WO2009151078A1 - エネルギーマネジメントシステム及びコンピュータプログラム - Google Patents
エネルギーマネジメントシステム及びコンピュータプログラム Download PDFInfo
- Publication number
- WO2009151078A1 WO2009151078A1 PCT/JP2009/060621 JP2009060621W WO2009151078A1 WO 2009151078 A1 WO2009151078 A1 WO 2009151078A1 JP 2009060621 W JP2009060621 W JP 2009060621W WO 2009151078 A1 WO2009151078 A1 WO 2009151078A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- unit
- schedule
- schedule information
- measurement value
- determination
- Prior art date
Links
- 238000004590 computer program Methods 0.000 title description 3
- 238000005259 measurement Methods 0.000 claims abstract description 140
- 238000003860 storage Methods 0.000 claims description 220
- 238000011156 evaluation Methods 0.000 claims description 93
- 238000004088 simulation Methods 0.000 claims description 92
- 230000009286 beneficial effect Effects 0.000 claims description 46
- 230000008859 change Effects 0.000 claims description 43
- 238000012806 monitoring device Methods 0.000 claims description 39
- 230000005540 biological transmission Effects 0.000 claims description 29
- 238000012790 confirmation Methods 0.000 claims description 28
- 238000009434 installation Methods 0.000 claims description 28
- 238000001514 detection method Methods 0.000 claims description 27
- 230000006870 function Effects 0.000 claims description 18
- 238000004364 calculation method Methods 0.000 description 58
- 238000004891 communication Methods 0.000 description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 20
- 238000012544 monitoring process Methods 0.000 description 16
- 238000004378 air conditioning Methods 0.000 description 13
- 238000000034 method Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 12
- 238000010586 diagram Methods 0.000 description 6
- 230000005611 electricity Effects 0.000 description 6
- 238000005303 weighing Methods 0.000 description 6
- 239000003086 colorant Substances 0.000 description 5
- 238000012545 processing Methods 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 101001003569 Homo sapiens LIM domain only protein 3 Proteins 0.000 description 3
- 101000639972 Homo sapiens Sodium-dependent dopamine transporter Proteins 0.000 description 3
- 102100026460 LIM domain only protein 3 Human genes 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000000630 rising effect Effects 0.000 description 3
- 238000009826 distribution Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000013480 data collection Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000011867 re-evaluation Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Definitions
- the present invention relates to an energy management system and a computer program.
- This energy management system system collects data such as power usage data / environment information (temperature and humidity) and control information of each electrical device installed in a building or facility, for a predetermined period (for example, Data collected for each day, month, and year is aggregated and the power consumption is displayed in a graph (line graph or bar graph).
- data such as power usage data / environment information (temperature and humidity) and control information of each electrical device installed in a building or facility, for a predetermined period (for example, Data collected for each day, month, and year is aggregated and the power consumption is displayed in a graph (line graph or bar graph).
- Such an energy management system controls an electric device based on schedule information that instructs the operation of the electric device. Therefore, in order to reduce the power consumption of the electrical equipment, it is necessary to set a schedule appropriately.
- the above-mentioned energy management system only displays the collected power consumption in a graph.
- the extent to which the power consumption is reduced when the schedule information is changed can only be determined by an administrator who is familiar with energy management technology and has sufficient knowledge.
- the present invention has been made in view of the above problems.
- the objective of this invention is providing the energy management system and computer program which can create the schedule information which reduces the usage-amount of energy resources.
- An energy management system is an energy management system for managing equipment, and includes an acquisition unit, a measurement value storage unit, a determination unit, a determination storage unit, a usage information display unit, a schedule input unit, Schedule storage means, simulation means, prediction value storage means, and prediction information display means are provided.
- the acquisition means is configured to acquire a measurement value indicating a value obtained by measuring the amount of energy resources used by the device during a predetermined period.
- the measurement value storage unit is configured to store the measurement value acquired by the acquisition unit.
- the determination unit is configured to determine, for each unit time, whether or not the device is used based on the measurement value stored in the measurement value storage unit.
- the determination storage unit is configured to store a determination result indicating a result determined by the determination unit.
- the usage information display means is configured to display whether or not the device is used for each unit time based on the determination result stored in the determination storage means.
- the schedule input means is configured to receive input of schedule information that defines the operation of the device during the predetermined period for each unit time.
- the schedule storage means is configured to store the schedule information input using the schedule input means.
- the simulation means stores, in the measurement value storage means, a predicted value indicating the amount of energy resources used in the device when the device operates according to the schedule information stored in the schedule storage device. It is comprised so that it may calculate based on the said measured value.
- the predicted value storage means is configured to store the predicted value calculated by the simulating means.
- the prediction information display means is configured to display the prediction value stored in the prediction value storage means.
- the user can input the schedule information while considering whether or not the device is used. And if the said schedule information is input, the usage-amount of energy resources when the said apparatus operate
- an evaluation unit evaluates whether the use of the device is beneficial or wasteful for each unit time based on the measurement value stored in the measurement value storage unit and the schedule information stored in the schedule storage unit.
- the evaluation storage means is configured to store an evaluation result indicating a result evaluated by the evaluation means.
- the evaluation display means is configured to display for each unit time whether the use of the device is beneficial or wasteful based on the evaluation result stored in the evaluation storage means.
- the evaluation unit is configured to evaluate that the use of the device is useless if a time change of the measurement value stored in the measurement value storage unit satisfies a predetermined condition.
- the predetermined condition is that a period in which the measured value exceeds a predetermined threshold is continued for a predetermined time.
- device information storage means for storing, for each device, the type of the device and an installation area indicating a place where the device is installed.
- the evaluation unit is configured to check whether there are a plurality of the devices of different types in the same installation area based on the type and the installation area for each of the devices stored in the device information storage unit. Is done.
- the evaluation means evaluates whether the use of the device is beneficial or useless based on a combination of the type of each device and the determination result when there are a plurality of the devices of different types in the same installation area. Configured as follows.
- the evaluation means is configured to evaluate the use of the device at the time as useful when the time when the use of the device is determined to be useless satisfies a predetermined exception condition.
- an information storage unit that stores an installation area indicating a place where each device is installed for each device and a person detection unit that detects the presence or absence of a person in the installation area are provided.
- the exceptional condition is that the person detecting means detects a person in the installation area of the device.
- the usage information display means is configured to display the amount of energy resources used by the device as a numerical value.
- the amount of energy resources used by the device according to the setting of the schedule information can be grasped in more detail.
- a control device that controls the device and a setting device that communicates with the control device.
- the control device includes setting storage means, device control means, schedule receiving means, and schedule changing means.
- the setting storage means is configured to store the schedule information.
- the device control means is configured to control the device according to the schedule information stored in the setting storage means.
- the schedule receiving means is configured to receive the schedule information from the setting device.
- the schedule changing unit is configured to change the content of the schedule information stored in the setting storage unit to the content of the schedule information received by the schedule receiving unit.
- the setting device includes a determination unit, a current schedule storage unit, a confirmation unit, a confirmation storage unit, and a schedule transmission unit.
- the determination unit is configured to accept a determination to change the schedule information stored in the setting storage unit of the control device.
- the current schedule storage means is configured to store the schedule information stored in the setting storage means.
- the confirmation unit is configured to confirm whether or not the schedule information has been changed based on the schedule information stored in the schedule storage unit and the schedule information stored in the current schedule storage unit.
- the confirmation storage means is configured to store a confirmation result indicating a result confirmed by the confirmation means.
- the schedule transmission means when the change of the schedule information stored in the setting storage means is determined using the determination means, the schedule information changed with reference to the confirmation result stored in the confirmation storage means Only to the control device.
- the schedule information change can be easily reflected.
- the apparatus includes a plurality of measuring devices, a monitoring device that communicates with each of the measuring devices, and a terminal device that communicates with the monitoring device.
- the terminal device includes the acquisition unit, the measurement value storage unit, the determination unit, the determination storage unit, the usage information display unit, the schedule input unit, the schedule storage unit, and the simulation. Means, the predicted value storage means, and the predicted information display means.
- Each measuring device measures the amount of energy resources used in the device during the predetermined period and obtains the measured value, and the first memory stores the measured value obtained by the measuring unit.
- the monitoring device includes a measurement value acquisition unit that acquires the measurement value from the first storage unit of each measurement device, and a second storage unit that stores the measurement value acquired by the measurement value acquisition unit.
- the acquisition unit is configured to acquire the measurement value from the second storage unit of the monitoring device.
- a program according to the present invention is a program used in an energy management system for managing equipment, and includes a computer, an acquisition unit, a measurement value storage unit, a determination unit, a determination storage unit, a usage information display unit, It functions as a schedule input means, a schedule storage means, a simulation means, a predicted value storage means, and a prediction information display means.
- the acquisition means is configured to acquire a measurement value indicating a value obtained by measuring the amount of energy resources used by the device during a predetermined period.
- the measurement value storage unit is configured to store the measurement value acquired by the acquisition unit.
- the determination unit is configured to determine, for each unit time, whether or not the device is used based on the measurement value stored in the measurement value storage unit.
- the determination storage unit is configured to store a determination result indicating a result determined by the determination unit.
- the usage information display means is configured to display whether or not the device is used for each unit time based on the determination result stored in the determination storage means.
- the schedule input means is configured to receive input of schedule information that defines the operation of the device during the predetermined period for each unit time.
- the schedule storage means is configured to store the schedule information input using the schedule input means.
- the simulation means stores, in the measurement value storage means, a predicted value indicating the amount of energy resources used in the device when the device operates according to the schedule information stored in the schedule storage device. It is comprised so that it may calculate based on the said measured value.
- the predicted value storage means is configured to store the predicted value calculated by the simulating means.
- the prediction information display means is configured to display the prediction value stored in the prediction value storage means.
- the user can input the schedule information while considering whether or not the device is used. And if the said schedule information is input, the usage-amount of energy resources when the said apparatus operate
- the energy management system is used for management of devices arranged in a building B such as a tenant building.
- the devices managed by the energy management system of the present embodiment are devices that operate according to schedule information to be described later, such as lighting fixtures L1 to L4 and air conditioners AC1 to AC4.
- the energy management system of the present embodiment includes terminal devices 1A and 1B, a monitoring device (central monitoring panel) 2, a measuring device 3, and control devices 5A and 5B.
- the monitoring device 2 is connected to the measuring device 3 and the control devices 5A and 5B via a communication network NT such as the Internet.
- a global IP address is set for each of the measuring device 3 and the control devices 5A and 5B.
- the measurement device 3 and the control devices 5A and 5B have a function of performing communication via the communication network NT.
- the terminal device 1A is connected to the monitoring device 2 via the communication network NT.
- the terminal device 1B is connected to the monitoring device 2 via the LAN.
- Building B is, for example, two stories.
- Four zones (installation areas) Z1 to Z4 are assigned to the building B.
- Three zones Z1 to Z3 are assigned to the first floor of the building B, and the first floor of the building B is divided into three.
- Zone Z4 is assigned to the entire second floor of building B.
- Each zone Z1 to Z4 includes a plurality of lighting fixtures L1 to L4, air conditioners AC1 to AC4, lighting operation switches (lighting switches) S1 to S4, and an air conditioning operation switch (air conditioning switch) (not shown).
- Human sensors (human detection means) R1 to R4 are provided.
- the lighting fixtures L1 to L4, the lighting switches S1 to S4, and the human sensors R1 to R4 in the zones Z1 to Z4 are connected to the control device 5A via the transmission line LN1. Individual address information is assigned to the lighting fixtures L1 to L4, the lighting switches S1 to S4, and the human sensors R1 to R4.
- the lighting switches S1 to S4 are used to perform operations such as turning on / off the lighting fixtures L1 to L4 in the same zone Z1 to Z4.
- Each of the lighting switches S1 to S4 is configured to transmit an operation signal (lighting operation signal) corresponding to a user operation to the control device 5A.
- the air conditioning switch is used to perform operations such as turning on / off the air conditioners AC1 to AC4 in the same zone.
- Each air conditioning switch is configured to transmit an operation signal (air conditioning operation signal) corresponding to a user operation to the control device 5B.
- the human sensors R1 to R4 are configured to detect the presence or absence of a person in the same zone Z1 to Z4.
- the human sensors R1 to R4 are configured to transmit a detection signal (human body detection signal) to the control device 5A when detecting a person in the corresponding zones Z1 to Z4.
- the air conditioners AC1 to AC4 are connected to the control device 5B via the transmission line LN2. Individual address information is assigned to the air conditioners AC1 to AC4.
- distribution board 4 is installed in building B.
- the distribution board 4 incorporates a main breaker 40 and a plurality of branch breakers 41 to 44.
- the luminaires L1 to L3 in the zones Z1 to Z3 are connected to the branch circuit 61 corresponding to the branch breaker 41.
- Each lighting fixture L4 of zone Z4 is connected to the branch circuit 62 corresponding to the branch breaker 42.
- Each of the air conditioners AC1 to AC3 in the zones Z1 to Z3 is connected to the branch circuit 63 corresponding to the branch breaker 43.
- the branch circuit 64 corresponding to the branch breaker 44 is connected to the air conditioner AC4 in the zone Z4.
- Each branch circuit 61 to 64 is provided with measuring points P1 to P4 for measuring the load current.
- the measuring device 3 is configured to monitor the power consumption of devices such as the lighting fixtures L1 to L4 and the air conditioners AC1 to AC4 and to output them to the monitoring device 2 and the terminal device 1A.
- the measuring device 3 is power consumption measuring means for measuring the power consumption of the electrical equipment.
- the measuring device 3 includes wattmeters 31 to 34 installed in the building B and a collecting device (power monitoring device) 35.
- the wattmeters 31 to 34 are connected to the collection device 35 via the signal line LN3.
- Each wattmeter 31 to 34 measures the load current at the corresponding measurement points P1 to P4 (that is, the power consumption amount in each branch circuit 61 to 64) at every predetermined measurement cycle.
- each of the wattmeters 31 to 34 serves as a measurement value acquisition unit that acquires a measurement value indicating a value obtained by measuring the amount of electricity used by the device during a predetermined period (the amount of power consumed by the device during the predetermined period). Function.
- the power consumption in the branch circuit 61 is a total value of the power consumption of the plurality of lighting fixtures L1 to L3 belonging to the zones Z1 to Z3.
- the power consumption in the branch circuit 62 is a total value of the power consumption of the plurality of lighting fixtures L4 belonging to the zone Z4.
- the power consumption in the branch circuit 63 is the total power consumption of the air conditioners AC11 to AC3 belonging to the zones Z1 to Z3.
- the power consumption in the branch circuit 64 is the power consumption of the air conditioning AC4 in the zone Z4.
- the power consumption is measured for each group of one to a plurality of devices.
- Each wattmeter 31 to 34 stores the acquired measurement value in a built-in memory (not shown). Each wattmeter 31 to 34 is configured to output the measurement value stored in the built-in memory to the collection device 35 every time a predetermined transmission cycle elapses.
- the collection device 35 receives the measurement values output from the wattmeters 31 to 34.
- the collection device 35 functions as a first storage unit that stores the measurement values received from the wattmeters 31 to 34 in association with the measured date and time.
- the collection device 35 is connected to the monitoring device 2 via the communication network NT.
- the collecting device 35 transmits the measurement values of the branch circuits 61 to 64 to the monitoring device 2 in response to a request from the monitoring device 2 (for example, when receiving a monitoring data request signal described later from the monitoring device 2). Composed.
- the control device 5A is a lighting control device that controls the operation of the lighting fixtures L1 to L4.
- the control device 5A sends and receives a transmission signal to / from the desired lighting fixtures L1 to L4 or the lighting switches S1 to S4 or the human sensors R1 to R4 by sending a transmission signal including address information to the transmission line LN1. To do.
- the control device 5A is configured using a computer. As shown in FIG. 3A, the control device 5A includes a setting storage unit 51A, a device control unit 52A, a schedule reception unit 53A, a schedule change unit 54A, an operation signal reception unit 55A, and a detection signal reception unit. 56A, detection signal storage means 57A, and history transmission means 58A.
- the setting storage means 51A is configured to store schedule information (operation schedule information) of each of the lighting fixtures L1 to L4.
- the schedule information is information that defines the operation of the device during a predetermined period for each unit time (predetermined time segment).
- the schedule information is information that defines the operation (turning on or off) of the lighting fixtures L1 to L4 in the zones Z1 to Z4 for one week every 30 minutes.
- the time when the lighting fixtures L1 to L4 are turned on is referred to as the lighting time, and the time when the lighting fixtures L1 to L4 are turned off is referred to as the extinguishing time.
- the schedule receiving means 53A is configured to receive schedule information from the terminal device 1A or the monitoring device 2.
- the schedule changing unit 54A is configured to change the content of the schedule information stored in the setting storage unit 51A to the content of the schedule information received by the schedule receiving unit 53A. Therefore, when the control device 5A acquires the schedule information from the terminal device 1A or the monitoring device 2, the control device 5A updates the contents of the schedule information in the setting storage means 51A.
- the operation signal receiving means 55A is configured to receive an operation signal from each of the lighting switches S1 to S4.
- the device control unit 52A is configured to control the device according to the schedule information stored in the setting storage unit 51A. For example, when the current time (the time of the clock built in the control device 5A) is the lighting time specified by the schedule information, the device control means 52A transmits a lighting control signal to the corresponding lighting fixtures L1 to L4, The corresponding lighting fixtures L1 to L4 are turned on. When the current time comes to the turn-off time specified by the schedule information, the appliance control unit 52A transmits a lighting control signal to the corresponding lighting fixtures L1 to L4, and turns on the corresponding lighting fixtures L1 to L4.
- the device control means 52A is configured to control the lighting fixtures L1 to L4 in accordance with the lighting operation signal received by the operation signal receiving means 55A.
- the device control means 52A transmits a control signal to the lighting fixtures L1 to L4 according to the lighting operation signals from the lighting switches S1 to S4, and turns on or off the lighting fixtures L1 to L4. Therefore, according to the control device 5A, it is possible to control the lighting fixtures L1 to L4 other than the time specified by the schedule information (lighting time or lighting time).
- the detection signal receiving means 56A is configured to receive detection signals from the human sensors R1 to R4.
- the detection signal storage means 57A creates and stores a history of detection signals based on the detection signals received by the detection signal reception means 55A. That is, the history of the detection signal (when the person is detected) is stored in the control device 5A.
- the history transmission unit 58A is configured to transmit the history of the detection signal stored in the detection signal storage unit 56A to the terminal device 1A and the monitoring device 2. Further, when the history transmission unit 58A receives a detection data request signal described later from the monitoring device 2, the history transmission unit 58A transmits the detection signal history of the human sensors R1 to R4 stored in the detection signal storage unit 57A to the monitoring device 2. Configured as follows.
- the control device 5B is an air conditioning control device that controls the operation of the air conditioners AC1 to AC4. Control device 5B sends and receives transmission signals to / from desired air conditioners AC1 to AC4 by sending transmission signals including address information to transmission line LN2.
- the control device 5B is configured using a computer. As shown in FIG. 3B, the control device 5B includes a setting storage unit 51B, a device control unit 52B, a schedule reception unit 53B, and a schedule change unit 54B.
- the setting storage means 51B is configured to store schedule information of the air conditioners AC1 to AC4.
- the schedule information is information that defines the operation of the air conditioners AC1 to AC4 in the zones Z1 to Z4 for one week every 30 minutes.
- the time when the air conditioners AC1 to AC4 are turned on is referred to as the operation start time, and the time when the air conditioners AC1 to AC4 are turned off is referred to as the operation end time.
- the schedule receiving means 53B is configured to receive schedule information from the terminal device 1A or the monitoring device 2.
- the schedule changing unit 54B is configured to change the content of the schedule information stored in the setting storage unit 51B to the content of the schedule information received by the schedule receiving unit 53B. Therefore, when acquiring the schedule information from the terminal device 1A or the monitoring device 2, the control device 5B updates the contents of the schedule information in the setting storage unit 51B.
- the operation signal receiving means 55B is configured to receive an operation signal from each air conditioning switch.
- the device control unit 52B is configured to control the device according to the schedule information stored in the setting storage unit 51B. For example, when the current time comes to the operation start time specified by the schedule information, the device control unit 52B transmits an operation start signal to the corresponding air conditioners AC1 to AC4 to start the corresponding air conditioners AC1 to AC4. In addition, when the current time reaches the operation end time specified by the schedule information, the device control unit 52B transmits an operation end signal to the corresponding air conditioners AC1 to AC4, and stops the corresponding air conditioners AC1 to AC4.
- the device control means 52B is configured to control the air conditioners AC1 to AC4 according to the air conditioning operation signal received by the operation signal receiving means 55B.
- the device control means 52B transmits a control signal to the air conditioners AC1 to AC4 in response to an air conditioning operation signal from the air conditioning operation switch to start or stop each of the air conditioners AC1 to AC4. Therefore, the control device 5B can control the air conditioners AC1 to AC4 other than the time (operation start time or operation end time) specified by the schedule information.
- the monitoring device 2 includes a communication unit 21, a storage unit 22, and a calculation unit 23.
- the communication unit 21 is configured to communicate with the measurement device 3 and the control device 5A via the communication network NT.
- the calculation unit 23 is configured to cause the communication unit 21 to transmit the aforementioned monitoring data request signal and detection data request signal each time a predetermined data collection period elapses.
- the communication unit 21 and the calculation unit 23 constitute a measurement value acquisition unit that acquires measurement values from the collection device 35 of the measurement device 3.
- the storage unit 22 functions as a second storage unit that stores the measurement value received by the communication unit 21.
- the storage unit 22 stores a history of detection signals (measurement data of the human sensors R1 to R4) received by the communication unit 21.
- the monitoring device 2 may be configured to acquire measurement values from the plurality of measurement devices 3. In this case, the measurement values of the plurality of measuring devices 3 can be managed by one monitoring device 2.
- the terminal devices 1A and 1B have the same configuration. Therefore, only the terminal device 1A will be described below.
- the terminal device 1 ⁇ / b> A is a computer including an input unit 11, a display unit 12, a storage unit 13, a calculation unit 14, and a communication unit 15.
- the input unit 11 is a keyboard, a mouse, a touch panel, or the like.
- the input unit 11 is used by the user to select buttons B1 to B24, which will be described later, and to input schedule information.
- the display unit 12 is a display (for example, a liquid crystal display) or the like, and is controlled by the calculation unit 14 so as to perform a predetermined display.
- the storage unit 13 is used to store a program executed by the calculation unit 14, a measurement result of power consumption, a simulation result of power consumption, and the like.
- the storage unit 13 includes a large-capacity storage device such as a hard disk, and a memory such as a ROM and a RAM.
- the calculation unit 14 is a CPU or the like, and executes a program stored in the storage unit 13.
- the communication unit 15 is configured to perform communication via the network NT.
- the storage unit 13 is loaded with a program (hereinafter referred to as “energy management program”) for managing power consumption, simulating power consumption, and evaluating whether power consumption is beneficial.
- energy management program a program for managing power consumption, simulating power consumption, and evaluating whether power consumption is beneficial.
- the terminal devices 1A and 1B execute the energy management program, a power consumption management function, a power consumption simulation function, and a power evaluation function are realized.
- the energy management program manages the terminal device 1A, the acquisition unit 101, the measurement value storage unit 102, the determination unit 103, and the determination storage unit 104 in order to manage the power consumption of the device. And function as the usage information display means 105.
- the acquisition unit 101 is configured to acquire a measurement value indicating a value obtained by measuring the amount of energy resources used in the device during a predetermined period.
- the acquisition unit 101 inputs one or a plurality of devices as one group, and an electric energy measurement result (measurement value) obtained by measuring the electric energy consumption for each predetermined time segment (unit time) in a group unit. It is an electric energy input means.
- the device is an electrical device such as lighting fixtures L1 to L4 and air conditioners AC1 to AC4. Therefore, the energy resource is electricity, and the amount of energy resource used in the device is the power consumption of the device.
- the acquisition unit 101 communicates with the monitoring device 2 and the control devices 5A and 5B via the communication network NT, for example, and receives the power consumption amount during a predetermined period (for example, one week) in each of the branch circuits 61 to 64. That is, the acquisition unit 101 acquires the measurement value from the second storage unit of the monitoring device 2.
- Such an acquisition unit 101 is realized by the calculation unit 14 and the communication unit 15.
- the measurement value storage unit 102 is configured to store the measurement value acquired by the acquisition unit 101. Such a measured value storage unit 102 is realized by the storage unit 13 and the calculation unit 14.
- the determination unit 103 is configured to determine whether the device is used during a predetermined period based on the measurement value stored in the measurement value storage unit 102 every unit time (for example, 30 minutes). However, in the present embodiment, the determination unit 103 does not determine a time zone included in a time zone described later. For example, the determination unit 103 compares the measurement value stored in the measurement value storage unit 102 with a predetermined threshold value. The determination unit 103 determines that the device has been used only when the measured value exceeds a predetermined threshold value.
- the predetermined threshold is, for example, a value corresponding to the standby power amount of the corresponding branch circuits 61 to 64. That is, the determination unit 103 determines whether at least one of the devices connected to the branch circuits 61 to 64 has been used.
- Such determination means 103 is realized by the calculation unit 14.
- the determination storage unit 104 is configured to store a determination result indicating a result determined by the determination unit 103.
- the determination storage unit 104 is realized by such a storage unit 13 and the calculation unit 14.
- the usage information display unit 105 is configured to display, every unit time, whether or not the device has been used during a predetermined period based on the determination result stored in the determination storage unit 104. In other words, the usage information display unit 105 displays at least the presence / absence of power consumption for each predetermined time segment based on the power amount measurement result input to the power amount input unit.
- Such usage information display means 105 binarizes and displays the power consumption of the device during a predetermined period. For example, as shown in FIG. 17, the usage state display means 105 displays the unit time when the device is used separately from the unit time when the device is not used (in FIG. 17, the time zone when the device is used). Is shown as a diagonal line rising to the right). Further, the usage information display unit 105 is configured to display the power consumption of the device (the total value of the power consumption of the device during a predetermined period) as a numerical value. Such usage state display means 105 is realized by the display unit 12 and the calculation unit 14.
- the energy management program also includes a terminal device 1A, a schedule input unit 106, a schedule storage unit 107, a simulation unit 108, a predicted value storage unit 109, and a predicted value display in order to perform a power consumption simulation. It functions as the means 110.
- the schedule input means 106 is configured to accept input of schedule information that defines the operation of the device during a predetermined period per unit time. In other words, the schedule input means 106 is used for the user to input the change contents of the schedule information.
- schedule information is defined by a time zone described later. That is, the time zone in which the time zone is set is the time zone in which the device is turned off.
- the schedule information defines that the device is turned on at 7:30 from Monday to Friday and the device is turned off at 19:00. Further, in the example shown in FIG. 25, the schedule information includes the device on at 7:30 from Monday to Friday, the device off at 12:00, the device on at 12:30, and the device off at 19:00. It stipulates.
- Such a schedule input unit 106 is realized by the input unit 11, the display unit 12, and the calculation unit 14.
- the schedule storage unit 107 is configured to store the schedule information input using the schedule input unit 106. Such a schedule storage unit 107 is realized by the storage unit 13 and the calculation unit 14.
- the simulation unit 108 simulates a predicted value indicating the power consumption when the device operates according to the schedule information stored in the schedule storage unit 107 based on the measurement value stored in the measurement value storage unit 102. Configured. In other words, when the schedule information change content is input using the schedule input unit 106, the simulation unit 108 consumes power when the device is operated with the changed schedule information based on the power amount measurement result. Predict.
- the simulation unit 108 estimates the on / off state of the device by comparing the measured value stored in the measured value storage unit 102 with the standby power amount of the corresponding branch circuits 61 to 64 (in this estimation). May use the determination result of the determination means 103).
- the simulating means 108 compares the result (estimated result) of guessing on / off of the device with the schedule information stored in the schedule storage means. For example, in the estimation result, 0:00 to 6:00 is off, 6:00 to 18:00 is on, and 18:00 to 24:00 is off. In the schedule information stored in the schedule storage unit 107, Assume that 0:00 to 7:00 are off, 7:00 to 19:00 are on, and 19:00 to 24:00 are off.
- the measurement value stored in the measurement value storage means 102 is used as it is in the period in which ON / OFF coincides, that is, from 0:00 to 6:00, from 7:00 to 18:00, and from 19:00 to 24:00.
- the power consumption amount of the device is predicted for periods in which the on / off states do not coincide, that is, from 6:00 to 7:00, and from 18:00 to 19:00. For example, from 6:00 to 7:00, the estimation result is on and the schedule information is off. Therefore, the simulating unit 108 sets the standby power amount of the corresponding branch circuits 61 to 64 to 6:00 to 7:00. The amount of power consumed per unit time.
- the simulating means 108 has the most recent unit time (for example, 17:30 to 18:00) when the electrical device is on. ) Is the power consumption per unit time between 18:00 and 19:00.
- the average value of the power consumption of the unit time when the electrical equipment is determined to be on may be used, or the same unit time of the same day in the past or a different day of the week may be used. You may use power consumption. In this way, the simulation unit 108 estimates the power consumption amount of the electric device during a predetermined period.
- the predicted value storage unit 109 is configured to store the predicted value predicted by the simulation unit 108.
- the predicted value storage unit 109 is realized by the storage unit 13 and the calculation unit 14.
- the predicted value display unit 110 is configured to display the predicted value stored in the predicted value storage unit 109. Such predicted value display means 110 is realized by the display unit 12 and the calculation unit 14.
- each device is controlled to be turned on or off in accordance with preset schedule information. For example, all the devices are turned on during working hours (for example, in FIG. 24, Monday to Friday from 7:30 to 19:00 are working hours), and all the devices are turned off outside working hours. Such schedule information is set. In this case, if all the devices are operating according to the schedule information, power is not consumed outside the working hours. However, not all devices are used according to the schedule information. For example, when an employee wants to perform some work outside working hours, the employee operates a lighting switch S1 to S4 or the like to operate a desired device (lighting fixtures L1 to L4 or air conditioners AC1 to AC4). is there.
- the device continues to operate. In this case, since the use of the device is useless, the power consumption is useless (for example, in FIG. 24, the portion indicated by the network line is the useless portion of the device).
- the energy management program uses the terminal device 1A, the history receiving unit 111, and the history storage unit 112 in order to evaluate whether or not the power consumption in the device is beneficial (whether the use of the device is beneficial or wasteful). And device information storage means 113, evaluation means 114, evaluation storage means 115, and evaluation display means 116.
- the history receiving unit 111 is configured to receive a history of detection signals (measurement data of the human sensors R1 to R4).
- the history receiving means 111 communicates with the monitoring device 2 and the control devices 5A and 5B, and receives the history of detection signals during the predetermined period (measurement data of the human sensors R1 to R4).
- Such a history receiving unit 111 is realized by the calculation unit 14 and the communication unit 15.
- the history storage unit 112 is configured to store a history of detection signals received by the history reception unit 111. Such a history storage unit 112 is realized by the storage unit 13 and the calculation unit 14.
- the device information storage means 113 is configured to store information on each device.
- the information of each device is the type of device and the installation area indicating the location where the device is installed.
- the types of equipment include lighting fixtures and air conditioners, and the equipment installation area includes zones Z1 to Z4.
- the device information storage unit 113 is realized by the storage unit 13 and the calculation unit 14.
- the evaluation unit 114 is configured to determine, for each unit time, whether the use of the device is beneficial or not based on the measurement value stored in the measurement value storage unit 102 and the schedule information stored in the schedule storage unit 107. The In other words, the evaluation unit 114 evaluates whether or not the power consumption amount in each time segment is beneficial based on the power consumption amount and schedule information in each time segment input to the power amount input unit. It is. Such an evaluation unit 114 is realized by the calculation unit 14.
- the evaluation unit 114 determines that the device is useless.
- the evaluation unit 114 refers to the schedule information (in this embodiment, the time zone) stored in the schedule storage unit 107, and obtains the measurement value of the period during which the device is stopped (period included in the time zone). select.
- the evaluation unit 114 compares the selected measurement value with a predetermined threshold value (a value corresponding to the standby power amount of the corresponding branch circuit 61 to 64).
- the evaluation unit 114 determines that the use of the device is useless if the measured value exceeds a predetermined threshold value. For example, in the example shown in FIG. 17, it is determined that the use of the device between 22:00 and 23:00 on Friday, March 7 is useless.
- the evaluation unit 114 may be configured to evaluate that the use of the device is useless if the time change of the measurement value stored in the measurement value storage unit 102 satisfies a predetermined condition.
- the predetermined condition is that a period in which the measured value exceeds a predetermined threshold is continued for a predetermined time.
- the evaluation unit 114 determines that the use of the device is useless when the measured value continuously exceeds a predetermined threshold value a predetermined number of times (for example, 4 times) or more. In this way, for example, it is possible to prevent the use of the device from being determined to be useless due to the measurement error of the power consumption due to noise or the like although the use of the device is not useless.
- the use of the device may be beneficial. For example, the employee is working outside working hours.
- the evaluation unit 114 is configured to evaluate the use of the device in the unit time as useful. In this way, it can be determined more accurately whether or not the use of the device is beneficial.
- Exceptional conditions may be that human sensors R1 to R4 corresponding to the device installation area detect people. For example, when the evaluation unit 114 evaluates that the use of the device is useless, the evaluation unit 114 acquires the installation area of the device from the device information storage unit 113. Further, the evaluation unit 114 acquires a history of detection signals corresponding to the installation area of the device from the history storage unit 112. If the human sensors R1 to R4 installed in the same zones Z1 to Z4 output the detection signal in the unit time when the use of the device is determined to be useless, the evaluation unit 114 outputs the detection signal. Evaluate (re-evaluate) use as beneficial. In this case, it is evaluated that the use of the device is not wasteful in a place where a person is present.
- the evaluation unit 114 evaluates whether the use of the device is beneficial or wasteful based on the combination of the type of each device and the determination result of the determination unit 103. It may be configured as follows. Specifically, the evaluation unit 114 reads the installation area and type from the device information storage unit 113. Then, the evaluation unit 114 confirms whether there are a plurality of different types of devices in the same installation area based on the type and installation area for each device stored in the device information storage unit 113. When there are a plurality of devices of different types in the same installation area, the evaluation unit 114 evaluates whether the use of the device is beneficial or wasteful based on the combination of the type of each device and the determination result.
- the evaluation unit 114 acquires the determination results for the luminaire L1 and the air conditioner AC1 from the determination storage unit 104. And if the combination of the operating condition of the lighting fixture L1 and air conditioner AC1 from which a kind differs is a predetermined combination (both lighting fixture L1 and air conditioning machine AC1 are ON), the evaluation means 114 will use the lighting fixture L1. Evaluate it as beneficial. That is, when only one of the lighting fixture L1 and the air conditioner AC1 in the same zone Z1 is on, it is determined that the user has forgotten to turn it off.
- the evaluation storage unit 115 is configured to store an evaluation result indicating a result evaluated by the evaluation unit 114. Such an evaluation storage unit 115 is realized by the storage unit 13 and the calculation unit 14.
- the evaluation display means 116 is configured to display, every unit time, whether the use of the electric equipment is beneficial or wasteful based on the evaluation result stored in the evaluation storage means 115. For example, the evaluation display means 116 displays the unit time in which the use of the device is wasted separately from the unit time in which the use of the device was useful (in FIG. 24, the time zone in which the use of the device was wasted). Is indicated by a mesh line). Such an evaluation display unit 116 is realized by the display unit 12 and the calculation unit 14.
- the energy management program changes the schedule information of the control devices 5A and 5B from a remote location (that is, indirectly) by changing the terminal device 1A into a determination unit 117, a current schedule storage unit 118, It is made to function as a setting device including confirmation means 119, confirmation storage means 120, and schedule transmission means 121.
- the determining means 117 is configured to accept a change in schedule information stored in the setting storage means 51A and 51B of the control devices 5A and 5B (see, for example, FIG. 25). Such a determination unit 117 is realized by the input unit 11, the display unit 12, and the calculation unit 14.
- the current schedule storage unit 118 is configured to store schedule information stored in the setting storage units 51A and 51B.
- the current schedule storage unit 118 is configured to receive and store schedule information stored in the setting storage units 51A and 51B from the control devices 5A and 5B via the communication network NT.
- Such a current schedule storage unit 118 is realized by the storage unit 13, the calculation unit 14, and the communication unit 15.
- the confirmation unit 119 is configured to confirm whether the schedule information stored in the schedule storage unit 107 matches the schedule information stored in the current schedule storage unit 118. Such a confirmation unit 119 is realized by the calculation unit 14.
- the confirmation storage unit 120 is configured to store a confirmation result indicating a result confirmed by the confirmation unit 119.
- Such a confirmation storage unit 120 is realized by the storage unit 13 and the calculation unit 14.
- the schedule transmission unit 121 is configured to transmit the schedule information stored in the schedule storage unit 107 to the control devices 5A and 5B.
- the schedule transmission unit 121 determines to change the schedule information stored in the setting storage units 51 ⁇ / b> A and 51 ⁇ / b> B using the determination unit 117, the schedule transmission unit 121 refers to the confirmation result stored in the confirmation storage unit 120. Then, the schedule transmission unit 121 transmits only the changed schedule information to the corresponding control devices 5A and 5B. That is, the schedule transmission unit 121 transmits only the schedule information that needs to be changed to the control devices 5A and 5B.
- Such a schedule transmission unit 121 is realized by the calculation unit 14 and the communication unit 15. Note that the schedule transmission unit 121 may be configured to transmit all schedule information stored in the schedule storage unit 107 to the control devices 5A and 5B. In this case, the current schedule storage unit 118, the confirmation unit 119, and the confirmation storage unit 120 are not necessary.
- FIG. 6 shows a flowchart when the simulation is executed.
- the calculation unit 14 of the terminal device 1A displays the initial screen G1 shown in FIG. 7 on the display unit 12 by executing the energy management program stored in the storage unit 13.
- buttons B1 to B5 respectively corresponding to “new file creation”, “file list”, “common rule”, “data”, and “setting” are displayed.
- the mouse cursor is moved over the buttons B1 to B5 (mouse over)
- explanations of functions corresponding to the buttons B1 to B5 during the mouse over are displayed in the blank B0 provided below the initial screen G1. .
- the button B1 is a button for starting a process for predicting the power consumption when the schedule information is changed.
- a file for storing simulation results can be named and saved and managed.
- the button B2 is a button for calling a saved file (a file storing simulation results). It is also possible to change the parameter (schedule information) based on the simulation result stored in the file and execute the simulation again.
- the button B3 is a button for creating / changing / deleting a common rule.
- the common rule is a rule used for evaluating whether or not the power consumption for each time division (unit time) is beneficial (that is, whether the use of the electric device is beneficial or wasteful).
- the button B3 is used to set to which measurement point the created common rule is applied.
- the button B4 is a button for selecting a process for taking in power consumption data collected by another system.
- the terminal devices 1A and 1B are connected to the central monitoring panel 2 via the communication network NT.
- the terminal devices 1A and 1B automatically collect power consumption data from the central monitoring panel 2 by the power consumption receiving means 101 and store the collected power consumption data in the database of the measured value storage means 102. .
- the button B5 is a button for selecting a process (setting process) for setting various information used in the energy management program.
- setting process for example, measurement point information corresponding to the input power consumption amount, parameters used in the simulation, and the like are set.
- initial settings there are five items: measurement point setting, creation of common rules, association of common rules and measurement points, parameter setting, and capture of energy data (power consumption measurement results).
- measurement point setting creation of common rules
- association of common rules and measurement points creation of common rules and measurement points
- parameter setting creation of common rules
- capture of energy data power consumption measurement results
- the name of the measurement point for example, 1F common section light
- the type of input data for example, PI / AI / setting / DI / DO, etc.
- the collection interval of power consumption for example, the operation / Settings are made for items such as a threshold value (a value corresponding to standby power when the weighing data is power consumption) provided for each weighing point in order to determine stoppage.
- the time zone is a time zone for monitoring whether or not power is wasted.
- the amount of power consumption in the time zone in which the time zone is set becomes an evaluation target in the evaluation unit 114.
- the power consumption in the time zone in which the time zone is not set is a determination target in the determination unit 103.
- Such a time zone setting corresponds to the input of schedule information.
- the time zone is defined by four elements: time zone name, day of the week (day of monitoring), time (time of monitoring), and judgment logic.
- the determination logic is logic for determining whether the use of an electric device is beneficial or useless (wasted). That is, the determination logic specifies an evaluation method in the evaluation unit 114.
- the calculation unit 14 causes the display unit 12 to display a screen (setting screen) G2 for setting common rules as shown in FIG.
- the window W1 is displayed on the upper center side of the setting screen G2.
- the window W1 displays a list of common rules created so far. In the example shown in FIG. 8, three time zones of early morning (weekdays), nighttime (weekdays), and lunch break are set in the common rule named “common section light”.
- buttons B6 to B10 corresponding to “rule details”, “rule addition”, “rule deletion”, “rule duplication”, and “rule association” are displayed.
- the button B8 is a button for deleting the common rule selected by the user using the input unit 11.
- the calculation unit 14 deletes the currently selected common rule.
- the button B9 is a button for duplicating the common rule selected by the user using the input unit 11.
- the calculation unit 14 duplicates the selected common rule.
- the button B7 is a button for newly creating a common rule.
- operation unit 14 causes display unit 12 to display a pop-up screen for inputting the name of a newly created common rule.
- a name can be input by the input unit 11.
- the completion operation is performed after the name is input, a new common rule is added to the window W1.
- the button B6 is a button for displaying details of the common rule.
- the calculation unit 14 causes the display unit 12 to display a screen (rule detail screen) G3 illustrated in FIG.
- the name of the set time zone is displayed on the upper center side of the rule details screen G3.
- the window W2 is displayed on the lower side of the rule details screen G3.
- a time zone in which the common rule is applied is displayed in a graph.
- the horizontal axis of this graph is time (00:00 to 24:00), and the vertical axis is the day of the week (Sunday to Saturday).
- three time zones of early morning (weekdays), nighttime (weekdays), and lunch break are set.
- the band-like portion hereinafter referred to as a cell
- a cell the band-like portion corresponding to the time zone registered as the time zone in the graph is hatched.
- buttons B11 to B14 corresponding to “Delete time zone”, “Add time zone”, “Details of time zone”, and “Modify time zone” are displayed on the right side of the rule details screen G3.
- the calculation unit 14 performs a process of deleting the selected time zone.
- the calculation unit 14 causes the display unit 12 to display a screen (pop-up screen) G4 illustrated in FIG. In the center of the pop-up screen G4, a block K1 is displayed for inputting time zone information (name, day of the week, time, determination logic).
- a button B15 corresponding to “add” is displayed below the pop-up screen G4.
- the calculation unit 14 performs a process of newly adding a time zone defined by the information input to the block K1.
- the calculation unit 14 causes the display unit 12 to display a screen (pop-up screen) G5 for confirming information (setting contents) of the selected time zone, as shown in FIG.
- the name is “early morning (weekdays)”
- the day of the week is “Monday to Friday”
- the time is “0:00 am to 6:00 am”
- the determination logic is “type” A ".
- the calculation unit 14 causes the display unit 12 to display a screen (not shown) for correcting the time zone.
- the pop-up screen G4 can be applied to the screen in this case.
- FIG. 27A shows a determination result when the determination logic A is applied
- FIG. 27B shows a determination result when the determination logic B is applied
- FIG. 27C shows a determination result when the determination logic C is applied.
- time zones from 0:00 to 7:00 and from 10:00 to 24:00 are set as time zones.
- the time segment filled in with a diagonal line rising to the right is a time segment evaluated that the power consumption in the electrical device is beneficial (use of the electrical device is beneficial).
- the time segment filled with the mesh line is a time segment evaluated that the power consumption in the electric device is wasted (use of the electric device is wasted).
- the evaluation unit 114 uses the power consumption amount (measured value stored in the measurement value storage unit 102) during the day and time of the time zone and a predetermined threshold (a value corresponding to the standby power amount of the branch circuit). ). When the power consumption exceeds the threshold, the evaluation unit 114 evaluates that power consumption is useless (see FIG. 27A). In the example shown in FIG. 27A, 0:00 to 2:00, 5:00 to 6:00, and 11:00 in the time zone of 0:00 to 7:00 and 10:00 to 24:00. It is determined that the use of electric equipment in unit time included in the four time zones of -14: 00 and 16:00 to 24:00 is useless. In this case, the evaluation unit 114 may determine that the use of the electric device is beneficial when the measured value does not exceed the threshold value four times or more continuously. In this way, it is possible to prevent erroneous determination due to a measurement error of power consumption.
- Judgment logic B is a logic for judging waste of power due to forgetting to turn off the device at night.
- the evaluation unit 114 compares the power consumption amount in the time zone set in the time zone with a predetermined threshold (standby power) for each unit time.
- the evaluation unit 114 determines that the unit time when the power consumption exceeds a predetermined threshold is the usage period. For example, in the example shown in FIG. 27B, among the time zones of 0:00 to 7:00, 10:00 to 24:00, 0:00 to 2:00, 5:00 to 6:00, 11 Unit times included in four time zones of 1:00 to 14:00 and 16:00 to 24:00 are determined to be usage periods.
- the evaluation unit 114 treats use periods that are continuous in time series as one unit.
- the evaluation means 114 is from 0:00 to 2:00, from 5:00 to 6:00, from 11:00 to 14:00, and from 16:00 to 24: Each of up to 00 is treated as one usage period. Then, the evaluation unit 114 determines that the usage period including the end of the time zone (24:00 in the example illustrated in FIG. 27B) is a period in which the use of the electric device is useless. In other words, the evaluation unit 114 determines that only the usage period (16:00 to 24:00 in the illustrated example) at the end of the time zone (for example, 24:00) is forgotten to be erased (see FIG. 27B). .
- the evaluation unit 114 determines that the usage period that does not include the end of the time zone is a portion where it is difficult to determine whether the use of the electrical equipment is beneficial or useless. According to the determination logic B described above, for example, after the lamp is turned off according to the schedule information, even when the employee operates the switch to turn on / off the lighting equipment a plurality of times, the lighting equipment is turned on last. It can be determined that it is wasteful by extracting only the power consumption.
- Judgment logic C is a logic for judging waste of power due to forgetting to turn off the device in the early morning.
- the criteria for determining whether the usage period is a useless period is different from the determination logic B.
- the evaluation unit 114 determines that the use period including the beginning of the time zone (0:00 in the example illustrated in FIG. 27B) is a period in which the use of the electric device is useless. In other words, the evaluation unit 114 determines that the use period (from 0:00 to 2:00 in the illustrated example) relating to the beginning of the time zone (for example, 0:00) is waste due to forgetting to turn off (see FIG. 27C). .
- the evaluation unit 114 determines that the usage period that does not include the end of the time zone is a portion where it is difficult to determine whether the use of the electrical equipment is beneficial or useless. According to the above-described determination logic C, for example, even if an employee who went to work early in the morning after turning off the light according to the schedule information turns on / off the lighting device several times by operating the switch, the lighting device is first turned on. Only power consumption before lighting can be extracted and determined as useless.
- the determination logics B and C evaluate whether the use of the electric device is beneficial or wasteful by comparing the change pattern of the power consumption of the electric device with a predetermined change pattern (change pattern based on the schedule information).
- the predetermined change pattern is, for example, a change pattern when the use of an electric device is beneficial (for example, a change pattern that does not start or end of the time zone), or a change pattern when the use of an electric device is useless (for example, a time pattern). Change pattern at the beginning and end of the zone).
- determination logics B and C can easily determine whether the use of the electric device is beneficial or not, depending on whether the change pattern of the power consumption of the electric device corresponds to a predetermined pattern.
- the determination logics B and C are useful or useless with high accuracy even though they do not require complicated settings as compared to the determination logic A that simply determines whether the power consumption exceeds a predetermined threshold. Can be determined.
- a determination logic for determination may be used.
- Judgment logic as described above can extract unintentional consumption due to forgetting to erase, although there are few items to set.
- the time zone may be a relatively determined time instead of a fixed time. For example, from 3 hours after sunset to 24:00 may be a time zone for monitoring forgetting to turn off at night, or from 0:00 to before sunrise may be a time zone for monitoring forgetting to turn off early in the morning. What is necessary is just to acquire the time of sunset or sunrise from an external server (not shown) etc. via the communication network NT.
- the last exit time may be acquired from an entrance / exit management device that manages entrance / exit to a predetermined area, and the time from the last exit time to 24:00 may be used as a time zone for monitoring forgetting to turn off at night.
- adding the presence / absence of the presence of the user (power user) to the determination condition is greatly useful for improving the determination accuracy of the consumed power amount counted as wasted.
- a similar effect can be expected by acquiring an output signal from the human sensor. If the building where the electrical equipment is installed is a store, the time from the store closing time to 24:00 may be used as a time zone for monitoring forgetting to turn off at night. A forgetting monitoring period can be set. Since such a setting can be determined in accordance with the season and store operation, the determination accuracy can be further improved.
- the calculation unit 14 causes the display unit 12 to display a pop-up screen G6 shown in FIG.
- the pop-up screen G6 displays a left column W3 that displays the name of the measurement point associated with the common rule (for example, 1F—shared-unit light) and a right column W4 that displays the measurement point that is a candidate for association. .
- the measurement point of the linking candidate is displayed hierarchically.
- the pop-up screen G6 displays a setting button B16, a cancel button B17, and an OK button B18.
- the calculation unit 14 moves one or more measurement points selected in the right column W4 to the left column W3 and associates them with the common rule. Thereafter, when the OK button B18 is selected, the calculation unit 14 performs processing for saving the content set using the setting button B16 and closing the pop-up screen G6. Therefore, in order to perform the association, after selecting one or more measurement points to be associated with the common rule from the right column W2, the setting button B16 is selected, and the OK button B18 is selected.
- the calculation unit 14 moves the measurement point selected in the left column W3 to the right column W4 and cancels the association with the common rule. Thereafter, when the OK button B18 is selected, the calculation unit 14 performs processing for saving the content released using the release button B17 and closing the pop-up screen G6. Therefore, in order to cancel the linking, a cancel button B17 is selected after selecting a desired measurement point from the measurement points displayed in the left column W3, and an OK button B18 is selected.
- the power consumption receiving unit 101 executes a process of taking in the data of the power consumption collected in another system (a system different from the energy management system). For example, it is assumed that a file indicating power consumption data collected by another system is stored in a storage medium (for example, a memory card) in the CSV format. In this case, the storage medium is inserted into the reading device of the terminal device 1A.
- the power consumption receiving unit 101 takes in the above file from the storage medium.
- FIG. 13 shows the contents of the above file.
- the file shown in FIG. 13 has a CSV file format and four data strings DAT1 to DAT4. In FIG. 13, the leftmost data string DAT1 is date data.
- the data string DAT2 is time data.
- the data string DAT3 is data obtained by measuring the power consumption amount on the north side of the common use section light 1F every hour.
- the data string DAT4 is data obtained by measuring the amount of power consumption on the south side of the shared section lamp 1F every hour.
- a character string and a unit indicating the contents of the data strings DAT1 to DAT4 are described in the head portion of the file.
- the calculation unit 14 causes the display unit 12 to display a parameter setting screen G7 as shown in FIG.
- the setting screen G7 is a screen for inputting, as a parameter, a coefficient (converted value) for converting the power consumption amount into a power charge or CO 2 emission amount.
- the unit of power consumption is not limited to kilowatt hours (kwh), but may be British heat (Btu) or megajoules (MJ). That is, the unit according to the actual situation of each country can be used for units such as the amount of power consumption and the electricity charge.
- the setting screen G7 has an input block K2 for inputting a conversion value for converting the power consumption into a power charge, and an input block for inputting a conversion value for converting the power consumption into a CO 2 emission amount.
- K3 is displayed.
- the calculation unit 14 causes the storage unit 13 to store the converted values input to the input blocks K2 and K3. Each converted value stored in the storage unit 13 is used in subsequent calculations. Each conversion value may be input by the user using the input unit 11.
- the calculating part 14 may access a predetermined
- the amount of power consumption is displayed. However, when the device to be managed is a toilet using water (see FIG.
- a stove using gas or a water heater, the amount of water used.
- the amount of gas used may be displayed.
- a coefficient for converting the amount of water used ([m 3 ]) into a water rate and a factor for converting the amount of gas used ([Nm 3 ]) into a gas rate are entered. You may be able to do it.
- step S10 a process for creating or selecting a file for storing the simulation result is performed.
- the calculation unit 14 causes the display unit 12 to display a simulation top screen G8 illustrated in FIG.
- the top screen G8 displays a calculator block K4 on the left side and a window W5 displaying a list of measurement points in the center.
- the top screen G8 displays date blocks K5 and K6 at the lower center of the screen.
- the top screen G8 displays the calendar area K7 on the lower right.
- the top screen G8 displays buttons B19 to B21 for selecting a simulation type on the left side.
- the calculator block K4 is used for displaying simulation results.
- the calculator block K4 uses, for example, the power consumption estimated to be useless when the common rule selected in the simulation is applied to the stored power consumption data (measured values stored in the measured value storage unit 102). Is displayed numerically.
- Window W5 displays a list of weighing points.
- the window W5 displays the registered measurement points in a list format.
- the measurement points are hierarchically displayed for each group.
- the date block K5 displays the start date of the simulation.
- the date block K6 displays the end date of the simulation.
- the calendar area K7 displays a calendar.
- a day with power consumption data and a day without power consumption data are displayed separately.
- the calendar area K7 is underlined on days when there is no power consumption data and is displayed without being underlined on days with power consumption data. In this way, it is possible to prevent a day without power consumption data from being selected during the simulation period.
- buttons B19 to B21 correspond to “point-by-point simulation”, “date-by-date simulation”, and “state comparison”, respectively.
- the point-by-point simulation is a simulation for paying attention to one measurement point and determining whether or not there is a time segment that is determined not to be useful due to forgetting to erase.
- a measurement point for simulation is selected from the measurement points displayed in the window W5 (step S11).
- a simulation period is input (step S12).
- the calculation unit 14 causes the display unit 12 to display a pop-up screen G9 shown in FIG.
- a pop-up screen G9 an operation for selecting a start date and an end date of the simulation period can be performed.
- the start date selected in the pop-up screen G9 is displayed in the date block K5
- the end date selected in the pop-up screen G9 is displayed in the date block K6.
- the calculation unit 14 causes the display unit 12 to display a point-by-point simulation screen G10 illustrated in FIG. (Step S13).
- the simulation screen G10 displays a time zone with rectangular cells arranged in a matrix of 7 ⁇ 24.
- the vertical direction is the date and time (day of the week), and the horizontal direction is the time (0:00 to 24:00).
- the simulation screen G10 displays the time zone (cell) in which the common rule is set, surrounded by thick line frames FL1 and FL2.
- FIG. 17 there are a unit time (time division) in which it is determined that the use of the electric device is beneficial, a unit time in which the use of the electric device is determined to be useless, and a unit time in which the electric device is not used. , Are displayed in different colors. Since FIG. 17 is a black-and-white diagram, for convenience, the unit time determined to be useful for using the electric device and the unit time determined to be useless are displayed with different cell fill patterns. The unit time for which it is determined that the use of the electric device is useful is displayed with a diagonal line rising to the right, and the unit time for which the use of the electric device is determined to be useless is displayed with a mesh line.
- the simulation screen G10 displays the display blocks K8 and K9 on the upper side of the screen.
- the display block K8 displays a simulation period.
- the display block K9 displays the name of the weighing point.
- the simulation screen G10 displays a red icon I1, a yellow-green icon I2, and a yellow icon I3 below the display blocks K8 and K9.
- Icons I1 to I3 are arranged in the order of icons I1, I2, and I3 from left to right. Since FIG. 17 is a black and white figure, the difference in the colors of the icons I1 to I3 is indicated by the difference in the shaded pattern. That is, the red icon I1 is indicated by a mesh line, the yellow-green icon I2 is indicated by a right-down diagonal line, and the yellow icon I3 is indicated by a right-up diagonal line.
- the icon I1 indicates the display color (display pattern) of the time segment in which it is determined that the use of the electric device is useless.
- the simulation screen G10 displays the total power consumption (1 kWh in the illustrated example) corresponding to the icon I1 on the right side of the icon I1.
- the icon I2 indicates a display color (display pattern) of a time segment that is determined to be useless according to the common rule but is reevaluated as not useless according to the exception rule.
- the simulation screen G10 displays the total power consumption (0 kWh in the illustrated example) corresponding to the icon I2 on the right side of the icon I2.
- the icon I3 indicates a display color (display pattern) of a time section in which the electric device is used in a time zone in which no common rule (time zone) is set.
- the simulation screen G10 displays the total power consumption amount (126 kWh in the illustrated example) corresponding to the icon I3 on the right side of the icon I3.
- the unit of power consumption is not limited to kilowatt hours (kwh), but may be British heat (Btu) or megajoules (MJ). Further, the CO 2 emission amount may be displayed instead of the power consumption amount.
- the simulation screen G10 displays three selection buttons B22 to B24 on the upper right.
- the three selection buttons B22 to B24 are arranged in the order of selection buttons B22, B23, and B24 from left to right.
- the selection button B22 displays the current schedule information of the control devices 5A and 5B on the simulation screen G10, and stores the contents of the schedule information input to the terminal device 10A in the setting storage means 51A and 51B of the corresponding control devices 5A and 5B. This is a schedule reflection button for reflecting the contents of the stored schedule information.
- the selection button B23 is a simulation execution button. When the selection button B23 is selected, the calculation unit 14 calculates how much amount is obtained when the simulation result is applied not only to the simulated measurement point but also to all the registered measurement points.
- the calculation unit 14 displays the recalculated result in the entire field of the simulation screen G10 that is the previous screen.
- the selection button B24 is a rule saving button for saving the simulation result. When the selection button B24 is selected, the calculation unit 14 saves the rules used for the simulation in a file, a database, or the like.
- the simulation screen G10 shown in FIG. 17 is based on the power consumption measured at the measurement point of the 6th-floor air-conditioning power amount during a week from March 1 (Saturday) to March 7 (Friday). It is the screen which performed the simulation.
- the determination means 103 compares the amount of power consumption for each hour taken from the measurement point with a predetermined threshold (corresponding to the standby power amount).
- the usage information display unit 105 colors and displays on the simulation screen G10 only the cells corresponding to the period in which the power consumption exceeds a predetermined threshold (that is, the period in which the electrical equipment connected to the branch circuit is operating). Note that the usage information display unit 105 displays a cell corresponding to a period in which the power consumption is less than a predetermined threshold (that is, a period in which the electrical equipment is stopped) by non-display (for example, background color or white), thereby It is displayed separately from the cell corresponding to the period when the electric energy exceeds a predetermined threshold.
- a predetermined threshold that is, the period in which the electrical equipment is stopped
- the time zone surrounded by the frames FL1 and FL2 indicates the time zones TZ1 and TZ2 of the common rule applied to the measurement points.
- the day of the time zone TZ1 is from Monday to Friday, and the time is from midnight to 6:00 am.
- the day of the time zone TZ2 is from Monday to Friday, and the time is from 10 pm to 12 pm (midnight).
- the display color pattern of the cell is varied depending on whether or not a common rule is set for the cell. That is, the use state display unit 105 displays cells for which no common rule is set. As a result, the cells for which the common rule is not set and it is determined that the electric device is used are displayed in the same color (shaded pattern) as the icon I3.
- the evaluation display means 116 displays cells for which common rules are set. As a result, the cells in which the common rule is set and the use of the electric device is determined to be useless are displayed in the same color (shaded pattern) as the icon I1. On the other hand, a cell for which a common rule is set and which is determined to be beneficial to use an electric device is displayed in the same color (shaded pattern) as the icon I2.
- time zone TZ2 can be changed, for example, by dragging the left side of the frame FL indicating the start time of the time zone TZ2 with the mouse.
- the evaluation unit 114 evaluates whether or not the use of the electric device is beneficial for the changed time zone TZ2 by using the above-described determination logic A (step S15). Thereafter, the evaluation display means 116 displays the evaluation result of the evaluation means 114 (step S16).
- the simulation screen G11 shown in FIG. 18 shows the result of evaluating whether or not the use of the electrical equipment is useless for the changed time zone TZ2.
- the evaluation unit 114 determines whether or not to evaluate whether or not the use of the electric device is useless based on the operation input from the input unit 11 (step S17). For example, when the measurement point is changed, the process returns to step S11, and when the time zone is changed, the process returns to step S13. Thereby, it is evaluated whether or not the use of the electric device is useless at the changed measurement point or time zone.
- the calculation unit 14 displays a screen (not shown) showing an operation menu. ) Is displayed in a pop-up on the display unit 12.
- the screen showing the operation menu displays operation buttons for changing the time zone.
- the calculation unit 14 causes the display unit 12 to display a time zone change screen G12 as shown in FIG.
- the time zone change screen G12 is a screen for changing the time zone name, day of the week, time, and judgment logic.
- the time zone change screen G12 accepts changes in the time zone name, day of the week, time, and determination logic.
- the input of the name, day of the week, time, and determination logic of the time zone to be changed is performed by the input unit 11.
- the time zone change screen G12 displays a change button B25.
- the calculation unit 14 changes the time zone based on the name, day of the week, time, and determination logic input on the time zone change screen G12 and stores the change in the storage unit 13.
- the evaluation unit 114 evaluates whether or not the use of the electric device is useless with the contents of the changed time zone.
- the simulation screen G10 it is preferable to change the colors of the frames FL1 and FL2 in accordance with the type of determination logic (determination logics A to C). In this way, it can be seen at a glance which judgment logic is applied to the time zone, and setting errors can be prevented and operability can be improved.
- the line types solid line, dotted line, broken line, etc.
- line widths of the frames FL1 and FL2 may be changed according to the type of determination logic.
- the simulation screen G10 shown in FIG. 17 shows the result of using the determination logic A in both of the two time zones TZ1 and TZ2.
- the determination logic B is used instead of the determination logic A in the time zone TZ2.
- the determination logic B it is determined whether the power consumption in the unit time at the end (last) of the time zone exceeds a predetermined threshold value.
- the evaluation unit 114 searches for a unit time (excess portion) where the power consumption exceeds the predetermined threshold from the end of the time zone to the beginning. I will do it.
- the evaluation unit 114 determines that the use of the electric device is useless in that time period, with the consecutive excess portions as one group.
- the excess part before that unit time cannot be determined whether the use of electrical equipment is beneficial or useless (Displayed in green).
- all the excess portions of the time zone cannot be judged whether the use of electrical equipment is beneficial or not (for example, (Displayed in green).
- the evaluation unit 114 determines that the usage period at the end of the time zone is a period in which the use of the electric device is useless, and determines whether the use period of the other use period is useless. It is determined that the period cannot be determined. Therefore, if the decision logic B is adopted, the cells (Friday 22:00 to 23:00) displayed in the same color as the icon I1 in the simulation screen G13 shown in FIG. It is displayed in a color (for example, green) indicating a portion that cannot be determined. Such determination logic B is preferably applied to a case where 24 o'clock in the night is included in the time zone to be applied.
- the determination logic C is used instead of the determination logic A in the time zone TZ1.
- the determination logic C determines that the usage period at the beginning of the time zone is a period in which the use of the electric device is useless, and the other use periods are periods in which it is not possible to determine whether the use of the electric device is useless. Is determined.
- the determination logic C is preferably applied to an early morning time zone including 0:00.
- the early morning time zone TZ1 and the night time zone TZ2 are divided at 24:00 (0 o'clock). That is, the time zone is set based on 24 o'clock (0 o'clock). However, the time zone may be set based on the opening time, closing time, sunrise, sunset time, and the like. In this case, it is preferable to link with other systems, or to automatically acquire times such as sunrise and sunset. In this way, even if the time zone reference changes, it is not necessary to reset the time zone of the time zone each time, which increases convenience.
- the calculation unit 14 displays a time zone addition screen as illustrated in FIG. G14 is displayed on the display unit 12.
- the time zone addition screen G14 is a screen for adding a time zone.
- the time zone addition screen G14 receives input of the name, day of the week, time, and determination logic of the time zone to be added.
- the input unit 11 inputs the name, day of the week, time, and determination logic of the time zone to be added.
- the time zone addition screen G14 displays an addition button B26. When the add button B26 is selected, the calculation unit 14 creates a new time zone based on the name, day of the week, time, and determination logic input on the time zone addition screen G14, and stores the new time zone in the storage unit 13.
- the user when adding a time zone during the weekday lunch break, the user operates the input unit 11 to display the time zone addition screen G14.
- the input unit 11 is operated, for example, the name of the time zone to be added is “weekday lunch break”, the day of the week is “Monday to Friday”, and the time is “12:00 to 12:30”.
- the determination logic is input as “determination logic A”, and finally the add button B26 is selected.
- the schedule input means 106 sets a new time zone TZ3 based on the conditions input on the time zone addition screen G14. Information about the time zone TZ3 is stored in the schedule storage means 107. Then, the simulation means 108 recalculates the numerical value to be displayed on the right side of each icon I1 to I3 according to the time zone TZ3.
- the evaluation unit 114 evaluates whether the use of the device is beneficial or wasteful for the newly added time zone TZ3. In this case, the power consumption amount exceeds a predetermined threshold in the time period from 12:00 to 12:30 from Monday to Friday. Therefore, the evaluation unit 114 determines that the use of the device in the time period from 12:00 to 12:30 from Monday to Friday is useless. As a result, as shown in FIG. 22, the evaluation display unit 116 displays the frame FL3 indicating the newly added time zone TZ3 on the simulation screen G15, and displays the cell corresponding to the frame FL3 in red.
- the user can determine the optimal schedule information by changing or adding the time zone and executing the simulation.
- the time zone of the time zone TZ1 is changed from Monday to Friday from 0:00 to 7:30, and the time zone of the time zone TZ2 is changed from Monday to Friday from 19:00 to 24:00. It has changed.
- the arithmetic unit 14 causes the schedule information (setting storage of the control devices 5A and 5B) taken in from the control devices 5A and 5B, as shown in FIG.
- the schedule information stored in the section is displayed on the display section 12.
- a time zone in which the device operates is indicated by a frame FL4.
- the schedule information before the change specifies that the operation of the device is started at 7:30 and the operation of the device is stopped at 19:00.
- the schedule reflection button B22 When the schedule reflection button B22 is selected in the state in which the schedule information of the current control devices 5A and 5B is displayed in this way (that is, the simulation screen G17 shown in FIG. 24), the calculation unit 14 is as shown in FIG. Further, the schedule information stored in the schedule storage means 107 is displayed on the display unit 12.
- the time zone in which the device operates is indicated by frames FL5 and FL6.
- the newly input schedule information starts the operation of the device at 7:30, stops the operation of the device at 12:00, starts the operation of the device at 12:30, and starts the operation of the device at 19:00. Specify to stop.
- the schedule transmission means 121 Referring to the confirmation result stored in the confirmation storage unit 120, only the changed schedule information is transmitted to the control devices 5A and 5B.
- the terminal device 1A transmits the newly created schedule information from the communication unit 15 to the control devices 5A and 5B.
- the control devices 5A and 5B update the contents of the schedule information stored in the setting storage units 51A and 51B to the contents of the received schedule information (step S18).
- the calculation unit 14 saves the simulation result (rule, etc.) in a file, database, or the like (step S19).
- the presence / absence of power consumption during a predetermined period is displayed for each unit time on the display unit 12 of the terminal device 1A.
- the user can input device schedule information while viewing the usage state of the device.
- the simulating unit 108 uses the power consumption when the device is operated with the input schedule information based on the power consumption received by the power consumption receiving unit 101 (that is, the amount of power actually consumed by the device). Predict. Therefore, it is easy to understand the effect of power saving by changing the schedule information, and it is possible to easily create practical schedule information that can be expected to have more energy saving effect according to the usage form of the device.
- the energy management system of this embodiment determines whether the use of a device is beneficial or wasteful for each unit time based on the power consumption of the device and schedule information, and displays the determined result. Therefore, it can be easily understood whether the use of the device is beneficial or wasteful, and the schedule information can be appropriately changed. In addition, the schedule information can be easily reflected in the control devices 5A and 5B.
- the determination unit 103 determines whether or not the device has been used. However, you may make it acquire the historical information which shows the operation period of an apparatus from control apparatus 5A, 5B. In this case, the operation / stop of each device can be determined using the history information from the control devices 5A and 5B. Therefore, it can be determined whether or not the use of each device is beneficial.
- the energy management program is installed in the terminal devices 1A and 1B, and the terminal devices 1A and 1B include at least the power consumption receiving unit 101, the measured value storage unit 102, the determination unit 103, and the determination storage.
- Means 104, usage information display means 105, schedule input means 106, schedule storage means 107, simulation means 108, predicted value storage means 109, and predicted value display means 110 are caused to function.
- Such an energy management program may be installed in the monitoring device 2.
- the energy management system of the present embodiment may be configured to manage the power consumption of the monitored device in a building such as a supermarket, a business office, or a house.
- the device to be monitored may be an electrical device other than a lighting fixture or an air conditioner (for example, a personal computer, a printer, a copy machine, an air cleaner, a ventilation fan).
- the above-described energy management system employs electricity as an energy resource used in the device, and manages the amount of electricity (power consumption) used in the device.
- the device to be monitored may be a device that uses fluid energy resources such as water and gas.
- FIG. 28 shows a schematic diagram in which a part of a modification of the energy management system of the present embodiment is omitted.
- the building B shown in FIG. 28 has zones Z5 to Z7 corresponding to toilets on the first floor and zone Z8 corresponding to toilets on the second floor.
- a plurality of flush toilets T1 to T4 using water are installed in each of the zones Z5 to Z8 .
- human sensors R5 to R8 for detecting a person in each of the zones Z5 to Z8 are installed in each of the zones Z5 to Z8.
- a main pipe 70 and four branch pipes 71 to 74 branched from the main pipe 70 are installed. These pipes 70 to 74 are water pipes. Each of the branch pipes 71 to 74 is used for supplying water to each of the toilets T1 to T4. Each branch pipe 71 to 74 is provided with measuring points P11 to P14 for measuring the flow rate.
- toilets T1 to T4 are illustrated as devices. However, the device may be a water heater or a faucet other than the toilet bowl. Furthermore, the device may be a stop cock that can be remotely controlled. In this case, useless water can be prevented when the faucet is forgotten to be tightened or when the faucet is loosely tightened.
- the energy management system shown in FIG. 28 includes a measuring device 3A and a control device 5C in addition to the terminal devices 1A and 1B and the monitoring device 2 described above.
- the measuring device 3A is a flow rate monitoring device that monitors the amount of water used in the toilet bowls T1 to T4 and outputs it to the monitoring device 2 and the terminal device 1A.
- the measuring device 3A includes flow meters 31A to 34A installed in the building B and a collecting device 35A. Each of the flow meters 31A to 34A is connected to the collecting device 35A via the signal line LN5. Each of the flow meters 31A to 34A measures the flow rate at the corresponding measurement point P11 to P14 every predetermined measurement cycle.
- Each flow meter 31A to 34A functions as a measurement value acquisition means for acquiring a measurement value indicating a value obtained by measuring the amount of water used in the device during a predetermined period.
- the flow rates in the branch pipes 71 to 74 are the total values of the flow rates used in the plurality of toilets T1 to T4 belonging to the zones Z5 to Z8.
- Each flow meter 31A to 34A stores the acquired measurement value in a built-in memory (not shown).
- Each of the flow meters 31A to 34A is configured to output the measurement value stored in the built-in memory to the collection device 35A every time a predetermined transmission cycle elapses.
- the collecting device 35A receives the measurement values output from the flow meters 31A to 34A.
- the collecting device 35A functions as a first storage unit that stores the measurement values received from the flow meters 31A to 34A in association with the measured date and time.
- the collection device 35A is connected to the monitoring device 2 via the communication network NT.
- the collecting device 35A transmits the measurement values in the branch pipes 71 to 74 to the monitoring device 2 in response to a request from the monitoring device 2 (for example, when the monitoring data request signal is received from the monitoring device 2). Configured.
- the control device 5C is a toilet control device that controls the operation of the toilets T1 to T4.
- the control device 5C sends and receives transmission signals to / from desired toilets T1 to T4 or human sensors R5 to R8 by sending transmission signals including address information to the transmission line LN4. Since such a control device 5C has the same configuration as the control device 5A, a detailed description thereof will be omitted.
- storage part 13 of terminal device 1A, 1B shown in FIG. 28 is equipped with the program for performing the management of water usage, the simulation of the usage of water, and the evaluation whether use of an apparatus is beneficial. Is done.
- the terminal devices 1A and 1B execute this program, a function for managing the amount of water used, a function for simulating the amount of water used, and a function for evaluating whether the use of the device is beneficial are realized.
- the energy management system according to the present invention only needs to be configured to manage the amount of energy resources used in the equipment, and the energy resources are not limited to electricity, but water or gas. Can be adopted. That is, the energy management system according to the present invention may be configured to manage water usage and gas usage in addition to power consumption. In addition, the energy management system according to the present invention only needs to be configured to manage the usage amount of at least one energy resource (for example, electric power, water, gas).
- at least one energy resource for example, electric power, water, gas.
- the control devices 5A to 5C store device schedule information.
- the schedule information may be included in the device. That is, each device may be configured to store schedule information and operate according to the stored schedule information.
- the terminal device 1A has been changed for a device that needs to change the schedule information according to the change contents of the schedule information input using the schedule input unit 106. You may comprise so that schedule information may be set. That is, the terminal device 1A may be used as a device setting unit for setting schedule information for each device remotely.
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (11)
- 機器を管理するエネルギーマネジメントシステムであって、
所定期間中に上記機器で使用されたエネルギー資源の量を計測した値を示す計測値を取得する取得手段と、
上記取得手段が取得した上記計測値を記憶する計測値記憶手段と、
上記計測値記憶手段に記憶された上記計測値に基づいて上記機器が使用されたかどうかを単位時間毎に判定する判定手段と、
上記判定手段が判定した結果を示す判定結果を記憶する判定記憶手段と、
上記判定記憶手段に記憶された上記判定結果に基づいて上記機器が使用されたどうかを上記単位時間毎に表示する使用情報表示手段と、
上記所定期間中の上記機器の動作を上記単位時間毎に定義するスケジュール情報の入力を受け付けるスケジュール入力手段と、
上記スケジュール入力手段を用いて入力された上記スケジュール情報を記憶するスケジュール記憶手段と、
上記スケジュール記憶手段に記憶された上記スケジュール情報にしたがって上記機器が動作した場合に上記機器で使用されるエネルギー資源の量を示す予測値を上記計測値記憶手段に記憶された上記計測値に基づいて算出するシミュレート手段と、
上記シミュレート手段で算出された上記予測値を記憶する予測値記憶手段と、
上記予測値記憶手段に記憶された上記予測値を表示する予測情報表示手段とを備えることを特徴とするエネルギーマネジメントシステム。 - 上記計測値記憶手段に記憶された計測値と上記スケジュール記憶手段に記憶された上記スケジュール情報とに基づいて上記機器の使用が有益か無駄かを上記単位時間毎に評価する評価手段と、
上記評価手段が評価した結果を示す評価結果を記憶する評価記憶手段と、
上記評価記憶手段に記憶された上記評価結果に基づいて上記機器の使用が有益か無駄かを上記単位時間毎に表示する評価表示手段とを備えることを特徴とする請求項1記載のエネルギーマネジメントシステム。 - 上記評価手段は、上記計測値記憶手段に記憶された上記計測値の時間変化が所定の条件を満たしていれば、上記機器の使用が無駄であると評価するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。
- 上記所定の条件は、上記計測値が所定の閾値を越える期間が所定の時間継続されたことであることを特徴とする請求項3記載のエネルギーマネジメントシステム。
- 上記機器の種類と上記機器が設置されている場所を示す設置エリアとを上記機器毎に記憶する機器情報記憶手段を備え、
上記評価手段は、上記機器情報記憶手段に記憶された上記機器毎の上記種類と上記設置エリアに基づいて同じ上記設置エリアに上記種類が異なる複数の上記機器があるかどうかを確認し、同じ上記設置エリアに上記種類が異なる複数の上記機器がある場合、上記各機器の上記種類と上記判定結果との組み合わせに基づいて上記機器の使用が有益か無駄かを評価するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。 - 上記評価手段は、上記機器の使用が無駄と判断された時間が所定の例外条件を満たす場合、当該時間での上記機器の使用を有益と評価するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。
- 上記各機器が設置されている場所を示す設置エリアを上記機器毎に記憶する情報記憶手段と、
上記設置エリア内の人の存否を検出する人検出手段とを備え、
上記例外条件は、上記機器の上記設置エリアで上記人検出手段が人を検出したことであることを特徴とする請求項6記載のエネルギーマネジメントシステム。 - 上記使用情報表示手段は、上記機器で使用されたエネルギー資源の量を数値で表示するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。
- 上記機器を制御する制御装置と、上記制御装置と通信する設定装置とを備え、
上記制御装置は、上記スケジュール情報を記憶する設定記憶手段と、上記設定記憶手段に記憶された上記スケジュール情報にしたがって上記機器を制御する機器制御手段と、上記設定装置から上記スケジュール情報を受信するスケジュール受信手段と、上記設定記憶手段に記憶された上記スケジュール情報の内容を上記スケジュール受信手段で受信された上記スケジュール情報の内容に変更するスケジュール変更手段とを備え、
上記設定装置は、上記制御装置の上記設定記憶手段に記憶された上記スケジュール情報の変更の決定を受け付ける決定手段と、上記設定記憶手段に記憶された上記スケジュール情報を記憶する現スケジュール記憶手段と、上記スケジュール記憶手段に記憶された上記スケジュール情報と上記現スケジュール記憶手段に記憶された上記スケジュール情報とに基づいて上記スケジュール情報が変更されたかどうかを確認する確認手段と、上記確認手段が確認した結果を示す確認結果を記憶する確認記憶手段と、上記決定手段を用いて上記設定記憶手段に記憶された上記スケジュール情報の変更が決定されると上記確認記憶手段に記憶された確認結果を参照して変更された上記スケジュール情報だけを上記制御装置に送信するスケジュール送信手段とを備えることを特徴とする請求項1記載のエネルギーマネジメントシステム。 - 複数の計測装置と、上記各計測装置と通信する監視装置と、上記監視装置と通信する端末装置とを備え、
上記端末装置は、上記取得手段と、上記計測値記憶手段と、上記判定手段と、上記判定記憶手段と、上記使用情報表示手段と、上記スケジュール入力手段と、上記スケジュール記憶手段と、上記シミュレート手段と、上記予測値記憶手段と、上記予測情報表示手段とを備え、
上記各計測装置は、上記所定期間中に上記機器で使用されたエネルギー資源の量を計測して上記計測値を得る計測手段と、上記計測手段で得た上記計測値を記憶する上記第1記憶手段とを備え、
上記監視装置は、上記各計測装置の上記第1記憶手段から上記計測値を取得する計測値取得手段と、上記計測値取得手段が取得した上記計測値を記憶する第2記憶手段とを備え、
上記取得手段は、上記監視装置の上記第2記憶手段から上記計測値を取得するように構成されることを特徴とする請求項1記載のエネルギーマネジメントシステム。 - 機器を管理するエネルギーマネジメントシステムに用いられるプログラムであって、
所定期間中に上記機器で使用されたエネルギー資源の量を計測した値を示す計測値を取得する取得手段と、
上記取得手段が取得した上記計測値を記憶する計測値記憶手段と、
上記計測値記憶手段に記憶された上記計測値に基づいて上記機器が使用されたかどうかを単位時間毎に判定する判定手段と、
上記判定手段が判定した結果を示す判定結果を記憶する判定記憶手段と、
上記判定記憶手段に記憶された上記判定結果に基づいて上記機器が使用されたどうかを上記単位時間毎に表示する使用情報表示手段と、
上記所定期間中の上記機器の動作を上記単位時間毎に定義するスケジュール情報の入力に用いられるスケジュール入力手段と、
上記スケジュール入力手段を用いて入力された上記スケジュール情報を記憶するスケジュール記憶手段と、
上記スケジュール記憶手段に記憶された上記スケジュール情報どおりに上記機器が動作した場合に上記機器で使用されるエネルギー資源の量を示す予測値を上記計測値記憶手段に記憶された上記計測値に基づいて算出するシミュレート手段と、
上記シミュレート手段で算出された上記予測値を記憶する予測値記憶手段と、
上記予測値記憶手段に記憶された上記予測値を表示する予測情報表示手段としてコンピュータを機能させるためのプログラム。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2729846A CA2729846A1 (en) | 2008-06-10 | 2009-06-10 | Energy management system and computer program product |
US12/997,085 US20110172792A1 (en) | 2008-06-10 | 2009-06-10 | Energy management system and computer program product |
CN2009801218326A CN102057395A (zh) | 2008-06-10 | 2009-06-10 | 能量管理系统以及计算机程序 |
JP2010516869A JP5102875B2 (ja) | 2008-06-10 | 2009-06-10 | エネルギーマネジメントシステム及びコンピュータプログラム |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008152092 | 2008-06-10 | ||
JP2008-152092 | 2008-06-10 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2009151078A1 true WO2009151078A1 (ja) | 2009-12-17 |
Family
ID=41416784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2009/060621 WO2009151078A1 (ja) | 2008-06-10 | 2009-06-10 | エネルギーマネジメントシステム及びコンピュータプログラム |
Country Status (5)
Country | Link |
---|---|
US (1) | US20110172792A1 (ja) |
JP (1) | JP5102875B2 (ja) |
CN (1) | CN102057395A (ja) |
CA (1) | CA2729846A1 (ja) |
WO (1) | WO2009151078A1 (ja) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011078155A1 (ja) * | 2009-12-21 | 2011-06-30 | パナソニック電工株式会社 | 省エネルギー診断システム |
WO2011078075A1 (ja) * | 2009-12-21 | 2011-06-30 | パナソニック電工株式会社 | 省エネルギー診断システム |
JP2011204201A (ja) * | 2010-03-26 | 2011-10-13 | Panasonic Electric Works Co Ltd | 省エネルギー診断システム |
WO2011148974A1 (ja) * | 2010-05-25 | 2011-12-01 | パナソニック電工株式会社 | 省エネ診断システム |
JP2012027597A (ja) * | 2010-07-21 | 2012-02-09 | Fuji Electric Co Ltd | エネルギー監視システム |
JP2012094077A (ja) * | 2010-10-28 | 2012-05-17 | Toshiba Corp | 家庭用エネルギー管理システム |
JP2012093848A (ja) * | 2010-10-25 | 2012-05-17 | Hitachi Building Systems Co Ltd | エネルギー管理システム |
JP2012160028A (ja) * | 2011-02-01 | 2012-08-23 | Nippon Telegr & Teleph Corp <Ntt> | 省エネルギーアドバイス提供システム、省エネルギーアドバイス提供方法およびそのプログラム |
JP2012164233A (ja) * | 2011-02-08 | 2012-08-30 | Fujitsu Ltd | 浪費度算出装置、浪費度算出プログラム及び浪費度算出方法、並びにエネルギ管理システム |
JP2014089766A (ja) * | 2014-02-03 | 2014-05-15 | Panasonic Corp | 省エネ診断装置およびそれを用いた省エネ診断システム |
JP2014132822A (ja) * | 2010-12-06 | 2014-07-17 | Japan Techno Co.Ltd | デマンドカレンダー、デマンドカレンダー作成装置、デマンドカレンダー作成方法 |
JP5605865B2 (ja) * | 2010-11-29 | 2014-10-15 | Necソリューションイノベータ株式会社 | 電力管理システム、電力管理装置、電力管理方法、及びプログラム |
JP2015092368A (ja) * | 2014-12-10 | 2015-05-14 | パナソニックIpマネジメント株式会社 | 省エネルギ診断システム、サーバ |
JP2015163017A (ja) * | 2014-02-28 | 2015-09-07 | 株式会社東光高岳 | 運用パターン表示装置 |
JP2015218971A (ja) * | 2014-05-19 | 2015-12-07 | 三菱電機株式会社 | 空気清浄換気装置 |
JP2017076350A (ja) * | 2015-10-16 | 2017-04-20 | 富士通株式会社 | 情報変換方法、情報処理装置、及び情報変換プログラム |
EP2442421A3 (en) * | 2010-10-12 | 2017-09-27 | Samsung Electronics Co., Ltd. | Power management system and method for controlling the same |
JP2018049567A (ja) * | 2016-09-23 | 2018-03-29 | 株式会社日立ハイテクノロジーズ | サーバ、制御システム、制御方法、及び、制御プログラム |
JP2020190876A (ja) * | 2019-05-21 | 2020-11-26 | 三菱電機ビルテクノサービス株式会社 | 消費電力予測装置 |
JP2022134672A (ja) * | 2021-03-03 | 2022-09-15 | 横河電機株式会社 | 判定装置、判定方法、および、判定プログラム |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2488936A1 (fr) * | 2009-10-13 | 2012-08-22 | France Telecom | Gestion du stockage de données dans un espace de stockage distribué |
US8799850B2 (en) * | 2009-10-29 | 2014-08-05 | Synopsys, Inc. | Simulation-based design state snapshotting in electronic design automation |
TWM380086U (en) * | 2009-10-30 | 2010-05-11 | Bin Terng Entpr Co Ltd | Electric-powered curtain capable of preventing power interruption |
KR101662705B1 (ko) * | 2010-12-22 | 2016-10-05 | 한국전자통신연구원 | 그린 홈 전력 관리 시스템에서 소비 전력량 데이터 관리 및 검증 장치 및 그 방법 |
KR20120080406A (ko) * | 2011-01-07 | 2012-07-17 | 한국전자통신연구원 | 빌딩 운영 방안 도출 장치 및 방법 |
JP4775516B1 (ja) | 2011-03-14 | 2011-09-21 | オムロン株式会社 | 制御装置、制御方法、プログラム、記録媒体 |
US20130073232A1 (en) * | 2011-09-15 | 2013-03-21 | Electronic Systems Protection, Inc. | Source Power Anomaly and Load Power Consumption Monitoring and Analysis |
US9577473B2 (en) | 2011-09-15 | 2017-02-21 | Electronic Systems Protection, Inc. | Power-centric system management |
JP5899770B2 (ja) * | 2011-10-03 | 2016-04-06 | 富士ゼロックス株式会社 | エネルギー使用量管理装置及びプログラム |
JP5887549B2 (ja) * | 2011-11-07 | 2016-03-16 | パナソニックIpマネジメント株式会社 | エネルギー管理装置、エネルギー管理方法、プログラム |
JP6019566B2 (ja) * | 2011-11-17 | 2016-11-02 | ソニー株式会社 | 電力管理装置および電力管理方法 |
JP5888019B2 (ja) * | 2011-12-12 | 2016-03-16 | オムロン株式会社 | 制御装置、制御方法、プログラムおよび記録媒体 |
AU2013210745A1 (en) * | 2012-01-20 | 2014-08-21 | Neurio Technology Inc. | System and method of compiling and organizing power consumption data and converting such data into one or more user actionable formats |
US9014868B2 (en) * | 2012-03-29 | 2015-04-21 | International Business Machines Corporation | Power factor |
JP6136045B2 (ja) * | 2012-07-05 | 2017-05-31 | パナソニックIpマネジメント株式会社 | 機器制御装置、機器制御システム、プログラム |
JP5650874B1 (ja) * | 2014-02-27 | 2015-01-07 | パナソニック インテレクチュアル プロパティ コーポレーション オブアメリカPanasonic Intellectual Property Corporation of America | 制御方法、情報提供方法、及びプログラム |
SG11201500568TA (en) * | 2014-02-27 | 2015-09-29 | Panasonic Ip Corp America | Method for controlling information device, method for providing information, and program |
JP6404650B2 (ja) * | 2014-09-11 | 2018-10-10 | 株式会社東芝 | 機器運転設定値決定装置、機器運転設定値決定方法、及び、機器運転設定値決定プログラム |
CN106524429B (zh) * | 2014-09-30 | 2019-04-30 | 广东美的制冷设备有限公司 | 空调器运行参数分析方法、分享方法和空调系统及客户端 |
JP6541919B1 (ja) * | 2018-09-13 | 2019-07-10 | 三菱電機株式会社 | 設定支援装置、設定支援方法及びプログラム |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002209335A (ja) * | 2001-01-12 | 2002-07-26 | Nippon Telegraph & Telephone East Corp | 需要家消費電力制御管理システム |
JP2004116947A (ja) * | 2002-09-27 | 2004-04-15 | Osaka Gas Co Ltd | 空調運転管理システム |
JP2006079363A (ja) * | 2004-09-09 | 2006-03-23 | Tempearl Ind Co Ltd | 省エネルギー対策方法及び対策装置 |
JP2007172406A (ja) * | 2005-12-22 | 2007-07-05 | E-Cubic Co Ltd | エネルギー等消費量算定システム及びエネルギー等消費量適切性情報出力装置 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030171851A1 (en) * | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
US7216021B2 (en) * | 2003-10-30 | 2007-05-08 | Hitachi, Ltd. | Method, system and computer program for managing energy consumption |
US20060167591A1 (en) * | 2005-01-26 | 2006-07-27 | Mcnally James T | Energy and cost savings calculation system |
EP2220611A4 (en) * | 2007-11-05 | 2014-01-15 | Sloan Valve Co | SUPRERETTE OF PUBLIC TOILET |
-
2009
- 2009-06-10 JP JP2010516869A patent/JP5102875B2/ja not_active Expired - Fee Related
- 2009-06-10 WO PCT/JP2009/060621 patent/WO2009151078A1/ja active Application Filing
- 2009-06-10 US US12/997,085 patent/US20110172792A1/en not_active Abandoned
- 2009-06-10 CN CN2009801218326A patent/CN102057395A/zh active Pending
- 2009-06-10 CA CA2729846A patent/CA2729846A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002209335A (ja) * | 2001-01-12 | 2002-07-26 | Nippon Telegraph & Telephone East Corp | 需要家消費電力制御管理システム |
JP2004116947A (ja) * | 2002-09-27 | 2004-04-15 | Osaka Gas Co Ltd | 空調運転管理システム |
JP2006079363A (ja) * | 2004-09-09 | 2006-03-23 | Tempearl Ind Co Ltd | 省エネルギー対策方法及び対策装置 |
JP2007172406A (ja) * | 2005-12-22 | 2007-07-05 | E-Cubic Co Ltd | エネルギー等消費量算定システム及びエネルギー等消費量適切性情報出力装置 |
Cited By (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102713962A (zh) * | 2009-12-21 | 2012-10-03 | 松下电器产业株式会社 | 节能诊断系统 |
JP2011129067A (ja) * | 2009-12-21 | 2011-06-30 | Panasonic Electric Works Co Ltd | 省エネルギー診断システム |
WO2011078075A1 (ja) * | 2009-12-21 | 2011-06-30 | パナソニック電工株式会社 | 省エネルギー診断システム |
US9170576B2 (en) | 2009-12-21 | 2015-10-27 | Panasonic Intellectual Property Management Co., Ltd. | Energy conservation diagnosis system |
CN102713962B (zh) * | 2009-12-21 | 2015-09-02 | 松下电器产业株式会社 | 节能诊断系统 |
CN102741767B (zh) * | 2009-12-21 | 2015-11-25 | 松下电器产业株式会社 | 节能分析系统 |
US9710862B2 (en) | 2009-12-21 | 2017-07-18 | Panasonic Intellectual Property Management Co., Ltd. | Energy conservation analysis system |
JP5331212B2 (ja) * | 2009-12-21 | 2013-10-30 | パナソニック株式会社 | 省エネルギー診断システム |
CN102741767A (zh) * | 2009-12-21 | 2012-10-17 | 松下电器产业株式会社 | 节能分析系统 |
WO2011078155A1 (ja) * | 2009-12-21 | 2011-06-30 | パナソニック電工株式会社 | 省エネルギー診断システム |
JP2011204201A (ja) * | 2010-03-26 | 2011-10-13 | Panasonic Electric Works Co Ltd | 省エネルギー診断システム |
WO2011148974A1 (ja) * | 2010-05-25 | 2011-12-01 | パナソニック電工株式会社 | 省エネ診断システム |
EP2579202A4 (en) * | 2010-05-25 | 2016-01-27 | Panasonic Ip Man Co Ltd | ENERGY-SAVING DIAGNOSTIC SYSTEM |
JP2011248529A (ja) * | 2010-05-25 | 2011-12-08 | Panasonic Electric Works Co Ltd | 省エネ診断システム |
JP2012027597A (ja) * | 2010-07-21 | 2012-02-09 | Fuji Electric Co Ltd | エネルギー監視システム |
EP2442421A3 (en) * | 2010-10-12 | 2017-09-27 | Samsung Electronics Co., Ltd. | Power management system and method for controlling the same |
JP2012093848A (ja) * | 2010-10-25 | 2012-05-17 | Hitachi Building Systems Co Ltd | エネルギー管理システム |
JP2012094077A (ja) * | 2010-10-28 | 2012-05-17 | Toshiba Corp | 家庭用エネルギー管理システム |
JP5605865B2 (ja) * | 2010-11-29 | 2014-10-15 | Necソリューションイノベータ株式会社 | 電力管理システム、電力管理装置、電力管理方法、及びプログラム |
JP2017139957A (ja) * | 2010-12-06 | 2017-08-10 | 日本テクノ株式会社 | デマンドカレンダー |
JP2015213429A (ja) * | 2010-12-06 | 2015-11-26 | 日本テクノ株式会社 | デマンドカレンダー |
JP2014132822A (ja) * | 2010-12-06 | 2014-07-17 | Japan Techno Co.Ltd | デマンドカレンダー、デマンドカレンダー作成装置、デマンドカレンダー作成方法 |
JP2012160028A (ja) * | 2011-02-01 | 2012-08-23 | Nippon Telegr & Teleph Corp <Ntt> | 省エネルギーアドバイス提供システム、省エネルギーアドバイス提供方法およびそのプログラム |
JP2012164233A (ja) * | 2011-02-08 | 2012-08-30 | Fujitsu Ltd | 浪費度算出装置、浪費度算出プログラム及び浪費度算出方法、並びにエネルギ管理システム |
JP2014089766A (ja) * | 2014-02-03 | 2014-05-15 | Panasonic Corp | 省エネ診断装置およびそれを用いた省エネ診断システム |
JP2015163017A (ja) * | 2014-02-28 | 2015-09-07 | 株式会社東光高岳 | 運用パターン表示装置 |
JP2015218971A (ja) * | 2014-05-19 | 2015-12-07 | 三菱電機株式会社 | 空気清浄換気装置 |
JP2015092368A (ja) * | 2014-12-10 | 2015-05-14 | パナソニックIpマネジメント株式会社 | 省エネルギ診断システム、サーバ |
JP2017076350A (ja) * | 2015-10-16 | 2017-04-20 | 富士通株式会社 | 情報変換方法、情報処理装置、及び情報変換プログラム |
JP2018049567A (ja) * | 2016-09-23 | 2018-03-29 | 株式会社日立ハイテクノロジーズ | サーバ、制御システム、制御方法、及び、制御プログラム |
WO2018056366A1 (ja) * | 2016-09-23 | 2018-03-29 | 株式会社日立ハイテクノロジーズ | サーバ、制御システム、制御方法、及び、制御プログラム |
JP2020190876A (ja) * | 2019-05-21 | 2020-11-26 | 三菱電機ビルテクノサービス株式会社 | 消費電力予測装置 |
WO2020235150A1 (ja) * | 2019-05-21 | 2020-11-26 | 三菱電機株式会社 | 消費電力予測装置 |
JP7277254B2 (ja) | 2019-05-21 | 2023-05-18 | 三菱電機ビルソリューションズ株式会社 | 消費電力予測装置 |
JP2022134672A (ja) * | 2021-03-03 | 2022-09-15 | 横河電機株式会社 | 判定装置、判定方法、および、判定プログラム |
JP7359176B2 (ja) | 2021-03-03 | 2023-10-11 | 横河電機株式会社 | 判定装置、判定方法、および、判定プログラム |
Also Published As
Publication number | Publication date |
---|---|
CA2729846A1 (en) | 2009-12-17 |
CN102057395A (zh) | 2011-05-11 |
JPWO2009151078A1 (ja) | 2011-11-17 |
US20110172792A1 (en) | 2011-07-14 |
JP5102875B2 (ja) | 2012-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5102875B2 (ja) | エネルギーマネジメントシステム及びコンピュータプログラム | |
AU2021201867A1 (en) | Method and system for energy management | |
JP5227707B2 (ja) | 空調省エネ制御装置 | |
US7216021B2 (en) | Method, system and computer program for managing energy consumption | |
JP4363244B2 (ja) | エネルギー管理装置 | |
US7502698B2 (en) | Power consumption measuring device and power control system | |
JP4802046B2 (ja) | 建物の電力監視システム | |
US20110112875A1 (en) | Site survey and installation for remote facility management system | |
CN102136102A (zh) | 针对消费者能源消耗的分析 | |
KR20130049254A (ko) | 쓰리디 모델링 기반의 지능형 빌딩통합 자동제어 및 에너지 목표관리 시스템 및 그 방법 | |
JP2002117183A (ja) | 物資消費量関連サービス装置及び方法 | |
JP5475546B2 (ja) | 省エネ診断システム | |
KR20120028503A (ko) | 공간분할 기반 지능자율 에너지절감 방법 및 시스템 | |
WO2012026586A1 (ja) | 電気料金可視化装置 | |
JP2009112075A (ja) | 電力管理システム | |
KR20150096833A (ko) | 양방향 조율 및 순차보상 기반 최대수요전력관리 방법 및 시스템 | |
JP2024079525A (ja) | ビル管理システム | |
JPH08322147A (ja) | 電力需要予測システム | |
JP2001325657A (ja) | 課金システム及び課金方法 | |
JPH10336766A (ja) | 通信システム、端末装置およびコントローラ | |
JP2002259509A (ja) | オンラインメータ監視方法 | |
JP2002279573A (ja) | ガスコンセント及びデータ収集システム | |
JP4540737B2 (ja) | 建物設備管理の分析装置 | |
JP2011002384A (ja) | 警告システム | |
JP4223318B2 (ja) | アドバイザリーシステム、建物管理アドバイス提供方法及び建物管理アドバイス提供プログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200980121832.6 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09762508 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010516869 Country of ref document: JP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2729846 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 12997085 Country of ref document: US |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 09762508 Country of ref document: EP Kind code of ref document: A1 |