JP6344010B2 - 生産計画作成支援プログラム、生産計画作成支援方法および生産計画作成支援装置 - Google Patents
生産計画作成支援プログラム、生産計画作成支援方法および生産計画作成支援装置 Download PDFInfo
- Publication number
- JP6344010B2 JP6344010B2 JP2014070541A JP2014070541A JP6344010B2 JP 6344010 B2 JP6344010 B2 JP 6344010B2 JP 2014070541 A JP2014070541 A JP 2014070541A JP 2014070541 A JP2014070541 A JP 2014070541A JP 6344010 B2 JP6344010 B2 JP 6344010B2
- Authority
- JP
- Japan
- Prior art keywords
- work
- production plan
- time
- creation support
- item
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims description 152
- 238000000034 method Methods 0.000 title claims description 29
- 238000000605 extraction Methods 0.000 claims description 49
- 239000000284 extract Substances 0.000 claims description 27
- 230000008859 change Effects 0.000 claims description 21
- 230000008569 process Effects 0.000 claims description 20
- 238000010586 diagram Methods 0.000 description 24
- 230000007704 transition Effects 0.000 description 16
- 238000003860 storage Methods 0.000 description 11
- 238000004891 communication Methods 0.000 description 8
- 239000000463 material Substances 0.000 description 8
- 230000003111 delayed effect Effects 0.000 description 6
- 230000006870 function Effects 0.000 description 4
- 238000002360 preparation method Methods 0.000 description 3
- 230000008094 contradictory effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1093—Calendar-based scheduling for persons or groups
- G06Q10/1097—Task assignment
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Description
実施例1に係るシステム10について説明する。図1は、システムの全体の概略構成の一例を示す図である。図1に示すように、システム10は、製品等の生産計画の作成を支援するシステムである。システム10は、生産計画作成支援装置11と、端末装置12とを有する。生産計画作成支援装置11と端末装置12は、各種の情報を交換することが可能とされている。例えば、生産計画作成支援装置11と端末装置12は、ネットワーク13を介して通信可能に接続され、各種の情報を交換することが可能とされている。かかるネットワーク13の一態様としては、有線または無線を問わず、携帯電話などの移動体通信、インターネット(Internet)、LAN(Local Area Network)やVPN(Virtual Private Network)などの任意の種類の通信網を採用できる。
次に、本実施例に係る生産計画作成支援装置11の構成について説明する。図2は、生産計画作成支援装置の機能的な構成の一例を示す図である。図2に示すように、生産計画作成支援装置11は、通信I/F(インタフェース)部20と、記憶部21と、制御部22とを有する。生産計画作成支援装置11は、図2に示した機能部以外にも既知の各種の機能部を有してもよい。例えば、生産計画作成支援装置11は、各種の情報を入力する入力部、各種情報を表示する表示部を有してもよい。
本実施例に係る生産計画作成支援装置11が作業の移動可能な時間帯を出力する出力処理の流れについて説明する。図12は、出力処理の手順の一例を示すフローチャートである。この出力処理は、所定のタイミング、例えば、生産計画画面60において作業オブジェクトが選択されたタイミングで実行される。
上述してきたように、本実施例に係る生産計画作成支援装置11は、生産計画に含まれる第一の作業を選択する入力を受け付けると、第一の作業の前に完了が必要な第二の作業の完了時刻と、第一の作業の完了の後に開始可能な第三の作業の開始時刻とを抽出する。生産計画作成支援装置11は、第二の作業の完了時刻と第三の作業の開始時刻との間であって、第一の作業の移動可能な時間帯を出力する。これにより、生産計画作成支援装置11は、制限条件を意識して生産計画の編集作業を行うことができる。
また、上記の実施例で説明した各種の処理は、あらかじめ用意されたプログラムをパーソナルコンピュータやワークステーションなどのコンピュータシステムで実行することによって実現することもできる。そこで、以下では、上記の実施例と同様の機能を有するプログラムを実行するコンピュータシステムの一例を説明する。図13は、生産計画作成支援プログラムを実行するコンピュータを示す図である。
11 生産計画作成支援装置
12 端末装置
21 記憶部
22 制御部
30 作業情報
31 品目構成情報
40 受付部
41 表示制御部
42 抽出部
43 出力部
Claims (6)
- 生産計画に含まれる第一の作業を選択する入力を受け付けると、前記生産計画での前記第一の作業に関する品目の在庫の推移に基づいて、在庫数が前記第一の作業に対応する所定数を下回らずに確保できる期間を抽出し、
抽出された前記期間のうち、前記第一の作業の移動可能な時間帯を出力する
処理をコンピュータに実行させる生産計画作成支援プログラム。 - 前記抽出する処理は、前記第一の作業が無いものとして、前記第一の作業で使用する使用部品の在庫数の推移、および、前記第一の作業で生産する生産部品の在庫数の推移を求め、前記第一の作業の現状の作業期間から前記使用部品の在庫数が前記第一の作業で使用する使用数以上の所定数を下回らない最も遅い時刻と、前記第一の作業の現状の作業期間から前記生産部品の在庫数が、前記第一の作業の完了の後に開始可能な作業で使用する使用数以上の所定数を下回らない最も遅い時刻とのうち、早い方の時刻を終了時刻として抽出し、
前記出力する処理は、前記第一の作業の移動可能な時間帯の終了時刻として、前記抽出された終了時刻を出力する
ことを特徴とする請求項1記載の生産計画作成支援プログラム。 - 前記抽出する処理は、前記第一の作業が無いものとして、前記第一の作業で使用する使用部品の在庫数の推移を求め、前記第一の作業の作業期間から前記使用部品の在庫数が前記第一の作業で使用する使用数以上の所定数を下回らない最も早い時刻を抽出し、
前記出力する処理は、前記第一の作業の移動可能な時間帯の開始時刻として、前記最も早い時刻を出力する
ことを特徴とする請求項1または2記載の生産計画作成支援プログラム。 - 前記抽出する処理は、前記第一の作業で使用する部品の在庫数が、前記第一の作業の現状の作業期間から前記所定数を下回らない範囲で最も早い時刻を抽出する
ことを特徴とする請求項3記載の生産計画作成支援プログラム。 - 生産計画に含まれる第一の作業を選択する入力を受け付けると、前記生産計画での前記第一の作業に関する品目の在庫の推移に基づいて、在庫数が前記第一の作業に対応する所定数を下回らずに確保できる期間を抽出し、
抽出された前記期間のうち、前記第一の作業の移動可能な時間帯を出力する
処理をコンピュータが実行する生産計画作成支援方法。 - 生産計画に含まれる第一の作業を選択する入力を受け付けると、前記生産計画での前記第一の作業に関する品目の在庫の推移に基づいて、在庫数が前記第一の作業に対応する所定数を下回らずに確保できる期間を抽出する抽出部と、
抽出された前記期間のうち、前記第一の作業の移動可能な時間帯を出力する出力部と、
を有する生産計画作成支援装置。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014070541A JP6344010B2 (ja) | 2014-03-28 | 2014-03-28 | 生産計画作成支援プログラム、生産計画作成支援方法および生産計画作成支援装置 |
US14/611,667 US20150278752A1 (en) | 2014-03-28 | 2015-02-02 | Production schedule planning support method and production schedule planning support apparatus |
CN201510082535.2A CN104951860A (zh) | 2014-03-28 | 2015-02-15 | 生产调度计划支持方法和生产调度计划支持设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014070541A JP6344010B2 (ja) | 2014-03-28 | 2014-03-28 | 生産計画作成支援プログラム、生産計画作成支援方法および生産計画作成支援装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2015191633A JP2015191633A (ja) | 2015-11-02 |
JP6344010B2 true JP6344010B2 (ja) | 2018-06-20 |
Family
ID=54166498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014070541A Active JP6344010B2 (ja) | 2014-03-28 | 2014-03-28 | 生産計画作成支援プログラム、生産計画作成支援方法および生産計画作成支援装置 |
Country Status (3)
Country | Link |
---|---|
US (1) | US20150278752A1 (ja) |
JP (1) | JP6344010B2 (ja) |
CN (1) | CN104951860A (ja) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9922507B2 (en) * | 2015-04-28 | 2018-03-20 | Ncr Corporation | Self-learning suppression of secondary barcodes |
JP6630065B2 (ja) * | 2015-06-05 | 2020-01-15 | アズビル株式会社 | スケジュール管理システムおよびスケジュール管理方法 |
JP6760985B2 (ja) | 2018-03-06 | 2020-09-23 | ファナック株式会社 | 稼働管理装置 |
CN111435496B (zh) * | 2019-01-14 | 2023-10-03 | 上海汽车集团股份有限公司 | 一种知识及项目管理方法及装置 |
CN112508390B (zh) * | 2020-12-02 | 2022-05-03 | 贵州航天云网科技有限公司 | 一种协同制造支撑系统及方法 |
Family Cites Families (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0300456A3 (en) * | 1987-07-24 | 1990-08-08 | Bruce H. Faaland | Improved scheduling method and system |
US5216612A (en) * | 1990-07-16 | 1993-06-01 | R. J. Reynolds Tobacco Company | Intelligent computer integrated maintenance system and method |
US5963919A (en) * | 1996-12-23 | 1999-10-05 | Northern Telecom Limited | Inventory management strategy evaluation system and method |
US6278901B1 (en) * | 1998-12-18 | 2001-08-21 | Impresse Corporation | Methods for creating aggregate plans useful in manufacturing environments |
US6594535B1 (en) * | 1999-01-11 | 2003-07-15 | Demand Flow Institute, Llc | Material and inventory control system for a demand flow process |
US6714915B1 (en) * | 1999-11-22 | 2004-03-30 | International Business Machines Corporation | System and method for project designing and developing a procurement and accounts payable system |
US7236976B2 (en) * | 2000-06-19 | 2007-06-26 | Aramark Corporation | System and method for scheduling events and associated products and services |
JP2002140110A (ja) * | 2000-11-02 | 2002-05-17 | Ibm Japan Ltd | 生産管理システム及び生産管理方法 |
JP2002259650A (ja) * | 2001-03-02 | 2002-09-13 | Mitsubishi Electric Corp | スケジュール調整方法、スケジュール管理方法、およびスケジュール管理装置 |
AU2003223789A1 (en) * | 2002-05-02 | 2003-11-17 | Manugistics, Inc. | Constraint-based production planning and scheduling |
US8290805B2 (en) * | 2004-09-13 | 2012-10-16 | Hirokazu Usui | Project management system |
JP4481188B2 (ja) * | 2005-02-15 | 2010-06-16 | 明治乳業株式会社 | 生産計画システム |
KR20060101220A (ko) * | 2005-03-15 | 2006-09-22 | 유한회사 티픽스 시스템즈 | 생산관리 시스템 |
US8589944B2 (en) * | 2005-03-16 | 2013-11-19 | Ricoh Production Print Solutions | Method and system for task mapping to iteratively improve task assignment in a heterogeneous computing system |
US8595041B2 (en) * | 2006-02-07 | 2013-11-26 | Sap Ag | Task responsibility system |
US20100010856A1 (en) * | 2006-02-08 | 2010-01-14 | Kim Huat David Chua | Method and system for constraint-based project scheduling |
WO2008005573A2 (en) * | 2006-07-07 | 2008-01-10 | Factory Physics, Inc. | Dynamic risk-based scheduling to optimize and integrate production with a supply chain |
US8185422B2 (en) * | 2006-07-31 | 2012-05-22 | Accenture Global Services Limited | Work allocation model |
EP1887498A1 (en) * | 2006-07-31 | 2008-02-13 | Accenture Global Services GmbH | Work allocation model |
US20080184640A1 (en) * | 2007-02-01 | 2008-08-07 | James Rhodes | Movable building and building foundation |
JP5166908B2 (ja) * | 2007-07-06 | 2013-03-21 | 株式会社神戸製鋼所 | スケジュール管理装置、方法及びプログラム |
JP2012032946A (ja) * | 2010-07-29 | 2012-02-16 | Jfe Steel Corp | 計画作成表示システム |
CN101944202A (zh) * | 2010-09-03 | 2011-01-12 | 昆明理工大学 | 一种基于准时制的炼钢生产计划时间并行顺推编制方法 |
CN103365710B (zh) * | 2012-03-31 | 2018-11-06 | 索尼公司 | 实时任务调度装置和方法以及计算机系统 |
-
2014
- 2014-03-28 JP JP2014070541A patent/JP6344010B2/ja active Active
-
2015
- 2015-02-02 US US14/611,667 patent/US20150278752A1/en not_active Abandoned
- 2015-02-15 CN CN201510082535.2A patent/CN104951860A/zh active Pending
Also Published As
Publication number | Publication date |
---|---|
JP2015191633A (ja) | 2015-11-02 |
US20150278752A1 (en) | 2015-10-01 |
CN104951860A (zh) | 2015-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6344010B2 (ja) | 生産計画作成支援プログラム、生産計画作成支援方法および生産計画作成支援装置 | |
JP6025154B2 (ja) | プロジェクトを管理するシステム、方法およびプログラム | |
US11170327B2 (en) | Dynamic production planning system and dynamic production planning device | |
US20150277405A1 (en) | Production plan display method, production plan support method, production plan display apparatus, production plan support apparatus, and recording medium | |
JP6357831B2 (ja) | 生産計画作成支援プログラム、生産計画作成支援方法および生産計画作成支援装置 | |
JP2014191604A5 (ja) | ||
US20150277693A1 (en) | Production plan preparation support method and production plan preparation support apparatus | |
JP5785864B2 (ja) | 製造ラインシミュレーション装置、データ入力支援装置、およびデータ入力支援方法 | |
JPWO2017098619A1 (ja) | 表示方法、表示プログラム及び表示制御装置 | |
JP6329038B2 (ja) | 情報処理装置、工程バッファ算出方法、およびプログラム | |
EP3009900B1 (en) | Dynamic recommendation of elements suitable for use in an engineering configuration | |
WO2020171211A1 (ja) | 情報処理装置および方法 | |
EP2985662A1 (en) | Automatic creation of hardware configuration in a distributed control system | |
CN111191999A (zh) | 产品研发管理方法、装置、计算机设备及存储介质 | |
JP7281886B2 (ja) | 3次元オブジェクトの設計プロセスを要約するアニメーションを作成する方法 | |
JP6626327B2 (ja) | ガントチャート生成プログラム、ガントチャート生成装置、および、ガントチャート生成方法 | |
US11947877B2 (en) | Anti-constraint configuration and enforcement for computer-aided design (CAD) models | |
JP2017156891A (ja) | 情報処理システム、情報処理装置、及び情報処理方法 | |
JP7477793B2 (ja) | 処理装置、処理方法および処理プログラム | |
JP6869453B2 (ja) | 情報処理装置、情報処理方法及び情報処理プログラム | |
EP3176738A1 (en) | Real-time visibility of a process lifecycle | |
JP7109250B2 (ja) | 作業台設計装置、作業台設計方法及びプログラム | |
JP2012238048A (ja) | 工程進捗管理装置、工程進捗管理方法および工程進捗管理プログラム | |
JP2015088043A (ja) | 情報処理装置、情報処理方法、及びそのプログラム | |
JP6076929B2 (ja) | 作業手順管理システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20161206 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170815 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170926 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20171127 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180424 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180507 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6344010 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |