EP2364948B1 - Grue - Google Patents

Grue Download PDF

Info

Publication number
EP2364948B1
EP2364948B1 EP11001829A EP11001829A EP2364948B1 EP 2364948 B1 EP2364948 B1 EP 2364948B1 EP 11001829 A EP11001829 A EP 11001829A EP 11001829 A EP11001829 A EP 11001829A EP 2364948 B1 EP2364948 B1 EP 2364948B1
Authority
EP
European Patent Office
Prior art keywords
boom
crane
rope
load
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP11001829A
Other languages
German (de)
English (en)
Other versions
EP2364948A1 (fr
Inventor
Hans-Dieter Dipl.-Ing. Willim
Yggve Richter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liebherr Werk Ehingen GmbH
Original Assignee
Liebherr Werk Ehingen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE202010003269U external-priority patent/DE202010003269U1/de
Priority claimed from DE202010012237U external-priority patent/DE202010012237U1/de
Priority claimed from DE202010015616U external-priority patent/DE202010015616U1/de
Application filed by Liebherr Werk Ehingen GmbH filed Critical Liebherr Werk Ehingen GmbH
Publication of EP2364948A1 publication Critical patent/EP2364948A1/fr
Application granted granted Critical
Publication of EP2364948B1 publication Critical patent/EP2364948B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/185Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use erecting wind turbines

Definitions

  • the present invention relates to a crane, in particular a lattice boom crane, with a lower block with a load-receiving means, in particular a load hook.
  • the large loads to be lifted have a large area and thus offer the wind forces a large-area attack surface.
  • the attacking forces cause the rocking of the load or the swinging of the hook, which can result in an unstable lifting system.
  • limits are defined for maximum permissible wind speeds, up to which a planned stroke may be executed at all.
  • the DE 20 2006 015 189 U1 proposes the use of a frame for receiving a rotor blade, which is connected via a stabilizing guy stranding with the telescopic crane.
  • the device disclosed therein specifically relates to the lift or assembly of rotor blades.
  • Object of the present invention is to prevent or minimize the rocking of the load or the swinging of the hook during the lifting work and in addition to provide a way for precise alignment of the load or the hook.
  • a crane in particular a lattice boom crane, with a lower block with load-carrying means, in particular with a load hook, at least one winch is arranged on the lower block.
  • the outgoing control cable of at least one winch is connected or connectable to the crane boom for securing and / or precise alignment of the load or the lower bottle position.
  • the control cable is tensioned to prevent or minimize the rocking of the lower block or the swinging and twisting of the load attached to it.
  • the lower bottle with the be attached by appropriate winch operation even in large mounting heights precisely aligned or positioned.
  • the roller head is preferably widened at the top of the crane jib. Consequently, the pulleys on the bottom block are made correspondingly wide. Due to the large distance between the two outer pulleys on the lower block is given a great resistance against twisting of the load and the lower cylinder relative to the roller head.
  • the hoist rope of the crane is preferably reeved several times in the pulleys of the bottom block.
  • the crane according to the invention is advantageously also executable as a crane with multiple rope operation.
  • a winch is arranged next to the outer side of the two outermost deflection rollers of the lower block.
  • the resulting distance of the winches and the outgoing control cables to each other is maximum, which can be generated with low cable force a large moment for positioning or alignment of the lower block and the attached load.
  • the attachment of the winches can be done on a laterally attached to the bottom block widening of the lower bottle. Preferably, said widening is releasably connected to the lower bottle. If the winches or the control cables are not used, they can be removed from the lower block together with the winches for reasons of space or weight.
  • a drive in particular a hydraulic drive, arranged to supply at least one winch.
  • the arrangement of the drive is conceivable centrally on the support of the lower block, in particular centrally between two or more winches.
  • the drive preferably has an engine, a fuel tank, a hydraulic tank and a control device for the engine and the hydraulic lines.
  • a communication unit for remote control of the drive is provided. This is preferably arranged in the drive and communicates with the one or more control devices of the drive.
  • the drive can thus be conveniently controlled from the ground or from the control console of the crane.
  • the drive can be partially or completely removed from the lower block and then use this without drive. This may possibly be a necessary repositioning of the hoist to be avoided.
  • At least one control cable is slidably connected to the crane boom parallel to the boom longitudinal axis.
  • At least one guide cable is stretched parallel to the boom longitudinal axis.
  • the outgoing control cable at least one winch is longitudinally displaceable connected to the guide cable or connected end.
  • one or more guide cables run over large parts of the arm parallel to its longitudinal axis.
  • at least one winch can be provided at the lower region of the jib, in particular at the jib foot, which clamps one or more guide ropes.
  • the guide cable or the guide cables themselves are in turn fixed in the upper region of the boom in one or more fixed points on the boom.
  • a supply and control unit is provided near the wind.
  • the winch can also be arranged in the jib head or in the luffing jib for tensioning the guide wire or cables.
  • At least one control cable on the boom or on the guide cable has this advantageously at its free end to a block which is provided with a roller.
  • the roller is at least one Control cable along the guide rope mounted displaceably parallel to the boom longitudinal axis.
  • a single guide cable without guying function of the boom foot almost parallel to the boom longitudinal axis stretched and attached to the end boom system. Almost parallel here means at least in the direction of the boom longitudinal axis.
  • control cable (s) it is also possible for the control cable (s) to be guided along a guide cable region of the crane lifting cable.
  • control cable (s) are fastened directly to the boom.
  • the control cable can not be fixed either indirectly or directly on the crane boom. However, in this case can not be guaranteed at any time an optimal angle of the control cable to the boom.
  • Conceivable is a rotational movement of the load hook about its longitudinal axis.
  • a hook drive is provided, whose power supply is preferably made available from the drive of the winches available.
  • the load hook is rotatably supported by means of a turntable relative to the lower block.
  • the hook drive is therefore designed as a rotary drive, which is in communication with the turntable and performs the rotational movement.
  • both the drive of the winches and the hook drive can be removed from the lower block. This provides, among other things, additional space savings as well as weight savings, which under given circumstances enables a more cost-effective lifting process.
  • the present invention further relates to a lower block for a crane, in particular for a lattice boom crane, according to one of the aforementioned features.
  • the lower block according to the invention accordingly has at least one winch whose outgoing control cable can be connected to a crane jib.
  • the drive for supplying the at least one winch expediently sits on the lower block.
  • a second aspect of the invention relates to a crane having a frame adapted to receive a specific load and attached to the load hook of the crane.
  • the frame is preferably suitable for receiving a rotor blade for a wind turbine.
  • the crane is not limited to the inclusion of a rotor blade. Rather, any load can be picked up with the help of the frame.
  • the embodiment according to the second aspect of the invention will be explained below with reference to a frame for receiving a rotor blade.
  • the boom system of the crane according to the second aspect of the invention may, for. B. consist of a telescopic boom, a jib and possibly a main boom extension.
  • the attached to the load hook frame for receiving a special load is connected via at least two control cables with the guide cable and thereby sufficiently stabilized.
  • the tensioned guide cable can be attached to the boom system at the end, depending on the application, at a variable height.
  • a fastening in sufficient proximity to the roller head of the boom system, so that a guide is ensured at least two control cables used over the entire lifting height. At lower lift heights, it is sufficient to tension the guide cable end to the corresponding area on the boom system.
  • the control cables are at least partially guided along the guide cable.
  • the guide is expediently with the help of guide rollers or the like.
  • the introduced tension on the guide cable is advantageously carried out by means of a winch, which is preferably arranged in the region of the boom foot. Conveniently located in the region of the boom foot from the outset a power supply and a control connection with which the winch is coupled to the entire crane bus system or crane control system.
  • the winch is controlled synchronously by the crane control in response to a corresponding crane movement.
  • a rocking movement of the luffing jib or a telescoping of the corresponding jib part necessitates a crane control-controlled skipping or winding-up of the guide rope with the aid of the winch.
  • the winch can also be arranged indirectly or directly on the articulation piece and / or on the superstructure and / or on a luffing cylinder.
  • control cables extend from the frame to the guide cable and are deflected in the region of the connection point with the guide cable by one or more deflection rollers.
  • connection of the control cables with the guide cable is advantageously carried out via a connecting link.
  • the connecting link comprises a double roller which either directly receives the control cables or is indirectly connected to the control cables via deflection rollers.
  • the connecting link is guided over the double roller on the guide cable.
  • An advantage is the arrangement of one or more pulleys on the frame, through which the individual control cables are deflected. In this case, the force in the rope and the rope drive on the frame can be reduced.
  • one or more winches may be arranged on the frame to vary the tension of the control cables so as to keep the position of the frame stable.
  • the load can now be aligned at a very good angle, even when using a long luffing jib.
  • the lifting height in which a stabilization of the recorded load is made possible by means of the control cables, is therefore limited to the area of the main boom bracing.
  • an existing arbitrarily executed crane can be retrofitted by attaching a winch in the region of the boom foot and the clamping of the guide cable parallel to the longitudinal axis of the boom system.
  • the invention further relates to a crane according to a third aspect, wherein the crane comprises a load hook attached indirectly / directly to the crane hoisting rope to which a frame for receiving a special load is attached.
  • the frame is suitable for receiving a rotor blade of a wind turbine.
  • Such frames are referred to in the jargon as "yoke”.
  • This is a frame that takes the actual load gently and without damage.
  • the connection between the load hook and the frame is suitably made via towing means.
  • towing means For aligning and stabilizing the Yokes this self-operating assemblies such. As winches, drives, equipment, etc ..
  • the frame used has at least two indirectly associated with the crane boom controls for adjusting, stabilizing and fine-alignment of the frame or the load recorded.
  • the at least two control elements are guided along a guide cable region of the crane lifting cable. Accordingly, an area of the hoisting rope used is created which provides a guiding possibility for the connected control elements.
  • the attachment of a separate guide rope is therefore superfluous. Separate winches with corresponding Hydraulic and electrical control to tension the or the separate guide cables are also unnecessary.
  • the proposed solution significantly simplifies crane production and, moreover, is considerably cheaper than known designs.
  • the technical design of the crane according to the third aspect of the invention is independent of the type of main boom used.
  • it may be both a lattice boom and a telescopic boom.
  • a portion of the hoisting rope is used as a guide rope area, which runs almost parallel to the boom longitudinal axis on the load-facing boom side.
  • the hoist rope is guided by the crane hook back to the boom and is stretched almost parallel to the boom longitudinal axis in the direction of the boom foot.
  • the recirculated area of the hoist rope is used as the guide rope area.
  • the guide cable region of the hoist rope is formed by the hoist rope returned from the hook block in the direction of the boom, which extends from the hook block via at least one deflection roller on the boom in the direction of the boom longitudinal axis to the lower crane attachment point.
  • at least one deflection roller is expediently arranged on the roller head of the jib tip.
  • One or more pulleys may preferably be provided at any point of the boom. For example, on the main boom, on the boom extension or on the needle.
  • the hub height of a wind turbine to be mounted can be decisive.
  • At least one deflection roller in the guide cable area of the hoisting cable can be mounted or mounted at a variable height on the crane boom.
  • the assembly of the deflection roller can be done, for example, in coordination with the target height of the load to be provided.
  • the deflection roller is preferably bolted or fastened by means of clamping means on the crane.
  • One or more controls are particularly preferably designed as control cables. Accordingly, at least two control cables of the attached frame are guided along the guide cable portion of the hoisting cable.
  • a timing chain and / or a spindle and / or a cylinder and / or a telescopic rod and / or an articulated steering is conceivable.
  • a scissors-based element is conceivable.
  • the embodiment is expedient for at least a part of the controls identical, but also any combination of the proposed embodiments is possible.
  • the end stop point of the returned hoist rope is preferably on the pivot piece of the crane jib.
  • the hoist rope can be struck at the end on the luffing cylinder or also on the revolving platform.
  • a cable lock is arranged on Hubseilende.
  • the Hubseilende can be attacked or struck depending on the requirement profile at any point of the crane.
  • the handling of the Hubseilendes is preferably carried out with the help of one end of the hoist rope or rope lock arranged mounting part, which is accessible either from the crane footprint from or alternatively operated by a drive. It is conceivable to operate the mounting part by means of at least one winch, in particular to wind or unwind. As a mounting part, for example, an already existing mounting part of the winch can be used.
  • An advantageous embodiment of the crane according to the third aspect of the invention comprises at least one deflection roller arranged in the guide cable region of the hoisting cable and a device for catching or fixing at least one guided control element.
  • the controls slide, in particular by means of a fixed connecting link, as a function of the lifting height along the guide cable region of the hoist cable.
  • the device is used for fixing and stabilizing the control elements, in particular the connecting link, so that a precise control or fine adjustment of the frame can be ensured by means of the controls.
  • the deflection roller is arranged on the crane, so that the controls or the connecting link can be caught or fixed in the target lift height to be achieved.
  • a variably mounted on the boom deflection pulley designed the device for trapping and fixing.
  • the assembly of the deflection roller in the hub height range of a wind turbine to be mounted takes place.
  • the attachment of the said pulley on the boom just below the lift height to be achieved so that a premature capture and fixing of the controls leads to a certain and advantageous diagonal pull of the controls. The diagonal pull reinforces the achieved fixation of the controls.
  • the device of the deflection roller consists at least of a pivotally mounted about the Umlenkrollenachse plate having at least one stop surface.
  • the pivotal mounting of the plate ensures a targeted alignment of the stop surface in response to the deflected by the pulley rope.
  • the abutment surface is arranged on the underside of the plate and the cable is guided orthogonal to the abutment surface through this.
  • the cable runs orthogonally through the center of area of the stop surface. The vertical movement of the sliding on the rope controls can thus be limited by the stop surface to a maximum height.
  • the plate of the device preferably comprises at least one retaining roller which ensures a soft and damped positioning of the plate on the rope. This is particularly advantageous if the plate is deflected in any direction, thus resulting in increasing the Seilumschlingungswinkels the deflected rope on the pulley.
  • the tensile force created in the rope acts as a restoring force and is damped by the plate due to the retaining roller.
  • a connecting link is provided which is suitable for connecting at least one control element to the guide cable region of the hoisting cable.
  • the connecting link on at least one stop surface, which can be brought into abutment with the appropriate counter-stop surface of the deflection roller described above.
  • At least one sliding block is preferably provided in the region of the abutment surface of the connecting link. With the help of Gleitklotzes a targeted striking the two stop surfaces is ensured. Furthermore, the slide block in the captured position of the connecting link causes an improved positive connection between the guide roller and connecting link.
  • the connecting link is preferably designed to be rotatable about the cable axis of the hoist rope, so that the mobility of the controls is not or only slightly limited.
  • the sliding block In the trapped state of the connecting link, the sliding block preferably slides around the surface circumference of the abutment surface of the deflecting roller.
  • a fourth aspect of the invention further relates to a deflection roller with a device for catching and fixing at least one control element or a connecting link.
  • the diverting pulley obviously has the same features and characteristics as the previous embodiment of the crane according to the third aspect of the invention, so that at this point a repeated discussion is omitted.
  • a connecting link is further proposed which can be caught or fixed on a deflection roller with a corresponding device.
  • the connecting link obviously has the same features and characteristics as the previous embodiment of the crane according to the third Aspect of the invention, which is why a repeated explanation is omitted here.
  • deflection roller and the connecting link can of course also be used on a separate non-assignable to the hoist rope guide rope of any crane.
  • the Indian FIG. 1 shown lattice boom crane 1 has in a conventional manner a two-part boom 11, which is tiltable with the aid of a luffing gear about a horizontal rocking axis.
  • the reference numerals used below refer exclusively to the FIGS. 1 to 3 , Behind the main boom 11, a rear-facing thickening boom is mounted.
  • the bracing of the boom 11 is realized by means of the guy rods 2.
  • At least one hoist rope 12 is guided over one or more pulleys of the roller head 10 over the tip of the boom 11 and sheared several times in the guide rollers 50 of the lower block 51.
  • the roller head 10 is widened at the top of the boom 11.
  • the design of the roller head 10 and the guide rollers 50 of the lower block 51 are arranged correspondingly spaced from each other, so that a nearly vertical course of the hoisting rope 12 is ensured.
  • a design of the crane 1 according to the invention in multiple rope operation is conceivable. Due to the large distance between the two outer deflection rollers 50 of the lower block 51, a large resistance against twisting of the load and the lower block 51 is achieved with respect to the roller head.
  • this invention is equipped with the two control winches 52.
  • FIGS. 2a and 2b show detailed shots of the lower block 51 of the invention.
  • the lower block 51 is widened in the outer side region by selectively laterally mounted support to the two control winds 52 next to the outer deflection rollers 50 of the lower block 51 to order.
  • the laterally mounted support for broadening on the outer region of the lower block 51 are preferably detachably attached to the lower block 51 and can be selectively connected to this or separated from it.
  • the drive 54 also referred to in the concrete embodiment as a "power pack" has an engine, fuel or a fuel tank, a hydraulic tank, and a control device for controlling the motor and the hydraulic lines.
  • a communication unit is provided thereon, which communicates the control commands transmitted by the remote control to the respective control devices for activating the motor and the hydraulic lines.
  • the "power pack" or the drive 54 can only be mounted on the support of the lower block 51 when needed. If the stabilization of the lower block 51 according to the invention by means of its winches 52 and its outgoing control cables 53 is not required, the entire drive 54 and the corresponding winches 52 can be disassembled from the lower block on their widenings, whereby the lower block 51 is known from the prior art Lower bottle corresponds.
  • the load hook 70 To generate a rotational movement of the load hook 70 about its axis of rotation A, it is rotatably mounted on the lower block 51 via a turntable 72. About the rotary drive 73, a rotational torque for generating the rotational movement of the load hook 70 is generated about its axis of rotation A. The drive of the drive 73 and its power supply is also via the "power pack" of the drive 54. Consequently, the remote control of the movement of the load hook is also ensured.
  • FIG. 3b At the boom foot at least one winch 30 is provided, which spans the guide cable 31 over the boom area up to a fixed point 32.
  • the fixed point 32 is set in the region of the boom head.
  • a supply and control unit 33 is provided for driving and supplying the winch 30, a supply and control unit 33 is provided.
  • the fixed point 32 can also be defined on the boom foot, and the respective winch or winch 30 for tensioning the guide cable 31 are correspondingly mounted in the boom head area.
  • FIG. 3a have the expiring of the winds 52 control cables 53 at its free end on a block 54 which is equipped with a roller 55.
  • the control cables 53 are thus attached via the block 54 to a single or a plurality of separate guide cables 31 on the boom 11, so that a longitudinally displaceable storage by means of the roller 55 of the control cables 53 along the longitudinal axis of the boom 11 is made possible. This ensures that, even with variable height of the lower block 51, an optimum angle of the control cables 53 relative to the boom 11 for aligning the lower cylinder 51 with the load is always present.
  • the individual guide cables 31 are replaced by corresponding guide rails.
  • the control cables 53 are attached via a corresponding sliding connection with the guide rail on the boom, whereby also a longitudinally displaceable arrangement of the control cables 53 on the boom 11 is ensured.
  • the control cables 53 can also be multi-stranded. As a result, the cable cross-section can be reduced.
  • the lattice boom crane 1 has on the one hand by the widened design of the roller head 10 at the top of the boom 11, and the correspondingly increased distance between the pulleys 50 on the lower block 51 a greater resistance to rotation of the load due to the wind speeds occurring.
  • On the other hand is achieved by the inventive arrangement of one or more winds 52 with corresponding control cables 53 on the lower block 51 a more stable and influenced orientation or positioning of the lower block 51 and the attached load.
  • the Indian FIG. 4 shown vehicle crane 1 has in a conventional manner designed as a truck undercarriage 2, on which a rotatable about an upright axle superstructure 3 is mounted.
  • the reference numerals used below refer exclusively to the FIGS. 4 and 5 .
  • the uppercarriage 3 carries a cantilevered about a horizontal axis boom system 14, which has a hinged to the uppercarriage 3 articulated section 4 and several austeleskopierbare telescopic shots.
  • a tiltable lattice tip 6 is arranged, which can be connected via lattice pieces.
  • the main boom 5 is braced by means of a bracing 7, which is designed as a spatial, known Y-bracing.
  • a hoist rope 22 is guided over a pulley 9 on the luffing tip 6 and carries a load hook 21.
  • the load hook 21 is a frame 15 attached, which serves to receive a rotor blade not shown here a wind turbine.
  • winch 10 To stabilize the frame 15, in particular during assembly of the rotor blade on the wind rotor hub, only a single winch 10 is now provided, which is located almost on the line of symmetry of the boom system 14. This is directly attached to the pivot piece 4 of the main boom 5 and is by coupled the proposed power supply and the control connection to the central crane system. The control of the winch 10 takes place, for example, starting from the crane control via the bus system.
  • the guide cable 13 extends to the outer region of the boom system 14.
  • the outer end of the cable 13 can be flexibly attached to any position of the boom system 14 depending on the application.
  • the guide cable 13 is fixedly arranged on the luffing tip 6 near the region of the deflection roller 9.
  • the winch 10 is controlled synchronously by the controller. Furthermore, a maximum winding force is defined for the winch 10. If the permissible winding force of the winch is exceeded, the winch automatically releases rope.
  • the two control cables 16, 17 extend in the direction of the guide cable 13.
  • the connecting link 20 has a double roller 25, which is guided along the guide cable 13. Symmetrical to the double roller 25, the two pulleys 26, 27 are movably attached to the connecting link. By the deflection rollers 26, 27, the control cables 16, 17 are deflected and guided back to the frame 15.
  • control cables 16, 17 are deflected by further deflection rollers and controlled by a corresponding winch drive.
  • the control cables 16, 17 control accordingly to stabilize or readjust the horizontal position of the frame 15 in the lifting height.
  • the use of the individual pulleys ensures a reduction in force in the rope and the cable drive of the frame 15.
  • the invention is not limited to the inclusion of a rotor blade.
  • About the frame 15 can be accommodated any suitable in the receptacle of the frame 15 load.
  • FIG. 6 shows a crane assembly 10 for the installation of wind turbines 100.
  • the reference numerals used below refer exclusively to the figures 6 to 9.
  • the specific embodiment of the crane body 10, in particular of the boom system 11, is irrelevant to the invention.
  • the idea according to the invention can basically be used with any type of cantilever system 11, such as, for example, a lattice boom crane and a telescopic crane.
  • a yoke 30 is attached via the towbar 21.
  • the yoke 30 includes a frame that receives a rotor blade 101 of the wind turbine 100 to be lifted gently and without damage. Further, the yoke 30 includes a number of self-operating assemblies, such as winches, drives, resources that serve to operate the outgoing control cables 40, among other things.
  • control cables 40 are connected for adjusting and stabilizing the yoke 30 indirectly with the boom system 11.
  • no additional guide cable is clamped on the boom system 11 as a guide possibility of the control cables 40.
  • the hoist rope 50 of the crane 10 is used instead.
  • the hoist rope 50 extends from the roller head 12 to the hook bottle 23 to be guided back to the boom system 11 after load-dependent reeving on the hook block 23.
  • the rope course of the hoist rope 50 returning from the hook block 23 is determined by the deflection roller 13 arranged on the roller head 12 and the deflection roller 14 mounted on the rotor hub height on the boom system 11.
  • the end of the hoist rope is struck at the lower attachment point, not shown, which is in dependence on the given lifting conditions or the crane body on the pivot piece, rocker cylinder or on the crane turning platform.
  • the portion 50a of the hoisting rope 50 which extends from the pulley 14 to the lower pivot point nearly parallel to the boom axis, is used as the guide rope portion 50a.
  • FIG. 7 An enlarged view of the Rolllenkopfs 12 is the FIG. 7 refer to. This gives once again an exact overview of the specific rope course of the hoist rope 50 on the roller head 12th
  • the number of shearing the hoist rope 50 on the hook bottle 23 is selected depending on the Yokes 30 used. It is possible to use Yokes with different physical dimensions, which are specially designed for different rotor blades with different geometrical dimensions and weights. For the reeving the total weight of yoke 30, hook bottle 23 and recorded rotor blade 101 must be considered. The number of shearing reduces the pulling force on the hoisting rope. This is necessary in order to prevent the tensile force in the rope from being higher than permissible. In area 50a, this effect is undesirable, albeit immutable.
  • the deflection roller 14 is mounted on the boom system 11 just below the target height (hub height) to be reached by the Yoke upper edge. Even before the yoke 30 reaches the target height, the control cables 40, which run along the guide cable region 50a of the hoisting cable 50 by means of connecting link 60, abut against the specially designed deflection roller 14. The selective striking of the connecting link 60 on the deflection roller 14 is supported by a retraction of the connecting link 60 in a corresponding device 200 on the guide roller 14.
  • the guide roller 14 can be gebolzt in the appropriate height on the boom system to achieve a fixation of the connecting link 60.
  • the mating connection elements are realized on the boom via clamping, bolt connections or other fixing mechanisms.
  • the deflection roller 14 is rigidly positioned on the boom system 11 with its axis of rotation.
  • the plate 200 is attached, which is pivotally mounted about the Umlenkrollenachse.
  • the plate 200 also carries a retaining roller 201 which positions the plate 200 soft and damped by the hoist rope 50. If the plate is to be deflected, for example, to the right then increases the wrap angle of the hoisting rope 50 to the deflection roller 14. The tensile force acts in the hoist rope 50 as a restoring force.
  • the plate 200 has on its underside a stop plate 202 which does not completely surround the hoist rope 50.
  • the center of the circular stop plate 202 lies on the longitudinal axis of the hoist rope 50.
  • the connecting link 60 also has a plate, the stop plate 300, whose shape corresponds to the stop plate 202 of the guide roller 14.
  • the catching and holding process in as described below.
  • the connecting link 60 is taken by the hoisting Yoke 30 via the control cables 40. If the two stop plates 202, 300 approach each other, they are aligned with one another via the slide block 301 of the connecting link 60 until both stop plates 202, 300, as in FIG FIG. 9 explicitly shown to lie on top of each other. The system is now positively connected via the sliding block 301, so that forces can be transmitted from the control cables 40 of the slide block 301 on the stop plate 202 of the guide roller 14.
  • the connecting link 60 is still rotatable about the cable axis and can be aligned according to the control cable forces.
  • the slide block 301 slides on the outside of the stopper plate 202 with the hoist rope 50 as a center.
  • the crane 10 according to the invention must continue to be able to lift heavy loads without major refitting.
  • a particularly heavy load in the assembly of wind turbines 100 for example, represents the nacelle.
  • the shearing of the hoist rope 50 on the hook block 23 is chosen accordingly, but in this extreme load case, the introduction of additional force in the guide cable portion 50a of the hoist rope 50 in the boom system 11th avoided as far as possible. For this reason, the hoist rope 50 is fixed at the end by a cable lock on the boom system 11.
  • the guide cable area 50a can be increased, reduced or recessed by the end-side variable mounting option.
  • the nacelle of the wind turbine 100 is brought into the mounting position.
  • the end of the hoist rope 50 is held on the cable lock at the upper end of the boom system 11. Due to the low windage surface, a guide cable portion 50a is not required.
  • yoke 30 is attached to hook hook 23.
  • the cable lock, at the end of the mounting part of the winch of the crane 10 is attached, pulled over the winch to the boom foot and hung.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)
  • Iron Core Of Rotating Electric Machines (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Claims (14)

  1. Grue (1), en particulier grue à mat en treillis, avec un moufle inférieur (51) avec un moyen de réception de charge, en particulier un crochet de charge (21), caractérisée en ce que le moufle inférieur (51) présente au moins un treuil (10) dont le câble de commande sortant (16, 17) est relié respectivement peut être relié, pour assurer et/ou orienter la position de la charge respectivement du moufle inférieur, à la flèche de grue.
  2. Grue (1) selon la revendication 1, caractérisée en ce qu'un entraînement, en particulier un entraînement hydraulique est disposé pour l'alimentation du au moins un treuil (10) sur le moufle inférieur (51).
  3. Grue selon la revendication 2, caractérisée en ce que l'entraînement présente une unité de communication pour la commande à distance de l'entraînement.
  4. Grue selon l'une des revendications précédentes, caractérisée en ce qu'au moins un câble de commande (16, 17) est relié respectivement peut être relié presque parallèlement à l'axe longitudinal de la flèche d'une manière déplaçable à la flèche de grue.
  5. Grue selon l'une des revendications précédentes, caractérisée en ce que, presque parallèlement à l'axe longitudinal de la flèche, au moins un câble de guidage est tendu pour le guidage d'au moins un câble de commande (16, 17).
  6. Grue selon la revendication 5, caractérisée en ce que le câble de guidage est fixé à un point fixe à la flèche, en particulier à la tête de flèche, et peut être serré par au moins un treuil de commande.
  7. Grue selon la revendication 5 ou 6, caractérisée en ce qu'un seul câble de guidage, sans fonction d'haubanage, est tendu depuis le pied de la flèche presque parallèlement à l'axe longitudinal de la flèche et est fixé, côté extrémité, au système de flèche.
  8. Grue selon l'une des revendications précédentes, caractérisée en ce que le ou les câbles de commande (16, 17) est/sont guidés le long d'une zone de câbles de guidage du câble de levage de la grue.
  9. Grue selon l'une des revendications précédentes, caractérisée en ce qu'au moins un câble de commande (16, 17) présente à son extrémité libre un bloc avec un galet de roulement.
  10. Grue selon l'une des revendications 1 à 4, caractérisée en ce qu'un rail de guidage avec une liaison de glissement est disposé pour le guidage du câble de commande (16, 17) à la flèche.
  11. Grue selon l'une des revendications précédentes, caractérisée en ce que le crochet de charge du moufle peut être amené à tourner au moyen d'un entraînement de crochet.
  12. Grue selon la revendication 11, caractérisé en ce que l'entraînement est relié amoviblement au moufle inférieur.
  13. Grue selon la revendication 11 ou 12, caractérisée en ce que les treuils sont reliés amoviblement au moufle inférieur.
  14. Moufle inférieur pour une grue selon l'une des revendications 1 à 13.
EP11001829A 2010-03-08 2011-03-04 Grue Active EP2364948B1 (fr)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE202010003269U DE202010003269U1 (de) 2010-03-08 2010-03-08 Kran
DE202010012237U DE202010012237U1 (de) 2010-09-06 2010-09-06 Kran
DE202010015616U DE202010015616U1 (de) 2010-11-18 2010-11-18 Kran

Publications (2)

Publication Number Publication Date
EP2364948A1 EP2364948A1 (fr) 2011-09-14
EP2364948B1 true EP2364948B1 (fr) 2012-05-09

Family

ID=44117036

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11001829A Active EP2364948B1 (fr) 2010-03-08 2011-03-04 Grue

Country Status (5)

Country Link
US (1) US8944262B2 (fr)
EP (1) EP2364948B1 (fr)
CN (1) CN102190256B (fr)
AT (1) ATE556975T1 (fr)
DK (1) DK2364948T3 (fr)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202010015616U1 (de) * 2010-11-18 2012-03-01 Liebherr-Werk Ehingen Gmbh Kran
GB201214656D0 (en) * 2012-08-16 2012-10-03 W3G Shipping Ltd Offshore structures and associated apparatus and method
ES2748053T3 (es) * 2012-08-30 2020-03-12 High Wind N V Dispositivo y método para ensamblar una estructura
US9321616B2 (en) * 2013-03-14 2016-04-26 Marvin M. May Lifting systems
US9366128B2 (en) 2013-05-22 2016-06-14 Baker Hughes Incorporated Automated wellbore equipment feeding system
DE102014003906A1 (de) * 2013-07-01 2015-01-08 Liebherr-Werk Biberach Gmbh Turmdrehkran
US9482312B2 (en) * 2013-12-05 2016-11-01 Honeywell International Inc. Rope drive anchoring assembly
EP2889251B1 (fr) 2013-12-30 2016-08-24 Siemens Aktiengesellschaft Agencement de guidage de charge
AU2015200233B2 (en) * 2014-01-21 2019-01-31 Joy Global Surface Mining Inc Controlling the operation of an industrial machine based on wire rope dead wraps
US9346656B2 (en) * 2014-07-01 2016-05-24 Marvin M. May Stabilization and control of a crane load
DE102015003982A1 (de) * 2015-03-26 2016-09-29 Liebherr-Werk Biberach Gmbh Kranturm
RU2624888C1 (ru) * 2016-04-25 2017-07-07 Акционерное общество "Центральное конструкторское бюро "Титан" Автомобильный консольный кран
DE202016005619U1 (de) * 2016-09-12 2016-12-19 Liebherr-Werk Ehingen Gmbh Kran
US11286046B2 (en) * 2018-03-26 2022-03-29 Michael J. Capek Payload lift and positioning system for airships
BE1026086B1 (nl) * 2018-07-27 2019-10-04 DEME Offshore Holding N.V. Hijsblok voor een kraan
EP3902763A1 (fr) 2018-12-28 2021-11-03 Vestas Wind Systems A/S Ensemble de levage et procédé de manipulation d'un élément
EP3708528B1 (fr) * 2019-03-12 2021-10-13 BAUER Maschinen GmbH Machine de travail et procédé de fonctionnement de la machine de travail
JP7238531B2 (ja) * 2019-03-26 2023-03-14 株式会社タダノ クレーン
CN111606197B (zh) * 2020-05-25 2021-10-29 中车青岛四方车辆研究所有限公司 一种工件吊具的柔性固定机构
NL2026970B1 (en) * 2020-11-24 2022-07-01 Prince Lifting Devices Pld B V Crane for handling a cable-suspended load, method of manufacturing such a crane and use of such a crane.
CN114604763B (zh) * 2022-01-24 2023-06-02 杭州大杰智能传动科技有限公司 用于智能塔吊吊钩导向的电磁定位装置及方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD105793A1 (fr) 1973-09-14 1974-05-12
FR2649966B1 (fr) 1989-07-18 1991-09-27 Potain Sa Dispositif motorise de rotation de charge, auto-alimente en energie, pour appareils de levage a cable
US6439407B1 (en) * 1998-07-13 2002-08-27 The United States Of America As Represented By The Secretary Of Commerce System for stabilizing and controlling a hoisted load
DE29908395U1 (de) 1999-05-15 1999-09-09 Heinzle Otto Vorrichtungen für einen Turmdrehkran als Obendreher mit Klettereinrichtung
US6474922B2 (en) * 2000-05-10 2002-11-05 Del Mar Avionics Remote operation auxiliary hoist control and precision load positioner
AU2002344946B2 (en) 2002-05-27 2005-09-01 Vestas Wind Systems A/S Methods of handling wind turbine blades and mounting said blades on a wind turbine, system and gripping unit for handling a wind turbine blade
DE102006033277A1 (de) * 2006-07-18 2008-02-07 Liebherr-Werk Nenzing Gmbh, Nenzing Verfahren zum Steuern der Orientierung einer Kranlast
DE202006015189U1 (de) 2006-10-04 2008-02-14 Liebherr-Werk Ehingen Gmbh Teleskopkran
EP1925582B1 (fr) * 2006-11-23 2010-06-23 Siemens Aktiengesellschaft Procédé et dispositif de montage de pales d'éoliennes
FR2926805A1 (fr) * 2008-01-25 2009-07-31 Saipem S A Sa Dispositif de levage et deplacement d'un objet comprenant la mise en oeuvre d'au moins un cable de traction

Also Published As

Publication number Publication date
DK2364948T3 (da) 2012-06-18
CN102190256A (zh) 2011-09-21
US20110272377A1 (en) 2011-11-10
US8944262B2 (en) 2015-02-03
EP2364948A1 (fr) 2011-09-14
ATE556975T1 (de) 2012-05-15
CN102190256B (zh) 2016-04-27

Similar Documents

Publication Publication Date Title
EP2364948B1 (fr) Grue
EP3016901B1 (fr) Grue a tour et procédé de montage d'une pale de rotor d'eolienne
EP2426077B1 (fr) Grue
EP2455322B1 (fr) Grue
DE202010003269U1 (de) Kran
EP2723670B1 (fr) Dispositif de manutention de charges pour le levage et procédé de montage de pales de rotor d'un aérogénérateur
WO2015039876A1 (fr) Dispositif et procédé de manutention, montage ou démontage d'éléments d'une éolienne
DE102009048846A1 (de) Kran
DE102009058268A1 (de) Kran und Verfahren zum Anheben eines Rotors
EP2693045A1 (fr) Système de déplacement destiné à réaliser des travaux d'inspection et d'entretien sur des bâtiments de type tour
DE202011001850U1 (de) Kran
EP3466866A1 (fr) Cadre de montage de treuil et dispositif formant treuil
EP2897892B1 (fr) Procédé permettant de faire fonctionner une grue, et grue correspondante
DE102012002040B4 (de) Verfahren zum Betrieb eines Krans und Kran
EP4059879A1 (fr) Grue mobile dotée d'un dispositif permettant d'aider ou de mettre en uvre de manière automatique un processus de montage et/ou d'enlèvement d'une flèche derrick, ainsi que procédé correspondant
EP3645913B1 (fr) Système muni de deux chaînes porte-câbles et d'un point de fixation déplaçable
DE102021113314B4 (de) Hubsystem und -verfahren für einen Kran
DE102013202235A1 (de) Kran mit einer Ausrüstung für den Abbau eines Auslegers des Krans in der Höhe
DE102013015311B4 (de) Verfahren zum Aufrichten und/oder Ablegen eines langen Auslegersystems
EP2984024B1 (fr) Flèche de grue repliable et grue
DE102016003897B4 (de) Verfahren zur Entlastung des Hauptauslegers eines Krans sowie Kran
DE102011014585A1 (de) Verfahren zum Aufrichten eines Auslegers eines Kranes
DE19833184C2 (de) Containerbrücke mit höhenverstellbarem Brückenträger
DE1456454C (de) Turmdrehkran
DE202015008149U1 (de) Baumaschine, insbesondere Kran, mit A-Bock

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110715

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: B66C 13/06 20060101AFI20111025BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 556975

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120515

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502011000020

Country of ref document: DE

Effective date: 20120712

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20120509

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

Effective date: 20120509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120809

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120909

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120810

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120910

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20130212

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502011000020

Country of ref document: DE

Effective date: 20130212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120809

BERE Be: lapsed

Owner name: LIEBHERR-WERK EHINGEN G.M.B.H.

Effective date: 20130331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120820

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130331

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130331

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130304

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120509

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110304

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130304

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 556975

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160304

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160304

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230322

Year of fee payment: 13

Ref country code: DK

Payment date: 20230321

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230323

Year of fee payment: 13

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230607

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240320

Year of fee payment: 14