JP6549896B2 - 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム - Google Patents
電力需要調整装置、電力需要調整方法及び電力需要調整プログラム Download PDFInfo
- Publication number
- JP6549896B2 JP6549896B2 JP2015102495A JP2015102495A JP6549896B2 JP 6549896 B2 JP6549896 B2 JP 6549896B2 JP 2015102495 A JP2015102495 A JP 2015102495A JP 2015102495 A JP2015102495 A JP 2015102495A JP 6549896 B2 JP6549896 B2 JP 6549896B2
- Authority
- JP
- Japan
- Prior art keywords
- power demand
- charge
- load factor
- information
- storage battery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/14—Energy storage units
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Description
2 需要家
3 上位系
4 配電線
10 電力需要調整装置
11 負荷率算出部
12 DR情報作成部
13 通信制御部
14 DR情報抽出部
15 充放電計画作成部
20 需要家端末
21 充放電計画作成部
22 蓄電池
23 監視センサ
200 コミュニティ
Claims (8)
- 蓄電池の充放電に対するインセンティブの情報を含むデマンドレスポンス情報を用いない状態での、予め決められた複数の需要家が属するコミュニティにおける第1の翌日の電力需要予測を取得し、前記第1の翌日の電力需要予測及び前記コミュニティにおける翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め、求めた前記第2の翌日の電力需要予測から前記コミュニティの翌日の負荷率を算出する処理を行う負荷率算出部と、
前記負荷率算出部により求められた最新の第2の翌日の電力需要予測を基に前記デマンドレスポンス情報を作成する情報作成部と、
前記情報作成部により作成された最新の前記デマンドレスポンス情報を基に作成された前記翌日の蓄電池の充放電計画を取得し前記負荷率算出部へ送信する取得部と、
前記負荷率算出部が前記処理を所定回数繰り返した後に、前記処理毎に前記情報作成部が作成した前記デマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各前記需要家に通知する通知部と
を備えたことを特徴とする電力需要調整装置。 - 前記通知部は、前記負荷率算出部により算出された前記負荷率の中で最高の負荷率に対応する前記デマンドレスポンス情報を抽出することを特徴とする請求項1に記載の電力需要調整装置。
- 前記負荷率算出部は、1回目の処理では、前記第1の翌日の電力需要の推定値を基に、第2の翌日の電力需要予測を求め且つ前記負荷率を算出し、2回目以降の処理では、前記第1の翌日の電力需要の推定値に加えて、前記取得部が作成した前記翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め且つ前記負荷率を算出することを特徴とする請求項1又は2に記載の電力需要調整装置。
- 前記取得部は、前記需要家毎の前記充放電計画を作成し、
前記負荷率算出部は、前記翌日の電力需要及び各前記需要家の前記充放電計画を基に、前記第2の翌日の電力需要予測を求め且つ前記負荷率を算出することを特徴とする請求項1〜3のいずれか一つに記載の電力需要調整装置。 - 予め決められた1又は複数の仮想的な需要家群に関する仮想充放電計画を作成する仮想計画作成部をさらに備え、
前記取得部は、前記仮想計画作成部から前記仮想充放電計画を取得して、取得した前記仮想充放電計画を前記充放電計画として前記負荷率算出部へ送信する
ことを特徴とする請求項1〜3のいずれか一つに記載の電力需要調整装置。 - 前記取得部は、前記需要家の平均である平均需要家、前記平均需要家よりも需要が大きい大需要家及び前記平均需要家よりも需要が小さい小需要家の前記充放電計画を作成することを特徴とする請求項5に記載の電力需要調整装置。
- 蓄電池の充放電に対するインセンティブの情報を含むデマンドレスポンス情報を用いない状態での、予め決められた複数の需要家が属するコミュニティにおける第1電力需要予測を取得する取得ステップと、
前記第1電力需要予測及び前記コミュニティにおける翌日の蓄電池の充放電計画を基に第2電力需要予測を求め、求めた前記第2電力需要予測から前記コミュニティの翌日の負荷率を算出する算出ステップと、
前記算出ステップにより算出された前記負荷率を基に、前記デマンドレスポンス情報を作成する情報作成ステップと、
前記情報作成ステップにより作成された前記デマンドレスポンス情報を基に作成された前記翌日の蓄電池の充放電計画を取得する計画取得ステップと、
前記算出ステップ、前記情報作成ステップ及び前記計画取得ステップを所定回数繰り返す繰返ステップと、
前記情報作成ステップにおいて作成された前記デマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各前記需要家に通知する通知ステップと
を備えたことを特徴とする電力需要調整方法。 - 蓄電池の充放電に対するインセンティブの情報を含むデマンドレスポンス情報を用いない状態での、予め決められた複数の需要家が属するコミュニティにおける第1電力需要予測を取得する取得工程と、
前記第1電力需要予測及び前記コミュニティにおける翌日の蓄電池の充放電計画を基に第2電力需要予測を求め、求めた前記第2電力需要予測から前記コミュニティの翌日の負荷率を算出する算出工程と、
前記算出工程により算出された前記負荷率を基に、前記デマンドレスポンス情報を作成する情報作成工程と、
前記情報作成工程により作成された前記デマンドレスポンス情報を基に作成された前記翌日の蓄電池の充放電計画を取得する計画取得工程と、
前記算出工程、前記情報作成工程及び前記計画取得工程を所定回数繰り返す繰返工程と、
前記情報作成工程により作成された前記デマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各前記需要家に通知する通知工程と
をコンピュータに実行させることを特徴とする電力需要調整プログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015102495A JP6549896B2 (ja) | 2015-05-20 | 2015-05-20 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015102495A JP6549896B2 (ja) | 2015-05-20 | 2015-05-20 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016220384A JP2016220384A (ja) | 2016-12-22 |
JP6549896B2 true JP6549896B2 (ja) | 2019-07-24 |
Family
ID=57581776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015102495A Active JP6549896B2 (ja) | 2015-05-20 | 2015-05-20 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6549896B2 (ja) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7092558B2 (ja) * | 2018-05-30 | 2022-06-28 | 一般財団法人電力中央研究所 | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム |
US11545829B2 (en) * | 2018-07-31 | 2023-01-03 | Honda Motor Co., Ltd. | Power prediction system, power prediction device, power prediction method, program, and storage medium |
US10903652B2 (en) * | 2019-02-13 | 2021-01-26 | Abb Power Grids Switzerland Ag | Control architectures for power distribution networks with distributed energy resource |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011254617A (ja) * | 2010-06-02 | 2011-12-15 | Tokyo Electric Power Co Inc:The | 充電制御システムおよび充電制御方法 |
JP6097592B2 (ja) * | 2013-01-30 | 2017-03-15 | 積水化学工業株式会社 | 地域内電力需給制御システム |
-
2015
- 2015-05-20 JP JP2015102495A patent/JP6549896B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP2016220384A (ja) | 2016-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nojavan et al. | Optimal bidding and offering strategies of merchant compressed air energy storage in deregulated electricity market using robust optimization approach | |
Liu et al. | Bidding strategy for microgrid in day-ahead market based on hybrid stochastic/robust optimization | |
Sadati et al. | Smart distribution system operational scheduling considering electric vehicle parking lot and demand response programs | |
Nojavan et al. | Application of fuel cell and electrolyzer as hydrogen energy storage system in energy management of electricity energy retailer in the presence of the renewable energy sources and plug-in electric vehicles | |
Mazidi et al. | Integrated scheduling of renewable generation and demand response programs in a microgrid | |
Yao et al. | Residential demand side management under high penetration of rooftop photovoltaic units | |
CN105684257B (zh) | 用于控制微电网的操作的微电网能量管理系统和方法 | |
Moazeni et al. | Mean-conditional value-at-risk optimal energy storage operation in the presence of transaction costs | |
Oskouei et al. | Scenario-based stochastic optimal operation of wind, photovoltaic, pump-storage hybrid system in frequency-based pricing | |
Mazidi et al. | Design of a risk-averse decision making tool for smart distribution network operators under severe uncertainties: An IGDT-inspired augment ε-constraint based multi-objective approach | |
Hossan et al. | Integrated CVR and demand response framework for advanced distribution management systems | |
US20140005852A1 (en) | Reduction of operational cost using energy storage management and demand response | |
Bendato et al. | Design criteria for the optimal sizing of integrated photovoltaic-storage systems | |
JP6042184B2 (ja) | エネルギー管理システム、エネルギー管理方法、プログラム、サーバ装置およびローカルサーバ | |
JP6543145B2 (ja) | ピーク電力予測装置、電力管理システム及びピーク電力予測方法 | |
Hartmann et al. | Evaluation of business possibilities of energy storage at commercial and industrial consumers–A case study | |
Xu et al. | Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation | |
US9727929B2 (en) | Energy management system, energy management method, program, server apparatus, and local server | |
Johnson et al. | Optimal placement, sizing, and dispatch of multiple BES systems on UK low voltage residential networks | |
Solano et al. | Impact of fixed charges on the viability of self-consumption photovoltaics | |
Barsali et al. | Optimised operation of storage systems integrated with MV photovoltaic plants, considering the impact on the battery lifetime | |
KR20210100699A (ko) | 하이브리드 발전소 | |
JP6549896B2 (ja) | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム | |
JP6069738B2 (ja) | 充放電制御システム、充放電制御方法、および充放電制御プログラム | |
Elazab et al. | Optimal techno-economic feasibility analysis of a grid-tied microgrid considering demand response strategy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180302 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20181214 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190205 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190329 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190416 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190613 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190625 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190628 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6549896 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |