- JPWO2020027202A1 JPWO2020027202A1 JP2020506381A JP2020506381A JPWO2020027202A1 JP WO2020027202 A1 JPWO2020027202 A1 JP WO2020027202A1 JP 2020506381 A JP2020506381 A JP 2020506381A JP 2020506381 A JP2020506381 A JP 2020506381A JP WO2020027202 A1 JPWO2020027202 A1 JP WO2020027202A1
- Authority
- JP
- Japan
- Prior art keywords
- power
- charging device
- charging
- battery
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 25
- 238000010801 machine learning Methods 0.000 claims abstract description 15
- 238000012545 processing Methods 0.000 claims description 40
- 238000004891 communication Methods 0.000 description 35
- 238000007726 management method Methods 0.000 description 27
- 230000004044 response Effects 0.000 description 27
- 230000008569 process Effects 0.000 description 12
- 230000001629 suppression Effects 0.000 description 12
- 230000005540 biological transmission Effects 0.000 description 8
- 238000005259 measurement Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- 230000006399 behavior Effects 0.000 description 5
- 238000001514 detection method Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 238000007599 discharging Methods 0.000 description 4
- 238000012549 training Methods 0.000 description 4
- 238000013528 artificial neural network Methods 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 238000002485 combustion reaction Methods 0.000 description 2
- 239000000470 constituent Substances 0.000 description 2
- 238000009795 derivation Methods 0.000 description 2
- 238000007636 ensemble learning method Methods 0.000 description 2
- HBBGRARXTFLTSG-UHFFFAOYSA-N Lithium ion Chemical compound [Li+] HBBGRARXTFLTSG-UHFFFAOYSA-N 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000013135 deep learning Methods 0.000 description 1
- 238000005401 electroluminescence Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000013277 forecasting method Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000011478 gradient descent method Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 229910001416 lithium ion Inorganic materials 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000007637 random forest analysis Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012706 support-vector machine Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
- G01R21/133—Arrangements for measuring electric power or power factor by using digital technique
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/367—Software therefor, e.g. for battery testing using modelling or look-up tables
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0047—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
- H02J7/0048—Detection of remaining charge capacity or state of charge [SOC]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/02—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/40—The network being an on-board power network, i.e. within a vehicle
- H02J2310/48—The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/58—The condition being electrical
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
- H02J3/144—Demand-response operation of the power transmission or distribution network
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/20—Information technology specific aspects, e.g. CAD, simulation, modelling, system security
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Power Engineering (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Public Health (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本願は、2018年7月31日に出願された日本国特許出願2018−143636号に基づき優先権を主張し、その内容をここに援用する。
(1)本発明の一態様は、電力を利用する電力装置に対して着脱自在に装着されるバッテリと、前記バッテリを充電する充電装置と、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する電力予測装置と、を備える電力予測システムである。
図1は、実施形態における電力予測システム1の構成の一例を示す図である。図示の例のように、電力予測システム1は、鞍乗り型の自動二輪車12の駆動源である着脱式バッテリ14を、複数のユーザが共同利用するシェアサービスを提供可能なシステムにおいて、着脱式バッテリ14が充電ステーション16により供給可能な電力量を予測するシステムである。例えば、電力予測システム1は、一以上の鞍乗り型の自動二輪車12と、各自動二輪車12に電力を供給可能な着脱式バッテリ14と、一以上の充電ステーション16と、管理サーバ18と、端末装置28とを備える。自動二輪車12は「電力装置」の一例であり、充電ステーション16は「充電装置」の一例であり、管理サーバ18は「電力予測装置」の一例である。
図2は、実施形態における着脱式バッテリ14の構成の一例を示す図である。図示の例のように、着脱式バッテリ14は、蓄電池141と、測定センサ142と、BMU(Battery Management Unit)143と、接続部144と、バッテリ側記憶部145とを備える。
図3は、実施形態における充電ステーション16の構成の一例を示す図である。図示の例のように、充電ステーション16は、表示部161と、読取部162と、充電部163と、接続部164と、通信部165と、ステーション側記憶部166と、ステーション側制御部167とを備える。通信部165は「取得部」または「受信部」の一例である。
図4は、実施形態における管理サーバ18の構成の一例を示す図である。図示の例のように、管理サーバ18は、通信部181と、サーバ側記憶部182と、サーバ側制御部183とを備える。
以下、学習モデルMDLの学習処理(トレーニング)について説明する。図5は、管理サーバ18による学習モデルMDLの学習処理の一例を示すフローチャートである。本フローチャートの処理は、例えば、通信部181によってステーション利用状況情報が受信された回数が所定回数に達した場合に行われてよい。
以下、学習モデルMDLを利用した電力予測処理(ランタイム)について説明する。図9は、管理サーバ18による学習モデルMDLを利用した電力予測処理の一例を示すフローチャートである。本フローチャートの処理は、例えば、所定の周期で繰り返し行われてよい。
(1)本発明の一態様は、電力を利用する電力装置に対して着脱自在に装着されるバッテリと、前記バッテリを充電する充電装置と、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する電力予測装置と、を備え、前記利用状況には、前記充電装置に装着されたバッテリの充電容量を表す指標値と、前記充電装置に装着されたバッテリの個数と、時刻と、のうち少なくとも一つ以上が含まれる電力予測システムである。
(2)本発明の他の態様は、電力を利用する電力装置に対して着脱自在に装着されるバッテリと、前記バッテリを充電する充電装置と、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する電力予測装置と、を備え、前記利用環境には、前記充電装置が設置された地域の天候と、前記充電装置が設置された地域の気温と、日付と、曜日と、のうち少なくとも一つ以上が含まれる電力予測システムである。
(9)本発明の他の態様は、電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信する受信部と、前記受信部により受信された前記充電装置の前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する予測部と、を備え、前記利用環境には、前記充電装置が設置された地域の天候と、前記充電装置が設置された地域の気温と、日付と、曜日と、のうち少なくとも一つ以上が含まれる電力予測装置である。
(10)の態様は、上記(8)又は(9)の態様において、前記受信部が、現在又は将来の第1時点における前記充電装置の前記利用情報を受信し、前記予測部が、過去の第2時点における前記充電装置の前記利用情報が入力されると、前記第2時点における前記電力量を出力するように学習されたモデルに対して、前記取得部によって取得された前記利用情報を入力することで、前記第1時点において前記充電装置が前記充電装置外に供給可能な前記電力量を予測するものである。
(11)の態様は、上記(10)の態様において、前記電力予測装置が、前記第2時点において前記充電装置に装着された前記バッテリの数と、前記第2時点において前記充電装置に装着された前記バッテリの充電容量とに基づいて、前記第2時点において前記充電装置が前記充電装置外に供給可能な前記電力量を導出し、前記第2時点における前記充電装置の前記利用情報に対して、前記導出した電力量が対応付けられた教師データに基づいて、前記モデルを学習する学習処理部を更に有するものである。
(12)の態様は、上記(11)の態様において、前記受信部が、複数の前記充電装置のそれぞれが設置された地域ごとに、前記充電装置の前記利用情報を受信し、前記学習処理部が、前記受信部によって前記地域ごとの前記充電装置から受信された前記利用情報に基づいて、前記地域ごとに前記モデルを学習するものである。
(14)本発明の他の態様は、コンピュータが、電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信し、前記受信した前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測し、前記利用環境には、前記充電装置が設置された地域の天候と、前記充電装置が設置された地域の気温と、日付と、曜日と、のうち少なくとも一つ以上が含まれる電力予測方法である。
Claims (12)
- 電力を利用する電力装置に対して着脱自在に装着されるバッテリと、
前記バッテリを充電する充電装置と、
前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する電力予測装置と、
を備える電力予測システム。 - 前記電力予測装置は、
現在又は将来の第1時点における前記充電装置の前記利用情報を取得する取得部と、
過去の第2時点における前記充電装置の前記利用情報が入力されると、前記第2時点における前記電力量を出力するように学習されたモデルに対して、前記取得部によって取得された前記利用情報を入力することで、前記第1時点において前記充電装置が前記充電装置外に供給可能な前記電力量を予測する予測部と、を有する、
請求項1に記載の電力予測システム。 - 前記電力予測装置は、
前記第2時点において前記充電装置に装着された前記バッテリの数と、前記第2時点において前記充電装置に装着された前記バッテリの充電容量とに基づいて、前記第2時点において前記充電装置が前記充電装置外に供給可能な前記電力量を導出し、
前記第2時点における前記充電装置の前記利用情報に対して、前記導出した電力量が対応付けられた教師データに基づいて、前記モデルを学習する、
学習処理部を更に有する、
請求項2に記載の電力予測システム。 - 前記取得部は、複数の前記充電装置のそれぞれが設置された地域ごとに、前記充電装置の前記利用情報を取得し、
前記学習処理部は、前記取得部によって前記地域ごとの前記充電装置から取得された前記利用情報に基づいて、前記地域ごとに前記モデルを学習する、
請求項3に記載の電力予測システム。 - 前記予測部は、前記充電装置が使用電力の抑制の要請を受けた場合、前記モデルに基づいて、前記電力量を予測する、
請求項2から4のうちいずれか一項に記載の電力予測システム。 - 前記電力予測装置は、前記充電装置が使用電力の抑制の要請を受けた場合、前記予測部によって予測された前記電力量が、抑制するように要請された電力量以上である場合、前記充電装置から前記充電装置外に電力を供給させる供給電力制御部を更に備える、
請求項5に記載の電力予測システム。 - 前記利用状況には、前記充電装置に装着されたバッテリの充電容量を表す指標値と、前記充電装置に装着されたバッテリの個数と、時刻と、のうち少なくとも一つ以上が含まれる、
請求項1から6のうちいずれか一項に記載の電力予測システム。 - 前記利用環境には、前記充電装置が設置された地域の天候と、前記充電装置が設置された地域の気温と、日付と、曜日と、のうち少なくとも一つ以上が含まれる、
請求項1から7のうちいずれか一項に記載の電力予測システム。 - 電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信する受信部と、
前記受信部により受信された前記充電装置の前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する予測部と、
を備える電力予測装置。 - コンピュータが、
電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信するステップと、
前記受信した前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測するステップと、を含む、
電力予測方法。 - コンピュータに、
電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信するステップと、
前記受信した前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測するステップと、
を実行させるためのプログラム。 - 請求項11に記載のプログラムを格納したコンピュータ読み取り可能な記憶媒体。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018143636 | 2018-07-31 | ||
JP2018143636 | 2018-07-31 | ||
PCT/JP2019/030034 WO2020027202A1 (ja) | 2018-07-31 | 2019-07-31 | 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPWO2020027202A1 true JPWO2020027202A1 (ja) | 2020-08-06 |
JP7058718B2 JP7058718B2 (ja) | 2022-04-22 |
Family
ID=69231816
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020506381A Active JP7058718B2 (ja) | 2018-07-31 | 2019-07-31 | 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 |
Country Status (5)
Country | Link |
---|---|
US (1) | US11545829B2 (ja) |
EP (1) | EP3832583A4 (ja) |
JP (1) | JP7058718B2 (ja) |
CN (1) | CN112513916A (ja) |
WO (1) | WO2020027202A1 (ja) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11932633B2 (en) | 2018-05-07 | 2024-03-19 | Mirati Therapeutics, Inc. | KRas G12C inhibitors |
WO2020146613A1 (en) | 2019-01-10 | 2020-07-16 | Mirati Therapeutics, Inc. | Kras g12c inhibitors |
EP4021444A4 (en) | 2019-08-29 | 2023-01-04 | Mirati Therapeutics, Inc. | G12D KRAS INHIBITORS |
CA3152025A1 (en) | 2019-09-24 | 2021-04-01 | David BRIERE | Combination therapies |
CN115135315A (zh) | 2019-12-20 | 2022-09-30 | 米拉蒂治疗股份有限公司 | Sos1抑制剂 |
WO2021149467A1 (ja) * | 2020-01-23 | 2021-07-29 | パナソニックIpマネジメント株式会社 | 蓄電パックの認証方法、蓄電パック、充電装置、電動移動体、及び電動移動体の制御装置 |
CN112465195A (zh) * | 2020-11-12 | 2021-03-09 | 广东电网有限责任公司广州供电局 | 考虑高比例分布式光伏接入的母线负荷预测方法及系统 |
US11605966B2 (en) * | 2020-12-02 | 2023-03-14 | Dish Network L.L.C. | Anticipatory event based battery charging |
WO2022191233A1 (ja) | 2021-03-10 | 2022-09-15 | 本田技研工業株式会社 | 電力装置及びその制御方法 |
US20220335546A1 (en) * | 2021-04-20 | 2022-10-20 | Volta Charging, Llc | System and method for estimating electric vehicle charging station demand at specific points of interest |
CN113537607B (zh) * | 2021-07-23 | 2022-08-05 | 国网青海省电力公司信息通信公司 | 停电预测方法 |
US11572183B1 (en) | 2022-01-13 | 2023-02-07 | Beta Air, Llc | Apparatuses and methods for preconditioning a power source of an electric aircraft |
CN117937550B (zh) * | 2024-03-25 | 2024-08-02 | 宁波市电力设计院有限公司 | 一种综合能源储能系统优化调度方法和系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4164996B2 (ja) * | 2000-01-05 | 2008-10-15 | 日産自動車株式会社 | 電力マネジメントシステム |
JP2015156748A (ja) * | 2014-02-20 | 2015-08-27 | 株式会社オートネットワーク技術研究所 | 電気自動車のバッテリー管理装置 |
WO2016143384A1 (ja) * | 2015-03-12 | 2016-09-15 | オムロン株式会社 | 過不足判定装置、その制御方法、制御プログラム、および記録媒体 |
JP2018088742A (ja) * | 2016-11-28 | 2018-06-07 | アイフォーコムホールディングス株式会社 | エネルギ需要予測システム |
Family Cites Families (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3935099B2 (ja) * | 2003-04-15 | 2007-06-20 | 株式会社デンソー | 車両用蓄電装置の内部状態検出システム |
KR100880717B1 (ko) * | 2005-02-14 | 2009-02-02 | 가부시키가이샤 덴소 | 뉴럴네트워크연산에 기초한 2차전지의 충전상태를 검출하기위한 방법 및 장치 |
JP2011172315A (ja) | 2010-02-16 | 2011-09-01 | Toyota Motor Corp | 電力供給装置及び電力供給システム |
JP5565104B2 (ja) * | 2010-05-28 | 2014-08-06 | トヨタ自動車株式会社 | 情報提供システム |
US9129461B2 (en) | 2011-07-26 | 2015-09-08 | Gogoro Inc. | Apparatus, method and article for collection, charging and distributing power storage devices, such as batteries |
EP2737600B1 (en) | 2011-07-26 | 2018-10-03 | Gogoro Inc. | Apparatus, method and article for redistributing power storage devices, such as batteries, between collection, charging and distribution machines |
JP5861107B2 (ja) * | 2011-09-27 | 2016-02-16 | パナソニックIpマネジメント株式会社 | 電力供給装置、電力供給方法、制御装置、プログラム |
US9459323B2 (en) * | 2011-11-08 | 2016-10-04 | Hitachi Chemical Company, Ltd. | Battery-state monitoring system |
JP6108148B2 (ja) * | 2012-05-30 | 2017-04-05 | 日本電気株式会社 | 情報処理装置、情報処理システム、情報処理システムの制御方法、情報処理方法、および情報処理プログラム |
KR101413291B1 (ko) * | 2012-10-10 | 2014-06-27 | 한전케이디엔주식회사 | 전기 자동차의 배터리 충전 장치 및 방법 |
JP2015011576A (ja) * | 2013-06-28 | 2015-01-19 | 株式会社東芝 | 蓄電池駆動車両の運行システム |
WO2015056109A2 (en) * | 2013-08-06 | 2015-04-23 | Systemex-Energies International Inc. | Power control device |
WO2015075794A1 (ja) | 2013-11-20 | 2015-05-28 | 株式会社 東芝 | 電力需要予測システム、電力需要予測方法、需要家プロファイリングシステム、及び需要家プロファイリング方法 |
JP2015171189A (ja) * | 2014-03-05 | 2015-09-28 | 清水建設株式会社 | 充放電管理装置、充放電管理方法及びプログラム |
JP2016116401A (ja) * | 2014-12-17 | 2016-06-23 | 株式会社ピューズ | 電力負荷平準化装置 |
WO2016143382A1 (ja) | 2015-03-11 | 2016-09-15 | 富士電機株式会社 | 内部電源回路および半導体装置 |
JP6549896B2 (ja) * | 2015-05-20 | 2019-07-24 | 一般財団法人電力中央研究所 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
DE112015006704B4 (de) * | 2015-07-15 | 2024-04-25 | Honda Motor Co., Ltd. | Lade/Entladevorrichtung und Lade/Entladesteuerungsverfahren |
US10614146B2 (en) * | 2015-12-17 | 2020-04-07 | Siemens Aktiengesellschaft | Adaptive demand response method using batteries with commercial buildings for grid stability and sustainable growth |
CN106021923A (zh) * | 2016-05-19 | 2016-10-12 | 江苏理工学院 | 纯电动汽车动力电池荷电状态预测方法及预测系统 |
JP6605416B2 (ja) * | 2016-08-26 | 2019-11-13 | 三菱電機ビルテクノサービス株式会社 | 電力管理システム、電力管理方法、アグリゲータシステム、需要家電力管理システム、及びプログラム |
JP6764769B2 (ja) | 2016-11-22 | 2020-10-07 | 株式会社竹中工務店 | 電力供給制御装置、電力供給制御プログラム、電力料金設定システム |
US20200023747A1 (en) * | 2017-02-22 | 2020-01-23 | Iotecha Corp. | Method and Apparatus for Charging a Battery From an Isolatable Electric Power Grid |
JP2018143636A (ja) | 2017-03-08 | 2018-09-20 | 国立大学法人九州大学 | 反応管及び空気浄化装置 |
US20190033385A1 (en) * | 2017-07-28 | 2019-01-31 | Northstar Battery Company, Llc | Systems and methods for determining a state of charge of a disconnected battery |
JP7214339B2 (ja) | 2017-09-29 | 2023-01-30 | 本田技研工業株式会社 | 可搬型充電給電装置 |
-
2019
- 2019-07-31 JP JP2020506381A patent/JP7058718B2/ja active Active
- 2019-07-31 WO PCT/JP2019/030034 patent/WO2020027202A1/ja unknown
- 2019-07-31 US US17/263,165 patent/US11545829B2/en active Active
- 2019-07-31 EP EP19844626.2A patent/EP3832583A4/en not_active Ceased
- 2019-07-31 CN CN201980049950.4A patent/CN112513916A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4164996B2 (ja) * | 2000-01-05 | 2008-10-15 | 日産自動車株式会社 | 電力マネジメントシステム |
JP2015156748A (ja) * | 2014-02-20 | 2015-08-27 | 株式会社オートネットワーク技術研究所 | 電気自動車のバッテリー管理装置 |
WO2016143384A1 (ja) * | 2015-03-12 | 2016-09-15 | オムロン株式会社 | 過不足判定装置、その制御方法、制御プログラム、および記録媒体 |
JP2018088742A (ja) * | 2016-11-28 | 2018-06-07 | アイフォーコムホールディングス株式会社 | エネルギ需要予測システム |
Also Published As
Publication number | Publication date |
---|---|
JP7058718B2 (ja) | 2022-04-22 |
US20210194244A1 (en) | 2021-06-24 |
EP3832583A4 (en) | 2021-12-08 |
US11545829B2 (en) | 2023-01-03 |
WO2020027202A1 (ja) | 2020-02-06 |
CN112513916A (zh) | 2021-03-16 |
EP3832583A1 (en) | 2021-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7058718B2 (ja) | 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 | |
JP7217277B2 (ja) | 推定システム、推定装置、推定方法、プログラム、及び記憶媒体 | |
WO2012004897A1 (ja) | 情報提供装置および情報提供方法 | |
KR101413291B1 (ko) | 전기 자동차의 배터리 충전 장치 및 방법 | |
JP6970628B2 (ja) | 自律走行車、走行制御装置、走行制御方法、及び制御プログラム | |
WO2020166602A1 (ja) | 充電装置、充電方法、プログラム、及び記憶媒体 | |
CN113306448A (zh) | 充电提示方法、装置、设备及存储介质 | |
WO2020258206A1 (en) | Secure and efficient computing sharing for electric automobiles | |
US11511646B2 (en) | Management apparatus, management method, and program | |
JP7171537B2 (ja) | バッテリ交換システム、管理装置、管理方法、およびプログラム | |
JP7029020B2 (ja) | 情報処理装置、情報処理方法、サービスシステム、プログラム、及び記憶媒体 | |
JP2022157359A (ja) | 情報処理方法 | |
JP2021189640A (ja) | 情報処理装置、情報処理方法、およびプログラム | |
JPWO2020171056A1 (ja) | 保管装置、推定装置、保管方法、プログラム、及び記憶媒体 | |
WO2020027113A1 (ja) | 充電状態マップ生成システム、サーバ装置、マップ生成方法、コンピュータプログラム及び記録媒体 | |
US20230219449A1 (en) | Server apparatus, system, and operating method | |
CN108229708B (zh) | 基于无人机的预约充电方法和装置 | |
JPWO2020027087A1 (ja) | 案内システム、サーバ装置、案内方法、コンピュータプログラム及び記憶媒体 | |
CN114389324B (zh) | 服务器、充电系统以及存储介质 | |
WO2023187875A1 (ja) | 情報提供装置、情報提供方法、およびプログラム | |
JP7319795B2 (ja) | 情報提供装置、情報提供方法、及びプログラム | |
WO2024024010A1 (ja) | 料金請求システム、料金請求方法、およびプログラム | |
WO2024069922A1 (ja) | 管理装置、管理方法、およびプログラム | |
US20230012850A1 (en) | Control device, disaster support system, and storage medium | |
WO2021005709A1 (ja) | 情報提供装置、情報提供方法、およびプログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200205 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200205 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20200205 |
|
A975 | Report on accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A971005 Effective date: 20200527 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200630 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200831 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20201201 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210225 |
|
C60 | Trial request (containing other claim documents, opposition documents) |
Free format text: JAPANESE INTERMEDIATE CODE: C60 Effective date: 20210225 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20210305 |
|
C21 | Notice of transfer of a case for reconsideration by examiners before appeal proceedings |
Free format text: JAPANESE INTERMEDIATE CODE: C21 Effective date: 20210309 |
|
A912 | Re-examination (zenchi) completed and case transferred to appeal board |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20210430 |
|
C211 | Notice of termination of reconsideration by examiners before appeal proceedings |
Free format text: JAPANESE INTERMEDIATE CODE: C211 Effective date: 20210511 |
|
C22 | Notice of designation (change) of administrative judge |
Free format text: JAPANESE INTERMEDIATE CODE: C22 Effective date: 20210810 |
|
C22 | Notice of designation (change) of administrative judge |
Free format text: JAPANESE INTERMEDIATE CODE: C22 Effective date: 20211102 |
|
C13 | Notice of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: C13 Effective date: 20211124 |
|
C302 | Record of communication |
Free format text: JAPANESE INTERMEDIATE CODE: C302 Effective date: 20220113 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220119 |
|
C23 | Notice of termination of proceedings |
Free format text: JAPANESE INTERMEDIATE CODE: C23 Effective date: 20220208 |
|
C03 | Trial/appeal decision taken |
Free format text: JAPANESE INTERMEDIATE CODE: C03 Effective date: 20220315 |
|
C30A | Notification sent |
Free format text: JAPANESE INTERMEDIATE CODE: C3012 Effective date: 20220315 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20220412 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7058718 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |