Sous-structure métallique de plafond

Info

Publication number
EP2625346A2
EP2625346A2 EP11764689.3A EP11764689A EP2625346A2 EP 2625346 A2 EP2625346 A2 EP 2625346A2 EP 11764689 A EP11764689 A EP 11764689A EP 2625346 A2 EP2625346 A2 EP 2625346A2
Authority
EP
European Patent Office
Prior art keywords
substructure according
metallic
ceiling substructure
connectors
web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11764689.3A
Other languages
German (de)
English (en)
Other versions
EP2625346B1 (fr
Inventor
Karl Wenig
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Knauf Ceiling Solutions GmbH and Co KG
Original Assignee
Knauf AMF GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Knauf AMF GmbH and Co KG filed Critical Knauf AMF GmbH and Co KG
Priority to PL11764689T priority Critical patent/PL2625346T3/pl
Priority to EP11764689.3A priority patent/EP2625346B1/fr
Publication of EP2625346A2 publication Critical patent/EP2625346A2/fr
Application granted granted Critical
Publication of EP2625346B1 publication Critical patent/EP2625346B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/122Connections between non-parallel members of the supporting construction one member passing through the other member, both members laying at least partly in the same plane

Definitions

  • the invention relates to a metallic Deckenunter- construction for ceiling elements, which consists of intersecting, spaced from the ceiling metal beams.
  • the metal supports form a grid and are in the form of main and transverse beams.
  • the connection of the metal support to each other is realized by specially designed connectors, which engage in openings which are arranged in the web region of the metal support, and engage the individual metal support with each other.
  • spaced metal supports forming a grid are known in the art.
  • WO 2009/087378 AI describes a T-beam of a web and a flange, which can also be used for metallic ceiling substructures.
  • a further object of the present invention is also to propose a connector which is as simple as possible in construction, which nevertheless ensures reliable latching of the individual metal carriers to one another.
  • a metallic ceiling substructure for ceiling elements, which consists of intersecting, spaced from the ceiling metal beams, which form a grid.
  • the metal beams are formed as a main and transverse beams and consist of an inverse T-profile, the flange is aligned in the direction of the interior of the room.
  • the crossing points of the grid are arranged by at the front ends of the cross member
  • Connectors which are latched to each other via openings in the web area of the metal carrier formed.
  • the metal supports have an opening with a rectangular basic shape, protrusions in the direction of the interior of the opening being centered on the short sides of the rectangle and on the longitudinal sides of the rectangle at the same height. are formed.
  • These specially designed openings then act together with the connectors as they are proposed according to the invention, namely with connectors which have respective bends on their longitudinal sides.
  • the projections i. the protrusions on both the short side of the rectangle and those arranged on the longitudinal sides are machined out of the material of the metallic supports themselves.
  • the protrusions can be formed simultaneously with the manufacture of the metallic supports.
  • the projections on the longitudinal side are formed in the upper region facing away from the flange side.
  • the projections and the opening itself are then dimensioned so that they are suitable for guiding the connectors passing through the opening. According to the invention, the size ratios of the rectangle are thus matched directly to the connector.
  • the connectors themselves are, as known per se, attached to the front ends of the cross member via at least one connecting device, preferably a compression and / or rivets.
  • the connectors, which at the front ends of the cross member are, as known per se, attached to the front ends of the cross member via at least one connecting device, preferably a compression and / or rivets.
  • Cross members are attached, then naturally protrude beyond the front end of the cross member.
  • the connectors are matched in their dimensioning and design so that they work together in combination with the openings in the web area of the metal support. It is essential that each connector has on both sides of the long sides a fold, which cooperates with the projections.
  • the specific form of the connector is not limited in the sense of the invention.
  • the connectors if they have the above-described folds in omega form, can be designed both as hook connectors and as click connectors.
  • the hook connectors which can be used according to the invention, are constructed so that the connector itself has two openings, both in the front end of the web area superior part are formed.
  • the two openings can either be flat, or, which is preferred, be formed so that the first opening, namely the one which faces the front end of the web, has approximately rectangular shape and is arched outwardly.
  • the second opening is designed so that in each case the curved opening of the other connector of the cross member can engage in the second opening. This will be a further stabilization of
  • the hook connector as described above is further distinguished by the fact that it has an arcuate recess and an additional nose in the folded-off region, on the side facing away from the flange side.
  • This specific design of the arcuate recess with the nose ensures that then, in the locked state, an easy release of the latching connection becomes possible. Namely, when one of the rails, preferably the main carrier is pushed aside, the nose releases from its support point and the cross member can then be pulled out through its opening.
  • the inventively proposed hook connector which has a hook at its free end, thus characterized by the fact that he also has omega shape and that he next to the nose has an arcuate recess in the folded portion.
  • the invention also encompasses other embodiments, namely by means of an opening in the connector or else two, which can each also be planar. Also, the invention includes embodiments without opening in the
  • Connector are formed. According to the invention but not only the hook connectors described above can be used for latching cross members to the main carrier or the cross members with each other, but the locking can also be done by means of so-called. Click connectors. Such click connectors are known in the art in principle. According to the present invention, however, it is now proposed to use a click connector, which in turn also has the omega shape already described above for the hook connector.
  • the click connector according to the invention is therefore also characterized in that it has the above-described folds, so that an omega shape of the click connector is formed and in which case a spring is arranged in the area between the two folds.
  • the design of the spring is in and of itself known in the art.
  • the click connector also has an omega shape due to the folds.
  • Connectors with each other ie click connectors or hook connectors, are used for locking, but it is also a latching possible in such a way that on a cross member in the front end of a click connector and at the other end face of the second cross member, for example a Hook connector is arranged.
  • the omega shape also ensures locking of these two different connector types.
  • latching takes place by means of the connectors described above between two transverse beams and the main beam.
  • the transverse beams may in turn be latched to one another.
  • the metallic ceiling substructure according to the invention is further distinguished by the fact that the connection of the cross members to the main carrier or the connection of two cross members with another cross member through the arranged in the web portion opening can be formed so that metal carriers are connected to each other via impact at the intersection points , In this case, thus abuts the front end of the flange of the cross member to the longitudinal edge of the flange. This achieves a flush transition towards the room side.
  • the ceiling substructure according to the invention can also be designed so that the front ends of the cross member have a crank, so that this offset then engage over the flange of the main carrier or the cross member, so that then a secure grip is ensured.
  • Another particularly preferred embodiment now proposes that for safe connection of the cross member with the main carrier or the cross member with each other at the front ends of the cross member ahoppedcetateer from the material of the cross member projection is present. This projection then engages in the locked state on the flange of the main carrier or the cross member and provides additional stabilization.
  • this solution consists in the fact that this projection can be worked out in the manufacture of the cross member with the material of the cross member in one operation.
  • the projection, which protrudes from the web of the cross member is thus an integral part of the cross member itself.
  • the length and dimensioning of the projection of the cross member is adjusted so that a secure overlap of the projection on the top of the flange of the main carrier or another cross member achieved becomes. It has been found that especially this variant is preferred because it is inexpensive to manufacture on the one hand and also allows a secure and stable locking.
  • this solution has the advantage that there is no jamming when releasing the locking connection, so that the locking connection in a simple manner dissolves again.
  • the T-beam is preferably formed from a double sheet.
  • T-beam thus takes place from a flat sheet, which is formed by certain forming operations so that a T with a web length preferably in the range of 20 to 80 mm and a flange width of 10 to 70 mm is formed.
  • the web-side end of the T-beam has a hollow profile, preferably in a rectangular shape.
  • the double sheet is connected to the flange-side end of the T-beam via an additional metallic end plate.
  • This metallic end plate which then visually comes into effect on the room side, can be designed according to the desired design. In addition to the optical effects, this metallic end plate also has the advantage that it provides additional stabilization of the flange end of the T-profile.
  • the T-beam used according to the invention for the main beams and the cross beams can be further formed in the web area by providing at least one line-shaped reinforcing profile over the entire length of the web area.
  • This reinforcing profile may for example be embossed in the form of a rectangle in the metal.
  • the invention also includes forms of execution in which more than one reinforcing profile, for example two or three reinforcing profiles, are incorporated in parallel in the web area.
  • reinforcing ribs may additionally be pressed in the web region of the main carrier and cross member in the region of the flange-side end.
  • reinforcing ribs can be incorporated selectively or in the form of short lines in the web area in the region of the flange-side end. These reinforcing ribs are usually also formed in a line shape and parallel to the flange. Preferably, the reinforcing ribs are introduced by a two-stage process in the web. In the first process step, a tab is cut free from the material. In the second process step is then carried out by a stamp pressing, so that a flow of the material of the tab takes place. By this pressing is then ensured that the tab can not be pushed back into the recess.
  • such a configuration of the reinforcing ribs according to the present invention is preferred since, in particular with such a configuration of the reinforcing ribs, a high improvement in the torsional stiffness can be achieved.
  • a pressing is thus produced from one side of the side surface of the web region in the direction of the other. It has now been found that it is further preferred if these reinforcing ribs not only from a
  • reinforcing ribs have been alternately pressed from one direction into the other at the flange end, and that then further reinforcing ribs are additionally pressed parallel thereto at the web-side end in the direction of the hollow profile, which in turn alternately from one direction the other are incorporated.
  • the arranged at the web-side end reinforcing ribs may have a greater distance from each other.
  • the invention also includes embodiments in which e.g. two reinforcing ribs are arranged in line parallel to the flange and in addition then also the reinforcing profiles in line form as described above are present.
  • the material of the metallic carrier is a steel sheet of cold rolled strip.
  • the steel grades include integrated C-steels with carbon mass fractions up to 1%, a preferred steel sheet is DX 51 Z 100.
  • the material for the connectors is a stainless steel, e.g. Chromium-nickel alloyed steels, such as e.g.
  • FIG. 1 shows a plan view of the shape of the opening in the web region of the metallic carrier.
  • Figure 2 shows in section the structure of the metallic supports, i. both the main beam and the cross member.
  • Figure 3 shows a hook connector and its attachment to the frontal region of the cross member.
  • Figure 4 shows a click connector and its attachment to the frontal region of the cross member.
  • Figure 5 shows in Figure 4a and Figure 4b in two different views the formation of the crossing point of the latching between the main and cross members with the connectors.
  • FIG. 6 shows in a further section how the connectors cooperate in the opening.
  • FIG. 7 shows a further illustration of a bayonet closure for connecting the main carriers to one another.
  • Figure 8 shows the omega shape of a hook connector.
  • Figure 9 shows the omega shape of a click connector.
  • FIG. 10 shows a hook connector in five different perspectives a), b), c), d) and e).
  • FIG. 11 shows in section the structure of a metallic carrier in the embodiment with two line-shaped reinforcing ribs.
  • FIG. 12 shows the metallic carrier according to FIG. 11 in a side view.
  • FIGS. 13 and 14 show a further embodiment of the metal layer with reinforcing ribs.
  • Figure 1 shows, in plan view, the formation of the opening 1 of the present invention in the metal supports, i. is provided both in the main carrier and in the cross member.
  • the opening 1 is in
  • the formed rectangular shape has two projections 2, 3 on the two short sides and two projections 4 and 5 on the longitudinal sides.
  • the projections are it worked out of the material of the metallic support itself and thus integral part of ⁇ part of the metal support. This allows a simple and inexpensive manufacture because the advantages cracks 2, 3, 4, 5 are made as the Me ⁇ tallmon of the same material and thus can be manufactured in one operation.
  • the essential feature of the solution according to the invention is the specific formation of the opening 1 in the metal carriers.
  • the positioning of the longitudinal projections 4 and 5 is chosen so that they are arranged in the upper third, preferably in the upper quarter of the opening 1 and that they are shaped so that the connector with its specific shape supported by the projections becomes.
  • the metal carrier according to the invention consists of a double sheet, the through
  • Forming is formed accordingly.
  • At its flange 31 opposite end of the web 32 is formed in the form of a rectangular hollow section 9.
  • the example shown in the embodiment according to FIG. 2 additionally also has a bridge 32
  • This reinforcing profile 7 is also formed during the molding of the double sheet with and provides for an additional stiffening of the T-beam in the web 32. This reinforcing profile 7 is preferably over the entire length of the web
  • the invention also includes embodiments in which two or three parallel line-shaped reinforcing profiles 7 are introduced in the web 32.
  • the metal carrier according to the invention may additionally have reinforcing ribs 8.
  • reinforcing ribs 8 can either also be worked out of the material of the double sheet metal carrier or they can be applied separately in one operation. These reinforcing ribs, which are likewise likewise arranged linearly in the region of the web 32 close to the flange, once again increase the rigidity in order then to produce sufficient stability for the ceiling substructure when the corresponding ceiling elements are suspended.
  • the invention encompasses embodiments in which only reinforcing ribs are arranged in line form or that only reinforcing profiles in line form are provided.
  • the metal carrier shown there also additionally has a metallic end plate 10 which is folded over the ends of the flange 31 of the metal carrier. By means of this end plate, a desired optical effect can be produced on the room side. Furthermore, the end plate also ensures a flush conclusion room side.
  • FIG. 3 shows a detail of the formation of a hook connector 11 according to the invention and its attachment to a cross member 12.
  • the connector 11, as can be seen from Figure 3, is attached via two pressings 13, 14 at the front end of the cross member 12.
  • the connector 11 is characterized in that it has a hook 15 at its free end. As explained in more detail below in FIG. 4, this hook 15 serves for latching to the main carrier or cross member.
  • the embodiment of the connector, as shown in FIG. 3, also has two openings 16 and 17.
  • the first opening 17, ie the person who is the front end of the web is ⁇ supplied, formed in a rectangular shape and has outwardly bulging longitudinal sides.
  • the second Publ ⁇ voltage 16 is now formed flat and designed so that during engagement of the connectors 11 at the intersections of the bulge of the other
  • Connector 17 can engage in the opening 16. As a result, a secure and immovable stabilization ⁇ tion of the two cross members to each other is achieved.
  • Another essential element of the hook connector according to the invention is that this in the folded portion, on the side of the hook connector
  • an arcuate recess 41 with a nose 40 has. This training in the form of an arch 41 with a nose 40 ensures that even the hook connector in
  • the embodiment shown in Figure 3 is still characterized by the fact that the cross member 12 is provided with a projection 20.
  • This projection 20, which is an integral part of the cross member 12 is machined out of the same material as the cross member 12 and serves to stabilize the Operative connection of the two transverse beams 12 to be connected to a main beam or to another cross beam.
  • the design and shape of the projection 20 is chosen so that it engages in the locked state on the flange of the main carrier or the cross member and thus contributes to a stabilization (see, inter alia, Figure 4).
  • FIG. 3 likewise shows the reinforcing ribs 8 introduced in the cross member 12 in line form.
  • Figure 4 shows the inventive design of a click connector.
  • the click-connector according to the invention also has, what is considered essential to the invention, two folds 18, 19, so that in turn here an omega-shape is formed.
  • the click connector according to the invention then has, as is well known in the art, a resilient element 50.
  • the formation of this resilient element 50 is in and of itself known in comparable click connectors in the prior art.
  • the cross member 12 is shown in fragmentary detail with a hook connector 11, as has been described in detail above in Figure 3.
  • An identical cross member 12 with an identical connector 11 is shown in the right part of Figure 5a.
  • the main carrier 21, which now only seen in section here is, is constructed analogously as in Figure 2 and consists of a web with a rectangular reinforcement 9 and a flange.
  • the opening is designated 1.
  • the hook 15 passes through the opening 1.
  • the two connectors 11 are then interconnected via the openings 16 and 17
  • the opening 17 has a bulge to the outside, this bulge of the opening 17 of a connector 11 can engage in the planar opening 16 of the other connector 11, so as to accomplish a secure locking.
  • FIG. 5b shows the latching in plan view.
  • the main carrier 21 is, as described above in Figure 5a, with the two cross members 12 and the identical connectors 11th
  • FIG. 6 in a third section, the latching of the two hook connectors in the opening 1 is shown in an enlarged view.
  • FIG. 6 shows the interaction of the opening 1 with the specially designed connectors 11.
  • FIG. 6 shows the omega shape (dashed line) of the connectors 11.
  • the projections 2, 3, 4 and 5 serve to guide the connector 11.
  • the connector 11 has bends 18, 19 which are formed in such a way that they surround the projections 2, 3, 4 and 5 .
  • the connector 11 is provided with folds 18, 19, the said longitudinal sides pulled through, formed, these folds 18, 19 are formed so that they interact exactly with the projections 2, 3, 4 and 5, thus ensuring a secure fit of Verrastharm.
  • FIG. 7 shows the main carrier 21 with the opening 1 and a bayonet closure 30.
  • FIG. 8 shows the hook connector 11 described in more detail in FIG. 3 in three different views.
  • the hook connector 11 is shown in plan view and completely corresponds to the hook connector, as it already is in FIG has been described in detail.
  • Figure 8b the hook connector 11 is now shown in section. As can be seen from the cross section b), the hook connector 11 has an omega shape with two folds 18 and 19.
  • Figure 8 then shows the hook connector 11 in the side view.
  • FIG. 9 shows in an analogous manner in three views in FIGS. 9a, 9b and 9c the construction of the click connector already described in FIG. Of the
  • Click connector 60 in the illustration a i. in the plan view, has already been described in more detail in Figure 4.
  • the click connector 60 also has an omega shape with bends 18 and 19 in cross-section.
  • the key advantage of the connectors according to the invention is that both the hook connector 11, As described above in Figure 8, as well as the click connector 60 in cross-section have an omega-shaped, which is designed similar, so that this omega shape with the projections in the opening 1 cooperates.
  • the depth of the fold is matched exactly to the projections.
  • FIG. 10 shows a further embodiment of a hook connector 11 in different perspective views.
  • the hook connector 11, as shown in plan view in FIG. 10 a), essentially corresponds to the embodiment of the hook connector , as has already been described in detail in Figure 8.
  • the hook connector of this embodiment starting from the nose 40 in the bent portion 18 in the direction of the front end of the connector 11, and here in the non-folded portion, a further fold 70 on.
  • This further bend 70 is now, as can be seen from the perspective illustrations b), c), d) and e), in the direction of the fold 18, but only in the region which does not bend in comparison to the embodiment according to FIG is. This is also apparent from the sectional views f) and g).
  • the embodiment according to FIG. 10 brings with it the advantage that even easier and clearer locking and loosening occur at the same time. cherem stop the locking connection results.
  • Figure 11 now shows in cross section a further exemplary form of the metal carrier, that is both the main ⁇ support and the cross member.
  • the embodiment corresponds to the form as has already been described in detail in FIG.
  • further reinforcing ribs 8 ⁇ are provided additionally in addition to the reinforcing ribs 8, which are formed in flanschnahen area, and the lens-shaped reinforcing profile.
  • These additional reinforcing ribs 8 V are also incorporated as the reinforcing ribs 8 in the metallic carrier, for example, also pressed, but preferably have a greater distance from each other as the reinforcing ribs 8 in the vicinity of the flange.
  • the invention also encompasses embodiments in which more reinforcing ribs 8, as shown in FIG. 12, are introduced. It is essential, however, that these reinforcing ribs 8 are formed in the web region between the linear reinforcement 7 and the rectangular hollow profile 9.
  • FIG. 13 and 14 show now execution forms of the metal support, in which additionally reinforcing ribs 40, 41 and 40 ', 41 1 are alternately introduced from one side in the direction of the other.
  • reinforcing ribs 40, 41 are introduced at the flange-side end in a line-shaped manner.
  • each form the reinforcing ribs have been alternately incorporated from one side in the direction of the other.
  • the reinforcing ribs, which have been designated 40 are visible from the non-visible side in the web area been pressed. Those which are shown dark (reference numeral 41) have been pressed from the visible side toward the other side.
  • reinforcing ribs 40, 41 have in each case been pressed in alternately from one side in the direction of the other parallel to the flange in line form at uniform intervals, and continue parallel to
  • reinforcing ribs 40 * and 41 press-fitted, but the reinforcing ribs arranged in the direction of the web-end are provided at a greater distance in the vicinity of the hollow profile 9. It has been found that this embodiment in particular has excellent torsional safety and stability of the metal carrier In the representation in FIG. 13, the opening that has hitherto been shown in the other embodiments has not been drawn.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Mechanical Coupling Of Light Guides (AREA)

Abstract

La présente invention concerne une sous-structure métallique de plafond destinée à des éléments de plafond et composée de poutres métalliques croisées placées à distance du plafond. Les poutres métalliques forment un réseau et se présentent sous la forme de poutres principales et de poutres transversales. Les poutres métalliques sont assemblées au moyen de connecteurs de forme spéciale qui viennent en prise dans des ouvertures ménagées dans la zone de l'âme des poutres métalliques et permettent de bloquer entre elles les poutres métalliques individuelles.
EP11764689.3A 2010-10-04 2011-10-04 Sous-structure métallique de plafond Active EP2625346B1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PL11764689T PL2625346T3 (pl) 2010-10-04 2011-10-04 Metalowa podkonstrukcja sufitowa
EP11764689.3A EP2625346B1 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP10013273.7A EP2447434B1 (fr) 2010-10-04 2010-10-04 Sous-structure de plafond métallique
PCT/EP2011/004943 WO2012045438A2 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond
EP11764689.3A EP2625346B1 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond

Publications (2)

Publication Number Publication Date
EP2625346A2 true EP2625346A2 (fr) 2013-08-14
EP2625346B1 EP2625346B1 (fr) 2018-06-27

Family

ID=43502847

Family Applications (2)

Application Number Title Priority Date Filing Date
EP10013273.7A Active EP2447434B1 (fr) 2010-10-04 2010-10-04 Sous-structure de plafond métallique
EP11764689.3A Active EP2625346B1 (fr) 2010-10-04 2011-10-04 Sous-structure métallique de plafond

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP10013273.7A Active EP2447434B1 (fr) 2010-10-04 2010-10-04 Sous-structure de plafond métallique

Country Status (11)

Country Link
EP (2) EP2447434B1 (fr)
JP (1) JP5934223B2 (fr)
KR (1) KR102017501B1 (fr)
CN (1) CN103154399B (fr)
AU (1) AU2011313553B2 (fr)
BR (1) BR112013007902B1 (fr)
ES (2) ES2464464T3 (fr)
PL (2) PL2447434T3 (fr)
UA (1) UA110944C2 (fr)
WO (1) WO2012045438A2 (fr)
ZA (1) ZA201301695B (fr)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IN2014CN03324A (fr) * 2011-11-11 2015-07-03 Giuseppe Cipriani
ITVR20130040A1 (it) 2013-02-14 2014-08-15 Giuseppe Cipriani Struttura metallica di supporto di un controsoffitto.
ITVR20130058A1 (it) 2013-03-08 2014-09-09 Giuseppe Cipriani Profilato di una struttura di supporto di un controsoffitto e procedimento di lavorazione per lavorare il profilato.
ITVR20130230A1 (it) * 2013-10-17 2015-04-18 Giuseppe Cipriani Accessorio di collegamento di un profilato di una struttura di supporto di un controsoffitto

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3096862A (en) * 1960-09-07 1963-07-09 W J Haertel & Co Ceiling suspension system with double locking clip
US3290075A (en) * 1964-01-20 1966-12-06 Chicago Metallic Sash Co Interlocking runner connection
US3501185A (en) * 1966-07-11 1970-03-17 Donn Prod Inc Cross beam connector
US4779394B1 (en) 1987-04-14 1994-09-27 Donn Inc Connector for suspension ceiling grid
US5517796A (en) * 1994-05-25 1996-05-21 Usg Interiors, Inc. Stab-in removable end connector
US6199343B1 (en) 1999-04-19 2001-03-13 Worthington Armstrong Venture Connector assembly for ceiling grid
JP2001241137A (ja) * 2000-02-24 2001-09-04 Ibiden Co Ltd 建物の天井構造
US6729100B2 (en) * 2002-04-30 2004-05-04 Usg Interiors, Inc. Main tee splice
US6751922B1 (en) * 2003-02-25 2004-06-22 Worthington Armstrong Venture Faceted radius grid
JP4096789B2 (ja) * 2003-04-14 2008-06-04 松下電工株式会社 天井枠
GB2456328A (en) 2008-01-11 2009-07-15 Usg Interiors Inc Grid members for a suspended ceiling and methods of making same
ITPD20100023U1 (it) * 2010-04-06 2011-10-07 Dallan Spa Profilato per intelaiature e intelaiatura

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2012045438A2 *

Also Published As

Publication number Publication date
PL2447434T3 (pl) 2014-09-30
WO2012045438A3 (fr) 2012-06-21
BR112013007902A2 (pt) 2017-06-06
EP2447434B1 (fr) 2014-02-26
AU2011313553B2 (en) 2015-11-26
EP2625346B1 (fr) 2018-06-27
KR20130098387A (ko) 2013-09-04
EP2447434A1 (fr) 2012-05-02
BR112013007902B1 (pt) 2020-12-01
KR102017501B1 (ko) 2019-09-03
ES2688456T3 (es) 2018-11-02
CN103154399A (zh) 2013-06-12
JP2013542348A (ja) 2013-11-21
JP5934223B2 (ja) 2016-06-15
WO2012045438A2 (fr) 2012-04-12
ZA201301695B (en) 2013-11-27
PL2625346T3 (pl) 2018-11-30
ES2464464T3 (es) 2014-06-02
AU2011313553A1 (en) 2013-04-11
CN103154399B (zh) 2016-08-31
UA110944C2 (uk) 2016-03-10

Similar Documents

Publication Publication Date Title
EP2208835B1 (fr) Panneau, en particulier panneau de sol
CH658285A5 (de) Stegrost und verfahren zu dessen herstellung.
DE3423967C2 (fr)
EP2625346B1 (fr) Sous-structure métallique de plafond
EP1165905B1 (fr) Plaque en matiere plastique, notamment pour revetir des pieces en beton
WO2011066988A1 (fr) Jeu de puzzle comportant une ou plusieurs parties de puzzle pliables
DE202007019173U1 (de) Steckzunge für ein Sicherheitsgurtschloss
WO2020193257A1 (fr) Dispositif de protection anti-escalade
EP0345222A2 (fr) Grille et son encadrement
DE3624618C2 (de) Traggitter für eine abgehängte Decke
WO2000056589A1 (fr) Profile extrude sous forme de plaque
DE3740563A1 (de) Schiene fuer haengedecken
WO2000028157A1 (fr) Element de liaison destine a des palplanches metalliques
EP0440177B1 (fr) Coffrage pour construction en béton
DE3243936A1 (de) Fassadeneinheit
AT517588B1 (de) Durchsturzsicherung
DE4340404C2 (de) Arretierverbindung für ein gitterförmiges Schienensystem einer Hängedecke
AT395778B (de) Flanschverbindung fuer klimatisierungskanaele
DE4441769C2 (de) Steckverbinder für Sprossenprofile
AT403187B (de) Einpresstopf für ein scharnier
EP0465905A1 (fr) Revêtement de plafond
DE202004011238U1 (de) Verwahrkasten für Bewehrungsanschlüsse für Betonverbindungen, Bewehrungsanschluß mit einem Verwahrkasten und Betonverbindung
DE976549C (de) Ausbautraeger, insbesondere fuer den Strebausbau
WO2004016874A1 (fr) Dalle en beton composite et ancre de maintien servant a assembler deux dalles en beton
AT413878B (de) Eckverbindung für die abgekanteten wandflansche eines im querschnitt rechtwinkeligen blechkanalschusses

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130430

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20151221

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20171026

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

INTC Intention to grant announced (deleted)
GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

INTG Intention to grant announced

Effective date: 20180517

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1012495

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502011014382

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180927

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180927

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20180627

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2688456

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20181102

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180928

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181027

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502011014382

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

26N No opposition filed

Effective date: 20190328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181004

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20111004

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180627

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180627

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230822

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20230920

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20230921

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231027

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20231102

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20231027

Year of fee payment: 13

Ref country code: IT

Payment date: 20231023

Year of fee payment: 13

Ref country code: FR

Payment date: 20231025

Year of fee payment: 13

Ref country code: DE

Payment date: 20231027

Year of fee payment: 13

Ref country code: CH

Payment date: 20231102

Year of fee payment: 13

Ref country code: AT

Payment date: 20230920

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20231027

Year of fee payment: 13