WO2009151078A1 - エネルギーマネジメントシステム及びコンピュータプログラム - Google Patents

エネルギーマネジメントシステム及びコンピュータプログラム Download PDF

Info

Publication number
WO2009151078A1
WO2009151078A1 PCT/JP2009/060621 JP2009060621W WO2009151078A1 WO 2009151078 A1 WO2009151078 A1 WO 2009151078A1 JP 2009060621 W JP2009060621 W JP 2009060621W WO 2009151078 A1 WO2009151078 A1 WO 2009151078A1
Authority
WO
WIPO (PCT)
Prior art keywords
unit
schedule
schedule information
measurement value
determination
Prior art date
Application number
PCT/JP2009/060621
Other languages
English (en)
French (fr)
Inventor
清敏 篠原
章生 仲野
真明 寺野
徹 下間
龍一 前田
知也 十河
Original Assignee
パナソニック電工株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック電工株式会社 filed Critical パナソニック電工株式会社
Priority to CA2729846A priority Critical patent/CA2729846A1/en
Priority to US12/997,085 priority patent/US20110172792A1/en
Priority to CN2009801218326A priority patent/CN102057395A/zh
Priority to JP2010516869A priority patent/JP5102875B2/ja
Publication of WO2009151078A1 publication Critical patent/WO2009151078A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Definitions

  • the present invention relates to an energy management system and a computer program.
  • This energy management system system collects data such as power usage data / environment information (temperature and humidity) and control information of each electrical device installed in a building or facility, for a predetermined period (for example, Data collected for each day, month, and year is aggregated and the power consumption is displayed in a graph (line graph or bar graph).
  • data such as power usage data / environment information (temperature and humidity) and control information of each electrical device installed in a building or facility, for a predetermined period (for example, Data collected for each day, month, and year is aggregated and the power consumption is displayed in a graph (line graph or bar graph).
  • Such an energy management system controls an electric device based on schedule information that instructs the operation of the electric device. Therefore, in order to reduce the power consumption of the electrical equipment, it is necessary to set a schedule appropriately.
  • the above-mentioned energy management system only displays the collected power consumption in a graph.
  • the extent to which the power consumption is reduced when the schedule information is changed can only be determined by an administrator who is familiar with energy management technology and has sufficient knowledge.
  • the present invention has been made in view of the above problems.
  • the objective of this invention is providing the energy management system and computer program which can create the schedule information which reduces the usage-amount of energy resources.
  • An energy management system is an energy management system for managing equipment, and includes an acquisition unit, a measurement value storage unit, a determination unit, a determination storage unit, a usage information display unit, a schedule input unit, Schedule storage means, simulation means, prediction value storage means, and prediction information display means are provided.
  • the acquisition means is configured to acquire a measurement value indicating a value obtained by measuring the amount of energy resources used by the device during a predetermined period.
  • the measurement value storage unit is configured to store the measurement value acquired by the acquisition unit.
  • the determination unit is configured to determine, for each unit time, whether or not the device is used based on the measurement value stored in the measurement value storage unit.
  • the determination storage unit is configured to store a determination result indicating a result determined by the determination unit.
  • the usage information display means is configured to display whether or not the device is used for each unit time based on the determination result stored in the determination storage means.
  • the schedule input means is configured to receive input of schedule information that defines the operation of the device during the predetermined period for each unit time.
  • the schedule storage means is configured to store the schedule information input using the schedule input means.
  • the simulation means stores, in the measurement value storage means, a predicted value indicating the amount of energy resources used in the device when the device operates according to the schedule information stored in the schedule storage device. It is comprised so that it may calculate based on the said measured value.
  • the predicted value storage means is configured to store the predicted value calculated by the simulating means.
  • the prediction information display means is configured to display the prediction value stored in the prediction value storage means.
  • the user can input the schedule information while considering whether or not the device is used. And if the said schedule information is input, the usage-amount of energy resources when the said apparatus operate
  • an evaluation unit evaluates whether the use of the device is beneficial or wasteful for each unit time based on the measurement value stored in the measurement value storage unit and the schedule information stored in the schedule storage unit.
  • the evaluation storage means is configured to store an evaluation result indicating a result evaluated by the evaluation means.
  • the evaluation display means is configured to display for each unit time whether the use of the device is beneficial or wasteful based on the evaluation result stored in the evaluation storage means.
  • the evaluation unit is configured to evaluate that the use of the device is useless if a time change of the measurement value stored in the measurement value storage unit satisfies a predetermined condition.
  • the predetermined condition is that a period in which the measured value exceeds a predetermined threshold is continued for a predetermined time.
  • device information storage means for storing, for each device, the type of the device and an installation area indicating a place where the device is installed.
  • the evaluation unit is configured to check whether there are a plurality of the devices of different types in the same installation area based on the type and the installation area for each of the devices stored in the device information storage unit. Is done.
  • the evaluation means evaluates whether the use of the device is beneficial or useless based on a combination of the type of each device and the determination result when there are a plurality of the devices of different types in the same installation area. Configured as follows.
  • the evaluation means is configured to evaluate the use of the device at the time as useful when the time when the use of the device is determined to be useless satisfies a predetermined exception condition.
  • an information storage unit that stores an installation area indicating a place where each device is installed for each device and a person detection unit that detects the presence or absence of a person in the installation area are provided.
  • the exceptional condition is that the person detecting means detects a person in the installation area of the device.
  • the usage information display means is configured to display the amount of energy resources used by the device as a numerical value.
  • the amount of energy resources used by the device according to the setting of the schedule information can be grasped in more detail.
  • a control device that controls the device and a setting device that communicates with the control device.
  • the control device includes setting storage means, device control means, schedule receiving means, and schedule changing means.
  • the setting storage means is configured to store the schedule information.
  • the device control means is configured to control the device according to the schedule information stored in the setting storage means.
  • the schedule receiving means is configured to receive the schedule information from the setting device.
  • the schedule changing unit is configured to change the content of the schedule information stored in the setting storage unit to the content of the schedule information received by the schedule receiving unit.
  • the setting device includes a determination unit, a current schedule storage unit, a confirmation unit, a confirmation storage unit, and a schedule transmission unit.
  • the determination unit is configured to accept a determination to change the schedule information stored in the setting storage unit of the control device.
  • the current schedule storage means is configured to store the schedule information stored in the setting storage means.
  • the confirmation unit is configured to confirm whether or not the schedule information has been changed based on the schedule information stored in the schedule storage unit and the schedule information stored in the current schedule storage unit.
  • the confirmation storage means is configured to store a confirmation result indicating a result confirmed by the confirmation means.
  • the schedule transmission means when the change of the schedule information stored in the setting storage means is determined using the determination means, the schedule information changed with reference to the confirmation result stored in the confirmation storage means Only to the control device.
  • the schedule information change can be easily reflected.
  • the apparatus includes a plurality of measuring devices, a monitoring device that communicates with each of the measuring devices, and a terminal device that communicates with the monitoring device.
  • the terminal device includes the acquisition unit, the measurement value storage unit, the determination unit, the determination storage unit, the usage information display unit, the schedule input unit, the schedule storage unit, and the simulation. Means, the predicted value storage means, and the predicted information display means.
  • Each measuring device measures the amount of energy resources used in the device during the predetermined period and obtains the measured value, and the first memory stores the measured value obtained by the measuring unit.
  • the monitoring device includes a measurement value acquisition unit that acquires the measurement value from the first storage unit of each measurement device, and a second storage unit that stores the measurement value acquired by the measurement value acquisition unit.
  • the acquisition unit is configured to acquire the measurement value from the second storage unit of the monitoring device.
  • a program according to the present invention is a program used in an energy management system for managing equipment, and includes a computer, an acquisition unit, a measurement value storage unit, a determination unit, a determination storage unit, a usage information display unit, It functions as a schedule input means, a schedule storage means, a simulation means, a predicted value storage means, and a prediction information display means.
  • the acquisition means is configured to acquire a measurement value indicating a value obtained by measuring the amount of energy resources used by the device during a predetermined period.
  • the measurement value storage unit is configured to store the measurement value acquired by the acquisition unit.
  • the determination unit is configured to determine, for each unit time, whether or not the device is used based on the measurement value stored in the measurement value storage unit.
  • the determination storage unit is configured to store a determination result indicating a result determined by the determination unit.
  • the usage information display means is configured to display whether or not the device is used for each unit time based on the determination result stored in the determination storage means.
  • the schedule input means is configured to receive input of schedule information that defines the operation of the device during the predetermined period for each unit time.
  • the schedule storage means is configured to store the schedule information input using the schedule input means.
  • the simulation means stores, in the measurement value storage means, a predicted value indicating the amount of energy resources used in the device when the device operates according to the schedule information stored in the schedule storage device. It is comprised so that it may calculate based on the said measured value.
  • the predicted value storage means is configured to store the predicted value calculated by the simulating means.
  • the prediction information display means is configured to display the prediction value stored in the prediction value storage means.
  • the user can input the schedule information while considering whether or not the device is used. And if the said schedule information is input, the usage-amount of energy resources when the said apparatus operate
  • the energy management system is used for management of devices arranged in a building B such as a tenant building.
  • the devices managed by the energy management system of the present embodiment are devices that operate according to schedule information to be described later, such as lighting fixtures L1 to L4 and air conditioners AC1 to AC4.
  • the energy management system of the present embodiment includes terminal devices 1A and 1B, a monitoring device (central monitoring panel) 2, a measuring device 3, and control devices 5A and 5B.
  • the monitoring device 2 is connected to the measuring device 3 and the control devices 5A and 5B via a communication network NT such as the Internet.
  • a global IP address is set for each of the measuring device 3 and the control devices 5A and 5B.
  • the measurement device 3 and the control devices 5A and 5B have a function of performing communication via the communication network NT.
  • the terminal device 1A is connected to the monitoring device 2 via the communication network NT.
  • the terminal device 1B is connected to the monitoring device 2 via the LAN.
  • Building B is, for example, two stories.
  • Four zones (installation areas) Z1 to Z4 are assigned to the building B.
  • Three zones Z1 to Z3 are assigned to the first floor of the building B, and the first floor of the building B is divided into three.
  • Zone Z4 is assigned to the entire second floor of building B.
  • Each zone Z1 to Z4 includes a plurality of lighting fixtures L1 to L4, air conditioners AC1 to AC4, lighting operation switches (lighting switches) S1 to S4, and an air conditioning operation switch (air conditioning switch) (not shown).
  • Human sensors (human detection means) R1 to R4 are provided.
  • the lighting fixtures L1 to L4, the lighting switches S1 to S4, and the human sensors R1 to R4 in the zones Z1 to Z4 are connected to the control device 5A via the transmission line LN1. Individual address information is assigned to the lighting fixtures L1 to L4, the lighting switches S1 to S4, and the human sensors R1 to R4.
  • the lighting switches S1 to S4 are used to perform operations such as turning on / off the lighting fixtures L1 to L4 in the same zone Z1 to Z4.
  • Each of the lighting switches S1 to S4 is configured to transmit an operation signal (lighting operation signal) corresponding to a user operation to the control device 5A.
  • the air conditioning switch is used to perform operations such as turning on / off the air conditioners AC1 to AC4 in the same zone.
  • Each air conditioning switch is configured to transmit an operation signal (air conditioning operation signal) corresponding to a user operation to the control device 5B.
  • the human sensors R1 to R4 are configured to detect the presence or absence of a person in the same zone Z1 to Z4.
  • the human sensors R1 to R4 are configured to transmit a detection signal (human body detection signal) to the control device 5A when detecting a person in the corresponding zones Z1 to Z4.
  • the air conditioners AC1 to AC4 are connected to the control device 5B via the transmission line LN2. Individual address information is assigned to the air conditioners AC1 to AC4.
  • distribution board 4 is installed in building B.
  • the distribution board 4 incorporates a main breaker 40 and a plurality of branch breakers 41 to 44.
  • the luminaires L1 to L3 in the zones Z1 to Z3 are connected to the branch circuit 61 corresponding to the branch breaker 41.
  • Each lighting fixture L4 of zone Z4 is connected to the branch circuit 62 corresponding to the branch breaker 42.
  • Each of the air conditioners AC1 to AC3 in the zones Z1 to Z3 is connected to the branch circuit 63 corresponding to the branch breaker 43.
  • the branch circuit 64 corresponding to the branch breaker 44 is connected to the air conditioner AC4 in the zone Z4.
  • Each branch circuit 61 to 64 is provided with measuring points P1 to P4 for measuring the load current.
  • the measuring device 3 is configured to monitor the power consumption of devices such as the lighting fixtures L1 to L4 and the air conditioners AC1 to AC4 and to output them to the monitoring device 2 and the terminal device 1A.
  • the measuring device 3 is power consumption measuring means for measuring the power consumption of the electrical equipment.
  • the measuring device 3 includes wattmeters 31 to 34 installed in the building B and a collecting device (power monitoring device) 35.
  • the wattmeters 31 to 34 are connected to the collection device 35 via the signal line LN3.
  • Each wattmeter 31 to 34 measures the load current at the corresponding measurement points P1 to P4 (that is, the power consumption amount in each branch circuit 61 to 64) at every predetermined measurement cycle.
  • each of the wattmeters 31 to 34 serves as a measurement value acquisition unit that acquires a measurement value indicating a value obtained by measuring the amount of electricity used by the device during a predetermined period (the amount of power consumed by the device during the predetermined period). Function.
  • the power consumption in the branch circuit 61 is a total value of the power consumption of the plurality of lighting fixtures L1 to L3 belonging to the zones Z1 to Z3.
  • the power consumption in the branch circuit 62 is a total value of the power consumption of the plurality of lighting fixtures L4 belonging to the zone Z4.
  • the power consumption in the branch circuit 63 is the total power consumption of the air conditioners AC11 to AC3 belonging to the zones Z1 to Z3.
  • the power consumption in the branch circuit 64 is the power consumption of the air conditioning AC4 in the zone Z4.
  • the power consumption is measured for each group of one to a plurality of devices.
  • Each wattmeter 31 to 34 stores the acquired measurement value in a built-in memory (not shown). Each wattmeter 31 to 34 is configured to output the measurement value stored in the built-in memory to the collection device 35 every time a predetermined transmission cycle elapses.
  • the collection device 35 receives the measurement values output from the wattmeters 31 to 34.
  • the collection device 35 functions as a first storage unit that stores the measurement values received from the wattmeters 31 to 34 in association with the measured date and time.
  • the collection device 35 is connected to the monitoring device 2 via the communication network NT.
  • the collecting device 35 transmits the measurement values of the branch circuits 61 to 64 to the monitoring device 2 in response to a request from the monitoring device 2 (for example, when receiving a monitoring data request signal described later from the monitoring device 2). Composed.
  • the control device 5A is a lighting control device that controls the operation of the lighting fixtures L1 to L4.
  • the control device 5A sends and receives a transmission signal to / from the desired lighting fixtures L1 to L4 or the lighting switches S1 to S4 or the human sensors R1 to R4 by sending a transmission signal including address information to the transmission line LN1. To do.
  • the control device 5A is configured using a computer. As shown in FIG. 3A, the control device 5A includes a setting storage unit 51A, a device control unit 52A, a schedule reception unit 53A, a schedule change unit 54A, an operation signal reception unit 55A, and a detection signal reception unit. 56A, detection signal storage means 57A, and history transmission means 58A.
  • the setting storage means 51A is configured to store schedule information (operation schedule information) of each of the lighting fixtures L1 to L4.
  • the schedule information is information that defines the operation of the device during a predetermined period for each unit time (predetermined time segment).
  • the schedule information is information that defines the operation (turning on or off) of the lighting fixtures L1 to L4 in the zones Z1 to Z4 for one week every 30 minutes.
  • the time when the lighting fixtures L1 to L4 are turned on is referred to as the lighting time, and the time when the lighting fixtures L1 to L4 are turned off is referred to as the extinguishing time.
  • the schedule receiving means 53A is configured to receive schedule information from the terminal device 1A or the monitoring device 2.
  • the schedule changing unit 54A is configured to change the content of the schedule information stored in the setting storage unit 51A to the content of the schedule information received by the schedule receiving unit 53A. Therefore, when the control device 5A acquires the schedule information from the terminal device 1A or the monitoring device 2, the control device 5A updates the contents of the schedule information in the setting storage means 51A.
  • the operation signal receiving means 55A is configured to receive an operation signal from each of the lighting switches S1 to S4.
  • the device control unit 52A is configured to control the device according to the schedule information stored in the setting storage unit 51A. For example, when the current time (the time of the clock built in the control device 5A) is the lighting time specified by the schedule information, the device control means 52A transmits a lighting control signal to the corresponding lighting fixtures L1 to L4, The corresponding lighting fixtures L1 to L4 are turned on. When the current time comes to the turn-off time specified by the schedule information, the appliance control unit 52A transmits a lighting control signal to the corresponding lighting fixtures L1 to L4, and turns on the corresponding lighting fixtures L1 to L4.
  • the device control means 52A is configured to control the lighting fixtures L1 to L4 in accordance with the lighting operation signal received by the operation signal receiving means 55A.
  • the device control means 52A transmits a control signal to the lighting fixtures L1 to L4 according to the lighting operation signals from the lighting switches S1 to S4, and turns on or off the lighting fixtures L1 to L4. Therefore, according to the control device 5A, it is possible to control the lighting fixtures L1 to L4 other than the time specified by the schedule information (lighting time or lighting time).
  • the detection signal receiving means 56A is configured to receive detection signals from the human sensors R1 to R4.
  • the detection signal storage means 57A creates and stores a history of detection signals based on the detection signals received by the detection signal reception means 55A. That is, the history of the detection signal (when the person is detected) is stored in the control device 5A.
  • the history transmission unit 58A is configured to transmit the history of the detection signal stored in the detection signal storage unit 56A to the terminal device 1A and the monitoring device 2. Further, when the history transmission unit 58A receives a detection data request signal described later from the monitoring device 2, the history transmission unit 58A transmits the detection signal history of the human sensors R1 to R4 stored in the detection signal storage unit 57A to the monitoring device 2. Configured as follows.
  • the control device 5B is an air conditioning control device that controls the operation of the air conditioners AC1 to AC4. Control device 5B sends and receives transmission signals to / from desired air conditioners AC1 to AC4 by sending transmission signals including address information to transmission line LN2.
  • the control device 5B is configured using a computer. As shown in FIG. 3B, the control device 5B includes a setting storage unit 51B, a device control unit 52B, a schedule reception unit 53B, and a schedule change unit 54B.
  • the setting storage means 51B is configured to store schedule information of the air conditioners AC1 to AC4.
  • the schedule information is information that defines the operation of the air conditioners AC1 to AC4 in the zones Z1 to Z4 for one week every 30 minutes.
  • the time when the air conditioners AC1 to AC4 are turned on is referred to as the operation start time, and the time when the air conditioners AC1 to AC4 are turned off is referred to as the operation end time.
  • the schedule receiving means 53B is configured to receive schedule information from the terminal device 1A or the monitoring device 2.
  • the schedule changing unit 54B is configured to change the content of the schedule information stored in the setting storage unit 51B to the content of the schedule information received by the schedule receiving unit 53B. Therefore, when acquiring the schedule information from the terminal device 1A or the monitoring device 2, the control device 5B updates the contents of the schedule information in the setting storage unit 51B.
  • the operation signal receiving means 55B is configured to receive an operation signal from each air conditioning switch.
  • the device control unit 52B is configured to control the device according to the schedule information stored in the setting storage unit 51B. For example, when the current time comes to the operation start time specified by the schedule information, the device control unit 52B transmits an operation start signal to the corresponding air conditioners AC1 to AC4 to start the corresponding air conditioners AC1 to AC4. In addition, when the current time reaches the operation end time specified by the schedule information, the device control unit 52B transmits an operation end signal to the corresponding air conditioners AC1 to AC4, and stops the corresponding air conditioners AC1 to AC4.
  • the device control means 52B is configured to control the air conditioners AC1 to AC4 according to the air conditioning operation signal received by the operation signal receiving means 55B.
  • the device control means 52B transmits a control signal to the air conditioners AC1 to AC4 in response to an air conditioning operation signal from the air conditioning operation switch to start or stop each of the air conditioners AC1 to AC4. Therefore, the control device 5B can control the air conditioners AC1 to AC4 other than the time (operation start time or operation end time) specified by the schedule information.
  • the monitoring device 2 includes a communication unit 21, a storage unit 22, and a calculation unit 23.
  • the communication unit 21 is configured to communicate with the measurement device 3 and the control device 5A via the communication network NT.
  • the calculation unit 23 is configured to cause the communication unit 21 to transmit the aforementioned monitoring data request signal and detection data request signal each time a predetermined data collection period elapses.
  • the communication unit 21 and the calculation unit 23 constitute a measurement value acquisition unit that acquires measurement values from the collection device 35 of the measurement device 3.
  • the storage unit 22 functions as a second storage unit that stores the measurement value received by the communication unit 21.
  • the storage unit 22 stores a history of detection signals (measurement data of the human sensors R1 to R4) received by the communication unit 21.
  • the monitoring device 2 may be configured to acquire measurement values from the plurality of measurement devices 3. In this case, the measurement values of the plurality of measuring devices 3 can be managed by one monitoring device 2.
  • the terminal devices 1A and 1B have the same configuration. Therefore, only the terminal device 1A will be described below.
  • the terminal device 1 ⁇ / b> A is a computer including an input unit 11, a display unit 12, a storage unit 13, a calculation unit 14, and a communication unit 15.
  • the input unit 11 is a keyboard, a mouse, a touch panel, or the like.
  • the input unit 11 is used by the user to select buttons B1 to B24, which will be described later, and to input schedule information.
  • the display unit 12 is a display (for example, a liquid crystal display) or the like, and is controlled by the calculation unit 14 so as to perform a predetermined display.
  • the storage unit 13 is used to store a program executed by the calculation unit 14, a measurement result of power consumption, a simulation result of power consumption, and the like.
  • the storage unit 13 includes a large-capacity storage device such as a hard disk, and a memory such as a ROM and a RAM.
  • the calculation unit 14 is a CPU or the like, and executes a program stored in the storage unit 13.
  • the communication unit 15 is configured to perform communication via the network NT.
  • the storage unit 13 is loaded with a program (hereinafter referred to as “energy management program”) for managing power consumption, simulating power consumption, and evaluating whether power consumption is beneficial.
  • energy management program a program for managing power consumption, simulating power consumption, and evaluating whether power consumption is beneficial.
  • the terminal devices 1A and 1B execute the energy management program, a power consumption management function, a power consumption simulation function, and a power evaluation function are realized.
  • the energy management program manages the terminal device 1A, the acquisition unit 101, the measurement value storage unit 102, the determination unit 103, and the determination storage unit 104 in order to manage the power consumption of the device. And function as the usage information display means 105.
  • the acquisition unit 101 is configured to acquire a measurement value indicating a value obtained by measuring the amount of energy resources used in the device during a predetermined period.
  • the acquisition unit 101 inputs one or a plurality of devices as one group, and an electric energy measurement result (measurement value) obtained by measuring the electric energy consumption for each predetermined time segment (unit time) in a group unit. It is an electric energy input means.
  • the device is an electrical device such as lighting fixtures L1 to L4 and air conditioners AC1 to AC4. Therefore, the energy resource is electricity, and the amount of energy resource used in the device is the power consumption of the device.
  • the acquisition unit 101 communicates with the monitoring device 2 and the control devices 5A and 5B via the communication network NT, for example, and receives the power consumption amount during a predetermined period (for example, one week) in each of the branch circuits 61 to 64. That is, the acquisition unit 101 acquires the measurement value from the second storage unit of the monitoring device 2.
  • Such an acquisition unit 101 is realized by the calculation unit 14 and the communication unit 15.
  • the measurement value storage unit 102 is configured to store the measurement value acquired by the acquisition unit 101. Such a measured value storage unit 102 is realized by the storage unit 13 and the calculation unit 14.
  • the determination unit 103 is configured to determine whether the device is used during a predetermined period based on the measurement value stored in the measurement value storage unit 102 every unit time (for example, 30 minutes). However, in the present embodiment, the determination unit 103 does not determine a time zone included in a time zone described later. For example, the determination unit 103 compares the measurement value stored in the measurement value storage unit 102 with a predetermined threshold value. The determination unit 103 determines that the device has been used only when the measured value exceeds a predetermined threshold value.
  • the predetermined threshold is, for example, a value corresponding to the standby power amount of the corresponding branch circuits 61 to 64. That is, the determination unit 103 determines whether at least one of the devices connected to the branch circuits 61 to 64 has been used.
  • Such determination means 103 is realized by the calculation unit 14.
  • the determination storage unit 104 is configured to store a determination result indicating a result determined by the determination unit 103.
  • the determination storage unit 104 is realized by such a storage unit 13 and the calculation unit 14.
  • the usage information display unit 105 is configured to display, every unit time, whether or not the device has been used during a predetermined period based on the determination result stored in the determination storage unit 104. In other words, the usage information display unit 105 displays at least the presence / absence of power consumption for each predetermined time segment based on the power amount measurement result input to the power amount input unit.
  • Such usage information display means 105 binarizes and displays the power consumption of the device during a predetermined period. For example, as shown in FIG. 17, the usage state display means 105 displays the unit time when the device is used separately from the unit time when the device is not used (in FIG. 17, the time zone when the device is used). Is shown as a diagonal line rising to the right). Further, the usage information display unit 105 is configured to display the power consumption of the device (the total value of the power consumption of the device during a predetermined period) as a numerical value. Such usage state display means 105 is realized by the display unit 12 and the calculation unit 14.
  • the energy management program also includes a terminal device 1A, a schedule input unit 106, a schedule storage unit 107, a simulation unit 108, a predicted value storage unit 109, and a predicted value display in order to perform a power consumption simulation. It functions as the means 110.
  • the schedule input means 106 is configured to accept input of schedule information that defines the operation of the device during a predetermined period per unit time. In other words, the schedule input means 106 is used for the user to input the change contents of the schedule information.
  • schedule information is defined by a time zone described later. That is, the time zone in which the time zone is set is the time zone in which the device is turned off.
  • the schedule information defines that the device is turned on at 7:30 from Monday to Friday and the device is turned off at 19:00. Further, in the example shown in FIG. 25, the schedule information includes the device on at 7:30 from Monday to Friday, the device off at 12:00, the device on at 12:30, and the device off at 19:00. It stipulates.
  • Such a schedule input unit 106 is realized by the input unit 11, the display unit 12, and the calculation unit 14.
  • the schedule storage unit 107 is configured to store the schedule information input using the schedule input unit 106. Such a schedule storage unit 107 is realized by the storage unit 13 and the calculation unit 14.
  • the simulation unit 108 simulates a predicted value indicating the power consumption when the device operates according to the schedule information stored in the schedule storage unit 107 based on the measurement value stored in the measurement value storage unit 102. Configured. In other words, when the schedule information change content is input using the schedule input unit 106, the simulation unit 108 consumes power when the device is operated with the changed schedule information based on the power amount measurement result. Predict.
  • the simulation unit 108 estimates the on / off state of the device by comparing the measured value stored in the measured value storage unit 102 with the standby power amount of the corresponding branch circuits 61 to 64 (in this estimation). May use the determination result of the determination means 103).
  • the simulating means 108 compares the result (estimated result) of guessing on / off of the device with the schedule information stored in the schedule storage means. For example, in the estimation result, 0:00 to 6:00 is off, 6:00 to 18:00 is on, and 18:00 to 24:00 is off. In the schedule information stored in the schedule storage unit 107, Assume that 0:00 to 7:00 are off, 7:00 to 19:00 are on, and 19:00 to 24:00 are off.
  • the measurement value stored in the measurement value storage means 102 is used as it is in the period in which ON / OFF coincides, that is, from 0:00 to 6:00, from 7:00 to 18:00, and from 19:00 to 24:00.
  • the power consumption amount of the device is predicted for periods in which the on / off states do not coincide, that is, from 6:00 to 7:00, and from 18:00 to 19:00. For example, from 6:00 to 7:00, the estimation result is on and the schedule information is off. Therefore, the simulating unit 108 sets the standby power amount of the corresponding branch circuits 61 to 64 to 6:00 to 7:00. The amount of power consumed per unit time.
  • the simulating means 108 has the most recent unit time (for example, 17:30 to 18:00) when the electrical device is on. ) Is the power consumption per unit time between 18:00 and 19:00.
  • the average value of the power consumption of the unit time when the electrical equipment is determined to be on may be used, or the same unit time of the same day in the past or a different day of the week may be used. You may use power consumption. In this way, the simulation unit 108 estimates the power consumption amount of the electric device during a predetermined period.
  • the predicted value storage unit 109 is configured to store the predicted value predicted by the simulation unit 108.
  • the predicted value storage unit 109 is realized by the storage unit 13 and the calculation unit 14.
  • the predicted value display unit 110 is configured to display the predicted value stored in the predicted value storage unit 109. Such predicted value display means 110 is realized by the display unit 12 and the calculation unit 14.
  • each device is controlled to be turned on or off in accordance with preset schedule information. For example, all the devices are turned on during working hours (for example, in FIG. 24, Monday to Friday from 7:30 to 19:00 are working hours), and all the devices are turned off outside working hours. Such schedule information is set. In this case, if all the devices are operating according to the schedule information, power is not consumed outside the working hours. However, not all devices are used according to the schedule information. For example, when an employee wants to perform some work outside working hours, the employee operates a lighting switch S1 to S4 or the like to operate a desired device (lighting fixtures L1 to L4 or air conditioners AC1 to AC4). is there.
  • the device continues to operate. In this case, since the use of the device is useless, the power consumption is useless (for example, in FIG. 24, the portion indicated by the network line is the useless portion of the device).
  • the energy management program uses the terminal device 1A, the history receiving unit 111, and the history storage unit 112 in order to evaluate whether or not the power consumption in the device is beneficial (whether the use of the device is beneficial or wasteful). And device information storage means 113, evaluation means 114, evaluation storage means 115, and evaluation display means 116.
  • the history receiving unit 111 is configured to receive a history of detection signals (measurement data of the human sensors R1 to R4).
  • the history receiving means 111 communicates with the monitoring device 2 and the control devices 5A and 5B, and receives the history of detection signals during the predetermined period (measurement data of the human sensors R1 to R4).
  • Such a history receiving unit 111 is realized by the calculation unit 14 and the communication unit 15.
  • the history storage unit 112 is configured to store a history of detection signals received by the history reception unit 111. Such a history storage unit 112 is realized by the storage unit 13 and the calculation unit 14.
  • the device information storage means 113 is configured to store information on each device.
  • the information of each device is the type of device and the installation area indicating the location where the device is installed.
  • the types of equipment include lighting fixtures and air conditioners, and the equipment installation area includes zones Z1 to Z4.
  • the device information storage unit 113 is realized by the storage unit 13 and the calculation unit 14.
  • the evaluation unit 114 is configured to determine, for each unit time, whether the use of the device is beneficial or not based on the measurement value stored in the measurement value storage unit 102 and the schedule information stored in the schedule storage unit 107. The In other words, the evaluation unit 114 evaluates whether or not the power consumption amount in each time segment is beneficial based on the power consumption amount and schedule information in each time segment input to the power amount input unit. It is. Such an evaluation unit 114 is realized by the calculation unit 14.
  • the evaluation unit 114 determines that the device is useless.
  • the evaluation unit 114 refers to the schedule information (in this embodiment, the time zone) stored in the schedule storage unit 107, and obtains the measurement value of the period during which the device is stopped (period included in the time zone). select.
  • the evaluation unit 114 compares the selected measurement value with a predetermined threshold value (a value corresponding to the standby power amount of the corresponding branch circuit 61 to 64).
  • the evaluation unit 114 determines that the use of the device is useless if the measured value exceeds a predetermined threshold value. For example, in the example shown in FIG. 17, it is determined that the use of the device between 22:00 and 23:00 on Friday, March 7 is useless.
  • the evaluation unit 114 may be configured to evaluate that the use of the device is useless if the time change of the measurement value stored in the measurement value storage unit 102 satisfies a predetermined condition.
  • the predetermined condition is that a period in which the measured value exceeds a predetermined threshold is continued for a predetermined time.
  • the evaluation unit 114 determines that the use of the device is useless when the measured value continuously exceeds a predetermined threshold value a predetermined number of times (for example, 4 times) or more. In this way, for example, it is possible to prevent the use of the device from being determined to be useless due to the measurement error of the power consumption due to noise or the like although the use of the device is not useless.
  • the use of the device may be beneficial. For example, the employee is working outside working hours.
  • the evaluation unit 114 is configured to evaluate the use of the device in the unit time as useful. In this way, it can be determined more accurately whether or not the use of the device is beneficial.
  • Exceptional conditions may be that human sensors R1 to R4 corresponding to the device installation area detect people. For example, when the evaluation unit 114 evaluates that the use of the device is useless, the evaluation unit 114 acquires the installation area of the device from the device information storage unit 113. Further, the evaluation unit 114 acquires a history of detection signals corresponding to the installation area of the device from the history storage unit 112. If the human sensors R1 to R4 installed in the same zones Z1 to Z4 output the detection signal in the unit time when the use of the device is determined to be useless, the evaluation unit 114 outputs the detection signal. Evaluate (re-evaluate) use as beneficial. In this case, it is evaluated that the use of the device is not wasteful in a place where a person is present.
  • the evaluation unit 114 evaluates whether the use of the device is beneficial or wasteful based on the combination of the type of each device and the determination result of the determination unit 103. It may be configured as follows. Specifically, the evaluation unit 114 reads the installation area and type from the device information storage unit 113. Then, the evaluation unit 114 confirms whether there are a plurality of different types of devices in the same installation area based on the type and installation area for each device stored in the device information storage unit 113. When there are a plurality of devices of different types in the same installation area, the evaluation unit 114 evaluates whether the use of the device is beneficial or wasteful based on the combination of the type of each device and the determination result.
  • the evaluation unit 114 acquires the determination results for the luminaire L1 and the air conditioner AC1 from the determination storage unit 104. And if the combination of the operating condition of the lighting fixture L1 and air conditioner AC1 from which a kind differs is a predetermined combination (both lighting fixture L1 and air conditioning machine AC1 are ON), the evaluation means 114 will use the lighting fixture L1. Evaluate it as beneficial. That is, when only one of the lighting fixture L1 and the air conditioner AC1 in the same zone Z1 is on, it is determined that the user has forgotten to turn it off.
  • the evaluation storage unit 115 is configured to store an evaluation result indicating a result evaluated by the evaluation unit 114. Such an evaluation storage unit 115 is realized by the storage unit 13 and the calculation unit 14.
  • the evaluation display means 116 is configured to display, every unit time, whether the use of the electric equipment is beneficial or wasteful based on the evaluation result stored in the evaluation storage means 115. For example, the evaluation display means 116 displays the unit time in which the use of the device is wasted separately from the unit time in which the use of the device was useful (in FIG. 24, the time zone in which the use of the device was wasted). Is indicated by a mesh line). Such an evaluation display unit 116 is realized by the display unit 12 and the calculation unit 14.
  • the energy management program changes the schedule information of the control devices 5A and 5B from a remote location (that is, indirectly) by changing the terminal device 1A into a determination unit 117, a current schedule storage unit 118, It is made to function as a setting device including confirmation means 119, confirmation storage means 120, and schedule transmission means 121.
  • the determining means 117 is configured to accept a change in schedule information stored in the setting storage means 51A and 51B of the control devices 5A and 5B (see, for example, FIG. 25). Such a determination unit 117 is realized by the input unit 11, the display unit 12, and the calculation unit 14.
  • the current schedule storage unit 118 is configured to store schedule information stored in the setting storage units 51A and 51B.
  • the current schedule storage unit 118 is configured to receive and store schedule information stored in the setting storage units 51A and 51B from the control devices 5A and 5B via the communication network NT.
  • Such a current schedule storage unit 118 is realized by the storage unit 13, the calculation unit 14, and the communication unit 15.
  • the confirmation unit 119 is configured to confirm whether the schedule information stored in the schedule storage unit 107 matches the schedule information stored in the current schedule storage unit 118. Such a confirmation unit 119 is realized by the calculation unit 14.
  • the confirmation storage unit 120 is configured to store a confirmation result indicating a result confirmed by the confirmation unit 119.
  • Such a confirmation storage unit 120 is realized by the storage unit 13 and the calculation unit 14.
  • the schedule transmission unit 121 is configured to transmit the schedule information stored in the schedule storage unit 107 to the control devices 5A and 5B.
  • the schedule transmission unit 121 determines to change the schedule information stored in the setting storage units 51 ⁇ / b> A and 51 ⁇ / b> B using the determination unit 117, the schedule transmission unit 121 refers to the confirmation result stored in the confirmation storage unit 120. Then, the schedule transmission unit 121 transmits only the changed schedule information to the corresponding control devices 5A and 5B. That is, the schedule transmission unit 121 transmits only the schedule information that needs to be changed to the control devices 5A and 5B.
  • Such a schedule transmission unit 121 is realized by the calculation unit 14 and the communication unit 15. Note that the schedule transmission unit 121 may be configured to transmit all schedule information stored in the schedule storage unit 107 to the control devices 5A and 5B. In this case, the current schedule storage unit 118, the confirmation unit 119, and the confirmation storage unit 120 are not necessary.
  • FIG. 6 shows a flowchart when the simulation is executed.
  • the calculation unit 14 of the terminal device 1A displays the initial screen G1 shown in FIG. 7 on the display unit 12 by executing the energy management program stored in the storage unit 13.
  • buttons B1 to B5 respectively corresponding to “new file creation”, “file list”, “common rule”, “data”, and “setting” are displayed.
  • the mouse cursor is moved over the buttons B1 to B5 (mouse over)
  • explanations of functions corresponding to the buttons B1 to B5 during the mouse over are displayed in the blank B0 provided below the initial screen G1. .
  • the button B1 is a button for starting a process for predicting the power consumption when the schedule information is changed.
  • a file for storing simulation results can be named and saved and managed.
  • the button B2 is a button for calling a saved file (a file storing simulation results). It is also possible to change the parameter (schedule information) based on the simulation result stored in the file and execute the simulation again.
  • the button B3 is a button for creating / changing / deleting a common rule.
  • the common rule is a rule used for evaluating whether or not the power consumption for each time division (unit time) is beneficial (that is, whether the use of the electric device is beneficial or wasteful).
  • the button B3 is used to set to which measurement point the created common rule is applied.
  • the button B4 is a button for selecting a process for taking in power consumption data collected by another system.
  • the terminal devices 1A and 1B are connected to the central monitoring panel 2 via the communication network NT.
  • the terminal devices 1A and 1B automatically collect power consumption data from the central monitoring panel 2 by the power consumption receiving means 101 and store the collected power consumption data in the database of the measured value storage means 102. .
  • the button B5 is a button for selecting a process (setting process) for setting various information used in the energy management program.
  • setting process for example, measurement point information corresponding to the input power consumption amount, parameters used in the simulation, and the like are set.
  • initial settings there are five items: measurement point setting, creation of common rules, association of common rules and measurement points, parameter setting, and capture of energy data (power consumption measurement results).
  • measurement point setting creation of common rules
  • association of common rules and measurement points creation of common rules and measurement points
  • parameter setting creation of common rules
  • capture of energy data power consumption measurement results
  • the name of the measurement point for example, 1F common section light
  • the type of input data for example, PI / AI / setting / DI / DO, etc.
  • the collection interval of power consumption for example, the operation / Settings are made for items such as a threshold value (a value corresponding to standby power when the weighing data is power consumption) provided for each weighing point in order to determine stoppage.
  • the time zone is a time zone for monitoring whether or not power is wasted.
  • the amount of power consumption in the time zone in which the time zone is set becomes an evaluation target in the evaluation unit 114.
  • the power consumption in the time zone in which the time zone is not set is a determination target in the determination unit 103.
  • Such a time zone setting corresponds to the input of schedule information.
  • the time zone is defined by four elements: time zone name, day of the week (day of monitoring), time (time of monitoring), and judgment logic.
  • the determination logic is logic for determining whether the use of an electric device is beneficial or useless (wasted). That is, the determination logic specifies an evaluation method in the evaluation unit 114.
  • the calculation unit 14 causes the display unit 12 to display a screen (setting screen) G2 for setting common rules as shown in FIG.
  • the window W1 is displayed on the upper center side of the setting screen G2.
  • the window W1 displays a list of common rules created so far. In the example shown in FIG. 8, three time zones of early morning (weekdays), nighttime (weekdays), and lunch break are set in the common rule named “common section light”.
  • buttons B6 to B10 corresponding to “rule details”, “rule addition”, “rule deletion”, “rule duplication”, and “rule association” are displayed.
  • the button B8 is a button for deleting the common rule selected by the user using the input unit 11.
  • the calculation unit 14 deletes the currently selected common rule.
  • the button B9 is a button for duplicating the common rule selected by the user using the input unit 11.
  • the calculation unit 14 duplicates the selected common rule.
  • the button B7 is a button for newly creating a common rule.
  • operation unit 14 causes display unit 12 to display a pop-up screen for inputting the name of a newly created common rule.
  • a name can be input by the input unit 11.
  • the completion operation is performed after the name is input, a new common rule is added to the window W1.
  • the button B6 is a button for displaying details of the common rule.
  • the calculation unit 14 causes the display unit 12 to display a screen (rule detail screen) G3 illustrated in FIG.
  • the name of the set time zone is displayed on the upper center side of the rule details screen G3.
  • the window W2 is displayed on the lower side of the rule details screen G3.
  • a time zone in which the common rule is applied is displayed in a graph.
  • the horizontal axis of this graph is time (00:00 to 24:00), and the vertical axis is the day of the week (Sunday to Saturday).
  • three time zones of early morning (weekdays), nighttime (weekdays), and lunch break are set.
  • the band-like portion hereinafter referred to as a cell
  • a cell the band-like portion corresponding to the time zone registered as the time zone in the graph is hatched.
  • buttons B11 to B14 corresponding to “Delete time zone”, “Add time zone”, “Details of time zone”, and “Modify time zone” are displayed on the right side of the rule details screen G3.
  • the calculation unit 14 performs a process of deleting the selected time zone.
  • the calculation unit 14 causes the display unit 12 to display a screen (pop-up screen) G4 illustrated in FIG. In the center of the pop-up screen G4, a block K1 is displayed for inputting time zone information (name, day of the week, time, determination logic).
  • a button B15 corresponding to “add” is displayed below the pop-up screen G4.
  • the calculation unit 14 performs a process of newly adding a time zone defined by the information input to the block K1.
  • the calculation unit 14 causes the display unit 12 to display a screen (pop-up screen) G5 for confirming information (setting contents) of the selected time zone, as shown in FIG.
  • the name is “early morning (weekdays)”
  • the day of the week is “Monday to Friday”
  • the time is “0:00 am to 6:00 am”
  • the determination logic is “type” A ".
  • the calculation unit 14 causes the display unit 12 to display a screen (not shown) for correcting the time zone.
  • the pop-up screen G4 can be applied to the screen in this case.
  • FIG. 27A shows a determination result when the determination logic A is applied
  • FIG. 27B shows a determination result when the determination logic B is applied
  • FIG. 27C shows a determination result when the determination logic C is applied.
  • time zones from 0:00 to 7:00 and from 10:00 to 24:00 are set as time zones.
  • the time segment filled in with a diagonal line rising to the right is a time segment evaluated that the power consumption in the electrical device is beneficial (use of the electrical device is beneficial).
  • the time segment filled with the mesh line is a time segment evaluated that the power consumption in the electric device is wasted (use of the electric device is wasted).
  • the evaluation unit 114 uses the power consumption amount (measured value stored in the measurement value storage unit 102) during the day and time of the time zone and a predetermined threshold (a value corresponding to the standby power amount of the branch circuit). ). When the power consumption exceeds the threshold, the evaluation unit 114 evaluates that power consumption is useless (see FIG. 27A). In the example shown in FIG. 27A, 0:00 to 2:00, 5:00 to 6:00, and 11:00 in the time zone of 0:00 to 7:00 and 10:00 to 24:00. It is determined that the use of electric equipment in unit time included in the four time zones of -14: 00 and 16:00 to 24:00 is useless. In this case, the evaluation unit 114 may determine that the use of the electric device is beneficial when the measured value does not exceed the threshold value four times or more continuously. In this way, it is possible to prevent erroneous determination due to a measurement error of power consumption.
  • Judgment logic B is a logic for judging waste of power due to forgetting to turn off the device at night.
  • the evaluation unit 114 compares the power consumption amount in the time zone set in the time zone with a predetermined threshold (standby power) for each unit time.
  • the evaluation unit 114 determines that the unit time when the power consumption exceeds a predetermined threshold is the usage period. For example, in the example shown in FIG. 27B, among the time zones of 0:00 to 7:00, 10:00 to 24:00, 0:00 to 2:00, 5:00 to 6:00, 11 Unit times included in four time zones of 1:00 to 14:00 and 16:00 to 24:00 are determined to be usage periods.
  • the evaluation unit 114 treats use periods that are continuous in time series as one unit.
  • the evaluation means 114 is from 0:00 to 2:00, from 5:00 to 6:00, from 11:00 to 14:00, and from 16:00 to 24: Each of up to 00 is treated as one usage period. Then, the evaluation unit 114 determines that the usage period including the end of the time zone (24:00 in the example illustrated in FIG. 27B) is a period in which the use of the electric device is useless. In other words, the evaluation unit 114 determines that only the usage period (16:00 to 24:00 in the illustrated example) at the end of the time zone (for example, 24:00) is forgotten to be erased (see FIG. 27B). .
  • the evaluation unit 114 determines that the usage period that does not include the end of the time zone is a portion where it is difficult to determine whether the use of the electrical equipment is beneficial or useless. According to the determination logic B described above, for example, after the lamp is turned off according to the schedule information, even when the employee operates the switch to turn on / off the lighting equipment a plurality of times, the lighting equipment is turned on last. It can be determined that it is wasteful by extracting only the power consumption.
  • Judgment logic C is a logic for judging waste of power due to forgetting to turn off the device in the early morning.
  • the criteria for determining whether the usage period is a useless period is different from the determination logic B.
  • the evaluation unit 114 determines that the use period including the beginning of the time zone (0:00 in the example illustrated in FIG. 27B) is a period in which the use of the electric device is useless. In other words, the evaluation unit 114 determines that the use period (from 0:00 to 2:00 in the illustrated example) relating to the beginning of the time zone (for example, 0:00) is waste due to forgetting to turn off (see FIG. 27C). .
  • the evaluation unit 114 determines that the usage period that does not include the end of the time zone is a portion where it is difficult to determine whether the use of the electrical equipment is beneficial or useless. According to the above-described determination logic C, for example, even if an employee who went to work early in the morning after turning off the light according to the schedule information turns on / off the lighting device several times by operating the switch, the lighting device is first turned on. Only power consumption before lighting can be extracted and determined as useless.
  • the determination logics B and C evaluate whether the use of the electric device is beneficial or wasteful by comparing the change pattern of the power consumption of the electric device with a predetermined change pattern (change pattern based on the schedule information).
  • the predetermined change pattern is, for example, a change pattern when the use of an electric device is beneficial (for example, a change pattern that does not start or end of the time zone), or a change pattern when the use of an electric device is useless (for example, a time pattern). Change pattern at the beginning and end of the zone).
  • determination logics B and C can easily determine whether the use of the electric device is beneficial or not, depending on whether the change pattern of the power consumption of the electric device corresponds to a predetermined pattern.
  • the determination logics B and C are useful or useless with high accuracy even though they do not require complicated settings as compared to the determination logic A that simply determines whether the power consumption exceeds a predetermined threshold. Can be determined.
  • a determination logic for determination may be used.
  • Judgment logic as described above can extract unintentional consumption due to forgetting to erase, although there are few items to set.
  • the time zone may be a relatively determined time instead of a fixed time. For example, from 3 hours after sunset to 24:00 may be a time zone for monitoring forgetting to turn off at night, or from 0:00 to before sunrise may be a time zone for monitoring forgetting to turn off early in the morning. What is necessary is just to acquire the time of sunset or sunrise from an external server (not shown) etc. via the communication network NT.
  • the last exit time may be acquired from an entrance / exit management device that manages entrance / exit to a predetermined area, and the time from the last exit time to 24:00 may be used as a time zone for monitoring forgetting to turn off at night.
  • adding the presence / absence of the presence of the user (power user) to the determination condition is greatly useful for improving the determination accuracy of the consumed power amount counted as wasted.
  • a similar effect can be expected by acquiring an output signal from the human sensor. If the building where the electrical equipment is installed is a store, the time from the store closing time to 24:00 may be used as a time zone for monitoring forgetting to turn off at night. A forgetting monitoring period can be set. Since such a setting can be determined in accordance with the season and store operation, the determination accuracy can be further improved.
  • the calculation unit 14 causes the display unit 12 to display a pop-up screen G6 shown in FIG.
  • the pop-up screen G6 displays a left column W3 that displays the name of the measurement point associated with the common rule (for example, 1F—shared-unit light) and a right column W4 that displays the measurement point that is a candidate for association. .
  • the measurement point of the linking candidate is displayed hierarchically.
  • the pop-up screen G6 displays a setting button B16, a cancel button B17, and an OK button B18.
  • the calculation unit 14 moves one or more measurement points selected in the right column W4 to the left column W3 and associates them with the common rule. Thereafter, when the OK button B18 is selected, the calculation unit 14 performs processing for saving the content set using the setting button B16 and closing the pop-up screen G6. Therefore, in order to perform the association, after selecting one or more measurement points to be associated with the common rule from the right column W2, the setting button B16 is selected, and the OK button B18 is selected.
  • the calculation unit 14 moves the measurement point selected in the left column W3 to the right column W4 and cancels the association with the common rule. Thereafter, when the OK button B18 is selected, the calculation unit 14 performs processing for saving the content released using the release button B17 and closing the pop-up screen G6. Therefore, in order to cancel the linking, a cancel button B17 is selected after selecting a desired measurement point from the measurement points displayed in the left column W3, and an OK button B18 is selected.
  • the power consumption receiving unit 101 executes a process of taking in the data of the power consumption collected in another system (a system different from the energy management system). For example, it is assumed that a file indicating power consumption data collected by another system is stored in a storage medium (for example, a memory card) in the CSV format. In this case, the storage medium is inserted into the reading device of the terminal device 1A.
  • the power consumption receiving unit 101 takes in the above file from the storage medium.
  • FIG. 13 shows the contents of the above file.
  • the file shown in FIG. 13 has a CSV file format and four data strings DAT1 to DAT4. In FIG. 13, the leftmost data string DAT1 is date data.
  • the data string DAT2 is time data.
  • the data string DAT3 is data obtained by measuring the power consumption amount on the north side of the common use section light 1F every hour.
  • the data string DAT4 is data obtained by measuring the amount of power consumption on the south side of the shared section lamp 1F every hour.
  • a character string and a unit indicating the contents of the data strings DAT1 to DAT4 are described in the head portion of the file.
  • the calculation unit 14 causes the display unit 12 to display a parameter setting screen G7 as shown in FIG.
  • the setting screen G7 is a screen for inputting, as a parameter, a coefficient (converted value) for converting the power consumption amount into a power charge or CO 2 emission amount.
  • the unit of power consumption is not limited to kilowatt hours (kwh), but may be British heat (Btu) or megajoules (MJ). That is, the unit according to the actual situation of each country can be used for units such as the amount of power consumption and the electricity charge.
  • the setting screen G7 has an input block K2 for inputting a conversion value for converting the power consumption into a power charge, and an input block for inputting a conversion value for converting the power consumption into a CO 2 emission amount.
  • K3 is displayed.
  • the calculation unit 14 causes the storage unit 13 to store the converted values input to the input blocks K2 and K3. Each converted value stored in the storage unit 13 is used in subsequent calculations. Each conversion value may be input by the user using the input unit 11.
  • the calculating part 14 may access a predetermined
  • the amount of power consumption is displayed. However, when the device to be managed is a toilet using water (see FIG.
  • a stove using gas or a water heater, the amount of water used.
  • the amount of gas used may be displayed.
  • a coefficient for converting the amount of water used ([m 3 ]) into a water rate and a factor for converting the amount of gas used ([Nm 3 ]) into a gas rate are entered. You may be able to do it.
  • step S10 a process for creating or selecting a file for storing the simulation result is performed.
  • the calculation unit 14 causes the display unit 12 to display a simulation top screen G8 illustrated in FIG.
  • the top screen G8 displays a calculator block K4 on the left side and a window W5 displaying a list of measurement points in the center.
  • the top screen G8 displays date blocks K5 and K6 at the lower center of the screen.
  • the top screen G8 displays the calendar area K7 on the lower right.
  • the top screen G8 displays buttons B19 to B21 for selecting a simulation type on the left side.
  • the calculator block K4 is used for displaying simulation results.
  • the calculator block K4 uses, for example, the power consumption estimated to be useless when the common rule selected in the simulation is applied to the stored power consumption data (measured values stored in the measured value storage unit 102). Is displayed numerically.
  • Window W5 displays a list of weighing points.
  • the window W5 displays the registered measurement points in a list format.
  • the measurement points are hierarchically displayed for each group.
  • the date block K5 displays the start date of the simulation.
  • the date block K6 displays the end date of the simulation.
  • the calendar area K7 displays a calendar.
  • a day with power consumption data and a day without power consumption data are displayed separately.
  • the calendar area K7 is underlined on days when there is no power consumption data and is displayed without being underlined on days with power consumption data. In this way, it is possible to prevent a day without power consumption data from being selected during the simulation period.
  • buttons B19 to B21 correspond to “point-by-point simulation”, “date-by-date simulation”, and “state comparison”, respectively.
  • the point-by-point simulation is a simulation for paying attention to one measurement point and determining whether or not there is a time segment that is determined not to be useful due to forgetting to erase.
  • a measurement point for simulation is selected from the measurement points displayed in the window W5 (step S11).
  • a simulation period is input (step S12).
  • the calculation unit 14 causes the display unit 12 to display a pop-up screen G9 shown in FIG.
  • a pop-up screen G9 an operation for selecting a start date and an end date of the simulation period can be performed.
  • the start date selected in the pop-up screen G9 is displayed in the date block K5
  • the end date selected in the pop-up screen G9 is displayed in the date block K6.
  • the calculation unit 14 causes the display unit 12 to display a point-by-point simulation screen G10 illustrated in FIG. (Step S13).
  • the simulation screen G10 displays a time zone with rectangular cells arranged in a matrix of 7 ⁇ 24.
  • the vertical direction is the date and time (day of the week), and the horizontal direction is the time (0:00 to 24:00).
  • the simulation screen G10 displays the time zone (cell) in which the common rule is set, surrounded by thick line frames FL1 and FL2.
  • FIG. 17 there are a unit time (time division) in which it is determined that the use of the electric device is beneficial, a unit time in which the use of the electric device is determined to be useless, and a unit time in which the electric device is not used. , Are displayed in different colors. Since FIG. 17 is a black-and-white diagram, for convenience, the unit time determined to be useful for using the electric device and the unit time determined to be useless are displayed with different cell fill patterns. The unit time for which it is determined that the use of the electric device is useful is displayed with a diagonal line rising to the right, and the unit time for which the use of the electric device is determined to be useless is displayed with a mesh line.
  • the simulation screen G10 displays the display blocks K8 and K9 on the upper side of the screen.
  • the display block K8 displays a simulation period.
  • the display block K9 displays the name of the weighing point.
  • the simulation screen G10 displays a red icon I1, a yellow-green icon I2, and a yellow icon I3 below the display blocks K8 and K9.
  • Icons I1 to I3 are arranged in the order of icons I1, I2, and I3 from left to right. Since FIG. 17 is a black and white figure, the difference in the colors of the icons I1 to I3 is indicated by the difference in the shaded pattern. That is, the red icon I1 is indicated by a mesh line, the yellow-green icon I2 is indicated by a right-down diagonal line, and the yellow icon I3 is indicated by a right-up diagonal line.
  • the icon I1 indicates the display color (display pattern) of the time segment in which it is determined that the use of the electric device is useless.
  • the simulation screen G10 displays the total power consumption (1 kWh in the illustrated example) corresponding to the icon I1 on the right side of the icon I1.
  • the icon I2 indicates a display color (display pattern) of a time segment that is determined to be useless according to the common rule but is reevaluated as not useless according to the exception rule.
  • the simulation screen G10 displays the total power consumption (0 kWh in the illustrated example) corresponding to the icon I2 on the right side of the icon I2.
  • the icon I3 indicates a display color (display pattern) of a time section in which the electric device is used in a time zone in which no common rule (time zone) is set.
  • the simulation screen G10 displays the total power consumption amount (126 kWh in the illustrated example) corresponding to the icon I3 on the right side of the icon I3.
  • the unit of power consumption is not limited to kilowatt hours (kwh), but may be British heat (Btu) or megajoules (MJ). Further, the CO 2 emission amount may be displayed instead of the power consumption amount.
  • the simulation screen G10 displays three selection buttons B22 to B24 on the upper right.
  • the three selection buttons B22 to B24 are arranged in the order of selection buttons B22, B23, and B24 from left to right.
  • the selection button B22 displays the current schedule information of the control devices 5A and 5B on the simulation screen G10, and stores the contents of the schedule information input to the terminal device 10A in the setting storage means 51A and 51B of the corresponding control devices 5A and 5B. This is a schedule reflection button for reflecting the contents of the stored schedule information.
  • the selection button B23 is a simulation execution button. When the selection button B23 is selected, the calculation unit 14 calculates how much amount is obtained when the simulation result is applied not only to the simulated measurement point but also to all the registered measurement points.
  • the calculation unit 14 displays the recalculated result in the entire field of the simulation screen G10 that is the previous screen.
  • the selection button B24 is a rule saving button for saving the simulation result. When the selection button B24 is selected, the calculation unit 14 saves the rules used for the simulation in a file, a database, or the like.
  • the simulation screen G10 shown in FIG. 17 is based on the power consumption measured at the measurement point of the 6th-floor air-conditioning power amount during a week from March 1 (Saturday) to March 7 (Friday). It is the screen which performed the simulation.
  • the determination means 103 compares the amount of power consumption for each hour taken from the measurement point with a predetermined threshold (corresponding to the standby power amount).
  • the usage information display unit 105 colors and displays on the simulation screen G10 only the cells corresponding to the period in which the power consumption exceeds a predetermined threshold (that is, the period in which the electrical equipment connected to the branch circuit is operating). Note that the usage information display unit 105 displays a cell corresponding to a period in which the power consumption is less than a predetermined threshold (that is, a period in which the electrical equipment is stopped) by non-display (for example, background color or white), thereby It is displayed separately from the cell corresponding to the period when the electric energy exceeds a predetermined threshold.
  • a predetermined threshold that is, the period in which the electrical equipment is stopped
  • the time zone surrounded by the frames FL1 and FL2 indicates the time zones TZ1 and TZ2 of the common rule applied to the measurement points.
  • the day of the time zone TZ1 is from Monday to Friday, and the time is from midnight to 6:00 am.
  • the day of the time zone TZ2 is from Monday to Friday, and the time is from 10 pm to 12 pm (midnight).
  • the display color pattern of the cell is varied depending on whether or not a common rule is set for the cell. That is, the use state display unit 105 displays cells for which no common rule is set. As a result, the cells for which the common rule is not set and it is determined that the electric device is used are displayed in the same color (shaded pattern) as the icon I3.
  • the evaluation display means 116 displays cells for which common rules are set. As a result, the cells in which the common rule is set and the use of the electric device is determined to be useless are displayed in the same color (shaded pattern) as the icon I1. On the other hand, a cell for which a common rule is set and which is determined to be beneficial to use an electric device is displayed in the same color (shaded pattern) as the icon I2.
  • time zone TZ2 can be changed, for example, by dragging the left side of the frame FL indicating the start time of the time zone TZ2 with the mouse.
  • the evaluation unit 114 evaluates whether or not the use of the electric device is beneficial for the changed time zone TZ2 by using the above-described determination logic A (step S15). Thereafter, the evaluation display means 116 displays the evaluation result of the evaluation means 114 (step S16).
  • the simulation screen G11 shown in FIG. 18 shows the result of evaluating whether or not the use of the electrical equipment is useless for the changed time zone TZ2.
  • the evaluation unit 114 determines whether or not to evaluate whether or not the use of the electric device is useless based on the operation input from the input unit 11 (step S17). For example, when the measurement point is changed, the process returns to step S11, and when the time zone is changed, the process returns to step S13. Thereby, it is evaluated whether or not the use of the electric device is useless at the changed measurement point or time zone.
  • the calculation unit 14 displays a screen (not shown) showing an operation menu. ) Is displayed in a pop-up on the display unit 12.
  • the screen showing the operation menu displays operation buttons for changing the time zone.
  • the calculation unit 14 causes the display unit 12 to display a time zone change screen G12 as shown in FIG.
  • the time zone change screen G12 is a screen for changing the time zone name, day of the week, time, and judgment logic.
  • the time zone change screen G12 accepts changes in the time zone name, day of the week, time, and determination logic.
  • the input of the name, day of the week, time, and determination logic of the time zone to be changed is performed by the input unit 11.
  • the time zone change screen G12 displays a change button B25.
  • the calculation unit 14 changes the time zone based on the name, day of the week, time, and determination logic input on the time zone change screen G12 and stores the change in the storage unit 13.
  • the evaluation unit 114 evaluates whether or not the use of the electric device is useless with the contents of the changed time zone.
  • the simulation screen G10 it is preferable to change the colors of the frames FL1 and FL2 in accordance with the type of determination logic (determination logics A to C). In this way, it can be seen at a glance which judgment logic is applied to the time zone, and setting errors can be prevented and operability can be improved.
  • the line types solid line, dotted line, broken line, etc.
  • line widths of the frames FL1 and FL2 may be changed according to the type of determination logic.
  • the simulation screen G10 shown in FIG. 17 shows the result of using the determination logic A in both of the two time zones TZ1 and TZ2.
  • the determination logic B is used instead of the determination logic A in the time zone TZ2.
  • the determination logic B it is determined whether the power consumption in the unit time at the end (last) of the time zone exceeds a predetermined threshold value.
  • the evaluation unit 114 searches for a unit time (excess portion) where the power consumption exceeds the predetermined threshold from the end of the time zone to the beginning. I will do it.
  • the evaluation unit 114 determines that the use of the electric device is useless in that time period, with the consecutive excess portions as one group.
  • the excess part before that unit time cannot be determined whether the use of electrical equipment is beneficial or useless (Displayed in green).
  • all the excess portions of the time zone cannot be judged whether the use of electrical equipment is beneficial or not (for example, (Displayed in green).
  • the evaluation unit 114 determines that the usage period at the end of the time zone is a period in which the use of the electric device is useless, and determines whether the use period of the other use period is useless. It is determined that the period cannot be determined. Therefore, if the decision logic B is adopted, the cells (Friday 22:00 to 23:00) displayed in the same color as the icon I1 in the simulation screen G13 shown in FIG. It is displayed in a color (for example, green) indicating a portion that cannot be determined. Such determination logic B is preferably applied to a case where 24 o'clock in the night is included in the time zone to be applied.
  • the determination logic C is used instead of the determination logic A in the time zone TZ1.
  • the determination logic C determines that the usage period at the beginning of the time zone is a period in which the use of the electric device is useless, and the other use periods are periods in which it is not possible to determine whether the use of the electric device is useless. Is determined.
  • the determination logic C is preferably applied to an early morning time zone including 0:00.
  • the early morning time zone TZ1 and the night time zone TZ2 are divided at 24:00 (0 o'clock). That is, the time zone is set based on 24 o'clock (0 o'clock). However, the time zone may be set based on the opening time, closing time, sunrise, sunset time, and the like. In this case, it is preferable to link with other systems, or to automatically acquire times such as sunrise and sunset. In this way, even if the time zone reference changes, it is not necessary to reset the time zone of the time zone each time, which increases convenience.
  • the calculation unit 14 displays a time zone addition screen as illustrated in FIG. G14 is displayed on the display unit 12.
  • the time zone addition screen G14 is a screen for adding a time zone.
  • the time zone addition screen G14 receives input of the name, day of the week, time, and determination logic of the time zone to be added.
  • the input unit 11 inputs the name, day of the week, time, and determination logic of the time zone to be added.
  • the time zone addition screen G14 displays an addition button B26. When the add button B26 is selected, the calculation unit 14 creates a new time zone based on the name, day of the week, time, and determination logic input on the time zone addition screen G14, and stores the new time zone in the storage unit 13.
  • the user when adding a time zone during the weekday lunch break, the user operates the input unit 11 to display the time zone addition screen G14.
  • the input unit 11 is operated, for example, the name of the time zone to be added is “weekday lunch break”, the day of the week is “Monday to Friday”, and the time is “12:00 to 12:30”.
  • the determination logic is input as “determination logic A”, and finally the add button B26 is selected.
  • the schedule input means 106 sets a new time zone TZ3 based on the conditions input on the time zone addition screen G14. Information about the time zone TZ3 is stored in the schedule storage means 107. Then, the simulation means 108 recalculates the numerical value to be displayed on the right side of each icon I1 to I3 according to the time zone TZ3.
  • the evaluation unit 114 evaluates whether the use of the device is beneficial or wasteful for the newly added time zone TZ3. In this case, the power consumption amount exceeds a predetermined threshold in the time period from 12:00 to 12:30 from Monday to Friday. Therefore, the evaluation unit 114 determines that the use of the device in the time period from 12:00 to 12:30 from Monday to Friday is useless. As a result, as shown in FIG. 22, the evaluation display unit 116 displays the frame FL3 indicating the newly added time zone TZ3 on the simulation screen G15, and displays the cell corresponding to the frame FL3 in red.
  • the user can determine the optimal schedule information by changing or adding the time zone and executing the simulation.
  • the time zone of the time zone TZ1 is changed from Monday to Friday from 0:00 to 7:30, and the time zone of the time zone TZ2 is changed from Monday to Friday from 19:00 to 24:00. It has changed.
  • the arithmetic unit 14 causes the schedule information (setting storage of the control devices 5A and 5B) taken in from the control devices 5A and 5B, as shown in FIG.
  • the schedule information stored in the section is displayed on the display section 12.
  • a time zone in which the device operates is indicated by a frame FL4.
  • the schedule information before the change specifies that the operation of the device is started at 7:30 and the operation of the device is stopped at 19:00.
  • the schedule reflection button B22 When the schedule reflection button B22 is selected in the state in which the schedule information of the current control devices 5A and 5B is displayed in this way (that is, the simulation screen G17 shown in FIG. 24), the calculation unit 14 is as shown in FIG. Further, the schedule information stored in the schedule storage means 107 is displayed on the display unit 12.
  • the time zone in which the device operates is indicated by frames FL5 and FL6.
  • the newly input schedule information starts the operation of the device at 7:30, stops the operation of the device at 12:00, starts the operation of the device at 12:30, and starts the operation of the device at 19:00. Specify to stop.
  • the schedule transmission means 121 Referring to the confirmation result stored in the confirmation storage unit 120, only the changed schedule information is transmitted to the control devices 5A and 5B.
  • the terminal device 1A transmits the newly created schedule information from the communication unit 15 to the control devices 5A and 5B.
  • the control devices 5A and 5B update the contents of the schedule information stored in the setting storage units 51A and 51B to the contents of the received schedule information (step S18).
  • the calculation unit 14 saves the simulation result (rule, etc.) in a file, database, or the like (step S19).
  • the presence / absence of power consumption during a predetermined period is displayed for each unit time on the display unit 12 of the terminal device 1A.
  • the user can input device schedule information while viewing the usage state of the device.
  • the simulating unit 108 uses the power consumption when the device is operated with the input schedule information based on the power consumption received by the power consumption receiving unit 101 (that is, the amount of power actually consumed by the device). Predict. Therefore, it is easy to understand the effect of power saving by changing the schedule information, and it is possible to easily create practical schedule information that can be expected to have more energy saving effect according to the usage form of the device.
  • the energy management system of this embodiment determines whether the use of a device is beneficial or wasteful for each unit time based on the power consumption of the device and schedule information, and displays the determined result. Therefore, it can be easily understood whether the use of the device is beneficial or wasteful, and the schedule information can be appropriately changed. In addition, the schedule information can be easily reflected in the control devices 5A and 5B.
  • the determination unit 103 determines whether or not the device has been used. However, you may make it acquire the historical information which shows the operation period of an apparatus from control apparatus 5A, 5B. In this case, the operation / stop of each device can be determined using the history information from the control devices 5A and 5B. Therefore, it can be determined whether or not the use of each device is beneficial.
  • the energy management program is installed in the terminal devices 1A and 1B, and the terminal devices 1A and 1B include at least the power consumption receiving unit 101, the measured value storage unit 102, the determination unit 103, and the determination storage.
  • Means 104, usage information display means 105, schedule input means 106, schedule storage means 107, simulation means 108, predicted value storage means 109, and predicted value display means 110 are caused to function.
  • Such an energy management program may be installed in the monitoring device 2.
  • the energy management system of the present embodiment may be configured to manage the power consumption of the monitored device in a building such as a supermarket, a business office, or a house.
  • the device to be monitored may be an electrical device other than a lighting fixture or an air conditioner (for example, a personal computer, a printer, a copy machine, an air cleaner, a ventilation fan).
  • the above-described energy management system employs electricity as an energy resource used in the device, and manages the amount of electricity (power consumption) used in the device.
  • the device to be monitored may be a device that uses fluid energy resources such as water and gas.
  • FIG. 28 shows a schematic diagram in which a part of a modification of the energy management system of the present embodiment is omitted.
  • the building B shown in FIG. 28 has zones Z5 to Z7 corresponding to toilets on the first floor and zone Z8 corresponding to toilets on the second floor.
  • a plurality of flush toilets T1 to T4 using water are installed in each of the zones Z5 to Z8 .
  • human sensors R5 to R8 for detecting a person in each of the zones Z5 to Z8 are installed in each of the zones Z5 to Z8.
  • a main pipe 70 and four branch pipes 71 to 74 branched from the main pipe 70 are installed. These pipes 70 to 74 are water pipes. Each of the branch pipes 71 to 74 is used for supplying water to each of the toilets T1 to T4. Each branch pipe 71 to 74 is provided with measuring points P11 to P14 for measuring the flow rate.
  • toilets T1 to T4 are illustrated as devices. However, the device may be a water heater or a faucet other than the toilet bowl. Furthermore, the device may be a stop cock that can be remotely controlled. In this case, useless water can be prevented when the faucet is forgotten to be tightened or when the faucet is loosely tightened.
  • the energy management system shown in FIG. 28 includes a measuring device 3A and a control device 5C in addition to the terminal devices 1A and 1B and the monitoring device 2 described above.
  • the measuring device 3A is a flow rate monitoring device that monitors the amount of water used in the toilet bowls T1 to T4 and outputs it to the monitoring device 2 and the terminal device 1A.
  • the measuring device 3A includes flow meters 31A to 34A installed in the building B and a collecting device 35A. Each of the flow meters 31A to 34A is connected to the collecting device 35A via the signal line LN5. Each of the flow meters 31A to 34A measures the flow rate at the corresponding measurement point P11 to P14 every predetermined measurement cycle.
  • Each flow meter 31A to 34A functions as a measurement value acquisition means for acquiring a measurement value indicating a value obtained by measuring the amount of water used in the device during a predetermined period.
  • the flow rates in the branch pipes 71 to 74 are the total values of the flow rates used in the plurality of toilets T1 to T4 belonging to the zones Z5 to Z8.
  • Each flow meter 31A to 34A stores the acquired measurement value in a built-in memory (not shown).
  • Each of the flow meters 31A to 34A is configured to output the measurement value stored in the built-in memory to the collection device 35A every time a predetermined transmission cycle elapses.
  • the collecting device 35A receives the measurement values output from the flow meters 31A to 34A.
  • the collecting device 35A functions as a first storage unit that stores the measurement values received from the flow meters 31A to 34A in association with the measured date and time.
  • the collection device 35A is connected to the monitoring device 2 via the communication network NT.
  • the collecting device 35A transmits the measurement values in the branch pipes 71 to 74 to the monitoring device 2 in response to a request from the monitoring device 2 (for example, when the monitoring data request signal is received from the monitoring device 2). Configured.
  • the control device 5C is a toilet control device that controls the operation of the toilets T1 to T4.
  • the control device 5C sends and receives transmission signals to / from desired toilets T1 to T4 or human sensors R5 to R8 by sending transmission signals including address information to the transmission line LN4. Since such a control device 5C has the same configuration as the control device 5A, a detailed description thereof will be omitted.
  • storage part 13 of terminal device 1A, 1B shown in FIG. 28 is equipped with the program for performing the management of water usage, the simulation of the usage of water, and the evaluation whether use of an apparatus is beneficial. Is done.
  • the terminal devices 1A and 1B execute this program, a function for managing the amount of water used, a function for simulating the amount of water used, and a function for evaluating whether the use of the device is beneficial are realized.
  • the energy management system according to the present invention only needs to be configured to manage the amount of energy resources used in the equipment, and the energy resources are not limited to electricity, but water or gas. Can be adopted. That is, the energy management system according to the present invention may be configured to manage water usage and gas usage in addition to power consumption. In addition, the energy management system according to the present invention only needs to be configured to manage the usage amount of at least one energy resource (for example, electric power, water, gas).
  • at least one energy resource for example, electric power, water, gas.
  • the control devices 5A to 5C store device schedule information.
  • the schedule information may be included in the device. That is, each device may be configured to store schedule information and operate according to the stored schedule information.
  • the terminal device 1A has been changed for a device that needs to change the schedule information according to the change contents of the schedule information input using the schedule input unit 106. You may comprise so that schedule information may be set. That is, the terminal device 1A may be used as a device setting unit for setting schedule information for each device remotely.

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 エネルギーマネジメントシステムは、判定手段(103)と、使用情報表示手段(105)と、スケジュール入力手段(106)と、シミュレート手段(108)と、予測値表示手段(110)とを備える。判定手段(103)は、電気機器の所定期間中の消費電力量(計測値)に基づいて電気機器が使用されたかどうかを単位時間毎に判定する。使用情報表示手段(105)は、判定手段(103)の判定結果に基づいて電気機器が使用されたどうかを単位時間毎に表示する。スケジュール入力手段(106)は、所定期間中の電気機器の動作を単位時間毎に定義するスケジュール情報の入力をユーザに要求する。シミュレート手段(108)は、スケジュール入力手段(106)で入力されたスケジュール情報どおりに電気機器が動作した場合の消費電力量(予測値)を計測値に基づいてシミュレートする。予測値表示手段(110)は、シミュレート手段(108)で演算された予測値を表示する。

Description

エネルギーマネジメントシステム及びコンピュータプログラム
 本発明は、エネルギーマネジメントシステム及びコンピュータプログラムに関する。
 従来から、日本国公開特許公報8-50501に見られるようなエネルギーマネジメントシステムシステム(EMS)がある。
 このエネルギーマネジメントシステムシステムは、建物や施設内に設置された電気機器の電力使用量のデータ・環境情報(温度や湿度)や各電気機器の制御情報などのデータを収集し、所定の期間(例えば日、月、年の単位)毎に収集したデータを集計して、電力消費量をグラフ(折れ線グラフや棒グラフ)で表示する。
 このようなエネルギーマネジメントシステムは、電気機器の動作を指示するスケジュール情報に基づいて電気機器を制御する。そのため、電気機器の消費電力量を低減するためには、スケジュールを適切に設定する必要がある。
 しかしながら、上述のエネルギーマネジメントシステムでは、収集した電力消費量をグラフで表示するだけである。
 そのため、スケジュール情報を変更した際に電力消費量がどの程度低減されるかは、エネルギー管理技術に精通し十分な知識を有する管理者にしか判らなかった。
 本発明は上記問題点に鑑みて為された。本発明の目的は、エネルギー資源の使用量を低減するスケジュール情報を作成できるエネルギーマネジメントシステム及びコンピュータプログラムを提供することにある。
 本発明に係るエネルギーマネジメントシステムは、機器を管理するエネルギーマネジメントシステムであって、取得手段と、計測値記憶手段と、判定手段と、判定記憶手段と、使用情報表示手段と、スケジュール入力手段と、スケジュール記憶手段と、シミュレート手段と、予測値記憶手段と、予測情報表示手段とを備える。上記取得手段は、所定期間中に上記機器で使用されたエネルギー資源の量を計測した値を示す計測値を取得するように構成される。上記計測値記憶手段は、上記取得手段が取得した上記計測値を記憶するように構成される。上記判定手段は、上記計測値記憶手段に記憶された上記計測値に基づいて上記機器が使用されたかどうかを単位時間毎に判定するように構成される。上記判定記憶手段は、上記判定手段が判定した結果を示す判定結果を記憶するように構成される。上記使用情報表示手段は、上記判定記憶手段に記憶された上記判定結果に基づいて上記機器が使用されたどうかを上記単位時間毎に表示するように構成される。上記スケジュール入力手段は、上記所定期間中の上記機器の動作を上記単位時間毎に定義するスケジュール情報の入力を受け付けるように構成される。上記スケジュール記憶手段は、上記スケジュール入力手段を用いて入力された上記スケジュール情報を記憶するように構成される。上記シミュレート手段は、上記スケジュール記憶手段に記憶された上記スケジュール情報にしたがって上記機器が動作した場合に上記機器で使用されるエネルギー資源の量を示す予測値を上記計測値記憶手段に記憶された上記計測値に基づいて算出するように構成される。上記予測値記憶手段は、上記シミュレート手段で算出された上記予測値を記憶するように構成される。上記予測情報表示手段は、上記予測値記憶手段に記憶された上記予測値を表示するように構成される。
 この発明によれば、上記単位時間毎に上記機器が使用されたか否かを知ることができる。したがって、ユーザは、上記機器が使用されたかどうかを考慮しながら上記スケジュール情報を入力することができる。そして、上記スケジュール情報が入力されると、入力された上記スケジュール情報どおりに上記機器が動作した場合のエネルギー資源の使用量が表示される。そのため、上記スケジュール情報の変更によりどの程度エネルギー資源を節約できるかをユーザが容易に理解できるようになる。その結果、エネルギー資源の使用量を低減するための上記スケジュール情報を上記機器の使用形態に合わせて容易に作成できる。
 好ましくは、評価手段と、評価記憶手段と、評価表示手段とをさらに備える。上記評価手段は、上記計測値記憶手段に記憶された計測値と上記スケジュール記憶手段に記憶された上記スケジュール情報とに基づいて上記機器の使用が有益か無駄かを上記単位時間毎に評価するように構成される。上記評価記憶手段は、上記評価手段が評価した結果を示す評価結果を記憶するように構成される。上記評価表示手段は、上記評価記憶手段に記憶された上記評価結果に基づいて上記機器の使用が有益か無駄かを上記単位時間毎に表示するように構成される。
 この場合、上記機器の使用が有益か無駄かを容易に理解でき、上記スケジュール情報の変更を適切に行える。
 好ましくは、上記評価手段は、上記計測値記憶手段に記憶された上記計測値の時間変化が所定の条件を満たしていれば、上記機器の使用が無駄であると評価するように構成される。
 より好ましくは、上記所定の条件は、上記計測値が所定の閾値を越える期間が所定の時間継続されたことである。
 この場合、上記機器の使用が有益か否かを容易に判断できる。
 好ましくは、上記機器の種類と上記機器が設置されている場所を示す設置エリアとを上記機器毎に記憶する機器情報記憶手段を備える。上記評価手段は、上記機器情報記憶手段に記憶された上記機器毎の上記種類と上記設置エリアに基づいて同じ上記設置エリアに上記種類が異なる複数の上記機器があるかどうかを確認するように構成される。上記評価手段は、同じ上記設置エリアに上記種類が異なる複数の上記機器がある場合、上記各機器の上記種類と上記判定結果との組み合わせに基づいて上記機器の使用が有益か無駄かを評価するように構成される。
 この場合、上記機器の使用が有益か否かを確実に判断できる。
 好ましくは、上記評価手段は、上記機器の使用が無駄と判断された時間が所定の例外条件を満たす場合、当該時間での上記機器の使用を有益と評価するように構成される。
 この場合、上記機器の使用が有益か否かをより正確に判断できる。
 好ましくは、上記各機器が設置されている場所を示す設置エリアを上記機器毎に記憶する情報記憶手段と、上記設置エリア内の人の存否を検出する人検出手段とを備える。上記例外条件は、上記機器の上記設置エリアで上記人検出手段が人を検出したことである。
 この場合、上記機器の上記設置エリアに人がいる場合には、上記機器の使用が無駄ではないと評価される。そのため、実情に沿った評価が行える。
 好ましくは、上記使用情報表示手段は、上記機器で使用されたエネルギー資源の量を数値で表示するように構成される。
 この場合、上記スケジュール情報の設定に応じた上記機器でのエネルギー資源の使用量をより詳細に把握できる。
 好ましくは、上記機器を制御する制御装置と、上記制御装置と通信する設定装置とを備える。上記制御装置は、設定記憶手段と、機器制御手段と、スケジュール受信手段と、スケジュール変更手段とを備える。上記設定記憶手段は、上記スケジュール情報を記憶するように構成される。上記機器制御手段は、上記設定記憶手段に記憶された上記スケジュール情報にしたがって上記機器を制御するように構成される。上記スケジュール受信手段は、上記設定装置から上記スケジュール情報を受信するように構成される。上記スケジュール変更手段は、上記設定記憶手段に記憶された上記スケジュール情報の内容を上記スケジュール受信手段で受信された上記スケジュール情報の内容に変更するように構成される。上記設定装置は、決定手段と、現スケジュール記憶手段と、確認手段と、確認記憶手段と、スケジュール送信手段とを備える。上記決定手段は、上記制御装置の上記設定記憶手段に記憶された上記スケジュール情報の変更の決定を受け付けるように構成される。上記現スケジュール記憶手段は、上記設定記憶手段に記憶された上記スケジュール情報を記憶するように構成される。上記確認手段は、上記スケジュール記憶手段に記憶された上記スケジュール情報と上記現スケジュール記憶手段に記憶された上記スケジュール情報とに基づいて上記スケジュール情報が変更されたかどうかを確認するように構成される。上記確認記憶手段は、上記確認手段が確認した結果を示す確認結果を記憶するように構成される。上記スケジュール送信手段は、上記決定手段を用いて上記設定記憶手段に記憶された上記スケジュール情報の変更が決定されると上記確認記憶手段に記憶された確認結果を参照して変更された上記スケジュール情報だけを上記制御装置に送信するように構成される。
 この場合、上記スケジュール情報の変更を容易に反映させることができる。
 また、好ましくは、複数の計測装置と、上記各計測装置と通信する監視装置と、上記監視装置と通信する端末装置とを備える。上記端末装置は、上記取得手段と、上記計測値記憶手段と、上記判定手段と、上記判定記憶手段と、上記使用情報表示手段と、上記スケジュール入力手段と、上記スケジュール記憶手段と、上記シミュレート手段と、上記予測値記憶手段と、上記予測情報表示手段とを備える。上記各計測装置は、上記所定期間中に上記機器で使用されたエネルギー資源の量を計測して上記計測値を得る計測手段と、上記計測手段で得た上記計測値を記憶する上記第1記憶手段とを備える。上記監視装置は、上記各計測装置の上記第1記憶手段から上記計測値を取得する計測値取得手段と、上記計測値取得手段が取得した上記計測値を記憶する第2記憶手段とを備える。上記取得手段は、上記監視装置の上記第2記憶手段から上記計測値を取得するように構成される。
 本発明に係るプログラムは、機器を管理するエネルギーマネジメントシステムに用いられるプログラムであって、コンピュータを、取得手段と、計測値記憶手段と、判定手段と、判定記憶手段と、使用情報表示手段と、スケジュール入力手段と、スケジュール記憶手段と、シミュレート手段と、予測値記憶手段と、予測情報表示手段として機能させる。上記取得手段は、所定期間中に上記機器で使用されたエネルギー資源の量を計測した値を示す計測値を取得するように構成される。上記計測値記憶手段は、上記取得手段が取得した上記計測値を記憶するように構成される。上記判定手段は、上記計測値記憶手段に記憶された上記計測値に基づいて上記機器が使用されたかどうかを単位時間毎に判定するように構成される。上記判定記憶手段は、上記判定手段が判定した結果を示す判定結果を記憶するように構成される。上記使用情報表示手段は、上記判定記憶手段に記憶された上記判定結果に基づいて上記機器が使用されたどうかを上記単位時間毎に表示するように構成される。上記スケジュール入力手段は、上記所定期間中の上記機器の動作を上記単位時間毎に定義するスケジュール情報の入力を受け付けるように構成される。上記スケジュール記憶手段は、上記スケジュール入力手段を用いて入力された上記スケジュール情報を記憶するように構成される。上記シミュレート手段は、上記スケジュール記憶手段に記憶された上記スケジュール情報にしたがって上記機器が動作した場合に上記機器で使用されるエネルギー資源の量を示す予測値を上記計測値記憶手段に記憶された上記計測値に基づいて算出するように構成される。上記予測値記憶手段は、上記シミュレート手段で算出された上記予測値を記憶するように構成される。上記予測情報表示手段は、上記予測値記憶手段に記憶された上記予測値を表示するように構成される。
 この発明によれば、上記単位時間毎に上記機器が使用されたか否かを知ることができる。したがって、ユーザは、上記機器が使用されたかどうかを考慮しながら上記スケジュール情報を入力することができる。そして、上記スケジュール情報が入力されると、入力された上記スケジュール情報どおりに上記機器が動作した場合のエネルギー資源の使用量が表示される。そのため、上記スケジュール情報の変更によりどの程度エネルギー資源を節約できるかをユーザが容易に理解できるようになる。その結果、エネルギー資源の使用量を低減するための上記スケジュール情報を上記機器の使用形態に合わせて容易に作成できる。
本発明の一実施形態のエネルギーマネジメントシステムの端末装置のブロック図である。 同上のエネルギーマネジメントシステムの概略構成図である。 同上のエネルギーマネジメントシステムの制御装置のブロック図である。 同上における中央監視盤の概略図である。 同上における端末装置の概略図である。 同上の動作を説明するフローチャートである。 同上における端末装置に表示される初期画面の説明図である。 同上における端末装置に表示される設定画面の説明図である。 同上における端末装置に表示される設定画面の説明図である。 同上における端末装置に表示される画面の説明図である。 同上における端末装置に表示される画面の説明図である。 同上における端末装置に表示される画面の説明図である。 同上における端末装置に取り込まれる消費電力量の計測データの説明図である。 同上における端末装置に表示される設定画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置に表示されるシミュレーション画面の説明図である。 同上における端末装置の判定ロジックを説明する説明図である。 同上のエネルギーマネジメントシステムの変形例の概略構成図である。
 本発明に係る一実施形態のエネルギーマネジメントシステムは、例えばテナントビルなどの建物B内に配設された機器の管理に用いられる。本実施形態のエネルギーマネジメントシステムによって管理される機器は、後述するスケジュール情報にしたがって動作する機器であり、例えば、照明器具L1~L4や空調機AC1~AC4などである。
 本実施形態のエネルギーマネジメントシステムは、図2に示すように、端末装置1A,1Bと、監視装置(中央監視盤)2と、計測装置3と、制御装置5A,5Bとを備える。監視装置2は、計測装置3と制御装置5A,5Bとにインターネットのような通信ネットワークNTを介して接続される。また、計測装置3と制御装置5A,5Bとには、それぞれグローバルIPアドレスが設定される。計測装置3と各制御装置5A,5Bとは、通信ネットワークNTを介して通信を行う機能を備える。また、端末装置1Aは、通信ネットワークNTを介して監視装置2に接続される。端末装置1Bは、LANを介して監視装置2に接続される。
 建物Bは、例えば2階建てである。建物Bには、4つのゾーン(設置エリア)Z1~Z4が割り当てられている。3つのゾーンZ1~Z3は、建物Bの1階に割り当てられ、建物Bの1階を3つに区分けしている。ゾーンZ4は、建物Bの2階全体に割り当てられている。
 各ゾーンZ1~Z4には、複数の照明器具L1~L4と、空調機AC1~AC4と、照明用の操作スイッチ(照明スイッチ)S1~S4と、図示しない空調用の操作スイッチ(空調スイッチ)と、人感センサ(人検出手段)R1~R4とが配設される。
 各ゾーンZ1~Z4の照明器具L1~L4と照明スイッチS1~S4と人感センサR1~R4とは、伝送線LN1を介して制御装置5Aに接続される。照明器具L1~L4と照明スイッチS1~S4と人感センサR1~R4とには、個別のアドレス情報が割り当てられる。
 照明スイッチS1~S4は、同じゾーンZ1~Z4内にある照明器具L1~L4のオン/オフなどの操作を行うために用いられる。各照明スイッチS1~S4は、ユーザの操作に対応する操作信号(照明操作信号)を制御装置5Aに送信するように構成される。
 空調スイッチは、同じゾーンにある空調機AC1~AC4のオン/オフなどの操作を行うために用いられる。各空調スイッチは、ユーザの操作に対応する操作信号(空調操作信号)を制御装置5Bに送信するように構成される。
 人感センサR1~R4は、同じゾーンZ1~Z4内の人の存否を感知するように構成される。人感センサR1~R4は、対応するゾーンZ1~Z4において人を検知すると、制御装置5Aへ検知信号(人体検知信号)を送信するように構成される。
 空調機AC1~AC4は、伝送線LN2を介して制御装置5Bに接続される。空調機AC1~AC4には個別のアドレス情報が割り当てられている。
 また、建物B内には、分電盤4が設置される。分電盤4は、主幹ブレーカ40と、複数の分岐ブレーカ41~44とを内蔵する。分岐ブレーカ41に対応する分岐回路61には、ゾーンZ1~Z3の各照明器具L1~L3が接続される。分岐ブレーカ42に対応する分岐回路62には、ゾーンZ4の各照明器具L4が接続される。分岐ブレーカ43に対応する分岐回路63には、ゾーンZ1~Z3の各空調機AC1~AC3が接続される。分岐ブレーカ44に対応する分岐回路64には、ゾーンZ4の空調機AC4が接続される。各分岐回路61~64には、負荷電流を計測するための計量ポイントP1~P4が設けられる。
 計測装置3は、照明器具L1~L4や空調機AC1~AC4などの機器の消費電力量を監視して監視装置2および端末装置1Aに出力するように構成される。計測装置3は、電気機器の消費電力量を計測する消費電力計測手段である。
 計測装置3は、建物B内に設置される電力計31~34と、収集装置(電力監視装置)35とを備える。
 各電力計31~34は、信号線LN3を介して収集装置35に接続される。各電力計31~34は、対応する計量ポイントP1~P4での負荷電流(つまり各分岐回路61~64での消費電力量)を所定の計測周期毎に計測する。よって、各電力計31~34は、所定期間中に機器で使用された電気の量(所定期間中の機器での消費電力量)を計測した値を示す計測値を取得する計測値取得手段として機能する。
 ここで、分岐回路61での消費電力量は、各ゾーンZ1~Z3に属する複数の照明器具L1~L3の消費電力量の合計値である。分岐回路62での消費電力量は、ゾーンZ4に属する複数の照明器具L4の消費電力量の合計値である。分岐回路63での消費電力量は、各ゾーンZ1~Z3に属する空調AC11~AC3の消費電力量の合計値である。分岐回路64での消費電力量は、ゾーンZ4の空調AC4の消費電力量である。このように、本実施形態のエネルギーマネジメントシステムでは、1乃至複数の機器のグループ毎に、消費電力量を計測する。
 各電力計31~34は、取得した計測値を内蔵メモリ(図示せず)に記憶させる。各電力計31~34は、所定の送信周期が経過する毎に、内蔵メモリに記憶された計測値を収集装置35に出力するように構成される。
 収集装置35は、各電力計31~34から出力された計測値を受信する。収集装置35は、各電力計31~34から受信した計測値を計測された日時と関連付けて記憶する第1記憶手段として機能する。また、収集装置35は、通信ネットワークNTを介し監視装置2に接続される。収集装置35は、監視装置2からの要求に応じて(例えば、監視装置2から後述する監視データ要求信号を受信すると)、各分岐回路61~64の計測値を監視装置2に送信するように構成される。
 制御装置5Aは、照明器具L1~L4の動作を制御する照明制御装置である。制御装置5Aは、アドレス情報を含めた伝送信号を伝送線LN1に送出することによって、所望の照明器具L1~L4または照明スイッチS1~S4または人感センサR1~R4との間で伝送信号を授受する。
 制御装置5Aは、コンピュータを用いて構成される。制御装置5Aは、図3(a)に示すように、設定記憶手段51Aと、機器制御手段52Aと、スケジュール受信手段53Aと、スケジュール変更手段54Aと、操作信号受信手段55Aと、検知信号受信手段56Aと、検知信号記憶手段57Aと、履歴送信手段58Aとを備える。
 設定記憶手段51Aは、各照明器具L1~L4のスケジュール情報(動作スケジュール情報)を記憶するように構成される。
 ここで、スケジュール情報とは、所定期間中の機器の動作を単位時間(所定の時間区分)毎に定義する情報である。例えば、制御装置5Aの場合、スケジュール情報は、一週間の各ゾーンZ1~Z4の照明器具L1~L4の動作(点灯または消灯)を30分毎に定義する情報である。なお、照明器具L1~L4をオンにする時刻を点灯時刻といい、照明器具L1~L4をオフにする時刻を消灯時刻という。
 スケジュール受信手段53Aは、端末装置1Aや監視装置2からスケジュール情報を受信するように構成される。
 スケジュール変更手段54Aは、設定記憶手段51Aに記憶されたスケジュール情報の内容をスケジュール受信手段53Aで受信されたスケジュール情報の内容に変更するように構成される。したがって、制御装置5Aは、端末装置1Aや監視装置2からスケジュール情報を取得すると、設定記憶手段51Aのスケジュール情報の内容を更新する。
 操作信号受信手段55Aは、各照明スイッチS1~S4から操作信号を受信するように構成される。
 機器制御手段52Aは、設定記憶手段51Aに記憶されたスケジュール情報にしたがって機器を制御するように構成される。例えば、機器制御手段52Aは、現時刻(制御装置5Aに内蔵された時計の時刻)がスケジュール情報で指定された点灯時刻になると、対応する照明器具L1~L4に点灯制御信号を送信して、対応する照明器具L1~L4を点灯させる。機器制御手段52Aは、現時刻がスケジュール情報で指定された消灯時刻になると、対応する照明器具L1~L4に点灯制御信号を送信して、対応する照明器具L1~L4を点灯させる。
 また、機器制御手段52Aは、操作信号受信手段55Aが受信した照明操作信号に応じて照明器具L1~L4を制御するように構成される。例えば、機器制御手段52Aは、照明スイッチS1~S4からの照明操作信号に応じて照明器具L1~L4に制御信号を送信して、各照明器具L1~L4を点灯または消灯させる。そのため、制御装置5Aによれば、スケジュール情報で指定された時間(点灯時刻または消灯時刻)以外でも照明器具L1~L4を制御することができる。
 検知信号受信手段56Aは、人感センサR1~R4から検知信号を受信するように構成される。
 検知信号記憶手段57Aは、検知信号受信手段55Aが受信した検知信号に基づいて検知信号の履歴を作成して記憶する。つまり、制御装置5Aには検知信号の履歴(いつ人を検出したか)が記憶される。
 履歴送信手段58Aは、検知信号記憶手段56Aに記憶された検知信号の履歴を端末装置1Aや監視装置2に送信するように構成される。また、履歴送信手段58Aは、監視装置2から後述する検知データ要求信号を受信すると、検知信号記憶手段57Aに記憶された各人感センサR1~R4の検知信号の履歴を監視装置2に送信するように構成される。
 制御装置5Bは、空調機AC1~AC4の動作を制御する空調制御装置である。制御装置5Bは、アドレス情報を含めた伝送信号を伝送線LN2に送出することによって、所望の空調機AC1~AC4との間で伝送信号を授受する。
 制御装置5Bは、コンピュータを用いて構成される。制御装置5Bは、図3(b)に示すように、設定記憶手段51Bと、機器制御手段52Bと、スケジュール受信手段53Bと、スケジュール変更手段54Bとを備える。
 設定記憶手段51Bは、空調機AC1~AC4のスケジュール情報を記憶するように構成される。例えば、スケジュール情報は、一週間の各ゾーンZ1~Z4の空調機AC1~AC4の動作を30分毎に定義する情報である。なお、空調機AC1~AC4をオンにする時刻を運転開始時刻といい、空調機AC1~AC4をオフにする時刻を運転終了時刻という。
 スケジュール受信手段53Bは、端末装置1Aや監視装置2からスケジュール情報を受信するように構成される。
 スケジュール変更手段54Bは、設定記憶手段51Bに記憶されたスケジュール情報の内容をスケジュール受信手段53Bで受信されたスケジュール情報の内容に変更するように構成される。したがって、制御装置5Bは、端末装置1Aや監視装置2からスケジュール情報を取得すると、設定記憶手段51Bのスケジュール情報の内容を更新する。
 操作信号受信手段55Bは、各空調スイッチから操作信号を受信するように構成される。
 機器制御手段52Bは、設定記憶手段51Bに記憶されたスケジュール情報にしたがって機器を制御するように構成される。例えば、機器制御手段52Bは、現時刻がスケジュール情報で指定された運転開始時刻になると、対応する空調機AC1~AC4に運転開始信号を送信して、対応する空調機AC1~AC4を始動させる。また、機器制御手段52Bは、現時刻がスケジュール情報で指定された運転終了時刻になると、対応する空調機AC1~AC4に運転終了信号を送信して、対応する空調機AC1~AC4を停止させる。
 また、機器制御手段52Bは、操作信号受信手段55Bが受信した空調操作信号に応じて空調機AC1~AC4を制御するように構成される。例えば、機器制御手段52Bは、空調操作スイッチからの空調操作信号に応じて空調機AC1~AC4に制御信号を送信して、各空調機AC1~AC4を始動または停止させる。そのため、制御装置5Bは、スケジュール情報で指定された時間(運転開始時刻または運転終了時刻)以外でも空調機AC1~AC4を制御できる。
 監視装置2は、図4に示すように、通信部21と、記憶部22と、演算部23とを備える。通信部21は、通信ネットワークNTを経由して計測装置3および制御装置5Aと通信を行うように構成される。演算部23は、所定のデータ収集期間が経過する毎に、前述の監視データ要求信号や検知データ要求信号を通信部21に送信させるように構成される。通信部21と演算部23とによって、計測装置3の収集装置35から計測値を取得する計測値取得手段が構成される。記憶部22は、通信部21が受信した計測値を記憶する第2記憶手段として機能する。また、記憶部22は、通信部21が受信した検知信号の履歴(人感センサR1~R4の測定データ)を記憶する。なお、監視装置2は、複数の計測装置3から計測値を取得するように構成されていてもよい。この場合には、1つの監視装置2で複数の計測装置3の計測値を管理できる。
 端末装置1A,1Bは同様の構成を有する。よって、以下では、端末装置1Aについてのみ説明する。
 端末装置1Aは、図5に示すように、入力部11と、表示部12と、記憶部13と、演算部14と、通信部15とを備えるコンピュータである。入力部11は、キーボードや、マウス、タッチパネルなどである。入力部11は、ユーザが後述するボタンB1~B24の選択や、スケジュール情報の入力を行うために用いられる。表示部12は、ディスプレイ(例えば液晶ディスプレイ)などであって、所定の表示を行うように演算部14によって制御される。記憶部13は、演算部14が実行するプログラムや、消費電力量の計測結果、消費電力のシミュレーション結果などを記憶するために用いられる。記憶部13は、ハードディスクのような大容量記憶装置や、ROM,RAMなどのメモリからなる。演算部14は、CPUなどであって、記憶部13に記憶されたプログラムを実行する。通信部15は、ネットワークNTを経由した通信を行うように構成される。
 記憶部13には、消費電力量の管理・消費電力量のシミュレーション・電力消費が有益か否かの評価を実行するためのプログラム(以下、「エネルギーマネジメントプログラム」という)が搭載される。端末装置1A,1Bがエネルギーマネジメントプログラムを実行することにより、消費電力量の管理機能・消費電力量のシミュレーション機能・電力評価機能が実現される。
 図1に示すように、エネルギーマネジメントプログラムは、機器の消費電力量を管理するために、端末装置1Aを、取得手段101と、計測値記憶手段102と、判定手段103と、判定記憶手段104と、使用情報表示手段105として機能させる。
 取得手段101は、所定期間中に機器で使用されたエネルギー資源の量を計測した値を示す計測値を取得するように構成される。言い換えれば、取得手段101は、1乃至複数の機器を1つのグループとして、グループ単位で所定の時間区分(単位時間)毎に消費電力量を計測した電力量計測結果(計測値)が入力される電力量入力手段である。
 本実施形態の場合、機器は、照明器具L1~L4・空調機AC1~AC4のような電気機器である。よって、エネルギー資源は電気であり、機器で使用されたエネルギー資源の量は機器の消費電力量である。取得手段101は、例えば、通信ネットワークNTを介して監視装置2や制御装置5A,5Bと通信して、各分岐回路61~64での所定期間中(例えば一週間)の消費電力量を受け取る。つまり、取得手段101は、監視装置2の上記第2記憶手段から計測値を取得する。このような取得手段101は、演算部14と通信部15によって実現される。
 計測値記憶手段102は、取得手段101が取得した計測値として記憶するように構成される。このような計測値記憶手段102は、記憶部13と演算部14によって実現される。
 判定手段103は、計測値記憶手段102に記憶された計測値に基づいて所定期間中に機器が使用されたかどうかを単位時間(例えば、30分)毎に判定するように構成される。ただし、本実施形態では、判定手段103は、後述するタイムゾーンに含まれる時間帯については、判定を行わない。判定手段103は、例えば、計測値記憶手段102に記憶された計測値と所定の閾値とを比較する。判定手段103は、計測値が所定の閾値を上回ったときだけ、機器が使用されたと判定する。ここで、所定の閾値は、例えば、対応する分岐回路61~64の待機電力量に相応する値である。つまり、判定手段103は、各分岐回路61~64に接続された機器のうち少なくとも1つが使用されたかどうかを判定する。このような判定手段103は、演算部14によって実現される。
 判定記憶手段104は、判定手段103が判定した結果を示す判定結果を記憶するように構成される。判定記憶手段104は、このような記憶部13と演算部14によって実現される。
 使用情報表示手段105は、判定記憶手段104に記憶された判定結果に基づいて、所定期間中に機器が使用されたどうかを単位時間毎に表示するように構成される。言い換えれば、使用情報表示手段105は、電力量入力手段に入力された電力量計測結果をもとに、所定の時間区分毎に少なくとも消費電力量の有無をグループ単位で表示する。
 このような使用情報表示手段105は、所定期間中の機器の消費電力量を二値化して表示する。使用状態表示手段105は、例えば、図17に示すように、機器が使用された単位時間を、機器が使用されなかった単位時間と区別して表示する(図17では、機器が使用された時間帯を右上がりの斜線で示している)。さらに、使用情報表示手段105は、機器の消費電力量(所定期間中の機器の消費電力量の合計値)を数値で表示するように構成される。このような使用状態表示手段105は、表示部12と演算部14とによって実現される。
 また、エネルギーマネジメントプログラムは、消費電力量のシミュレーションを行うために、端末装置1Aを、スケジュール入力手段106と、スケジュール記憶手段107と、シミュレート手段108と、予測値記憶手段109と、予測値表示手段110として機能させる。
 スケジュール入力手段106は、所定期間中の機器の動作を単位時間毎に定義するスケジュール情報の入力を受け付けるように構成される。言い換えれば、スケジュール入力手段106は、ユーザがスケジュール情報の変更内容を入力するために用いられる。
 本実施形態では、後述するタイムゾーンによってスケジュール情報が規定される。すなわち、タイムゾーンが設定された時間帯が機器をオフとする時間帯となる。例えば、図24に示す例では、スケジュール情報は、月曜日~金曜日の7:30に機器をオン、19:00に機器をオフとすることを規定している。また、図25に示す例では、スケジュール情報は、月曜日~金曜日の7:30に機器をオン、12:00に機器をオフ、12:30に機器をオン、19:00に機器をオフとすることを規定している。このようなスケジュール入力手段106は、入力部11と表示部12と演算部14とによって実現される。
 スケジュール記憶手段107は、スケジュール入力手段106を用いて入力されたスケジュール情報を記憶するように構成される。このようなスケジュール記憶手段107は、記憶部13と演算部14とによって実現される。
 シミュレート手段108は、スケジュール記憶手段107に記憶されたスケジュール情報にしたがって機器が動作した場合の消費電力量を示す予測値を計測値記憶手段102に記憶された計測値に基づいてシミュレートするように構成される。言い換えれば、シミュレート手段108は、スケジュール入力手段106を用いてスケジュール情報の変更内容が入力されると、電力量計測結果に基づいて変更後のスケジュール情報で機器を動作させた場合の消費電力量を予測する。
 例えば、シミュレート手段108は、計測値記憶手段102に記憶された計測値と対応する分岐回路61~64の待機電力量とを比較することで、機器のオン・オフを推測する(この推測には、判定手段103の判定結果を用いても良い)。次に、シミュレート手段108は、機器のオン・オフを推測した結果(推測結果)と上記スケジュール記憶手段に記憶されたスケジュール情報とを比較する。例えば、推測結果では、0:00~6:00がオフ、6:00~18:00がオン、18:00~24:00がオフであり、スケジュール記憶手段107に記憶されたスケジュール情報では、0:00~7:00がオフ、7:00~19:00がオン、19:00~24:00がオフであるとする。この場合、オン・オフが一致する期間、つまり0:00~6:00、7:00~18:00、19:00~24:00では、計測値記憶手段102に記憶された計測値をそのまま用いる。一方、オン・オフが一致しない期間、つまり6:00~7:00、18:00~19:00については、機器の消費電力量を予測する。例えば、6:00~7:00では、推測結果がオン、スケジュール情報がオフであるから、シミュレート手段108は、対応する分岐回路61~64の待機電力量を、6:00~7:00間の単位時間の消費電力量とする。また、18:00~19:00では、推測結果がオフ、スケジュール情報がオンであるから、シミュレート手段108は、電気機器がオンである直近の単位時間(例えば、17:30~18:00)の消費電力量を、18:00~19:00間の単位時間の消費電力量とする。なお、直近の単位時間の消費電力量の代わりに、電気機器がオンと判定された単位時間の消費電力量の平均値を用いても良いし、過去の同じ曜日や異なる曜日の同じ単位時間の消費電力量を用いても良い。このようにして、シミュレート手段108は、所定の期間中の電気機器の消費電力量を推測する。
 予測値記憶手段109は、シミュレート手段108で予測された予測値を記憶するように構成される。予測値記憶手段109は、記憶部13と演算部14とで実現される。
 予測値表示手段110は、予測値記憶手段109に記憶された予測値を表示するように構成される。このような予測値表示手段110は、表示部12と演算部14とで実現される。
 ところで、各機器は、予め設定されたスケジュール情報にしたがってオンまたはオフになるように制御される。例えば、就業時間中(例えば、図24では、月曜日~金曜日それぞれの7:30から19:00までが就業時間である)は全ての機器がオンとなり、就業時間外は全ての機器がオフとなるようなスケジュール情報が設定される。この場合、全ての機器がスケジュール情報通りに動作していれば、就業時間外に電力が消費されることがない。しかしながら、全ての機器がスケジュール情報通りに使用されるとは限らない。例えば、就業時間外に従業員が何らかの作業を行いたい場合、従業員が照明スイッチS1~S4等を操作して所望の機器(照明器具L1~L4または空調機AC1~AC4)を動作させることがある。このとき、従業員が機器を停止し忘れて退社すると、機器がそのまま動作し続ける。この場合、機器の使用は無駄であるから、電力の消費が無駄である(例えば、図24では、網線で示す部分が機器の使用が無駄な部分である)。
 そこで、エネルギーマネジメントプログラムは、機器での電力消費が有益か否か(機器の使用が有益か無駄か)の評価を実行するために、端末装置1Aを、履歴受信手段111と、履歴記憶手段112と、機器情報記憶手段113と、評価手段114と、評価記憶手段115と、評価表示手段116として機能させる。
 履歴受信手段111は、検知信号の履歴(人感センサR1~R4の測定データ)を受け取るように構成される。例えば、履歴受信手段111は、監視装置2や制御装置5A,5Bと通信して、所定期間中の検知信号の履歴(人感センサR1~R4の測定データ)を受け取る。このような履歴受信手段111は、演算部14と通信部15とで実現される。
 履歴記憶手段112は、履歴受信手段111が受信した検知信号の履歴を記憶するように構成される。このような履歴記憶手段112は、記憶部13と演算部14とで実現される。
 機器情報記憶手段113は、各機器の情報を記憶するように構成される。ここで、各機器の情報とは、機器の種類と、機器が設置されている場所を示す設置エリアとである。例えば、機器の種類には、照明器具と空調機とが含まれ、機器の設置エリアには、ゾーンZ1~Z4が含まれる。例えば、機器L1については、種類が「照明器具」、設置エリアが「ゾーンZ1」という情報が機器情報記憶手段113に記憶されている。このような機器情報記憶手段113は、記憶部13と演算部14とで実現される。
 評価手段114は、計測値記憶手段102に記憶された計測値とスケジュール記憶手段107に記憶されたスケジュール情報とに基づいて機器の使用が有益か無駄かを単位時間毎に判定するように構成される。言い換えれば、評価手段114は、電力量入力手段に入力された各時間区分における消費電力量とスケジュール情報とに基づいて、各時間区分での消費電力量が有益か否かを評価する電力評価手段である。このような評価手段114は、演算部14で実現される。
 例えば、評価手段114は、スケジュール情報によればオフであるはずの機器がオンであれば、機器の使用が無駄であると判定する。
 例えば、評価手段114は、スケジュール記憶手段107に記憶されたスケジュール情報(本実施形態では、タイムゾーン)を参照して、機器が停止している期間(タイムゾーンに含まれる期間)の計測値を選択する。評価手段114は、選択した計測値と所定の閾値(対応する分岐回路61~64の待機電力量に相応する値)とを比較する。評価手段114は、計測値が所定の閾値を上回っていれば、機器の使用が無駄であると判定する。例えば、図17に示す例では、3月7日(金)の22:00~23:00の間の機器の使用が無駄と判定されている。
 また、評価手段114は、計測値記憶手段102に記憶された計測値の時間変化が所定の条件を満たしていれば、機器の使用が無駄であると評価するように構成されていてもよい。上記の所定の条件は、計測値が所定の閾値を越える期間が所定の時間継続されたことである。例えば、評価手段114は、計測値が所定の閾値を連続して所定回数(例えば4回)以上越えたときに機器の使用を無駄と判断する。このようにすれば、例えば、本来は機器の使用が無駄ではないのに、ノイズなどによる消費電力量の測定誤差によって、機器の使用が無駄であると判定してしまうことを防止できる。
 また、スケジュール情報ではオフである機器が実際にはオンであっても、機器の使用が有益な使用である場合がある。例えば、従業員が就業時間外に作業している場合である。
 そこで、評価手段114は、機器の使用が無駄と判断された単位時間が例外条件(例外ルール)を満たす場合には、当該単位時間での機器の使用を有益と評価するように構成される。このようにすれば、機器の使用が有益か否かをより正確に判断できる。
 例外条件には、機器の設置エリアで対応する人感センサR1~R4が人を検出したことを採用できる。例えば、評価手段114は、機器の使用を無駄と評価した場合には、機器の設置エリアを機器情報記憶手段113から取得する。また、評価手段114は、機器の設置エリアに対応する検知信号の履歴を履歴記憶手段112から取得する。そして、評価手段114は、機器の使用が無駄と判断された単位時間に、機器と同じゾーンZ1~Z4に設置されている人感センサR1~R4が検知信号を出力していれば、機器の使用が有益であると評価(再評価)する。この場合、人がいる場所では、機器の使用が無駄ではないと評価される。そのため、実情に沿った評価が行える。なお、例外条件によって無駄ではないと再評価する場合としては、例えば、就業時間外で残業したり早出したりして作業を行った場合や、タイムゾーン内で機器を使用したものの使用後にきちんと忘れずに電気機器を停止させた場合などがある。よって、これらに対応した例外条件を設定してもよい。
 また、評価手段114は、同じ設置エリアに種類が異なる複数の機器がある場合、各機器の種類と判定手段103の判定結果との組み合わせに基づいて、機器の使用が有益か無駄かを評価するように構成されていてもよい。具体的には、評価手段114は、機器情報記憶手段113から設置エリアと種別を読み出す。そして、記評価手段114は、機器情報記憶手段113に記憶された機器毎の種類と設置エリアに基づいて同じ設置エリアに種類が異なる複数の機器があるかどうかを確認する。評価手段114は、同じ設置エリアに種類が異なる複数の機器がある場合、各機器の種類と判定結果との組み合わせに基づいて機器の使用が有益か無駄かを評価する。この場合、機器の使用が有益か否かを確実に判断できる。例えば、評価する機器が照明器具L1である場合、照明器具L1の設置エリア(ゾーンZ1)には、照明器具L1と種類が異なる空調機AC1が存在する。この場合、評価手段114は、判定記憶手段104から照明器具L1および空調機AC1それぞれについての判定結果を取得する。そして、評価手段114は、種類が異なる照明器具L1と空調機AC1の動作状態の組み合わせが、所定の組み合わせ(照明器具L1と空調機AC1の両方がオン)であれば、照明器具L1の使用が有益であると評価する。つまり、同じゾーンZ1にある照明器具L1と空調機AC1との一方だけがオンであるときには、消し忘れと判断する。
 評価記憶手段115は、評価手段114が評価した結果を示す評価結果を記憶するように構成される。このような評価記憶手段115は、記憶部13と演算部14とで実現される。
 評価表示手段116は、評価記憶手段115に記憶された評価結果に基づいて電気機器の使用が有益か無駄かを単位時間毎に表示するように構成される。評価表示手段116は、例えば、機器の使用が無駄であった単位時間を、機器の使用が有用であった単位時間と区別して表示する(図24では、機器の使用が無駄であった時間帯を網線で示している)。このような評価表示手段116は、表示部12と演算部14とで実現される。
 さらに、エネルギーマネジメントプログラムは、制御機器5A,5Bのスケジュール情報を遠隔地から(すなわち間接的に)変更できるようにするために、端末装置1Aを、決定手段117と、現スケジュール記憶手段118と、確認手段119と、確認記憶手段120と、スケジュール送信手段121とを備える設定装置として機能させる。
 決定手段117は、制御装置5A,5Bの設定記憶手段51A,51Bに記憶されたスケジュール情報の変更の決定を受け付けるように構成される(例えば図25参照)。このような決定手段117は、入力部11と表示部12と演算部14とで実現される。
 現スケジュール記憶手段118は、設定記憶手段51A,51Bに記憶されたスケジュール情報を記憶するように構成される。例えば、現スケジュール記憶手段118は、通信ネットワークNTを介して制御装置5A,5Bから設定記憶手段51A,51Bに記憶されたスケジュール情報を受信して、記憶するように構成される。このような現スケジュール記憶手段118は、記憶部13と演算部14と通信部15とで実現される。
 確認手段119は、スケジュール記憶手段107に記憶されたスケジュール情報と現スケジュール記憶手段118に記憶されたスケジュール情報とが一致するかどうかを確認するように構成される。このような確認手段119は、演算部14によって実現される。
 確認記憶手段120は、確認手段119が確認した結果を示す確認結果を記憶するように構成される。このような確認記憶手段120は、記憶部13と演算部14とで実現される。
 スケジュール送信手段121は、スケジュール記憶手段107に記憶されたスケジュール情報を制御装置5A,5Bに送信するように構成される。スケジュール送信手段121は、決定手段117を用いて設定記憶手段51A,51Bに記憶されたスケジュール情報の変更が決定されると、確認記憶手段120に記憶された確認結果を参照する。そして、スケジュール送信手段121は、変更されたスケジュール情報だけを対応する制御装置5A,5Bに送信する。つまり、スケジュール送信手段121は、変更する必要があるスケジュール情報だけを制御装置5A,5Bに送信する。このようなスケジュール送信手段121は、演算部14と通信部15とで実現される。なお、スケジュール送信手段121は、スケジュール記憶手段107に記憶された全てのスケジュール情報を制御装置5A,5Bに送信するように構成されていてもよい。この場合には、現スケジュール記憶手段118と、確認手段119と、確認記憶手段120とが不要になる。
 次に、端末装置1Aの動作の具体例について図6~図27を参照して説明する。なお、図6はシミュレーション実行時のフローチャートを示す。
 端末装置1Aの演算部14は、記憶部13に記憶されたエネルギーマネジメントプログラムを実行することによって、図7に示す初期画面G1を表示部12に表示させる。
 初期画面G1の中央には、例えば「タイムマネジメントツール」といったタイトルT10が表示される。初期画面G1の右側には、「ファイル新規作成」・「ファイル一覧」・「共通ルール」・「データ」・「設定」にそれぞれ対応する5つのボタンB1~B5が表示される。ここで、マウスカーソルをボタンB1~B5上に移動させる(マウスオーバー)と、初期画面G1の下方に設けた空欄B0に、マウスオーバー中のボタンB1~B5に対応する機能の説明が表示される。
 ボタンB1は、スケジュール情報を変更した場合の消費電力量を予測する処理を開始させるためのボタンである。本実施形態のエネルギーマネジメントシステムでは、シミュレーションの結果を格納するファイルに名前を付けて保存・管理できる。
 ボタンB2は、保存したファイル(シミュレーション結果を格納したファイル)を呼び出すためのボタンである。ファイルに格納されたシミュレーション結果をもとにパラメータ(スケジュール情報)を変更し、再度シミュレーションを実行することもできる。
 ボタンB3は、共通ルールの作成・変更・削除を行うためのボタンである。共通ルールとは、時間区分(単位時間)毎の電力消費が有益か否か(つまり電気機器の使用が有益か無駄か)を評価するために使用するルールである。ボタンB3は、作成された共通ルールをどの計量ポイントに適用するのかを設定するために用いられる。
 ボタンB4は、他のシステムで収集された消費電力量のデータを取り込む処理を選択するためのボタンである。例えば、本実施形態のエネルギーマネジメントシステムでは、端末装置1A,1Bが通信ネットワークNTを介して中央監視盤2に接続されている。この場合、端末装置1A,1Bは、消費電力受信手段101によって中央監視盤2から消費電力量のデータを自動収集して、収集した消費電力量のデータを計測値記憶手段102のデータベースに格納する。
 ボタンB5は、エネルギーマネジメントプログラムで使用する各種の情報を設定するための処理(設定処理)を選択するためのボタンである。設定処理では、例えば入力された消費電力量に対応する計量ポイントの情報やシミュレーションの際に使用するパラメータなどが設定される。
 なお、本実施形態のエネルギーマネジメントプログラムでは、初期設定として、計量ポイント設定・共通ルール作成・共通ルールと計量ポイントの関連付け・パラメータ設定・エネルギーデータ(消費電力量の計測結果)の取込みの5項目の設定を行う。このような初期設定を行う処理は、初期画面G1から実行できる。
 「計量ポイント設定」では、計量ポイントの名称(例えば1F共用部電灯など)・入力データの種別(例えばPI/AI/設定/DI/DOなど)・消費電力量の収集間隔・電気機器の運転/停止を判別するために計量ポイント毎に設ける閾値(計量データが消費電力量の場合は待機電力に相当する値)などの項目について設定を行う。
 「共通ルール作成」では、作成する共通ルールの名称・当該共通ルールを適用するタイムゾーンの情報・当該共通ルールを適用する計量ポイントの情報などの項目を設定する。
 ここで、タイムゾーンとは、電力が無駄に消費されているかどうかを監視する時間帯のことである。タイムゾーンが設定された時間帯の消費電力量は、評価手段114での評価対象になる。一方、タイムゾーンが設定されていない時間帯の消費電力量は、判定手段103での判定対象になる。このようなタイムゾーンの設定は、スケジュール情報の入力に相当する。
 タイムゾーンは、タイムゾーンの名称・曜日(監視する曜日)・時間(監視する時間)・判定ロジックの4つの要素で定義される。判定ロジックとは、電気機器の使用が有益か無益(無駄)かを判断するためのロジックである。つまり、判定ロジックは、評価手段114での評価方法を指定する。
 次に、共通ルールを作成する処理を図8,図9に基づいて説明する。
 初期画面G1でボタンB3が選択されると、演算部14は、図8に示すような共通ルールを設定するための画面(設定画面)G2を表示部12に表示させる。
 設定画面G2の中央上側には、ウィンドウW1が表示される。ウィンドウW1には、現在までに作成されている共通ルールの一覧が表示される。図8に示す例では、「共用部 電灯」という名称の共通ルールに、早朝(平日)・夜間(平日)・昼休みという3つのタイムゾーンが設定されている。
 また、設定画面G2には、「ルール詳細」・「ルール追加」・「ルール削除」・「ルール複製」・「ルール紐付け」にそれぞれ対応するボタンB6~B10が表示される。
 ボタンB8は、ユーザが入力部11を用いて選択した共通ルールを削除するためのボタンである。ボタンB8が選択されると、演算部14は、選択中の共通ルールを削除する。
 ボタンB9は、ユーザが入力部11を用いて選択した共通ルールを複製するためのボタンである。ボタンB9が選択されると、演算部14は、選択中の共通ルールを複製する。
 ボタンB7は、共通ルールを新たに作成するためのボタンである。ボタンB7が選択されると、演算部14は、新たに作成する共通ルールの名称を入力するためのポップアップ画面を表示部12に表示させる。ポップアップ画面では、入力部11により名称の入力が可能である。名称の入力後に完了操作を行うと新たな共通ルールがウィンドウW1に追加される。
 ボタンB6は、共通ルールの詳細を表示するためのボタンである。共通ルールを選択した状態で、ユーザがボタンB6を選択すると、演算部14は、図9に示す画面(ルール詳細画面)G3を表示部12に表示させる。
 ルール詳細画面G3の中央の上側には、設定済みのタイムゾーンの名称が表示される。
 ルール詳細画面G3の下側には、ウィンドウW2が表示される。このウィンドウW2には、共通ルールを適用する時間帯がグラフで表示される。このグラフの横軸は、時間(00:00~24:00)であり、縦軸は曜日(日曜日~土曜日)である。図7では、早朝(平日)・夜間(平日)・昼休みという3つのタイムゾーンが設定されている。また、図7では、グラフにおいてタイムゾーンとして登録された時間帯に対応する帯状部分(以下、セルと言う)にハッチングが施されている。
 ルール詳細画面G3の右側には、「タイムゾーン削除」・「タイムゾーン追加」・「タイムゾーン詳細」・「タイムゾーン修正」にそれぞれ対応するボタンB11~B14が表示される。
 ボタンB11が選択されると、演算部14は、選択中のタイムゾーンを削除する処理を行う。
 ボタンB12が選択されると、演算部14は、図10に示す画面(ポップアップ画面)G4を表示部12に表示させる。ポップアップ画面G4の中央には、タイムゾーンの情報(名称・曜日・時間・判定ロジック)を入力するためブロックK1が表示される。また、ポップアップ画面G4の下方には、「追加」に対応するボタンB15が表示される。追加ボタンB15が選択されると、演算部14は、ブロックK1に入力された情報で定義されるタイムゾーンを新たに追加する処理を行う。
 ボタンB13が選択されると、演算部14は、図11に示すように、選択中のタイムゾーンの情報(設定内容)を確認するための画面(ポップアップ画面)G5を表示部12に表示させる。図9に示すポップアップ画面G5に表示されているタイムゾーンでは、名称が「早朝(平日)」、曜日が「月曜日から金曜日」、時間が「午前0時~午前6時」、判定ロジックが「タイプA」である。
 ボタンB14が選択されると、演算部14は、タイムゾーンの修正を行うための画面(図示せず)を表示部12に表示させる。この場合の画面には、ポップアップ画面G4を準用できる。
 例えば、タイプA~Cの3つの判定ロジックA~Cが用意されている。
 図27(a)は判定ロジックAが適用された場合、同図(b)は判定ロジックBが適用された場合、同図(c)は判定ロジックCが適用された場合の判定結果をそれぞれ示す。
 図27に示す例では、0:00~7:00までと10:00~24:00までの時間帯がタイムゾーンに設定されている。ここで、右上がりの斜線で塗りつぶされた時間区分は電気機器での電力消費が有益(電気機器の使用が有益)と評価された時間区分である。網線で塗りつぶされた時間区分は電気機器での電力消費が無駄(電気機器の使用が無駄)と評価された時間区分である。
 判定ロジックAの場合、評価手段114は、タイムゾーンの曜日および時間中の消費電力量(計測値記憶手段102に記憶された計測値)と所定の閾値(分岐回路の待機電力量に相当する値)とを比較する。評価手段114は、消費電力量が閾値を超えた場合は、電力消費が無駄と評価する(図27(a)参照)。図27(a)に示す例では、0:00~7:00・10:00~24:00のタイムゾーンのうち、0:00~2:00・5:00~6:00・11:00~14:00・16:00~24:00の4つの時間帯に含まれる単位時間での電気機器の使用が無駄と判断されている。なお、この場合において、評価手段114は、計測値が連続して4回以上閾値を超えない場合は、電気機器の使用が有益と判断しても良い。このようにすれば、消費電力量の測定誤差による誤判定を防止できる。
 判定ロジックBは、夜間の機器の消し忘れによる電力の無駄を判定するロジックである。判定ロジックBでは、評価手段114は、タイムゾーンで設定された時間帯の消費電力量と所定の閾値(待機電力)とを単位時間毎に比較する。評価手段114は、消費電力量が所定の閾値を越えた単位時間を使用期間と判定する。例えば、図27(b)に示す例では、0:00~7:00・10:00~24:00のタイムゾーンのうち、0:00~2:00・5:00~6:00・11:00~14:00・16:00~24:00の4つの時間帯に含まれる単位時間が使用期間と判断されている。評価手段114は、時系列的に連続する使用期間を1つのまとまりとして扱う。よって、評価手段114は、図27(b)に示す例では、0:00~2:00まで、5:00~6:00まで、11:00~14:00まで、16:00~24:00までをそれぞれ1つの使用期間として扱う。そして、評価手段114は、タイムゾーンの終わり(図27(b)に示す例では24:00)を含む使用期間を、電気機器の使用が無駄である期間と判定する。つまり、評価手段114は、タイムゾーンの終わり(例えば24:00)にかかる使用期間(図示例では16:00~24:00)のみを消し忘れによる無駄と判定する(図27(b)参照)。なお、評価手段114は、タイムゾーンの終わりを含まない使用期間については、電気機器の使用が有益か無駄かの判断がつかない部分と判断する。以上述べた判定ロジックBによれば、例えばスケジュール情報にしたがって消灯された後、従業者がスイッチを操作して照明器具の点灯・消灯を複数回行った場合でも、最後に照明器具を点灯した後の電力消費だけを抽出して無駄と判定できる。
 判定ロジックCは、早朝の機器の消し忘れによる電力の無駄を判定するロジックである。判定ロジックCでは、使用期間を、電気機器の使用が無駄な期間かどうかを判定する基準が判定ロジックBと異なる。判定ロジックCでは、評価手段114は、タイムゾーンの始まり(図27(b)に示す例では0:00)を含む使用期間を、電気機器の使用が無駄である期間と判定する。つまり、評価手段114は、タイムゾーンの始まり(例えば0:00)にかかる使用期間(図示例では0:00~2:00)のみを消し忘れによる無駄と判定する(図27(c)参照)。なお、評価手段114は、タイムゾーンの終わりを含まない使用期間については、電気機器の使用が有益か無駄かの判断がつかない部分と判断する。以上のべた判定ロジックCによれば、例えばスケジュール情報にしたがって消灯された後、早朝出勤した従業員がスイッチを操作して照明器具の点灯・消灯を複数回行った場合でも、最初に照明器具を点灯する前の電力消費だけを抽出して無駄と判定できる。
 これら判定ロジックB,Cは、電気機器の消費電力量の変化パターンを、所定の変化パターン(スケジュール情報に基づいた変化パターン)と比較することによって、電気機器の使用が有益か無駄かを評価するロジックである。所定の変化パターンは、例えば、電気機器の使用が有益な場合の変化パターン(例えば、タイムゾーンの始まりや終わりにかからない変化パターン)や、電気機器の使用が無駄な場合の変化パターン(例えば、タイムゾーンの始まりや終わりにかかる変化パターン)である。
 これら判定ロジックB,Cでは、電気機器の消費電力量の変化パターンが所定のパターンに該当するか否かで、電気機器の使用が有益か無駄かを容易に判断できる。また、判定ロジックB,Cは、単純に消費電力量が所定の閾値を超えたか否かで判定する判定ロジックAに比べて、複雑な設定を必要としないにも関わらず、精度よく有益か無駄かを判定できる。
 また、消費電力量が所定の閾値を超えた使用期間のうち特定時刻(例えば24:00)をまたいだ使用期間(図17の例では16:00~2:00)のみを消し忘れによる無駄と判定する判定ロジックを用いても良い。
 以上述べたような判定ロジックは、設定する項目が少ないにも関わらず消し忘れによる有益でない消費を抽出できる。なお、タイムゾーンの時間帯を決まった時刻ではなく、相対的に求まる時刻としても良い。例えば、日の入りから3時間後より24:00までを夜間の消し忘れを監視する時間帯としたり、0:00から日の出前までを早朝の消し忘れを監視する時間帯としたりしても良い。日の入りや日の出の時刻は、通信ネットワークNTを介して外部のサーバ(図示せず)などから取得すればよい。また、所定のエリアへの入退室を管理する入退室管理装置から最終退出時刻を取得し、最終退出時刻から24:00までを、夜間の消し忘れを監視する時間帯としても良い。この場合、ユーザ(電力利用者)の存在の有無を判定条件に加えることにより、無駄と計上される消費電力量の判定精度の向上に大いに役立つ。同様の効果は、人感センサからの出力信号を取得することでも期待できる。また、電気機器の設置された建物が店舗の場合には、店舗の閉店時間から24:00までを夜間の消し忘れを監視する時間帯としても良く、季節による環境変化や使用状況に合わせて消し忘れの監視期間を設定することができる。このような設定は、季節や店舗の運用に即した判定が行えるため、より判定精度の向上が見込まれる。
 設定画面G2でボタンB10が選択されると、演算部14は、図12に示すポップアップ画面G6を表示部12に表示させる。ポップアップ画面G6は、共通ルールを紐付けした計量ポイントの名称(例えば1F-共用部電灯など)を表示する左欄W3と、紐付けする候補となる計量ポイントを表示する右欄W4とを表示する。本実施形態のエネルギーマネジメントシステムでは、計量ポイントとグループとが対応しているため、紐付け候補の計量ポイントが階層的に表示されている。
 さらに、ポップアップ画面G6は、設定ボタンB16と、解除ボタンB17と、OKボタンB18とを表示する。
 設定ボタンB16が選択されると、演算部14は、右欄W4において選択された1乃至複数の計量ポイントを左欄W3に移動させるとともに共通ルールに紐付けする。この後に、OKボタンB18が選択されると、演算部14は、設定ボタンB16を用いて設定された内容を保存するとともに、ポップアップ画面G6を閉じる処理を行う。したがって、紐付けを行うには、共通ルールに紐付けしたい計量ポイントを右欄W2から1乃至複数選択した後に設定ボタンB16を選択し、OKボタンB18を選択すればよい。
 解除ボタンB17が選択されると、演算部14は、左欄W3において選択された計量ポイントを右欄W4に移動させるとともに共通ルールとの紐付けを解除する。この後に、OKボタンB18が選択されると、演算部14は、解除ボタンB17を用いて解除された内容を保存するとともに、ポップアップ画面G6を閉じる処理を行う。したがって、紐付けを解除するには、左欄W3に表示されている計量ポイントの中から所望の計量ポイントを選択した後に解除ボタンB17を選択し、OKボタンB18を選択すればよい。
 初期画面G1でボタンB4が選択されると、消費電力受信手段101は、他のシステム(エネルギーマネジメントシステムとは別のシステム)で収集された消費電力量のデータを取り込む処理を実行する。例えば他のシステムで収集された消費電力量のデータを示すファイルがCSV形式で記憶媒体(例えばメモリカード)に記憶されているとする。この場合、記憶媒体を端末装置1Aの読取装置に差し込む。そして、ボタンB4が選択されると、消費電力受信手段101は、記憶媒体から上述のファイルを取り込む。図13は、上述のファイルの中身を示す。図13に示すファイルは、ファイル形式がCSV形式であり、4つのデータ列DAT1~DAT4を有する。図13において一番左のデータ列DAT1は日付のデータである。データ列DAT2は時刻のデータである。データ列DAT3は共用部電灯1F北側の消費電力量を1時間毎に計量したデータである。データ列DAT4は共用部電灯1F南側の消費電力量を1時間毎に計量したデータである。また、ファイルの先頭部分には、各データ列DAT1~DAT4の内容を示す文字列や単位などが記述される。
 初期画面G1でボタンB5が選択されると、演算部14は、図14に示すようなパラメータの設定画面G7を表示部12に表示させる。
 設定画面G7は、消費電力量を電力料金やCO2排出量に換算するための係数(換算値)をパラメータとして入力するための画面である。なお、消費電力量の単位は、キロワット時(kwh)に限らず、英熱量(Btu)やメガジュール(MJ)であってもよい。つまり、消費電力量や電力料金などの単位には、各国の実情に沿った単位を使用できる。
 設定画面G7は、消費電力量を電力料金に換算するための換算値を入力するための入力ブロックK2と、消費電力量をCO2排出量に換算するための換算値を入力するための入力ブロックK3とを表示する。演算部14は、入力ブロックK2,K3に入力された換算値を記憶部13に記憶させる。記憶部13に記憶された各換算値は、以後の演算で使用される。なお、各換算値は、ユーザが入力部11を用いて入力しても良い。また、演算部14が、通信部15を用いて所定のサーバにアクセスして換算値をダウンロードしてもよい(つまり、端末装置1A,1Bが、換算値を自動設定しても良い)。なお、図14では、消費電力量を表示しているが、管理対象の機器が水を使用する便器(図28参照)や、ガスを使用するコンロや湯沸かし器である場合には、水の使用量やガスの使用量を表示してもよい。この場合、設定画面G7では、水の使用量([m3])を水道料金に換算するための係数や、ガスの使用量([Nm3])をガス料金に換算するための係数を入力できるようにしてもよい。
 次に端末装置1Aを用いて、スケジュール情報を変更した場合の消費電力量の変化をシミュレーションする処理について説明する。
 初期画面G1でボタンB1やボタンB2が選択されると、シミュレーション結果を保存するファイルを作成または選択する処理が行われる(ステップS10)。
 次に、シミュレーションを開始する操作が行われると、演算部14は、図15に示すシミュレーションのトップ画面G8を表示部12に表示させる。
 トップ画面G8は、電卓ブロックK4を左側に表示し、計量ポイントの一覧を表示するウィンドウW5を中央に表示する。トップ画面G8は、日付ブロックK5,K6を画面中央下側に表示する。トップ画面G8は、カレンダ領域K7を右下に表示する。トップ画面G8は、シミュレーションのタイプを選択するためのボタンB19~B21を左側に表示する。
 電卓ブロックK4は、シミュレーション結果を表示するために用いられる。例えば、電卓ブロックK4は、保存された消費電力量のデータ(計測値記憶手段102に記憶された計測値)に、シミュレーションで選択した共通ルールを適用した場合に無駄と推定される消費電力量等を数値で表示する。
 ウィンドウW5は、計量ポイントの一覧を表示する。ウィンドウW5は、登録された計量ポイントをリスト形式で表示する。なお、消費電力量のデータを取り込む際にグループを設定しておけば、グループ毎に計量ポイントを階層表示する。また、計量ポイントの種類(PI、AIなど)毎に色分けして表示することもできる。この場合、ユーザがシミュレーションに利用できるか否かを容易に理解できる。
 日付ブロックK5は、シミュレーションの開始日を表示する。
 日付ブロックK6は、シミュレーションの終了日を表示する。
 カレンダ領域K7は、カレンダを表示する。カレンダ領域K7は、消費電力量のデータがある日と消費電力量のデータがない日とを区別して表示する。例えば、カレンダ領域K7は、消費電力量のデータがない日には下線を付し、消費電力量のデータがある日には下線を付さずに表示する。このようにすれば、消費電力量のデータが存在しない日が、シミュレーション期間に選択されることを防止できる。
 ボタンB19~B21は、「ポイント別シミュレーション」・「日付別シミュレーション」・「状態比較」にそれぞれ対応する。ここで、ポイント別シミュレーションは、1つの計量ポイントに注目し、消し忘れ等によって有益でないと判断される時間区分が存在するか否かを判定するシミュレーションである。
 次に、ウィンドウW5に表示された計量ポイントからシミュレーションを行う計量ポイントを選択する(ステップS11)。
 次に、シミュレーション期間を入力する(ステップS12)。カレンダ領域K7が選択されると、演算部14は、図16に示すポップアップ画面G9を表示部12に表示させる。ポップアップ画面G9では、シミュレーション期間の開始日および終了日を選択する操作を行えるようになっている。ポップアップ画面G9で選択された開始日は日付ブロックK5に表示され、ポップアップ画面G9で選択された終了日は日付ブロックK6に表示される。
 トップ画面G8でボタンB19が選択されると、演算部14は、図17に示すポイント別のシミュレーション画面G10を表示部12に表示させる。(ステップS13)。
 シミュレーション画面G10は、縦7×横24のマトリクス状に並べた矩形状のセルで時間帯を表示する。縦方向は日時(曜日)であり、横方向は時刻(0:00~24:00)である。また、シミュレーション画面G10は、共通ルールが設定された時間帯(セル)を太線の枠FL1,FL2で囲って表示する。
 シミュレーション画面G10では、電気機器が使用されたか否かが使用状態表示手段105によって単位時間毎に表示され、電気機器の使用が有益か無駄かが評価表示手段116によって単位時間毎に表示される。
 図17に示す例では、電気機器の使用が有益と判断された単位時間(時間区分)と、電気機器の使用が無駄と判断された単位時間と、電気機器が使用されなかった単位時間とが、色分けして表示されている。なお、図17は白黒の図であるから、便宜上、電気機器の使用が有益と判断された単位時間と無駄と判断された単位時間とをセルの塗りつぶしパターンを異ならせて表示している。電気機器の使用が有益と判断された単位時間は右上がりの斜線で表示し、電気機器の使用が無駄と判断された単位時間は網線で表示する。
 また、シミュレーション画面G10は、表示ブロックK8,K9を画面上側に表示する。表示ブロックK8は、シミュレーション期間を表示する。表示ブロックK9は、計量ポイントの名称を表示する。これら表示ブロックK8,K9を見ることで、前画面(トップ画面G8)で選択したパラメータの内容を容易に読み取ることができる。
 また、シミュレーション画面G10は、赤色のアイコンI1と、黄緑色のアイコンI2と、黄色のアイコンI3とを表示ブロックK8,K9の下側に表示する。アイコンI1~I3は、左から右にアイコンI1,I2,I3の順で並んでいる。尚、図17は白黒の図であるから、各アイコンI1~I3の色の違いを網掛けパターンの違いで示している。すなわち、赤色のアイコンI1を網線で、黄緑色のアイコンI2を右下がりの斜線で、黄色のアイコンI3を右上がりの斜線でそれぞれ示している。
 アイコンI1は、電気機器の使用が無駄と判断された時間区分の表示色(表示パターン)を示す。シミュレーション画面G10は、アイコンI1に対応する消費電力量の合計値(図示例では1kWh)をアイコンI1の右側に表示する。アイコンI2は、共通ルールにより電気機器の使用が無駄と判定されたが例外ルールによって無駄ではないと再評価された時間区分の表示色(表示パターン)を示す。シミュレーション画面G10は、アイコンI2に対応する消費電力量の合計値(図示例では0kWh)をアイコンI2の右側に表示する。アイコンI3は、共通ルール(タイムゾーン)が設定されていない時間帯で電気機器が使用された時間区分の表示色(表示パターン)を示す。シミュレーション画面G10は、アイコンI3に対応する消費電力量の合計値(図示例では126kWh)をアイコンI3の右側に表示する。なお、消費電力量の単位は、キロワット時(kwh)に限らず、英熱量(Btu)やメガジュール(MJ)であってもよい。また、消費電力量の代わりにCO2排出量を表示するようにしてもよい。
 シミュレーション画面G10では、各単位時間(時間区分)において電気機器が使用されたか否かが色で表示されるため、表示が見やすい。また、シミュレーション画面G10では、各時間区分において電気機器が使用されたか否かの表示とともに、計量ポイント(電気機器)の消費電力量を表す数値で表示される。そのため、スケジュール情報の設定に応じた電気機器の消費電力量をより詳細に把握できる。
 シミュレーション画面G10は、3つの選択ボタンB22~B24を右上に表示する。3つの選択ボタンB22~B24は、左から右に選択ボタンB22,B23,B24の順で並んでいる。選択ボタンB22は、制御装置5A,5Bの現在のスケジュール情報をシミュレーション画面G10に表示したり、端末装置10Aに入力したスケジュール情報の内容を対応する制御装置5A,5Bの設定記憶手段51A,51Bに記憶されたスケジュール情報の内容に反映させたりするためのスケジュール反映ボタンである。選択ボタンB23は、シミュレーション実行ボタンである。選択ボタンB23が選択されると、演算部14は、シミュレーションした計量ポイントだけではなく、登録されている全ての計量ポイントにシミュレーション結果を適用した場合に、どの程度の量になるかを計算する。演算部14は、前画面となるシミュレーション画面G10の全体欄に再計算した結果を表示する。選択ボタンB24は、シミュレーションした結果を保存するためのルール保存ボタンである。選択ボタンB24が選択されると、演算部14は、シミュレーションに用いたルールをファイルやデータベース等に保存する。
 図17に示すシミュレーション画面G10は、3月1日(土曜日)から3月7日(金曜日)までの一週間の期間で、6階空調電力量の計量ポイントで計測された消費電力量をもとにシミュレーションを行った画面である。
 判定手段103は、計量ポイントから取り込んだ時間毎の消費電力量を所定の閾値(待機電力量に相当)と比較する。使用情報表示手段105は、消費電力量が所定の閾値を超えた期間(つまり分岐回路に接続された電気機器が動作した期間)に対応するセルのみを色づけしてシミュレーション画面G10に表示する。なお、使用情報表示手段105は、消費電力量が所定の閾値未満の期間(つまり電気機器が停止している期間)に対応するセルを非表示(例えば背景色や白色)とすることで、消費電力量が所定の閾値を越えた期間に対応するセルと区別して表示する。
 また、シミュレーション画面G10において枠FL1,FL2で囲まれた時間帯は、計量ポイントに適用された共通ルールのタイムゾーンTZ1,TZ2を示している。タイムゾーンTZ1の曜日は、月曜日から金曜日までであり、時間は、午前0時から午前6時までである。タイムゾーンTZ2の曜日は、月曜日から金曜日までであり、時間は、午後10時から午後12時(午前0時)までである。
 ここで、シミュレーション画面G10では、セルの表示色のパターンを、セルに共通ルールが設定されているか否かで異ならせている。すなわち、共通ルールが設定されていないセルの表示は、使用状態表示手段105が行う。その結果、共通ルールが設定されていないセルであって電気機器が使用されたと判定されたセルは、アイコンI3と同じ色(網掛けパターン)で表示される。共通ルールが設定されているセルの表示は、評価表示手段116が行う。その結果、共通ルールが設定されたセルであって電気機器の使用が無駄と判定されたセルはアイコンI1と同じ色(網掛けパターン)で表示される。一方、共通ルールが設定されたセルであって電気機器の使用が有益と判定されたセルはアイコンI2と同じ色(網掛けパターン)で表示される。
 図17に示すタイムゾーンTZ1,TZ2の設定では、3月7日(金曜日)の22時から23時までの電力消費が無駄と判定されている。
 電気機器の使用状況を見れば、就業時間(例えば17時)を過ぎた後に電気機器が使用されることが比較的多い。そこで、ユーザが、夜間の消し忘れの監視を強化することを目的として、タイムゾーンTZ2の始まりを22時から21時に変更したとする(ステップS14)。なお、タイムゾーンTZ2の変更は、例えば、タイムゾーンTZ2の開始時刻を示す枠FLの左辺をマウスでドラッグして移動させること等によって行える。
 タイムゾーンTZ2が変更されると、評価手段114は、変更後のタイムゾーンTZ2について上述の判定ロジックAを用いて、電気機器の使用が有益か否かを評価する(ステップS15)。その後、評価表示手段116は、評価手段114の評価結果を表示する(ステップS16)。
 図18に示すシミュレーション画面G11は、変更後のタイムゾーンTZ2について電気機器の使用が無駄か否かが評価された結果を示す。
 この評価結果では、電気機器の使用が無駄と判断された時間帯(木曜日の21時~21時30分、金曜日の21時30分~23時)が増えている。そのため、アイコンI3に対応する消費電力量が126kWhから124.8kWhに減少する一方、アイコンI1に対応する消費電力量が1kWhから2.2kWhに増加している。
 その後、評価手段114は、入力部11からの操作入力をもとに、電気機器の使用が無駄か否かの評価を実行するか否かを判定する(ステップS17)。例えば、計量ポイントが変更されるとステップS11に戻り、タイムゾーンが変更されるとステップS13に戻る。これによって、変更後の計量ポイントやタイムゾーンで、電気機器の使用が無駄かどうかが評価される。
 ところで、図17に示すシミュレーション画面G10で、所定の操作(例えば、タイムゾーンTZ2の枠FL2をマウスで右クリックする操作)が行われると、演算部14は、操作メニューを示す画面(図示せず)を表示部12にポップアップ表示させる。操作メニューを示す画面は、タイムゾーン変更用の操作ボタンを表示する。
 上記のタイムゾーン変更用の操作ボタンが選択されると、演算部14は、図19に示すようなタイムゾーン変更画面G12を表示部12に表示させる。
 タイムゾーン変更画面G12は、タイムゾーンの名称・曜日・時間・判定ロジックを変更するための画面である。タイムゾーン変更画面G12は、タイムゾーンの名称・曜日・時間・判定ロジックの変更を受け付ける。変更するタイムゾーンの名称・曜日・時間・判定ロジックの入力は、入力部11によって行う。また、タイムゾーン変更画面G12は、変更ボタンB25を表示する。変更ボタンB25が選択されると、演算部14は、タイムゾーン変更画面G12で入力された名称・曜日・時間・判定ロジックに基づいてタイムゾーンを変更して、記憶部13に記憶させる。さらに、評価手段114は、変更されたタイムゾーンの内容で、電気機器の使用が無駄かどうかの評価を行う。
 なお、シミュレーション画面G10は、判定ロジックのタイプ(判定ロジックA~C)に応じて枠FL1,FL2の色を変更することが好ましい。このようにすれば、タイムゾーンにどの判定ロジックが適用されているかが一目でわかり、設定ミスの防止や操作性向上が図れる。なお、枠FL1,FL2の色の代わりに、枠FL1,FL2の線種(実線・点線・破線等)や線の幅を判定ロジックのタイプに応じて変更してもよい。
 図17に示すシミュレーション画面G10は、2つのタイムゾーンTZ1,TZ2の両方に判定ロジックAを用いた結果を示している。
 ここで、タイムゾーンTZ2に判定ロジックAではなく判定ロジックBを用いたとする。
 判定ロジックBでは、タイムゾーンの終わり(最後方)の単位時間での消費電力量が所定の閾値を越えているかどうかを判定する。そして、消費電力量が所定の閾値を超えている場合、評価手段114は、消費電力量が所定の閾値を超えている単位時間(超過部分)をタイムゾーンの終わりから始まりに向けてさかのぼって探索していく。評価手段114は、連続する超過部分を1つのくくりとして、その時間帯では電気機器の使用が無駄であると判定する。消費電力量が所定の閾値を超えていない単位時間があると(超過部分が途切れると)、その単位時間より前の超過部分については、電気機器の使用が有益か無駄かの判断がつかない部分(緑色で表示)とする。また、タイムゾーンの終わりの単位時間での消費電力量が所定の閾値を越えていなければ、このタイムゾーンの超過部分の全てを電気機器の使用が有益か無駄かの判断がつかない部分(例えば緑色で表示)とする。
 上述したように判定ロジックBでは、評価手段114は、タイムゾーンの終わりにかかる使用期間を電気機器の使用が無駄な期間と判定し、それ以外の使用期間を電気機器の使用が無駄かどうかの判断ができない期間と判定する。そのため、判定ロジックBを採用すると、図20に示すシミュレーション画面G13ではアイコンI1と同じ色で表示されるセル(金曜日の22:00~23:00)が、電気機器の使用が有益か無駄かの判断がつかない部分を示す色(例えば緑色)で表示される。このような判定ロジックBは、適用するタイムゾーン内に夜中の24時を含む場合などに適用することが好ましい。
 また、タイムゾーンTZ1に判定ロジックAではなく判定ロジックCを用いたとする。判定ロジックCは、上述したように、タイムゾーンの始まりにかかる使用期間を電気機器の使用が無駄な期間と判定し、それ以外の使用期間を電気機器の使用が無駄かどうかの判断ができない期間と判定する。判定ロジックCは、0時を含むような早朝のタイムゾーンに適用することが好ましい。
 上記の例では、早朝のタイムゾーンTZ1と夜間のタイムゾーンTZ2とを24時(0時)で分けている。つまり、24時(0時)を基準として、タイムゾーンを設定している。しかし、タイムゾーンは、開店時間・閉店時間・日の出・日の入りの時刻等を基準に設定しても良い。この場合、他のシステムと連動したり、日の出・日の入り等の時刻を自動的に取得したりすることが好ましい。このようにすれば、タイムゾーンの基準が変化しても、その都度タイムゾーンの時間帯を再設定しなくて済み、利便性が増す。
 ところで、図17に示すシミュレーション画面G10で、所定の操作(枠FL1,FL2以外の部分をマウスで右クリックする操作)が行われると、演算部14は、図21に示すようなタイムゾーン追加画面G14を表示部12に表示させる。
 タイムゾーン追加画面G14は、タイムゾーンを追加するための画面である。タイムゾーン追加画面G14は、追加するタイムゾーンの名称・曜日・時間・判定ロジックの入力を受け付ける。追加するタイムゾーンの名称・曜日・時間・判定ロジックの入力は、入力部11により行う。また、タイムゾーン追加画面G14は、追加ボタンB26を表示する。追加ボタンB26が選択されると、演算部14は、タイムゾーン追加画面G14で入力された名称・曜日・時間・判定ロジックに基づいて新たなタイムゾーンを作成して、記憶部13に記憶させる。
 例えば、平日の昼休みにタイムゾーンを追加する場合、ユーザが入力部11を操作して、タイムゾーン追加画面G14を表示させる。このタイムゾーン追加画面G14において、入力部11を操作して、例えば、追加するタイムゾーンの名称を「平日の昼休み」、曜日を「月曜日から金曜日」、時間を「12:00~12:30」、判定ロジックを「判定ロジックA」と入力して、最後に追加ボタンB26を選択する。
 この場合、スケジュール入力手段106は、タイムゾーン追加画面G14で入力された条件をもとに新たなタイムゾーンTZ3を設定する。タイムゾーンTZ3についての情報はスケジュール記憶手段107に記憶される。そして、シミュレート手段108は、タイムゾーンTZ3に応じて、各アイコンI1~I3の右側に表示させる数値を再計算する。
 また、評価手段114は、新たに追加されたタイムゾーンTZ3について、機器の使用が有益か無駄かを評価する。この場合、月曜日から金曜日の12:00~12:30の時間帯では消費電力量が所定の閾値を超えている。そのため、評価手段114は、月曜日から金曜日の12:00~12:30の時間帯の機器の使用を無駄と判断する。その結果、評価表示手段116は、図22に示すように、新たに追加されたタイムゾーンTZ3を示す枠FL3をシミュレーション画面G15に表示させ、枠FL3に対応するセルを赤色で表示する。
 以上のように、タイムゾーンの変更や追加を行い、シミュレーションを実行することで、ユーザは、最適なスケジュール情報を決定できる。
 図23に示すシミュレーション画面G16では、タイムゾーンTZ1の時間帯を月曜日から金曜日の0:00から7:30に変更し、タイムゾーンTZ2の時間帯を月曜日から金曜日の19:00~24:00に変更している。
 図23に示すシミュレーション画面G16において、スケジュール反映ボタンB22が操作されると、演算部14は、図24に示すように、制御装置5A,5Bから取り込んだスケジュール情報(制御装置5A,5Bの設定記憶部に記憶されたスケジュール情報)を表示部12に表示させる。
 図24に示すシミュレーション画面G17では、機器が動作する時間帯を枠FL4で示している。変更前のスケジュール情報は、7:30に機器の運転を開始し、19:00時に機器の運転を停止することを規定する。
 このように現在の制御装置5A,5Bのスケジュール情報を表示させた状態(つまり図24に示すシミュレーション画面G17)において、スケジュール反映ボタンB22が選択されると、演算部14は、図25に示すように、スケジュール記憶手段107に記憶されたスケジュール情報を表示部12に表示させる。
 図25に示すシミュレーション画面G18では、機器が動作する時間帯を枠FL5,FL6で示している。新たに入力されたスケジュール情報は、7:30に機器の運転を開始し、12:00に機器の運転を停止し、12:30に機器の運転を開始し、19:00に機器の運転を停止することを規定する。
 上述の場合、枠FL4内にタイムゾーンTZ3が設定されているので、枠FL4からタイムゾーンTZ3に対応する時間帯が除外される。
 スケジュール記憶手段107に記憶されたスケジュール情報を表示させた状態(図25に示すシミュレーション画面G18)において、スケジュール反映ボタンB22が選択されると、決定手段117は、図26に示すように、制御装置5A,5Bのスケジュール情報を変更するかどうかを問う(現在の設定をスケジュール制御に反映させるか否かを問う)ポップアップ画面G19を表示部12に表示させる。
 ポップアップ画面G19において、「はい」のボタンB27が選択されると(つまり決定手段117を用いて設定記憶手段51A,51Bに記憶されたスケジュール情報の変更が決定されると)、スケジュール送信手段121は、確認記憶手段120に記憶された確認結果を参照して、変更されたスケジュール情報だけを制御装置5A,5Bに送信する。
 このように端末装置1Aは、新たに作成されたスケジュール情報を、通信部15から制御装置5A,5Bに送信する。制御装置5A,5Bは、端末装置1Aからスケジュール情報を受信すると、設定記憶部51A,51Bに記憶されたスケジュール情報の内容を、受信したスケジュール情報の内容に更新する(ステップS18)。
 また、ルール保存ボタンB24が選択されると、演算部14は、シミュレーションした結果(ルールなど)をファイルやデータベース等に保存する(ステップS19)。
 以上説明したように本実施形態のエネルギーマネジメントシステムでは、端末装置1Aの表示部12に、所定期間中の消費電力量の有無(機器が使用されたか否か)が単位時間毎に表示される。ユーザは、機器の使用状態を見ながら機器のスケジュール情報を入力できる。そして、シミュレート手段108は、消費電力受信手段101が受け取った消費電力量(すなわち機器で実際に消費された電力量)に基づいて、入力されたスケジュール情報で機器が動作した場合の消費電力量を予測する。そのため、スケジュール情報の変更による省電力化の効果を理解しやすく、機器の使用形態に合わせて、実用的でより省エネルギー効果の期待できるスケジュール情報を容易に作成できる。また、本実施形態のエネルギーマネジメントシステムは、機器の消費電力量とスケジュール情報とに基づいて機器の使用が有益か無駄かを単位時間毎に判定して、その判定した結果を表示する。そのため、機器の使用が有益か無駄かを容易に理解でき、スケジュール情報の変更を適切に行える。また、スケジュール情報の変更を容易に制御装置5A,5Bに反映させることができる。
 本実施形態では、機器が使用されたか否かを判定手段103が判定している。しかしながら、制御装置5A,5Bから機器の動作期間を示す履歴情報を取得するようにしてもよい。この場合、制御装置5A,5Bからの履歴情報を用いて個々の機器の運転・停止を判断できる。よって、個々の機器について使用が有益か否かの判定を行える。
 なお、本実施形態では、端末装置1A,1Bにエネルギーマネジメントプログラムを搭載し、端末装置1A,1Bを、少なくとも、消費電力受信手段101と、計測値記憶手段102と、判定手段103と、判定記憶手段104と、使用情報表示手段105と、スケジュール入力手段106と、スケジュール記憶手段107と、シミュレート手段108と、予測値記憶手段109と、予測値表示手段110として機能させる。このようなエネルギーマネジメントプログラムは、監視装置2に搭載されていてもよい。
 なお、本実施形態のエネルギーマネジメントシステムは、スーパーマーケットや事業所、住宅などの建物内で監視対象の機器の消費電力量を管理するように構成されていてもよい。また、監視対象の機器は、照明器具や空調機以外の電気機器(例えば、パーソナルコンピュータや、プリンタ、コピー機、空気清浄機、換気扇)であってもよい。
 つまり、上述のエネルギーマネジメントシステムは、機器で使用されるエネルギー資源として電気を採用し、機器で使用される電気の量(消費電力量)を管理する。しかし、監視対象の機器は、水やガスなどの流体のエネルギー資源を使用する機器であってもよい。
 図28は、本実施形態のエネルギーマネジメントシステムの変形例の一部を省略した概略図を示している。
 図28に示す建物Bは、1階の便所に相当するゾーンZ5~Z7と、2階の便所に相当するゾーンZ8とを有する。各ゾーンZ5~Z8には、水を使用する水洗式の便器T1~T4が複数設置される。また、各ゾーンZ5~Z8には、各ゾーンZ5~Z8内の人を検知する人感センサR5~R8が設置される。
 建物Bには、主配管70と、主配管70から分岐する4つの分岐配管71~74が設置されている。これら配管70~74は、水道管である。分岐配管71~74それぞれは、便器T1~T4それぞれに水を供給するために用いられる。また、各分岐配管71~74には、流量を計測するための計量ポイントP11~P14が設けられている。なお、図28に示す例では、機器として便器T1~T4を例示している。しかしながら、機器としては、便器以外にも、給湯器や、蛇口であってもよい。さらに、機器は、遠隔制御可能な止水栓であってもよい。この場合、蛇口を締め忘れたり、蛇口の締めが緩かったりしたときの無駄な水の使用を防止できる。
 図28に示すエネルギーマネジメントシステムは、上述した端末装置1A,1Bおよび監視装置2に加えて、計測装置3Aと、制御装置5Cとを備える。
 計測装置3Aは、便器T1~T4での水の使用量を監視して監視装置2および端末装置1Aに出力する流量監視装置である。計測装置3Aは、建物B内に設置される流量計31A~34Aと、収集装置35Aとを備える。各流量計31A~34Aは、信号線LN5を介して収集装置35Aに接続される。各流量計31A~34Aは、対応する計量ポイントP11~P14での流量を所定の計測周期毎に計測する。
 各流量計31A~34Aは、所定期間中に機器で使用された水の量を計測した値を示す計測値を取得する計測値取得手段として機能する。なお、各分岐配管71~74での流量は、各ゾーンZ5~Z8に属する複数の便器T1~T4で使用された流量の合計値である。
 各流量計31A~34Aは、取得した計測値を内蔵メモリ(図示せず)に記憶させる。各流量計31A~34Aは、所定の送信周期が経過する毎に、内蔵メモリに記憶された計測値を収集装置35Aに出力するように構成される。
 収集装置35Aは、各流量計31A~34Aから出力された計測値を受信する。収集装置35Aは、各流量計31A~34Aから受信した計測値を計測された日時と関連付けて記憶する第1記憶手段として機能する。また、収集装置35Aは、通信ネットワークNTを介し監視装置2に接続される。収集装置35Aは、監視装置2からの要求に応じて(例えば、監視装置2から前述の監視データ要求信号を受信すると)、各分岐配管71~74での計測値を監視装置2に送信するように構成される。
 制御装置5Cは、便器T1~T4の動作を制御する便器制御装置である。制御装置5Cは、アドレス情報を含めた伝送信号を伝送線LN4に送出することによって、所望の便器T1~T4または人感センサR5~R8との間で伝送信号を授受する。このような制御装置5Cは、制御装置5Aと同様の構成を有するから、詳細な説明を省略する。
 そして、図28に示す端末装置1A,1Bの記憶部13には、水の使用量の管理・水の使用量のシミュレーション・機器の使用が有益か否かの評価を実行するためのプログラムが搭載される。端末装置1A,1Bがこのプログラムを実行することにより、水の使用量を管理する機能・水の使用量をシミュレートする機能・機器の使用が有益か否かの評価する機能が実現される。
 このような端末装置1A,1Bの動作は、消費電力量の管理等をする場合をほぼ同じであるから、詳細な説明を省略する。なお、上述の人感センサR5~R8は、上述の例外ルールの使用に用いられる。
 以上述べたように、本発明に係るエネルギーマネジメントシステムは、機器で使用されるエネルギー資源の量を管理するように構成されていればよく、エネルギー資源としては、電気に限定されず、水やガスを採用できる。つまり、本発明に係るエネルギーマネジメントシステムは、消費電力量の他に、水の使用量やガスの使用量を管理するように構成されていてもよい。また、本発明に係るエネルギーマネジメントシステムは、少なくとも1つのエネルギー資源(例えば、電力や、水、ガス)の使用量を管理するように構成されていればよい。
 また、本実施形態では、制御装置5A~5Cが、機器のスケジュール情報を記憶している。しかし、スケジュール情報は、機器が有していても良い。つまり、各機器は、スケジュール情報を記憶し、記憶したスケジュール情報にしたがって動作するように構成されていてもよい。この場合、端末装置1Aは、スケジュールの変更内容が確定すると、スケジュール入力手段106を用いて入力されたスケジュール情報の変更内容にしたがって、スケジュール情報を変更させる必要のある機器に対して、変更されたスケジュール情報を設定するように構成してもよい。つまり、端末装置1Aを、各機器に対して遠隔からスケジュール情報を設定するための機器設定手段として用いるようにしてもよい。

Claims (11)

  1.  機器を管理するエネルギーマネジメントシステムであって、
     所定期間中に上記機器で使用されたエネルギー資源の量を計測した値を示す計測値を取得する取得手段と、
     上記取得手段が取得した上記計測値を記憶する計測値記憶手段と、
     上記計測値記憶手段に記憶された上記計測値に基づいて上記機器が使用されたかどうかを単位時間毎に判定する判定手段と、
     上記判定手段が判定した結果を示す判定結果を記憶する判定記憶手段と、
     上記判定記憶手段に記憶された上記判定結果に基づいて上記機器が使用されたどうかを上記単位時間毎に表示する使用情報表示手段と、
     上記所定期間中の上記機器の動作を上記単位時間毎に定義するスケジュール情報の入力を受け付けるスケジュール入力手段と、
     上記スケジュール入力手段を用いて入力された上記スケジュール情報を記憶するスケジュール記憶手段と、
     上記スケジュール記憶手段に記憶された上記スケジュール情報にしたがって上記機器が動作した場合に上記機器で使用されるエネルギー資源の量を示す予測値を上記計測値記憶手段に記憶された上記計測値に基づいて算出するシミュレート手段と、
     上記シミュレート手段で算出された上記予測値を記憶する予測値記憶手段と、
     上記予測値記憶手段に記憶された上記予測値を表示する予測情報表示手段とを備えることを特徴とするエネルギーマネジメントシステム。
  2.  上記計測値記憶手段に記憶された計測値と上記スケジュール記憶手段に記憶された上記スケジュール情報とに基づいて上記機器の使用が有益か無駄かを上記単位時間毎に評価する評価手段と、
     上記評価手段が評価した結果を示す評価結果を記憶する評価記憶手段と、
     上記評価記憶手段に記憶された上記評価結果に基づいて上記機器の使用が有益か無駄かを上記単位時間毎に表示する評価表示手段とを備えることを特徴とする請求項1記載のエネルギーマネジメントシステム。
  3.  上記評価手段は、上記計測値記憶手段に記憶された上記計測値の時間変化が所定の条件を満たしていれば、上記機器の使用が無駄であると評価するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。
  4.  上記所定の条件は、上記計測値が所定の閾値を越える期間が所定の時間継続されたことであることを特徴とする請求項3記載のエネルギーマネジメントシステム。
  5.  上記機器の種類と上記機器が設置されている場所を示す設置エリアとを上記機器毎に記憶する機器情報記憶手段を備え、
     上記評価手段は、上記機器情報記憶手段に記憶された上記機器毎の上記種類と上記設置エリアに基づいて同じ上記設置エリアに上記種類が異なる複数の上記機器があるかどうかを確認し、同じ上記設置エリアに上記種類が異なる複数の上記機器がある場合、上記各機器の上記種類と上記判定結果との組み合わせに基づいて上記機器の使用が有益か無駄かを評価するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。
  6.  上記評価手段は、上記機器の使用が無駄と判断された時間が所定の例外条件を満たす場合、当該時間での上記機器の使用を有益と評価するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。
  7.  上記各機器が設置されている場所を示す設置エリアを上記機器毎に記憶する情報記憶手段と、
     上記設置エリア内の人の存否を検出する人検出手段とを備え、
     上記例外条件は、上記機器の上記設置エリアで上記人検出手段が人を検出したことであることを特徴とする請求項6記載のエネルギーマネジメントシステム。
  8.  上記使用情報表示手段は、上記機器で使用されたエネルギー資源の量を数値で表示するように構成されることを特徴とする請求項2記載のエネルギーマネジメントシステム。
  9.  上記機器を制御する制御装置と、上記制御装置と通信する設定装置とを備え、
     上記制御装置は、上記スケジュール情報を記憶する設定記憶手段と、上記設定記憶手段に記憶された上記スケジュール情報にしたがって上記機器を制御する機器制御手段と、上記設定装置から上記スケジュール情報を受信するスケジュール受信手段と、上記設定記憶手段に記憶された上記スケジュール情報の内容を上記スケジュール受信手段で受信された上記スケジュール情報の内容に変更するスケジュール変更手段とを備え、
     上記設定装置は、上記制御装置の上記設定記憶手段に記憶された上記スケジュール情報の変更の決定を受け付ける決定手段と、上記設定記憶手段に記憶された上記スケジュール情報を記憶する現スケジュール記憶手段と、上記スケジュール記憶手段に記憶された上記スケジュール情報と上記現スケジュール記憶手段に記憶された上記スケジュール情報とに基づいて上記スケジュール情報が変更されたかどうかを確認する確認手段と、上記確認手段が確認した結果を示す確認結果を記憶する確認記憶手段と、上記決定手段を用いて上記設定記憶手段に記憶された上記スケジュール情報の変更が決定されると上記確認記憶手段に記憶された確認結果を参照して変更された上記スケジュール情報だけを上記制御装置に送信するスケジュール送信手段とを備えることを特徴とする請求項1記載のエネルギーマネジメントシステム。
  10.  複数の計測装置と、上記各計測装置と通信する監視装置と、上記監視装置と通信する端末装置とを備え、
     上記端末装置は、上記取得手段と、上記計測値記憶手段と、上記判定手段と、上記判定記憶手段と、上記使用情報表示手段と、上記スケジュール入力手段と、上記スケジュール記憶手段と、上記シミュレート手段と、上記予測値記憶手段と、上記予測情報表示手段とを備え、
     上記各計測装置は、上記所定期間中に上記機器で使用されたエネルギー資源の量を計測して上記計測値を得る計測手段と、上記計測手段で得た上記計測値を記憶する上記第1記憶手段とを備え、
     上記監視装置は、上記各計測装置の上記第1記憶手段から上記計測値を取得する計測値取得手段と、上記計測値取得手段が取得した上記計測値を記憶する第2記憶手段とを備え、
     上記取得手段は、上記監視装置の上記第2記憶手段から上記計測値を取得するように構成されることを特徴とする請求項1記載のエネルギーマネジメントシステム。
  11.  機器を管理するエネルギーマネジメントシステムに用いられるプログラムであって、
     所定期間中に上記機器で使用されたエネルギー資源の量を計測した値を示す計測値を取得する取得手段と、
     上記取得手段が取得した上記計測値を記憶する計測値記憶手段と、
     上記計測値記憶手段に記憶された上記計測値に基づいて上記機器が使用されたかどうかを単位時間毎に判定する判定手段と、
     上記判定手段が判定した結果を示す判定結果を記憶する判定記憶手段と、
     上記判定記憶手段に記憶された上記判定結果に基づいて上記機器が使用されたどうかを上記単位時間毎に表示する使用情報表示手段と、
     上記所定期間中の上記機器の動作を上記単位時間毎に定義するスケジュール情報の入力に用いられるスケジュール入力手段と、
     上記スケジュール入力手段を用いて入力された上記スケジュール情報を記憶するスケジュール記憶手段と、
     上記スケジュール記憶手段に記憶された上記スケジュール情報どおりに上記機器が動作した場合に上記機器で使用されるエネルギー資源の量を示す予測値を上記計測値記憶手段に記憶された上記計測値に基づいて算出するシミュレート手段と、
     上記シミュレート手段で算出された上記予測値を記憶する予測値記憶手段と、
     上記予測値記憶手段に記憶された上記予測値を表示する予測情報表示手段としてコンピュータを機能させるためのプログラム。
PCT/JP2009/060621 2008-06-10 2009-06-10 エネルギーマネジメントシステム及びコンピュータプログラム WO2009151078A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CA2729846A CA2729846A1 (en) 2008-06-10 2009-06-10 Energy management system and computer program product
US12/997,085 US20110172792A1 (en) 2008-06-10 2009-06-10 Energy management system and computer program product
CN2009801218326A CN102057395A (zh) 2008-06-10 2009-06-10 能量管理系统以及计算机程序
JP2010516869A JP5102875B2 (ja) 2008-06-10 2009-06-10 エネルギーマネジメントシステム及びコンピュータプログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008152092 2008-06-10
JP2008-152092 2008-06-10

Publications (1)

Publication Number Publication Date
WO2009151078A1 true WO2009151078A1 (ja) 2009-12-17

Family

ID=41416784

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/060621 WO2009151078A1 (ja) 2008-06-10 2009-06-10 エネルギーマネジメントシステム及びコンピュータプログラム

Country Status (5)

Country Link
US (1) US20110172792A1 (ja)
JP (1) JP5102875B2 (ja)
CN (1) CN102057395A (ja)
CA (1) CA2729846A1 (ja)
WO (1) WO2009151078A1 (ja)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011078155A1 (ja) * 2009-12-21 2011-06-30 パナソニック電工株式会社 省エネルギー診断システム
WO2011078075A1 (ja) * 2009-12-21 2011-06-30 パナソニック電工株式会社 省エネルギー診断システム
JP2011204201A (ja) * 2010-03-26 2011-10-13 Panasonic Electric Works Co Ltd 省エネルギー診断システム
WO2011148974A1 (ja) * 2010-05-25 2011-12-01 パナソニック電工株式会社 省エネ診断システム
JP2012027597A (ja) * 2010-07-21 2012-02-09 Fuji Electric Co Ltd エネルギー監視システム
JP2012094077A (ja) * 2010-10-28 2012-05-17 Toshiba Corp 家庭用エネルギー管理システム
JP2012093848A (ja) * 2010-10-25 2012-05-17 Hitachi Building Systems Co Ltd エネルギー管理システム
JP2012160028A (ja) * 2011-02-01 2012-08-23 Nippon Telegr & Teleph Corp <Ntt> 省エネルギーアドバイス提供システム、省エネルギーアドバイス提供方法およびそのプログラム
JP2012164233A (ja) * 2011-02-08 2012-08-30 Fujitsu Ltd 浪費度算出装置、浪費度算出プログラム及び浪費度算出方法、並びにエネルギ管理システム
JP2014089766A (ja) * 2014-02-03 2014-05-15 Panasonic Corp 省エネ診断装置およびそれを用いた省エネ診断システム
JP2014132822A (ja) * 2010-12-06 2014-07-17 Japan Techno Co.Ltd デマンドカレンダー、デマンドカレンダー作成装置、デマンドカレンダー作成方法
JP5605865B2 (ja) * 2010-11-29 2014-10-15 Necソリューションイノベータ株式会社 電力管理システム、電力管理装置、電力管理方法、及びプログラム
JP2015092368A (ja) * 2014-12-10 2015-05-14 パナソニックIpマネジメント株式会社 省エネルギ診断システム、サーバ
JP2015163017A (ja) * 2014-02-28 2015-09-07 株式会社東光高岳 運用パターン表示装置
JP2015218971A (ja) * 2014-05-19 2015-12-07 三菱電機株式会社 空気清浄換気装置
JP2017076350A (ja) * 2015-10-16 2017-04-20 富士通株式会社 情報変換方法、情報処理装置、及び情報変換プログラム
EP2442421A3 (en) * 2010-10-12 2017-09-27 Samsung Electronics Co., Ltd. Power management system and method for controlling the same
JP2018049567A (ja) * 2016-09-23 2018-03-29 株式会社日立ハイテクノロジーズ サーバ、制御システム、制御方法、及び、制御プログラム
JP2020190876A (ja) * 2019-05-21 2020-11-26 三菱電機ビルテクノサービス株式会社 消費電力予測装置
JP2022134672A (ja) * 2021-03-03 2022-09-15 横河電機株式会社 判定装置、判定方法、および、判定プログラム

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2488936A1 (fr) * 2009-10-13 2012-08-22 France Telecom Gestion du stockage de données dans un espace de stockage distribué
US8799850B2 (en) * 2009-10-29 2014-08-05 Synopsys, Inc. Simulation-based design state snapshotting in electronic design automation
TWM380086U (en) * 2009-10-30 2010-05-11 Bin Terng Entpr Co Ltd Electric-powered curtain capable of preventing power interruption
KR101662705B1 (ko) * 2010-12-22 2016-10-05 한국전자통신연구원 그린 홈 전력 관리 시스템에서 소비 전력량 데이터 관리 및 검증 장치 및 그 방법
KR20120080406A (ko) * 2011-01-07 2012-07-17 한국전자통신연구원 빌딩 운영 방안 도출 장치 및 방법
JP4775516B1 (ja) 2011-03-14 2011-09-21 オムロン株式会社 制御装置、制御方法、プログラム、記録媒体
US20130073232A1 (en) * 2011-09-15 2013-03-21 Electronic Systems Protection, Inc. Source Power Anomaly and Load Power Consumption Monitoring and Analysis
US9577473B2 (en) 2011-09-15 2017-02-21 Electronic Systems Protection, Inc. Power-centric system management
JP5899770B2 (ja) * 2011-10-03 2016-04-06 富士ゼロックス株式会社 エネルギー使用量管理装置及びプログラム
JP5887549B2 (ja) * 2011-11-07 2016-03-16 パナソニックIpマネジメント株式会社 エネルギー管理装置、エネルギー管理方法、プログラム
JP6019566B2 (ja) * 2011-11-17 2016-11-02 ソニー株式会社 電力管理装置および電力管理方法
JP5888019B2 (ja) * 2011-12-12 2016-03-16 オムロン株式会社 制御装置、制御方法、プログラムおよび記録媒体
AU2013210745A1 (en) * 2012-01-20 2014-08-21 Neurio Technology Inc. System and method of compiling and organizing power consumption data and converting such data into one or more user actionable formats
US9014868B2 (en) * 2012-03-29 2015-04-21 International Business Machines Corporation Power factor
JP6136045B2 (ja) * 2012-07-05 2017-05-31 パナソニックIpマネジメント株式会社 機器制御装置、機器制御システム、プログラム
JP5650874B1 (ja) * 2014-02-27 2015-01-07 パナソニック インテレクチュアル プロパティ コーポレーション オブアメリカPanasonic Intellectual Property Corporation of America 制御方法、情報提供方法、及びプログラム
SG11201500568TA (en) * 2014-02-27 2015-09-29 Panasonic Ip Corp America Method for controlling information device, method for providing information, and program
JP6404650B2 (ja) * 2014-09-11 2018-10-10 株式会社東芝 機器運転設定値決定装置、機器運転設定値決定方法、及び、機器運転設定値決定プログラム
CN106524429B (zh) * 2014-09-30 2019-04-30 广东美的制冷设备有限公司 空调器运行参数分析方法、分享方法和空调系统及客户端
JP6541919B1 (ja) * 2018-09-13 2019-07-10 三菱電機株式会社 設定支援装置、設定支援方法及びプログラム

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002209335A (ja) * 2001-01-12 2002-07-26 Nippon Telegraph & Telephone East Corp 需要家消費電力制御管理システム
JP2004116947A (ja) * 2002-09-27 2004-04-15 Osaka Gas Co Ltd 空調運転管理システム
JP2006079363A (ja) * 2004-09-09 2006-03-23 Tempearl Ind Co Ltd 省エネルギー対策方法及び対策装置
JP2007172406A (ja) * 2005-12-22 2007-07-05 E-Cubic Co Ltd エネルギー等消費量算定システム及びエネルギー等消費量適切性情報出力装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030171851A1 (en) * 2002-03-08 2003-09-11 Peter J. Brickfield Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US7216021B2 (en) * 2003-10-30 2007-05-08 Hitachi, Ltd. Method, system and computer program for managing energy consumption
US20060167591A1 (en) * 2005-01-26 2006-07-27 Mcnally James T Energy and cost savings calculation system
EP2220611A4 (en) * 2007-11-05 2014-01-15 Sloan Valve Co SUPRERETTE OF PUBLIC TOILET

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002209335A (ja) * 2001-01-12 2002-07-26 Nippon Telegraph & Telephone East Corp 需要家消費電力制御管理システム
JP2004116947A (ja) * 2002-09-27 2004-04-15 Osaka Gas Co Ltd 空調運転管理システム
JP2006079363A (ja) * 2004-09-09 2006-03-23 Tempearl Ind Co Ltd 省エネルギー対策方法及び対策装置
JP2007172406A (ja) * 2005-12-22 2007-07-05 E-Cubic Co Ltd エネルギー等消費量算定システム及びエネルギー等消費量適切性情報出力装置

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102713962A (zh) * 2009-12-21 2012-10-03 松下电器产业株式会社 节能诊断系统
JP2011129067A (ja) * 2009-12-21 2011-06-30 Panasonic Electric Works Co Ltd 省エネルギー診断システム
WO2011078075A1 (ja) * 2009-12-21 2011-06-30 パナソニック電工株式会社 省エネルギー診断システム
US9170576B2 (en) 2009-12-21 2015-10-27 Panasonic Intellectual Property Management Co., Ltd. Energy conservation diagnosis system
CN102713962B (zh) * 2009-12-21 2015-09-02 松下电器产业株式会社 节能诊断系统
CN102741767B (zh) * 2009-12-21 2015-11-25 松下电器产业株式会社 节能分析系统
US9710862B2 (en) 2009-12-21 2017-07-18 Panasonic Intellectual Property Management Co., Ltd. Energy conservation analysis system
JP5331212B2 (ja) * 2009-12-21 2013-10-30 パナソニック株式会社 省エネルギー診断システム
CN102741767A (zh) * 2009-12-21 2012-10-17 松下电器产业株式会社 节能分析系统
WO2011078155A1 (ja) * 2009-12-21 2011-06-30 パナソニック電工株式会社 省エネルギー診断システム
JP2011204201A (ja) * 2010-03-26 2011-10-13 Panasonic Electric Works Co Ltd 省エネルギー診断システム
WO2011148974A1 (ja) * 2010-05-25 2011-12-01 パナソニック電工株式会社 省エネ診断システム
EP2579202A4 (en) * 2010-05-25 2016-01-27 Panasonic Ip Man Co Ltd ENERGY-SAVING DIAGNOSTIC SYSTEM
JP2011248529A (ja) * 2010-05-25 2011-12-08 Panasonic Electric Works Co Ltd 省エネ診断システム
JP2012027597A (ja) * 2010-07-21 2012-02-09 Fuji Electric Co Ltd エネルギー監視システム
EP2442421A3 (en) * 2010-10-12 2017-09-27 Samsung Electronics Co., Ltd. Power management system and method for controlling the same
JP2012093848A (ja) * 2010-10-25 2012-05-17 Hitachi Building Systems Co Ltd エネルギー管理システム
JP2012094077A (ja) * 2010-10-28 2012-05-17 Toshiba Corp 家庭用エネルギー管理システム
JP5605865B2 (ja) * 2010-11-29 2014-10-15 Necソリューションイノベータ株式会社 電力管理システム、電力管理装置、電力管理方法、及びプログラム
JP2017139957A (ja) * 2010-12-06 2017-08-10 日本テクノ株式会社 デマンドカレンダー
JP2015213429A (ja) * 2010-12-06 2015-11-26 日本テクノ株式会社 デマンドカレンダー
JP2014132822A (ja) * 2010-12-06 2014-07-17 Japan Techno Co.Ltd デマンドカレンダー、デマンドカレンダー作成装置、デマンドカレンダー作成方法
JP2012160028A (ja) * 2011-02-01 2012-08-23 Nippon Telegr & Teleph Corp <Ntt> 省エネルギーアドバイス提供システム、省エネルギーアドバイス提供方法およびそのプログラム
JP2012164233A (ja) * 2011-02-08 2012-08-30 Fujitsu Ltd 浪費度算出装置、浪費度算出プログラム及び浪費度算出方法、並びにエネルギ管理システム
JP2014089766A (ja) * 2014-02-03 2014-05-15 Panasonic Corp 省エネ診断装置およびそれを用いた省エネ診断システム
JP2015163017A (ja) * 2014-02-28 2015-09-07 株式会社東光高岳 運用パターン表示装置
JP2015218971A (ja) * 2014-05-19 2015-12-07 三菱電機株式会社 空気清浄換気装置
JP2015092368A (ja) * 2014-12-10 2015-05-14 パナソニックIpマネジメント株式会社 省エネルギ診断システム、サーバ
JP2017076350A (ja) * 2015-10-16 2017-04-20 富士通株式会社 情報変換方法、情報処理装置、及び情報変換プログラム
JP2018049567A (ja) * 2016-09-23 2018-03-29 株式会社日立ハイテクノロジーズ サーバ、制御システム、制御方法、及び、制御プログラム
WO2018056366A1 (ja) * 2016-09-23 2018-03-29 株式会社日立ハイテクノロジーズ サーバ、制御システム、制御方法、及び、制御プログラム
JP2020190876A (ja) * 2019-05-21 2020-11-26 三菱電機ビルテクノサービス株式会社 消費電力予測装置
WO2020235150A1 (ja) * 2019-05-21 2020-11-26 三菱電機株式会社 消費電力予測装置
JP7277254B2 (ja) 2019-05-21 2023-05-18 三菱電機ビルソリューションズ株式会社 消費電力予測装置
JP2022134672A (ja) * 2021-03-03 2022-09-15 横河電機株式会社 判定装置、判定方法、および、判定プログラム
JP7359176B2 (ja) 2021-03-03 2023-10-11 横河電機株式会社 判定装置、判定方法、および、判定プログラム

Also Published As

Publication number Publication date
CA2729846A1 (en) 2009-12-17
CN102057395A (zh) 2011-05-11
JPWO2009151078A1 (ja) 2011-11-17
US20110172792A1 (en) 2011-07-14
JP5102875B2 (ja) 2012-12-19

Similar Documents

Publication Publication Date Title
JP5102875B2 (ja) エネルギーマネジメントシステム及びコンピュータプログラム
AU2021201867A1 (en) Method and system for energy management
JP5227707B2 (ja) 空調省エネ制御装置
US7216021B2 (en) Method, system and computer program for managing energy consumption
JP4363244B2 (ja) エネルギー管理装置
US7502698B2 (en) Power consumption measuring device and power control system
JP4802046B2 (ja) 建物の電力監視システム
US20110112875A1 (en) Site survey and installation for remote facility management system
CN102136102A (zh) 针对消费者能源消耗的分析
KR20130049254A (ko) 쓰리디 모델링 기반의 지능형 빌딩통합 자동제어 및 에너지 목표관리 시스템 및 그 방법
JP2002117183A (ja) 物資消費量関連サービス装置及び方法
JP5475546B2 (ja) 省エネ診断システム
KR20120028503A (ko) 공간분할 기반 지능자율 에너지절감 방법 및 시스템
WO2012026586A1 (ja) 電気料金可視化装置
JP2009112075A (ja) 電力管理システム
KR20150096833A (ko) 양방향 조율 및 순차보상 기반 최대수요전력관리 방법 및 시스템
JP2024079525A (ja) ビル管理システム
JPH08322147A (ja) 電力需要予測システム
JP2001325657A (ja) 課金システム及び課金方法
JPH10336766A (ja) 通信システム、端末装置およびコントローラ
JP2002259509A (ja) オンラインメータ監視方法
JP2002279573A (ja) ガスコンセント及びデータ収集システム
JP4540737B2 (ja) 建物設備管理の分析装置
JP2011002384A (ja) 警告システム
JP4223318B2 (ja) アドバイザリーシステム、建物管理アドバイス提供方法及び建物管理アドバイス提供プログラム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980121832.6

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09762508

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010516869

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2729846

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 12997085

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 09762508

Country of ref document: EP

Kind code of ref document: A1