JP3126315B2 - Method of knitting tubular knitted fabric having 2 × 1 rubber knitting structure - Google Patents

Method of knitting tubular knitted fabric having 2 × 1 rubber knitting structure

Info

Publication number
JP3126315B2
JP3126315B2 JP08286266A JP28626696A JP3126315B2 JP 3126315 B2 JP3126315 B2 JP 3126315B2 JP 08286266 A JP08286266 A JP 08286266A JP 28626696 A JP28626696 A JP 28626696A JP 3126315 B2 JP3126315 B2 JP 3126315B2
Authority
JP
Japan
Prior art keywords
needle
knitting
needles
knitted fabric
needle bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08286266A
Other languages
Japanese (ja)
Other versions
JPH10131001A (en
Inventor
治生 小杉
昌生 奥野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shima Seiki Manufacturing Ltd
Original Assignee
Shima Seiki Manufacturing Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to JP08286266A priority Critical patent/JP3126315B2/en
Application filed by Shima Seiki Manufacturing Ltd filed Critical Shima Seiki Manufacturing Ltd
Priority to KR1019970055676A priority patent/KR100469827B1/en
Priority to DE69721443T priority patent/DE69721443T2/en
Priority to CN97119940A priority patent/CN1104518C/en
Priority to ES97308606T priority patent/ES2192655T3/en
Priority to EP97308606A priority patent/EP0839940B1/en
Priority to US08/958,586 priority patent/US5873266A/en
Publication of JPH10131001A publication Critical patent/JPH10131001A/en
Application granted granted Critical
Publication of JP3126315B2 publication Critical patent/JP3126315B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B1/00Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes
    • D04B1/10Patterned fabrics or articles
    • D04B1/102Patterned fabrics or articles with stitch pattern
    • D04B1/106Patterned fabrics or articles with stitch pattern at a selvedge, e.g. hems or turned welts
    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B1/00Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes
    • D04B1/10Patterned fabrics or articles
    • D04B1/102Patterned fabrics or articles with stitch pattern
    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B1/00Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes
    • D04B1/22Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes specially adapted for knitting goods of particular configuration
    • D04B1/24Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes specially adapted for knitting goods of particular configuration wearing apparel
    • D04B1/246Upper torso garments, e.g. sweaters, shirts, leotards

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Knitting Of Fabric (AREA)
  • Knitting Machines (AREA)
  • Preliminary Treatment Of Fibers (AREA)
  • Treatment Of Fiber Materials (AREA)
  • Braiding, Manufacturing Of Bobbin-Net Or Lace, And Manufacturing Of Nets By Knotting (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、歯口を挟んで前後
に針床を配置せしめた横編機を使用して前側編地と後側
編地がその側端で繋がった筒状編地を2×1ゴム編みに
より編成する方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tubular knitted fabric in which a front knitted fabric and a rear knitted fabric are connected at their side ends by using a flat knitting machine having needle beds arranged in front and behind the tooth gap. Is knitted by 2 × 1 rubber knitting.

【0002】[0002]

【従来の技術】最近、横編機を使用して身頃及び袖を筒
状に編成するとともにこれらを編成中に一体化して編機
から外された状態で略完成品に近いセーターを生産する
方法が注目されている。横編機の前針床にセーターの袖
や身頃の前側部分を、後針床にその後側部分を係止した
状態で各部の両端部が繋がった概略筒状の編地が編成で
きる。上記方法により編成されたものは、縫製工程を不
要とするかあっても極僅かで済むため縫製に要する作業
の煩雑性を軽減できるというメリットがある。更にミシ
ンによる縫い合わせが不要なためニットの特性である伸
縮性を損なわれることがない。このような生産方式は、
セーターだけでなく種々のニット衣類に対しても採用で
きる。これらは一般に無縫製ニットと呼ばれ、本出願人
はこれまで特公平3−75656号公報、特公平3−1
6413、特公平4−15301号公報、特開平4−1
53346号公報を含め多数の発明を提案してきた。
2. Description of the Related Art Recently, a method of knitting a body and sleeves into a tubular shape using a flat knitting machine and integrating them into a knitting machine to produce a sweater almost similar to a finished product while being removed from the knitting machine. Is attracting attention. It is possible to knit a substantially tubular knitted fabric in which both ends of each part are connected to each other with the front part of the sweater sleeve and body fixed to the front needle bed of the flat knitting machine and the rear part fixed to the rear needle bed. The one knitted by the above method has an advantage that the necessity of the sewing step is unnecessary or very small, so that the complexity of the work required for the sewing can be reduced. Furthermore, since sewing by a sewing machine is unnecessary, the elasticity, which is a characteristic of the knit, is not impaired. Such a production system
It can be applied not only to sweaters but also to various knitted garments. These are generally called seamless knits, and the present applicant has heretofore disclosed Japanese Patent Publication No. 3-75656, Japanese Patent Publication No. 3-1.
6413, Japanese Patent Publication No. 4-15301, JP-A-4-14-1
A number of inventions have been proposed, including 53346.

【0003】本発明の主題に関連する筒状体にゴム編み
を編成する方法は上記特公平3−75656号公報や特
公平3−16413に開示される。特公平3−7565
6号公報は、前後に一対の針床を有する所謂、2枚ベッ
ド横編機により筒状体にゴム編みを編成するための基本
技術を開示したもので、これにより2枚ベッド横編機に
よる無縫製ニット衣類の製造が可能となった。特公平3
−16413は1×1ゴム編み編成される裾部分の伸縮
性を高める技術について開示する。2×1ゴム編みは上
記した1×1ゴム編みと同様に身頃や袖の裾部分に良く
利用される編み方であり、これらは伸縮性を要求され
る。しかし、裾ゴム等に使用される2×1ゴム編みを筒
状に編成する方法を開示したものはない。
A method of knitting a rubber knit on a cylindrical body related to the subject of the present invention is disclosed in the above-mentioned Japanese Patent Publication No. 3-75656 and Japanese Patent Publication No. 3-16413. Tokuhei 3-7565
No. 6 discloses a basic technique for knitting rubber knitting on a tubular body by a so-called two-bed flat knitting machine having a pair of needle beds at the front and back, and thereby a two-bed flat knitting machine. The production of seamless knitted clothing has become possible. Tokuhei 3
No. 16413 discloses a technique for enhancing the elasticity of a hem portion knitted in a 1 × 1 rubber knit. The 2 × 1 rubber knitting is a knitting method often used for the body and the hem of the sleeve similarly to the above 1 × 1 rubber knitting, and these are required to have elasticity. However, there is no disclosure of a method of knitting a 2 × 1 rubber knit used for a hem rubber or the like into a tubular shape.

【0004】[0004]

【発明が解決しようとする課題】本発明は、上記問題に
鑑み発明されたものであり、前後に針床を有する横編機
を使用して裾ゴム等に使用される2×1ゴム編みからな
る筒状体を編成するための方法を提供することを目的と
する。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and has been developed from a 2 × 1 rubber knitting used for a hem rubber or the like using a flat knitting machine having a needle bed in front and back. It is an object of the present invention to provide a method for knitting a tubular body.

【0005】[0005]

【課題を解決するための手段】請求項1に記載の方法で
は、左右方向に延び、かつ前後方向に互いに対向する少
なくとも前後一対の針床を有し、前記一対の針床はそれ
ぞれ多数の針を持ち、さらに前記一対の針床は対向部に
歯口を形成し、かつ前記針床の少なくとも一方が左右に
ラッキング可能で、前記針床間で編目の目移しが可能
な、横編機を用い、第1の針床に前側編地を、第2の針
床に後側編地を付属させて、前後に重ねられた状態で前
側編地と後側編地が編み幅の側端で連結された状態で編
成される筒状編地を2×1ゴム編みからなる編み組織で
もって編成する方法であって、前後針床の第1〜6針の
計12針からなる針群を筒状編地の2×1ゴム編みの基
本ユニットとして割り当て、各基本ユニットの第1針床
の第1・6針を前側編地の表目形成用の編針とし、第2
針床の第1・6針を後側編地の表目形成用の編針とし、
第2針床の第2・4針(または第3・5針)を前側編地
の裏目形成用の編針とし、第1針床の第3・5針(また
は第2・4針)を後側編地の裏目形成用の編針とし、他
の針を編目移し分け用の補助針とし、この基本ユニット
を針床上の所定区間の針に対して繰り返し配置し、 A)後側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第2針床の編針に係
止される前側編地の裏目を第1針床の補助針に移し、且
つ第2針床の補助針に係止される後側編地の裏目を第1
針床の編針に移し、しかる後に、第2針床の第1針、第
1針床の第3・5針(または第2・4針)および第2針
床の第6針の編針に編糸を供給して後側編地の編目コー
スを編成する工程、 B)前側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第1針床の編針に係
止される後側編地の裏目を第2針床の補助針に移し、且
つ第1針床の補助針に係止される前側編地の裏目を第2
針床の編針に移し、しかる後に、第1針床の第1針、第
2針床の第2・4(または第3・5針)および第1針床
の第6針の編針に編糸を供給して前側編地の編目コース
を編成する工程、上記A)、B)の工程を繰り返し行う
ことで2×1ゴム編み組織からなる筒状編地を編成す
る。
According to a first aspect of the present invention, at least a pair of needle beds extend in the left-right direction and are opposed to each other in the front-rear direction. A flat knitting machine further comprising: a pair of needle beds forming tooth gaps in opposed portions, and at least one of the needle beds can be racked left and right, and a stitch can be transferred between the needle beds. The front knitted fabric is attached to the first needle bed and the rear knitted fabric is attached to the second needle bed. A method of knitting a tubular knitted fabric knitted in a connected state with a knitting structure composed of 2 × 1 rubber knitting, wherein a needle group consisting of a total of 12 needles of first to sixth needles of a front and rear needle bed is formed. Are allocated as basic units of 2 × 1 rubber knitting of the knitted fabric, and the first and sixth needles of the first needle bed of each basic unit are knitted in the front side. The knitting needle for forming the surface of the ground
The first and sixth needles of the needle bed are used as knitting needles for forming the surface of the rear knitted fabric,
The second and fourth needles (or third and fifth needles) of the second needle bed are used as knitting needles for forming the back stitch of the front knitted fabric, and the third and fifth needles (or second and fourth needles) of the first needle bed are rearward. A) a knitting needle for forming a back stitch on the side knitted fabric, and another needle as an auxiliary needle for transferring the stitches. This basic unit is repeatedly arranged with respect to the needles in a predetermined section on the needle bed. In order to knit the course by 2 × 1 rubber knitting, the back stitch of the front knitted fabric locked by the knitting needle of the second needle bed of each of the developed units is transferred to the auxiliary needle of the first needle bed, and the second needle The back side of the back knitted fabric locked by the auxiliary needle on the floor
Transfer to the knitting needles of the needle bed, and then knit the needles of the first needle of the second needle bed, the third and fifth needles (or the second and fourth needles) of the first needle bed and the sixth needle of the second needle bed. Supplying yarn and knitting the stitch course of the rear knitted fabric; B) knitting the stitch course of the front knitted fabric to the knitting needle of the first needle bed of each of the developed units in order to knit 2 × 1 rubber knitting. The back stitch of the rear knitted fabric to be locked is transferred to the auxiliary needle of the second needle bed, and the back stitch of the front knitted fabric locked to the auxiliary needle of the first needle bed is set to the second stitch.
The knitting needle is transferred to the knitting needles of the needle bed, and thereafter, the knitting yarns are attached to the knitting needles of the first needle of the first needle bed, the second and fourth (or 3.5 and fifth needles) of the second needle bed and the sixth needle of the first needle bed. To knit a stitch course of the front knitted fabric, and repeat the above steps A) and B) to knit a tubular knitted fabric having a 2 × 1 rubber knitting structure.

【0006】また、請求項2に記載の方法では、前記第
1針床の第1〜6針および第2針床の第2〜7針の計1
2針からなる針群を筒状編地の2×1ゴム編みの基本ユ
ニットとして割り当て、各基本ユニットの第1針床の第
2・4針(または第1・3針)を前側編地の表目形成用
の編針とし、第2針床の第5・7針(または第4・6
針)を前側編地の裏目形成用の編針とし、第1針床の第
1・3針(または第2・4針)を後側編地の裏目形成用
の編針とし、第2針床の第4・6針(または第5・7
針)を後側編地の表目形成用の編針とし、第2針床の第
5針(または第4針)で形成される前側編地の裏目の移
し分け用の補助針を第1針床の第5針(または第4針)
とし、第2針床の第7針(または第6針)で形成される
前側編地の裏目の移し分け用の補助針を第1針床の第6
針(または第5針)とし、第1針床の第1針(または第
3針)で形成される後側編地の裏目の移し分け用の補助
針を第2針床の第2針(または第3針)とし、第1針床
の第3針(または第4針)で形成される後側編地の裏目
の移し分け用の補助針を第2針床の第3針(または第4
針)とし、この基本ユニットを針床上の所定区間の針に
対して繰り返し配置し、 A)後側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第2針床の編針に係
止される前側編地の裏目を第1針床の補助針に移し、且
つ第2針床の補助針に係止される後側編地の裏目を第1
針床の編針に移し、しかる後に、第1針床の第1・3針
(または第2・4)、第2針床の第4・6針(または第
5・7針)に編糸を供給して後側編地の編目コースを編
成する工程、 B)前側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第1針床の編針に係
止される後側編地の裏目を第2針床の補助針に移し、且
つ第1針床の補助針に係止される前側編地の裏目を第2
針床の編針に移し、しかる後に、第1針床の第2・4針
(または第1・3針)、第2針床の第5・7針(または
第4・6針)に編糸を供給して前側編地の編目コースを
編成する工程、上記A)、B)の工程を繰り返し行うこ
とで2×1ゴム編み組織からなる筒状編地を編成するよ
うにした。
According to a second aspect of the present invention, a total of 1 to 6 stitches of the first needle bed and 2 to 7 stitches of the second needle bed are provided.
A needle group consisting of two needles is assigned as a basic unit of 2 × 1 rubber knitting of the tubular knitted fabric, and the second and fourth needles (or the first and third needles) of the first needle bed of each basic unit are assigned to the front knitted fabric. The knitting needle for forming the outer surface is used, and the fifth and seventh needles (or the fourth and sixth needles) of the second needle bed are used.
Needle) is used as the knitting needle for forming the back stitch of the front knitted fabric, the first and third needles (or the second and fourth stitches) of the first needle bed are set as the knitting needle for forming the back stitch of the rear knitted fabric, and 4th and 6th needles (or 5th and 7th needles)
Needle) is used as a knitting needle for forming the face of the rear knitted fabric, and an auxiliary needle for transferring the back face of the front knitted fabric formed by the fifth needle (or the fourth needle) of the second needle bed is the first needle. Fifth needle (or fourth needle) on the floor
The auxiliary needle for transferring the back side of the front knitted fabric formed by the seventh needle (or the sixth needle) of the second needle bed is the sixth needle of the first needle bed.
A needle (or a fifth needle) is used, and an auxiliary needle for transferring the back side of the back knitted fabric formed by the first needle (or the third needle) of the first needle bed is a second needle (of the second needle bed). Or the third needle of the second needle bed (or the third needle) and the auxiliary needle for transferring the back side of the back knitted fabric formed by the third needle (or the fourth needle) of the first needle bed. 4
The basic unit is repeatedly arranged with respect to the needle in a predetermined section on the needle bed. A) In order to knit a stitch course of the rear knitted fabric by 2 × 1 rubber knitting, the first unit of each of the developed units is knitted. The back stitch of the front knitted fabric locked by the knitting needle of the two-needle bed is transferred to the auxiliary needle of the first needle bed, and the back stitch of the rear knitted fabric locked by the auxiliary needle of the second needle bed is set to the first stitch.
Transfer to the knitting needles of the needle bed, and thereafter, knit the yarn to the first and third needles (or 2.4) of the first needle bed and the 4.6 and 5 needles (or 5.7 needles) of the second needle bed. Feeding and knitting the stitch course of the rear knitted fabric; B) engaging the knitting needles of the first needle bed of each of the developed units to knit the 2 × 1 rubber knitted stitch course of the front knitted fabric. The back stitch of the rear knitted fabric to be transferred is transferred to the auxiliary needle of the second needle bed, and the back stitch of the front knitted fabric locked by the auxiliary needle of the first needle bed is set to the second stitch.
Transfer to the knitting needles of the needle bed, and thereafter, knitting yarns to the second and fourth needles (or first and third needles) of the first needle bed and the fifth and seventh needles (or fourth and sixth needles) of the second needle bed To knit a stitch course of the front knitted fabric, and repeat the above steps A) and B) to knit a tubular knitted fabric having a 2 × 1 rubber knitting structure.

【0007】[0007]

【発明の実施の形態】本発明の編成方法を筒状編成され
るセーターの身頃部の裾部分に適用した場合についての
好適な実施の形態について図面と共に詳細に説明する。
本明細書でいう筒状編地とは、後述する実施の形態に示
すような前後編地の両端部が連結された完全な筒状体と
して構成される編地のみに限定されるものではなく、前
後身頃の両端の一方側が開放された、あるいはカーディ
ガンのように前身頃の中央部において編地が分断されて
いるようなものも含む。編成に使用される横編機は、左
右方向に延び、かつ歯口を挟んで前後方向に対向する前
後一対の針床を有し、前記一対の針床はそれぞれ多数の
針を持ち、前記針床間で編目の目移しが可能で、且つ、
後針床が左右にラッキング可能なものが使用される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment in which the knitting method of the present invention is applied to a skirt portion of a body portion of a sweater to be knitted in a tubular form will be described in detail with reference to the drawings.
The tubular knitted fabric referred to in this specification is not limited to only a knitted fabric configured as a complete tubular body in which both ends of a front and rear knitted fabric are connected as shown in an embodiment described later. Also, there are ones in which one of both ends of the front and rear bodies is opened, or a knitted fabric in which the knitted fabric is divided at the center of the front body like a cardigan. The flat knitting machine used for knitting has a pair of front and rear needle beds extending in the left-right direction and facing in the front-rear direction across the tooth gap, and each of the pair of needle beds has a large number of needles. It is possible to transfer stitches between floors, and
A rear needle bed that can be racked left and right is used.

【0008】<実施例1>図1は、無縫製ニットされた
セーター1を示す。図2のPは2×1ゴム編み組織で編
成されるセーターの裾ゴム部5の基本となる針立て、即
ち基本ユニットを示す。基本ユニットPは、前針床(第
1針床)の針ア〜カと、後針床(第2針床)の針あ〜か
の計12針で構成される。前裾ゴム部5fの2×1ゴム
編みは、前針床の1番目の針ア、後針床の2・4番目の
針い・え、および前針床の6番目の針カを使用して形成
される。後裾ゴム部5bは、後針床の1番目の針あ、前
針床の3・5番目の針ウ・オ、および後針床の6番目の
針かを使用して形成される。前針床の2・4番目の針イ
・エは、後針床の針い・えで形成された前裾ゴム部の裏
目の移し分け用の補助針(空針)で、後身頃3bの2×
1ゴム編みの編目コースの編成がなされる間、前身頃3
fの裏目はこれらの針に預けられる。同様に後針床の3
・5番目の針う・おは、前針床の針ウ・オで形成された
後身頃3bの裏目の移し分け用の補助針(空針)で、前
身頃3fの2×1ゴム編みの編目コースの編成がなされ
る間、後身頃3bの裏目はこれらの針に預けられる。こ
のようにして構成された2×1ゴム編みのための基本ユ
ニットPは、図2に示すように所望の編み幅を有する筒
状編地を編成するために適宜数リピートP1,P2,…し
て針床上の各針に割り当てられる。本実施例では、上記
基本ユニットPを前針床の針A〜R、後針床の針a〜r
に展開させて裾ゴム部の編成を行う。アルファベット大
文字は前針床の針、小文字は後針床の針を示す。
Embodiment 1 FIG. 1 shows a sweater 1 knitted without sewing. P in FIG. 2 indicates a needle stand which is the basis of the hem rubber portion 5 of the sweater knitted in a 2 × 1 rubber knitting structure, that is, a basic unit. The basic unit P is composed of a total of 12 needles, that is, needle needles of a front needle bed (first needle bed) and needle needles of a rear needle bed (second needle bed). The 2 × 1 rubber knitting of the front hem rubber portion 5f uses the first needle needle of the front needle bed, the second and fourth needle needles of the rear needle bed, and the sixth needle needle of the front needle bed. Formed. The rear hem rubber portion 5b is formed by using the first needle hole of the rear needle bed, the 3.5th needle needle of the front needle bed, or the sixth needle of the rear needle bed. The second and fourth needles and needles on the front needle bed are auxiliary needles (empty needles) for transferring the back of the front hem rubber portion formed by the needles on the rear needle bed. 2x
1 While the knitting of the rubber stitch course is performed, the front body 3
The back of f is deposited in these needles. Similarly, back needle bed 3
The fifth needle is an auxiliary needle (empty needle) for transferring the back side of the back body 3b formed by the needle needle of the front needle bed, and is a 2x1 rubber knitting of the front body 3f. While the knitting of the stitch course is performed, the back face of the back body 3b is deposited on these needles. The basic unit P for 2 × 1 rubber knitting configured in this manner is appropriately divided into several repeats P 1 , P 2 , and P 2 to knit a tubular knitted fabric having a desired knitting width as shown in FIG. ... and assigned to each needle on the needle bed. In this embodiment, the basic unit P is composed of the needles A to R of the front needle bed and the needles a to r of the rear needle bed.
And knit the hem rubber part. Uppercase letters indicate needles on the front needle bed, and lowercase letters indicate needles on the rear needle bed.

【0009】図3は、前裾ゴム部(前側編地)は前針床
の針に付属させ、後裾ゴム部(後側編地)は後針床の針
に付属させて編成が行われる状態を示す。図3−Aは、
前身頃3fの裾2×1ゴム編みの編目が前針床の針に、
後身頃3bの裾2×1ゴム編みの編目が後針床の針にそ
れぞれ係止された状態を示し、白抜き丸印で表されたも
のが前側編地の編目で、黒丸印記号で表されたものが後
側編地の編目を示す。ここでいう付属とは、前身頃3f
の編目コースが編成される間は、図3−Bに示すように
後身頃3bの編目を後針床の針に係止させ、同様に後身
頃3bの編目コースが編成される間は、図3−Cに示す
ように前身頃3fの編目を前針床の針に付属係止させる
ことを意味する。
In FIG. 3, knitting is performed by attaching the front hem rubber portion (front knitted fabric) to the needle of the front needle bed and attaching the rear hem rubber portion (rear knitted fabric) to the needle of the rear needle bed. Indicates the status. FIG.
The stitches of the front body 3f hem 2 × 1 rubber knit are used as the needles of the front needle bed,
The stitches of the 2 × 1 rubber hem of the back body 3b are locked to the needles of the rear needle bed, respectively, and the white circles indicate the stitches of the front knitted fabric and the black circles indicate the stitches. The stitched pattern shows the stitches of the back knitted fabric. The attachment here is the front body 3f
3B, the stitches of the back body 3b are engaged with the needles of the back needle bed as shown in FIG. 3-B. Similarly, while the stitch course of the back body 3b is knitted, as shown in FIG. As shown in 3-C, this means that the stitches of the front body 3f are attached to the needles of the front needle bed.

【0010】図4〜図6は、セーター1の裾部分の編成
を示した編成ステップを示す。本実施例では、1つの給
糸部材7を使い、編糸を左から右方向に移動させて先ず
後裾ゴム部の編目コースを形成した後、続いて編糸を右
から左方向に移動させ前裾ゴム部の編目コースを形成す
るように編糸を時計針方向に周回状供給することで筒状
編地を編成する。図の右側に編目コースの編成の向きと
目移しの向きを矢印で示した。後針床が前針床に対して
ラッキング可能で、針A−a,B−b,…が向かい合う
状態をラッキングの基準位置とする。尚、編成に使用す
る針数は説明の便宜上少数とした。
FIG. 4 to FIG. 6 show knitting steps showing knitting of the skirt portion of the sweater 1. In the present embodiment, the knitting yarn is moved from left to right using one yarn feeding member 7 to form a stitch course of the rear hem rubber portion, and then the knitting yarn is moved from right to left. A tubular knitted fabric is knitted by supplying a knitting yarn in a clockwise direction so as to form a stitch course of the front hem rubber portion. Arrows indicate the knitting direction and transfer direction of the stitch course on the right side of the figure. The state where the rear needle bed can be racked with respect to the front needle bed and the needles A-a, B-b,... Face each other is defined as a racking reference position. The number of stitches used for knitting was set to a small number for convenience of explanation.

【0011】以下、各編成ステップについて説明する。
後裾ゴム部の編出し部の編成がステップ1〜8、前裾ゴ
ム部の編出し部の編成がステップ9〜12、前後裾ゴム
部の繰り返し編成がステップ13〜16、裾ゴム部編成
の後の身頃部編成の移し分けがステップ17〜23、平
編み組織よりなる身頃部の編成がステップ24〜25に
おいて行われる。図のSは、編地編成の冒頭に行われる
抜き糸による編成が完了した状態の針床上の編目の係止
状態を示し、前身の抜き糸の編目が前針床の針B,D,
H,J,N,Pに、後身の抜き糸が後針床の針c,e,
i,k,o,qに係止される。
Hereinafter, each knitting step will be described.
Steps 1 to 8 for knitting of the set-up portion of the rear hem rubber portion, steps 9 to 12 for knitting of the set-up portion of the front hem rubber portion, and steps 13 to 16 for repeated knitting of the front and rear hem rubber portions. The subsequent transfer of the body part knitting is performed in steps 17 to 23, and the knitting of the body part having a flat knitting structure is performed in steps 24 to 25. S in the figure shows the locked state of the stitches on the needle bed in a state where the knitting with the yarn removed at the beginning of the knitting of the knitted fabric is completed.
In H, J, N, and P, the rear thread is inserted into the needles c, e,
Locked to i, k, o, q.

【0012】ステップ1〜8において抜き糸編成に続く
後身頃3bの編出しおよび止め袋編み編成が行われる。
先ずステップ1では、後身頃3bの抜き糸により形成さ
れた編目を前針床の針C,E,I,K,O,Qに移す。
続いてステップ2では、給糸部材7を左側端の針Aを越
える位置まで移動させ、その際に針Aに編糸をフックさ
せる。ステップ3では、編目形成は行われず給糸部材7
のみが針Aの左側まで移動させる。上記ステップ1〜3
は基準位置のラッキングで行われる。
In steps 1 to 8, knitting of the back body 3b and knitting of the stopper bag are performed after the knitting of the thread.
First, in step 1, the stitches formed by the drawn thread of the back body 3b are transferred to the needles C, E, I, K, O, and Q of the front needle bed.
Subsequently, in step 2, the yarn supplying member 7 is moved to a position beyond the needle A at the left end, and at this time, the knitting yarn is hooked to the needle A. In Step 3, the stitch formation is not performed and the yarn supplying member 7 is not formed.
Only the needle moves to the left side of the needle A. Steps 1-3 above
Is performed by racking the reference position.

【0013】ステップ4は、後身の裾部分の編出しコー
スの編成を示し、後針床が左に針1.5本分ラッキング
した状態で行われる。給糸部材7を右方向に移動させ、
前後針床の針a,C,f,E,g,i,…に給糸して編
目形成を行う。ステップ5は、給糸部材7を側端の針R
を越える位置まで移動させ、その際に針Rに編糸をフッ
クさせた後、ステップ6で給糸部材7を針Rの右側まで
移動する。ステップ7,8は編出しコースの編成に続く
止め袋編みを示し、ステップ7では針r,m,l,g,
f,aに給糸して編出しコースに続く編目コースを形成
する。ステップ8では針C,E,I,K,O,Qに給糸
して編目コースを形成する。
Step 4 shows knitting of a setting course of the hem portion of the back body, which is performed in a state where the back needle bed is racked by 1.5 needles to the left. Move the yarn feeding member 7 to the right,
Threads are supplied to the needles a, C, f, E, g, i,... Of the front and rear needle beds to form a stitch. Step 5 is to move the yarn supplying member 7 to the needle R at the side end.
After the knitting yarn is hooked to the needle R at this time, the yarn feeding member 7 is moved to the right side of the needle R in step 6. Steps 7 and 8 show the closing bag knitting following the knitting of the set-up course, and in step 7, the needles r, m, l, g,
Yarns are fed to f and a to form a stitch course following the set-up course. In step 8, yarns are supplied to the needles C, E, I, K, O, and Q to form a stitch course.

【0014】次にステップ9〜12において前裾ゴム部
の編出しおよび止め袋編み編成を行う。先ずステップ9
では、前針床の針C,E,I,K,O,Qに係止される
後身頃3bの裏目を後針床の補助針c,e,i,k,
o,qに預け、後裾ゴム部の編目を全て後針床の針に付
属させる。同時に後裾ゴム部の抜き糸の編目を後針床の
針b,d,h,j,n,pに移す。ステップ10は、前
裾ゴム部の編出しコースの編成を示し、後針床が左に針
1.5本分ラッキングされた状態で行う。給糸部材7を
左方向に移動させ前後針床の針R,p,M,n,L,
j,…に給糸して編目形成を行う。ステップ2およびス
テップ5でフックされた編目はこのとき編み込まれ、前
後裾ゴム部の編出し部分を編地の両側端で強固に連結す
る。ステップ11,12は編出し編成後の止め袋編みを
示し、ステップ11では針A,F,G,L,M,Rに給
糸して編出しコースに続く編目コースを形成する。ステ
ップ12では針p,n,j,h,d,bに給糸して編目
コースを形成する。
Next, in steps 9 to 12, set-up of the front hem rubber portion and knitting of the stopper bag are performed. First step 9
Then, the back of the back body 3b locked to the needles C, E, I, K, O, Q of the front needle bed is replaced with the auxiliary needles c, e, i, k,
Leave it in o, q and attach all stitches of the rear hem rubber part to the needle on the rear needle bed. At the same time, the stitches of the thread removed from the rear hem rubber portion are transferred to the needles b, d, h, j, n, p on the rear needle bed. Step 10 shows knitting of a set-up course of the front hem rubber portion, which is performed in a state where the rear needle bed is racked by 1.5 needles to the left. The yarn feeding member 7 is moved to the left, and the needles R, p, M, n, L,
The thread is supplied to j,... to form a stitch. The stitches hooked in step 2 and step 5 are knitted at this time, and the set-up portions of the front and rear hem rubber portions are firmly connected at both ends of the knitted fabric. Steps 11 and 12 show the stop knitting after set-up knitting. In step 11, yarns are supplied to the needles A, F, G, L, M and R to form a stitch course following the set-up course. In step 12, yarn is supplied to the needles p, n, j, h, d, and b to form a stitch course.

【0015】ステップ13では、次ステップで行われる
後裾ゴム部の2×1ゴム編みを行うために後針床の針
d,b,h,j,n,pに係止される前裾ゴム部の裏目
を一旦前針床の補助針B,D,H,J,N,Pへ預ける
とともにステップ9において後針床の針c,e,i,
k,o,qに預けられた後裾ゴム部の裏目を前針床の針
C,E,I,K,O,Qへ移し替える。ステップ14で
は、給糸部材7を右方向に移動させながら針a,C,
E,f,g,I,…に給糸して後裾ゴム部の2×1ゴム
の編目コースを編成する。ステップ15は、ステップ9
と同じく次の前裾ゴム部編成のための編目の移し分けを
示す。ステップ16では、給糸部材7を左方向に移動さ
せながら針R,p,n,M,L,j…に給糸して前裾ゴ
ム部の2×1ゴムの編目コースを編成する。上記したス
テップ13〜16の4ステップを適宜回数繰り返すこと
で所望長さの裾ゴム部を筒状に編成する。本例の編成方
法によれば後針床を定位置に停止させた状態で編目コー
スの形成と移し分け行うことができるため効率的な編成
ができる。そのため2カムシステム以上の多重カムシス
テムを有する横編機を用いて上記各ステップをカムシス
テムに割り当てれば更に生産性を高めることができる。
In step 13, the front hem rubber which is locked to the needles d, b, h, j, n, p of the rear needle bed in order to perform the 2 × 1 rubber knitting of the rear hem rubber portion performed in the next step. The back stitch of the part is once deposited in the auxiliary needles B, D, H, J, N, and P of the front needle bed, and the needles c, e, i, and
The back lining of the rear hem rubber portion deposited at k, o, q is transferred to the needles C, E, I, K, O, Q of the front needle bed. In step 14, the needles a, C,
The yarns are supplied to E, f, g, I,... To knit a 2 × 1 rubber stitch course of the rear hem rubber portion. Step 15 is Step 9
In the same manner as above, the transfer of stitches for the next front hem rubber part knitting is shown. In step 16, yarn is supplied to the needles R, p, n, M, L, j,... While moving the yarn supplying member 7 to the left, and a stitch course of 2 × 1 rubber of the front hem rubber portion is knitted. By repeating the above four steps of steps 13 to 16 as needed, the hem rubber portion having a desired length is knitted into a tubular shape. According to the knitting method of this example, the stitch course can be formed and transferred separately while the rear needle bed is stopped at a fixed position, so that efficient knitting can be performed. Therefore, the productivity can be further increased by assigning each of the above steps to a cam system using a flat knitting machine having a multiple cam system of two or more cam systems.

【0016】ステップ17〜23は、裾ゴム部の編成に
続いて行われる身頃部編成のための編目の移し分けを示
す。先ずステップ17では、後針床を右に針1本分ラッ
キングして後針床の針b,h,nに係止される前裾ゴム
部の裏目を前針床の針C,I,Oに移す。ステップ18
では、後針床を左に針1本分ラッキングして前針床の針
A,G,Mに係止される前裾ゴム部の表目を後針床の針
b,h,nに移した後、続くステップ19において前針
床の針B,H,Nに置き替えるとともに後針床の針d,
j,pに係止される前裾ゴム部の裏目を針D,J,Pに
移す。次にステップ20では後針床を右に針1本分ラッ
キングして、先のステップ17において前針床の針C,
I,Oに移された前裾ゴム部の裏目を後針床の針b,
h,nへ移した後、ステップ21で前針床の針B,H,
Nに移す。これにより前針床の針B,H,Nに先に移さ
れた前裾ゴム部の表目に後針床の針b,h,nで形成さ
れた裏目が重なることになる。この時点で前裾ゴム部の
編目は1本置きの針B,D,F,H,J,…に係止され
ることになり前身頃3fの編成の準備を完了する。
Steps 17 to 23 show the transfer of stitches for body part knitting performed after knitting of the hem rubber part. First, in step 17, the rear needle bed is racked to the right by one needle, and the back of the front hem rubber portion locked by the needles b, h, n of the rear needle bed is stitched with the needles C, I, O of the front needle bed. Transfer to Step 18
Then, the rear needle bed is racked to the left by one needle, and the surface of the front hem rubber portion locked by the needles A, G, M of the front needle bed is moved to the needles b, h, n of the rear needle bed. Then, in the following step 19, the needles are replaced with the needles B, H, N of the front needle bed and the needles d,
Transfer the back lining of the front hem rubber portion locked to j, p to needles D, J, P. Next, in step 20, the rear needle bed is racked to the right by one needle, and in step 17, needles C,
The back lining of the front hem rubber part transferred to I, O is
h, n, then, in step 21, the needles B, H,
Move to N. As a result, the back stitch formed by the needles b, h, and n of the rear needle bed overlaps the front surface of the front hem rubber portion that has been transferred to the needles B, H, and N of the front needle bed. At this time, the stitches of the front hem rubber portion are locked by the alternate needles B, D, F, H, J,..., And the preparation of the knitting of the front body 3f is completed.

【0017】ステップ21では、更に後針床の針e,
k,qに係止される後裾ゴム部の裏目を前針床の針E,
K,Qに移す。ステップ22では、後針床を右へ針1本
分ラッキングし、後針床の針f,l,rに係止される後
裾ゴム部の表目を前針床の針G,M,Sへ移した後、ス
テップ23において後針床を右へ針2本分ラッキングし
て後針床の針e,k,qへを置き替える。ステップ24
では、前針床の針E,K,Qに係止される後裾ゴム部の
裏目を後針床の後裾ゴム部の表目を係止する針e,k,
qに移し重ねる。これにより後身頃3b編成のための準
備を完了する。
In step 21, the needles e,
The back lining of the rear hem rubber part locked to k, q is
Move to K and Q. In step 22, the rear needle bed is racked to the right by one needle, and the surface of the rear hem rubber portion locked by the needles f, l, r of the rear needle bed is set to the needles G, M, S of the front needle bed. Then, in step 23, the rear needle bed is racked to the right by two needles and replaced with the needles e, k, and q of the rear needle bed. Step 24
Then, the needles e, k, which lock the back lining of the rear hem rubber portion locked by the needles E, K, and Q of the front needle bed with the front eye of the rear hem rubber portion of the rear needle bed.
Transfer to q. This completes the preparation for the back body 3b knitting.

【0018】ステップ25,26は裾ゴム部に続く平編
み組織よりなる身頃部の最初に形成される編目コースの
編成を示したものでステップ25で後身頃3bの編目コ
ースが、ステップ26で前身頃3fの編目コースが編成
される。
Steps 25 and 26 show the knitting of the stitch course formed at the beginning of the body part consisting of a flat knitting structure following the hem rubber part. Around 3f stitch course is organized.

【0019】本実施例では基本ユニットの前針床の第3
・5針で後裾ゴム部の裏目を形成し、後針床の第2・4
針で前裾ゴム部の裏目を形成するようにしたが、これに
代えて前針床の第2・4針で後裾ゴム部の裏目を形成
し、後針床の第3・5針で前裾ゴム部の裏目を形成する
ようにしてもよい。
In the present embodiment, the third needle bed of the front needle bed of the basic unit is used.
・ The back lining of the rear hem rubber part is formed with 5 stitches, and the second and fourth
The back lining of the front hem rubber portion was formed with a needle, but instead of this, the back lining of the rear hem rubber portion was formed with the second and fourth needles of the front needle bed, and the back lining of the third and fifth needles of the rear needle bed were formed. The back lining of the front hem rubber portion may be formed.

【0020】<実施例2>次に他の変形例について説明
する。図7は図2に対応する本実施例の2×1ゴム編み
のための基本ユニットを示す。基本ユニットQは、前針
床の1〜6番目の針ア〜カと、後針床の2〜7番目の針
あ〜かの計12針で構成される。前裾ゴム部の2×1ゴ
ム編みは、前針床の2・4番目の針イ・エ、後針床の5
・7番目の針え・かを使用して形成され、後裾ゴム部の
それは、前針床の1・3番目の針ア・ウおよび後針床の
4・6番目の針う・おを使用して形成される。前針床の
5番目の針オは、後針床の5番目の針えで形成された前
裾ゴム部の裏目の移し分け用の補助針、6番目の針カ
は、後針床の7番目の針かで形成された前裾ゴム部の裏
目の移し分け用の補助針であり、後裾ゴム部の2×1ゴ
ム編みの編目コースの編成がなされる間、前裾ゴム部の
裏目はこれらの針に預けられる。同様に後針床の2番目
の針あは、前針床の1番目の針アで形成された後裾ゴム
部の裏目の移し分け用の補助針、3番目の針いは、前針
床の3番目の針ウで形成された後裾ゴム部の裏目の移し
分け用の補助針で、前裾ゴム部の2×1ゴム編みの編目
コースの編成がなされる間、後裾ゴム部の裏目はこれら
の針に預けられる。上記基本ユニットQを前針床の針A
〜R、後針床の針b〜sに展開させて裾ゴム部の編成を
行う。
<Embodiment 2> Next, another modification will be described. FIG. 7 shows a basic unit for 2 × 1 rubber knitting of this embodiment corresponding to FIG. The basic unit Q includes a total of twelve needles, that is, needle needles 1 to 6 of the front needle bed and needle needles 2 to 7 of the rear needle bed. The 2 × 1 rubber knitting of the front hem rubber part is the 2nd and 4th needles on the front needle bed and 5 on the rear needle bed.
-It is formed by using the seventh needle bar-and that of the rear hem rubber part is the first and third needle needles of the front needle bed and the fourth and sixth needle needles of the rear needle bed. Formed using. The fifth needle of the front needle bed is an auxiliary needle for transferring the back side of the front hem rubber portion formed by the fifth needle of the rear needle bed, and the sixth needle is the seventh needle of the rear needle bed. This is an auxiliary needle for transferring the back side of the front rubber part formed by the second needle, and the back side of the front rubber part during knitting of the 2 × 1 rubber knitting course of the rear rubber part. Is deposited in these needles. Similarly, the second needle of the rear needle bed is an auxiliary needle for transferring the back of the rear hem rubber portion formed by the first needle of the front needle bed, and the third needle is the front needle bed. The auxiliary needle for transferring the back side of the rear hem rubber part formed by the third needle c. Of the rear hem rubber part while the knitting of the 2 × 1 rubber stitch course of the front hem rubber part is performed. The underside is deposited in these needles. The basic unit Q is connected to the needle A of the front needle bed.
-R, knitting of the hem rubber portion is developed to the needles b-s of the rear needle bed.

【0021】図8は、図3に対応した図を示し、図8−
Aは、前裾ゴム部の2×1ゴム編みの編目が前針床の針
に、後裾ゴム部の2×1ゴム編みの編目が後針床の針に
それぞれ係止された状態を示す。図9〜11は編成ステ
ップを示し、先の実施例と同様に後裾ゴム部、前裾ゴム
部、後裾ゴム部、…の順に時計針方向に周回給糸しなが
ら筒状編地の各編目コースを編成する。
FIG. 8 shows a diagram corresponding to FIG.
A shows a state in which the 2 × 1 rubber stitch of the front hem rubber portion is locked to the needle of the front needle bed, and the 2 × 1 rubber knit stitch of the rear hem rubber portion is locked to the needle of the rear needle bed. . 9 to 11 show the knitting steps, each of the tubular knitted fabrics being wound in the clockwise direction in the order of the rear hem rubber portion, the front hem rubber portion, the rear hem rubber portion,. Create a stitch course.

【0022】以下、各編成ステップについて説明する。
後裾ゴム部の編出し部の編成がステップ1〜4、前裾ゴ
ム部の編出し部の編成がステップ5〜9、前後裾ゴム部
の繰り返し編成がステップ10〜15、裾ゴム部編成と
それに続く身頃編成のための編目の移し分け並びに身頃
部が1コース編成されるまでをステップ16〜26にお
いて行われる。図のSは抜き糸による編成が完了した状
態の針床上の編目の係止状態を示し、前裾ゴム部の抜き
糸の編目が前針床の針B,D,H,J,N,Pに、後裾
ゴム部の抜き糸が後針床の針c,e,i,k,o,qに
係止される。
Hereinafter, each knitting step will be described.
The knitting of the set-up portion of the rear rubber portion is steps 1 to 4, the knitting of the set-up portion of the front rubber portion is steps 5 to 9, and the repeated knitting of the front and rear rubber portions is steps 10 to 15, and the knitting of the rubber bottom portion. Steps 16 to 26 are performed until the transfer of stitches for the subsequent body knitting and the body part is knitted for one course. S in the figure shows the locked state of the stitches on the needle bed in a state where the knitting by the drawn thread is completed, and the stitches of the drawn thread in the front hem rubber portion are the needles B, D, H, J, N, P of the front needle bed. Then, the thread removed from the rear hem rubber portion is locked by the needles c, e, i, k, o, and q on the rear needle bed.

【0023】ステップ1〜4では、抜き糸編成に続く後
裾ゴム部の編出しおよび止め袋編みコースの編成が行わ
れる。先ずステップ1で後針床を左に針2本分ラッキン
グし、後裾ゴム部の抜き糸による編目を前針床の針A,
C,G,I,M,Oに移す。ステップ2で針床をラッキ
ングさせた状態で、給糸部材7を右方向に移動させて前
後針床の針A,d,C,f,G,j,…に給糸して後裾
ゴム部の編出しコースの編成を行う。続くステップ3で
は、針r,p,l,j,f,dに給糸し、ステップ4で
は、基準位置にラッキングさせてから針A,C,G,
I,M,Oに給糸して前記編出しコースに続く止め袋編
みを行う。
In steps 1 to 4, knitting of the rear hem rubber portion and knitting of the stopper bag knitting course following knitting of knitting yarn are performed. First, in Step 1, the rear needle bed is racked to the left by two needles, and the stitches formed by the thread removed from the rubber portion of the rear hem are inserted into the needles A,
Transfer to C, G, I, M, O. With the needle bed racked in step 2, the yarn supplying member 7 is moved rightward to supply yarn to the needles A, d, C, f, G, j,. Of the set-up course. In the following step 3, yarn is supplied to the needles r, p, l, j, f, and d. In step 4, the needles A, C, G,
Yarns are supplied to I, M, and O, and a stop bag knitting following the set-up course is performed.

【0024】次にステップ5〜9において前裾ゴム部の
編出しおよび止め袋編み編成が行われる。先ずステップ
5で、前針床の針C,I,Oに係止される後裾ゴム部の
裏目を後針床の補助針c,i,oに預け、次のステップ
6において後針床を左へ針1本分ラッキングさせ、前針
床の針A,G,Mに係止される後裾ゴム部の裏目を後針
床の補助針b,h,nに預けることで後裾ゴム部の編目
を全て後針床の針に付属させる。ステップ7では、針床
を基準位置から左に針2本分ラッキングさせた状態で、
給糸部材7を左方向に移動させて前後針床の針s,P,
q,N,m,J,…に給糸して前裾ゴム部の編出しコー
スの編成を行った後、ステップ8で針B,D,H,J,
N,Pに給糸し、続くステップ9で針床を基準位置にラ
ッキングさせて針s,q,m,k,g,eに給糸して続
く止め袋編みコースを編成する。本実施例では、先の実
施例の図3のステップ2,3,5,6に対応する編成を
省いた。
Next, in steps 5 to 9, knitting of the front hem rubber portion and knitting of the stopper bag are performed. First, at step 5, the back lining of the rear hem rubber portion locked to the needles C, I, O of the front needle bed is deposited on the auxiliary needles c, i, o of the rear needle bed. Rack one needle to the left and deposit the back lining of the rear hem rubber portion locked to needles A, G, and M on the front needle bed with the auxiliary needles b, h, and n on the rear needle bed to make the rear hem rubber portion. All stitches are attached to the needle on the rear needle bed. In step 7, with the needle bed racked two needles to the left from the reference position,
The yarn feeding member 7 is moved to the left so that the needles s, P,
After feeding yarns to q, N, m, J,... and knitting a knitting course of the front hem rubber portion, the needles B, D, H, J,
In step 9, the needle bed is racked at the reference position, and the needles s, q, m, k, g, and e are fed to form a stopper bag knitting course. In the present embodiment, knitting corresponding to steps 2, 3, 5, and 6 in FIG. 3 of the previous embodiment is omitted.

【0025】ステップ10,11では、続く後裾ゴム部
の2×1ゴム編みを行うための編目の移し分けがなされ
る。先ずステップ10で後針床の針e,k,qに係止さ
れる前裾ゴム部の裏目を一旦前針床の針E,K,Qへ預
けるとともにステップ5において後針床の補助針c,
i,oに預けられた後裾ゴム部の裏目を前針床の針C,
I,Oへ移す。次にステップ11では、後針床を左へ針
1本分ラッキングして針g,m,sに係止される前裾ゴ
ム部の裏目を前針床の針F,L,Rへ預けるとともにス
テップ6で後針床の補助針b,h,nに預けられた後裾
ゴム部の裏目を前針床の針A,G,Mへ移す。ステップ
12では、基準位置にラッキングして給糸部材7を右方
向に移動させながら針A,C、d,f,G,I,…に給
糸して後裾ゴム部の2×1のゴム編みコースを編成す
る。ステップ13,14は、次に行われる前裾ゴム部の
編成のための編目の移し分けで、前針床の針C,E,
I,K,O,Qに係止される編目を後針床の針c,e,
i,k,o,qへ移すとともに前針床の針C,A,F,
G,L,M,Rに係止される編目を後針床の針b,g,
h,m,n,sへ移す。ステップ15では、給糸部材7
を左方向に移動させながら針s,q,P,N,m,k,
…に給糸して前裾ゴム部の2×1ゴム編みコースを編成
する。上記したステップ10〜15の6ステップを適宜
回数リピートすることで裾ゴム部を筒状編成する。
In Steps 10 and 11, stitches for performing 2 × 1 rubber knitting of the subsequent rear hem rubber portion are transferred. First, in step 10, the back lining of the front hem rubber portion locked by the needles e, k, q of the rear needle bed is once deposited in the needles E, K, Q of the front needle bed, and in step 5, the auxiliary needle c of the rear needle bed. ,
The back lining of the back hem rubber part deposited in i, o is needle C of the front needle bed,
Move to I and O. Next, in step 11, the rear needle bed is racked to the left by one needle, the back lining of the front hem rubber portion locked by the needles g, m, s is deposited on the needles F, L, R of the front needle bed. In step 6, the back lining of the rear hem rubber portion deposited in the auxiliary needles b, h, n of the rear needle bed is moved to the needles A, G, M of the front needle bed. In step 12, the yarn is supplied to the needles A, C, d, f, G, I,. Create a knitting course. Steps 13 and 14 are transfer of stitches for knitting the front hem rubber portion performed next, and the needles C, E, and
Stitches locked to I, K, O, Q are needles c, e,
Move to i, k, o, q and needles C, A, F,
The stitches locked to G, L, M, R are replaced with needles b, g,
Move to h, m, n, s. In step 15, the yarn supplying member 7
While moving to the left, the hands s, q, P, N, m, k,
... and knit a 2 × 1 rubber knitting course of the front hem rubber part. The hem rubber portion is knitted in a tubular shape by repeating the above-mentioned steps 10 to 15 as necessary six times.

【0026】リピート終了後、ステップ16〜21にお
いて更に1コースづつの裾ゴム部の編目コースが形成さ
れる。ステップ16〜18は、後裾ゴム部の編目コース
の編成のための編目の移し分けと編目形成を示し、上記
ステップ10〜12と同じ編成が行われる。続くステッ
プ19,20では次の前裾ゴム部の編目コースの編成の
ための編目の移し分けを行うとともに裾ゴム部の編成が
完了した後身側では、身頃部の編成のための編目の移し
分けが開始される。ステップ19では、後針床を左へ針
1本分ラッキングさせ、前針床の針A,C,G,I,
M,Oに係止される後裾ゴム部の最終コースの裏目は後
針床の針b,d,h,j,n,pに移され、その結果、
前針床の針C,I,Oに係止されていた裏目は針d,
j,pに係止される表目に重ねられる。同時に前裾ゴム
部の編成のために前針床の補助針f,l,rに係止され
る裏目は後針床の針g,m,sに移される。ステップ2
0ではラッキングを基準位置に戻して前針床の補助針
E,K,Qに係止される前裾ゴム部の裏目を後針床の針
e,k,qに移す。ステップ21で前裾ゴム部の編目コ
ースの編成を行う。
After the end of the repeat, in steps 16 to 21, a stitch course of the hem rubber portion is further formed for each one course. Steps 16 to 18 show transfer of stitches and formation of stitches for knitting the stitch course of the rear hem rubber portion, and the same knitting as in steps 10 to 12 is performed. In the following steps 19 and 20, stitches for knitting the next front hem rubber stitch course are transferred, and stitches for knitting the body portion are transferred on the rear side after knitting of the hem rubber portion is completed. Dividing starts. In step 19, the rear needle bed is racked one needle to the left, and the needles A, C, G, I,
The back lining of the final course of the rear hem rubber portion locked to M, O is transferred to the needles b, d, h, j, n, p of the rear needle bed, and as a result,
The back lining locked to the needles C, I, O of the front needle bed is the needle d,
It is superimposed on the table locked to j and p. At the same time, the back stitches locked by the auxiliary needles f, l, r of the front needle bed for knitting the front hem rubber portion are transferred to the needles g, m, s of the rear needle bed. Step 2
At 0, the racking is returned to the reference position, and the back stitch of the front hem rubber portion locked by the auxiliary needles E, K, Q of the front needle bed is moved to the needles e, k, q of the rear needle bed. In step 21, the stitch course of the front hem rubber portion is knitted.

【0027】ステップ22では、後針床を左へ針1本分
ラッキングして後針床の針e,k,qに係止される前裾
ゴム部の裏目を針D,J,Pに係止される表目に重ねる
とともに針g,m,sに係止される後裾ゴム部の裏目を
前針床の針F,L,Rに移す。このステップが終了した
状態では、前裾ゴム部の編目は前針床の針B,D,F,
H,J,…に、後裾ゴム部の編目は後針床の針b,d,
f,h,j,…にそれぞれ係止される状態となる。ステ
ップ23では、給糸部材7を右方向に移動させ後針床の
上記針に給糸して後身頃3b部の最初の編目コースを編
成する。続くステップ24,25で後針床の上記針に係
止される後身頃3bの編目を針1本分左へシフトさせる
編成を行い、後身頃3bの編目を針a,c,e,g,
i,…に係止させる。これにより針床上の各編目を係止
する針は、対向する針床上に空針を得る。ステップ26
では、給糸部材7を左に移動させ前針床の針R,P,
N,L,J,…に給糸して前身頃3f部の最初の編目コ
ースを編成する。
In step 22, the rear needle bed is racked to the left by one needle, and the back lining of the front hem rubber portion engaged with the needles e, k, q of the rear needle bed is engaged with the needles D, J, P. The back lining of the rear hem rubber portion, which is placed on the surface to be stopped and locked by the needles g, m, s, is moved to the needles F, L, R on the front needle bed. In the state where this step is completed, the stitches of the front hem rubber portion are the needles B, D, F,
H, J, ..., the stitches of the rear hem rubber part are needles b, d,
f, h, j,... are locked. In step 23, the yarn feeding member 7 is moved rightward to feed yarn to the above-mentioned needle on the rear needle bed, and the first stitch course of the back body 3b is knitted. In subsequent steps 24 and 25, knitting is performed to shift the stitch of the back body 3b locked to the needle on the back needle bed to the left by one needle, and the stitch of the back body 3b is shifted to the needles a, c, e, g, and
i, .... As a result, the needle that locks each stitch on the needle bed obtains an empty needle on the opposite needle bed. Step 26
Then, the yarn supplying member 7 is moved to the left, and the needles R, P,
Threads are supplied to N, L, J, ... to form the first stitch course of the front body 3f section.

【0028】本実施例では基本ユニットの前針床の第2
・4針で前裾ゴム部の表目を、後針床の第5・7針で前
裾ゴム部の裏目を、前針床の第1・3針で後裾ゴム部の
裏目を、後針床の第4・6針で後裾ゴム部の表目を形成
し、後針床の第5針で形成される前裾ゴム部の裏目の移
し分け用の補助針を前針床の第5針とし、後針床の第7
針で形成される前裾ゴム部の裏目の移し分け用の補助針
を前針床の第6針とし、前針床の第1針で形成される後
裾ゴム部の裏目の移し分け用の補助針を後針床の第2針
とし、前針床の第3針で形成される後裾ゴム部の裏目の
移し分け用の補助針を後針床の第3針としたが、これに
代えて前針床の第1・3針で前裾ゴム部の表目を、後針
床の第4・6針で前裾ゴム部の裏目を、前針床の第2・
4針で後裾ゴム部の裏目を、後針床の第5・7針で後裾
ゴム部の表目を形成し、後針床の第4針で形成される前
裾ゴム部の裏目の移し分け用の補助針を前針床の第4針
とし、後針床の第6針で形成される前裾ゴム部の裏目の
移し分け用の補助針を前針床の第5針とし、前針床の第
3針で形成される後裾ゴム部の裏目の移し分け用の補助
針を後針床の第3針とし、前針床の第4針で形成される
後裾ゴム部の裏目の移し分け用の補助針を後針床の第4
針としてもよい。
In the embodiment, the second needle bed of the front needle bed of the basic unit is used.
・ Four stitches on the front hem rubber portion with 4 stitches, 5th and 7th stitches on the rear needle bed with the back stitches on the front hem rubber portion, and 1st and 3rd stitches on the front needle bed with the back stitches on the rear hem rubber portion. The fourth and sixth needles of the needle bed form the face of the rear hem rubber portion, and the auxiliary needle for transferring the back lining of the front hem rubber portion formed by the fifth needle of the rear needle bed is used as the fourth needle of the front needle bed. 5 stitches, 7th of the rear needle bed
The auxiliary needle for transferring the back side of the front rubber part formed by the needle is the sixth needle of the front needle bed, and the auxiliary needle for transferring the back side of the rear rubber part formed by the first needle of the front needle bed. The auxiliary needle was the second needle of the rear needle bed, and the auxiliary needle for transferring the back side of the back hem rubber portion formed by the third needle of the front needle bed was the third needle of the rear needle bed. Instead, the first and third stitches of the front needle bed set the front hem rubber portion, the fourth and sixth stitches of the rear needle bed set the back lining of the front hem rubber portion, and the second and third stitches of the front needle bed.
The back stitch of the back hem rubber portion is formed with 4 stitches and the back stitch of the back hem rubber portion is formed with the 5 th and 7 st stitches of the back needle bed, and the back stitch of the front hem rubber portion formed with the 4 st stitches of the rear needle bed. The auxiliary needle for transfer is the fourth needle of the front needle bed, and the auxiliary needle for transferring the back of the front hem rubber portion formed by the sixth needle of the rear needle bed is the fifth needle of the front needle bed; The auxiliary needle for transferring the back side of the rear hem rubber portion formed by the third needle of the front needle bed is the third needle of the rear needle bed, and the auxiliary needle of the rear hem rubber portion formed by the fourth needle of the front needle bed is formed. Auxiliary needle for transfer of backside stitch
It may be a needle.

【0029】上記した各実施例では、基本ユニットを構
成する針ア・あが編み幅の左端に位置するようにして3
回(整数回)展開するようにした。これにより前裾ゴム
部と後裾ゴム部の編み幅の境界部分にも2×1のゴム編
みパターンが崩れることなく連編されるので編地の外観
を損ねることがない。2×1ゴム編みパターンを崩さな
いためには編み幅の左端を針ア・あ、又は針エ・え、か
らスタートさせ、編み幅の右端を針カ・か、又は針ウ・
う、で終わるように基本ユニットを展開させればよい。
しかし、基本ユニットは必ずしも上記のように展開させ
る必要はなく編地の左端を針ア・あ〜針カ・かの何れの
針からスタートさせ右端を何れの針で終わるようにして
も構わない。
In each of the above-described embodiments, the needles A and A constituting the basic unit are positioned at the left end of the knitting width.
Expanded (integer times). As a result, the 2 × 1 rubber knitting pattern is continuously knitted at the boundary between the knitting widths of the front rubber hem and the rear rubber hem without collapsing. In order not to break the 2 × 1 rubber knitting pattern, start the left end of the knitting width with a needle A, or a needle D, and set the right end of the knitting width with a needle A or a needle C.
Just expand the basic units so that they end with
However, the basic unit does not necessarily need to be developed as described above, and the left end of the knitted fabric may be started from any of the needles A to A and the right end may be ended with any of the needles.

【0030】尚、上記の例ではセーター1の裾部分に2
×1ゴム編み組織よりなる編地の編成を行ったが、裾部
に限らず身頃部全体をゴム編みするようにしてもよく、
また、例えば靴下やサポーター等の筒状体の編成に対し
本発明の筒状のゴム編みを適用してもよく、その場合に
は伸縮性に富んだ筒状編地を得ることができるなど本発
明の主旨を逸脱しない範囲において実施できることはい
うまでもない。
In the above example, the sweater 1 has 2
Although knitting of a × 1 rubber knitting fabric was performed, rubber knitting may be performed not only on the hem but also on the entire body,
In addition, for example, the tubular rubber knitting of the present invention may be applied to knitting of a tubular body such as a sock or a supporter, in which case a tubular knitted fabric with high elasticity can be obtained. It goes without saying that the present invention can be implemented without departing from the gist of the invention.

【0031】[0031]

【発明の効果】上記した編成方法を実施することで前側
編地と後側編地の側端が連結された筒状体に伸縮性の改
善された2×1ゴム編みを横編機を使用して編成するこ
とができるため無縫製ニットによる編地編成の多様化を
図ることに寄与できる。
According to the above-described knitting method, a flat knitting machine is used to form a 2 × 1 rubber knit with improved elasticity on a tubular body in which the side ends of the front knitted fabric and the rear knitted fabric are connected. Therefore, it is possible to contribute to diversification of knitted fabric knitting by the seamless knitting.

【図面の簡単な説明】[Brief description of the drawings]

【図1】無縫製ニットされたセーターを示す。FIG. 1 shows a seamlessly knitted sweater.

【図2】本発明の実施例1の2×1ゴム編みの基本ユニ
ットが針床上に展開された状態を示す。
FIG. 2 shows a state in which the basic unit of 2 × 1 rubber knitting according to the first embodiment of the present invention is deployed on a needle bed.

【図3】実施例1における針床上における前身、後身の
各裾ゴム部の編目の係止状態を示す。
FIG. 3 shows the stitched state of each hem rubber portion of the front body and the back body on the needle bed in the first embodiment.

【図4】実施例1の裾部分の編成ステップを示す。FIG. 4 shows a knitting step of a skirt portion according to the first embodiment.

【図5】実施例1の裾部分の編成ステップを示す。FIG. 5 shows a knitting step of a hem portion in the first embodiment.

【図6】実施例1の裾部分の編成ステップを示す。FIG. 6 shows a knitting step of a hem portion in the first embodiment.

【図7】本発明の実施例2の2×1ゴム編みの基本ユニ
ットが針床上に展開された状態を示す。
FIG. 7 shows a 2 × 1 rubber knitted basic unit according to the second embodiment of the present invention spread out on a needle bed.

【図8】実施例2における針床上における前身、後身の
各裾ゴム部の編目の係止状態を示す。
FIG. 8 shows a stitch engagement state of each hem rubber portion of the front body and the back body on the needle bed in the second embodiment.

【図9】実施例2の裾部分の編成ステップを示す。FIG. 9 shows a knitting step of a hem portion according to the second embodiment.

【図10】実施例2の裾部分の編成ステップを示す。FIG. 10 shows a knitting step of a hem portion in the second embodiment.

【図11】実施例2の裾部分の編成ステップを示す。FIG. 11 shows a knitting step of a hem portion in the second embodiment.

【符号の説明】[Explanation of symbols]

1…セーター、3…身頃、3f…前身頃、3b…後身
頃、5…裾ゴム部、5f…前裾ゴム部、5b…後裾ゴム
部、7…給糸部材
DESCRIPTION OF SYMBOLS 1 ... Sweater, 3 ... body, 3f ... front body, 3b ... back body, 5 ... hem rubber part, 5f ... front hem rubber part, 5b ... rear hem rubber part, 7 ... thread supply member

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】左右方向に延び、かつ前後方向に互いに対
向する少なくとも前後一対の針床を有し、前記一対の針
床はそれぞれ多数の針を持ち、さらに前記一対の針床は
対向部に歯口を形成し、かつ前記針床の少なくとも一方
が左右にラッキング可能で、前記針床間で編目の目移し
が可能な、横編機を用い、第1の針床に前側編地を、第
2の針床に後側編地を付属させて、前後に重ねられた状
態で前側編地と後側編地が編み幅の側端で連結された状
態で編成される筒状編地を2×1ゴム編みからなる編み
組織でもって編成する方法であって、前後針床の第1〜
6針の計12針からなる針群を筒状編地の2×1ゴム編
みの基本ユニットとして割り当て、各基本ユニットの第
1針床の第1・6針を前側編地の表目形成用の編針と
し、第2針床の第1・6針を後側編地の表目形成用の編
針とし、第2針床の第2・4針(または第3・5針)を
前側編地の裏目形成用の編針とし、第1針床の第3・5
針(または第2・4針)を後側編地の裏目形成用の編針
とし、他の針を編目移し分け用の補助針とし、この基本
ユニットを針床上の所定区間の針に対して繰り返し配置
し、 A)後側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第2針床の編針に係
止される前側編地の裏目を第1針床の補助針に移し、且
つ第2針床の補助針に係止される後側編地の裏目を第1
針床の編針に移し、しかる後に、第2針床の第1針、第
1針床の第3・5針(または第2・4針)および第2針
床の第6針の編針に編糸を供給して後側編地の編目コー
スを編成する工程、 B)前側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第1針床の編針に係
止される後側編地の裏目を第2針床の補助針に移し、且
つ第1針床の補助針に係止される前側編地の裏目を第2
針床の編針に移し、しかる後に、第1針床の第1針、第
2針床の第2・4(または第3・5針)および第1針床
の第6針の編針に編糸を供給して前側編地の編目コース
を編成する工程、上記A)、B)の工程を繰り返し行う
ことを特徴とする2×1ゴム編み組織からなる筒状編地
の編成方法。
An at least one pair of needle beds extending in the left-right direction and facing each other in the front-rear direction, the pair of needle beds each having a large number of needles, and the pair of needle beds are provided at opposed portions. A flat knitting machine which forms a tooth gap, and at least one of the needle beds can be racked right and left, and transfer of stitches between the needle beds is possible, is used to form a front knitted fabric on the first needle bed. A tubular knitted fabric knitted in a state where the front knitted fabric and the rear knitted fabric are connected at the side ends of the knitting width in a state where the back knitted fabric is attached to the second needle bed in a state where the back knitted fabric is attached back and forth. It is a method of knitting with a knitting structure composed of 2 × 1 rubber knitting, and the first to the first and second needle beds
A needle group consisting of a total of 12 needles of 6 needles is allocated as a basic unit of 2 × 1 rubber knitting of a tubular knitted fabric, and the first and sixth needles of the first needle bed of each basic unit are used for forming a face of a front knitted fabric. The first and sixth needles of the second needle bed are used as knitting needles for forming the surface of the rear knitted fabric, and the second and fourth needles (or third and fifth needles) of the second needle bed are used as the front knitted fabric. Knitting needle for forming the back line of the third needle bed
The needles (or the second and fourth needles) are used as knitting needles for forming the back stitch of the rear knitted fabric, and the other needles are used as auxiliary needles for transferring stitches. This basic unit is repeatedly used for needles in a predetermined section on the needle bed. A) In order to knit 2 × 1 rubber knitting of the stitch course of the rear knitted fabric, the back stitch of the front knitted fabric locked by the knitting needles of the second needle bed of each of the developed units is replaced with the first stitch. The back knitted fabric is transferred to the auxiliary needle on the floor and locked by the auxiliary needle on the second needle bed.
Transfer to the knitting needles of the needle bed, and then knit the needles of the first needle of the second needle bed, the third and fifth needles (or the second and fourth needles) of the first needle bed and the sixth needle of the second needle bed. Supplying yarn and knitting the stitch course of the rear knitted fabric; B) knitting the stitch course of the front knitted fabric to the knitting needle of the first needle bed of each of the developed units in order to knit 2 × 1 rubber knitting. The back stitch of the rear knitted fabric to be locked is transferred to the auxiliary needle of the second needle bed, and the back stitch of the front knitted fabric locked to the auxiliary needle of the first needle bed is set to the second stitch.
The knitting needle is transferred to the knitting needles of the needle bed, and thereafter, the knitting yarns are attached to the knitting needles of the first needle of the first needle bed, the second and fourth (or 3.5 and fifth needles) of the second needle bed and the sixth needle of the first needle bed. And knitting a stitch course of the front knitted fabric, and repeating the above steps A) and B). The method for knitting a tubular knitted fabric having a 2 × 1 rubber knitting structure.
【請求項2】左右方向に延び、かつ前後方向に互いに対
向する少なくとも前後一対の針床を有し、前記一対の針
床はそれぞれ多数の針を持ち、さらに前記一対の針床は
対向部に歯口を形成し、かつ前記針床の少なくとも一方
が左右にラッキング可能で、前記針床間で編目の目移し
が可能な、横編機を用い、第1の針床に前側編地を、第
2の針床に後側編地を付属させて、前後に重ねられた状
態で前側編地と後側編地が編み幅の側端で連結された状
態で編成される筒状編地を2×1ゴム編みからなる編み
組織でもって編成する方法であって、前記第1針床の第
1〜6針および第2針床の第2〜7針の計12針からな
る針群を筒状編地の2×1ゴム編みの基本ユニットとし
て割り当て、各基本ユニットの第1針床の第2・4針
(または第1・3針)を前側編地の表目形成用の編針と
し、第2針床の第5・7針(または第4・6針)を前側
編地の裏目形成用の編針とし、第1針床の第1・3針
(または第2・4針)を後側編地の裏目形成用の編針と
し、第2針床の第4・6針(または第5・7針)を後側
編地の表目形成用の編針とし、第2針床の第5針(また
は第4針)で形成される前側編地の裏目の移し分け用の
補助針を第1針床の第5針(または第4針)とし、第2
針床の第7針(または第6針)で形成される前側編地の
裏目の移し分け用の補助針を第1針床の第6針(または
第5針)とし、第1針床の第1針(または第3針)で形
成される後側編地の裏目の移し分け用の補助針を第2針
床の第2針(または第3針)とし、第1針床の第3針
(または第4針)で形成される後側編地の裏目の移し分
け用の補助針を第2針床の第3針(または第4針)と
し、この基本ユニットを針床上の所定区間の針に対して
繰り返し配置し、 A)後側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第2針床の編針に係
止される前側編地の裏目を第1針床の補助針に移し、且
つ第2針床の補助針に係止される後側編地の裏目を第1
針床の編針に移し、しかる後に、第1針床の第1・3針
(または第2・4)、第2針床の第4・6針(または第
5・7針)に編糸を供給して後側編地の編目コースを編
成する工程、 B)前側編地の編目コースを2×1ゴム編み編成するた
めに、前記展開された各ユニットの第1針床の編針に係
止される後側編地の裏目を第2針床の補助針に移し、且
つ第1針床の補助針に係止される前側編地の裏目を第2
針床の編針に移し、しかる後に、第1針床の第2・4針
(または第1・3針)、第2針床の第5・7針(または
第4・6針)に編糸を供給して前側編地の編目コースを
編成する工程、上記A)、B)の工程を繰り返し行うこ
とを特徴とする2×1ゴム編み組織からなる筒状編地の
編成方法。
2. A pair of needle beds extending in the left-right direction and facing each other in the front-rear direction, the pair of needle beds each having a large number of needles, and the pair of needle beds are provided at opposed portions. A flat knitting machine which forms a tooth gap, and at least one of the needle beds can be racked right and left, and transfer of stitches between the needle beds is possible, is used to form a front knitted fabric on the first needle bed. A tubular knitted fabric knitted in a state where the front knitted fabric and the rear knitted fabric are connected at the side ends of the knitting width in a state where the back knitted fabric is attached to the second needle bed in a state where the back knitted fabric is attached back and forth. A method of knitting with a knitting structure consisting of 2 × 1 rubber knitting, wherein a needle group consisting of a total of 12 needles, the first to sixth needles of the first needle bed and the second to seventh needles of the second needle bed, 2 × 1 stitches (or 1.3 stitches) of the 1st needle bed of each basic unit Is the knitting needle for forming the face of the front knitted fabric, the fifth and seventh stitches (or the fourth and sixth stitches) of the second needle bed are the knitting needles for forming the back stitch of the front knitted fabric, and the first needle bed has the first stitch. 3 stitches (or 2nd and 4th stitches) are used as knitting needles for forming the back side of the back knitted fabric, and 4th and 6th stitches (or 5th and 7th stitches) of the second needle bed are the surface of the back knitted fabric. The auxiliary needle for transferring the back side of the front knitted fabric formed by the fifth needle (or fourth needle) of the second needle bed is used as the knitting needle for forming the fifth needle (or fourth needle) of the first needle bed. ) And the second
The auxiliary needle for transferring the back side of the front knitted fabric formed by the seventh needle (or sixth needle) of the needle bed is the sixth needle (or fifth needle) of the first needle bed, and the auxiliary needle of the first needle bed. The auxiliary needle for transferring the back side of the rear knitted fabric formed by the first needle (or the third needle) is the second needle (or the third needle) of the second needle bed, and the third needle of the first needle bed. The auxiliary needle for transferring the back side of the back knitted fabric formed by the needle (or the fourth needle) is the third needle (or the fourth needle) of the second needle bed, and the basic unit is a predetermined section on the needle bed. A) The front knitted fabric locked by the knitting needles of the second needle bed of each of the developed units so as to knit the stitch course of the rear knitted fabric by 2 × 1 rubber knitting. Is transferred to the auxiliary needle of the first needle bed, and the back of the rear knitted fabric locked by the auxiliary needle of the second needle bed is moved to the first needle bed.
Transfer to the knitting needles of the needle bed, and thereafter, knit the yarn to the first and third needles (or 2.4) of the first needle bed and the 4.6 and 5 needles (or 5.7 needles) of the second needle bed. Feeding and knitting the stitch course of the rear knitted fabric; B) engaging the knitting needles of the first needle bed of each of the developed units to knit the 2 × 1 rubber knitted stitch course of the front knitted fabric. The back stitch of the rear knitted fabric to be transferred is transferred to the auxiliary needle of the second needle bed, and the back stitch of the front knitted fabric locked by the auxiliary needle of the first needle bed is set to the second stitch.
Transfer to the knitting needles of the needle bed, and thereafter, knitting yarns to the second and fourth needles (or first and third needles) of the first needle bed and the fifth and seventh needles (or fourth and sixth needles) of the second needle bed And knitting a stitch course of the front knitted fabric, and repeating the above steps A) and B). The method for knitting a tubular knitted fabric having a 2 × 1 rubber knitting structure.
JP08286266A 1996-10-29 1996-10-29 Method of knitting tubular knitted fabric having 2 × 1 rubber knitting structure Expired - Fee Related JP3126315B2 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
JP08286266A JP3126315B2 (en) 1996-10-29 1996-10-29 Method of knitting tubular knitted fabric having 2 × 1 rubber knitting structure
DE69721443T DE69721443T2 (en) 1996-10-29 1997-10-28 Process for the production of circular knitwear with 2X1 rib stitches
CN97119940A CN1104518C (en) 1996-10-29 1997-10-28 Braiding method of drum-like braided fabric substrate with 2 X 1 screwed hole structure
ES97308606T ES2192655T3 (en) 1996-10-29 1997-10-28 METHOD FOR CONNECTING A 2 X 1 TUBULAR TUBULAR FABRIC.
KR1019970055676A KR100469827B1 (en) 1996-10-29 1997-10-28 How to knit cylindrical knitted fabrics with 2 × 1 rubber tissue
EP97308606A EP0839940B1 (en) 1996-10-29 1997-10-28 A method of knitting tubular fabric having 2 x 1 rib stitch
US08/958,586 US5873266A (en) 1996-10-29 1997-10-28 Method of knitting tubular fabric having 2×1 rib stitch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08286266A JP3126315B2 (en) 1996-10-29 1996-10-29 Method of knitting tubular knitted fabric having 2 × 1 rubber knitting structure

Publications (2)

Publication Number Publication Date
JPH10131001A JPH10131001A (en) 1998-05-19
JP3126315B2 true JP3126315B2 (en) 2001-01-22

Family

ID=17702142

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08286266A Expired - Fee Related JP3126315B2 (en) 1996-10-29 1996-10-29 Method of knitting tubular knitted fabric having 2 × 1 rubber knitting structure

Country Status (7)

Country Link
US (1) US5873266A (en)
EP (1) EP0839940B1 (en)
JP (1) JP3126315B2 (en)
KR (1) KR100469827B1 (en)
CN (1) CN1104518C (en)
DE (1) DE69721443T2 (en)
ES (1) ES2192655T3 (en)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2779747B1 (en) * 1998-06-15 2000-08-18 Terrot METHOD FOR MANUFACTURING A KNITTED ARTICLE AND ARTICLE SO OBTAINED
DE10027534A1 (en) * 2000-06-02 2001-12-13 Stoll & Co H Knitting of a tubular garment with circular band sections on a flatbed knitter uses four knitting planes and selective use of alternating needles in the two opposing needle beds
EP1396564A1 (en) * 2002-09-04 2004-03-10 H. Stoll GmbH & Co. Method for knitting rib sections
EP1396565B1 (en) * 2002-09-04 2008-03-19 H. Stoll GmbH & Co. Method for producing knitted rib-sections
JP5695862B2 (en) * 2010-08-25 2015-04-08 株式会社島精機製作所 How to create a knitted fabric
JP5698482B2 (en) * 2010-09-17 2015-04-08 株式会社島精機製作所 Method of increasing outside of tubular knitted fabric, and knitted fabric
DE102011012767A1 (en) 2010-09-18 2012-03-22 H. Stoll Gmbh & Co. Kg Method for producing a hose knit
JP5695978B2 (en) * 2011-06-02 2015-04-08 株式会社島精機製作所 Knitting method of knitted fabric having holes and the knitted fabric
JP5736250B2 (en) * 2011-06-28 2015-06-17 株式会社島精機製作所 Knitting method of knitted fabric and knitted fabric
JP5905347B2 (en) * 2012-06-29 2016-04-20 株式会社島精機製作所 Knitting method of knitted fabric
JP2014025159A (en) * 2012-07-25 2014-02-06 Shima Seiki Mfg Ltd Method for knitting knitted fabric
JP6084041B2 (en) * 2013-01-10 2017-02-22 株式会社島精機製作所 Knitted substrate forming method, knitted substrate, and fiber reinforced plastic
CN103866478B (en) * 2014-03-04 2015-06-17 江苏金龙科技股份有限公司 Method for using two-needle bar flat knitting machine to weave 1*1 rib stitch fabric capable of being directly worn without tailoring and sewing processes
CN103866479A (en) * 2014-03-04 2014-06-18 江苏金龙科技股份有限公司 Method for knitting 2*1 rib stitch textile through two-needle bar flat knitting machine
CN103866482B (en) * 2014-03-05 2015-09-23 江苏金龙科技股份有限公司 One knits by two-needle bar flat knitting machine the method can wearing 2 × 2 rib stitch fabrics
US10100445B2 (en) * 2014-04-03 2018-10-16 Nike, Inc. Method of forming a unitary knit article using flat-knit construction
EP3138431B1 (en) * 2014-05-02 2019-04-17 Shima Seiki Mfg., Ltd. Shoe upper and method for knitting shoe upper
CN104264355B (en) * 2014-08-27 2016-04-06 江苏金龙科技股份有限公司 A kind of method by two-needle bar flat knitting machine braided metal wire fabric
US10368590B2 (en) 2015-11-03 2019-08-06 Nike, Inc. Flat-knit support garment for upper torso
US10415164B2 (en) 2017-05-02 2019-09-17 Nike, Inc. Upper-torso garment with three-dimensional knit structures
US10912340B2 (en) 2017-05-02 2021-02-09 Nike, Inc. Upper-torso garment with tubular-jacquard knit structure
US10145042B2 (en) * 2017-05-02 2018-12-04 Nike, Inc. Upper-torso garment with tubular-jacquard knit structure
JP6501824B2 (en) * 2017-05-29 2019-04-17 株式会社島精機製作所 Bonding method of knitted fabric
US11142854B2 (en) 2018-10-03 2021-10-12 Nike, Inc. Upper-torso garment with three-dimensional knit structures
CN111304808B (en) * 2020-03-09 2021-07-16 斓帛职业培训学校(桐乡)有限公司 Two-needle-plate cylindrical 2X1 tight rib knitting structure and knitting method thereof
JP7434035B2 (en) * 2020-04-01 2024-02-20 株式会社島精機製作所 How to knit tubular knitted fabric
CN114000251B (en) * 2021-11-05 2023-01-13 嘉兴市蒂维时装有限公司 Weaving method of full-forming side seam hand seam imitating decorative line, and weave and fabric thereof

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1185299A (en) * 1966-06-07 1970-03-25 Courtaulds Ltd Knitting Method
JPS60194154A (en) * 1984-03-07 1985-10-02 株式会社島精機製作所 Knitting of tublar plain stitch fabric by traverse knitting fabric
JPH0268337A (en) * 1988-09-01 1990-03-07 Shima Seiki Seisakusho:Kk Method for knitting cylindrical knitted fabric having rubber knitted weave
JPH02229248A (en) * 1989-03-03 1990-09-12 Shima Seiki Seisakusho:Kk Knitting of tubular knit fabric
US5211035A (en) * 1990-03-27 1993-05-18 Drassel, Inc. Method of manufacturing split-heel sock
JPH0765258B2 (en) * 1990-07-17 1995-07-12 株式会社島精機製作所 Knitted fabric edge treatment method
JP2530254B2 (en) * 1990-10-31 1996-09-04 株式会社島精機製作所 Knitted fabric end treatment method and knitted fabric with design treatment applied to the end
JP2538421B2 (en) * 1990-12-13 1996-09-25 株式会社島精機製作所 Knitting method of knitted fabric for neck in Nitto products
KR930005416A (en) * 1991-08-21 1993-03-23 정용문 Branch connection method and telephone connection circuit of telephone having priority of call
DE69232234T2 (en) * 1991-09-19 2002-06-13 Shima Seiki Mfg. Ltd., Wakayama Process for knitting seamless clothing on flat knitting machines
IT1271974B (en) * 1993-03-05 1997-06-10 Benetton Spa PROCEDURE FOR THE CREATION OF A COMPLETE CLOTHING ON A TWO-FRONT STRAIGHT MACHINE WITH TONGUE NEEDLES
JP3406085B2 (en) * 1994-10-12 2003-05-12 株式会社島精機製作所 How to knit a rope pattern on the side edge of the knitting width of a tubular knitted fabric

Also Published As

Publication number Publication date
DE69721443T2 (en) 2003-11-20
US5873266A (en) 1999-02-23
JPH10131001A (en) 1998-05-19
EP0839940A2 (en) 1998-05-06
CN1181428A (en) 1998-05-13
KR19980033237A (en) 1998-07-25
KR100469827B1 (en) 2005-05-19
EP0839940A3 (en) 1999-04-14
ES2192655T3 (en) 2003-10-16
EP0839940B1 (en) 2003-05-02
CN1104518C (en) 2003-04-02
DE69721443D1 (en) 2003-06-05

Similar Documents

Publication Publication Date Title
JP3126315B2 (en) Method of knitting tubular knitted fabric having 2 × 1 rubber knitting structure
JP3010480B2 (en) Method of knitting woven jacquard consisting of double jersey organization on tubular knitted fabric
JP3541177B2 (en) How to knit knitted clothing
WO2002070800A1 (en) Knitted fabric having opening portion and knitting method therefor
JP3071147B2 (en) How to knit a garment with a collar
US20030010067A1 (en) Method of knitting neck portion of knit wear by weft knitting machine and the knit wear
GB2228750A (en) Knitting tubular fabric with fashion lines on a flat machine
JPH0375656B2 (en)
CN102086560A (en) Knitting method of knitted fabric and knitted fabric
WO2001055492A1 (en) Method of knitting neck of knit wear by weft knitting machine and knit designing device for producing the method of knitting the neck
JP5567565B2 (en) Knitwear having sleeves and body and knitting method thereof
JP3968100B2 (en) Method for knitting tubular knitted fabric
US6935140B2 (en) Method of knitting tubular knitted fabric
JP3888899B2 (en) Knitwear knitting method
EP0569159A2 (en) A method of forming piping at the end of a knitted fabric and a knitted fabric having piping formed at its fabric end
KR100585256B1 (en) Binding off method excellent in stretchability
JP2002020951A (en) Method for producing knitted fabric having several knitting planes
JP5603779B2 (en) Inside increase method and knitted fabric
US5692399A (en) Method of knitting fabric having three-dimensional silhouette shape
JP2003041461A (en) Knitting method for border pattern and knitted product having the same
JP3251521B2 (en) Knitted garment having two-layer structure and knitting method thereof
EP1605083B1 (en) Method of knitting knitwear
JP3757073B2 (en) A method for knitting a garment with a two-layer structure
JP2514489B2 (en) Knitted fabric having quadruple structure and knitting method thereof
JP3494487B2 (en) Knitting method of tubular knitted fabric

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081102

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091102

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091102

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101102

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111102

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121102

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131102

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees