EP2625346B1 - Sous-structure métallique de plafond - Google Patents

Sous-structure métallique de plafond Download PDF

Info

Publication number
EP2625346B1
EP2625346B1 EP11764689.3A EP11764689A EP2625346B1 EP 2625346 B1 EP2625346 B1 EP 2625346B1 EP 11764689 A EP11764689 A EP 11764689A EP 2625346 B1 EP2625346 B1 EP 2625346B1
Authority
EP
European Patent Office
Prior art keywords
metal
accordance
ceiling substructure
beams
connectors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP11764689.3A
Other languages
German (de)
English (en)
Other versions
EP2625346A2 (fr
Inventor
Karl Wenig
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Knauf Ceiling Solutions GmbH and Co KG
Original Assignee
Knauf AMF GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Knauf AMF GmbH and Co KG filed Critical Knauf AMF GmbH and Co KG
Priority to EP11764689.3A priority Critical patent/EP2625346B1/fr
Priority to PL11764689T priority patent/PL2625346T3/pl
Publication of EP2625346A2 publication Critical patent/EP2625346A2/fr
Application granted granted Critical
Publication of EP2625346B1 publication Critical patent/EP2625346B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/122Connections between non-parallel members of the supporting construction one member passing through the other member, both members laying at least partly in the same plane

Definitions

  • the invention relates to a metallic ceiling substructure for ceiling elements, which consists of intersecting, spaced from the ceiling metal beams.
  • the metal supports form a grid and are in the form of main and transverse beams.
  • the connection of the metal support to each other is realized by specially designed connectors, which engage in openings which are arranged in the web region of the metal support, and engage the individual metal support with each other.
  • the prior art prior art substructure is also a grid formed by locking of main and cross members.
  • the main and transverse beams described therein are designed in the form of a T-profile.
  • the latching takes place here already by connectors, which are arranged on the front sides of the metal carrier and by an opening which is arranged in the web region of the metal carrier, engage.
  • the opening in the T-beams is formed in a special rectangular shape.
  • WO 2009/087378 A1 a T-beam of a web and a flange described, which can also be used for metallic ceiling substructures.
  • US3501185A describes all the technical features of the introductory part of the first claim. Proceeding from this, it is the object of the present invention to provide a metallic ceiling substructure for ceiling elements, in which the individual metal support, ie the main and cross members, are locked together easily and safely. Also should be possible by the solution to be found easy separation of the latched connection.
  • a further object of the present invention is also to propose a connector which is as simple as possible in construction, which nevertheless ensures reliable latching of the individual metal carriers to one another.
  • a metallic ceiling substructure for ceiling elements, which consists of intersecting, spaced from the ceiling metal beams, which form a grid.
  • the metal beams are formed as a main and transverse beams and consist of an inverse T-profile, the flange is aligned in the direction of the interior of the room.
  • the crossing points of the grid are formed by connectors which are arranged at the front ends of the cross members and which are latched to one another via openings in the web region of the metal carriers.
  • the metal supports have an opening with a rectangular basic shape, with projections in the direction of the interior of the opening being formed centrally on the short sides of the rectangle and on the longitudinal sides of the rectangle at the same height are.
  • These specially designed openings then act together with the connectors as they are proposed according to the invention, namely with connectors which have respective bends on their longitudinal sides.
  • a further advantage of the solution according to the invention is that the projections, ie the projections both on the short side of the rectangle and those which are arranged on the longitudinal sides, are machined out of the material of the metallic carrier itself. As a result, in a simple production process, the protrusions can be formed simultaneously with the manufacture of the metallic supports.
  • the projections are formed on the longitudinal side in the upper region facing away from the flange side. These projections are on the long sides in the upper third.
  • the projections and the opening itself are then dimensioned so that they are suitable for guiding the connectors passing through the opening.
  • the size ratios of the rectangle are thus matched directly to the connector.
  • the connectors themselves are, as known per se, attached to the front ends of the cross member via at least one connecting device, preferably a compression and / or rivets.
  • the connectors, which are attached to the front ends of the cross member, then protrude beyond the front end of the cross member, of course.
  • the connectors are matched in their dimensioning and design so that they work together in combination with the openings in the web area of the metal support.
  • each connector has a fold on both sides of the long sides, which cooperates with the projections.
  • the specific form of the connector is not limited in the sense of the invention.
  • the connectors if they have the above-described folds in omega form, can be designed both as hook connectors and as click connectors.
  • the hook connectors which can be used according to the invention, are constructed so that the connector itself has two openings, both in the front end of the web area superior part are formed.
  • the two openings can either be flat, or, which is preferred, be formed so that the first opening, namely the one which faces the front end of the web, has approximately rectangular shape and is arched outwardly.
  • the second opening is designed so that in each case the bulged opening of the other connector of the cross member can engage in the second opening.
  • the hook connector as described above is further characterized in that it has an arcuate recess and an additional nose in the folded portion, on the side facing away from the flange side.
  • This specific design of the arcuate recess with the nose ensures that then in the locked state easy release of the locking connection is possible. Namely, when one of the rails, preferably the main carrier is pushed aside, the nose releases from its support point and the cross member can then be pulled out through its opening.
  • the inventively proposed hook connector which has a hook at its free end, thus characterized by the fact that he also has omega shape and that he next to the nose has an arcuate recess in the folded portion.
  • the invention also encompasses other embodiments, namely by means of an opening in the connector or else two, which can each also be planar. Also, the invention includes embodiments that are formed without opening in the connector.
  • the hook connectors described above can be used for latching cross members to the main carrier or the cross members with each other, but the locking can also be done by means of so-called.
  • Click connectors Such click connectors are known in the art in principle.
  • a click connector which in turn also has the omega shape already described above for the hook connector.
  • the click connector according to the invention is therefore also characterized in that it has the above-described folds, so that an omega-shape of the click connector is formed and in which case a spring is arranged in the area between the two folds.
  • the design of the spring is in and of itself known in the art.
  • the click connector also has an omega shape due to the folds.
  • latching takes place by means of the above-described connectors between two transverse beams and the main beam.
  • the transverse beams may in turn be latched to one another.
  • the cross member in the web area on the opening described above then also have the cross member in the web area on the opening described above.
  • a latching then takes place with two other cross members with the connectors described above.
  • the main carrier 3 to 4 m long preferably 3.6 m and 3.75 m
  • the cross member has a length of 0.5 m to 2.0 m, preferably 0.6 m to 0.625 m and 1.2 m and 1.25 m, respectively.
  • the metallic ceiling substructure according to the invention is further distinguished by the fact that the connection of the cross members to the main carrier or the connection of two cross members with another cross member through the arranged in the web portion opening can be formed so that metal carriers are connected to each other via impact at the intersection points , In this case, thus abuts the front end of the flange of the cross member to the longitudinal edge of the flange. This achieves a flush transition towards the room side.
  • the ceiling substructure according to the invention can also be designed so that the front ends of the cross member have a crank, so that this offset then engage over the flange of the main carrier or the cross member, so that then a secure grip is ensured.
  • Another particularly preferred embodiment now proposes that for safe connection of the cross member with the main carrier or the cross member with each other at the front ends of the cross member ahoppedcetateer from the material of the cross member projection is present. This projection then engages in the locked state on the flange of the main carrier or the cross member and provides additional stabilization.
  • this solution consists in the fact that this projection can be worked out in the manufacture of the cross member with the material of the cross member in one operation.
  • the projection, which protrudes from the web of the cross member is thus an integral part of the cross member itself.
  • the length and dimensioning of the projection of the cross member is adjusted so that a secure overlap of the projection on the top of the flange of the main carrier or another cross member achieved becomes. It has been found that especially this variant is preferred because it is inexpensive to manufacture on the one hand and also allows a secure and stable locking.
  • this solution has the advantage that there is no jamming when releasing the locking connection, so that the locking connection in a simple manner dissolves again.
  • the T-beam is preferably formed from a double sheet.
  • the production of such a T-beam thus takes place from a flat sheet, which is formed by certain forming operations so that a T with a web length preferably in the range of 20 to 80 mm and a flange width of 10 to 70 mm is formed.
  • the web-side end of the T-beam has a hollow profile, preferably in a rectangular shape.
  • the double sheet is connected to the flange-side end of the T-beam via an additional metallic end plate.
  • This metallic end plate which then visually comes into effect on the room side, can be designed according to the desired design. In addition to the optical effects, this metallic end plate also has the advantage that it provides additional stabilization of the flange end of the T-profile.
  • the T-beam used according to the invention for the main beams and the cross beams can be further formed in the web area by providing at least one line-shaped reinforcing profile over the entire length of the web area.
  • This reinforcing profile may for example be embossed in the form of a rectangle in the metal.
  • the invention also encompasses embodiments in which more than one reinforcing profile, for example two or three reinforcing profiles, are incorporated in the web area in parallel form.
  • reinforcing ribs may additionally be pressed in the web region of the main carrier and cross member in the region of the flange-side end. These reinforcing ribs can be incorporated selectively or in the form of short lines in the web area in the region of the flange-side end. These reinforcing ribs are usually also formed in a line shape and parallel to the flange.
  • the reinforcing ribs are introduced by a two-stage process in the web. In the first process step, a tab is cut free from the material. In the second process step is then carried out by a stamp pressing, so that a flow of the material of the tab takes place.
  • such a configuration of the reinforcing ribs according to the present invention is preferred, since a high improvement of the torsional stiffness can be achieved, in particular, with such a configuration of the reinforcing ribs.
  • this embodiment can then be combined with the further possibility that there is additionally a linear reinforcement as described above.
  • an embodiment is preferred in which the reinforcing ribs have been alternately pressed from one direction into the other at the flange end, and that then further reinforcing ribs are additionally pressed parallel thereto at the web-side end in the direction of the hollow profile, which in turn alternately from one direction the other are incorporated.
  • the arranged at the web-side end reinforcing ribs may have a greater distance from each other.
  • the invention also includes embodiments in which e.g. two reinforcing ribs are arranged in line parallel to the flange and in addition then also the reinforcing profiles in line form as described above are present.
  • the material of the metallic carrier is a steel sheet of cold rolled strip.
  • the steel grades include integrated C-steels with carbon mass fractions up to 1%, a preferred steel sheet is DX 51 Z 100.
  • the material for the connectors is a stainless steel, e.g. Chromium-nickel alloyed steels, such as e.g. X10CrNi18-8 (AISI 301).
  • FIGS. 13 and 14 show a further embodiment of the metal layer with reinforcing ribs.
  • FIG. 1 shows in plan view the formation of the opening 1, as provided according to the invention in the metal supports, ie both in the main carrier and in the cross member.
  • the opening 1 is formed in a rectangular shape and has two projections 2, 3 on the two short sides and two projections 4 and 5 on the longitudinal sides.
  • the projections are FIG. 5 shows in FIG. 4a and in FIG. 4b in two different views the formation of the crossing point of the catch between the main and cross members with the connectors.
  • FIG. 6 shows in a further section how the connectors interact in the opening.
  • FIG. 7 shows in a further illustration a bayonet closure for connecting the main carrier with each other.
  • FIG. 8 shows the omega shape of a hook connector.
  • FIG. 9 shows the omega shape of a click connector.
  • FIG. 1 shows in plan view the formation of the opening 1, as provided according to the invention in the metal supports, ie both in the main carrier and in the cross member.
  • the opening 1 is formed in a rectangular shape and has two projections 2, 3 on the two short sides and two projections 4 and 5 on the longitudinal sides.
  • the projections are be worked out of the material of the double sheet metal carrier or they can be applied separately in one operation.
  • These reinforcing ribs which are likewise likewise arranged linearly in the vicinity of the flange 32 close to the flange, again increase the rigidity, in order then to produce sufficient stability for the ceiling substructure when the corresponding ceiling elements are suspended.
  • the invention includes, of course, embodiments in which only reinforcing ribs are arranged in line form or that only reinforcing profiles are provided in line form.
  • the metal support shown there additionally has a metallic end plate 10 which is folded over the ends of the flange 31 of the metal support.
  • a desired optical effect can be produced on the room side.
  • the end plate also ensures a flush conclusion room side.
  • FIG. 3 shows a detail of the formation of a hook connector 11 according to the invention and its attachment to a cross member 12.
  • the connector 11, as shown FIG. 3 can be seen, is attached via two pressings 13, 14 at the front end of the cross member 12.
  • the connector 11 is characterized in that it has a hook 15 at its free end. As below in the FIG. 4 explained in more detail, this hook 15 is used for locking with the main beam or cross member.
  • the embodiment of the connector as he FIG. 3 is shown also has two openings 16 and 17. As is apparent from the figure, is the first opening 17, ie the one which faces the front end of the web, formed in a rectangular shape and has outwardly bulging longitudinal sides.
  • the second opening 16 is now flat and designed so that when interlocking the connectors 11 at the crossing points, the bulge of the other connector 17 can engage in the opening 16.
  • the connector 11, as in FIG. 3 is still characterized by the fact that it has two folds 18, 19, so that an omega shape is formed. These bends 18, 19 are formed in their shape, that they with the projections 4 and 5, as in FIG. 1 shown, work together.
  • Another essential element of the hook connector according to the invention is that this has an arcuate recess 41 with a nose 40 in the folded portion, on the side facing away from the flange side.
  • FIG. 3 illustrated embodiment is still characterized by the fact that the cross member 12 is provided with a projection 20.
  • This projection 20, which is an integral part of the cross member 12 is machined out of the same material as the cross member 12 and serves to stabilize the Operative connection of the two transverse beams 12 to be connected to a main beam or to another cross beam.
  • the design and shape of the projection 20 is chosen so that it engages in the locked state on the flange of the main carrier or the cross member and thus contributes to a stabilization (see, inter alia FIG. 4 ).
  • FIG. 3 also shows the introduced in the cross member 12 reinforcing ribs 8 in line form.
  • FIG. 4 now shows the inventive design of a click connector.
  • the click-connector according to the invention also has, what is considered essential to the invention, two folds 18, 19, so that in turn here an omega-shape is formed.
  • the click connector according to the invention then has, as is well known in the art, a resilient element 50.
  • the formation of this resilient element 50 is in and of itself known in comparable click connectors in the prior art.
  • FIG. 5 is now shown in two different sections a) and b), as the two cross members 12 are latched on the hook connectors and the main carrier 21.
  • FIG. 5a On average in the FIG. 5a is partially shown in the left part of the cross member 12 with a hook connector 11, as described above in the FIG. 3 has been described in detail.
  • An identical cross member 12 with an identical connector 11 is in the right part of FIG. 5a shown.
  • the main carrier 21, which now only seen in section here is, is analogous to in FIG. 2 constructed and consists of a web with a rectangular reinforcement 9 and a flange.
  • the opening is designated 1.
  • the hook 15 engages through the opening 1 therethrough.
  • the two connectors 11 are then locked together via the openings 16 and 17 with each other. Characterized in that the opening 17 has a bulge to the outside, this bulge of the opening 17 of a connector 11 can engage in the planar opening 16 of the other connector 11, so as to accomplish a secure locking.
  • FIG. 5b the latch is shown in plan view.
  • the main carrier 21 is, as in the above FIG. 5a described, with the two cross beams 12 and the identical connectors 11 locked.
  • the locking is achieved via the connectors 11 of the respective cross members 12, which are fastened by means of rivets 13, 14 at the front end of the cross member (crossing point).
  • FIG. 6 is now shown in a third section in an enlarged view the locking of the two hook connectors in the opening 1.
  • FIG. 6 shows the interaction of the opening 1 with the specially designed connectors 11.
  • FIG. 6 is the omega shape (dashed) of the connectors 11 to see.
  • the projections 2, 3, 4 and 5 serve to guide the connector 11.
  • the connector 11 has folds 18, 19 which are formed so that they engage around the projections 2, 3, 4 and 5.
  • the connector 11 is provided with folds 18, 19, the said longitudinal sides pulled through, formed, these folds 18, 19 are formed so that they interact exactly with the projections 2, 3, 4 and 5, thus ensuring a secure fit of Verrastharm.
  • FIG. 7 The main carrier 21 with the opening 1 and a bayonet closure 30.
  • a connector as described above is not proposed for connecting the main carriers to one another, but this connection is ensured with bayonet closures known per se from the prior art.
  • FIG. 8 shows now in three different views already at FIG. 3 closer described hook connector 11.
  • the hook connector 11 is shown in plan view and fully corresponds to the hook connector as shown in FIG. 3 has already been described in detail.
  • FIG. 8b is now shown in section the hook connector 11.
  • the hook connector 11 has an omega shape with two folds 18 and 19.
  • FIG. 8 shows FIG. 8 then the hook connector 11 in the side view.
  • FIG. 9 shows in an analogous way in three views in Figures 9a, 9b and 9c the training of already at FIG. 4 described click connector.
  • the click connector 60 in cross-section an omega shape with folds 18 and 19.
  • the key advantage of the connectors according to the invention is that both the hook connector 11, as above at FIG. 8 described as well as the click connector 60 in cross-section an omega-shaped, which is designed similar, so that this omega shape with the projections in the opening 1 cooperates.
  • the depth of the fold is matched exactly to the projections.
  • the hook connector 11 essentially corresponds to the embodiment of the hook connector, as already described in FIG FIG. 8 has been described in detail.
  • the hook connector according to FIG. 8 has the hook connector of this embodiment, starting from the nose in the bent portion 18 in the direction of the front end ces connector 11, and here in the non-folded portion, a further fold. This further fold is now formed in the direction of the fold 18, but only in the area compared to the execution of FIG. 8 not folded.
  • the above embodiment has the advantage that even easier and clearer locking and releasing at the same time tig sure Hold the locking connection results.
  • the embodiment corresponds to those already detailed in FIG. 2 has been described.
  • the embodiment according to FIG. 2 is now that in addition to the reinforcing ribs 8, which are formed in the region near the flange, and the linear reinforcing profile, further reinforcing ribs are additionally provided.
  • These additional reinforcing ribs are also incorporated as the reinforcing ribs 8 in the metallic carrier, for example, also pressed, but preferably have a greater distance from each other as the reinforcing ribs 8 in the vicinity of the flange.
  • the invention also includes embodiments in which more additional reinforcing ribs are introduced. It is essential, however, that these additional reinforcing ribs are formed in the web region between the linear reinforcement 7 and the rectangular hollow profile 9.
  • reinforcing ribs are alternately introduced from one side in the direction of the other.
  • reinforcing ribs are linearly introduced at the flange end.
  • each of the reinforcing ribs has been alternately worked from one side toward the other.
  • reinforcing ribs parallel to the flange in line shape at regular intervals reinforcing ribs have been alternately pressed in each case from one side in the direction of the other and continue parallel to the web-side end in the vicinity of the hollow section 9 alternately pressed reinforcing ribs, but are in the direction of web-side end arranged reinforcing ribs provided at a greater distance. It has been found that, in particular, this embodiment realizes an excellent torsional security and stability of the metal carrier.
  • reinforcing ribs 32 are alternately introduced alternately from one direction to the other in the metal carrier 21 only alternately at the flange-side end of the web.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Mechanical Coupling Of Light Guides (AREA)

Claims (27)

  1. Infrastructure de plafond métallique pour des éléments de plafond, qui est constituée de supports métalliques distants du plafond, qui forment une grille, les supports métalliques étant conçus comme des supports principaux et des supports transversaux et présentent un profil en T inversé, dont la bride (31) pointe en direction de l'intérieur de la pièce, et les points de croisement de la grille étant constitués de connecteurs (11, 60) disposés au niveau des extrémités frontales des supports transversaux (12), qui sont encliquetés entre eux par des ouvertures (1) dans la partie d'entretoise des supports métalliques, les supports métalliques présentant une ouverture (1) avec une forme de base rectangulaire, moyennant quoi, au centre au niveau des côtés courts du rectangle et au niveau des côtés longs du rectangle, sont réalisées des saillies (2, 3, 4, 5) à la même hauteur en direction de l'intérieur de l'ouverture (1) et les connecteurs (11, 60) présentant, au niveau de leurs côtés longitudinaux, des plis (18, 19), qui interagissent avec les saillies (2, 3, 4, 5), caractérisé en ce que les saillies (4, 5) sont réalisées au niveau des côtés longitudinaux, dans le tiers supérieur de la zone opposée au côté de la bride (31), moyennant quoi, dans l'entretoise (32) des supports métalliques, à partir d'au moins une face latérale de l'entretoise (32), des nervures de renfort (8, 8') sont enfoncées en direction des faces latérales opposées de l'entretoise (32).
  2. Infrastructure de plafond métallique selon la revendication 1, caractérisée en ce que les saillies (2, 3, 4, 5) des ouvertures (1) sont réalisées à partir du matériau des supports métalliques.
  3. Infrastructure de plafond métallique selon l'une des revendications 1 ou 2, caractérisée en ce que les saillies (2, 3, 4, 5) des ouvertures rectangulaires (1) sont dimensionnées de façon à servir de guidage pour les connecteurs (11, 60) guidés à travers l'ouverture (1).
  4. Infrastructure de plafond métallique selon l'une des revendications 1 à 3, caractérisée en ce que les connecteurs (11, 60) à travers les plis (18, 19) présentent une forme d'oméga.
  5. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 4, caractérisée en ce que les connecteurs (11, 60) sont fixés au niveau des extrémités frontales des supports transversaux (12) par l'intermédiaire d'au moins un pressage (13, 14).
  6. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 5, caractérisée en ce que les connecteurs (11) présentent deux ouvertures (16, 17), la première ouverture (17), qui est orientée vers l'extrémité frontale de l'entretoise, présentant une forme rectangulaire avec des côtés longitudinaux courbés vers l'extérieur, et en ce que la deuxième ouverture (16) est conçue de façon à ce que l'ouverture incurvée (17) du connecteur (11) de l'autre support transversal (12) puisse s'emboîter dans la deuxième ouverture (16) du connecteur (11) et en ce que, au niveau des extrémités libres des connecteurs (11), se trouve un crochet (15) (connecteur à crochet).
  7. Infrastructure de plafond métallique selon la revendication 6, caractérisée en ce que les connecteurs (11) présentent, sur le côté opposé au côté de la bride, dans la partie pliée, un embout (40) et une échancrure en forme d'arc (41).
  8. Infrastructure de plafond métallique selon la revendication 7, caractérisée en ce que le connecteur (11) présente, à partir de l'embout (40), dans la partie pliée (18), en direction de l'extrémité frontale du connecteur (11), dans la partie non pliée, un autre pliage.
  9. Infrastructure de plafond métallique selon l'une des revendications 1 à 5, caractérisée en ce que les connecteurs (60) présentent entre les deux pliages (18, 19), un élément élastique (50) (connecteur à clipsage).
  10. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 9, caractérisée en ce que les supports métalliques sont reliés entre eux par aboutement au niveau des points de croisement.
  11. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 9, caractérisée en ce que les supports métalliques sont reliés entre eux par l'intermédiaire d'un coudage formé au niveau des extrémités frontales des supports transversaux (12).
  12. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 9, caractérisée en ce que les supports métalliques comprennent chacun, au niveau des extrémités frontales de l'entretoise (32), une saillie (20) réalisée à partir du matériau du support métalliques, qui s'emboîte, dans l'état encliqueté, sur le côté intérieur de la bride (31) de l'autre support métallique.
  13. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 12, caractérisée en ce que les supports en T sont constitués d'une double tôle.
  14. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 13, caractérisée en ce que l'extrémité frontale des supports en T présente un profil creux (9) de préférence de forme rectangulaire.
  15. Infrastructure de plafond métallique selon la revendication 14, caractérisée en ce que la double tôle est reliée au niveau de l'extrémité côté bride du support en T, par l'intermédiaire d'une tôle de raccordement métallique (10) supplémentaire.
  16. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 15, caractérisée en ce que, dans l'entretoise (32) des supports métalliques, de préférence sur toute la longueur des supports métalliques, se trouve au moins un profilé de renfort linéaire (7).
  17. Infrastructure de plafond métallique selon la revendication 16, caractérisée en ce que deux ou trois profilés parallèles de renfort linéaires (7) se trouvent dans l'entretoise (32).
  18. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 17, caractérisée en ce qu'au moins une partie des nervures de renfort (8) sont pressées par l'autre côté.
  19. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 18, caractérisée en ce que les nervures de renfort (8) sont parallèles à la bride (31) sous une forme linéaire.
  20. Infrastructure de plafond métallique selon au moins l'une des revendications 16 à 19, caractérisée en ce que, dans l'entretoise (32), de préférence sur toute la longueur du support métallique, se trouve un profilé de renfort linéaire (7) et au niveau de l'extrémité, côté bride, se trouvent des nervures de renfort (8) et au niveau de l'extrémité côté entretoise, se trouvent d'autres nervures de renfort (8').
  21. Infrastructure de plafond métallique selon la revendication 20, caractérisée en ce que les autres nervures de renfort (8') présentent une distance entre elles supérieure aux nervures de renfort (8).
  22. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 21, caractérisée en ce que les supports principaux (21) sont reliés entre eux par l'intermédiaire de connecteurs disposés au niveau des extrémités frontales, qui forment les uns avec les autres une fermeture à baïonnette (30).
  23. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 22, caractérisée en ce que la grille est constituée de supports transversaux et de supports principaux (12, 21) encliquetés les uns avec les autres et/ou de supports transversaux (12) encliquetés entre eux.
  24. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 23, caractérisée en ce que les supports principaux (21) présentent une longueur de 3 m à 4 m et les supports transversaux (12) présentent une longueur de 0,5 m ou de 2 m.
  25. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 24, caractérisée en ce que le profilé en T des supports métalliques présentent une longueur d'entretoise de 20 à 80 mm et une largeur de bride de 10 à 70 mm.
  26. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 25, caractérisée en ce que le matériau métallique des supports est une tôle fine en acier.
  27. Infrastructure de plafond métallique selon au moins l'une des revendications 1 à 26, caractérisée en ce que le matériau métallique des connecteurs est un acier inoxydable.
EP11764689.3A 2010-10-04 2011-10-04 Sous-structure métallique de plafond Active EP2625346B1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP11764689.3A EP2625346B1 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond
PL11764689T PL2625346T3 (pl) 2010-10-04 2011-10-04 Metalowa podkonstrukcja sufitowa

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP10013273.7A EP2447434B1 (fr) 2010-10-04 2010-10-04 Sous-structure de plafond métallique
EP11764689.3A EP2625346B1 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond
PCT/EP2011/004943 WO2012045438A2 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond

Publications (2)

Publication Number Publication Date
EP2625346A2 EP2625346A2 (fr) 2013-08-14
EP2625346B1 true EP2625346B1 (fr) 2018-06-27

Family

ID=43502847

Family Applications (2)

Application Number Title Priority Date Filing Date
EP10013273.7A Active EP2447434B1 (fr) 2010-10-04 2010-10-04 Sous-structure de plafond métallique
EP11764689.3A Active EP2625346B1 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP10013273.7A Active EP2447434B1 (fr) 2010-10-04 2010-10-04 Sous-structure de plafond métallique

Country Status (11)

Country Link
EP (2) EP2447434B1 (fr)
JP (1) JP5934223B2 (fr)
KR (1) KR102017501B1 (fr)
CN (1) CN103154399B (fr)
AU (1) AU2011313553B2 (fr)
BR (1) BR112013007902B1 (fr)
ES (2) ES2464464T3 (fr)
PL (2) PL2447434T3 (fr)
UA (1) UA110944C2 (fr)
WO (1) WO2012045438A2 (fr)
ZA (1) ZA201301695B (fr)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103958798B (zh) * 2011-11-11 2017-06-13 G·奇普里亚尼 用于假天花板的支撑金属结构
ITVR20130040A1 (it) 2013-02-14 2014-08-15 Giuseppe Cipriani Struttura metallica di supporto di un controsoffitto.
ITVR20130058A1 (it) 2013-03-08 2014-09-09 Giuseppe Cipriani Profilato di una struttura di supporto di un controsoffitto e procedimento di lavorazione per lavorare il profilato.
ITVR20130230A1 (it) * 2013-10-17 2015-04-18 Giuseppe Cipriani Accessorio di collegamento di un profilato di una struttura di supporto di un controsoffitto

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3096862A (en) * 1960-09-07 1963-07-09 W J Haertel & Co Ceiling suspension system with double locking clip
US3290075A (en) * 1964-01-20 1966-12-06 Chicago Metallic Sash Co Interlocking runner connection
US3501185A (en) * 1966-07-11 1970-03-17 Donn Prod Inc Cross beam connector
US4779394B1 (en) 1987-04-14 1994-09-27 Donn Inc Connector for suspension ceiling grid
US5517796A (en) * 1994-05-25 1996-05-21 Usg Interiors, Inc. Stab-in removable end connector
US6199343B1 (en) 1999-04-19 2001-03-13 Worthington Armstrong Venture Connector assembly for ceiling grid
JP2001241137A (ja) * 2000-02-24 2001-09-04 Ibiden Co Ltd 建物の天井構造
US6729100B2 (en) * 2002-04-30 2004-05-04 Usg Interiors, Inc. Main tee splice
US6751922B1 (en) * 2003-02-25 2004-06-22 Worthington Armstrong Venture Faceted radius grid
JP4096789B2 (ja) * 2003-04-14 2008-06-04 松下電工株式会社 天井枠
GB2456328A (en) 2008-01-11 2009-07-15 Usg Interiors Inc Grid members for a suspended ceiling and methods of making same
ITPD20100023U1 (it) * 2010-04-06 2011-10-07 Dallan Spa Profilato per intelaiature e intelaiatura

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
PL2447434T3 (pl) 2014-09-30
JP5934223B2 (ja) 2016-06-15
CN103154399A (zh) 2013-06-12
PL2625346T3 (pl) 2018-11-30
EP2447434B1 (fr) 2014-02-26
KR102017501B1 (ko) 2019-09-03
BR112013007902B1 (pt) 2020-12-01
ES2464464T3 (es) 2014-06-02
JP2013542348A (ja) 2013-11-21
WO2012045438A2 (fr) 2012-04-12
UA110944C2 (uk) 2016-03-10
EP2447434A1 (fr) 2012-05-02
WO2012045438A3 (fr) 2012-06-21
ES2688456T3 (es) 2018-11-02
BR112013007902A2 (pt) 2017-06-06
AU2011313553B2 (en) 2015-11-26
EP2625346A2 (fr) 2013-08-14
ZA201301695B (en) 2013-11-27
CN103154399B (zh) 2016-08-31
AU2011313553A1 (en) 2013-04-11
KR20130098387A (ko) 2013-09-04

Similar Documents

Publication Publication Date Title
EP2208835B1 (fr) Panneau, en particulier panneau de sol
EP2625346B1 (fr) Sous-structure métallique de plafond
EP1587195B1 (fr) Système de canalisation pour câble
DE2540118C3 (de) Tragschiene für eine Unterdecke
AT521787B1 (de) Aufkletterschutzeinrichtung
DE3624618C2 (de) Traggitter für eine abgehängte Decke
DE102015108298B4 (de) Steckbarer Gitterrost und Verfahren zu seiner Herstellung
DE3243936A1 (de) Fassadeneinheit
DE3740563A1 (de) Schiene fuer haengedecken
AT395778B (de) Flanschverbindung fuer klimatisierungskanaele
DE102014107965A1 (de) Wandabschnitt
DE4340404C2 (de) Arretierverbindung für ein gitterförmiges Schienensystem einer Hängedecke
DE10010229C1 (de) Haltevorrichtung zum Befestigen von wenigstens einem Geländerrohr an einem Rohrständer eines Gerüstes
DE2823374C3 (de) Draht-Verzugmatte für den Gruben- und Tunnelausbau
DE2721541B2 (de) Rasterdecke
EP0465905A1 (fr) Revêtement de plafond
DE976549C (de) Ausbautraeger, insbesondere fuer den Strebausbau
DE202019005047U1 (de) Betonbauelement und Bewehrungsanordnung, insbesondere für ein Betonbauelement
WO2004016874A1 (fr) Dalle en beton composite et ancre de maintien servant a assembler deux dalles en beton
AT413878B (de) Eckverbindung für die abgekanteten wandflansche eines im querschnitt rechtwinkeligen blechkanalschusses
DE7713539U1 (de) Stahlregal mit Hakenlaschenverbindungen
AT51685B (de) Eisenträger als Einlage für Betonkonstruktionen.
DE2729227C3 (fr)
DE102017112918A1 (de) Spundwandzwischenelement, Spundwandelement und Spundwandsystem mit Spundwandzwischenelment
DE29807453U1 (de) Vorrichtung zur Lagesicherung von Bauelementen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130430

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20151221

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20171026

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

INTC Intention to grant announced (deleted)
GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

INTG Intention to grant announced

Effective date: 20180517

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1012495

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502011014382

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180927

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180927

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20180627

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2688456

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20181102

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180928

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181027

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502011014382

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

26N No opposition filed

Effective date: 20190328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181004

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20111004

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180627

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230822

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20230920

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20230921

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231027

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20231102

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20231027

Year of fee payment: 13

Ref country code: IT

Payment date: 20231023

Year of fee payment: 13

Ref country code: FR

Payment date: 20231025

Year of fee payment: 13

Ref country code: DE

Payment date: 20231027

Year of fee payment: 13

Ref country code: CH

Payment date: 20231102

Year of fee payment: 13

Ref country code: AT

Payment date: 20230920

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20231027

Year of fee payment: 13