WO2006016472A1 - 静電塗装装置 - Google Patents

静電塗装装置 Download PDF

Info

Publication number
WO2006016472A1
WO2006016472A1 PCT/JP2005/013524 JP2005013524W WO2006016472A1 WO 2006016472 A1 WO2006016472 A1 WO 2006016472A1 JP 2005013524 W JP2005013524 W JP 2005013524W WO 2006016472 A1 WO2006016472 A1 WO 2006016472A1
Authority
WO
WIPO (PCT)
Prior art keywords
current
paint
high voltage
current detection
coating machine
Prior art date
Application number
PCT/JP2005/013524
Other languages
English (en)
French (fr)
Inventor
Yukio Yamada
Original Assignee
Abb K.K.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abb K.K. filed Critical Abb K.K.
Priority to JP2006531389A priority Critical patent/JP4388070B2/ja
Priority to CA002566233A priority patent/CA2566233A1/en
Priority to US11/571,276 priority patent/US7926443B2/en
Priority to EP05766501A priority patent/EP1797962B1/en
Publication of WO2006016472A1 publication Critical patent/WO2006016472A1/ja
Priority to US13/008,670 priority patent/US8042488B2/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B3/00Spraying or sprinkling apparatus with moving outlet elements or moving deflecting elements
    • B05B3/02Spraying or sprinkling apparatus with moving outlet elements or moving deflecting elements with rotating elements
    • B05B3/10Spraying or sprinkling apparatus with moving outlet elements or moving deflecting elements with rotating elements discharging over substantially the whole periphery of the rotating member, i.e. the spraying being effected by centrifugal forces
    • B05B3/1035Driving means; Parts thereof, e.g. turbine, shaft, bearings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B5/00Electrostatic spraying apparatus; Spraying apparatus with means for charging the spray electrically; Apparatus for spraying liquids or other fluent materials by other electric means
    • B05B5/025Discharge apparatus, e.g. electrostatic spray guns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B5/00Electrostatic spraying apparatus; Spraying apparatus with means for charging the spray electrically; Apparatus for spraying liquids or other fluent materials by other electric means
    • B05B5/025Discharge apparatus, e.g. electrostatic spray guns
    • B05B5/04Discharge apparatus, e.g. electrostatic spray guns characterised by having rotary outlet or deflecting elements, i.e. spraying being also effected by centrifugal forces
    • B05B5/0415Driving means; Parts thereof, e.g. turbine, shaft, bearings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B5/00Electrostatic spraying apparatus; Spraying apparatus with means for charging the spray electrically; Apparatus for spraying liquids or other fluent materials by other electric means
    • B05B5/025Discharge apparatus, e.g. electrostatic spray guns
    • B05B5/053Arrangements for supplying power, e.g. charging power

Definitions

  • the present invention relates to an electrostatic coating apparatus that sprays paint in a state where a high voltage is applied to a coating machine.
  • an electrostatic coating apparatus a coating machine that sprays paint toward an object to be coated using a rotary atomizing head, a high voltage is generated by boosting a power supply voltage, and the high voltage is applied to the coating machine.
  • a high voltage generator for outputting to the rotary atomizing head; a power supply voltage control device for controlling a power supply voltage supplied to the high voltage generator; and a setting signal for setting a power supply voltage for the power supply voltage control device
  • a high voltage control device that controls the high voltage output from the high voltage generator is known.
  • the rotary atomizing head constitutes an electrode that discharges a high voltage toward an object to be coated. For this reason, an electrostatic field is formed between the rotary atomizing head and the object to be grounded. Then, the paint particles charged to a high voltage through the rotary atomizing head are applied by flying toward the object to be coated along the static electric field.
  • the electrostatic device fe ⁇ the low voltage side of the high voltage generator is at the first potential.
  • the surface of the machine cover is adsorbed by sprayed mist, dust and other floating substances, and moisture in the air, which reduces the surface resistance of the force bar and damages the insulation of the electrostatic coating device.
  • the current flowing through the high voltage generator hereinafter referred to as the entire return path
  • the high voltage application path consisting of the path of the power source, the high voltage generator, the rotary atomizing head, the object to be coated, etc.
  • Current and a decrease in insulation such as a cover was detected based on the amplitude of the current.
  • the electrostatic coating apparatus detects a decrease in insulation such as force bar based on the total return current flowing through the high voltage generator in the high voltage application path.
  • the high voltage generator in addition to the current flowing between the rotating atomizing head and the object to be coated through the high voltage application path (hereinafter referred to as the object current to be coated) flows, the high voltage generator
  • the current flowing through the leakage path other than the path (hereinafter referred to as leakage current) flows.
  • the total return current includes, for example, the coating current flowing between the rotary atomizing head and the coating and the surface of the coating machine. Leakage current flowing through the same.
  • the location where the leakage current of the paint machine occurs is in addition to the surface of the power par of the paint machine, for example, the inner surface of the paint passage in the paint machine, the inner surface of the air passage for spray pattern formation, etc.
  • the pigments in the paint tend to adhere little by little with the progress of use even if appropriate cleaning is performed. As a result, the high voltage is likely to cause creeping discharge.
  • a so-called meta-click paint containing metallic pigments such as aluminum Niumu powder
  • the pigment is a conductive paint passage interior wall remains, also c reduction in the insulation resistance becomes noticeable.
  • spray pattern formation The shape of the shaper, the supply and stop of paint, the air valve for the air valve for controlling the stop, the air motor for moving the rotary atomizing head, etc. Fine dust and moisture contained in it adhere to it, and high m pressure tends to cause creeping discharge.
  • the coating machine is in a state where leakage current can occur at multiple locations.
  • a decrease in insulation is detected based on the total return current, it is difficult to determine whether the current to be coated or the leakage current has increased, and where the leakage current has occurred. I do not understand,
  • the present invention has been made in view of the above-described problems of the prior art, and the object of the present invention is to identify a location where leakage current is generated, and to prevent damage to the coating machine, thereby improving reliability and durability. It is to provide an electrostatic coating device that can improve the productivity and painting productivity.
  • the present invention includes a coating machine that sprays paint on an object to be coated, a high voltage generated by boosting a power supply voltage, and the high voltage is output to the coating machine.
  • High power A voltage generator, a power supply voltage control device for controlling a power supply voltage supplied to the high voltage generator, and a setting signal for setting the power supply voltage to the power supply voltage control device, and generating the high voltage This is applied to an electrostatic coating device comprising a high voltage control device for controlling a high voltage output from a container.
  • the features of the configuration adopted by the present invention are: a total return current detection means for detecting a total return current flowing through the high voltage generator; and a leakage current detection for detecting a leakage current flowing without passing through the object to be coated.
  • the high voltage control device uses the all return current detection value by the all return current detection means and the leakage current detection value by the leakage current detection means to impair the insulation of the coating machine.
  • the power supply voltage cutoff means that outputs a cutoff signal that cuts off the supply of the power supply voltage to the power supply voltage control device, and the initial level of insulation decrease using the leakage current detection value by the leakage current detection means.
  • a configuration including notifying means for notifying the insulation reduction occurring in the coating machine.
  • the power shut-off means is, for example, whether or not the total return current detection value by the all return current detection means has exceeded a predetermined cutoff threshold current value, or by the leakage current detection means.
  • the power shut-off means can use the total return current detection value, for example, to determine that the coating machine has abnormally approached the workpiece and the insulation of the coating machine has been impaired.
  • the leakage current detection value it was determined that the insulation of the location where the leakage current flows (for example, the surface of the coating machine cover, the inner surface of the paint passage, the inner surface of the air passage, etc.) was impaired. Can be separated
  • the notification means is, for example, a predetermined alarm threshold current value in which the leakage current detection value is fc smaller than the cutoff threshold current value. It is possible to determine whether or not the initial level of insulation degradation has occurred in the HIJ because the insulation of the coating machine is impaired. Use the values to understand the progress of dielectric breakdown at locations other than between the object to be coated and the coating machine (for example, the power bar surface of the coating machine, the inner surface of the paint passage, the inner surface of the air passage, etc.) Can do.
  • the notification means When the leakage current on the surface of-, the inner surface of the paint passage, the inner surface of the air passage, etc. is detected individually, the notification means will identify the location where the leakage current is increasing among the locations where the leakage current is occurring. Can be determined. For this reason, by notifying the increase point of the leakage current using the notification means, the operator only needs to perform maintenance work on the location determined by the notification means of the coating machine. This reduces the time required for machine maintenance and improves paint productivity.
  • the leakage current detecting means includes an outer surface current detector for detecting a current flowing on the outer surface of the coating machine.
  • the leakage current flowing on the outer surface of the coating machine can be detected using the outer surface current detector.
  • the power shut-off means and notification means can grasp the progress of dielectric breakdown on the outer surface of the coating machine, it is determined that the adsorbate has accumulated on the outer surface of the coating machine, resulting in a decrease in insulation and loss. Therefore, the power shut-off means can cut off the supply of high voltage before dielectric breakdown occurs on the outer surface of the coating machine, thus preventing damage to the coating machine and increasing the reliability and durability.
  • the notification means can notify the FJIJ that the damage due to creeping discharge has progressed on the outer surface of the coating machine to notify the FJIJ of a decrease in insulation due to an alarm, etc., and prompt the operator to clean the outer surface of the equipment.
  • the leakage current detecting means includes a paint passage current detector for detecting a current flowing through the paint passage in the coating machine.
  • the power shut-off means and the notification means are insulated in the paint passage. Since it is not possible to grasp the progress of destruction, it is possible to determine that pigment has adhered and deposited on the inner surface of the paint passage, resulting in a loss of insulation. Therefore, the power shut-off means can cut off the supply of voltage when dielectric breakdown occurs on the inner surface of the paint passage, thus preventing damage to the paint passage and improving reliability and durability.
  • the informing means informs the operator that the insulation is lowered by generating an alarm before the damage due to creeping discharge progresses on the inner surface of the paint passage, and prompts the operator to clean and wash the paint passage.
  • the leakage current detecting means includes an outer surface current detector for detecting a current flowing through the outer surface of the HIJ self-painting machine, and a paint passage current detector for detecting a current flowing through the paint passage in the coating machine. It is configured to include. With this configuration, it is possible to detect the leakage current flowing through the outer surface of the coating machine using the outer surface current detector, and to detect the leakage current flowing through the paint passage using the coating passage current detector. You can. As a result, the power shut-off stage and the notification means can grasp the progress of the dielectric breakdown on the outer surface of the coating machine and can grasp the progress of the dielectric breakdown in the paint passage. ⁇
  • is a motor that is rotationally driven by driving air, a rotary shaft that is rotated by the air motor, and a rotary shaft provided at the tip of the rotary shaft.
  • the leakage current detecting means detects the current flowing through the drive passage for supplying the HU 5 self-drive shaft. Flow through a supply valve drive air passage for opening and closing the paint supply valve, and a flow detector current detector for detecting a current flowing through the shaping passage for supplying FJiJ S Detect current Supply valve drive air passage current detector.
  • the leakage current detection means includes the drive air passage current detector, the shaving air passage current detector, and the supply valve drive air passage current detector, three current detectors are used. Therefore, the leakage current flowing in each air passage can be detected, and the power shut-off means and the notification means can grasp the progress of insulation breakdown in the air passage. Dust on the inside It is possible to determine that moisture has adhered or deposited and the insulation has deteriorated or lost. Therefore, the power shut-off means can shut off the supply of high voltage before dielectric breakdown occurs on the inner surface of each air passage, so that damage to the air passage can be prevented, and reliability and durability can be improved.
  • the notification means can notify the operator of maintenance of the air passage and the air source by informing the operator of a decrease in the absolute level by generating an alarm before the damage due to creeping discharge occurs on the inner surface of each air passage. It is possible to facilitate sweeping of road and air source filters and dryers.
  • the coating machine includes an air motor that is driven to rotate by a drive wheel, a rotary shaft that is rotated by the air motor, and a rotating shaft that is provided at a tip of the rotary shaft.
  • a rotary atomizing head that sprays the paint supplied through the paint supply valve while rotating by the shaft, and a shearing air that is provided on the outer peripheral side of the rotary atomizing head and forms a spray pattern of the paint.
  • the leakage current detecting means includes an all-air passage current detector, and the all-air passage current detector includes driving air for supplying the driving air. The current flowing through the passage, the current flowing through the shearing air passage for supplying the shaping, and the current flowing through the supply valve drive passage for opening and closing the HU paint supply valve are combined. It is configured to detect
  • the all-air passage current detector included in the leakage current detection means calculates the current flowing through the driving air passage, the current flowing through the shaping air passage, and the current flowing through the supply valve drive passage. Since it is configured to detect together, leakage that flows in all the air passages using a single all-air passage current detector. Leakage current can be detected together. As a result, the power shutoff means and the notification means can grasp the progress of the dielectric breakdown in the air passage, so that dust, moisture, etc. adhere to and accumulate on the inner surface of the air passage. It can be determined that the loss or loss has occurred.
  • the drive air passage, shaving air passage, and supply valve are generally connected to a common air source and the same air is supplied to the drive air passage, so the factor that reduces the insulation in each air passage is air Moisture and dust (fine mist ⁇ ) in the inside are common on the inner surface of the air passage. For this reason, these air passages tend to be less insulating.
  • the passage current detector detects the leakage currents flowing in all air passages together (total). If the insulation of any air passage is reduced, it can be detected early or reliably. Can do. Also, since a single all-air passage current detector is used for a plurality of air passages, the number of current detectors should be reduced as compared to a field opening provided with a plurality of air passages. As a result, it is possible to simplify the control function of the power shut-off means and the notification means, and to reduce the manufacturing cost of the entire apparatus.
  • the power shut-off means flows between the object to be coated except for the leakage current detection value by the leakage current detection means from the total return current detection value by the whole return current detection means.
  • the substrate electrical abnormality processing means can determine whether the coating machine has abnormally approached the substrate using the substrate current flowing between the substrate and the abnormal approach. In this case, the supply voltage can be cut off.
  • the workpiece current abnormality processing means determines whether or not the coating machine has abnormally approached the workpiece using the coating current obtained by subtracting the leakage current detection value from the total return current detection value. Therefore, it is possible to grasp the approaching state of the object with high accuracy.
  • the workpiece current abnormality processing means constantly monitors the workpiece current obtained by subtracting the leakage current detection value, abnormal leakage current (such as the outside surface of the coating machine) It is possible to monitor indirectly whether or not (leakage current below the point where current is generated). For this reason, even if such an abnormal leakage current occurs, it can be detected and distinguished at an early stage by the workpiece current abnormality processing means.
  • the power cut-off means subtracts the leakage current detection value by the leakage current detection means from the total return current detection value by the all return current detection means, and between the object to be coated.
  • An object current calculating means for calculating a current to be applied to the object to be applied, and an amount of change in the object current applied by the object current calculating means to the power supply voltage control device when the change amount exceeds a predetermined shut-off change amount.
  • a slope abnormality processing means for outputting a shut-off signal for shutting off the supply of power supply voltage is provided.
  • the slope abnormality processing means can determine whether or not the coating machine has abnormally approached the object using the amount of change in the object current flowing between the object and the object. Approach When this happens, the supply of power supply voltage can be cut off. In addition, when determining whether or not the object is abnormally approached using the amount of change in the total return current detection value, the approach condition of the object to be coated is relaxed based on the leakage current, and the accuracy is lowered. Easy to do. On the other hand, the slope abnormality processing means determines whether or not the coating machine has abnormally approached the substrate using the amount of change in the substrate current obtained by subtracting the leakage current detection value from the total return current detection value. Therefore, it is possible to grasp the approaching state of the object with high accuracy.
  • FIG. 1 is a partially broken front view showing a rotary atomizing head-type coating ⁇ . According to the first embodiment of the present invention.
  • FIG. 2 is a configuration diagram showing the overall configuration of the rotary atomizing head type coating apparatus according to the first embodiment.
  • FIG. 3 is an explanatory diagram showing the cutoff threshold current value and the alarm threshold current value stored in the high voltage control device in FIG.
  • FIG. 4 is a flowchart showing the high voltage generation control process according to the first embodiment.
  • Figure 5 is a flowchart following Figure 4.
  • FIG. 6 is a flowchart showing the high voltage generation control process according to the second embodiment.
  • Figure 7 is a flowchart following Figure 6.
  • Fig. 8 is a flowchart showing the slope detection process in Fig. 6.
  • FIG. 9 is a configuration diagram showing the overall configuration of the rotary atomizing head type coating apparatus according to the third embodiment.
  • FIG. 1 to FIG. 5 show a rotary atomizing head type coating apparatus according to the first embodiment.
  • 1 is a coating machine for spraying paint toward the object A to be grounded, and the coating machine 1 is applied to force bar 2, gamo-evening 3, rotating atomizing head 5 etc. Is composed of,
  • 2 is a cylindrical force bar formed of an absolute resin material.
  • This cover 2 covers the gamo evening 3, high voltage generator 14 etc.
  • FIG. 3 shows a motor evening made of a conductive metal material accommodated on the inner peripheral side of the force bar 2.
  • a hollow rotating shaft 3 C rotatably supported in a housing 3 A via a hydrostatic bearing 3 B, and a fan fixed on the base end side of the rotating shaft 3 C—bin 3 D It is also composed by
  • the drive air passage 4 provided in the sprayer 1 is connected.
  • the gambling evening 3 connects the rotary shaft 3C and the rotary atomizing head 5 with, for example,
  • Reference numeral 5 denotes a rotary atomizing head attached to the distal end side of the rotary shaft 3 C of the gammo 3.
  • the rotary atomizing head 5 is made of, for example, a metal material or a conductive resin material.
  • the rotary atomizing head 5 is a CJ that sprays the paint from the periphery with the mental power when the paint is supplied through the feed tube 8 described later in a state where the rotary atomizing head 5 is rotated at high speed.
  • Rotating atomizing head 5 has X axis High voltage generator 14 (described later) is connected via 3C etc. o This enables high voltage to be applied to the entire rotary atomizing head 5 when electrostatic coating is performed. It is possible to directly charge the paint flowing on the front surface to a high voltage.
  • the shaving air ring 6 is a shaving air ring made of, for example, an insulating resin material.
  • the shaving air ring 6 is provided on the front end side of the cover 2 so as to surround the outer peripheral side of the rotary atomizing head 5. Yes.
  • the shaping air ring 6 is provided with a plurality of air discharge holes 6 A, and the air discharge holes 6 A
  • a paint passage 9 is provided in the field tube 8, and the paint passage 9 is connected to a paint supply source 10 and a cleaning thinner supply source (not shown) via a color change valve device (not shown).
  • the feed tube 8 feeds the paint from the paint supply source 10 toward the rotary atomizing head 5 through the paint passage 9 during painting, and at the time of cleaning, Supply cleaning fluid (thinner, air, etc.) from the cleaning thinner supply source when changing colors, etc.
  • the fiber tube 8 is not limited to the present embodiment.
  • a paint passage is formed in the inner cylinder, and the cleaning cylinder is passed through the outer cylinder.
  • the paint passage 9 is not limited to the one that passes through the feed tube 8 in the present embodiment, but the type of the coating machine 1. Depending on the type of passage, it can be adopted.
  • This paint supply valve 1 1 shows, for example, a normally-closed paint supply valve provided in the middle of the paint passage 9.
  • This paint supply valve 1 1 includes a valve body 1 1 A extending through the paint passage 9, and the valve body 1 1 A cylinder located on the base end side of A 1 1 Piston provided in B 1 1
  • the valve body 1 1 A is opened against the valve spring 1 1 D by supplying the supply valve drive wheel (pyro fan) to the chamber 1 1 E (in Fig. 1). Move to the left) and allow the distribution of the paint in the paint passage 9.
  • the air source 1 3 indicates an air source.
  • the air source 1 3 is connected to the drive air passage 4, the shaving air passage 7 and the supply valve drive air passage 1 2.
  • the air source 1 3 is outside air through the filter. After the air is sucked and compressed, the compressed air is dried and discharged using a layer (not shown). Then, the compressed air discharged from the air source 13 is supplied to the air motor 3 via an air-electric converter (not shown) provided in the middle of the drive air passage 4, for example. The number of revolutions of the air motor 3 is controlled using a vessel.
  • the compressed air discharged from the air source 13 is supplied to the shaping air passage 7 to form a spray pattern of the material particles. Do At the same time, it is supplied to the supply valve drive air passage 12 and used to open and close the paint supply valve 1 1.
  • the high voltage generator 14 is a high voltage generator built in the base end of the cover 1, and the high voltage generator 14 is a multi-stage type comprising, for example, a plurality of capacitors and diodes (both not shown). Rectifier circuit
  • the pressure generator 14 composed of a so-called cock croft circuit is a power supply voltage control device 1 described later.
  • the power supply voltage supplied from 5 is boosted to generate a high voltage of, for example, 1 30 to 1 50 kV, and the high voltage generator 14 is connected to the circuit through the air motor 3 and the rotary atomizing head 5.
  • the paint supplied to the atomizing head 5 is directly charged with a high voltage.
  • 1 5 indicates a power supply voltage control device, and this power supply voltage control device 15 is connected to the high voltage generator 1 4 to control the output voltage (high voltage) output from the high voltage generator 1 4. This is what controls the DC power supply voltage to be supplied.
  • the power supply voltage control device 15 has its input side connected to the commercial power supply 17 via the power conversion circuit 16 and its output side connected to the high voltage generator 14.
  • the power conversion circuit 16 is, for example, a high-voltage transformer and
  • AC 100 V supplied from commercial power supply 1 7 is converted to DC 2 4 V, for example, and converted to power supply voltage DC 2 4 V as power supply voltage 1 5 Output to
  • the power supply voltage control device 15 is composed of an NPN type transistor 18 and a power transistor control circuit 19 for controlling the power transistor 18 and a power transistor.
  • the collector of 1 8 is connected to the power conversion circuit 1 6 and the high voltage generator 1 4 And the base is connected to the Hunjis evening control circuit 19.
  • the transistor control circuit 19 changes the base voltage of the transistor 18 according to a setting signal output from the high voltage controller 20 described later, and generates a high voltage from the semiconductor circuit.
  • the power supply voltage applied to the input side of the unit 14 is controlled variably.
  • the high voltage control device 20 is a high-voltage control device that outputs a signal (setting signal) corresponding to the set voltage output from the voltage setting device 21 to set the power supply voltage to the power supply voltage control device 15.
  • the high voltage control device 20 includes a processing device (CPU) and the like.
  • the high voltage controller 20 also has a voltage setter 2 1, a voltage sensor 2 2, a current sensor 2 on its input side.
  • the high voltage control device 20 compares the set voltage output from the voltage setter 2 1 with the detected voltage from the voltage sensor 2 2 and outputs the output voltage output from the high voltage generator 14- C. This enables high voltage control
  • the high voltage controller 20 operates according to a program for high voltage generation control processing shown in FIGS. 4 and 5 to be described later, so that the high voltage controller 20 has a current sensor 2 3 to be described later. , 25 to 29 Using the current detection values I t I a to I e to determine the insulation state of the sprayer 1, when it is determined that the insulation level has deteriorated, the alarm buzzer 30 and When the alarm signal is output to amplifier 3 1 or when it is determined that the insulation is impaired, a shut-off signal is output to the power supply voltage control device 15 to supply the power voltage to the high voltage generator 14 Shut off
  • the set voltage output from the voltage setter 21 is appropriately set within a range of, for example, 1-30 to 1150 kV according to the properties of the coating material, coating conditions, and the like.
  • the voltage sensor 2 2 is a voltage sensor connected to the output side of the high voltage generator 14, and the voltage sensor 2 2 is an output output from the high voltage generator 14 as the voltage of the motor 3 and the rotary atomizing head 5. The voltage is detected and this voltage detection value V is output to the high voltage controller 2 0
  • 2 3 is the high voltage generator 1 among the high voltage application paths consisting of the commercial power supply 17, power conversion circuit 16, high voltage generator 14, rotary atomizing head 5, coating object A, etc. All return currents flowing through 4 are detected.
  • the voltage generator 14 leakage current through various leakage paths to be described later flows in addition to the current to be coated passing through the voltage application path X. That is, a high voltage application path and Since the leakage path is contacted via ground, both the workpiece current and the leakage current return to the high voltage generator 14. Therefore, the current sensor 23 detects the total return current obtained by adding the coating current and the leakage current, and outputs this current detection value It to the high voltage controller 20.
  • This leakage current detector 24 shows a leakage current detector as a leakage current detection means that detects leakage current that flows without passing through the object A.
  • This leakage current detector 24 includes current sensors 25 to 5 to be described later. 2 9 and its output side is the high voltage controller 2
  • This current sensor 25 shows a current sensor as an outer surface current detector.
  • This current sensor 25 is an annular conductor terminal made of a conductive metal material or the like provided on the surface of the cover 2, for example.
  • the conductor terminal 25 A is formed of an annular conductor that is substantially flush with the surface of the force C and surrounds the cover 1.
  • the current sensor 26 shows a current sensor as a drive air passage current detector.
  • the current sensor 26 is connected to an annular conductor terminal 26 A made of, for example, a conductive metal material provided in the middle of the drive passage 4.
  • the conductor terminal 26 A is formed of an annular conductor whose inner peripheral surface is substantially flush with the inner wall surface of the drive air passage 4.
  • the current sensor 26 is connected to the coating machine through conductor terminal 26 A.
  • the current sensor 27 shows a current sensor as a shaving air passage current detector.
  • the current sensor 27 is connected to an annular conductor terminal 27 A made of a conductive metal material or the like provided in the middle of the shaving air passage 7, for example.
  • the conductor terminal 2 7 A is formed of an annular conductor whose inner peripheral surface is substantially flush with the inner wall surface of the shaping channel 7.
  • the current sensor 2 7 is connected to the shaving air passage in the painting machine 1 through the conductor terminal 2 7 A.
  • the current sensor 28 shows a current sensor as a supply valve drive air passage current detector.
  • the current sensor 28 when the current sensor 28 is connected to an annular conductor terminal 28 A made of an equivalent force of a conductive metal material provided in the middle of the supply valve drive air passage 12, the conductor 28 A The inner peripheral surface is formed by an annular conductor that is substantially flush with the inner wall surface of the supply valve drive air passage 12. Then, the current sensor 28 detects the current flowing through the supply valve drive air passage 12 in the coating machine 1 through the conductor terminal 28 A, and directs the detected current value I d to the high voltage control device 20. Output
  • This current sensor 29 shows a current sensor as a paint passage current detector. This current sensor 29 is located upstream of the paint supply valve 11 (the paint supply source 10 side), for example, and is connected to the paint passage.
  • the current sensor 29 A is formed of an annular conductor whose inner peripheral surface is substantially flush with the inner wall surface of the paint passage 9.
  • the current sensor 29 detects the current flowing through the paint passage 9 in the coating machine 1 through the conductor terminal 29 A and outputs the detected current value I e to the voltage control device 20.
  • an alarm buzzer 3 1 indicates an alarm lamp.
  • the alarm buzzer 30 and the alarm lamp 31 constitute alarm means and are connected to the output side of the I I pressure controller 20.
  • the alarm buzzer 30 and the alarm lamp 3 1 are driven based on the alarm signal output from the direction si pressure control device 20, and the insulation of the cover 2 and the like is reduced for the worker. This is a notification that the user is present.
  • the rotary atomizing head type coating apparatus according to the first embodiment is described above. Next, the operation of the device 1 will be described.
  • the coating machine 1 rotates the rotary atomizing head 5 at high speed by the air motor 3 and supplies the paint to the rotating atomizing head 5 through the feed tube 8 in this state. As a result, the coating machine 1 atomizes and sprays the paint by the as mental force when the rotary atomizing head 5 rotates. Furthermore, by supplying the shaping air through the shaping air U 6, the paint particles are applied to the object to be coated while the spray pattern is controlled.
  • 3 ⁇ 4 voltage is applied to the rotary atomizing head 5 through an air motor 3 by a high voltage generator 14.
  • the paint particles are directly charged with a high voltage through the rotary atomizing head 5 and fly along the electrostatic field formed between the rotary atomizing head 5 and the workpiece A. And apply to the substrate,
  • the cutoff current value I to is the value of the high voltage generator 14 when the rotary atomizing head 5 is abnormally close to the workpiece A or the insulation of the force bar 2 is impaired.
  • This shut-off threshold value I to indicates the total return current value that flows, for example
  • the cutoff current value I ⁇ ⁇ is the coating current that flows between the coating machine 1 and the coating material A in a state where the rotary atomizing head 5 is abnormally close to the coating material A and the insulation is impaired.
  • the object current value is shown.
  • This cutoff threshold current value I ⁇ ⁇ is set to about 80 HA, for example.
  • the cut-off threshold current value I aO indicates the current value that flows on the outer surface of the cover 2 in a state where the insulation of the power bar — 2 is impaired.
  • This cutoff threshold current value I a O is, for example, 6 It is set to about 0.
  • the cut-off threshold current values Ib0 to IdO are the current values that flow in the air passages 4, 7, and 12 when the insulation properties of the air passages 4, 7, and 12 are impaired. Is shown.
  • the cut-off threshold current values Ib0 to IdO are, for example, about 10 / ZA.
  • the cut-off threshold current value I eO indicates the value of the current flowing in the paint passage 9 in a state in which the paint passage 9 is defeated. This blocking threshold
  • the current value I eO is set to about 15 A, for example.
  • the alarm threshold current value Ial to Ie1 is smaller than the cutoff threshold current value Ia0 to IeO (for example, about 60% to 80% of the cutoff threshold current value I10). Value).
  • the alarm threshold current value I a 1 flows through the outer surface of the cover 1 in an initial stage state in which the insulation of the cover 2 is lowered (the insulation of the cover 2 tends to be lost).
  • the threshold current value I a 1 is the alarm threshold value, for example, about 4 0 ⁇ A, which is smaller than the cutoff threshold current value I aO.
  • the current values I b 1 to I d 1 indicate the values of the current flowing in the air paths 4, 7, 1 2 in the initial stage state where the insulation of the air paths 4 7, 12 is lowered.
  • the threshold current values Ib1 to Id1 are smaller than the cutoff current value IbOIdO, for example, 6
  • the alarm threshold current value I el indicates the value of the current flowing in the paint path 9 in the initial stage when the insulation property of the paint path 9 is lowered.
  • This alarm threshold current value I e 1 is set to, for example, about 10 A as a value smaller than the cutoff threshold current value I eO.
  • Fig. 3 summarizes the cutoff threshold current values I t0, I ⁇ , I a0 to I e0, and the alarm threshold current values I al to I el. It looks like a map of the night.
  • step 1 the absolute value detection cutoff current value I t0, 1 x0 is obtained from the data shown in Fig. 3 stored in memory (not shown) of the high voltage controller 20 in advance. , I aO ⁇ I eO are read.
  • step 2 the alarm threshold current value I al to I el for absolute value detection is read from the data stored in the memory in advance as shown in Fig. 3, and in step 3, the current sensors 2 3, 2 5 Read the detected current values I t, I a to I e detected by ⁇ 29.
  • step 4 the leakage current detection values Ia to Ie are subtracted from the total return current detection value It, and the coating flowing between the coating machine 1 and the coating A is detected.
  • the coating current value IX is calculated based on the following equation (1).
  • the workpiece current value IX calculated in step 4 is the predetermined cutoff threshold current value I. It is determined whether or not it is greater than ⁇ (I x> I ⁇ ), and if “YES” is determined in Step 5, for example, the rotary atomizing head 5 is abnormally close to the workpiece A and insulated. As a result, the current flowing between the coating machine 1 and the object to be coated A has increased to such an extent that dielectric breakdown can occur. An abnormal stop display indicating that the current value IX is excessive is output to, for example, a monitor (not shown) of the high voltage controller 20.
  • Step 7 the high voltage controller 20 outputs a cutoff signal to the power supply voltage controller 15 and drives the transistor control circuit 19 to convert the high voltage generator 14 and the power supply. Disconnect from circuit 1 6 and stop supplying high voltage. Finally, in step 8, the process of stopping the sprayer 1 is performed and the process is terminated.
  • Step 5 it is determined whether or not the detected current value Ia flowing on the surface of the cover 1 or the like is larger than a predetermined cutoff threshold current value IaO (Ia> IaO). If “YES” is determined in Step 9, for example, creeping discharge occurs due to the adsorbed material adhering to the cover 2 or the like, resulting in a state where the insulation is impaired, and the surface of the force bar 2 is The flowing current has increased to such an extent that dielectric breakdown can occur.
  • IaO Ia> IaO
  • an abnormal stop display indicating that the detected current value Ia detected on the surface of the cover 2 is excessive in step 10 is displayed on, for example, a monitor (not shown) of the high voltage controller 20. Output.
  • the process goes to Step 7 where the high voltage generator 14 and the power conversion circuit 16 are disconnected to stop the supply of the high voltage, and the process goes to Step 8 to stop the operation of the coating machine 1. To complete the process.
  • Step 9 the process proceeds to Step 1 1.
  • the detected current values I b to I d flowing in the air passages 4, 7, and 12 and the detected current value I e flowing in the coating passage 9 are respectively determined as predetermined cutoff threshold currents. Greater than values Ib0 to Ie0 (Ib> IbO, Ic> Ic0, Id> IdO, Ie> IeO) Judgment is made on the force. If “YES” is determined in step 11, for example, creeping discharge is generated due to moisture, dust, etc. adhering in the air passages 4, 7, and 12, resulting in a loss of insulation.
  • step 13 whether the current detection value It of all return currents flowing through the high voltage generator 14 is greater than a predetermined cutoff threshold current value I t 0 (It> I tO). Determine whether or not. Then, if “YES” is determined in Step 1 3, the current detection value It has increased to such an extent that dielectric breakdown can occur. An abnormal stop display indicating that it is excessive is output to, for example, a monitor (not shown) of the high voltage controller 20. After that, the process goes to Step 7 where the high voltage generator 14 and the power conversion circuit 16 are disconnected to stop the supply of the high voltage, and the process goes to Step 8 to stop the operation of the coating machine 1. To complete the process.
  • Step 13 current detection values I a to I e, It, and coating are applied because all of steps 5, 9, 11, and 13 are determined to be NO.
  • the object current value IX is the cut-off threshold current value I aO to I e 0, I tO, 1 x0 or less, so that the current detection values I a to I e, I t and the workpiece current value IX are Proceed to Step 15 because painting is considered small enough to continue.
  • Step 15 it is determined whether or not the detected current value I a flowing on the surface of the cover 2 or the like is larger than a predetermined alarm threshold current value I a 1 (I a> I al). To do.
  • step 15 If it is determined as “YES” in step 15, painting can be continued, but creeping discharge is caused by, for example, the adsorbent adhering to the cover 2, and the insulation performance is lowered. For this reason, the process proceeds to step 16 to output an alarm signal to the alarm buzzer 30 and the alarm lamp 31 and, for example, the current detection value la increases on a monitor (not shown) of the high voltage controller 20 and the like. Display that the insulation of the cover 2 has deteriorated, and use these to prompt the operator to maintain the surface of the cover 2 (inspection, cleaning, etc.). Then repeat the process from step 3 onwards.
  • step 17 the detected current value I! Flowing in the air passages 4, 7, 12 is obtained! )
  • I d and the detected current value I e flowing in the paint passage 9 are pre-determined alarm flow values I bl to I el ⁇ ⁇ (I b> I bl, I c> I cl I d> I dl, I e> I el). If it is determined in step 17 that “Y ⁇ S”, the coating can be continued, but creeping discharge is generated by moisture, dust, etc. adhering to the air passages 4, 7, 12, for example. The insulation is lowered due to creeping discharge caused by pigments or the like adhering to the paint passage 9 in a state where the insulation is lowered. For this, step 1
  • any of the detected current values I a to I e is the alarm threshold current value I a l to
  • the rotary atomizing head type coating apparatus can be operated based on the high voltage generation control process as described above.
  • the current sensor 2 3 that detects the total return current flowing through the high voltage generator 14, and the leakage current detector 24 that detects the leakage current that flows without passing through the object A Is provided.
  • the high voltage control device 20 determines whether the current detection value It by the current sensor 23 exceeds the predetermined cutoff current value It 0 or the current detection value by the leakage current detector 24.
  • I a to I e has exceeded a predetermined breaking threshold current value I a0 to I e O, it is determined whether or not the insulation of coating machine 1 has been impaired to the extent that dielectric breakdown can occur. Can be determined.
  • the high-voltage control device 20 can determine, for example, that the coating machine 1 has abnormally approached the workpiece A by using the current detection value It, and that the sterility of the coating machine 1 has been impaired. Also, the voltage control device 20 uses the detected current values Ia to Ie to check the surface of the force bar 2 of the coating machine 1, the inner surfaces of the air passages 4, 7, 12 and the inner surface of the paint passage 9, etc. Thus, it can be determined that the insulation of the part where the leakage current flows without passing through the object A is impaired.
  • the high voltage controller 2 0 is connected to the leakage current detector 2 4.
  • the current detection values I a to I e are used to notify the insulation reduction of the coating machine 1.
  • the high voltage control device 20 determines whether or not the detected current value I a I e has exceeded a predetermined alarm threshold current value I al I el that is smaller than the cutoff threshold current value I a0 I e O.
  • the high voltage control device 20 uses the detected current value l a I e to place other than between the object A and the coating machine 1.
  • the leakage current detector 2 4 individually detects leakage currents such as the surface of the cover 1 of the coating machine 1, the inner surfaces of the air passages 4, 7, and 12, and the inner surface of the paint passage 9.
  • the current sensor 2 5 2 9 to be detected is provided.
  • the voltage control device 20 can discriminate a location where the leakage current is increasing (a location where insulation is reduced) among a plurality of locations where the leakage current is detected.
  • the worker only needs to maintain and clean only the parts identified by the high-voltage control device 20 of the coating machine 1 and the associated equipment.
  • the drive air passage 4 It is probable that moisture, dust, etc. are attached to the inner surface of either the pumping air passage 7 or the supply valve drive air passage 12. For this reason, one of the passages discriminated by the high-voltage control device 20 is cleaned, and the air source 13 for supplying air to the air passages 4, 7, 12, a driver, etc. Check, clean, replace, etc.
  • the high voltage control device 20 calculates a coating object current value IX that flows between the coating object A and the coating machine 1, and the coating object current value IX is a predetermined cutoff threshold current value I ⁇ . It is configured to output a cut-off signal to the power supply voltage control device 15 when ⁇ is exceeded. For this reason, the high-voltage control device 20 can determine whether or not the coating machine 1 has abnormally approached the object A using the object current value IX. On the other hand, the supply of the power supply voltage to the high voltage generator 14 can be cut off.
  • the coating machine 1 uses the workpiece current value Ix obtained by removing the current detection values Ia to Ie of the leakage current from the total return current detection value It. To determine whether or not it is abnormally close to the object to be coated
  • a painting failure can be avoided and the painting productivity can be improved.
  • 13 ⁇ 4 voltage control unit 20 is the lightning current detection value of leakage current.
  • the workpiece current value I X excluding I a to I e can be constantly monitored. Therefore, the high voltage control unit 20 determines whether or not abnormal leakage current (leakage current below the point where normal leakage current occurs, such as the outer surface of the coating machine 1) has occurred inside or outside the coating machine 1. It can be monitored indirectly. For this reason, even if such an abnormal leakage current occurs, it can be detected and identified at an early stage, and inspection and repair can be promoted before the sprayer 1 is damaged.
  • abnormal leakage current leakage current below the point where normal leakage current occurs, such as the outer surface of the coating machine 1
  • FIGS. 6 to 8 show high voltage generation control processing according to the second embodiment.
  • the feature of this embodiment is that the amount of change in the coating current exceeds the predetermined amount of change in the threshold voltage.
  • slope abnormality processing is performed to output a shutoff signal that shuts off the supply of power supply voltage to the power supply voltage control device.
  • the same components as those in the first embodiment are denoted by the same reference numerals, and description thereof is omitted.
  • cutoff threshold current values I to, I x 0, I a 0 to I e O and the reporting threshold current values I a 1 to I e 1 are the same as in the first embodiment. 3 and stored in advance in a memory or the like (not shown) of the high voltage controller 20 as shown in FIG.
  • the current value of the object to be used for detecting the slope every 1700 ms is stored in the memory (not shown) of the high voltage controller 20 as I x ′.
  • the amount of change in the cut-off threshold ⁇ I ⁇ is the change in the coating current value I x that flows between the coating machine 1 and the coating A when the rotary atomizing head 5 abnormally approaches the coating.
  • the quantity is set to a value of about 4 to 40 (for example, about 15) and stored in the memory of the high voltage controller 20.
  • step 21 the cutoff threshold current values I t0, 1 x0, I a0 to I eO for absolute value detection, and the cutoff threshold change amount ⁇ I ⁇ , which are stored in the memory in advance, are read.
  • Step 2 2 the alarm threshold current values I a 1 to I e 1 for absolute value detection stored in the memory in advance are read.
  • step 23 the current detection values I t and I a to I e detected by the current sensors 2 3 and 25 to 29 are read.
  • step 24 the detection values Ia to Ie of the leakage current are subtracted from the detection value It of the total return current, and the coating machine 1 and the coating target are applied in the same manner as in the first embodiment. Calculate the coating object current value IX flowing between the object A and the object A based on the equation (1).
  • step 25 the slope detection process described later is performed, and the change amount ⁇ IX of the coating object current value IX every 1700 ms is calculated according to the expression (2) described later, and the process proceeds to step 26. To do.
  • step 26 it is determined whether or not the change amount ⁇ I x of the workpiece current value IX is larger than the predetermined cut-off threshold change amount ⁇ 1 x0 ( ⁇ I ⁇ > ⁇ I ⁇ ). judge. And if you decide “YES” in step 26, The rotary atomizing head 5 tends to abnormally approach the object A, and the current flowing between the coating machine 1 and the object A increases greatly in a short time. For this reason, the process proceeds to step 27, and an abnormal stop display indicating that the change amount ⁇ Ix of the object to be coated is excessive is output to, for example, a monitor (not shown) of the high voltage controller 20. . After that, the process goes to Step 2 8 to drive the transistor control circuit 1 9 to cut off the high voltage generator 1 4 and the power conversion circuit 1 6 to stop the high voltage supply. 2 Proceed to 9 to stop the sprayer 1 and stop the process.
  • Step 26 the process proceeds to Step 30 where the workpiece current value IX is larger than the predetermined cutoff threshold current value I ⁇ ⁇ (I x> I It is determined whether or not ⁇ ⁇ ). Then, in step 30, when “YESJ” is determined, for example, the rotary atomizing head 5 is abnormally close to the object A and the insulation is lost, and the coating machine 1 and the object A For this reason, the process proceeds to step 3 1 to display an abnormal stop display indicating that the workpiece current value IX is excessive. It is displayed on a monitor etc. (not shown) of the device 20.
  • step 28 the high voltage controller 20 outputs a shut-off signal to the power supply voltage controller 15 to The control device 15 cuts off the high voltage supply by shutting off the high voltage generator 14 and the power conversion circuit 16 6. Finally, in step 29, the sprayer 1 is stopped. To complete the process.
  • step 3 2 the detected current value I a flowing on the surface of the cover 2 or the like is determined in advance. It is determined whether the cut-off threshold current value is larger than I aO (I a> I aO). If “YES” is determined in Step 3 2, for example, creeping discharge occurs due to the adsorbed material adhering to the cover 2 or the like, resulting in a state in which the insulation is impaired, and the current flowing on the surface of the force bar 2 is reduced. It has increased to about 1 inch due to insulation breakdown. For this reason, an abnormal stop display indicating that the detected current value Ia detected on the surface of the cover 2 is excessive is moved to step 33, for example, on a monitor (not shown) of the high voltage controller 20 or the like. Output. Then step
  • step 2 Move to 8 to cut off the high voltage generator 1 4 and power conversion circuit 1 6 to stop the supply of high voltage, then move to step 2 9 to stop the sprayer 1 drive, End processing.
  • Step 3 2 the process proceeds to Step 3 4.
  • the detected current values I b to I d flowing in the air passages 47 and 12 and the detected current value I e flowing in the paint passage 9 are respectively determined as predetermined cutoff threshold current values I Greater than b0 to IeO (Ib> Ib0, Ic> IcO, Id> IdO, Ie> IeO) Judgment of force and power.
  • ⁇ ⁇ ⁇ S for example, creeping discharge is generated due to moisture, dust, etc. adhering in the air passages 4, 7, 12, resulting in a state in which insulation is impaired.
  • the current flowing in any of air passages 4, 7, and 12 has increased to such an extent that dielectric breakdown can occur.
  • creeping discharge occurs in the pigment or the like adhering in the paint passage 9 and the insulation is impaired, and the current flowing in the paint passage 9 increases to such an extent that dielectric breakdown can occur.
  • the process proceeds to step 35, and the path of the current detection values Ib to Ie, which is excessive among the current detection values lb to Ie, is specified.
  • Abnormal stop display to be set Then, output to a 20 monitor (not shown). Then, move to Scho Sop 28 to block between the high voltage generator 14 and the power converter circuit 16.
  • Step 34 Move to Step 3 6.
  • step 36 whether the current detection value I t of the total return current flowing through the high voltage generator 14 is larger than a predetermined cutoff threshold current value I to (I t> I t O). Determine whether or not. And step 3
  • step 3 7 the current detection value It of all return currents is excessive.
  • an abnormal stop display indicating “” is output to the monitor (not shown) of the high voltage controller 20.
  • step 36 determines whether “NOJ” is determined in step 36, the amount of change in the coating current ⁇ I x, the current detection values la to I e, It, and the coating current value IX are small enough to allow the coating to continue. Proceed to step 3-8.
  • Step 3 8 it is determined whether or not the detected current value I a flowing on the surface of the cover 2 or the like is larger than a predetermined alarm threshold current value I a 1 (I a> I al). . If “YES” is determined in step 3 8, the coating can be continued, but creeping discharge is generated by, for example, the absorbent adhering to the cover 2, resulting in a decrease in the insulation. W For this reason, the process proceeds to step 39 to output an alarm signal to the alarm buzzer 30 and the alarm lamp 31 and, for example, the current detection value la increases in the monitor (not shown) of the high voltage controller 20 etc. And the insulation of the power bar 2 has decreased and • ar display
  • step 3 8 the process proceeds to step 40. And in step 40,
  • step 51 it is determined whether or not a preset time T1 of, for example, about 1700 ms has elapsed as a preset time T.1 for detecting a time change in current. 5 If “NO” is determined in step 1, proceed to step 5 4 and return as it is, or if “YES” is determined in step 51, proceed to step 5 2 and the current substrate current. The difference between the value IX and the previous workpiece current value I x '(1700 ms before) is calculated based on the following equation (2). Then, the difference between the two is calculated as the amount of change ⁇ IX of the object current for slope detection due to the vibration of the current.
  • the supply voltage supply to the power supply voltage control device 15 is cut off when the change amount ⁇ IX of the workpiece current exceeds a predetermined cut-off change ⁇ I ⁇ ⁇ . It is configured to output a cutoff signal. Therefore, the coating machine 1 uses the amount of change ⁇ I x in the coating object current flowing between the coating machine 1 and the coating object A.
  • the present embodiment uses a change amount ⁇ I X of the workpiece current value I X obtained by removing the leakage current detection value I a-I e from the total return current detection value I t.
  • FIG. 9 shows a rotary atomizing head type coating apparatus according to a third embodiment.
  • a feature of the present embodiment is a configuration in which an all-air passage current detector that detects together a current flowing through the drive air passage, a current flowing through the shaving air passage, and a current flowing through the supply valve drive air passage is provided. It has been done.
  • the same components as those in the first embodiment are denoted by the same reference numerals, and the description thereof is omitted.
  • the leakage current detector 4 1 is a leakage current detector as a leakage current detection means according to the third embodiment.
  • the leakage current detector 4 1 detects the leakage current flowing without passing through the object A, and
  • the leakage current detector 4 1 outputs the detection value to the high-voltage control device 20, like the leakage current detector 2 4 according to the first embodiment, as an external current detector.
  • a current sensor 25 and a current sensor 29 as a paint passage current detector are provided. However, in this embodiment, it will be described later in place of the current sensor 2 6 2 8 according to the first embodiment.
  • the configuration differs from that of the first embodiment in that a single current sensor 4 2 is provided.
  • Conductor terminal 4 2 A provided in the middle of the conductor X 4
  • Conductor terminal 4 2 B provided in the middle of the piping passage 7
  • Conductor terminal 4 2 provided in the middle of the supply valve drive air passage 1 2 Connected to C and.
  • the high-voltage controller 20 uses the detected current values I t, I a, I f, I e to calculate the workpiece current value I x in substantially the same manner as in the first embodiment.
  • the current detection value If is used to shut off the voltage supply and generate an alarm.
  • the third embodiment can achieve the same operational effects as the first embodiment.
  • the leakage current detector 4 1 combines the current flowing through the driving air passage 4, the current flowing through the shaving air passage 7, and the current flowing through the supply valve driving air passage 1 2 together. Since the current sensor 4 2 to be detected is included, a single current sensor 4 2 can be used to detect leakage currents flowing in all the air passages 4, 7, and 12 together.
  • the high-voltage control device 20 can grasp the progress of the absolute destruction in the air passages 4, 7, 12, so that dust, It is possible to detect that moisture has adhered or accumulated. Therefore, The high-voltage control device 20 can shut off the high-voltage supply before dielectric breakdown occurs on the inner surface of the air passage 4 7 1 2, preventing damage to the air passage 4 7 1 2, reliability, High voltage control device 2
  • the drive air passage 4, the shelving air passage 7, and the supply valve drive air passage 12 are connected to the common air source 13 and supplied with the same air. Therefore, the insulation in the air passages 4 7 and 1 2 The factor that decreases the performance is the same as the moisture and dust (fine mist) in the air adhere to the inner surface of the air passage 4 7 1 2. Therefore, these air passages 4 and 7
  • current sensor 4 2 detects the leakage current flowing in all air passages 4 and 7 1 2 together (in total). Even if there is a decrease in insulation for the air passages 4, 7, 12 of the
  • step 5 1 In the first and second embodiments, step 5 1
  • Steps 1 5 1 8, 3 8 4 1 are specific examples of the notification means
  • Step 4 2 4 is a specific example of the workpiece current calculation means
  • steps 25 to 29 show specific examples of the slope abnormality processing means.
  • the cutoff threshold change amount ⁇ I x 0, the alarm threshold current value I al I el, etc. Not limited to the values exemplified in each embodiment, it is set as appropriate according to the type of coating machine, coating conditions, etc.
  • the amount of change ⁇ IX of the object current is used for the interruption process for cutting off the supply of voltage.
  • the present invention is not limited to this.
  • the present invention may be configured to be used for alarm processing in which an alarm is generated with respect to the alarm means using the change amount of the object current.
  • the rotary atomizing head 5 is formed of a metal material or a conductive resin material, and the direct band for charging the paint directly to a high voltage via the rotary atomizing head 5 is used.
  • the electric rotary atomizing head type coating apparatus has been described as an example.
  • the present invention is not limited to the direct charging type, and for example, an external electrode is provided on the outer peripheral side of the force bar of the rotary atomizing head type coating apparatus, and sprayed from the rotary atomizing head by this external electrode.
  • The may be used for an indirect charging type rotary atomizing head type coating device that indirectly charges the paint to a high voltage.
  • the electrostatic spraying device is applied to a rotary atomizing head type coating device (rotating atomizing electrostatic coating device) that sprays paint using the rotary atomizing head 5.
  • a rotary atomizing head type coating device rotating atomizing electrostatic coating device
  • the present invention is not limited to this.
  • the present invention is applicable to an electrostatic coating apparatus using an atomization method other than rotary atomization such as an air atomizing electrostatic coating apparatus and a hydraulic atomizing electrostatic coating apparatus. May be. This Seventh A
  • Conductor terminals are provided in various passages such as the field opening, the surface of the insulating cover of the equipment, the coating passage, the supply valve drive passage, the atomizing air, the shaving way (pattern formation way), and the like. Connect the current sensor to. As a result, the current flowing through each passage is detected using a current sensor.

Abstract

高電圧発生器(14)には、全帰路電流を検出する電流センサ(23)を接続する。また、塗装機(1)のカバー表面、エア通路(4,7,12)、塗料通路(9)には、漏洩電流を検出する電流センサ(25~29)からなる漏洩電流検出器(24)を設ける。そして、高電圧制御装置(20)は、電流センサ(23,25~29)からの電流検出値(It,Ia~Ie)に基づいて、電源電圧制御装置(15)を制御し、高電圧発生器(14)から出力する高電圧を昇降させる。これにより、高電圧制御装置(20)は、電流検出値(It,Ia~Ie)を用いて、漏洩電流が増大して絶縁性が低下した箇所を判別して報知することができ、当該箇所の保守作業を作業者に促すことができる。また、高電圧制御装置(20)は、絶縁性が損なわれた異常特には、高電圧の供給を停止することができる。

Description

明 細 書 静電塗装装置 技術分野
本発明は、 塗装機に高電圧を印加した状態で塗料を噴 霧するよう にした静電塗装装置に関する。 背景技術
一般に 、 静電塗装装置と して、 回転霧化頭を用いて被 塗物に向けて塗料を噴霧する塗装機と 、 電源電圧を昇圧 して高電圧を発生して該高電圧を塗装機の回転霧化頭に 出力する高電圧発生器と 、 該高電圧発生器に供給する電 源電圧を制御する電源電圧制御装置と 、 該電源電圧制御 装置に対して電源電圧を設定するための設定信号を出力 し 、 刖記高電圧発生器から出力する高電圧を制御する高 圧制御装置とによって構成したものが知 られている
(例えば、 特開 2 0 0 2 - 1 8 6 8 8 4号公報参照)。 このような従来技術による静電塗装装置では、 例えば 回転霧化頭は、 被塗物に向けて高電圧を放電する電極を 構成している。 このため、 回転霧化頭とアース電位とな つた被塗物との間には 、 静電界が形成されている。 そし て 、 回転霧化頭を通じて高電圧に帯電した塗料粒子は 、 しの静電界に沿って被塗物に向けて飛行して塗着する。 また、 静電 装 fe Λでは、 高電圧発生器の低圧側はァ 一ス電位となっている 。 このため、 静電塗装装置では 、 刖述した回転霧化頭と被塗物との間の静電界に加えて 、 高電圧発生器のアース側となる静電塗装装置の後部側と 回転霧化頭との間にも静電界が形成される。 このとき 、 杜
機のカバーの表面に噴霧ミ ス 卜 、 塵埃等の浮遊物お よび空気中の水分等が吸着して、 力バ一等の表面抵抗を 低下させ、 静電塗装装置の絶縁性を損な という問題が あつた 。 このため、 従来技術による静電塗装装置では 、 電源 、 高電圧発生器 、 回転霧化頭 、 被塗物等の経路から なる高電圧印加経路のうち高電圧発生器を流れる電流 ( 以下 、 全帰路電流という) を検出し 、 該電流の振幅に基 づいてカバ一等の絶縁性の低下を検出していた。
ところで、 従来技術による静電塗装装置では、 高電圧 印加経路のうち高電圧発生器を流れる全帰路電流に基づ いて力バ一等の絶縁性の低下を検出していた。 しかし 、 高電圧発生器には、 例えば高電圧印加経路を通って回転 霧化頭と被塗物との間に流れる電流 (以下 、 被塗物電流 という ) が流れるのに加えて、 高電圧印加経路以外の漏 洩経路を通る電流 (以下 、 漏洩電流という ) が流れる このため 、 全帰路電流には、 例えば回転霧化頭と被塗物 との間に流れる被塗物電流と塗装機の表面等を流れる漏 洩電流とを含んでしまう 。 こ こで、 塗装機の漏洩電流が 生じる箇所は、 塗装機の力パーの表面に加えて、 例えば 塗装機内の塗料通路の内面、 噴霧パターン成形用等のェ ァ通路の内面等に存在す
例えば、 塗料 路の内面では、 適切な洗浄を行つてい ても使用の経過と共に塗料中の顔料等が少しずつ残留付 着する傾向があるから 、 残留付着した顔料等によつて絶 縁抵抗値が低下して高電圧が沿面放電し易い状態にある。 特にアルミ ニゥム粉等の金属顔料を含む所謂メタ リ ッ ク 塗料を使用 したとさには、 塗料通路内壁に導電体である 顔料が残留するから 、 絶縁抵抗値の低下が顕著になる c また、 エア通路の内面では、 例えば、 噴霧パターン成 形用のシ —ピングェァ、 塗料の供給、 停止を制御する ェァバルブ用のパイ 口 ッ トエア、 回転霧化頭を 動する エアモー夕用の駆動ェァ等が流通する とさに、 しれらの エアに含まれる微細な塵埃や水分等が付着し、 高 m圧が 沿面放電し易い状態にある。
このよう に塗装機は 、 複数箇所で漏洩電流が発生し得 る状態にある。 これに対し、 全帰路電流に基づいて絶緣 性の低下を検出したときには、 被塗物電流と漏洩電流の いずれが増加したのか判別し難いのに加え 、 いずれの 所で漏洩電流が生じているかが分からない,
このため、 例えば塗装機のカバーの表面を清掃しただ けでは漏洩電流を十分に抑止する こ とができず、 異常電 流値の増加による高電圧の遮断が頻発して塗装機の稼動 停止回数が増加する傾向があ Ό 、 装生産性が低 < なる という問題があった。 また、 漏洩 流が生じている箇所 を特定する ことができないから、 例えば力バ一の表面、 塗料通路の内面、 エア通路の内面 の絶縁破壊の進行状 況が不明で、 未然に塗装機の破損 (電気的焼損 ) を防ぐ ことがで なかった。 発明の開
本発明は上述した従来技術の問題 鑑みなされたもの で、 本発明の目的は、 漏洩電流が生 ている箇所を特定 する こ とができ、 塗装機の損傷を未 に防止して信頼性、 耐久性、 塗装生産性を高める ことが さる静電塗装装置 を提供する ことにある。
( 1 ) . 上述した課題を解決するために、 本発明は、 被塗物に塗料を噴霧する塗装機と、 電源電圧を昇圧して 高電圧を発生し、 該高電圧を前記塗装機に出力する高電 圧発生器と、 該高電圧発生器に供給する電源電圧を制御 する電源電圧制御装置と、 該電源電圧制御装置に対して 電源電圧を設定するための設定信号を出力 し、 前記高電 圧発生器から出力する高電圧を制御する高電圧制御装置 とを備えてなる静電塗装装置に適用される。
そして、 本発明が採用する構成の特徴は、 前記高電圧 発生器を流れる全帰路電流を検出する全帰路電流検出手 段と、 前記被塗物を通らずに流れる漏洩電流を検出する 漏洩電流検出手段とを備え、 前記高電圧制御装置は、 前 記全帰路電流検出手段による全帰路電流検出値と該漏洩 電流検出手段による漏洩電流検出値とを用いて前記塗装 機の絶縁性が損なわれたと判別したときには、 前記電源 電圧制御装置に対して電源電圧の供給を遮断する遮断信 号を出力する電源遮断手段と、 前記漏洩電流検出手段に よる漏洩電流検出値を用いて初期段階の絶縁低下が生じ たと判別したときには、 前記塗装機に生じている絶縁低 下を報知する報知手段とを含む構成と したことにある。
このよう に構成したこ とによ り 、 電源遮断手段は、 例 えば全帰路電流検出手段による全帰路電流検出値が所定 の遮断しきい電流値を超えたか否か、 または漏洩電流検 出手段による漏洩電流検出値が所定の遮断しきい電流値 を超えたか否かを判別する こ とによって、 絶縁破壊が生 じ得る程度に塗装機の絶縁性が損なわれたか否かを判別 する こ とがでさる。 こ Lによ り、 電源遮断手段は、 例え ば全帰路電流検出値を用いて塗装機が被塗物に異常接近 して塗装機の絶縁性が損なわれたこ とを判別するこ とが でさる た 、 漏洩電流検出値を用いて漏洩電流が流れ る箇所 (例えば、 塗装機のカバーの表面、 塗料通路の内 面 、 ェァ通路の内面等) の絶縁性が損なわれたことを判 別することができ
また、 被塗物を通らずに流れる漏洩電 を検出する漏 洩電流検出手段を設けたから、 報知手段は 、 例えば漏洩 電流検出値が遮断しきい電流値よ り fc小さい所定の警報 しきい電流値を超えたか否かを判別する とによって、 塗装機の絶縁性が損なわれる HIJに初期段階の絶縁低下が 生じたか否かを判別する ことができる これによ り、 報 知手段は、 漏洩電流検出値を用いて被塗物と塗装機との 間以外の箇所 (例えば塗装機の力バ一の 面、 塗料通路 の内面、 エア通路の内面等) における絶縁破壊の進行状 況を把握する こ とができる。 この結果、 これら各箇所で の沿面放電による損傷が進行する前に、 例えば警報の発 生等によって絶縁低下を報知し、 作業者に対して塗装機 の保守 (点検 、 清掃等) を促すこ とができ、 塗装機の損 傷を防ぎ、 信頼性 、 耐久性を高める ことができる <
特に、 漏洩電流検出手段を用いて例えば塗装機の力バ
—の表面、 塗料通路の内面、 ェァ通路の内面等の漏洩電 流を個別に検出 したときには、 報知手段は、 漏洩電流が 生じている箇所のう ち、 漏洩電流が増大している箇所を 判別する こ とができる。 このため、 報知手段を用いて当 該漏洩電流の増大箇所を通知する こ とによつて、 作業者 は、 塗装機のうち報知手段によつて判別した箇所に対し てだけ保守作業を行えばよく 、 機の保守に必 な時 問を短縮して、 塗装生産性を向上する ことができる。
( 2 ) . 本発明では、 前記漏洩電流検出手段は、 前記 塗装機の外面を流れる電流を検出する外面電流検出器を 含む構成としている。
この構成によ り、 外面電流検出器を用いて塗装機の外 面を流れる漏洩電流を検出する こ とができる。 これによ Ό 電源遮断手段および報知手段は 塗装機の外面にお ける絶縁破壊の進行状況を把握する とができるから 塗 機の外面に吸着物が堆積して絶縁性が低下 、 損失し た とを判別する こ とができる 従つて、 電源遮断手段 は 塗装機の外面で絶縁破壊が生じる前に咼電圧の供給 を遮断する ことができるから 塗装機の損傷を防ぎ 信 頼性 耐久性を高めるこ とがでさる また、 報知手段は、 塗装機の外面で沿面放電による損傷が進行する FJIJに警報 の発生等によって絶縁低下を報知し 作業者に対して 装機の外面に対する清掃を促すことができる。
( 3 ) . 本発明では、 前記漏洩電流検出手段は、 塗装機内の塗料通路を流れる電流を検出する塗料通路電 流検出器を含む構成としている。
この構成によ り、 塗料通路電流検出器を用いて塗料通 路内を流れる漏洩電流を検出する こ とがでさる れに よ り、 電源遮断手段および報知手段は、 塗料通路内にお ける絶縁破壊の進行状況を把握する こ とがでさるから、 塗料通路の内面に顔料等が付着、 堆積して絶縁性が低下 損失したことを判別する ことができる。 従つて 電源遮 断手段は、 塗料通路の内面で絶縁破壊が生じる刖に 电 圧の供給を遮断する ことができるから、 塗料通路の損傷 を防ぎ、 信頼性、 耐久性を高める ことがでさる また、 報知手段は、 塗料通路の内面で沿面放電による損傷が進 行する前に警報の発生等によって絶縁低下を報知し 、 作 業者に対して塗料通路の清掃、 洗浄を促す とがでさる
( 4 ) . 本発明では、 前記漏洩電流検出手段は HIJ 己 塗装機の外面を流れる電流を検出する外面電流検出器と、 前記塗装機内の塗料通路を流れる電流を検出する塗料通 路電流検出器とを含む構成としている。 この構成によ り 、 外面電流検出器を用いて塗装機の外 面を流れる漏洩電流を検出する こ とができると共に 塗 料通路電流検出器を用いて塗料通路内を流れる漏洩電流 を検出する こ とができる。 これによ り、 電源遮断 段お よび報知手段は、 塗装機の外面における絶縁破壊の進行 状況を把握する こ とができる と共に 、 塗料通路内におけ る絶縁破壊の進行状況を把握する ことができる <
( 5 ) . 本発明では、 . j 塗 :璣は、 駆動エアに つ て回転駆動するェァモ一夕と、 該エアモータによ て回 転する回転軸と 該回転軸の先端に設けられ該回転軸に よって回転する間に塗料供給弁を介して供給された塗料 を噴霧する回転霧化頭と、 該回転霧化頭の外周側に設け られ塗料の噴霧パターンを成形するシェービングェァを 吐出するためのェァ吐出孔を有するシェービングェァ U ングとによって構成し 、 前記漏洩電流検出手段は HU 5己 駆動ェァを供給するための駆動ェァ通路を流れる電流を 検出する駆動ェァ通路電流検出器と、 FJiJ S己シ ピング を供給するためのシェ一ピングェァ通路を流れる電流を 検出するシェ一ピングェァ通路電流検出器と、 前記塗料 供給'弁を開閉駆動するための供給弁駆動エア通路を流れ る電流を検出する供給弁駆動エア通路電流検出器とを含 む構成としている。
この場合、 漏洩電流検出手段は、 駆動エア通路電流検 出器、 シェービングエア通路電流検出器および供給弁駆 動ェァ通路電流検出器を含む構成と したから、 3個の電 流検出器を用いてそれぞれのェァ通路内を流れる漏洩電 流を検出する こ とができ れに り 電源遮断手段 および報知手段は、 エア通路内における絶縁破壊の進行 状況を把握する こ とができるから ェァ通路の内面に塵 水分等が付着、 堆積して絶縁性が低下、 失したこ とを判別するこ とができる。 従って、 電源遮断手段は、 各エア通路の内面で絶縁破壊が生じる前に高電圧の供給 を遮断する ことができるから、 エア通路の損傷を防ぎ、 信頼性、 耐久性を高める ことができる。 また、 報知手段 は、 各エア通路の内面で沿面放電による損傷が 行する 前に警報の発生等によって絶緣低下を報知し、 作業者に エア通路やエア源の保守を要請する ことができ エア通 路およびエア源のフィ ルタ、 ドライヤに対する 掃を促 すことができる。
( 6 ) . 本発明では、 前記塗装機は 、 駆動ェァによつ て回転駆動するエアモー夕と、 該エアモー夕によつて回 転する回転軸と、 該回転軸の先端に設けられ該回転軸に よって回転する間に塗料供給弁を介して供給された塗料 を噴霧する回転霧化頭と、 該回転霧化頭の外周側に設け られ塗料の噴霧パターンを成形するシエービングエアを 吐出するためのエア吐出孔を有する シエービングエア リ ングとによって構成し、 前記漏洩電流検出手段は全エア 通路電流検出器を含む構成と し、 該全エア通路電流検出 器は、 前記駆動エアを供給するための駆動エア通路を流 れる電流と、 前記シエーピングを供給するためのシエ ー ビングエア通路を流れる電流と、 HU記塗料供給弁を開閉 駆動するための供給弁駆動ェァ通路を流れる電流とを一 緒に検出する構成と している
この場合、 漏洩電流検出手段に含まれる全ェァ通路電 流検出器は、 駆動エア通路を流れる電流と 、 シェ一ピン グエア通路を流れる電流と、 供給弁駆動ェァ通路を流れ る電流とを一緒に検出する構成と したから 、 単一の全ェ ァ通路電流検出器を用いて全てのェァ通路内を流れる漏 洩電流を一緒に検出する ことができる。 これによ り、 電 源遮断手段および報知手段は、 エア通路内における絶縁 破壊の進行状況を把握するこ とができるから、 エア通路 の内面に塵埃、 水分等が付着、 堆積して絶縁性が低下、 損失したことを判別する ことができる。
また、 駆動エア通路、 シェービングエア通路、 供給弁 駆動エア通路には一般に共通のエア源に接 feeされ、 同じ ェァが供給されるから 、 各エア通路内の絶縁性を低下さ せる要因は エア中の水分、 塵埃 (微細ミ ス 卜) がェァ 通路の内面に付着することで共通している このため これらのェァ通路は 緒に絶縁性が低下する傾向がある のに対し、 全エア通路電流検出器は全てのェァ通路内を 流れる漏洩電流を一緒に (合計して) 検出するカゝら い ずれのエア通路の絶縁性が低下した場合でち早期か 確 実に検出する こ とができる。 また、 複数のェァ通路に対 して単一の全エア通路電流検出器を用いるから、 複数の エア通路に電流検出器をそれぞれ設けた場口 に比べて 電流検出器の数を少なく する ことができる これに り 電源遮断手段および報知手段の制御機能を簡略化する とができると共に、 装置全体の製造コス トを低減する とができる。
( 7 ) . 本発明では、 前記電源遮断手段は、 記全帰 路電流検出手段による全帰路電流検出値から前記漏洩電 流検出手段による漏洩電流検出値を除き、 被塗物との間 に流れる被塗物電流を演算する被塗物電流演算手段と 該被塗物電流演算手段による被塗物電流が所定の遮断し さい電流値を超えたときに前記電源電圧制御装置に対し て電源電圧の供給を遮断する遮断信号を出力する被塗物 電流異常処理手段とを備える構成と している。 これによ り 、 被塗物電 異常処理手段は 被 物との 間に流れる被塗物電流を用いて塗装機が被塗物に異常接 近したか否かを判別する とができ、 異常接近したとき には電源電圧の供給を遮断する こ とができる また 、 全 帰路電流検出値を用いて被塗物に異常接近したか否かを 判別する場合には、 被塗物の接近状況が漏洩電流に基づ いて緩和され 精度が低下し易い。 これに対し、 被塗物 電流異常処理手段は 、 全帰路電流検出値から漏洩電流検 出値を減算した被塗物電流を用いて塗装機が被塗物に異 常接近したか否かを判別するから、 被塗物の接近状況を 高い精度で把握する ことがでさる。
さ らに、 被塗物電流異常処理手段は漏洩電流検出値を 減算した被塗物電流を常時監視するから、 塗装機の内外 で異常な漏洩電流 (塗装機の外面等のよう に通常の漏洩 電流が生じる箇所以下での漏洩電流) が生じたか否かを 間接的に監視する こ とができる。 このため、 このような 異常な漏洩電流が生じた場合でも、 被塗物電流異常処理 手段によって早期に発見、 判別することができる。
( 8 ) . 本発明では、 前記電源遮断手段は、 前記全帰 路電流検出手段による全帰路電流検出値から前記漏洩電 流検出手段による漏洩電流検出値を減算し 、 被塗物との 間に流れる被塗物電流を演算する被塗物電流演算手段と 該被塗物 流演算手段による被塗物電流の変化量が所定 の遮断しさい変化量を超えたときに前記電源電圧制御装 置に対して電源電圧の供給を遮断する遮断信号を出力す るスロープ異常処理手段とを備える構成と している。
これによ り 、 スロープ異常処理手段は、 被塗物との間 に流れる被塗物電流の変化量を用いて塗装機が被塗物に 異常接近したか否かを判別する ことができ 、 異常接近し たときには電源電圧の供給を遮断する こ とができる。 ま た 、 全帰路電流検出値の変化量を用いて被塗物に異常接 近したか否かを判別する場 には、 被塗物の接近状況が 漏洩電流に基づいて緩和され 、 精度が低下し易い。 これ に対し、 スロープ異常処理手段は、 全帰路電流検出値か ら漏洩電流検出値を減算した被塗物電流の変化量を用い て塗装機が被塗物に異常接近したか否かを判別するから、 被塗物の接近状況を高い精度で把握することができる。 図面の簡単な説明
図 1 は、 本発明の第 1 の実施の形態による回転霧化頭 型塗 ΙΘ.を示す一部破断の正面図である。
図 2 は、 第 1 の実施の形態による回転霧化頭型塗装装 置の全体構成を示す構成図である。
図 3 は、 図 1 中の高電圧制御装置に格納された遮断し きい電流値、 警報しきい電流値を示す説明図である。
図 4 は、 第 1 の実施の形態による高電圧発生制御処理 を示す流れ図である。
図 5 は、 図 4 に続く 流れ図である。
図 6 は、 第 2 の実施の形態による高電圧発生制御処理 を示す流れ図である。
図 7 は、 図 6 に続く流れ図である。
図 8 は、 図 6 中のスロープ検出処理を示す流れ図であ る。
図 9 は、 第 3 の実施の形態による回転霧化頭型塗装装 置の全体構成を示す構成図である。 発明を実施するための最良の形態
以下、 本発明の実施の形態による静電塗装装置と して 回転霧化頭型塗装装置を例に挙げて添付図面に従って詳 細に説明する。
まず、 図 1 ないし図 5 は第 1 の実施の形態による回転 霧化頭型塗装装置を示している 。 図において、 1 はァ一 ス電位にある被塗物 Aに向けて塗料を噴霧する塗装機で 該塗装機 1 は、 後述する力バ ― 2 、 ェァモ —夕 3 、 回転 霧化頭 5等によつて構成されている ,
2 は絶緣性樹脂材料によつて形成された円筒状の力バ
―を している 。 このカバ ― 2 は、 ェァモ一夕 3 、 高電 圧発生器 1 4等を覆っている
3 は力バ ― 2 の内周側に収容された導電性金属材料か らなるェァモ一夕を示している しのェァモ一夕 3 は、 モ ―夕八クジング 3 Aと、 該モ ―夕八ゥジング 3 A内に 静圧ェァ軸受 3 Bを介して回転可能に支持された中空の 回転軸 3 C と、 該回転軸 3 Cの基端側に固定されたェァ 夕 ―ビン 3 Dとによって構成されている また、 ェァモ
―夕 3 には 、 塗装機 1 内に設けられた駆動エア通路 4が 接 eされている 。 そして、 ェァモ一夕 3 は 、 エア夕一ビ ン 3 Dに対して駆動エア通路 4 を通じて駆動エアを供給 する こ とによ り 、 回転軸 3 C と回転霧化頭 5 を、 例えば
3 0 0 0 〜 1 5 0 0 0 0 r P mで高速回転させるもので ある
5 はェァモ一夕 3 の回転軸 3 C先端側に取付けられた 回転霧化頭で、 該回転霧化頭 5 は、 例えば金属材料また は導電性の樹脂材料によつて形成されている。 この回転 霧化頭 5 は 、 ェァモ一夕 3 に つて高速回転された状態 で 、 後述のフィ ー ドチューブ 8 を通じて塗料が供給され る とに Ό 、 その塗料を 心力に つて周縁から噴霧 する CJ .た 、 回転霧化頭 5 には 、 Xァモ―夕 3 の回転軸 3 C等を介して後述の高電圧発生器 1 4が接続されてい る o これによ り 、 静電塗装を行う場合に 、 回転霧化頭 5 全体に高電圧を印加する ことができ、 これらの前面を流 れる塗料を直接的に高電圧に帯電させる ことができる。
6 は例えば絶縁性樹脂材料を用いて形成されたシェ一 ビングエア リ ングで、 該シェービングエア リ ング 6 は、 回転霧化頭 5 の外周側を囲繞するよう にカバー 2 の先端 側に設けられている 。 このシェ一ピングエア リ ング 6 に は複数個のェァ吐出孔 6 Aが穿設され、 該エア吐出孔 6
Aは塗装機 1 内に exけられたシェ一ビングエア通路 7 が 連通している o そして、 エア吐出孔 6 Aにはシエ ーピン グエア通路 7 を通じてシエ ーピングエアが供給され、 ェ ァ吐出孔 6 Aは 、 該シェービングェァを回転霧化頭 5か ら噴霧される塗料に向けて噴出する 。 これによ り、 シ X
—ビングェァは 、 回転霧化頭 5から噴霧された塗料粒子 の噴霧パタ一ンを成形する。
8 は回転軸 3 C内に揷通して設けられたフィ ー ドチ ーブで、 該フィ一 チューブ 8 の先端側は、 回転軸 3 C の先端から突出して回転霧化頭 5 内に延在している。 ま た、 フィ一ドチュ一ブ 8 内には塗料通路 9 が設けられる と共に、 該塗料通路 9 は色替弁装置 (図示せず) を介し て塗料供給源 1 0 および洗浄シンナ供給源 (図示せず) に接続されている o これによ り、 フイ ー ドチューブ 8 は、 塗装時には塗料通路 9 を通じて回転霧化頭 5 に向けて塗 料供給源 1 0 からの塗料を供給する と共に、 洗浄時、 色 替時等には洗浄シンナ供給源からの洗浄流体 (シンナ 、 空気等) を供給する o
なお、 フィ一 チユ ーブ 8 は、 本実施の形態に限らず、 例えば内筒に塗料通路が形成され 、 外筒に洗浄シンナ通 路が配置された二重筒状に形成してもよい また、 塗料 通路 9 は、 本実施の形態のょラ にフィ ー ドチュ一ブ 8 内 を通る ものに限らず、 塗装機 1 の種類に応じて種 の通 路形態が採用可能である
1 1 は塗料通路 9 の途中に設けられた例えば常閉型の 塗料供給弁を示している この塗料供給弁 1 1 は 、 塗料 通路 9 内を延びる弁体 1 1 Aと、 該弁体 1 1 Aの基端側 に位置してシリ ンダ 1 1 B内に設けられたピス 卜 ン 1 1
C と、 シリ ンダ 1 1 B内に設けられ弁体 1 1 Aを閉弁方 向に付勢する弁ばね 1 1 Dと、 シリ ンダ 1 1 B内で弁ば ね 1 1 D と反対側に設けられた受圧室 1 1 E とから構成 されている。 また 、 受圧室 1 1 Eには、 力バ ― 2 内を延 びる供給弁駆動ェァ通路 1 2 が接続されている そして 塗料供給弁 1 1 は 、 供給弁駆動ェァ通路 1 2 を通じて受 圧室 1 1 E に供給弁駆動ェァ (パイ ロ ッ 卜ェァ) が供給 される ことによつて、 弁ばね 1 1 Dに抗して弁体 1 1 A が開弁し (図 1 中の左方に移動し)、 塗料通路 9 内の塗 料の流通を許可する。
1 3 はエア源を示し 、 該エア源 1 3 は 、 駆動エア通路 4、 シェービングエア通路 7 および供給弁駆動エア通路 1 2 に接続されている 乙、 エア源 1 3 は 、 フィ ル 夕を通じて外気を吸引 、 圧縮した後に、 ラィャ (いず れも図示せず) を用いて圧縮空気を乾燥させて吐出する。 そして 、 ェァ源 1 3 から吐出される圧縮空気は 、 例えば 駆動ェァ通路 4の途中に設けられた空電変換器 (図示せ ず) を介してェァモ一夕 3 に供給され、 空電変換器を用 いてェァモ一夕 3 の回転数が制御されている また、 ェ ァ源 1 3 から吐出される圧縮空気は、 シェ一ピングエア 通路 7 に供給されて 料粒子の噴霧パ夕一ンを成形する と共に、 供給弁駆動エア通路 1 2 に供給されて塗料供給 弁 1 1 の開閉駆動に使用される。
1 4 はカバ一 2 の基端側に内蔵された高電圧発生器で、 該高電圧発生器 1 4 は、 例えば複数のコ ンデンサ、 ダイ オー ド (いずれも図示せず) か らなる多段式整流回路
(所謂、 コ ック ク ロフ ト回路) によつて構成されている また 圧発生器 1 4 は、 後述の電源電圧制御装置 1
5 から供給される電源電圧を昇圧して 、 例えば一 3 0 一 1 5 0 k Vの高電圧を発生する そして、 高電圧発生 器 1 4 は、 エアモータ 3 、 回転霧化頭 5 を通じて、 該回 転霧化頭 5 に供給された塗料に直接的に高電圧に帯電さ せている。
次に、 1 5 は電源電圧制御装置を示し、 この電源電圧 制御装置 1 5 は、 高電圧発生器 1 4から出力される出力 電圧 (高電圧) を制御するために高電圧発生器 1 4 に供 給する直流の電源電圧を制御する ちのである。 そレて、 この電源電圧制御装置 1 5 は、 その入力側が電源変換回 路 1 6 を介して商用電源 1 7 に接 され、 出力側が高電 圧発生器 1 4 に接続されている
こで、 電源変換回路 1 6 は例えば高圧用 ト ランスと
Α / D変換器とから構成され、 商用電源 1 7 から給電さ れる A C 1 0 0 Vを例えば D C 2 4 Vに電源変換し の D C 2 4 Vを電源電圧と して電源電圧制御装置 1 5 に 出力してい
また 前記電源電圧制御装置 1 5 は N P N型のパヮ 一 卜 ランジス夕 1 8 と該パワー h ラ ンジス夕 1 8 を制御 する 卜ラ ンジスタ制御回路 1 9 とに つて構成されてい そして 、 パワー トラ ンジス夕 1 8 のコ レクタは電源 変換回路 1 6 に接続され、 エミ V夕は高電圧発生器 1 4 の入力側に接続されると共に、 ベ一スは フンジス夕制 御回路 1 9 に接続されている。
そして、 ト ラ ンジスタ制御回路 1 9 は 、 後述する高電 圧制御装置 2 0 から出力される設定信号に応じてパヮ一 ト ランジスタ 1 8 のベース電圧を変化させ ェミ ッ夕か ら高電圧発生器 1 4 の入力側に印加される電源電圧を可 変に制御している。
2 0 は電源電圧制御装置 1 5 に対して電源電圧を設定 するために電圧設定器 2 1 か ら出力される設定電圧に応 じた信号 (設定信号) を出力する高電圧制御装置で 、 該 高電圧制御装置 2 0 は、 処理装置 ( C P U ) 等を含んで 構成されている。 また、 高電圧制御装置 2 0 は、 その入 力側に電圧設定器 2 1 、 電圧センサ 2 2 、 電流センサ 2
3および漏洩電流検出器 2 4が接続されると共に 、 出力 側に後述の警報ブザー 3 0 、 警報ランプ 3 1 が接 iされ ている。
そして 、 高電圧制御装置 2 0 は、 電圧設定器 2 1 から 出力される設定電圧と電圧センサ 2 2 に る検出電圧と を比較して高電圧発生器 1 4から出力される出力電圧を フィ ― ハ、ック制御する。 これによ り、 高電圧制御
2 0 は 、 h ランジス夕制御回路 1 9 に設定信号を出力し、 パヮ一卜ラ ンジスタ 1 8 の駆動を制御して高電圧発生器
1 4から出力する高電圧を制御している ,
また 、 高電圧制御装置 2 0 は、 後述の図 4および図 5 に示す高電圧発生制御処理のプログラムに従って作動す る れによ り 、 高電圧制御装置 2 0 は 、 後述の電流セ ンサ 2 3 , 2 5 〜 2 9 の電流検出値 I t I a〜 I eを用 いて、 塗装機 1 の絶縁状態を判別し、 絶縁性が低下した 初期段階と判別したときには、 警報ブザ 3 0 、 警報ラ ンプ 3 1 に警報信号を出力する 方、 絶縁性が損なわ れた状態と判別したときには、 電源電圧制御装置 1 5 に 対して遮断信号を出力 し 、 高電圧発生器 1 4 に対する電 源電圧の供給を遮断する
なお 、 電圧設定器 2 1 から出力される設定電圧は 、 塗 料の性質 、 塗装条件等に応じて例えば一 3 0 〜 一 1 5 0 k Vの 囲内で適宜設定されるものである。
2 2 は高電圧発生器 1 4 の出力側に接続された電圧セ ンサで 、 該電圧センサ 2 2 は、 ェァモータ 3 、 回転霧化 頭 5 の電圧として高電圧発生器 1 4から出力される出力 電圧を検出し、 この電圧検出値 Vを高電圧制御装置 2 0 に向けて出力している
2 3 は高電圧発生器 1 4 に接続された全帰路電流検出 手段としての電流センサ ^不している。 この電流センサ
2 3 は、 商用電源 1 7 、 電源変換回路 1 6 、 高電圧発生 器 1 4 、 回転霧化頭 5 、 被塗物 A等の経路からなる高電 圧印加経路のうち、 高電圧発生器 1 4 を流れる全帰路電 流を検出している。 このとさ 、 ί¾電圧発生器 1 4 には、 咼電圧印加経路を通る被塗物電流に加 X.て 、 後述する各 種の漏洩経路を通る漏洩電流が流れる 即ち、 高電圧印 加経路と漏洩経路とはアースを介して接 士されているか ら 、 高電圧発生器 1 4 には、 被塗物電流と漏洩電流との 両方が戻つてく る。 このため、 電流センサ 2 3 は、 被塗 物電流と漏洩電流とを加えた全帰路電流を検出し、 この 電流検出値 I tを高電圧制御装置 2 0 に向けて出力 して いる。
2 4 は被塗物 Aを通らずに流れる漏洩電流を検出する 漏洩電流検出手段と しての漏洩電流検出器を示している。 この漏洩電流検出器 2 4 は、 後述する電流センサ 2 5 〜 2 9 によって構成され、 その出力側が高電圧制御装置 2
0 に接続されている。
2 5 は外面電流検出器としての電流センサを示してい る この電流センサ 2 5 は、 例えばカバー 2 の表面に設 けられた導電性金属材料等からなる環状の導体端子 2 5
Aに接続されている。 この場合、 導体端子 2 5 Aは 、 力 ハ、一 2 の表面と略同一面をなし、 カバ一 2 を取囲む環状 の導体によって形成されている。 そして、 電流センサ 2
5 は 、 導体端子 2 5 Aを通じて塗装機 1 の外面 (力バ一
2 の表面) を流れる電流を検出 し、 この電流検出値 l a を高電圧制御装置 2 0 に向けて出力している。
2 6 は駆動エア通路電流検出器と しての電流センサを 示している。 この電流センサ 2 6 は、 例えば駆動ェァ通 路 4 の途中に設けられた導電性金属材料等からなる環状 の導体端子 2 6 Aに接続されている。 この場合、 導体端 子 2 6 Aは、 その内周面が駆動エア通路 4の内壁面と略 同一面をなす環状の導体によって形成されている。 そし て 、 電流センサ 2 6 は、 導体端子 2 6 Aを通じて塗装機
1 内の駆動エア通路 4 を流れる電流を検出し、 この電流 検出値 l bを高電圧制御装置 2 0 に向けて出力 している。
2 7 はシェービングエア通路電流検出器と しての電流 センサを示している。 この電流センサ 2 7 は、 例えばシ ェ一ビングエア通路 7 の途中に設けられた導電性金属材 料等からなる環状の導体端子 2 7 Aに接続されている。
の場合、 導体端子 2 7 Aは、 その内周面がシェ一ピン グェァ通路 7 の内壁面と略同一面をなす環状の導体によ つて形成されている。 そして、 電流センサ 2 7 は、 導体 端子 2 7 Aを通じて塗装機 1 内のシェービングエア通路
7 を流れる電流を検出 し、 この電流検出値 I cを高電圧 制御装置 2 0 に向けて出力してレ ^る。
2 8 は供給弁駆動エア通路電流検出器と しての電流セ ンサを示している 。 この電流センサ 2 8 は、 例えば供給 弁駆動エア通路 1 2 の途中に設けられた導電性金属材料 等力 らなる環状の導体端子 2 8 Aに接続されている の場合 、 導体 子 2 8 Aは 、 その内周面が供給弁駆動ェ ァ通路 1 2 の内壁面と略同一面をなす環状の導体によつ て形成されている 。 そして 、 電流センサ 2 8 は 導体端 子 2 8 Aを通じて塗装機 1 内の供給弁駆動エア通路 1 2 を流れる電流を検出し、 この電流検出値 I dを高電圧制 御装置 2 0 に向けて出力している
2 9 は塗料通路電流検出器と しての電流センサを示し ている。 この電流センサ 2 9 は、 例えば塗料供給弁 1 1 よ り も上流側 (塗料供給源 1 0側 ) に位置して塗料通路
9 の途中に設けられた導電性金属材料等からなる環状の 導体端子 2 9 Aに接続されている の場合、 導体端子
2 9 Aは、 その内周面が塗料通路 9 の内壁面と略同 面 をなす環状の導体によって形成されている。 そして 電 流センサ 2 9 は 、 導体端子 2 9 Aを通じて塗装機 1 内の 塗料通路 9 を流れる電流を検出 し、 この電流検出値 I e を同電圧制御装置 2 0 に向けて出力している。
3 0 は警報ブザ 3 1 は警報ランプをそれぞれ示し ている 。 これらの警報ブザ一 3 0 、 警報ランプ 3 1 は 警報手段を構成すると共に、 I I 圧制御装置 2 0 の出力 側に接続されている。 そして、 警報ブザー 3 0 、 警報ラ ンプ 3 1 は、 向 si圧制御装置 2 0 から出力される警報信 号に基づいて駆動し、 作業者に対してカバ一 2 等の絶縁 性が低下している ことを報知するものである。
第 1 の実施の形態による回転霧化頭型塗装装置は上述 のような構成を有するもので、 次に、 涂 1尘 置と しての 作動について説明す 。
塗装機 1 は 、 エアモータ 3 によつて回転霧化頭 5 を高 速回転させ、 この状態でフィ ー チューブ 8 を通じて回 転霧化頭 5 に塗料を供給する。 これによ り、 塗装機 1 は、 回転霧化頭 5が回転する ときの as心力によつて塗料を微 粒化して噴霧する。 まに、 シェ ―ピングエア U ング 6 を 通じてシェ一ビングエアを供給する ことによつて 、 塗料 粒子は、 噴霧パ夕一ンが制御されつ 被塗物に塗着する ものである。
また、 回転霧化頭 5 にはエアモ一タ 3 を介して高電圧 発生器 1 4 によ O |¾電圧が印加されている。 しれによ り、 塗料粒子は、 回転霧化頭 5 を通じて直接的に高電圧に帯 電する と共に 、 回転霧化頭 5 と被塗物 Aとの間に形成さ れた静電界に沿って飛行し、 被塗物に塗着する ,
次に、 高電圧制御装置 2 0 による高電圧発生制御処理 について図 4および図 5 を参照しつつ説明する。
なお、 遮断しさい電流値 I t oは 、 回転霧化頭 5 が被塗 物 Aに異常接近した状態または力バ一 2等の絶縁性が損 なわれた状態で 、 高電圧発生器 1 4 を流れる全帰路電流 値を示している この遮断しきい 流値 I t oは 、 例えば
2 0 0 μ A程度に設定されている
また、 遮断しさい電流値 I χ θは 、 回転霧化頭 5が被塗 物 Aに異常接近して絶縁性が損なわれた状態で塗装機 1 と被塗物 Aとの間に流れる被塗物電流値を示している。 この遮断しきい電流値 I χ θは、 例えば 8 0 H A程度に設 定されている。 遮断しきい電流値 I aOは、 力バ — 2 の絶 縁性が損なわれた状態でカバー 2 の外面を流れる電流値 を示している。 この遮断しきい電流値 I a Oは、 例えば 6 0 程度に設定されている。 さ らに、 遮断しきい電流 値 I b0〜 I dOは、 各エア通路 4, 7 , 1 2 の絶縁性が損 なわれた状態で各ェァ通路 4 , 7 , 1 2内に流れる電流 値を示している。 この遮断しきい電流値 I b0〜 I dOは、 例えば 1 0 /Z A程度に ¾·疋 れている。 遮断しきい電流 値 I eOは、 塗料通路 9の絶緣性が損なわれた状態で塗料 通路 9 内に流れる電流値を示している。 この遮断しきい
}階警通小,同
電流値 I eOは、 例えば 1 5 A程度に設定されている。
一方、 警報しきい電流値 I al〜 I e 1は、 遮断しきい電 流値 I a0〜 I eOよ り 小さい値 (例えば、 遮断しきい電 流値 I 10の 6 0 %〜 8 0 %程度の値) にそれぞれ設定さ れている。
こ こで、 警報しきい電流値 I a 1は、 カバ一 2 の絶縁性 が低下した初期段 の状態 (カバ一 2 の絶縁性が失われ る傾向がある状態 でカバ一 2 の外面を流れる電流値を 示している。 の 報しきい電流値 I a 1は、 遮断しきい 電流値 I aOよ り ち さい値と して例えば 4 0 α A程度に 設定されている 様に、 警報しきい電流値 I b 1〜 I d 1 は、 各ェァ通路 4 7, 1 2 の絶縁性が低下した初期段 階の状態で各ェァ 路 4, 7 , 1 2 内に流れる電流値を 示している。 この 報しきい電流値 I b 1〜 I d 1は、 遮断 しさい 流値 I bO I dOよ り も小さい値と して例えば 6
At A程 にそれぞれ設定されている。 警報しきい電流値 I elは 塗料通路 9 の絶縁性が低下した初期段階の状態 で塗料 路 9内に流れる電流値を示している。 この警報 しさい 流値 I e 1は、 遮断しきい電流値 I eOよ り も小さ い値と て例えば 1 0 A程度に設定されている。
刖述 た遮断しきい電流値 I t0, I χθ, I a0〜 I e0、 警報し い電流値 I al〜 I elをまとめると、 図 3 に示す デ一夕マップのよう になる。
まず、 ステッ プ 1では、 予め高電圧制御装置 2 0 のメ モリ等 (図示せず) に格納しておいた図 3 に示すデータ から絶対値検出用の遮断しきい電流値 I t0, 1 x0, I aO 〜 I eOを読込む。 ステップ 2では、 予めメモリ に格納し ておいた図 3 に示すデ一夕から絶対値検出用の警報しき い電流値 I al〜 I elを読込み、 ステップ 3では、 電流セ ンサ 2 3, 2 5〜 2 9 によって検出した電流の検出値 I t, I a〜 I eを読込む。
次に、 ステッ プ 4では、 全帰路電流の検出値 I tか ら 漏洩電流の検出値 I a〜 I eを減算して、 塗装機 1 と被塗 物 A と の 間 に流れて い る 被塗物電流値 I Xを以下の ( 1 ) 式に基づいて演算する。
Ix = It -(Ia + Ib + Ic + Id + Ie) · · · · ( " 次に、 ステップ 5では、 ステップ 4で算出した被塗物 電流値 I Xが予め決め られた遮断しきい電流値 I χθよ り も大きい ( I x> I χθ) か否かを判定する。 そして、 ス テツプ 5で 「 Y E S」 と判定したときには、 例えば回転 霧化頭 5が被塗物 Aに異常接近して絶縁性が損なわれた 状態とな り、 塗装機 1 と被塗物 Aとの間に流れる電流が 絶縁破壊を生じ得る程度に増大している。 このため、 ス テツ プ 6 に移って被塗物電流値 I Xが過大である こ とを 示す異常停止表示を例えば高電圧制御装置 2 0のモニタ 等 (図示せず) に出力する。
その後、 ステップ 7では、 高電圧制御装置 2 0は電源 電圧制御装置 1 5 に対して遮断信号を出力 し、 トラ ンジ ス夕制御回路 1 9 を駆動して高電圧発生器 1 4 と電源変 換回路 1 6 との間を遮断し、 高電圧の供給を停止する。 最後に、 ステッ プ 8では、 塗装機 1 の駆動を停止させる 処理を行い、 処理を終了する。
一方、 ステッ プ 5で 「 N O」 と判定したときには、 ス テツプ 9 に移行する。 そして、 ステップ 9では、 カバ一 2等の表面を流れる電流検出値 I aが予め決められた遮 断しきい電流値 I aOよ り も大きい ( I a〉 I aO) か否か を判定する。 そして、 ステッ プ 9で 「Y E S」 と判定し たときには、 例えばカバ一 2等に付着した吸着物によつ て沿面放電が生じて絶縁性が損なわれた状態となり、 力 バ一 2 の表面を流れる電流が絶縁破壊を生じ得る程度に 増大している。 このため、 ステップ 1 0 に移ってカバ一 2 の表面で検出 した電流検出値 I aが過大である こ とを 示す異常停止表示を例えば高電圧制御装置 2 0のモニタ 等 (図示せず) に出力する。 その後、 ステップ 7 に移つ て高電圧発生器 1 4 と電源変換回路 1 6 との間を遮断し て高電圧の供給を停止し、 ステップ 8 に移って塗装機 1 の駆動を停止させる処理を行い、 処理を終了する。
一方、 ステップ 9で 「 N 0」 と判定したときには、 ス テツプ 1 1 に移行する。 そして、 ステップ 1 1 では、 ェ ァ通路 4, 7 , 1 2 内を流れる電流検出値 I b〜 I dと塗 料通路 9 内を流れる電流検出値 I eがそれぞれ予め決め られた遮断しきい電流値 I b0〜 I e0よ り も大きい ( I b > I bO, I c> I c0, I d> I dO, I e> I eO) 力 否力 を 判定する。 そして、 ステップ 1 1 で 「Y E S」 と判定し たときには、 例えばエア通路 4, 7 , 1 2 内に付着した 水分、 塵埃等によって沿面放電が生じて絶縁性が失われ た状態となり、 エア通路 4 , 7 , 1 2 内のいずれかを流 れる電流が絶縁破壊を生じ得る程度に増大している。 ま たは、 塗料通路 9 内に付着した顔料等によって沿面放電 が生じて絶縁性が損なわれた状態となり、 塗料通路 9 内 を流れる電流が絶縁破壊を生じ得る程度に増大している。 このため、 ステップ 1 2 に移って電流検出値 I !)〜 I eの うち過大となった電流検出値 I b〜 I eの通路を特定する 異常停止表示を例えば高電圧制御装置 2 0 のモニタ等 (図示せず) に出力する。 その後、 ステップ 7 に移って 高電圧発生器 1 4 と電源変換回路 1 6 との間を遮断して 高電圧の供給を停止し、 ステップ 8 に移って塗装機 1 の 駆動を停止させる処理を行い、 処理を終了する。
一方、 ステップ 1 1で 「 N O」 と判定したときには、 ステップ 1 3 に移行する。 そして、 ステッ プ 1 3では、 高電圧発生器 1 4 を流れる全帰路電流の電流検出値 I t が予め決め られた遮断しきい電流値 I t 0よ り も大きい ( I t> I tO) か否かを判定する。 そして、 ステッ プ 1 3で 「 Y E S」 と判定したときには、 電流検出値 I tが 絶縁破壊を生じ得る程度に増大しているから、 ステップ 1 4 に移って全帰路電流の電流検出値 I tが過大である こ とを示す異常停止表示を例えば高電圧制御装置 2 0の モニタ等 (図示せず) に出力する。 その後、 ステップ 7 に移って高電圧発生器 1 4 と電源変換回路 1 6 との間を 遮断して高電圧の供給を停止し、 ステップ 8 に移って塗 装機 1 の駆動を停止させる処理を行い、 処理を終了する。
一方、 ステップ 1 3で 「 N O」 と判定したときには、 ステップ 5 , 9 , 1 1 , 1 3 のいずれでも 「N Oj と判 定されたから、 電流検出値 I a〜 I e, I t、 被塗物電流 値 I Xはいずれも遮断しきい電流値 I aO〜 I e 0 , I tO, 1 x0以下となる。 このため、 電流検出値 I a〜 I e, I t、 被塗物電流値 I Xは塗装が継続可能な程度に小さ いもの と考えられるから、 ステップ 1 5 に移行する。 次に、 ステッ プ 1 5では、 カバー 2等の表面を流れる 電流検出値 I aが予め決め られた警報しきい電流値 I a 1 よ り も大きい ( I a〉 I al) か否かを判定する。 そして、 ステップ 1 5で 「 Y E S」 と判定したときには、 塗装の 継続は可能であるものの、 例えばカバー 2 に付着した吸 着物によって沿面放電が生じ、 絶縁性が低下している。 このため、 ステップ 1 6 に移って警報ブザー 3 0、 警報 ランプ 3 1 に警報信号を出力すると共に、 例えば高電圧 制御装置 2 0 のモニタ等 (図示せず) に電流検出値 l a が増大してカバ一 2 の絶縁性が低下している ことを表示 し、 これらを用いて作業者に対してカバ一 2の表面の保 守 (点検、 清掃等) を促す。 その後、 ステップ 3以降の 処理を繰返す。
一方、 ステッ プ 1 5で 「 N O」 と判定したときには、 ステッ プ 1 7 に移行する。 そして、 ステップ 1 7では、 エア通路 4 , 7 , 1 2内を流れる電流検出値 I !)〜 I dと 塗料通路 9 内を流れる電流検出値 I eがそれぞれ予め決 められた警報しさい 流値 I bl〜 I elよ Ό も大さい ( I b> I bl, I c> I cl I d> I dl, I e> I el) か否かを 判定する。 そして 、 ステツプ 1 7 で 「 Y Ε S」 と判定し たときには、 塗 の 続は可能であるものの、 例えばェ ァ通路 4 , 7 , 1 2内に付着した水分、 塵埃等によって 沿面放電が生じて絶緣性が低下した状態 、 または塗料通 路 9内に付着した顔料等によって沿面放電が生じて絶縁 性が低下した状 となつている。 このため 、 ステツ プ 1
8 に移って警報ブザ ― 3 0、 警報ラ ンプ 3 1 に警報信号 を出力すると共に 、 例えば高電圧制御装置 2 0 のモニタ 等 (図示せず) にェァ通路 4 , 7 , 1 2 と塗料通路 9 の うち絶縁性が低下した通路を表示する。 れによ り、 作 業者に対してエア通路 4 , 7 , 1 2 と塗料通路 9 のう ち 絶縁性が低下した通路を知らせる と共に、 当該通路等の 保守を促す。 その後、 ステップ 3以降の処理を繰返す。
一方、 ステップ 1 7 で 「 N O」 と判定したときには、 いずれの電流検出値 I a〜 I eも警報しきい電流値 I a l〜
I e lよ も小さ く 、 通常の塗装状態に保たれていると考 えられる 。 このため、 そのままの状態を保持して、 ステ ソプ 3 に移行し、 ステップ 3以降の処理を繰返す。
第 1 の実施の形態による回転霧化頭型塗装装置は上述 の如き高電圧発生制御処理に基づき作動するものでめる。 然るに 、 本実施の形態では、 高電圧発生器 1 4 を流れ る全帰路電流を検出する電流センサ 2 3 と、 被塗物 Aを 通らずに流れる漏洩電流を検出する漏洩電流検出器 2 4 とを設けている。 このため、 高電圧制御装置 2 0 は 、 電 流センサ 2 3 による電流検出値 I tが所定の遮断しさい 流値 I t 0を超えたか否か、 または漏洩電流検出器 2 4 による電流検出値 I a〜 I eが所定の遮断しきい電流値 I a0〜 I e Oを超えたか否かを判別する ことによって、 絶縁 破壊が生じ得る程度に塗装機 1 の絶縁性が損なわれたか 否かを判別することができる。
これによ り、 高電圧制御装置 2 0 は、 例えば電流検出 値 I tを用いて塗装機 1 が被塗物 Aに異常接近して塗装 機 1 の絶緣性が損なわれたこ とを判別できる。 また 、 咼 電圧制御装置 2 0 は 、 電流検出値 I a〜 I eを用いて塗 機 1 の力バ — 2 の表面、 エア通路 4, 7 , 1 2 の内面 、 塗料通路 9 の内面等のよう に被塗物 Aを通らずに漏洩電 流が流れる箇所の絶縁性が損なわれたことを判別する とができる
また、 高電圧制御装置 2 0 は、 漏洩電流検出器 2 4 に よる電流検出値 I a ~ I eを用いて塗装機 1 の絶縁低下を 報知する構成と している。 このため、 高電圧制御装置 2 0 は、 電流検出値 I a I eが遮断しきい電流値 I a0 I e Oよ り も小さい所定の警報しきい電流値 I a l I e lを超 えたか否かを判別するこ とによって、 塗装機 1 の絶縁性 が損なわれる前に初期段階の絶縁低下が生じたか否かを 判別することができる。
これによ り 、 高電圧制御装置 2 0 は、 電流検出値 l a I eを用 いて被塗物 A と塗装機 1 との間以外の箇所
(例えば塗装機 1 のカバ一 2 の表面 、 ェァ通路 4 7
1 2 の内面、 塗料通路 9 の内面等 ) における絶縁破 の 進行状況を把握する ことができるから、 これら各箇所で の沿面放電による損傷が進行する刖に警報を発生して塗 装機 1 の保守 清掃を促すこ とがでさ、 塗装機 1 の損傷 を防ぎ、 信頼性 耐久性を高める とがでさる。
特に、 第 1 の実施の形態では 漏洩電流検出器 2 4 は 例えば塗装機 1 のカバ一 2 の表面、 エア通路 4 , 7 , 1 2 の内面、 塗料通路 9 の内面等の漏洩電流を個別に検出 する電流センサ 2 5 2 9 を備える構成と している。 こ のため 咼電圧制御装置 2 0 は 、 漏洩電流を検出する複 数箇所のうち、 漏洩電流が増大している箇所 (絶縁性が 低下している箇所) を判別する ことができる。 この結果 作業者は 塗装機 1 のう ち高電圧制御装置 2 0 によって 判別した箇所やその関連装唐等だけを保守 、 清掃すれば よい。
具体的には、 電流センサ 2 5 の電流検出値 I aが増大 して高電圧制御装置 2 0 が警報の発生や高電圧の供給停 止を行ったときには、 塗装機 1 のカバ一 2 の表面に吸着 物が堆積している ものと考え られる。 このため、 作業者 は塗装機 1 のカバー 2 の表面を清掃すればよい。
また、 電流センサ 2 6 〜 2 8 の電流検出値 I b〜 I dが 増大して高電圧制御装置 2 0 が警報の発生や高電圧の供 給停止を行ったときには、 駆動エア通路 4 、 シエ ーピン グエア通路 7 、 供給弁駆動エア通路 1 2 のうちいずれか の通路の内面に水分、 塵埃等が付着しているものと考え られる。 このため、 高電圧制御装置 2 0 によって判別さ れたいずれかの通路を清掃する と共に、 各エア通路 4 , 7 , 1 2 にエアを供給するエア源 1 3 のフィ ル夕、 ドラ ィャ等を点検、 清掃、 交換等すればよい。
さ ら に、 電流センサ 2 9 の電流検出値 I eが増大して 咼電圧制御装置 2 0 が警報の発生や高電圧の供給停止を 行つたときには、 塗料通路 9 の内面に塗料の顔料等が付 着しているものと考えられる。 このため、 作業者は塗衣 機 1 内の塗料通路 9 をシンナ等を用いて清掃すればよい このよう に、 絶緣性が低下して漏洩電流が生じた箇所 のみ保守、 清掃等を行えばよいから、 塗装機 1 の清掃等 による塗装中断時間を短縮する こ とができ、 塗装生産性 を向上することができる。
また、 高電圧制御装置 2 0 は、 被塗物 Aと塗装機 1 と の間に流れる被塗物電流値 I Xを演算し、 該被塗物電流 値 I Xが所定の遮断しきい電流値 I χ θを超えたときに電 源電圧制御装置 1 5 に対して遮断信号を出力する構成と している。 このため、 高電圧制御装置 2 0 は、 被塗物電 流値 I Xを用いて塗装機 1 が被塗物 Aに異常接近したか 否かを判別する こ とができ、 異常接近したと判別したと さには高電圧発生器 1 4 に対する電源電圧の供給を遮断 する ことができる。
また、 従来技術のよ う に全帰路電流検出値 I tを用い て塗装機 1 が被塗物 Aに異常接近したか否かを判別する 場合には、 被塗物 Aの接近状況が漏洩電流に基づいて緩 和され、 精度が低下し易い。 これに対し、 本実施の形態 では、 全帰路電流検出値 I tか ら漏洩電流の電流検出値 I a〜 I eを除いた被塗物電流値 I xを用いて塗装機 1 が 被 物 Aに異常接近したか否カゝを判別するから 、 被塗物
Aの接近状況を高い精度で把握する こ とがでさる。 この 結果 、 塗装途中の不必要な塗装の中断を防止して被塗物
Aの塗装不良を回避する ことができ、 塗装生産性を向上 させる ことがでさる。
さ ら に、 1¾電圧制御お置 2 0 は漏洩電流の雷流検出値
I a〜 I eを除いた被塗物電流値 I Xを常時監視する こ と ができる。 従って 、 高電圧制御お置 2 0 は、 塗装機 1 の 内外で異常な漏洩電流 (塗装機 1 の外面等のように通常 の漏洩電流が生じる箇所以下での漏洩電流) が生じたか 否かを間接的に監視する ことができる。 このため、 この ような異常な漏洩電流が生じた場合でも、 早期に発見、 判別することができ、 塗装機 1 が損傷する前に点検 、 修 理を促すことがでさる。
次に、 図 6 ないし図 8 は第 2 の実施の形態による高電 圧発生制御処理を示している 本実施の形態の特徴は被 塗物電流の変化量が所定の遮断しきい変化量を超えたと きに電源電圧制御装置に対して電源電圧の供給を遮断す る遮断信号を出力するス ロープ異常処理を行う ことにあ る。 なお、 本実施の形態では第 1 の実施の形態と同一の 構成要素には同一の符号を付し 、 その説明を省略するも のとする。
また、 遮断しきい電流値 I t o , I x 0, I a 0〜 I e O 報しきい電流値 I a 1 〜 I e 1は 、 第 1 の実施の形態と同様 に設定され、 図 3 に示すよう に、 高電圧制御装置 2 0 の メモリ等 (図示せず) に予め格納されているものである。
また、 スロープ検出に用いる例えば 1 7 0 m s 毎の被 塗物電流値は、 I x' と して高電圧制御装置 2 0 のメモ リ (図示せず) に格納されている ものとする。 また、 遮 断しきい変化量 Δ I χθは、 回転霧化頭 5が被塗物に異常 接近するときに塗装機 1 と被塗物 Aとの間に流れる被塗 物電流値 I xの変化量と して 4〜 4 0 程度の値 (例 えば 1 5 程度) に設定され、 高電圧制御装置 2 0の メモリ に格納されている。
まず、 ステップ 2 1 では、 予めメモリ に格納しておい た絶対値検出用の遮断しきい電流値 I t0, 1 x0, I a0〜 I eO、 遮断しきい変化量 Δ I χθを読込む。 ステップ 2 2 では、 予めメモリ に格納しておいた絶対値検出用の警報 しきい電流値 I a 1〜 I e 1を読込む。 ステップ 2 3では、 電流センサ 2 3 , 2 5〜 2 9 によって検出した電流の検 出値 I t, I a〜 I eを読込む。
次に、 ステッ プ 2 4では、 全帰路電流の検出値 I tか ら漏洩電流の検出値 I a〜 I eを減算し、 第 1 の実施の形 態と同様に、 塗装機 1 と被塗物 Aとの間に流れている被 塗物電流値 I Xを ( 1 ) 式に基づいて演算する。
次に、 ステップ 2 5では、 後述するスロープ検出処理 を行い、 後述する ( 2 ) 式に従って、 1 7 0 m s 毎の被 塗物電流値 I Xの変化量 Δ I Xを演算し、 ステップ 2 6 に 移行する。
そして、 ステッ プ 2 6 では、 被塗物電流値 I Xの変化 量 Δ I xが予め決め られた遮断しきい変化量 Δ 1 x0よ り も大きい ( Δ I χ> Δ I χθ) か否かを判定する。 そして、 ステッ プ 2 6で 「 Y E S」 と判定したときには、 例えば 回転霧化頭 5 が被塗物 Aに異常接近する傾向があ り、 塗 装機 1 と被塗物 Aとの間に流れる電流が短時間で大きく 増大している。 このため、 ステップ 2 7 に移って被塗物 電流の変化量 Δ I xが過大である こ とを示す異常停止表 示を例えば高電圧制御装置 2 0 のモニタ等 (図示せず) に出力する。 その後、 ステッ プ 2 8 に移って ト ランジス 夕制御回路 1 9 を駆動し、 高電圧発生器 1 4 と電源変換 回路 1 6 との間を遮断して高電圧の供給を停止し、 ステ ップ 2 9 に移って塗装機 1 の駆動を停止させる処理を行 い、 処理を終了する。
一方、 ステップ 2 6 で 「 N O」 と判定したときには、 ステップ 3 0 に移行し、 被塗物電流値 I Xが予め決め ら れた遮断しきい電流値 I χ θよ り も大きい ( I x > I χ θ ) か否かを判定する。 そして、 ステッ プ 3 0 で 「 Y E S J と判定したときには、 例えば回転霧化頭 5 が被塗物 Aに 異常接近して絶縁性が損なわれた状態とな り、 塗装機 1 と被塗物 Aとの間に流れる電流が絶縁破壊を生じ得る程 度に増大している。 このため、 ステップ 3 1 に移って被 塗物電流値 I Xが過大である こ とを示す異常停止表示を 例えば高電圧制御装置 2 0 のモニタ等 (図示せず) に表 示する。 その後、 ステッ プ 2 8では、 高電圧制御装置 2 0が電源電圧制御装置 1 5 に遮断信号を出力するこ とに よって、 電源電圧制御装置 1 5 は高電圧発生器 1 4 と電 源変換回路 1 6 との間を遮断して高電圧の供給を停止す る。 最後に、 ステッ プ 2 9 では、 塗装機 1 の駆動を停止 させる処理を行い、 処理を終了する。
一方、 ステッ プ 3 0 で 「 N O」 と判定したときには、 ステッ プ 3 2 に移行する。 そして、 ステッ プ 3 2 では、 カバー 2 等の表面を流れる電流検出値 I aが予め決め ら れた遮断しきい電流値 I aOよ り も大きい ( I a> I aO) か否かを判定する。 そして、 ステップ 3 2で 「 Y E S」 と判定したときには、 例えばカバー 2等に付着した吸着 物によって沿面放電が生じて絶縁性が損なわれた状態と な り、 力バ ― 2 の表面を流れる電流が絶縁破壊を生じ ί 1旦寸 る程度に増大している。 このため、 ステップ 3 3 に移 てカバ一 2 の表面で検出 した電流検出値 I aが過大であ る ことを示す異常停止表示を例えば高電圧制御装置 2 0 のモニタ等 (図示せず) に出力する。 その後、 ステツ プ
2 8 に移つて高電圧発生器 1 4 と電源変換回路 1 6 との 間を遮断して高電圧の供給を停止し、 ステップ 2 9 に移 つて塗装機 1 の駆動を停止させる処理を行い、 処理を終 了する。
一方、 ステヅ プ 3 2で 「 N O」 と判定したときには 、 ステップ 3 4に移行する。 そして、 ステップ 3 4では 、 エア通路 4 7 , 1 2内を流れる電流検出値 I b〜 I dと 塗料通路 9 内を流れる電流検出値 I eがそれぞれ予め決 められた遮断しきい電流値 I b0〜 I eOよ り も大きい ( I b> I b0, I c > I cO, I d> I dO, I e> I eO) 力、否力 を 判定する 。 そして、 ステツプ 3 4で Γ Υ Ε S 」 と判定し たときには、 例えばェァ通路 4 , 7 , 1 2内に付着した 水分、 塵埃等によって沿面放電が生じて絶縁性が損なわ れた状態とな り、 エア通路 4, 7, 1 2内のいずれかを 流れる電流が絶縁破壊を生じ得る程度に増大している。 または、 塗料通路 9 内に付着した顔料等に つて沿面放 電が生じて絶縁性が損なわれた状態となり 、 塗料通路 9 内を流れる電流が絶縁破壊を生じ得る程度に増大してい る。 このため、 ステッ プ 3 5 に移って電流検出値 l b〜 I eのう ち過大となった電流検出値 I b〜 I eの通路を特 定する異常停止表示を例えば咼電圧制御
Figure imgf000035_0001
2 0 のモ二 タ等 (図示せず) に出力する その後、 ス丁 ソ プ 2 8 に 移つて高電圧発生器 1 4 と電源変換回路 1 6 との間を遮
断して高電圧の供給を停止し 、 スアツ ノ 2 9 に移つて塗 装機 1 の駆動を停止させる処理を行い、 処理を終了する 一方 、 ステップ 3 4で Γ N O J と判定したとさには、 ステソプ 3 6 に移行する。 そして 、 ステソ プ 3 6 では、 高電圧発生器 1 4 を流れる全帰路電流の電流検出値 I t が予め決め られた遮断しきい電流値 I t oよ り も大きい ( I t > I t O ) か否かを判定する。 そして、 ステップ 3
6 で 「 Y E S」 と判定したときには、 電流検出値 I tが 絶縁破壊を生じ得る程度に増大しているから、 ステッ プ 3 7 に移つて全帰路電流の電流検出値 I tが過大である とを示す異常停止表示を例えば高電圧制御装置 2 0 の モ二夕等 (図示せず) に出力する。 その後、 ステップ 2 8 に移って高電圧発生器 1 4 と電源変換回路 1 6 との間 を遮断して高電圧の供給を停止し、 ステッ プ 2 9 に移つ て塗装機 1 の駆動を停止させる処理を行い、 処理を終了 する。
一方、 ステップ 3 6で 「 N O J と判定したときには、 被塗物電流の変化量 Δ I x、 電流検出値 l a〜 I e, I t、 被塗物電流値 I Xは塗装が継続可能な程度に小さいもの と考えられるから、 ステップ 3 8 に移行する。
次に、 ステップ 3 8 では、 カバ一 2 等の表面を流れる 電流検出値 I aが予め決め られた警報しきい電流値 I a 1 り も大きい ( I a > I a l ) か否かを判定する。 そして、 ステツプ 3 8 で 「 Y E S」 と判定したときには、 塗装の 続は可能であるものの、 例えばカバー 2 に付着した吸 物によって沿面放電が生じ、 絶緣性が低下している。 W このため、 ステップ 3 9 に移って警報ブザー 3 0 、 警報 ラ ンプ 3 1 に警報信号を出力する と共に、 例えば高電圧 制御装置 2 0 のモニタ等 (図示せず) に電流検出値 l a が増大して力バ一 2 の絶縁性が低下している し と •ar表示
5 し 、 これらを用いて作業者に対してカバ一 2 の表面の保 守 (点検 、 清掃等) を促す 。 その後 、 ステツプ 2 3 以降 の処理を 返す
一方、 ステップ 3 8 で 「 N O」 と判定したとさには、 ステップ 4 0 に移行する。 そして、 ステップ 4 0では、
0 ェァ通路 4 , , 1 2 内を流れる電流検出値 I b- - I dと 塗料通路 9 内を流れる電流検出値 I eがそれぞれ予め決 められた警報しさい電流値 I bl 〜 I elよ Ό も大さい ( I b> I bl, I c> I cl I d> I dl, I e> I el) か否かを 判定する。 そして 、 ステツプ 4 0 で Γ Y E S J と判定し たときには、 塗装の維続は可能である ものの、 例えばェ ァ通路 4 , 7 , 1 2 内に付着した水分、 塵埃等によって 沿面放電が生じて絶緣性が低下した状態 、 または塗料通 路 9 内に付着した顔料等によつて沿面放電が生じて絶縁 性が低下した状態となつている 。 このため 、 ステップ 4
1 に移って警報ブザ一 3 0 、 警報ランプ 3 1 に警報信号 を出力する と共に 、 例えば高電圧制御装.置 2 0 のモニタ 等 (図示せず) にェァ通路 4 , 7 , 1 2 と塗料通路 9 の う ち絶縁性が低下した通路を表 κ る。 れによ り、 作 業者に対してエア通路 4 , 7 , 1 2 と塗料通路 9 のつち
25 絶縁性が低下した通路を知らせる と共に 、 当該通路等の 保守を促す。 その後 、 ステッ プ 2 3 以降の処理を繰返す。
一方、 ステップ 4 0 で 「 N O J と判定したときには 、 いずれの電流検出値 I a〜 I e 警報しさい 流値 I al 〜
I e 1よ り も小さ く 、 通常の塗装状能に保たれていると考 えられる このため、 そのままの状態を保持して、 ステ ップ 2 3 に移行し、 ステップ 2 3以降の処理を繰返す。 次に、 ステヅ プ 2 5 のスロープ検出処理について、 図
8 を参照し つ説明する。 ステッ プ 5 1 では、 電流の時 間変化を検出するために予め設定された時間 T.1と して 例えば 1 7 0 m s 程度の設定時間 T 1を経過したか否か を判定する そして、 ステップ 5 1 で 「N O」 と判定し たときには 、 ステツプ 5 4 に移ってそのままリ ターンす ス 方、 ステップ 5 1 で 「 Y E S」 と判定したときには ステ ッ プ 5 2 に移っ て今回の被塗物電流値 I Xと前回 ( 1 7 0 m s 前) の被塗物電流値 I x ' との差を以下の ( 2 ) 式に基づいて演算する。 そして、 両者の差を電流 の振動によるスロープ検出用の被塗物電流の変化量△ I Xと して算出する。 その後、 ステッ プ 5 3 に移って、 メ モ リ 内に格納された被塗物電流値 I x ' を今回の被塗物 電流値 I Xに更新 ( I X ' = I X ) し、 ステッ プ 5 4 に移 つて リ ターンする。 これによ り 、 設定時間 T 1毎の被塗 物電流の変化量 Δ I xを演算するものである。 厶 Ix = Ix - Ιχ' · · · · ( 2 ) か < して 、 第 2 の実施の形態でも第 1 の実施の形態と 同様の作用効果を得る こ とができる。 特に、 本実施の形 態では 、 被塗物電流の変化量 Δ I Xが所定の遮断しさい 変化 Δ I χ θを超えたときに電源電圧制御装置 1 5 に対 して電源電圧の供給を遮断する遮断信号を出力する構成 と している 。 従って、 塗装機 1 と被塗物 Aとの間に流れ る被塗物電流の変化量 Δ I xを用いて塗装機 1 が被塗物
Aに異常接近したか否かを判別する ことがでさ、 異 接 近したときには高電圧発生器 1 4 に対する電源電圧の供 給を遮断する ことができる。
一方、 従来技術のよう に全帰路電流検出値 I tの変化 を用いて被塗物 Aに異常接近したか否かを判別する場
□ には、 被塗物 Aの接近状況が漏洩電流に基づいて緩和 され、 精度が低下し易い。 これに対し、 本実施の形 は 、 全帰路電流検出値 I tか ら漏洩電流検出値 I a - I e を除いた被塗物電流値 I Xの変化量 Δ I Xを用いて塗装機
1 が被塗物 Aに異常接近したか否かを判別するから 、 被 塗物 Aの接近状況を高い精度で把握する こ とができる のため、 不必要な塗装の中断を回避する ことがでさ、 塗装の生産性を高めることができる。
次に、 図 9 は第 3 の実施の形態による回転霧化頭型塗 装装置を示している。 本実施の形態の特徴は、 駆動ェァ 通路を流れる電流と、 シェービングエア通路を流れる電 流と、 供給弁駆動エア通路を流れる電流とを一緒に検出 する全エア通路電流検出器を設ける構成と したことにあ る 。 なお、 本実施の形態では第 1 の実施の形態と同一の 構成要素には同一の符号を付し、 その説明を省略するも のとする。
4 1 は第 3 の実施の形態による漏洩電流検出手段と し ての漏洩電流検出器で、 該漏洩電流検出器 4 1 は、 被塗 物 Aを通らずに流れる漏洩電流を検出すると共に、 その 検出値を高電圧制御装置 2 0 に向けて出力する た、 漏洩電流検出器 4 1 は、 第 1 の実施の形態による漏洩電 流検出器 2 4 と同様に、 外面電流検出器と しての電流セ ンサ 2 5 と塗料通路電流検出器と しての電流センサ 2 9 とを備えている。 しかし、 本実施の形態では、 第 1 の実 施の形態による電流センサ 2 6 2 8 に代えて後述する 単一の電流センサ 4 2 を備える構成と している点で第 1 の実施の形態とは異なる。
4 2 は全エア通路電流検出器と しての電流センサで、 該電流センサ 4 2 は、 第 1 の実施の形態による電流セン サ 2 6 〜 2 8 に代えて設けられ 例えば駆動ェァ通路 4 の途中に設けられた導体端子 4 2 Aと、 シ X一ピングェ ァ通路 7の途中に設けられた導体端子 4 2 Bと、 供給弁 駆動エア通路 1 2 の途中に設けられた導体端子 4 2 Cと に接続されている。 そして、 電流センサ 4 2 は、 導体端 子 4 2 A〜 4 2 Cを通じて各ェァ通路 4, 7, 1 2 を流 れる電流を検出し、 これらの電流を合計した電流検出値 I f ( I f= I b + I c+ I d) を高電圧制御装置 2 0 に向 けて出力している
これによ り、 高電圧制御装置 2 0は、 第 1 の実施の形 態とほぼ同様に、 電流検出値 I t, I a, I f, I eを用い て被塗物電流値 I xを演算する と共に、 電流検出値 I fを 用いて電圧供給の遮断、 警報の発生を行う ものである。
かく して、 第 3 の実施の形態でも第 1 の実施の形態と 様の作用効果を得るこ とができる。 しかし、 本実施の 形態では、 漏洩電流検出器 4 1 は、 駆動エア通路 4を流 れる電流と、 シェ—ビングエア通路 7 を流れる電流と、 供給弁駆動エア通路 1 2 を流れる電流とを一緒に検出す る電流センサ 4 2 を含む構成と したから、 単一の電流セ ンサ 4 2 を用いて全てのエア通路 4 , 7, 1 2 内を流れ る漏洩電流を一緒に検出することができる。
これによ り、 高電圧制御装置 2 0 は、 エア通路 4, 7 , 1 2内における絶緣破壊の進行状況を把握する ことがで きるから、 エア通路 4 , 7, 1 2 の内面に塵埃、 水分等 が付着、 堆積したこ とを検出する こ とができる。 従って、 高電圧制御装置 2 0 は、 エア通路 4 7 1 2 の内面で 絶縁破壊が生じる前に高電圧の供給を遮断する ことがで きるから、 エア通路 4 7 1 2 の損傷を防ぎ、 信頼性、 耐久性を高める こ とができる また、 高電圧制御装置 2
0 は、 エア通路 4 7 1 2 の内面で沿面放電による損 傷が進行する前に警報を発生する こ とができ、 ェァ通路
4 , 7 , 1 2 の清掃やエア源 1 3 のフィ ルタ、 ドラィャ に対する清掃を促すことがでさる。
また、 駆動エア通路 4、 シェ ビングエア通路 7 供 給弁駆動エア通路 1 2 には共通のエア源 1 3 に接続され、 同じエアが供給されるから、 各エア通路 4 7 , 1 2 内 の絶縁性を低下させる要因は エア中の水分、 塵埃 (微 細ミス ト) がエア通路 4 7 1 2 の内面に付着する とで共通している。 このため これらのエア通路 4 , 7
1 2 は一緒に絶縁性が低下する傾向があるのに対し、 電 流センサ 4 2 は全てのエア通路 4 , 7 1 2 内を流れる 漏洩電流を一緒に (合計して ) 検出するから、 いずれの エア通路 4 , 7 , 1 2 に対して絶縁性の低下が生じた場 合でも早期かつ確実に検出する ことができる ,
また 、 複数のェァ通路 4 , 7 1 2 に対して単一の電 流センサ 4 2 を用いるから、 第 1 の実施の形態のよう に 複数のエア通路 4 7 , 1 2 に電流センサをそれぞれ ex けた場合に比ベて 電流センサの数を少なくするこ とが できる 。 このため 電圧の遮断処理および警報処理の制 御機能を簡略化する ことができると共に、 装置全体の製 造コス トを低減する ことがでさる
なお 、 第 1 , 第 2 の実施の形態では、 ステッ フ 5 1
4 , 2 6 3 7 は電源遮断手段の具体例、 ステツプ 1 5 1 8 , 3 8 4 1 は報知手段の具体例、 ステツプ 4 2 4 は被塗物電流演算手段の具体例、 ステップ 5 〜 8
2 8 〜 3 1 は被塗物電流異常処理手段の具体例 、 ステソ プ 2 5 〜 2 9 はスロープ異常処理手段の具体例をそれぞ れ示してい 。
また 、 Turn断しきい電流値 I t 0 , 1 x 0 , I a0〜 I e 0. 遮 断しさい変化量 Δ I x 0、 警報しきい電流値 I a l I e l等 は、 図 3 および HII記各実施の形態に例示した値に限らず 塗装機の種類、 塗装条件等に応じて適宜設定される もの である σ
また 、 刖記第 2 の実施の形態では、 被塗物電流の変化 量 Δ I Xは、 電圧の供給を遮断する遮断処理に用いる も のと した。 しかし 、 本発明はこれに限らず、 例えば被塗 物電流の変化量を用いて警報手段に対して警報を発生さ せる警報処理に用いる構成としてもよい。
また 、 刖記各実施の形態では、 回転霧化頭 5 を金属材 料または導電性の樹脂材料によって形成し、 該回転霧化 頭 5 を介して直接的に塗料を高電圧に帯電させる直接帯 電式の回転霧化頭型塗装装置を例に挙げて説明した。 し かし 、 本発明は直接帯電式に限らず、 例えば回転霧化頭 型塗装装置の力バ一の外周側に外部電極を設け 、 この外 部電極によつて回転霧化頭から噴霧された塗料を間接的 に高電圧に帯電させる間接帯電式の回転霧化頭型塗装装 置に is用 してもよい。
さ らに、 前記各実施の形態では静電塗装装置として回 転霧化頭 5 を用いて塗料を噴霧する回転霧化頭型塗装装 置 (回転霧化式静電塗装装置) に適用する場合を例に挙 げて 明した。 しかし、 本発明はこれに限らず 、 例えば 空気霧化式静電塗装装置、 液圧霧化式静電塗装 置等の 回転霧化以外の霧化方式を用いた静電塗装装置に M用 し てもよい。 この七县 A
場口 、 装機の絶縁性カバーの表面、 塗 料通路 、 供給弁駆動ェァ通路、 霧化エア、 シェービング ェァ (パターン形成ェァ ) 等の各種の通路に導体端子を 設け、 該導体端子に電流センサを接続する。 これによ り、 電流センサを用いて 、 各通路等に流れる電流を検出もの である o

Claims

請 求 の 範 囲
1 . 被塗物に塗料を噴霧する塗装機と、 電源電圧を昇 圧して高電圧を発生し、 該高電圧を前記塗装機に出力す る高電圧発生器と、 該高電圧発生器に供給する電源電圧 を制御する電源電圧制御装置と、 該電源電圧制御装置に 対して電源電圧を設定するための設定信号を出力し 、 刖 記高電圧発生器から出力する高電圧を制御する高電圧制 御装置とを備えてなる静電塗装装置において、
HU ed 咼電圧発生器を流れる全帰路電流を検出する全帰 路電流検出手段と、 前記被塗物を通らずに流れる漏洩電 流を検出する漏洩電流検出手段とを備え、
刖 電圧制御装置は 刖記全帰路電流検出手段によ る全帰路電流検出値と該漏洩電流検出手段による漏洩電 流検出値とを用いて前記塗装機の絶縁性が損なわれたと 判別したときには、 刖記電源電圧制御装置に対して電源 電圧の供給を遮断する遮断信号を出力する電源遮断手段 と、
前記漏洩電流検出手段による漏洩電流検出値を用いて 初期段階の絶縁低下が生じたと判別したときには、 前記 塗装機に生じている絶縁低下を報知する報知手段とを含 む構成と したことを特徴とする静電塗装装置。
2 . 前記漏洩電流検出手段は、 前記塗装機の外面を流 れる電流を検出する外面電流検出器を含む構成としてな る請求項 1 に記載の静電塗装装置。
3 . 前記漏洩電流検出手段は、 前記塗装機内の塗料通 路を流れる電流を検出する塗料通路電流検出器を含む構 成と してなる請求項 1 に記載の静電塗装装置。
4 . 前記漏洩電流検出手段は、 前記塗装機の外面を流 れる電流を検出する外面電流検出器と、 前記塗装機内の 塗料通路を流れる電流を検出する塗料通路電流検出器と を含む構成としてなる請求項 1 に記載の静電塗装装置。
5 . 前 S塗装機は、 駆動ェァによって回転駆動するェ ァモ一夕 と、 該エアモー夕によつて回転する回転軸と 、 該回転軸の先端に設けられ該回転軸によって回転する間 に塗料供給弁を介して供給された塗料を噴霧する回転霧 化頭と、 該回転霧化頭の外周側に設けられ塗料の噴霧パ 夕ーンを成形するシエーピングエアを吐出するためのェ ァ吐出孔を有するシエーピングエア リ ングとによつて構 成し、
前記漏洩電流検出手段は、 前記駆動エアを供給するた めの駆動エア通路を流れる電流を検出する駆動ェァ通路 電流検出器と、 前記シエーピングを供給するためのシ X
―ビングエア通路を流れる電流を検出するシェ—ピング ェァ通路電流検出器と、 前記塗料供給弁を開閉駆動する ための供給弁駆動エア通路を流れる電流を検出する供給 弁駆動エア通路電流検出器とを含む構成と してなる m求 項 1 , 2 , 3 または 4 に記載の静電塗装装置,
6 . 前記塗装機は、 駆動ェァによって回転駆動するェ ァモータと、 該エアモー夕によって回転する回転軸と 、 該回転軸の先端に設けられ該回転軸によって回転する間 に塗料供給弁を介して供給された塗料を噴霧する回転霧 化頭と、 該回転霧化頭の外周側に設けられ塗料の噴霧パ タ —ンを成形するシェ一ピングエアを吐出するためのェ ァ吐出孔を有するシェ一ピングエア リ ングとによ て構 成し、
前記漏洩電流検出手段は全エア通路電流検出器を含む 構成と し、 該全エア通路電流検出器は、 前記駆動ェァを 472 供給するための駆動エア通路を流れる電流と、 前記シ X 一ピングを供給するためのシェ一ビングエア通路を流れ る電流と、 前記塗料供給弁を開閉駆動するための供給弁 駆動エア通路を流れる零流とを一緒に検出する構成と し てなる請求項 1, 2, 3 または 4 に記載の静電塗装装置。
7 . 前記電源遮断手段は、 前記全帰路電流検出手段に よる全帰路電流検出値か 記漏洩電流検出手段による 漏洩電流検出値を減算し 、 前記塗装機と被塗物との間に 流れる被塗物電流を演算する被塗物電流演算手段と、 該 被塗物電流演算手段による被塗物電流が所定の遮断しさ ぃ電流値を超えたときに刖 θ己電源電圧制御装置に対して 電源電圧の供給を遮断する遮断信号を出力する被塗物電 流異常処理手段とを備える構成と してなる請求項 1 に記 載の静電塗装装置。
8 . 前記電源遮断手段は、 前記全帰路電流検出手段に
=tる全帰路電流検出値か 刖記漏洩電流検出手段による 漏洩電流検出値を減算し 、 m記塗装機と被塗物との間に 流れる被塗物電流を演算する被塗物電流演算手段と、 該 被塗物電流演算手段による被塗物電流の変化量が所定の 遮断しきい変化量を超えたときに前記電源電圧制御装置 に対して電源電圧の供給を遮断する遮断信号を出力する ス口ープ異常処理手段とを備える構成と してなる請求項
1 に記載の静電塗装装置
PCT/JP2005/013524 2004-08-10 2005-07-15 静電塗装装置 WO2006016472A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2006531389A JP4388070B2 (ja) 2004-08-10 2005-07-15 静電塗装装置
CA002566233A CA2566233A1 (en) 2004-08-10 2005-07-15 Electrostatic coating apparatus
US11/571,276 US7926443B2 (en) 2004-08-10 2005-07-15 Electrostatic coating apparatus
EP05766501A EP1797962B1 (en) 2004-08-10 2005-07-15 Electrostatic coating apparatus
US13/008,670 US8042488B2 (en) 2004-08-10 2011-01-18 Electrostatic coating apparatus

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2004-233630 2004-08-10
JP2004233630 2004-08-10

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US11/571,276 A-371-Of-International US7926443B2 (en) 2004-08-10 2005-07-15 Electrostatic coating apparatus
US13/008,670 Continuation US8042488B2 (en) 2004-08-10 2011-01-18 Electrostatic coating apparatus

Publications (1)

Publication Number Publication Date
WO2006016472A1 true WO2006016472A1 (ja) 2006-02-16

Family

ID=35839245

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2005/013524 WO2006016472A1 (ja) 2004-08-10 2005-07-15 静電塗装装置

Country Status (7)

Country Link
US (2) US7926443B2 (ja)
EP (1) EP1797962B1 (ja)
JP (1) JP4388070B2 (ja)
KR (1) KR100763457B1 (ja)
CN (1) CN100421810C (ja)
CA (1) CA2566233A1 (ja)
WO (1) WO2006016472A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012071224A (ja) * 2010-09-27 2012-04-12 Toyota Motor Corp 静電塗装装置およびアース状態検査方法
WO2013111664A1 (ja) 2012-01-25 2013-08-01 Abb株式会社 静電塗装装置

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NZ585074A (en) * 2007-11-06 2012-06-29 Panasonic Corp Refrigerator with an atomization device and a protection unit to supprss current flow to the user
US9272297B2 (en) * 2008-03-04 2016-03-01 Sono-Tek Corporation Ultrasonic atomizing nozzle methods for the food industry
US20100145516A1 (en) * 2008-12-08 2010-06-10 Illinois Tool Works Inc. High voltage monitoring system and method for spray coating systems
DE102009013561A1 (de) * 2009-03-17 2010-10-07 Dürr Systems GmbH Überwachungsverfahren und Überwachungseinrichtung für eine elektrostatische Beschichtungsanlage
JP5654822B2 (ja) * 2010-09-30 2015-01-14 パナソニック株式会社 静電霧化装置
US9415407B2 (en) * 2012-10-17 2016-08-16 Trinity Industrial Corp. Electrostatic coating apparatus and grounded state checking method
JP5230041B1 (ja) * 2013-01-30 2013-07-10 ランズバーグ・インダストリー株式会社 静電塗装機及び静電塗装方法
KR101397384B1 (ko) * 2013-03-28 2014-05-20 엔젯 주식회사 스프레이 노즐 및 이를 이용한 코팅 시스템
DE102013022282B3 (de) * 2013-12-03 2015-03-05 Eisenmann Ag Mit Innenaufladung arbeitender Hochrotationszerstäuber
FR3108045B1 (fr) * 2020-03-11 2023-02-10 Exel Ind Installation comportant un pulvérisateur et procédé associé
FR3108046B1 (fr) * 2020-03-11 2023-02-10 Exel Ind Pulvérisateur, installation comportant un tel pulvérisateur et procédé associé
US11953161B1 (en) 2023-04-18 2024-04-09 Intelcon System C.A. Monitoring and detecting pipeline leaks and spills

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09262510A (ja) * 1996-03-28 1997-10-07 Trinity Ind Corp 静電塗装機の汚れ度合監視装置
JP2002186884A (ja) 2000-12-20 2002-07-02 Abb Kk 静電塗装装置

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3851618A (en) * 1974-01-14 1974-12-03 Ransburg Corp Electrostatic coating apparatus
US3875892A (en) * 1974-01-14 1975-04-08 Ransburg Corp Apparatus for avoiding sparks in an electrostatic coating system
FR2551928B1 (fr) * 1983-09-14 1986-05-23 Sames Sa Dispositif de protection des circuits basse tension d'equipement de projection electrostatique, et equipement de projection incorporant ce dispositif
DE3709510A1 (de) * 1987-03-23 1988-10-06 Behr Industrieanlagen Verfahren zur betriebssteuerung einer elektrostatischen beschichtungsanlage
EP0537345B1 (en) * 1990-06-30 1998-04-22 Kabushiki Kaisya Kotogawa Method and apparatus for paint insulation in electrostatic coating
JP2768811B2 (ja) * 1990-07-06 1998-06-25 本田技研工業株式会社 塗装方法
JPH04349956A (ja) * 1991-05-29 1992-12-04 Honda Motor Co Ltd 静電塗装装置
JP2830683B2 (ja) * 1992-09-11 1998-12-02 トヨタ自動車株式会社 回転霧化静電塗装装置
GB9409167D0 (en) * 1994-05-09 1994-06-29 Ici Plc Spraying devices
FR2736773B1 (fr) * 1995-07-10 1997-08-22 Sames Sa Procede d'elaboration de haute tension et dispositif de projection electrostatique de produit de revetement
JP3354038B2 (ja) * 1995-09-29 2002-12-09 本田技研工業株式会社 静電塗装方法
US5788164A (en) * 1995-12-19 1998-08-04 Toyota Jidosha Kabushiki Kaisha Rotary atomizing electrostatic coating apparatus
GB9604329D0 (en) * 1996-02-29 1996-05-01 Ici Plc Electrostatic spraying
JPH1015440A (ja) * 1996-07-08 1998-01-20 Ransburg Ind Kk 静電塗装機
US6437963B1 (en) * 1999-09-24 2002-08-20 Efc Systems, Inc. Method and apparatus for controlling power supplied to an electrostatic device
US6423143B1 (en) * 1999-11-02 2002-07-23 Illinois Tool Works Inc. Voltage block monitoring system
JP4786014B2 (ja) * 2000-06-29 2011-10-05 アネスト岩田株式会社 静電塗装装置
JP2002035647A (ja) * 2000-07-21 2002-02-05 Anest Iwata Corp 送電周波数調整装置を備えた静電塗装器
JP3672182B2 (ja) * 2000-11-07 2005-07-13 トヨタ自動車株式会社 静電塗装装置の異常検知方法
DE602004020352D1 (de) * 2003-07-24 2009-05-14 Ransburg Ind Finishing Kk Elektrostatische lackiervorrichtung

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09262510A (ja) * 1996-03-28 1997-10-07 Trinity Ind Corp 静電塗装機の汚れ度合監視装置
JP2002186884A (ja) 2000-12-20 2002-07-02 Abb Kk 静電塗装装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP1797962A4

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012071224A (ja) * 2010-09-27 2012-04-12 Toyota Motor Corp 静電塗装装置およびアース状態検査方法
WO2013111664A1 (ja) 2012-01-25 2013-08-01 Abb株式会社 静電塗装装置
CN103974780A (zh) * 2012-01-25 2014-08-06 Abb株式会社 静电涂饰装置
JPWO2013111664A1 (ja) * 2012-01-25 2015-05-11 Abb株式会社 静電塗装装置
US9662669B2 (en) 2012-01-25 2017-05-30 Abb K.K. Electrostatic coating apparatus

Also Published As

Publication number Publication date
JPWO2006016472A1 (ja) 2008-05-01
CN100421810C (zh) 2008-10-01
US20110107966A1 (en) 2011-05-12
US20070227445A1 (en) 2007-10-04
EP1797962A1 (en) 2007-06-20
KR100763457B1 (ko) 2007-10-04
JP4388070B2 (ja) 2009-12-24
US7926443B2 (en) 2011-04-19
EP1797962A4 (en) 2008-12-17
CN1976757A (zh) 2007-06-06
KR20070020047A (ko) 2007-02-16
EP1797962B1 (en) 2012-06-06
US8042488B2 (en) 2011-10-25
CA2566233A1 (en) 2006-02-16

Similar Documents

Publication Publication Date Title
WO2006016472A1 (ja) 静電塗装装置
JP5771705B2 (ja) 静電塗装装置
JP4678858B2 (ja) 静電塗装装置
JP4705818B2 (ja) 静電塗装装置
JP4327846B2 (ja) 回転霧化頭型塗装装置
US5949235A (en) System and method for detection and control of ungrounded parts in a production coating line
JP3673168B2 (ja) 静電塗装装置
JP3673173B2 (ja) 回転霧化頭型塗装装置
JP2632411B2 (ja) 静電塗装装置
JP6945433B2 (ja) 静電塗装システムの自己診断方法
JP2005066410A (ja) 静電塗装装置
JPH10109054A (ja) 静電塗装装置
WO2013024536A1 (ja) 静電塗装装置
JP3276796B2 (ja) 回転霧化頭型塗装装置
JP3266438B2 (ja) 回転霧化頭型塗装装置
JP4339603B2 (ja) 静電塗装機用高電圧出力制御方法
JP2004214426A (ja) 除電機能付超高圧純水洗浄装置
JPS629386B2 (ja)

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KM KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NG NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SM SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU LV MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2006531389

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 2566233

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 1020067024798

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 11571276

Country of ref document: US

Ref document number: 2007227445

Country of ref document: US

Ref document number: 200580021317.2

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2005766501

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

WWP Wipo information: published in national office

Ref document number: 1020067024798

Country of ref document: KR

WWP Wipo information: published in national office

Ref document number: 2005766501

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 11571276

Country of ref document: US