EP2151514B1 - Vorrichtung zum Sammeln von Faserbündeln für eine Spinnmaschine - Google Patents

Vorrichtung zum Sammeln von Faserbündeln für eine Spinnmaschine Download PDF

Info

Publication number
EP2151514B1
EP2151514B1 EP09166088A EP09166088A EP2151514B1 EP 2151514 B1 EP2151514 B1 EP 2151514B1 EP 09166088 A EP09166088 A EP 09166088A EP 09166088 A EP09166088 A EP 09166088A EP 2151514 B1 EP2151514 B1 EP 2151514B1
Authority
EP
European Patent Office
Prior art keywords
fiber bundle
side edge
downstream
upstream
collecting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP09166088A
Other languages
English (en)
French (fr)
Other versions
EP2151514A1 (de
Inventor
Kohei Sato
Takahisa Ishii
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyota Industries Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Industries Corp filed Critical Toyota Industries Corp
Publication of EP2151514A1 publication Critical patent/EP2151514A1/de
Application granted granted Critical
Publication of EP2151514B1 publication Critical patent/EP2151514B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H5/00Drafting machines or arrangements ; Threading of roving into drafting machine
    • D01H5/18Drafting machines or arrangements without fallers or like pinned bars
    • D01H5/70Constructional features of drafting elements
    • D01H5/72Fibre-condensing guides

Definitions

  • the present invention relates to a fiber bundle collecting device for a spinning machine according to the preamble of claim 1 and, more particularly, to a device arranged downstream of a draft device (draft part) of a spinning machine for collecting fiber bundle drafted by the draft device.
  • a typical fiber bundle collecting device has a suction pipe having a guide surface with a suction slit and a perforated conveyer belt moving along the guide surface for collecting and transporting the fiber bundle (for example, refer to JP-A-2002-61036 ).
  • the fiber bundle collecting device disclosed in JP-A-2002-61036 and shown in Figs. 6 and 7A through 7C has a front roller pair (final delivery roller pair) 62, a suction pipe 63, a guide roller 64 and a perforated conveyer belt 65.
  • the suction pipe 63 and the perforated conveyer belt 65 are located downstream of the front roller pair 62 of the draft device 61 as viewed in the transporting direction of the fiber bundle, and the perforated conveyer belt 65 is wound around the suction pipe 63 and the guide roller 64.
  • a suction slit 66 is formed in the suction pipe 63 at the sliding surface thereof.
  • a nip roller 67 is disposed adjacent to the downstream end of the suction slit 66 as viewed in the transporting direction of the fiber bundle F for pressing the perforated conveyer belt 65 and the fiber bundle F against the suction pipe 63 while allowing the perforated conveyer belt 65 to move.
  • the suction slit 66 is formed oblique with respect to the transporting direction (arrow direction) of the fiber bundle F moved by the perforated conveyer belt 65. More particularly, the suction slit 66 is formed with a substantially constant width except the part adjacent to the upstream end thereof as viewed in the transporting direction of the fiber bundle F which is formed so to be widened gradually toward the upstream end. As shown in Figs.
  • the left edge of the suction slit 66 as seen in the drawings is formed substantially linearly, while the right edge of the suction slit 66 is curved on the upstream side thereof to have upstream and downstream portions and the inclination angle of the upstream portion relative to the traveling direction of the fiber bundle F is relatively larger than that of the downstream portion.
  • a widened region 68 is formed in the suction slit 66 at the upstream end thereof.
  • the curved right edge of the suction slit 66 serves as the guide edge 69 for the fiber bundle F.
  • the fiber bundle F travels while traversing in the width direction of the perforated conveyer belt 65.
  • the fiber bundle collecting device disclosed in the above Publication the fiber bundle F traverses in the range of the width W of the region 68, and the width of the traversing motion of the fiber bundle F is in the range of about 5 to 6 millimeters.
  • the fiber bundle F is traversed within the width of the region 68 formed at the upstream end of the suction slit 66, and guided toward the guide edge 69 from an downstream edge 68A of the region 68 extending continuously to the guide edge 69 of the suction slit 66.
  • the distance of the guide edge 69 over which the fiber bundle F moves from the region 68 is substantially constant regardless of the point of the region 68 through which the fiber bundle F being traversed enters into the region 68.
  • the angle between the downstream edge 68A of the region 68 and the transporting direction of the fiber bundle F on the perforated conveyer belt 65 needs to be increased.
  • the fiber bundle F fails to move along the downstream edge 68A of the region 68 and be guided toward the guide edge 69 smoothly, so that the resulting yarn quality is varied.
  • the angle made between the downstream edge 68A of the region 68 and the fiber bundle transporting direction of the perforated conveyer belt 65 may not be set so large.
  • the range S of the traversing motion of the fiber bundle F needs to be set to correspond to both of the downstream edge 68A of the region 68 and the guide edge 69 of the suction slit 66.
  • the traveling path of the fiber bundle F relative to the suction slit 66 is changed by the traversing motion of the fiber bundle F, so that the distance of the movement of the fiber bundle F along the guide edge 69 of the suction slit 66 is also changed.
  • the fiber bundle F traveling on the left side of the suction slit 66 moves a shorter distance as compared to the fiber bundle F traveling on the right side.
  • the angle made between the suction slit 66 and the transporting direction of the fiber bundle F is increased for solving the above problem, it becomes difficult for the fiber bundle F to move along the guide edge 69 of the suction slit 66. Also, it is difficult to reduce variations of the moving distance of the fiber bundle F along the guide edge 69 by increasing the overall length of the suction slit 66 because of the arrangement of the spinning machine. If the angle of only the side edge opposite to the guide edge 69 of the suction slit 66 is increased, the width of the suction slit 66 is undesirably decreased at some points.
  • the present invention which has been made in view of the above problems, has the object to provide a fiber bundle collecting device for a spinning machine which reduces the variation of the spun yarn quality.
  • the DE-A1-10 2007 003 525 discloses a fiber bundle collecting device which comprises an apron guide, a suction pipe having a guide surface with a suction slit and a perforated conveyer belt wound around the suction pipe and the apron guide.
  • the perforated conveyer belt is rotated.
  • the suction slit is formed oblique with respect to the traveling direction of which the fiber bundle travels in the regions upstream and downstream of the suction slit.
  • the suction slit has a first side edge and a second side edge in the width direction of the suction slit.
  • the first side edge serves as a guide edge for collecting the fiber bundle and has an upstream portion and a downstream portion.
  • the obliqueness of the upstream portion with respect to the traveling direction of the fiber bundle is greater than the obliqueness of the downstream portion with respect to the traveling direction of the fiber bundle.
  • the second side edge has a downstream portion, a downstream end, an upstream portion and an upstream end.
  • the downstream portion of the second side edge extends along the first side edge from the downstream end of the second side edge.
  • the upstream end of the second side edge is located at a side of the first side edge from a first imaginary line extending from the downstream portion of the second side edge and the upstream end of the second side edge is located at a side of the first side edge from an intersecting point located between the first imaginary line and a second imaginary line extending from the upstream end in perpendicular direction to the traveling direction of the fiber bundle.
  • DE-A1-37 14 212 discloses a further fiber bundle collecting device.
  • the fiber bundle collecting device includes an apron guide, a suction pipe having a guide surface with a suction slit and a perforated conveyer belt wound around the suction pipe and the apron guide and rotated to deliver fiber bundle.
  • the suction slit is formed oblique with respect to the traveling direction of which the fiber bundle travels in the regions upstream and downstream of the suction slit.
  • the suction slit has a first side edge and a second side edge in the width direction of the suction slit. The first side edge serves as a guide edge for collecting the fiber bundle.
  • the first side edge has an upstream portion and a downstream portion, and the obliqueness of the upstream portion with respect to the traveling direction of the fiber bundle is greater than the obliqueness of the downstream portion with respect to the traveling direction of the fiber bundle.
  • the second side edge has a downstream portion, a downstream end and an upstream end.
  • the downstream portion of the second side edge extends along the first side edge from the downstream end of the second side edge.
  • the upstream end of the second side edge is located at a side of the first side edge from a first imaginary line extending from the downstream portion of the second side edge.
  • the upstream end of the second side edge is located at a side of the first side edge from an intersecting point located between the first imaginary line and a second imaginary line extending from the upstream end in perpendicular direction to the traveling direction of the fiber bundle.
  • a fiber bundle collecting device 11 is arranged downstream of a final delivery roller pair 13 of a draft device 12.
  • the fiber bundle collecting device 11 includes a delivery part 14, a suction pipe 15, a perforated conveyer belt 16 and an apron guide 17.
  • the delivery part 14 includes a bottom nip roller 18A and a top nip roller 19.
  • the bottom nip roller 18A is formed as a part of a rotary shaft 18 which is arranged in parallel relation to the front bottom roller 13A of the final delivery roller pair 13.
  • the top nip roller 19 is pressed against the bottom nip roller 18A through the perforated conveyer belt 16.
  • the two top nip rollers 19 are supported by a weighting arm (not shown) through a support member 20 for each two spindles of the spinning machine as in the case of the front top roller 13B of the draft device 12, and the support member 20 is formed integrally with a support member for the two front top rollers 13B.
  • the suction pipe 15 is located upstream of the nip point of the delivery part 14 as viewed in the traveling direction of the fiber bundle F.
  • the bottom components of the fiber bundle collecting device 11 are provided by half of the spindles arranged between roller stands 21 of the draft device 12 as one unit, or four spindles in this embodiment.
  • a support arm (not shown) is disposed at an intermediate position between any two adjacent roller stands 21 arranged at a predetermined interval in the longitudinal direction of the spinning machine.
  • the support arm is supported at the proximal end thereof by a support beam (not shown) extending in the longitudinal direction of the spinning machine, and the rotary shaft 18 is supported between the roller stand 21 and the support arm.
  • a gear 22 is fixedly mounted on the rotary shaft 18 for rotation therewith at a longitudinal intermediate position thereof.
  • the front bottom roller 13A is formed with a gear 13C in facing relation to the gear 22.
  • An intermediate gear 25 is rotatably supported for engagement with the gear 13C and the gear 22 by the support arm 24 fixed at the proximal end thereof to the support beam. In such an arrangement, the torque of the front bottom roller 13A is transmitted to the rotary shaft 18 through the gear 13C, the intermediate gear 25 and the gear 22.
  • a suction duct (not shown) is arranged extending in the frame of the spinning machine in the longitudinal direction thereof or in the direction perpendicular to the plane of Fig. 1 .
  • the suction pipe 15 extends parallel to the suction duct and is connected to the suction duct through a connection tube 26.
  • the suction pipe 15 has a guide surface 28 with a suction slit 27.
  • the perforated conveyer belt 16 is wound around the suction pipe 15, the apron guide 17 and the bottom nip roller 18A in contact therewith. In such arrangement, the perforated conveyer belt 16 is rotated, thereby delivering the fiber bundle F.
  • the perforated conveyer belt 16 is made of woven fabric having an appropriate air permeability.
  • the suction slit 27 is formed oblique with respect to the traveling direction in the vertical direction as seen in Figs. 2A and 2B or of which the fiber bundle F travels in the regions upstream and downstream of the suction slit 27.
  • the suction slit 27 is formed oblique rightward in this preferred embodiment of the present invention.
  • One of the side edges of the suction slit 27 in the width direction thereof (longitudinal direction of the suction pipe 15) located on the outer side of the oblique direction of the suction slit 27 (the edge on the right side of Figs. 2A and 2B ) serves as a guide edge 29 for collecting the fiber bundle F.
  • the guide edge 29 as a first side edge is formed such that the linear downstream portion 29B extends continuously from the linear upstream portion 29A and also that the obliqueness of the upstream portion 29A is larger than that of the downstream portion 29B.
  • the upstream portion 29A and the downstream portion 29B are connected with a smooth curved shape of the guide edge 29.
  • the suction slit 27 has a side edge 30 as a second side edge which is formed opposite to the guide edge 29 and has a downstream portion 30A and an upstream portion 30B.
  • the side edge 30 is formed such that its downstream portion 30A extends along the downstream portion 29B of the guide edge 29 from the downstream end of the side edge 30.
  • the downstream portion 30A is formed in parallel relation to the downstream portion 29B of the guide edge 29. As shown in Fig.
  • the side edge 30 of the suction slit 27 is formed such that the upstream end 30UP of the side edge 30 is located at a side of the guide edge 29 as viewed from the intersection point P1 located between the imaginary line L1 as an extension from the downstream portion 30A of the side edge 30 and the imaginary line L2 extending along the upstream end edge 32 of the suction slit 27.
  • the imaginary line L1 serves as a first imaginary line and the imaginary line L2 serves as a second imaginary line.
  • the upstream end edge 32 of the suction slit 27 extends from the upstream end (30UP) in perpendicular direction to the traveling direction of the fiber bundle F. The distance from the nip point of the final delivery roller pair 13 to the suction slit 27 is kept constant irrespective of the position of the fiber bundle F being traversed.
  • the upstream portion 30B of the side edge 30 has a linear portion 31 extending along the draw-in direction of the fiber bundle F from the upstream end 30UP.
  • the intermediate portion 30C connecting the downstream portion 30A and the linear portion 31 of the side edge 30 is formed in a linear shape whose obliqueness is greater than that of the downstream portion 30A.
  • the linear portion 31 is formed such that an imaginary extension line extending from the linear portion 31 intersects with the upstream portion 29A of the guide edge 29. That is, the upstream end 30UP of the side edge 30 is located at such a position that an imaginary extension line extending along the traveling direction of the fiber bundle F and passing through the upstream end 30UP intersects with the upstream portion 29A of the guide edge 29.
  • the linear intermediate portion 30C has substantially the same obliqueness as the upstream portion 29A of the guide edge 29, and is connected to the downstream portion 30A with a smooth curved shape.
  • the ratios of the lengths of the upstream and downstream portions 29A, 29B of the guide edge 29, the lengths of the downstream and upstream portions 30A, 30B of the side edge 30 and the lengths of the linear portion 31 and the whole side edge 30 may be determined in accordance with the obliqueness of the guide edge 29, the quality of yarn to be spun, and the like.
  • the range of the traversing motion of the fiber bundle F is set to include an imaginary line (not shown) extending through the upstream end 30UP of the side edge 30 and in the traveling direction of the fiber bundle F.
  • the fiber bundle F is drafted by the draft device 12 and guided from the final delivery roller pair 13 to the fiber bundle collecting device 11.
  • the bottom nip roller 18A and the top nip roller 19 are rotated at substantially the same surface speed as that of the final delivery roller pair 13 and, therefore, the fiber bundle F passes through the nip point of the bottom and top nip rollers 18A, 19 under an appropriate tension and then moves downstream while being turned and twisted.
  • the fiber bundle F travels while being traversed by a traverse device (not shown).
  • the speed of the traversing motion of the fiber bundle F is set to be sufficiently smaller than the traveling speed of the fiber bundle F.
  • the suction of the suction duct is conducted to the suction pipe 15 through the connection tube 26, and the suction at the suction slit 27 formed at the guide surface 28 is exerted to the fiber bundle F through the perforated conveyer belt 16.
  • the fiber bundle F travels while being subjected to sucking and collecting at the position corresponding to the suction slit 27. Therefore, as compared to a spinning machine provided with no fiber bundle collecting device, production of fluff and fly is restricted and, therefore, the yarn quality is improved.
  • the fiber bundle F being fed out from the final delivery roller pair 13 is urged in the direction perpendicular to the transporting direction of the perforated conveyer belt 16 (in width direction of the suction slit 27) due to the traversing motion.
  • the fiber bundle F is pressed against the surface of the perforated conveyer belt 16 at the suction slit 27 by the suction, which makes it hard for the fiber bundle F to move in the width direction of the suction slit 27.
  • the side edge 30 of the suction slit 27 has a non-linear shape.
  • the side edge 30 of the suction slit 27 is formed such that the upstream end 30UP of the side edge 30 is located toward the guide edge 29 as viewed from the intersection point P1 made between the imaginary line L1 as an extension from the downstream portion 30A of the side edge 30 and the imaginary line L2 extending along the upstream end edge 32 of the suction slit 27 which in turn extends in perpendicular direction to the traveling direction of the fiber bundle F.
  • the fiber bundle F traveling on the left side in Fig. 2B relative to the upstream end 30UP of the side edge 30 may be subjected to collecting with a sufficiently length thereof at the downstream portion 29B of the guide edge 29.
  • the region of the fiber bundle collecting device 11 where the fiber bundle F is collected while traveling along the guide edge 29 ranges from the bottom end of the guide edge 29 to the upstream of the downstream portion 29B irrespective the position of the traversing motion. Therefore, the region of the fiber bundle collecting device 11 where the fiber bundle F is pressed against the guide edge 29 for collecting is not significantly changed depending on the position of the traversing motion of the fiber bundle F, thereby preventing the variation of the spun yarn quality.
  • the fiber bundle F was spun without traversing using the fiber bundle collecting device of the embodiment having the suction pipe 15 with the suction slit 27 having a shape shown in Fig. 2B on one hand and the fiber bundle collecting device of the background art having the suction pipe 63 with the suction slit 66 having a shape shown in Fig. 7C on the other.
  • the hairiness and the tenacity of the spun yarn were measured for different traveling paths of the fiber bundle F. The results of the measurements are shown in Figs. 3A and 3B . Tests were conducted using a spun yarn made of 100% cotton and having count 50.
  • the hairiness is a measure of yarn fluff and it may be defined as the total length of fibers protruding from the structure of the yarn with a length approximately 1 centimeter.
  • Fig. 3A is a graph showing the relation between the hairiness and the traveling path of the fiber bundle F according to the tests.
  • Fig. 3B is a graph showing the relation between the yarn tenacity and the traveling path of the fiber bundle F according to the tests. In Figs.
  • the abscissa axis indicates the traveling path of the fiber bundle F
  • the value "0" on the abscissa axis indicates that the point where traveling path of the fiber bundle F intersects with the upper end edge of the suction slit 27 is located at the same horizontal position as the downstream end 29DP of the guide edge 29.
  • the value "2" indicates that the point where path of the fiber bundle F intersects with the upper end edge of the suction slit 27 is shifted rightward by 2 millimeters from the point indicated by the value "0”
  • the value "-2" indicates that the point of intersection is shifted leftward by 2 millimeters from the point indicated by the value "0".
  • the hairiness is improved with a decrease of the value thereof or toward the abscissa axis
  • the yarn tenacity is improved with an increase of the value thereof or away from the abscissa axis.
  • the variation of hairiness caused by the difference of the traveling path of the fiber bundles in the preferred embodiment of the present invention is less than that in a comparative example of the conventional art, and evaluation of the hairiness is improved.
  • the variation of yarn tenacity caused by the difference of the traveling path of the fiber bundles according to the preferred embodiment of the present invention is also less than that according to the comparative example of the conventional art, and evaluation of the yarn tenacity is also improved.
  • the preferred embodiment according to the present invention offers the following advantageous effects.
  • the present invention is not limited to the preferred embodiment described above-described preferred embodiment, but it may be modified in various ways as exemplified below.
  • the suction slit 27 is not limited to the structure of Fig. 2B wherein the upstream portion 30B of the side edge 30 located opposite to the guide edge 29 has the linear portion 31 extending from the upstream end 30UP and along the direction in which the fiber bundle F travels, and the downstream portion 30A of the side edge 30 and the linear portion 31 are connected by the intermediate portion 30C.
  • Fig. 2B wherein the upstream portion 30B of the side edge 30 located opposite to the guide edge 29 has the linear portion 31 extending from the upstream end 30UP and along the direction in which the fiber bundle F travels, and the downstream portion 30A of the side edge 30 and the linear portion 31 are connected by the intermediate portion 30C.
  • the suction slit 27 may dispense with the liner portion extending along the direction in which the fiber bundle F travels such as the linear portion 31, but the upstream portion 30B of the side edge 30 extending continuously to the downstream portion 30A of the side edge 30 is formed such that the obliqueness of the upstream portion 30B of the side edge 30 with respect to the direction in which the fiber bundle F travels is greater than the obliqueness of the downstream portion 30A with respect to the direction in which the fiber bundle F travels.
  • the shape of the side edge 30 located opposite to the guide edge 29 of the suction slit 27 become simple in comparison to the shape of the side edge 30 having the intermediate portion 30C.
  • the suction slit 27 is not limited to the structure in which the whole suction slit 27 is oblique rightward as viewed with the upstream side of the movement of the fiber bundle F set at the top of the drawing, but, for example, the suction slit 27 may be oblique leftward, as shown in Fig. 4B .
  • the left side edge of the suction slit 27 serves as the guide edge 29.
  • the moving distance of the fiber bundles F along the guide edge 29 is kept substantially the same irrespective of the traveling path of the fiber bundle F, thereby reducing the variation of the spun yarn quality.
  • the suction slit 27 is not limited to a shape in which the downstream portion 30A linearly extends exactly parallel to the guide edge 29.
  • the shape of the suction slit 27 may be formed in such a manner that the distance between the downstream portion 30A and the guide edge 29 is increased toward the upstream side thereof, or neither of the downstream portion 30A and the downstream portion 29B have a linear shape, but they are curved continuously from the bottom end thereof.
  • the suction slit 27 may be formed in such a manner that both of the upstream portion 29A and the downstream portion 29B of the guide edge 29 have curved shapes, respectively.
  • the guide member 33 with a guide surface 33A having a circular arc shape may be arranged downstream of the bottom nip roller 18A for rotating the perforated conveyer belt 16 for delivering the fiber bundle F.
  • the connecting tube 26 connecting the suction pipe 15 to the suction duct for applying vacuum to the suction pipe 15 may be arranged at a position where the connecting tube 26 is connected to the suction pipe 15 from the front of the bottom nip roller 18A.
  • the conveyer belt may be made of perforated and elastic rubber or resin instead of the woven fabric or knitted fabric.
  • a fiber bundle collecting device for a spinning machine includes an apron guide, a suction pipe having a guide surface with a suction slit and a perforated conveyer belt.
  • the suction slit is formed oblique with respect to the traveling direction of which the fiber bundle travels in the regions upstream and downstream of the suction slit to have first and second side edges.
  • the second side edge has a downstream end, a downstream portion extending along the first side edge from the downstream end and an upstream end located at a side of the first side edge from a first imaginary line extending from the downstream portion and at a side of the first side edge from an intersecting point located between the first imaginary line and a second imaginary line extending from the upstream end in perpendicular direction to the traveling direction of the fiber bundle.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Claims (8)

  1. Vorrichtung (11) zum Sammeln von Faserbündeln für eine Spinnmaschine, die stromabwärts eines finalen Zustellwalzenpaars (13) einer Ziehvorrichtung (12) vorgesehen ist, mit:
    einer Gliederbandführungseinrichtung (17);
    einem Saugrohr (15), das eine Führungsfläche (28) mit einem Saugschlitz (27) aufweist; und
    einem perforierten Fördergürtel (16), der um das Saugrohr (15) und die Gliederbandführungseinrichtung (17) aufgezogen ist, wobei der perforierte Fördergürtel (16) zum Zustellen von Faserbündel (F) gedreht wird,
    wobei der Saugschlitz (27) bezüglich der Bewegungsrichtung, in der sich das Faserbündel (F) in den Bereichen stromaufwärts und stromabwärts des Saugschlitzes (27) bewegt, schräg ausgebildet ist, und wobei der Saugschlitz (27) einen ersten Seitenrand (29) und einen zweiten Seitenrand (30) in der Breitenrichtung des Saugschlitzes (27) aufweist,
    wobei der erste Seitenrand (29) als ein Führungsrand zum Sammeln des Faserbündels (F) dient, der erste Seitenrand (29) einen stromaufwärtigen Abschnitt (29A) und einen stromabwärtigen Abschnitt (29B) aufweist und die Schrägheit des stromaufwärtigen Abschnitts (29A) bezüglich der Bewegungsrichtung des Faserbündels (F) größer als die Schrägheit des stromabwärtigen Abschnitts (29B) bezüglich der Bewegungsrichtung des Faserbündels (F) ist,
    wobei der zweite Seitenrand (30) einen stromabwärtigen Abschnitt (30a), ein stromabwärtiges Ende, einen stromaufwärtigen Abschnitt (30B) und ein stromaufwärtiges Ende (30UP) aufweist, wobei sich der stromabwärtige Abschnitt (30A) und der zweite Seitenrand (30) von dem stromabwärtigen Ende des zweiten Seitenrands (30) ausgehend entlang des ersten Seitenrands (39) erstrecken, wobei sich das stromaufwärtige Ende (30UP) des zweiten Seitenrands (30) an einer Seite des ersten Seitenrands (29) ausgehend von einer ersten gedachten Linie (L1) befindet, die sich von dem stromabwärtigen Abschnitt (30A) des zweiten Seitenrands (30) aus erstreckt, und wobei sich das stromaufwärtige Ende (30UP) des zweiten Seitenrands (30) an einer Seite des ersten Seitenrands (29) ausgehend von einem Schnittpunkt (P1) befindet, der sich zwischen der ersten gedachten Linie (L1) und einer zweiten gedachten Linie (L2) befindet, die sich von dem stromaufwärtigen Ende (30UP) in senkrechter Richtung zu der Bewegungsrichtung des Faserbündels (F) erstreckt,
    gekennzeichnet dadurch, dass
    der stromaufwärtige Abschnitt (30B) des zweiten Seitenrands (30) einen linearen Abschnitt (31) aufweist, der sich von dem stromaufwärtigen Ende (30UP) ausgehend entlang der Bewegungsrichtung des Faserbündels (F) erstreckt.
  2. Vorrichtung (11) zum Sammeln von Faserbündeln nach Anspruch 1, gekennzeichnet dadurch, dass der lineare Abschnitt (31) und der stromabwärtige Abschnitt (30A) des zweiten Seitenrands (30) durch eine gleichmäßig gekrümmte Form des zweiten Seitenrands (30) verbunden sind.
  3. Vorrichtung (11) zum Sammeln von Faserbündeln nach Anspruch 1, gekennzeichnet dadurch, dass der lineare Abschnitt (31) und der stromabwärtige Abschnitt (30A) des zweiten Seitenrands (30) durch eine lineare Form des zweiten Seitenrands (30) verbunden sind.
  4. Vorrichtung (11) zum Sammeln von Faserbündeln nach Anspruch 1, gekennzeichnet dadurch, dass der stromaufwärtige Abschnitt (30B) des zweiten Seitenrands (30) eine lineare Form aufweist und sich kontinuierlich zu dem stromabwärtigen Abschnitt (30A) des zweiten Seitenrands (30) hin erstreckt.
  5. Vorrichtung (11) zum Sammeln von Faserbündeln nach Anspruch 1, gekennzeichnet dadurch, dass der stromaufwärtige Abschnitt (30B) des zweiten Seitenrands (30) eine gekrümmte Form aufweist und sich kontinuierlich zu dem stromabwärtigen Abschnitt (30A) des zweiten Seitenrands (30) hin erstreckt.
  6. Vorrichtung (11) zum Sammeln von Faserbündeln nach Anspruch 4 oder 5, gekennzeichnet dadurch, dass die Schrägheit des stromaufwärtigen Abschnitts (30B) des zweiten Seitenrands (30) bezüglich der Bewegungsrichtung des Faserbündels (F) größer als die Schrägheit des stromabwärtigen Abschnitts (30A) des zweiten Seitenrands (30) bezüglich der Bewegungsrichtung des Faserbündels (F) ist.
  7. Vorrichtung (11) zum Sammeln von Faserbündeln nach einem der Ansprüche 1 bis 6, gekennzeichnet dadurch, dass der stromabwärtige Abschnitt (30A) des zweiten Seitenrands (30) eine gekrümmte Form aufweist, die sich von dem stromabwärtigen Ende des stromabwärtigen Abschnitts (30A) des zweiten Seitenrands (30) ausgehend kontinuierlich erstreckt.
  8. Vorrichtung (11) zum Sammeln von Faserbündeln nach einem der Ansprüche 1 bis 7, gekennzeichnet dadurch, dass der stromaufwärtige Abschnitt (29A) und der stromabwärtige Abschnitt (29B) des ersten Seitenrands (29) jeweils gekrümmte Formen aufweisen.
EP09166088A 2008-08-04 2009-07-22 Vorrichtung zum Sammeln von Faserbündeln für eine Spinnmaschine Active EP2151514B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008200813A JP5098880B2 (ja) 2008-08-04 2008-08-04 紡機における繊維束集束装置

Publications (2)

Publication Number Publication Date
EP2151514A1 EP2151514A1 (de) 2010-02-10
EP2151514B1 true EP2151514B1 (de) 2011-09-28

Family

ID=41228422

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09166088A Active EP2151514B1 (de) 2008-08-04 2009-07-22 Vorrichtung zum Sammeln von Faserbündeln für eine Spinnmaschine

Country Status (4)

Country Link
EP (1) EP2151514B1 (de)
JP (1) JP5098880B2 (de)
CN (1) CN101643950B (de)
AT (1) ATE526440T1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586672B (zh) * 2015-12-03 2018-04-06 江南大学 一种减小导纱钩阻捻作用的方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012087419A (ja) * 2010-10-15 2012-05-10 Toyota Industries Corp 紡機における繊維束集束装置
IT1402834B1 (it) * 2010-11-10 2013-09-27 Marzoli Spa Dispositivo di compattazione di un nastro di fibre tessili in un filatoio
JP7468394B2 (ja) * 2021-02-17 2024-04-16 株式会社豊田自動織機 紡機の繊維束集束装置

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3714212A1 (de) * 1987-04-29 1988-11-17 Fritz Stahlecker Vorrichtung zum pneumatischen falschdrallspinnen mit einem streckwerk
DE19623824A1 (de) * 1996-03-06 1997-10-09 Rieter Ag Maschf Spinnmaschine mit einer der Faserbandkonzentration dienenden Kondensationsstufe auf dem Umfang einer am Ausgang eines Mehrstufen-Streckwerks vorgesehenen Saugwalze
DE19949666A1 (de) * 1999-10-14 2001-04-19 Stahlecker Fritz Vorrichtung zum Verdichten eines Faserverbandes
DE10039732A1 (de) * 2000-08-15 2002-02-28 Fritz Stahlecker Vorrichtung zum Verdichten eines Faserverbandes
DE10056668A1 (de) * 2000-11-09 2002-05-16 Fritz Stahlecker Vorrichtung an einer Spinnmaschine zum Verdichten eines Faserverbandes
DE10137004A1 (de) * 2001-07-25 2003-02-13 Stahlecker Gmbh Wilhelm Spinnmaschine mit einer Vielzahl von Spinnstellen
DE10321891A1 (de) * 2003-05-07 2004-12-09 Spindelfabrik Süssen Schurr, Stahlecker & Grill GmbH Vorrichtung zum Verdichten eines Faserverbandes
DE102004062796A1 (de) * 2004-12-20 2006-06-29 Spindelfabrik Süssen Schurr Stahlecker & Grill GmbH Unterdruckkanal für Faserbündelungseinrichtungen einer Spinnmaschine
DE102005013765A1 (de) * 2005-03-22 2006-09-28 Maschinenfabrik Rieter Ag Verfahren und Vorrichtung zum Herstellen von Coregarn
DE102007003525A1 (de) * 2007-01-19 2008-07-31 Spindelfabrik Suessen Gmbh Saugkanal für eine Faserbündelungseinrichtung
DE102007006282A1 (de) * 2007-02-01 2008-08-07 Wilhelm Stahlecker Gmbh Streckwerk mit Verdichtungszone

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586672B (zh) * 2015-12-03 2018-04-06 江南大学 一种减小导纱钩阻捻作用的方法

Also Published As

Publication number Publication date
EP2151514A1 (de) 2010-02-10
JP5098880B2 (ja) 2012-12-12
CN101643950B (zh) 2011-10-05
JP2010037677A (ja) 2010-02-18
ATE526440T1 (de) 2011-10-15
CN101643950A (zh) 2010-02-10

Similar Documents

Publication Publication Date Title
EP1911865B1 (de) Faserbündelungsvorrichtung für eine Spinnmaschine
US6161258A (en) Spinning machine having a plurality of spinning stations
EP2151514B1 (de) Vorrichtung zum Sammeln von Faserbündeln für eine Spinnmaschine
EP2333137B1 (de) Vorrichtung zum Bündeln von Faserbündeln für eine Spinnmaschine
CN106337257B (zh) 具有多个纤维带引导器的牵伸机构
US6425164B2 (en) Transport belt for transporting a fiber strand to be condensed and method of making same
JP4582637B2 (ja) 圧縮装置を有する紡績機
US6237317B1 (en) Condensing zone for a spinning machine
CN111850750A (zh) 皮圈牵伸装置
EP2921577B1 (de) Streckwerk und spinnmaschine
JP2008174895A (ja) 繊維バンドリング装置のための吸引チャネル
KR101393360B1 (ko) 편직물 제조장치
CN112760765B (zh) 用于纺纱机牵伸装置的凝棉装置和凝棉装置的牵伸装置
JP3786069B2 (ja) 紡機の繊維束集束装置
JP3826864B2 (ja) 紡機における繊維束集束装置
CN214458527U (zh) 牵伸装置、纺纱机以及牵伸辊
CN102660818B (zh) 用于纺纱机的纤维束集束装置
KR20070029097A (ko) 편직물을 제조하기 위한 장치
EP2865795A1 (de) Streckwerk und Spinnmaschine
CN114941190B (zh) 纺织机的纤维束集束装置
CN104695069A (zh) 部件和纺纱机
US5175991A (en) Arrangement for pneumatic false-twist spinning
Kumar et al. Compact spinning: a critical review
EP2752512B1 (de) Spinnmaschine
JP2003147627A (ja) 繊維ストランドを延伸及び凝縮するための装置

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20090722

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: CH

Ref legal event code: NV

Representative=s name: NOVAGRAAF INTERNATIONAL SA

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009002789

Country of ref document: DE

Effective date: 20111201

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20110928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111228

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20110928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111229

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 526440

Country of ref document: AT

Kind code of ref document: T

Effective date: 20110928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120130

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

26N No opposition filed

Effective date: 20120629

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602009002789

Country of ref document: DE

Effective date: 20120629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120731

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20130329

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120731

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120108

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120722

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130722

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130722

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110928

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120722

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090722

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230519

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20230801

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230531

Year of fee payment: 15