したリーダーに沿う昇降台から、パイプケーシングとコアーロッドとを各々吊持させて、その昇降台に組み付けた回転駆動源のモーター出力軸と、コアーロッドの回転入力軸とを連結一体化すると共に、
 地盤の掘削時には上記パイプケーシングとコアーロッドとを同一方向へ回転駆動する一方、パイプケーシングに対する中込め材の投入とその締め固め時には、上記コアーロッドだけを掘削時との逆方向へ回転駆動するワンウエイクラッチ機構を、上記パイプケーシングのトップカバーケースに内蔵させたことを特徴とする第1の態様の地盤改良用ドレーン杭の埋設装置である。
 第7の態様は、コアーロッドを地盤の掘削時と逆方向へ回転駆動した時だけ、パイプケーシングを上記コアーロッドと同じ逆方向へ連れ廻らず、その中込め材受け入れ口が中込め材投入シュートと対応合致する関係状態に位置決め停止させるパイプケーシング用制動機構を、
 上記パイプケーシングにおけるトップカバーケースの上面に設置したことを特徴とする第1の態様の地盤改良用ドレーン杭の埋設装置である。
 第1の態様の構成によれば、パイプケーシングの上下方向に沿って切り欠き延在された中込め材受け入れ口へ、中込め材投入シュートが一定な地上高さ位置から固定状態に臨み、上記パイプケーシングの停止中に中込め材投入シュートをスライド操作して、その中込め材受け入れ口の開閉扉を開放状態に保ち、パイプケーシングの内部へ中込め材を投入するようになっており、その中込め材の投入は上記パイプケーシングの引き上げ中においても、支障なく円滑に行なわれるため、従来技術のスキップバケットやその他の中込め材投入機器を昇降作動させる装置と、そのオペレータによる特別の煩雑な操作とが不要となる。その結果、小型の建設機械を使用して行なう地盤改良作業にとって、著しく有益である。
 又、パイプケーシングの円周面には中込め材受け入れ口の開閉扉が、上下方向に沿って取り付けられており、その取付部分ではパイプケーシングがアウタースクリューオーガーのないフラット面をなすため、ここに落下した掘削土砂を、回転するアウタースクリューオーガーによって、周囲へ高密度に押し付け締め固めることができ、その掘削穴の崩壊を予防することに役立つ。
 更に、パイプケーシングの停止中に中込め材を投入し、その後コアーロッドだけを掘削時との逆方向へ回転駆動すれば、そのコアーロッドの下端部をなすインナースクリューオーガーも同じ方向へ回転するため、掘削土砂と先の中込め材がパイプケーシングの開口下面から掘削穴へ放出され、そのインナースクリューオーガーによって確実に締め固められる結果となり、高密度なドレーン杭を得られるのである。
 特に、第2の態様の構成を採用するならば、建設機械のリーダーに沿って昇降作動される昇降台から吊り下がるパイプケーシングの下端部を、延長脚柱に付属固定された振れ止め用の包囲枠によって、安定な垂直姿勢状態に保つことができるほか、そのパイプケーシングの中込め材受け入れ口に対する中込め材投入シュートも、やはり延長脚柱に固定支持された一定の地上高さとして、これからパイプケーシングの内部へ中込め材を正しく円滑に投入し得る効果がある。
 その場合、パイプケーシング振れ止め用の包囲枠として、第3の態様の構成を採用するならば、そのパイプケーシングを包囲する複数本の遊転ローラーが、文字通り遊転作用するため、パイプケーシングのアウタースクリューオーガーと剛性な包囲枠との摩擦による金属音の発生を防止できるほか、自由側包囲枠片を固定側包囲枠片から開放し得ることとも相侯って、付着した土砂の排除作業やパイプケーシングに対する包囲枠の組立て作業を容易に行なえる効果もある。
 第4の態様の構成を採用するならば、中込め材受け入れ口の開閉扉が弾性変形可能な膜材から成るため、掘削時の土圧を受けて、パイプケーシングの中込め材受け入れ口を確実な封止状態に施蓋でき、掘削した土砂のみならず、泥水の侵入も防止し得る効果がある。
 又、第5の態様の構成を採用するならば、パイプケーシングの下端部とインナースクリューオーガーにおける下段羽根部との上下相互間隙を、地盤の掘削時には一早く土砂により閉塞して、いたづらに過大な掘削土砂が侵入することを防ぐ一方、その後コアーロッドを逆方向へ回転駆動しつつ、掘削穴から引き上げる工程では、そのインナースクリューオーガーの最大回転直径を有する下段羽根部が、パイプケーシングの下端部から放出された中込め材を、その逃げ角に基いて下方と横方向(径方向)へ押し付け締め固めることになり、その中込め材から圧密された高強度なドレーン杭を得られるのである。
 第6の態様の構成を採用するならば、回転駆動源がコアーロッドと直接に連結一体化される1個であっても、ワンウエイクラッチ機構によって、パイプケーシングをそのコアーロッドと同一方向へ回転駆動できる効果がある。
 更に、第7の態様の構成を採用するならば、コアーロッドを地盤の掘削時と逆方向へ回転駆動した時に限って、パイプケーシングがコアーロッドと同じ逆方向へ連れ廻らないようになっているため、そのパイプケーシングの内部に対する中込め材の投入作用を確実に安定良く営ませることができ、その中込め材を咬み込むことなく掘削穴へ放出して、円滑に締め固め圧密することも可能となり、耐久性の向上に役立つ。
C.変形例:
 以上、本発明の具体例を詳細に説明したが、これらは例示に過ぎず、特許請求の範囲を限定するものではない。特許請求の範囲に記載の技術には、以上に例示した具体例を様々に変形、変更したものが含まれる。また、本明細書または図面に説明した技術要素は、単独であるいは各種の組合せによって技術的有用性を発揮するものであり、出願時の請求項に記載の組合せに限定されるものではない。また、本明細書または図面に例示した技術は複数の目的を同時に達成し得るものであり、そのうちの一つの目的を達成すること自体で技術的有用性を持つものである。具体的には、たとえば以下のような変形例も実施可能で-ある。
C-1.第1変形例:上述の各実施例のアタッチメントでは、インナースクリューオーガーの先端29c(下段羽根部)ガパイプケーシングから突出し、インナースクリューオーガー29の後部がパイプケーシング12内に配置されているが、たとえば図53~図55に示される変形例のようにインナースクリューオーガー29vの全体がパイプケーシング12の外に露出するような構成としてもよい。パイプケーシング12は、インナースクリューオーガー29、29vの回転軸を外周から包囲するように構成されていればよい。ただし、上述の各実施例のように先端のみを突出させる構成は、パイプケーシング12の内部の螺旋構造を利用して効率的な砕石の加圧を実現することができるという利点を有している。
C-2.第2変形例:上述の各実施例では、アタッチメントを使用して掘削から砕石杭の形成までの一貫処理が実現されているが、たとえば水と空気を噴出させて掘削させる方法で別途掘削した後において、アタッチメントで砕石杭を形成するようにしても良い。ただし、上述の各実施例では、パイプケーシングを利用して掘削孔の内壁を加圧平坦化しつつ掘削が行われるので、掘削孔の型崩れを防止して高品質の砕石杭の形成や型崩れを起こしやすい地盤への施工が可能という利点がある。
 加えて、上述の各実施例では、アタッチメントを使用して掘削から砕石杭の形成までの一貫処理が実現されるとともに、砕石杭の品質がオペレータの熟練にほとんど依存させずに砕石杭を施工することが可能となっている。これにより、砕石杭の品質を安定させることができるとともに、特殊工程管理(ISO9000)の手法による品質保証(プロセスの妥当性に基づく品質保証)に極めて適合性が高い工法を実現することができる。
1 機体フレーム
2 リーダー取付ベース
3 油圧シリンダー
4 リーダー
5 アウトリガー
6 クローラ
7 キャビン
8 昇降台
9 昇降ガイドレール
10 延長脚柱
11 回転駆動源
12 パイプケーシング
13 フィン(アウタースクリューオーガー)
14 中込め材受け入れ口
15 扉取付プレート
16 扉受け止め座
17 補強布
18 金属骨
19 固定ボルト
20 ナット
21 扉押えプレート
22 コアーロッド
23 軸受け管
24 放射ステー
25 中込め材
26 回転入力軸
27 モーター出力軸
28 錐先
29 インナースクリューオーガー
29a 上段羽根部
29b 中段羽根部
29c 下段羽根部
30 掘削刃
31 圧密カム面
32 パイプケーシングの振れ止め用包囲枠
32r 固定側包囲枠片
32f 自由側包囲枠片
33 中込め材収容ホッパー
34 中込め材投入シュート
35 扉逃し切欠
36 補強リブ
37 取付プレート
38 固定ボルト
39 支持アーム
40 固定ピン
41 角形底筒
42 スライド口筒
43 三角シュー
44 調整フックレバー
45 凹溝
46 係止ピン
47 枢支ピン
48 枢支ピン
49 ロツクピン
50 垂立固定拝
51 遊転ローラー
52 固定ナット
53 切欠き凹溝
54 落し入れ貫通孔
55 パイプケーシングのトップカバーケース
56 ベアリング
57 原動アーム
58 従動リング
59 爪受け入れ角孔
60 連結爪
60f 伝動垂立面
60r 非伝動円弧面
61 脱落防止フランジ
62 圧縮コイルバネ
63 カム凸子
63f 前面
63r 後面
64 ハンガーステー
65 逆止爪
66 貫通ピン
100 砕石杭形成装置
100a 砕石杭形成装置
110 プレス板
111 油圧アクチュエータ
330 砕石投入装置
331 開放支持部材
331a 旋回支持部
331b 開放支持部材ベース
332 砕石投入アダプタ
332a 旋回アダプタ部
332b 砕石投入アダプタベース
332c 付勢錘
A 掘削土砂
B パイプケーシングの制動機構
C ワンウエイクラッチ機構
D 中込め材受け入れ口の開閉扉
M 小型地盤改良機
P ドレーン杭
Z 掘削深さ
d 最大回転直径
h 地上高さ
y 段違い寸法
T アタッチメント
TC 施工管理装置
α 中込め材受け入れ口の開度
β 逃げ角

Claims (8)

  1.  地中に挿入されて空間を形成し、前記地中から上昇しつつ前記空間に砕石杭を形成する砕石杭形成用のアタッチメントであって、
     中心軸方向に長軸を有する少なくとも一つの長孔である砕石投入孔が側面に形成されている円筒部と、
     前記砕石投入孔を前記円筒部の外部方向から塞ぐ開閉蓋と、
    を備えるアタッチメント。
  2.  請求項1記載のアタッチメントであって、さらに、
     正転方向と反転方向の回転駆動力を発生させる駆動装置に接続され、前記入力された正転方向の回転で前記地中を掘削し、前記入力された反転方向の回転で前記砕石に圧力を印加する螺旋部と、
    を備え、
     前記円筒部が、前記螺旋部と回転軸をほぼ共通にし、前記螺旋部の回転軸を外周から包囲し、前記螺旋部に対して軸方向の相対的な位置関係を拘束しつつ、前記螺旋部に対して回転可能に結合されているアタッチメント。
  3.  請求項2記載のアタッチメントであって、
     前記螺旋部が、前記円筒部の先端から突出し、前記突出した部分に前記円筒部の内径よりも広い掘削領域を掘削する掘削刃を有するアタッチメント。
  4.  請求項3記載のアタッチメントであって、さらに、
     前記螺旋部への正転方向の回転駆動力の入力に応じて前記円筒部が前記螺旋部と一体となって回転し、前記螺旋部への反転方向の回転駆動力の入力に応じて螺旋部側にのみ回転駆動力を伝達する回転駆動力伝達部と、
     前記円筒部の反転を防止する反転防止機構と、
    を備え、
     前記円筒部が、正転方向の回転に応じて前記円筒部の周囲の土砂を上昇させるように形成された螺旋状のフィンを有するアタッチメント。
  5.  請求項1ないし4のいずれかに記載のアタッチメントであって、
     前記開閉蓋が、前記円筒部の正転方向の回転によって、前記砕石投入孔を閉鎖する方向の力が前記地中から印加されるように構成されているアタッチメント。
  6.  請求項1ないし5のいずれか1項に記載のアタッチメントであって、さらに、
     地表面にほぼ平行な圧力面を有し、前記回転軸の方向に移動可能な表層保護板を備えるアタッチメント。
  7.  請求項1ないし6のいずれか1項に記載のアタッチメントであって、さらに、
     前記砕石投入孔に砕石を投入する砕石投入装置を備え、
     前記砕石投入装置は、
      前記開閉蓋を支持して前記砕石投入孔を開放状態とする開放保持部材と、
      与えられた砕石を受け取る砕石受領部と、
      前記砕石受領部から前記開放状態の砕石投入孔に砕石を移動させる砕石移動樋と、
    を備え、
     前記砕石移動樋が、
      前記砕石受領部に接続された砕石移動樋本体と、
      前記砕石移動樋本体に回動可能に接続され、先端部を前記砕石投入孔に接近させることによって前記砕石移動樋本体から前記砕石投入孔への砕石の移動を可能とする投入位置と、前記先端部が前記砕石投入孔から退避して前記円筒部を回転可能とする退避状態と、を含む複数の作動状態を有する砕石投入アダプタと、
    を有し、
     前記砕石投入アダプタが、前記円筒部の停止時において前記開放保持部材によって前記開閉蓋が前記開放状態とされているときに、前記砕石投入アダプタに加えられる砕石の重量に応じて前記投入位置となり、前記重量の消失に応じて前記退避状態とするための付勢部を有するアタッチメント。
  8.  地中に砕石を含む砕石杭を形成する砕石杭形成装置であって、
     請求項1ないし7のいずれか1項に記載のアタッチメントと、
     正転方向と反転方向の回転駆動力を発生させて、前記アタッチメントを駆動する駆動装置と、
    を備える砕石杭形成装置。
PCT/JP2009/065228 2008-09-09 2009-09-01 砕石杭形成用のアタッチメントおよびそのアタッチメントを備える砕石杭形成装置 WO2010029871A1 (ja)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
JP2008230516 2008-09-09
JP2008-230516 2008-09-09
JP2009-073586 2009-03-25
JP2009073586 2009-03-25
JP2009-192063 2009-08-21
JP2009192063A JP4445033B1 (ja) 2008-09-09 2009-08-21 砕石杭形成用のアタッチメントおよびそのアタッチメントを備える砕石杭形成装置

Publications (1)

Publication Number Publication Date
WO2010029871A1 true WO2010029871A1 (ja) 2010-03-18

Family

ID=42005128

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/065228 WO2010029871A1 (ja) 2008-09-09 2009-09-01 砕石杭形成用のアタッチメントおよびそのアタッチメントを備える砕石杭形成装置

Country Status (2)

Country Link
JP (1) JP4445033B1 (ja)
WO (1) WO2010029871A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012137118A1 (en) * 2011-04-04 2012-10-11 Jaron Lyell Mcmillan Machine and method for forming an in ground granular column
JP2013221387A (ja) * 2012-04-16 2013-10-28 Onabegumi:Kk 砕石杭形成用アタッチメント
NL1039935C2 (nl) * 2012-12-07 2014-06-11 Beheersmij Verstraeten B V Een grondverdringingsboor en werkwijze voor het ter plaatse vormen van een funderingspaal.
CN108568548A (zh) * 2018-06-21 2018-09-25 贵州大学 一种碎石清理和防护功能的矿山爆破用钻洞装置
CN115928700A (zh) * 2023-01-06 2023-04-07 福建厦兴重工机械有限公司 全液压步履式引孔碎石填充桩机

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4849580B1 (ja) * 2011-05-12 2012-01-11 八重樫 輝一 無排土砕石杭形成用具
JP4887460B1 (ja) * 2011-06-24 2012-02-29 雅久 樋口 地盤圧密装置
JP5959887B2 (ja) * 2012-03-09 2016-08-02 国立大学法人三重大学 砕石杭形成用制御装置及び砕石杭形成方法
JP5535279B2 (ja) * 2012-07-10 2014-07-02 雅久 樋口 地盤圧密装置
JP6915800B2 (ja) * 2017-03-29 2021-08-04 国立大学法人三重大学 砕石構造体の構築方法及び砕石構造体
JP7318921B2 (ja) * 2019-09-20 2023-08-01 株式会社 尾鍋組 砕石杭形成用のアタッチメント及びそれを備える砕石杭形成装置
JP7391305B2 (ja) 2020-05-28 2023-12-05 国立大学法人三重大学 砕石杭形成用アタッチメント及びそれを備える砕石杭形成装置
JP7104925B1 (ja) 2021-07-02 2022-07-22 東洋建設株式会社 砂杭造成装置

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54103208A (en) * 1978-01-30 1979-08-14 Shimizu Construction Co Ltd Device for making sand stake etc*
JPS59141622A (ja) * 1983-01-31 1984-08-14 Nakatomi Kurimoto 砂杭造成装置
JPS61246416A (ja) * 1985-04-23 1986-11-01 Kawasaki Steel Corp グラベルドレ−ンパイル
JPH02167918A (ja) * 1988-12-20 1990-06-28 Nippon Kaikou Kk 無振動式砕石杭打設装置
JPH03208906A (ja) * 1990-01-11 1991-09-12 Nippon Kaikou Kk ケーシングパイプ内の砂杭造成用砂レベル計測方法
JPH08284158A (ja) * 1995-04-13 1996-10-29 Hideaki Kishida 通水孔付き杭の施工方法
JPH0931961A (ja) * 1995-07-24 1997-02-04 Toyo Constr Co Ltd ロッドコンパクション工法およびその装置
JPH1136767A (ja) * 1997-07-16 1999-02-09 Sanwa Kizai Co Ltd 地盤改良柱体造成機
JP2002105942A (ja) * 2000-10-03 2002-04-10 Nippon Kaikou Kk 静的締固め杭造成方法及び装置

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0751767B2 (ja) * 1986-11-28 1995-06-05 日本海工株式会社 水中地盤改良方法及び装置
JP2007056605A (ja) * 2005-08-26 2007-03-08 Asahi Kasei Construction Materials Co Ltd 液状化防止工法
JP2009062762A (ja) * 2007-09-07 2009-03-26 Onabegumi:Kk 地盤改良用ドレーン杭の埋設装置とその使用による埋設工法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54103208A (en) * 1978-01-30 1979-08-14 Shimizu Construction Co Ltd Device for making sand stake etc*
JPS59141622A (ja) * 1983-01-31 1984-08-14 Nakatomi Kurimoto 砂杭造成装置
JPS61246416A (ja) * 1985-04-23 1986-11-01 Kawasaki Steel Corp グラベルドレ−ンパイル
JPH02167918A (ja) * 1988-12-20 1990-06-28 Nippon Kaikou Kk 無振動式砕石杭打設装置
JPH03208906A (ja) * 1990-01-11 1991-09-12 Nippon Kaikou Kk ケーシングパイプ内の砂杭造成用砂レベル計測方法
JPH08284158A (ja) * 1995-04-13 1996-10-29 Hideaki Kishida 通水孔付き杭の施工方法
JPH0931961A (ja) * 1995-07-24 1997-02-04 Toyo Constr Co Ltd ロッドコンパクション工法およびその装置
JPH1136767A (ja) * 1997-07-16 1999-02-09 Sanwa Kizai Co Ltd 地盤改良柱体造成機
JP2002105942A (ja) * 2000-10-03 2002-04-10 Nippon Kaikou Kk 静的締固め杭造成方法及び装置

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012137118A1 (en) * 2011-04-04 2012-10-11 Jaron Lyell Mcmillan Machine and method for forming an in ground granular column
EP2694744A1 (en) * 2011-04-04 2014-02-12 Jaron Lyell Jaron Lyell Mcmillan Machine and method for forming an in ground granular column
AU2012241026B2 (en) * 2011-04-04 2014-09-11 Jaron Lyell Mcmillan Machine and method for forming an in ground granular column
EP2694744A4 (en) * 2011-04-04 2014-11-19 Jaron Lyell Jaron Lyell Mcmillan MACHINE AND METHOD FOR FORMING A UNDERGROUND GRANULAR COLUMN
US9115477B2 (en) 2011-04-04 2015-08-25 Jaron Lyell Mcmillan Machine and method for forming an in ground granular column
JP2013221387A (ja) * 2012-04-16 2013-10-28 Onabegumi:Kk 砕石杭形成用アタッチメント
NL1039935C2 (nl) * 2012-12-07 2014-06-11 Beheersmij Verstraeten B V Een grondverdringingsboor en werkwijze voor het ter plaatse vormen van een funderingspaal.
CN108568548A (zh) * 2018-06-21 2018-09-25 贵州大学 一种碎石清理和防护功能的矿山爆破用钻洞装置
CN108568548B (zh) * 2018-06-21 2023-04-25 贵州大学 一种碎石清理和防护功能的矿山爆破用钻洞装置
CN115928700A (zh) * 2023-01-06 2023-04-07 福建厦兴重工机械有限公司 全液压步履式引孔碎石填充桩机
CN115928700B (zh) * 2023-01-06 2023-04-28 福建厦兴重工机械有限公司 全液压步履式引孔碎石填充桩机

Also Published As

Publication number Publication date
JP2010248885A (ja) 2010-11-04
JP4445033B1 (ja) 2010-04-07

Similar Documents

Publication Publication Date Title
JP4445033B1 (ja) 砕石杭形成用のアタッチメントおよびそのアタッチメントを備える砕石杭形成装置
JP5352900B2 (ja) 地中杭形成ヘッドおよびその地中杭形成ヘッドを備える砕石杭形成装置用アタッチメント
US3446026A (en) Landfill refuse-burying method and apparatus
US20150284932A1 (en) Excavation devices and methods
JP2014224456A (ja) 傾斜地盤の立坑築造工法及び立坑構造
JP2011089326A (ja) 管埋設用溝掘削機
JP5975266B2 (ja) 砕石杭形成用アタッチメント
JP5700611B1 (ja) 地中埋設杭撤去方法、及び地中埋設杭撤去装置
JPWO2003091532A1 (ja) アースドリル用掘削具
CA2090242A1 (en) Apparatus and method for cutting soil and in situ construction of subsurface containment barriers
JP2001286843A (ja) 廃棄物処分場の堆積ゴミの処理方法および処理装置
JP6037982B2 (ja) 廃棄物処分場における廃棄物処理工法
JP6843348B2 (ja) 砕石杭形成装置及び砕石杭の製造方法
JP2005336702A (ja) 地盤掘削装置
JP2003113607A (ja) 地盤改良工法と地盤改良装置
JP3669288B2 (ja) 液状化防止工法
JP4887460B1 (ja) 地盤圧密装置
JP2010090637A (ja) 地盤の掘削用パイプケーシング
JP4863311B2 (ja) 掘削工法
JP7396709B1 (ja) 地盤削孔方法、並びに地盤削孔装置の削孔制御装置及びそのプログラム
JP2001040697A (ja) 掘削溝用敷き均し装置
JP2022045281A (ja) 埋設土装入装置
JP2009510286A (ja) 地下連続壁を作る装置
JP2008063916A (ja) 地盤改良工法と地盤改良装置
JP2017042690A (ja) 廃棄物処分場における廃棄物減容処理工法及び掘削体

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09813017

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09813017

Country of ref document: EP

Kind code of ref document: A1