JP7092558B2 - 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム - Google Patents
電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム Download PDFInfo
- Publication number
- JP7092558B2 JP7092558B2 JP2018103364A JP2018103364A JP7092558B2 JP 7092558 B2 JP7092558 B2 JP 7092558B2 JP 2018103364 A JP2018103364 A JP 2018103364A JP 2018103364 A JP2018103364 A JP 2018103364A JP 7092558 B2 JP7092558 B2 JP 7092558B2
- Authority
- JP
- Japan
- Prior art keywords
- incentive
- demand curve
- next day
- demand
- target
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 30
- 230000005611 electricity Effects 0.000 claims description 17
- 238000007599 discharging Methods 0.000 claims description 16
- 230000008569 process Effects 0.000 claims description 5
- 238000012545 processing Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 16
- 230000007423 decrease Effects 0.000 description 6
- 238000005259 measurement Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 230000004044 response Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 230000035945 sensitivity Effects 0.000 description 2
- 230000008685 targeting Effects 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
図9は、電力需要調整装置のハードウェア構成図である。電力需要調整装置100は、CPU(Central Processing Unit)91、メモリ92、ハードディスク93及びネットワークインタフェース94を有する。CPU91は、バスにより、メモリ92、ハードディスク93及びネットワークインタフェース94と接続される。
15 配電用変電所
16 SVR
100 電力需要調整装置
101 データ取得部
102 目標需要カーブ作成部
103 インセンティブ決定部
104 インセンティブ通知部
200 HEMS
201 充放電計画作成部
202 蓄電池
Claims (7)
- 蓄電池による充放電に対するインセンティブが与えられない状態の前記蓄電池の翌日運用計画を需要家が保有する充放電制御装置から取得するデータ取得部と、
前記データ取得部により取得された前記翌日運用計画を基に前記インセンティブが与えられない状態の需要カーブを求め、前記需要カーブ及び前記翌日運用計画を基に、翌日の所定時間において前記需要カーブで表される電力需要を平準化した目標需要カーブを求める目標需要カーブ作成部と、
前記目標需要カーブ作成部により作成された前記目標需要カーブと前記需要カーブとの差を基に、前記所定時間における時間帯毎の翌日インセンティブを決定するインセンティブ決定部と、
前記インセンティブ決定部により決定された前記翌日インセンティブを前記充放電制御装置に通知する通知部と
を備えたことを特徴とする電力需要調整装置。 - 前記目標需要カーブ作成部は、前記所定時間における前記翌日運用計画に含まれる充電電力量及び放電電力量を維持するように前記目標需要カーブを決定することを特徴とする請求項1に記載の電力需要調整装置。
- 前記目標需要カーブ作成部は、前記所定時間における前記需要カーブで表される電力需要の積算量と前記所定時間における前記目標需要カーブで表される電力需要の積算量とが一致するように前記目標需要カーブを作成することを特徴とする請求項1又は2に記載の電力需要調整装置。
- 前記インセンティブ決定部は、前記目標需要カーブと前記需要カーブとの差を基に各前記時間帯における充放電の目標値を決定し、各前記時間帯において前記蓄電池からの充放電が決定した目標値となる場合に最大インセンティブを与えることを特徴とする請求項1~3のいずれか一つに記載の電力需要調整装置。
- 電力需要調整装置及び充放電制御装置を有する電力需要調整システムであって、
前記電力需要調整装置は、
蓄電池による充放電に対するインセンティブが与えられない状態の前記蓄電池の第1翌日運用計画を前記充放電制御装置から取得するデータ取得部と、
前記データ取得部により取得された前記第1翌日運用計画を基に前記インセンティブが与えられない状態の需要カーブを求め、前記需要カーブ及び前記第1翌日運用計画を基に、翌日の所定時間において前記需要カーブで表される電力需要を平準化した目標需要カーブを求める目標需要カーブ作成部と、
前記目標需要カーブ作成部により作成された前記目標需要カーブと前記需要カーブとの差を基に、前記所定時間における時間帯毎の翌日インセンティブを決定するインセンティブ決定部と、
前記インセンティブ決定部により決定された前記翌日インセンティブを前記充放電制御装置に通知する通知部とを備え、
前記充放電制御装置は、
予め決められた時間毎の電気料金を基に前記第1翌日運用計画を作成して前記データ取得部へ送信し、前記電気料金及び前記通知部から通知された前記翌日インセンティブを基に第2翌日運用計画を作成する計画作成部と、
前記計画作成部により作成された前記第2翌日運用計画を基に、翌日の前記蓄電池の充放電を制御する充放電制御部とを備えた
ことを特徴とする電力需要調整システム。 - 蓄電池による充放電に対するインセンティブが与えられない状態の前記蓄電池の翌日運用計画を需要家が保有する充放電制御装置から取得し、
前記翌日運用計画を基に前記インセンティブが与えられない状態の需要カーブを求め、
前記需要カーブ及び前記翌日運用計画を基に、翌日の所定時間において前記需要カーブで表される電力需要を平準化した目標需要カーブを求め、
前記目標需要カーブと前記需要カーブとの差を基に、前記所定時間における時間帯毎の翌日インセンティブを決定し、
決定した前記翌日インセンティブを前記充放電制御装置に通知する
処理をコンピュータに実行させることを特徴とする電力需要調整方法。 - 蓄電池による充放電に対するインセンティブが与えられない状態の前記蓄電池の翌日運用計画を需要家が保有する充放電制御装置から取得し、
前記翌日運用計画を基に前記インセンティブが与えられない状態の需要カーブを求め、
前記需要カーブ及び前記翌日運用計画を基に、翌日の所定時間において前記需要カーブで表される電力需要を平準化した目標需要カーブを求め、
前記目標需要カーブと前記需要カーブとの差を基に、前記所定時間における時間帯毎の翌日インセンティブを決定し、
決定した前記翌日インセンティブを前記充放電制御装置に通知する
処理をコンピュータに実行させることを特徴とする電力需要調整プログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018103364A JP7092558B2 (ja) | 2018-05-30 | 2018-05-30 | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018103364A JP7092558B2 (ja) | 2018-05-30 | 2018-05-30 | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2019207609A JP2019207609A (ja) | 2019-12-05 |
JP7092558B2 true JP7092558B2 (ja) | 2022-06-28 |
Family
ID=68767770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018103364A Active JP7092558B2 (ja) | 2018-05-30 | 2018-05-30 | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7092558B2 (ja) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113449929B (zh) * | 2021-07-16 | 2023-01-20 | 南方电网数字电网研究院有限公司 | 电力负荷分配方法、装置、计算机设备和存储介质 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013046451A (ja) | 2011-08-23 | 2013-03-04 | Hitachi Ltd | 電力系統の負荷平準化システム |
JP2015014935A (ja) | 2013-07-05 | 2015-01-22 | 日本電気株式会社 | 電力制御システム及び電力制御方法 |
JP2016085531A (ja) | 2014-10-23 | 2016-05-19 | トヨタ自動車株式会社 | 電力供給管理システム |
JP2016092844A (ja) | 2014-10-29 | 2016-05-23 | 中国電力株式会社 | 電力系統制御システム、電力系統制御システムの制御方法 |
JP2016220384A (ja) | 2015-05-20 | 2016-12-22 | 一般財団法人電力中央研究所 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
-
2018
- 2018-05-30 JP JP2018103364A patent/JP7092558B2/ja active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013046451A (ja) | 2011-08-23 | 2013-03-04 | Hitachi Ltd | 電力系統の負荷平準化システム |
JP2015014935A (ja) | 2013-07-05 | 2015-01-22 | 日本電気株式会社 | 電力制御システム及び電力制御方法 |
JP2016085531A (ja) | 2014-10-23 | 2016-05-19 | トヨタ自動車株式会社 | 電力供給管理システム |
JP2016092844A (ja) | 2014-10-29 | 2016-05-23 | 中国電力株式会社 | 電力系統制御システム、電力系統制御システムの制御方法 |
JP2016220384A (ja) | 2015-05-20 | 2016-12-22 | 一般財団法人電力中央研究所 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
Non-Patent Citations (1)
Title |
---|
スマートコミュニティの自律運用による配電系統への影響評価,電力中央研究所報告 研究報告:R15013,[online],2016年06月30日,https://criepi.denken.or.jp/hokokusho/pb/reportDownload?reportNoUkCode=R15013&tenpuTypeCode=30&seqNo=1&reportId=8686,[2021年11月12日検索] |
Also Published As
Publication number | Publication date |
---|---|
JP2019207609A (ja) | 2019-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Bidding strategy for microgrid in day-ahead market based on hybrid stochastic/robust optimization | |
JP6216377B2 (ja) | 電力調整装置、電力調整方法、電力調整システム、蓄電装置、サーバ、プログラム | |
Ranaweera et al. | Optimization of operational cost for a grid-supporting PV system with battery storage | |
Khodaei et al. | SCUC with hourly demand response considering intertemporal load characteristics | |
Ghofrani et al. | A framework for optimal placement of energy storage units within a power system with high wind penetration | |
EP3028358B1 (en) | Microgrid energy management system and method for controlling operation of a microgrid | |
US9098817B2 (en) | Method for real-time control of energy storage units to reduce electricity cost | |
JP6592454B2 (ja) | 電力制御システム、電力制御方法及びプログラム | |
Colson et al. | Improving sustainability of hybrid energy systems part II: Managing multiple objectives with a multiagent system | |
Mills | Strategies for mitigating the reduction in economic value of variable generation with increasing penetration levels | |
Bassett et al. | Energy arbitrage and market opportunities for energy storage facilities in Ontario | |
Pelzer et al. | Energy arbitrage through smart scheduling of battery energy storage considering battery degradation and electricity price forecasts | |
Choobineh et al. | Emergency electric service restoration in the aftermath of a natural disaster | |
Ghiani et al. | Optimal sizing and management of a smart Microgrid for prevailing self-consumption | |
KR20210100699A (ko) | 하이브리드 발전소 | |
Jordehi et al. | A two-stage stochastic model for security-constrained market clearing with wind power plants, storage systems and elastic demands | |
Grijalva et al. | Large-scale integration of wind generation including network temporal security analysis | |
Aziz et al. | Issues and mitigations of wind energy penetrated network: Australian network case study | |
Hashmi | Optimization and control of storage in smart grids | |
JP7092558B2 (ja) | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム | |
JP6549896B2 (ja) | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム | |
Monroy et al. | Energy storage effects on day-ahead operation of power systems with high wind penetration | |
Chengquan et al. | Dynamic optimal power flow including energy storage with adaptive operation costs | |
JP2018174623A (ja) | 電力管理装置、申請発電量算出方法 | |
Deboever et al. | Optimal scheduling of large-scale price-maker energy storage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20210201 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20211028 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20211124 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220113 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20220607 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20220616 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7092558 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |