EP1024106A1 - Method and device for mounting of the top of the tower of tower cranes - Google Patents

Method and device for mounting of the top of the tower of tower cranes Download PDF

Info

Publication number
EP1024106A1
EP1024106A1 EP00420008A EP00420008A EP1024106A1 EP 1024106 A1 EP1024106 A1 EP 1024106A1 EP 00420008 A EP00420008 A EP 00420008A EP 00420008 A EP00420008 A EP 00420008A EP 1024106 A1 EP1024106 A1 EP 1024106A1
Authority
EP
European Patent Office
Prior art keywords
jib
holder
arrow
mast
rear part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP00420008A
Other languages
German (de)
French (fr)
Other versions
EP1024106B1 (en
Inventor
Michel Lissandre
Yves Millet
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Manitowoc Crane Group France SAS
Original Assignee
Potain SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potain SA filed Critical Potain SA
Publication of EP1024106A1 publication Critical patent/EP1024106A1/en
Application granted granted Critical
Publication of EP1024106B1 publication Critical patent/EP1024106B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C21/00Cable cranes, i.e. comprising hoisting devices running on aerial cable-ways

Definitions

  • the present invention relates to a method and a device for mounting of the components of the rotating part of a tower crane, this invention focusing more particularly on the constitution and mounting the mast head of tower cranes.
  • the rotating part of such a crane comprises usually a rotating pivot, surmounted by a mast head also called “Arrow-holder", the arrow and the counter-arrow being located on either side of the masthead.
  • the arrow is articulated, by its posterior end, to the face front of the arrowhead, and it is held substantially in position horizontal by means of one or more lines of arrow rods, connecting each obliquely the top of the arrowhead at a point on the arrow.
  • the counter-jib is articulated, by its anterior end, to the rear face of the arrowhead, and it is held in position substantially horizontal by means of one or more lines of tie bars, each connecting obliquely the top of the arrowhead to a point on the counter-arrow.
  • European patent application EP 0 635 450 A1 in the name of Applicant describes a method for mounting the distributing boom and the jib of such a tower crane. According to this process, the elements of arrow are aligned and assembled on the ground with their tie rods, then we raise and aligns the tie rods, and possibly those of the jib, using an auxiliary assembly machine such as a mobile crane. Then, using the same machine, we lift the whole boom or counter-jib with the tie rods, and the jib or counterjib is presented opposite the masthead previously mounted, so that the free ends of the tie lines appear correctly at the top of the mast head, allowing a direct pinning of the tie rods at the top of the masthead.
  • This process is also implemented by aligning and assembling the boom elements on the ground, and using an auxiliary machine lifting to present the jib, then the jib, facing the masthead previously assembled.
  • the invention is essentially based on the initial separation of the two-part arrowhead, respectively a front part and a part rear, which allows two separate assemblies to be pre-assembled on the ground, one comprising the jib and the rear part of the jib holder, and the other the arrow and the front part of the arrow holder. These two pre-assembled assemblies are then successively lifted and assembled to the turning pivot or to the top of the mast-cabin by pinout.
  • the two constituent parts of the arrowhead are also linked together by broaching, in their upper portions, of so as to ultimately constitute a complete, rigid, looking arrowhead triangular or polygonal (seen from the side).
  • the assembly on the ground of the assembly formed by the arrow, its tie (s) and the front part of the arrow holder is made by tying articulated the base of the front part of the arrowhead at the end posterior of the boom foot, and also linking the front part of the boom holder at the jib foot by a means limiting pivoting, forward and toward the rear of the front part of the arrowhead relative to the arrow.
  • the angular travel thus authorized, for example of the order of 5 °, facilitates the final operation of connecting the tops of the front and rear parts of the arrowhead.
  • the assembly operation on the ground of the assembly formed by the arrow, its tie rod (s) and the front part of the arrow holder also includes, for the or each drawing of the arrow, the fixing of a rear part of the tie rod at the top of the front part of the jib holder, the fixing of a front part of the same tie at an intermediate point of the arrow, bringing the rear and front parts of the tie together using a sling pulled by an auxiliary handling or lifting device, and the pinout of the front end of the rear part of the tie rod on the rear end of the front part of the tie rod.
  • the tie rods are thus pinned together, by ground operations, and they find themselves in an aligned position.
  • the lifting operation of the assembly formed by the jib, its or its tie rods and the rear part of the arrow holder is achievable, according to a first method of implementation, using slings comprising front slings attached to the base of the rear part of the arrowhead, and passing over a deflection member carried by this rear part, and rear slings attached to the structure of the jib, so as to maintain the structure of the substantially horizontal jib during the lifting of this assembly and its pinout on the turning pivot or the mast-cabin, the tie rods of the jib being aligned and tensioned.
  • the lifting operation of the assembly formed by the jib, its or its tie rods and the rear part of the arrow holder is made using slings comprising front slings attached to the base of the rear part of the arrowhead, but not deflected, and rear slings attached to the strut structure, the slings being long adapted to maintain the structure of the jib in an inclined position by with respect to the horizontal, during the lifting of this assembly and its pinout on the turning pivot or the mast-cabin, the rear part of the boom holder being pivoted back and in abutment, so that the tie rod (s) remain relaxed; the structure of the jib is brought back to the horizontal, and the or the tie rods are tensioned, after pinning of said assembly on the pivot rotating or mast-cabin.
  • the process still advantageously comprises, after the broaching operation of the first of these sets on the turning pivot or the mast-cabin, the realization of a provisional connection with clearance maintaining the rear part of the arrow holder in upright position, waiting for the pinout of the top of the front part of the arrowhead on the top of said rear part.
  • This temporary connection with play is achievable by means of retaining rods and lights, connecting the top of the rear part of the arrow holder with swivel pivot or cabin mast.
  • the lifting operation of the assembly formed by the boom, its or its tie rods and the front part of the jib holder is also carried out using slings preferably by keeping the arrow substantially horizontal until its broaching on the swivel pivot or the mast-cabin, then by rotating the boom slightly upwards around the axis making this pinout, to make a approach pinout with clearance between the top of the front part and the top of the rear part of the arrowhead. Then there is a pivot reverse of the arrow driving forward the rear part of the arrow holder, and carrying out a final pinout.
  • the pivoting reverse of the arrow driving forward thanks to its dead weight more import the rear part of the arrow holder, move the broaching hole definitive of the summit of said rear part following an arc of a circle, the center corresponds to the broaching axis of the jib and the rear part of the boom holder on the turning pivot or the mast-cabin.
  • the final broaching hole at the top of the front part of the arrowhead is moves along another arc, the center of which corresponds to the axis of pin assignment of the arrow and the front part of the arrow holder on the turning pivot or the mast-cabin.
  • the final pin holes respective vertices of the two parts of the arrowhead are sure to find a common axis, at the point of intersection of the two arcs of circle mentioned, whatever the starting geometrical position of these broaching holes, and thus the realization of the final pinout is always possible.
  • this final pinout ensures the stiffening of the arrow holder, necessary for it to perform its function when working the crane.
  • the front part of the arrow holder is connected, via a crutch made up of two sections uneven articulated between them, at the rear part of the boom foot, one of the sections of the stand comprising a support member on the mast foot, so as to limit the pivoting, forward and backward, of the front part of the arrowhead relative to the arrow.
  • the post and the clevis complementary provided at the tops of the front and rear parts of the jib holder, have corresponding front and rear holes, respectively for carrying out an approach pinout with clearance, and a final broaching, between the tenon and the clevis.
  • the tower crane shown in FIG. 1 comprises, in a known manner, a fixed or rolling base frame 1, a mast 2 of adjustable height surmounted a fixed pivot 3 and a rotating part 4, orientable around a vertical axis, which itself includes a masthead or “arrowhead” 5, an arrow distributor 6 along which a carriage 7 moves, and a jib 8 carrying a counterweight 9.
  • the arrow holder 5 overcomes a short section of mast 10, called “cabin mast”, also belonging to the part 4 and on which the driver's cabin 11 of the crane.
  • the arrow 6 consists of several aligned elements, with lattice structure, including a first element 12 says “arrow foot”, articulated by its end posterior to the base of the arrowhead 5 and on the mast-cabin 10, around a horizontal axis.
  • Arrow 6 is held in a substantially horizontal position by two oblique tie rods 13 and 14, both linked to the top 15 of the arrowhead 5, and also linked, respectively, at two intermediate points 16 and 17 (spaced from each other) arrow 6.
  • the tie rods 13 and 14 are themselves formed, each, by several successive elements articulated together, and can thus be also referred to as "tie lines".
  • the counter-jib 8 is located, with respect to the mast head 5, on the opposite side in arrow 6, the anterior end of the jib 8 being articulated, around a horizontal axis 18, at the base of the jib holder 5 and on the mast-cabin 10.
  • This jib 8 is kept here in a substantially horizontal position by a double oblique tie 19, which connects two symmetrical points 20 of the part posterior of the structure of the jib 8 to the top 15 of the jib holder 5.
  • the jib tie rods 19 are composed of several successive elements, articulated between them.
  • the corflèche 8 also has a trellis structure (see Figure 2).
  • the arrow holder 5 consists of two removable and separable parts from each other, namely a front part 21 and a rear part 22, shown separate from each other in Figure 2. In the mounted position, the front 21 and rear 22 converge at the top 15 of the jib holder 5.
  • the front part 21 of the arrow holder 5 is associated with arrow 6 and, more in particular, at the foot of the arrow 12.
  • This front part 21 comprises two converging uprights 23, joined to each other at their top, and connected between them, respectively, at their base and at an intermediate height, by two horizontal crosspieces 24 and 25.
  • the lower ends of the two uprights 23 have respective pins 26, each pierced with a broaching hole 27.
  • the close upper ends of the two uprights 23 are assembled to another tenon 28, pierced with two holes 29 and 30, one anterior and the other posterior.
  • the rear end of the jib foot 12 comprises, on each side, a yoke 31 with opening directed downwards, receiving one of the tenons lower 26 of the front part 21 of the arrowhead 5.
  • a boss 32 on each of these pins 26, and a safety pin 33 (see detail in Figure 3), prohibit uncoupling between each yoke 31 and the corresponding pin 26.
  • the front part 21 of the arrow holder 5 is also connected to the jib base 12 by means of a crutch 34, consisting of two unequal sections 35 and 36, hinged together around an intermediate axis 37.
  • the first section 35 is articulated at one end to a yoke 38 linked to the crosspiece 25 of the part front 21 of the arrow holder 5; it has, at its opposite end, a plate support 39 intended to rest on the upper chord 40 of the jib foot 12.
  • the second section 36 is articulated around an axis 41 at the rear end of the upper chord 40 of the jib foot 12.
  • the stand 34 is shown in the folded position, position in which it limits the forward pivoting of the front part 21 of the arrow holder 5. In the unfolded position, the same stand 34 limits pivoting towards the rear of the front part 21 of the arrowhead 5.
  • the angle between the two limit positions of this front part 21 of the arrow holder 5 is of the order of 5 °.
  • the rear part 22 of the jib holder 5 is associated with the jib 8.
  • This rear part 22 includes two converging main uprights 42, joined to each other at their apex, and connected to each other, respectively to their base and at an intermediate height, by two horizontal crosspieces 43 and 44.
  • the lower ends of the two uprights 42 have tenons respective 45, each pierced with an opening 46.
  • the upper ends close to the two uprights 42 are assembled to a yoke 47, of which each branch has two holes, one anterior and the other posterior.
  • the rear part 22 of the boom holder 5 further comprises two retaining rods 48, articulated by their upper ends under the yoke 47.
  • the end lower of each connecting rod 48 carries a yoke 49.
  • the anterior end of the jib 8 has, on each side, a clevis 50 with opening directed downwards, receiving one of the tenons lower 45 of the rear part 22 of the arrowhead 5.
  • the part rear 22 of the arrowhead 5 has a strap 53 articulated on the uprights main 42, and designed to offset the attachment point of the slings handling, as detailed below.
  • the rear part 22 of the arrow holder 5 comprises at least a connecting bar 81, articulated on the crosspiece 44.
  • This bar is fixed on the front part 21 of the jib holder, once the crane is fully assembled, and serves triangulation bar reinforcing the connection between the front parts 21 and rear 22 of the boom holder 5.
  • the mast-cabin 10 comprises, at its top, two yokes 54 located respectively on both sides of the mast-cabin and facing forward, two other yokes 55 located respectively on both sides of the mast and rearward, and two legs 56 located respectively on both sides of the cabin mast and facing upwards.
  • the two front yokes 54 of the mast-cabin 10 are provided to receive the lower pins 26 of the front part 21 of the arrowhead 5, as well as the posterior yokes 31 of the jib foot 12.
  • the two rear yokes 55 of the mast-cabin 10 are provided to receive the lower lugs 45 of the part rear 22 of the arrowhead 5, as well as the front yokes 50 of the counterjib 8.
  • the two legs 56 of the mast-cabin 10, each pierced of a light are provided to receive the lower yokes 49 of the connecting rods retainer 48 of the rear part 22 of the jib holder 5.
  • FIG. 5 represents the region of the vertex 15 of the head of mast.
  • a first phase consists in assembling, on the ground, elements of the jib 8 and associated parts, using a handling machine low capacity (maximum load for example less than or equal to 4 tonnes).
  • the elements of the double tie 19 of the jib 8 are then put in place, as well as the rear part 22 of the arrow holder 5, so as to constitute a triangular-looking structure, formed of the counter-jib 8, of the double tie 19 and said rear part 22.
  • a second phase consists in assembling, on the ground, elements of arrow 6 and associated parts, still using a handling machine low capacity.
  • the successive elements of arrow 6 are aligned and assembled together and the carriage 7 is also put in place.
  • the front part 21 of the boom holder is brought, its stand 34 being folded and resting, by its support plate 39, on the upper chord 40 of the jib foot 12 - see figure 6.
  • the two lines of tie rods 13 and 14 of arrow 8 are also installed: the rear parts 13a or 14a of these tie rods 13 and 14 are joined by a double connecting rod 82, which hangs on a boss 83 formed around the hole anterior 29 of the pin 28 located at the top of the front part 21 of the arrow holder (see Figure 5), the double rod 82 being held in the hooked position by a clamping member.
  • the front part 13b or 14b of each tie 13 or 14, still separated from the rear part, is linked to point 16 or 17 to the frame upper 40 of arrow 6.
  • the front end of the rear part 14a has a yoke 57, and the rear end of the part before 14b of this tie rod has a lug 58 preferably with light or vice versa.
  • a roller 59 mounted at the front end of the rear part 14a of the line of tie rods 14, this roller 59 being able to roll on the upper chord 40.
  • a sling 60 is used passing over two movable pulleys 61, and on the hook 62 of the aforementioned handling device - see detail C in FIG. 6.
  • the next phase consists, by means of a heavy lifting machine capacity (maximum load for example equal to or greater than 10 tonnes), and using adapted slings, to carry out handling of the assembly formed by the jib 8, by the double tie 19 and by the rear part 22 of the jib holder 5, to lift this assembly and bring it to the mast-cabin 10, as illustrated generally in Figure 9.
  • maximum load for example equal to or greater than 10 tonnes
  • This phase is achievable, in a first mode of implementation illustrated by FIG. 10, using a set of particular slings, composed of two front slings 65 and two rear slings 66, of predefined length, suspended from the same hook 67 of the lifting gear.
  • the two front slings 65 are attached at a point 68, at the base of the rear part 22 of the arrowhead 5, and they pass over the deployed strap 53, so as to be deflected on the end 69 of this strap 53 which constitutes thus a deported attachment point.
  • the two rear slings 66 are attached at symmetrical points 70, situated towards the rear of the structure of the counter-arrow 8.
  • the double tie rod 19 of the counterjib 8 is aligned and taut, and the structure of jib 8 remains in substantially horizontal position, position which is maintained during pinning operations (previously described) of this assembly on the mast-cabin 10.
  • the handling of the assembly in question is carried out using another assembly special slings, still composed of two front slings 71 and two rear slings 72, of predefined length.
  • the two front slings 71 are attached to point 68, at the base of the rear part 22 of the arrowhead 5, and do not undergo here no deviation between the hook 67 and the attachment point 68.
  • the two rear slings 72 are attached to the points 70, located towards the rear of the structure of the jib 8.
  • the two slings front 71 keep the rear part 22 of the jib holder 5 pivoted towards the rear relative to the structure of the jib 8, in the stop position against the yoke 50 by the axis 52, so that the elements 73, 74 and 75 of the line of tie rods 19 form a broken line.
  • the structure of the jib 8 is handled by forming, with respect to the horizontal, an angle a sufficient important, for example equal to or greater than 15 °. This tilt of the counter-arrow 8 is retained during the operations (previously described) of pinout of the assembly on the mast-cabin 10.
  • the counterjib 8 is pivoted about its pin 18 of broaching on the mast-cabin 10, until they come into a substantially horizontal position, the elements 73, 74 and 75 of the double tie 19 then being aligned and tensioned.
  • FIGS. 12 to 14 illustrate a third embodiment, concerning the assembly and handling of the assembly formed by the jib 8, the tie rod (s) 19 and the rear part 22 of the jib holder 1.
  • FIG. 12 illustrates the pinning operation of the tie rods 19, carried out at ground.
  • the rear part 22 of the arrow holder 5 is brought into place in its articulation at the front of the structure of the jib 8, and maintained in a substantially vertical position (for example with a slight tilt backwards, the angle ⁇ being approximately 87 °), using the low capacity handling. It is then proceeded to the pinout of the or each line of tie rods 19.
  • this last mode of implementation makes useless any deflection member for slings 71 and 72.
  • the angle inclination of the counter-jib of the order of 6 °, is safer here that the angle of 15 ° or more reached in the previous setting mode artwork. This angle has smaller avoids introducing horizontal forces on the masthead and on the mast 2, during the disassembly of the jib 8.
  • the arrow 6 is then slightly pivoted upwards around its broaching axis 77 with the mast-cabin 10 (position visible in FIG. 15), the front part 21 of the jib holder 5 then performing a corresponding pivoting backwards.
  • the upper tenon 28 of the part front 21 of the arrowhead 5 thus engages in the upper yoke 47 of the rear part 22 of this arrowhead 5.
  • an approach pinning is then carried out, with play, between the stud 28 and the yoke 47, by means of an axis 78 which crosses the rear hole 30 of the tenon and the corresponding holes of the yoke 47, the diameter of the hole 30 being greater than that of axis 78.
  • the arrow 6 is lowered and brought back substantially to the horizontal, by reverse pivoting around its broaching axis 77 with the mast-cabin 10, using the lifting.
  • the rear part 22 of the arrow holder 5 is driven forward, by the approach pinout previously made, the top of this rear part 22 describing an arc centered on the axis 18, while the apex of the front part 21 of the arrowhead 5 moves in an arc centered on axis 77, the movement continuing until alignment of the anterior hole 29 of stud 28 with the corresponding holes in clevis 47, at point of intersection of the two above-mentioned arcs.
  • tie rods 13 and 14 of arrow 6 line up and stretch, while the stand 34 unfolds (see detail H in Figure 16).
  • the arrow holder 5 is then constituted in a rigid structure, triangular in shape, the three sides of which are formed respectively by the top of the mast-cabin 10, by the front part 21 (in particularly the uprights 23) and by the rear part 22 (in particular the amounts 42).
  • a small platform 80 with railing, carried by the rear part 22 of the arrowhead 5, allows responders to safely perform the broaching operations previously described, linking the respective vertices of the front 21 and rear 22 parts of the jib holder 5.
  • the slings 76 can now be detached from the boom 6, the latter being held in a substantially horizontal position by the single tie rods 13 and 14, stretched between the top 15 of the arrowhead 5 and points 16 and 17 - see figure 17.
  • one or more counterweight 9 can already be installed on the counterjib 8 in the intermediate stages of the crane assembly.
  • FIGS. 19 to 22 illustrate, as a variant of what has just been described, another version of the pinout of the upper part of the arrowhead 5. This variant implements the following means, clearly visible in FIG. 20 as well only on details N and R:
  • the front part 21 of the arrow holder 5 has, at its top, a tenon 28 provided with a rear hole 30 for the broaching of the line of tie rods 19 of the counterjib 8, and a front hole 29 for the final broaching of the two parts, front 21 and rear 22, respectively, of the arrowhead 5.
  • the rear part 22 of the arrow holder 5 has, at its top, a yoke 47 provided with a hole 84 for the final broaching of the two parts 21 and 22 of the arrowhead 5.
  • the yoke 47 is also provided, externally, with side washers 85 coaxial with the above-mentioned hole 84; these washers 85, welded on clevis 47, have an internal diameter equal to that of the axis of final pinout.
  • the line of tie rods 19 of the jib 8 comprises, at its end front, two connecting rods 86 and 87.
  • the first connecting rod 86 is a double connecting rod, composed of two symmetrical plates, which ensures the connection between the end of the tie rod line 19 and the side washers 85 carried by the upper yoke 47 of the rear part 22 of the arrowhead 5.
  • the second connecting rod 87 in particular in the form of a yoke, is housed inside the double rod 86, and it is connected to the end of the line of tie rods 19, to the same point as the first connecting rod 86.
  • the center distance of the second connecting rod 87 is slightly lower, for example 2 mm, than that of the double rod 86.
  • the broaching of the counterjib 8 is carried out by connecting the double tie rod 19 at the upper end of the rear part 22 of the jib holder 5 by means of the first connecting rod (double connecting rod) 86, the second connecting rod 87 being on standby.
  • the pinout of the arrow 6 is carried out by connecting the triangulation of this arrow, at its upper end and more particularly the hole rear 30 of the stud 28, at the end of the double tie 19 of the counter-jib 8, via the second connecting rod 87.
  • This variant has the advantage, in comparison with the previously described version, to no longer require a very precise realization of the centers of the holes at the tops of the front 21 and rear 22 parts of the arrow-holder 5, therefore to overcome a dimensional constraint.
  • the rotating part 4 of the crane can be dismantled by means of a series of reverse operations from those previously described, separating first the two parts 21 and 22 of the jib holder 5, then by handling on the one hand, the assembly composed of arrow 6, of the front part 21 of the arrow holder 5 and tie rods 13 and 14, and on the other hand the assembly composed of the counterjib 8, the rear part 22 of the jib holder 5 and the double tie 19. Once separated, the two parts 21 and 22 of the arrow holder 5 provide a minimum space requirement, for their transport and storage.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)

Abstract

Method involves assembly on ground of first section with counter broom (8), tie rods (19), rear part (22) of broom holder (5) and second section with broom (6), tie rods (13, 14) and front part (21) of broom holder. First section is raised onto center point or mast-cab along horizontal axis (18) while second section is raised along horizontal axis (77). Two sections are attached to each other with broaching axis (78, 79) at ends (28, 47). An Independent claim is also included for the description of the apparatus needed to assemble rotating section of tower crane.

Description

La présente invention concerne un procédé et un dispositif pour le montage des éléments constitutifs de la partie tournante d'une grue à tour, cette invention s'intéressant plus particulièrement à la constitution et au montage de la tête de mât des grues à tour.The present invention relates to a method and a device for mounting of the components of the rotating part of a tower crane, this invention focusing more particularly on the constitution and mounting the mast head of tower cranes.

Les grues à tour de grande capacité, utilisées sur les chantiers de construction de bâtiments et de travaux publics, sont généralement « tournantes du haut », c'est-à-dire qu'elles possèdent un mât fixe, de hauteur ajustable au moyen d'éléments de mât supplémentaires, et une partie supérieure tournante, orientable autour d'un axe vertical, qui comprend une flèche distributrice et une contreflèche constituant support de contrepoids.Large capacity tower cranes, used on construction sites construction of buildings and public works, are generally "Rotating from the top", that is to say that they have a fixed mast, of height adjustable by means of additional mast elements, and a part rotating upper, orientable around a vertical axis, which includes a distributor arrow and a counter-arrow constituting counterweight support.

Plus particulièrement, la partie tournante d'une telle grue comporte habituellement un pivot tournant, surmonté d'une tête de mât aussi appelée « porte-flèche », la flèche et la contreflèche étant situées de part et d'autre de la tête de mât. La flèche est articulée, par son extrémité postérieure, à la face avant du porte-flèche, et elle est maintenue en position sensiblement horizontale au moyen d'une ou plusieurs lignes de tirants de flèche, reliant chacune obliquement le sommet du porte-flèche à un point de la flèche. De manière analogue, la contreflèche est articulée, par son extrémité antérieure, à la face arrière du porte-flèche, et elle est maintenue en position sensiblement horizontale au moyen d'une ou plusieurs lignes de tirants de contreflèche, reliant chacune obliquement le sommet du porte-flèche à un point de la contreflèche.More particularly, the rotating part of such a crane comprises usually a rotating pivot, surmounted by a mast head also called "Arrow-holder", the arrow and the counter-arrow being located on either side of the masthead. The arrow is articulated, by its posterior end, to the face front of the arrowhead, and it is held substantially in position horizontal by means of one or more lines of arrow rods, connecting each obliquely the top of the arrowhead at a point on the arrow. Of analogously, the counter-jib is articulated, by its anterior end, to the rear face of the arrowhead, and it is held in position substantially horizontal by means of one or more lines of tie bars, each connecting obliquely the top of the arrowhead to a point on the counter-arrow.

La demande de brevet européen EP 0 635 450 A1, au nom du Demandeur, décrit un procédé pour le montage de la flèche distributrice et de la contreflèche d'une telle grue à tour. Selon ce procédé, les éléments de flèche sont alignés et assemblés au sol avec leurs tirants, puis on relève et aligne les tirants de flèche, et éventuellement ceux de la contreflèche, à l'aide d'un engin auxiliaire de montage tel que grue mobile. Ensuite, à l'aide du même engin, on lève l'ensemble de la flèche ou de la contreflèche avec les tirants, et on présente la flèche ou la contreflèche en face de la tête de mât précédemment montée, de sorte que les extrémités libres des lignes de tirants se présentent correctement au sommet de la tête de mât, permettant ainsi un brochage direct des tirants au sommet de la tête de mât.European patent application EP 0 635 450 A1, in the name of Applicant describes a method for mounting the distributing boom and the jib of such a tower crane. According to this process, the elements of arrow are aligned and assembled on the ground with their tie rods, then we raise and aligns the tie rods, and possibly those of the jib, using an auxiliary assembly machine such as a mobile crane. Then, using the same machine, we lift the whole boom or counter-jib with the tie rods, and the jib or counterjib is presented opposite the masthead previously mounted, so that the free ends of the tie lines appear correctly at the top of the mast head, allowing a direct pinning of the tie rods at the top of the masthead.

On connaít aussi, par la demande de brevet européen EP 0 846 650 A1 au nom du Demandeur, un procédé pour le montage des tirants des flèches de grues à tour, du genre ici concerné, selon lequel :

  • Dans une première phase, on assemble par brochage la contreflèche à la base de la tête de mât, précédemment montée, on lie l'extrémité du tirant de la contreflèche à une bretelle de montage fixée provisoirement sur la tête de mât, on relève la bretelle jusqu'à l'alignement du tirant par l'intermédiaire d'un câble de montage formant un mouflage entre cette bretelle et le sommet de la tête de mât précédemment montée, et on broche le tirant de la contreflèche au sommet de la tête de mât.
  • Dans une deuxième phase, il est procédé de façon analogue pour le ou les tirants de la flèche, c'est-à-dire que l'on assemble par brochage la flèche à la base de la tête de mât, du côté opposé à la contreflèche, on lie l'extrémité libre du ou des tirants de flèche à une bretelle de montage, fixée provisoirement sur la tête de mât, on relève cette bretelle jusqu'à l'alignement du tirant, ou des tirants reliés les uns aux autres, par l'intermédiaire du câble de montage précité formant un autre mouflage entre ladite bretelle et le sommet de la tête de mât précédemment montée, et on broche le ou les tirants de la flèche au sommet de la tête de mât.
We also know, from European patent application EP 0 846 650 A1 in the name of the Applicant, a method for mounting the tie rods of tower cranes of the kind here concerned, according to which:
  • In a first phase, the brace is assembled by broaching at the base of the masthead, previously mounted, the end of the brace tie rod is connected to a mounting strap temporarily fixed on the mast head, the strap is raised up to the alignment of the tie rod by means of a mounting cable forming a haulage between this strap and the top of the masthead previously mounted, and the tie rod of the counterjib is pinned to the top of the mast head .
  • In a second phase, the procedure is similar for the tie rod (s), that is to say that the arrow is assembled by pinning at the base of the mast head, on the side opposite to the counter-jib, the free end of the jib tie rod (s) is linked to a mounting strap, provisionally fixed to the mast head, this strap is raised until the tie rod or the tie rods are connected to each other, by means of the abovementioned mounting cable forming another haulage between said strap and the top of the previously mounted mast head, and the arrow rod (s) are pinned to the top of the mast head.

Ce procédé est, lui aussi, mis en oeuvre en alignant et assemblant préalablement au sol les éléments de flèche, et en utilisant un engin auxiliaire de levage pour présenter la contreflèche, puis la flèche, face à la tête de mât préalablement montée.This process is also implemented by aligning and assembling the boom elements on the ground, and using an auxiliary machine lifting to present the jib, then the jib, facing the masthead previously assembled.

Cette solution s'avère plus avantageuse que celle de la demande de brevet européen EP 0 636 450 A1, en particulier pour des grues à tour de grande capacité dont les flèches sont pourvues de plusieurs tirants. Cependant, elle conserve encore certains inconvénients.This solution is more advantageous than that of the request for European patent EP 0 636 450 A1, in particular for tower cranes large capacity whose arrows are provided with several tie rods. However, it still retains certain drawbacks.

En particulier, le procédé du document EP 0 846 650 A1 nécessite de disposer d'une motorisation spéciale, avec treuil auxiliaire et mouflage ou avec tirefort et mouflage, pour effectuer l'alignement et le brochage des tirants de la flèche et de la contreflèche, d'où une certaine complication constructive pour le dispositif de mise en oeuvre du procédé.In particular, the process of document EP 0 846 650 A1 requires have a special motorization, with auxiliary winch and hauling or with stiffener and hauling, to align and pin the tie rods of the arrow and counter-arrow, hence a certain constructive complication for the device for implementing the method.

La réalisation du mouflage, nécessaire pour l'alignement et le brochage des tirants de la flèche et de la contreflèche, demande aussi du temps. Ce procédé immobilise aussi pendant une relativement longue durée l'engin auxiliaire de levage, lequel doit être utilisé non seulement pour les opérations principales de manutention, mais aussi durant les opérations intermédiaires que sont le relevage des tirants de la contreflèche et des tirants de la flèche à l'aide du mouflage précité. Enfin, le procédé considéré nécessite l'exécution « en l'air » de plusieurs opérations manuelles d'assemblage par brochage, avec un certain risque pour les intervenants qui doivent se déplacer sur des parties de grue maintenues provisoirement par l'engin auxiliaire de levage. The hauling, necessary for alignment and broaching tie rods and arrow, also takes time. This process also immobilizes the device for a relatively long period lifting aid, which must be used not only for operations main handling, but also during intermediate operations what are the lifting of the tie rods of the contra-arrow and the tie-rods of the arrow to using the above-mentioned hauling. Finally, the process considered requires the execution “In the air” of several manual stitching assembly operations, with a certain risk for the interveners who have to travel on crane parts temporarily held by the auxiliary lifting device.

Par ailleurs, ce genre de procédé implique une réalisation en trois « colis » de la partie tournante de la grue, à savoir l'ensemble « flèche », l'ensemble « contreflèche », et l'ensemble « porte-flèche avec mouflage ». Ceci nécessite un volume important pour le stockage et le transport des constituants de la partie tournante, et implique aussi que l'engin auxiliaire de levage doit successivement monter les trois « colis ».Furthermore, this kind of process involves an implementation in three "Package" of the rotating part of the crane, namely the "boom" assembly, the “counter-arrow” assembly, and the “arrow-holder with hauling” assembly. This requires a large volume for the storage and transport of the constituents of the rotating part, and also implies that the auxiliary lifting device must successively assemble the three "packages".

La présente invention vise à éviter ces inconvénients, et elle a donc pour but de fournir un procédé et un dispositif pour le montage des éléments constitutifs de la partie tournante d'une grue à tour, du genre concerné, qui permettent à la fois :

  • de réduire le volume nécessaire pour le stockage et le transport des constituants de la partie tournante, en recherchant la possibilité d'imbriquer les éléments ;
  • de réduire le nombre de pièces et parties annexes, spécifiques aux opérations de montage de la grue, en particulier par suppression du mouflage et de sa motorisation, dédiés précédemment à ces opérations ;
  • de simplifier et limiter les opérations d'assemblage « en l'air » des éléments constitutifs de la partie tournante, et de rendre ces opérations plus sûres pour les intervenants, en réduisant le nombre des manutentions et des opérations d'assemblage « en l'air » notamment en réduisant le nombre de colis principaux ;
  • de réduire le temps d'utilisation de l'engin auxiliaire de montage, tel que grue mobile.
The present invention aims to avoid these drawbacks, and it therefore aims to provide a method and a device for mounting the constituent elements of the rotating part of a tower crane, of the type concerned, which allow both:
  • to reduce the volume necessary for the storage and transport of the components of the rotating part, by seeking the possibility of nesting the elements;
  • reduce the number of parts and ancillary parts, specific to the crane assembly operations, in particular by removing the hauling system and its motorization, previously dedicated to these operations;
  • to simplify and limit the assembly operations “in the air” of the constituent elements of the rotating part, and to make these operations safer for those involved, by reducing the number of handling operations and assembly operations “in the air ”notably by reducing the number of main packages;
  • to reduce the time of use of the auxiliary assembly machine, such as a mobile crane.

A cet effet, le procédé selon l'invention consiste essentiellement, pour une grue à tour dont la partie tournante comprend une tête de mât ou porte-flèche, une flèche distributrice articulée par son extrémité postérieure à la face avant du porte-flèche et reliée au sommet du porte-flèche par un ou plusieurs tirants, et une contreflèche articulée par son extrémité antérieure à la face arrière du porte-flèche et reliée au sommet du porte-flèche par un ou plusieurs tirants :

  • à assembler au sol un ensemble formé par la contreflèche, son ou ses tirants et une partie arrière du porte-flèche réalisé en deux parties séparables, à savoir une partie avant et la partie arrière, et à assembler aussi au sol un autre ensemble formé par la flèche, son ou ses tirants et la partie avant du porte-flèche ;
  • à l'aide d'un engin de manutention ou de levage, à lever l'ensemble prémonté formé par la contreflèche, son ou ses tirants et la partie arrière du porte-flèche, et à assembler par brochage cet ensemble, suivant un axe horizontal, sur le pivot tournant ou sur un élément de mât ou mât-cabine lié à ce pivot tournant ;
  • à l'aide de l'engin de manutention ou de levage, à lever l'ensemble prémonté formé par la flèche, son ou ses tirants et la partie avant du porte-flèche, et à assembler par brochage cet ensemble, suivant un axe horizontal, sur le pivot tournant ou le mât-cabine ;
  • à lier entre eux par au moins un axe de brochage les sommets respectifs des parties avant et arrière du porte-flèche.
To this end, the method according to the invention essentially consists, for a tower crane whose rotating part comprises a mast head or boom holder, a distributing boom articulated by its end posterior to the front face of the boom holder and connected at the top of the jib holder by one or more tie rods, and a jib articulated by its front end to the rear face of the jib holder and connected to the top of the jib holder by one or more tie rods:
  • to assemble on the ground an assembly formed by the jib, its tie rod (s) and a rear part of the jib holder made in two separable parts, namely a front part and the rear part, and to also assemble on the ground another assembly formed by the arrow, its tie rod (s) and the front part of the arrow holder;
  • using a handling or lifting machine, to lift the pre-assembled assembly formed by the jib, its tie rod (s) and the rear part of the jib holder, and to assemble this assembly by pinning, along a horizontal axis , on the rotary pivot or on a mast or mast-cabin element linked to this rotary pivot;
  • using the handling or lifting device, to lift the pre-assembled assembly formed by the arrow, its tie rod (s) and the front part of the jib holder, and to assemble this assembly, along a horizontal axis , on the turning pivot or the mast-cabin;
  • to link together by at least one broaching axis the respective tops of the front and rear parts of the jib holder.

Ainsi, l'invention se fonde essentiellement sur la séparation initiale du porte-flèche en deux parties, respectivement une partie avant et une partie arrière, ce qui permet de prémonter au sol deux ensembles distincts, comprenant l'un la contreflèche et la partie arrière du porte-flèche, et l'autre la flèche et la partie avant du porte-flèche. Ces deux ensembles prémontés sont ensuite successivement levés et assemblés au pivot tournant ou au sommet du mât-cabine par brochage. Les deux parties constitutives du porte-flèche sont aussi liées entre elles par brochage, dans leurs portions supérieures, de manière à constituer finalement un porte-flèche complet, rigide, d'allure triangulaire ou polygonale (vu de côté).Thus, the invention is essentially based on the initial separation of the two-part arrowhead, respectively a front part and a part rear, which allows two separate assemblies to be pre-assembled on the ground, one comprising the jib and the rear part of the jib holder, and the other the arrow and the front part of the arrow holder. These two pre-assembled assemblies are then successively lifted and assembled to the turning pivot or to the top of the mast-cabin by pinout. The two constituent parts of the arrowhead are also linked together by broaching, in their upper portions, of so as to ultimately constitute a complete, rigid, looking arrowhead triangular or polygonal (seen from the side).

Avantageusement, l'assemblage au sol de l'ensemble formé par la flèche, son ou ses tirants et la partie avant du porte-flèche est effectué en liant de façon articulée la base de la partie avant du porte-flèches à l'extrémité postérieure du pied de flèche, et en liant aussi la partie avant du porte-flèche au pied de flèche par un moyen limitant le pivotement, vers l'avant et vers l'arrière, de la partie avant du porte-flèche relativement à la flèche. Le débattement angulaire ainsi autorisé, par exemple de l'ordre de 5°, facilite l'opération finale de liaison des sommets des parties avant et arrière du porte-flèche.Advantageously, the assembly on the ground of the assembly formed by the arrow, its tie (s) and the front part of the arrow holder is made by tying articulated the base of the front part of the arrowhead at the end posterior of the boom foot, and also linking the front part of the boom holder at the jib foot by a means limiting pivoting, forward and toward the rear of the front part of the arrowhead relative to the arrow. The angular travel thus authorized, for example of the order of 5 °, facilitates the final operation of connecting the tops of the front and rear parts of the arrowhead.

Dans un mode de mise en oeuvre particulier, l'opération d'assemblage au sol de l'ensemble formé par la flèche, son ou ses tirants et la partie avant du porte-flèche comprend aussi, pour le ou chaque tirant de la flèche, la fixation d'une partie arrière du tirant au sommet de la partie avant du porte-flèche, la fixation d'une partie avant du même tirant en un point intermédiaire de la flèche, le rapprochement des parties arrière et avant du tirant à l'aide d'une élingue tirée par un engin auxiliaire de manutention ou de levage, et le brochage de l'extrémité avant de la partie arrière du tirant sur l'extrémité arrière de la partie avant du tirant. Les tirants sont ainsi brochés entre eux, par des opérations effectuées au sol, et ils se retrouvent dans une position alignée.In a particular embodiment, the assembly operation on the ground of the assembly formed by the arrow, its tie rod (s) and the front part of the arrow holder also includes, for the or each drawing of the arrow, the fixing of a rear part of the tie rod at the top of the front part of the jib holder, the fixing of a front part of the same tie at an intermediate point of the arrow, bringing the rear and front parts of the tie together using a sling pulled by an auxiliary handling or lifting device, and the pinout of the front end of the rear part of the tie rod on the rear end of the front part of the tie rod. The tie rods are thus pinned together, by ground operations, and they find themselves in an aligned position.

L'opération de levage de l'ensemble formé par la contreflèche, son ou ses tirants et la partie arrière du porte-flèche est réalisable, selon un premier mode de mise en oeuvre, à l'aide d'élingues comprenant des élingues avant attachées à la base de la partie arrière du porte-flèche, et passant sur un organe de déviation porté par cette partie arrière, et des élingues arrière attachées à la structure de la contreflèche, de manière à maintenir la structure de la contreflèche sensiblement horizontale au cours du levage de cet ensemble et de son brochage sur le pivot tournant ou le mât-cabine, le ou les tirants de la contreflèche étant alignés et tendus.The lifting operation of the assembly formed by the jib, its or its tie rods and the rear part of the arrow holder is achievable, according to a first method of implementation, using slings comprising front slings attached to the base of the rear part of the arrowhead, and passing over a deflection member carried by this rear part, and rear slings attached to the structure of the jib, so as to maintain the structure of the substantially horizontal jib during the lifting of this assembly and its pinout on the turning pivot or the mast-cabin, the tie rods of the jib being aligned and tensioned.

Dans un autre mode de mise en oeuvre, constituant une variante du précédent, l'opération de levage de l'ensemble formé par la contreflèche, son ou ses tirants et la partie arrière du porte-flèche est réalisée à l'aide d'élingues comprenant des élingues avant attachées à la base de la partie arrière du porte-flèche, mais ne subissant aucune déviation, et des élingues arrière attachées à la structure de la contreflèche, les élingues étant de longueur adaptée pour maintenir la structure de la contreflèche en position inclinée par rapport à l'horizontale, au cours du levage de cet ensemble et de son brochage sur le pivot tournant ou le mât-cabine, la partie arrière du porte-flèche étant pivotée vers l'arrière et en butée, de telle sorte que le ou les tirants restent détendus ; la structure de la contreflèche est ramenée à l'horizontale, et le ou les tirants sont mis en tension, après brochage dudit ensemble sur le pivot tournant ou le mât-cabine.In another embodiment, constituting a variant of the previous, the lifting operation of the assembly formed by the jib, its or its tie rods and the rear part of the arrow holder is made using slings comprising front slings attached to the base of the rear part of the arrowhead, but not deflected, and rear slings attached to the strut structure, the slings being long adapted to maintain the structure of the jib in an inclined position by with respect to the horizontal, during the lifting of this assembly and its pinout on the turning pivot or the mast-cabin, the rear part of the boom holder being pivoted back and in abutment, so that the tie rod (s) remain relaxed; the structure of the jib is brought back to the horizontal, and the or the tie rods are tensioned, after pinning of said assembly on the pivot rotating or mast-cabin.

Etant donné qu'il est procédé d'abord au montage de l'ensemble comprenant la contreflèche et la partie arrière du porte-flèche, puis au montage de l'ensemble comprenant la flèche et la partie avant du porte-flèche, le procédé comprend encore avantageusement, après l'opération de brochage du premier de ces ensembles sur le pivot tournant ou le mât-cabine, la réalisation d'une liaison provisoire avec jeu maintenant la partie arrière du porte-flèche en position dressée, en attendant le brochage du sommet de la partie avant du porte-flèche sur le sommet de ladite partie arrière. Cette liaison provisoire avec jeu, n'intervenant pas lors du travail de la grue, est réalisable au moyen de bielles de retenue et de lumières, reliant le sommet de la partie arrière du porte-flèche au pivot tournant ou au mât-cabine.Since the assembly is first carried out including the jib and the rear part of the jib holder, then mounting of the assembly comprising the arrow and the front part of the arrow holder, the process still advantageously comprises, after the broaching operation of the first of these sets on the turning pivot or the mast-cabin, the realization of a provisional connection with clearance maintaining the rear part of the arrow holder in upright position, waiting for the pinout of the top of the front part of the arrowhead on the top of said rear part. This temporary connection with play, not intervening during the work of the crane, is achievable by means of retaining rods and lights, connecting the top of the rear part of the arrow holder with swivel pivot or cabin mast.

L'opération de levage de l'ensemble formé par la flèche, son ou ses tirants et la partie avant du porte-flèche, est aussi effectuée à l'aide d'élingues de préférence en maintenant la flèche sensiblement horizontale jusqu'à son brochage sur le pivot tournant ou le mât-cabine, puis en faisant pivoter la flèche légèrement vers le haut autour de l'axe réalisant ce brochage, pour réaliser un brochage d'approche avec jeu entre le sommet de la partie avant et le sommet de la partie arrière du porte-flèche. Ensuite, il est procédé à un pivotement inverse de la flèche entraínant vers l'avant la partie arrière du porte-flèche, et à la réalisation d'un brochage définitif. Plus particulièrement, le pivotement inverse de la flèche, entraínant vers l'avant grâce à son poids mort plus important la partie arrière du porte-flèche, fait déplacer le trou de brochage définitif du sommet de ladite partie arrière suivant un arc de cercle, dont le centre correspond à l'axe de brochage de la contreflèche et de la partie arrière du porte-flèche sur le pivot tournant ou le mât-cabine. Pendant le même temps, le trou de brochage définitif du sommet de la partie avant du porte-flèche se déplace suivant un autre arc de cercle, dont le centre correspond à l'axe de brochage de la flèche et de la partie avant du porte-flèche sur le pivot tournant ou le mât-cabine. Par ces mouvements, les trous de brochage définitif respectifs des sommets des deux parties du porte-flèche sont sûrs de trouver un axe commun, au point d'intersection des deux arcs de cercle mentionnés, quelle que soit la position géométrique de départ de ces trous de brochage, et ainsi la réalisation du brochage définitif est toujours possible. Comme on le comprend, ce brochage définitif assure la rigidification du porte-flèche, nécessaire pour que celui-ci assure sa fonction lors du travail de la grue.The lifting operation of the assembly formed by the boom, its or its tie rods and the front part of the jib holder, is also carried out using slings preferably by keeping the arrow substantially horizontal until its broaching on the swivel pivot or the mast-cabin, then by rotating the boom slightly upwards around the axis making this pinout, to make a approach pinout with clearance between the top of the front part and the top of the rear part of the arrowhead. Then there is a pivot reverse of the arrow driving forward the rear part of the arrow holder, and carrying out a final pinout. More particularly, the pivoting reverse of the arrow, driving forward thanks to its dead weight more import the rear part of the arrow holder, move the broaching hole definitive of the summit of said rear part following an arc of a circle, the center corresponds to the broaching axis of the jib and the rear part of the boom holder on the turning pivot or the mast-cabin. During the same time, the final broaching hole at the top of the front part of the arrowhead is moves along another arc, the center of which corresponds to the axis of pin assignment of the arrow and the front part of the arrow holder on the turning pivot or the mast-cabin. By these movements, the final pin holes respective vertices of the two parts of the arrowhead are sure to find a common axis, at the point of intersection of the two arcs of circle mentioned, whatever the starting geometrical position of these broaching holes, and thus the realization of the final pinout is always possible. As we includes, this final pinout ensures the stiffening of the arrow holder, necessary for it to perform its function when working the crane.

Pour la mise en oeuvre du procédé de montage précédemment défini, l'invention a aussi pour objet un dispositif qui comprend essentiellement, en combinaison :

  • - une partie avant de porte-flèche, comportant des montants liés rigidement entre eux et pourvus à leurs extrémités inférieures de tenons ou chapes, coopérant avec des chapes ou tenons prévus à l'extrémité postérieure du pied de flèche, ainsi qu'avec des chapes ou tenons prévus sur le pivot tournant ou le mât-cabine,
  • - une partie arrière de porte-flèche, séparable de la partie avant et comportant des montants liés rigidement entre eux et pourvus à leurs extrémités inférieures de tenons ou chapes, coopérant avec des chapes ou tenons prévus à l'extrémité antérieure de la structure de la contreflèche, ainsi qu'avec des chapes ou tenons prévus sur le pivot tournant ou le mât-cabine,
  • - les parties avant et arrière du porte-flèche étant encore pourvues, à leurs sommets respectifs, d'organes complémentaires tels que tenon et chape, pour la liaison par brochage entre ces deux parties.
  • For the implementation of the previously defined mounting method, the invention also relates to a device which essentially comprises, in combination:
  • - A front part of arrow holder, comprising uprights rigidly connected to each other and provided at their lower ends with tenons or clevis, cooperating with clevis or tenons provided at the rear end of the arrow base, as well as with clevis or pins provided on the turning pivot or the mast-cabin,
  • - a rear part of the jib holder, separable from the front part and comprising uprights rigidly connected together and provided at their lower ends with tenons or clevis, cooperating with clevis or tenon provided at the anterior end of the structure of the counter-jib, as well as with clevis or tenons provided on the swivel pivot or the mast-cabin,
  • - The front and rear parts of the jib holder being further provided, at their respective vertices, with complementary members such as tenon and clevis, for the pin connection between these two parts.
  • Selon une forme de réalisation de ce dispositif, la partie avant du porte-flèche est reliée, par l'intermédiaire d'une béquille constituée de deux tronçons inégaux articulés entre eux, à la partie postérieure du pied de flèche, l'un des tronçons de la béquille comportant un organe d'appui sur le pied de mât, de manière à limiter le pivotement, vers l'avant et vers l'arrière, de la partie avant du porte-flèche relativement à la flèche. According to one embodiment of this device, the front part of the arrow holder is connected, via a crutch made up of two sections uneven articulated between them, at the rear part of the boom foot, one of the sections of the stand comprising a support member on the mast foot, so as to limit the pivoting, forward and backward, of the front part of the arrowhead relative to the arrow.

    Selon une autre disposition avantageuse, le tenon et la chape complémentaires, prévus aux sommets des parties avant et arrière du porte-flèche, comportent des trous antérieurs et postérieurs correspondants, respectivement pour la réalisation d'un brochage d'approche avec jeu, et d'un brochage définitif, entre le tenon et la chape.According to another advantageous arrangement, the post and the clevis complementary, provided at the tops of the front and rear parts of the jib holder, have corresponding front and rear holes, respectively for carrying out an approach pinout with clearance, and a final broaching, between the tenon and the clevis.

    Dans l'ensemble, le procédé et le dispositif pour le montage de la tête de mât des grues à tour, objets de l'invention, possèdent les avantages suivants, au regard de la technique antérieure :

    • Il n'est plus nécessaire de prévoir une motorisation (avec son alimentation en énergie) et un mouflage, pour effectuer l'alignement et le brochage des tirants de la flèche et éventuellement de la contreflèche, d'où simplification et économie.
    • Par la suppression de la réalisation d'un mouflage pour l'alignement et le brochage des tirants de flèche, l'invention procure aussi un gain de temps dans les opérations de prémontage et de montage.
    • La plupart des opérations de prémontage, concernant notamment l'ensemble formé par la flèche, son ou ses tirants et la partie avant du porte-flèche, et l'ensemble formé par la contreflèche, son ou ses tirants et la partie arrière du porte-flèche, sont réalisées au niveau du sol, donc en toute sécurité, à l'aide d'un engin de manutention de faible capacité.
    • Seuls deux « colis », à savoir d'une part l'ensemble formé par la flèche, son ou ses tirants et la partie avant du porte-flèche, et d'autre part l'ensemble formé par la contreflèche, son ou ses tirants et la partie arrière du porte-flèche, doivent être successivement manutentionnés par un engin de levage de forte capacité (au lieu de trois « colis » dans les solutions antérieures).
    • Les opérations de manutention de ces deux ensembles, à l'aide de l'engin de levage de forte capacité, sont effectuées directement l'une à la suite de l'autre, sans qu'il soit nécessaire de réaliser, entre ces opérations, d'autres opérations intermédiaires telles que relevage des tirants de flèche et de contreflèche ; le temps d'immobilisation de l'engin de levage de forte capacité est donc minimisé.
    • Toutes les opérations de brochage, qui restent à exécuter « en l'air », s'effectuent à l'aplomb du mât de la grue, donc sans risque pour les intervenants qui, en particulier, n'ont pas à se déplacer en hauteur sur des parties de grue maintenues seulement par l'engin de levage.
    • Etant réalisé en deux parties séparables, chacune de forme sensiblement plane, le porte-flèche offre un encombrement minimal, pour le transport et le stockage.
    • Cette structure en deux parties du porte-flèche en facilite aussi la fabrication, en évitant tout assemblage mécanosoudé en volume, chaque partie étant un simple treillis plan, avec deux montants réunis par des traverses.
    • La liaison entre l'extrémité postérieure de la flèche, la base de la partie avant du porte-flèche et le sommet du mât-cabine s'effectue en un seul point, plus particulièrement suivant le même axe de brochage, permettant ainsi une triangulation simple et évitant, de ce fait, tous les moments (couples) internes de flexion.
    • De même, la liaison entre l'extrémité antérieure de la contreflèche, la base de la partie arrière du porte-flèche et le sommet du mât-cabine s'effectue en un seul point, plus particulièrement suivant le même axe de brochage, permettant ainsi une triangulation simple et évitant de ce fait tous les moments (couples) internes de flexion.
    Overall, the method and the device for mounting the mast head of tower cranes, objects of the invention, have the following advantages, compared with the prior art:
    • It is no longer necessary to provide a motorization (with its energy supply) and a hauling system, to carry out the alignment and the broaching of the jib tie rods and possibly of the jib, hence simplification and economy.
    • By eliminating the need for hauling for the alignment and broaching of the tie rods, the invention also saves time in the pre-assembly and assembly operations.
    • Most of the pre-assembly operations, concerning in particular the assembly formed by the jib, its or its tie rods and the front part of the jib holder, and the assembly formed by the jib, its or its tie rods and the rear part of the holder boom, are made at ground level, therefore safely, using a low-capacity handling machine.
    • Only two "packages", namely on the one hand the assembly formed by the arrow, its or its tie rods and the front part of the jib holder, and on the other hand the assembly formed by the jib, its or its tie rods and the rear part of the jib holder, must be successively handled by a heavy lifting device (instead of three "packages" in the previous solutions).
    • The handling operations of these two sets, using the high capacity lifting device, are carried out directly one after the other, without it being necessary to carry out, between these operations, other intermediate operations such as raising the jib and counter-jib tie rods; the downtime of the high capacity lifting device is therefore minimized.
    • All pinout operations, which remain to be carried out "in the air", are carried out directly above the crane mast, therefore without risk for operators who, in particular, do not have to travel high on crane parts held only by the hoist.
    • Being made of two separable parts, each of substantially planar shape, the arrowhead offers minimal space, for transport and storage.
    • This structure in two parts of the jib holder also facilitates its manufacture, avoiding any mechanically welded assembly in volume, each part being a simple plane trellis, with two uprights joined by crosspieces.
    • The connection between the rear end of the boom, the base of the front part of the boom holder and the top of the mast-cabin takes place at a single point, more particularly along the same pinout axis, thus allowing simple triangulation. and thereby avoiding all internal bending moments (couples).
    • Likewise, the connection between the anterior end of the jib, the base of the rear part of the jib holder and the top of the cabin mast is made at a single point, more particularly along the same broaching axis, thus allowing a simple triangulation and thereby avoiding all internal bending moments (couples).

    L'invention sera de toute façon mieux comprise à l'aide de la description qui suit, en référence au dessin schématique annexé qui, à titre d'exemples, illustre des modes de mise en oeuvre de ce procédé pour le montage de la tête de mât des grues à tour, et représente des formes d'exécution du dispositif pour la mise en oeuvre de ce procédé :

  • Figure 1 est une vue d'ensemble de côté, à l'état monté, d'une grue à tour à laquelle s'applique le procédé de la présente invention ;
  • Figure 2 est une vue en perspective éclatée de la tête de mât et des parties adjacentes, notamment de la flèche et de la contreflèche ;
  • Figure 3 est une vue de détail , de côté, de la partie arrière du pied de flèche et d'une portion inférieure de la partie avant du porte-flèche ;
  • Figure 4 est une vue de détail, de côté, de l'extrémité avant de la contreflèche et d'une portion inférieure de la partie arrière du porte-flèche ;
  • Figure 5 est une vue de détail, de côté, des portions supérieures des parties avant et arrière du porte-flèche, réunies entre elles ;
  • Figure 6 représente, en vue de côté, l'ensemble formé par la flèche et ses tirants (représentés partiellement) et par la partie avant du porte-flèche, en phase initiale d'assemblage au sol ;
  • Figures 7 et 8 sont des vues de côté similaires à figure 6, illustrant deux phases ultérieures de l'assemblage au sol dudit ensemble ;
  • Figure 9 est une vue de côté illustrant dans son principe le montage, sur le mât-cabine, de l'ensemble formé par la contreflèche, ses tirants et la partie arrière du porte-flèche ;
  • Figure 10 représente plus en détail l'opération de la figure 9, particulièrement sous l'aspect manutention dudit ensemble, dans un premier mode de mise en oeuvre ;
  • Figure 11 est une vue similaire à figure 10, illustrant un deuxième mode de mise en oeuvre de la manutention dudit ensemble ;
  • Figures 12, 13 et 14 illustrent les phases successives d'un troisième mode de mise en oeuvre de l'assemblage et de la manutention de cet ensemble ;
  • Figure 15 est une vue de côté illustrant la première phase du montage, sur le mât-cabine, de l'ensemble formé par la flèche, ses tirants et la partie avant du porte-flèche ;
  • Figures 16 et 17 sont des vues de côté similaires à la figure 15, illustrant deux phases ultérieures du montage dudit ensemble sur le mât-cabine ;
  • Figure 18 est une vue similaire aux précédentes, montrant la phase finale de montage de la partie tournante de la grue ;
  • Figure 19 est une vue de côté illustrant une phase de montage, dans une variante de l'invention ;
  • Figure 20 est une vue en perspective éclatée de la région du sommet du porte-flèche, relative à cette variante ;
  • Figures 21 et 22 sont des vues de côté similaires à figure 19, illustrant des phases ultérieures du montage pour la même variante.
  • The invention will in any case be better understood with the aid of the description which follows, with reference to the appended schematic drawing which, by way of example, illustrates modes of implementation of this method for mounting the head. tower crane mast, and represents embodiments of the device for implementing this method:
  • Figure 1 is an overall side view, in the assembled state, of a tower crane to which the method of the present invention applies;
  • Figure 2 is an exploded perspective view of the masthead and adjacent parts, in particular of the jib and the jib;
  • Figure 3 is a detail view, from the side, of the rear part of the jib foot and of a lower portion of the front part of the jib holder;
  • Figure 4 is a detail view, from the side, of the front end of the jib and of a lower portion of the rear part of the jib holder;
  • Figure 5 is a detail view, from the side, of the upper portions of the front and rear parts of the arrowhead, joined together;
  • Figure 6 shows, in side view, the assembly formed by the boom and its tie rods (partially shown) and by the front part of the boom holder, in the initial assembly phase on the ground;
  • Figures 7 and 8 are side views similar to Figure 6, illustrating two subsequent phases of the assembly on the ground of said assembly;
  • Figure 9 is a side view illustrating in principle the mounting, on the mast-cabin, of the assembly formed by the jib, its tie rods and the rear part of the jib holder;
  • Figure 10 shows in more detail the operation of Figure 9, particularly in the handling aspect of said assembly, in a first embodiment;
  • Figure 11 is a view similar to Figure 10, illustrating a second embodiment of the handling of said assembly;
  • Figures 12, 13 and 14 illustrate the successive phases of a third embodiment of the assembly and handling of this assembly;
  • Figure 15 is a side view illustrating the first phase of assembly, on the mast-cabin, of the assembly formed by the boom, its tie rods and the front part of the boom holder;
  • Figures 16 and 17 are side views similar to Figure 15, illustrating two subsequent phases of mounting said assembly on the mast-cabin;
  • Figure 18 is a view similar to the previous ones, showing the final assembly phase of the rotating part of the crane;
  • Figure 19 is a side view illustrating an assembly phase, in a variant of the invention;
  • Figure 20 is an exploded perspective view of the top region of the arrowhead, relating to this variant;
  • Figures 21 and 22 are side views similar to Figure 19, illustrating subsequent stages of assembly for the same variant.
  • Certaines figures comportent des détails agrandis, désignés par les lettres A, B, C, etc...Some figures have enlarged details, designated by letters A, B, C, etc ...

    La grue à tour représentée sur la figure 1 comprend, de façon connue, un châssis de base 1 fixe ou roulant, un mât 2 de hauteur ajustable surmonté d'un pivot fixe 3 et une partie tournante 4, orientable autour d'un axe vertical, qui comprend elle-même une tête de mât ou « porte-flèche » 5, une flèche distributrice 6 le long de laquelle se déplace un chariot 7, et une contreflèche 8 portant un contrepoids 9. Dans l'exemple considéré, le porte-flèche 5 surmonte un court tronçon de mât 10, dit « mât-cabine », appartenant aussi à la partie tournante 4 et sur lequel est fixée latéralement la cabine de conduite 11 de la grue.The tower crane shown in FIG. 1 comprises, in a known manner, a fixed or rolling base frame 1, a mast 2 of adjustable height surmounted a fixed pivot 3 and a rotating part 4, orientable around a vertical axis, which itself includes a masthead or “arrowhead” 5, an arrow distributor 6 along which a carriage 7 moves, and a jib 8 carrying a counterweight 9. In the example considered, the arrow holder 5 overcomes a short section of mast 10, called “cabin mast”, also belonging to the part 4 and on which the driver's cabin 11 of the crane.

    D'une manière également connue en soi, la flèche 6 se compose de plusieurs éléments alignés, à structure en treillis, incluant un premier élément 12 dit « pied de flèche », articulé par son extrémité postérieure à la base du porte-flèche 5 et sur le mât-cabine 10, autour d'un axe horizontal. La flèche 6 est maintenue en position sensiblement horizontale par deux tirants obliques 13 et 14, liés l'un et l'autre au sommet 15 du porte-flèche 5, et liés aussi, respectivement, à deux points intermédiaires 16 et 17 (espacés l'un de l'autre) de la flèche 6. Les tirants 13 et 14 sont eux-mêmes formés, chacun, par plusieurs éléments successifs articulés entre eux, et peuvent ainsi être désignés aussi comme des « lignes de tirants ».In a manner also known per se, the arrow 6 consists of several aligned elements, with lattice structure, including a first element 12 says "arrow foot", articulated by its end posterior to the base of the arrowhead 5 and on the mast-cabin 10, around a horizontal axis. Arrow 6 is held in a substantially horizontal position by two oblique tie rods 13 and 14, both linked to the top 15 of the arrowhead 5, and also linked, respectively, at two intermediate points 16 and 17 (spaced from each other) arrow 6. The tie rods 13 and 14 are themselves formed, each, by several successive elements articulated together, and can thus be also referred to as "tie lines".

    La contreflèche 8 se situe, par rapport à la tête de mât 5, du côté opposé à la flèche 6, l'extrémité antérieure de la contreflèche 8 étant articulée, autour d'un axe horizontal 18, à la base du porte-flèche 5 et sur le mât-cabine 10. Cette contreflèche 8 est maintenue ici en position sensiblement horizontale par un double tirant oblique 19, qui relie deux points symétriques 20 de la partie postérieure de la structure de la contreflèche 8 au sommet 15 du porte-flèche 5. Comme les tirants de flèche 13 et 14, les tirants de contreflèche 19 sont composés de plusieurs éléments successifs, articulés entre eux. La contreflèche 8 possède elle aussi une structure en treillis (voir figure 2).The counter-jib 8 is located, with respect to the mast head 5, on the opposite side in arrow 6, the anterior end of the jib 8 being articulated, around a horizontal axis 18, at the base of the jib holder 5 and on the mast-cabin 10. This jib 8 is kept here in a substantially horizontal position by a double oblique tie 19, which connects two symmetrical points 20 of the part posterior of the structure of the jib 8 to the top 15 of the jib holder 5. Like the jib tie rods 13 and 14, the jib tie rods 19 are composed of several successive elements, articulated between them. The contreflèche 8 also has a trellis structure (see Figure 2).

    Le porte-flèche 5 est constitué de deux parties amovibles et séparables l'une de l'autre, à savoir une partie avant 21 et une partie arrière 22, représentées séparées l'une de l'autre sur la figure 2. En position montée, les parties avant 21 et arrière 22 convergent au sommet 15 du porte-flèche 5.The arrow holder 5 consists of two removable and separable parts from each other, namely a front part 21 and a rear part 22, shown separate from each other in Figure 2. In the mounted position, the front 21 and rear 22 converge at the top 15 of the jib holder 5.

    La partie avant 21 du porte-flèche 5 est associée à la flèche 6 et, plus particulièrement, au pied de flèche 12. Cette partie avant 21 comprend deux montants convergents 23, réunis l'un à l'autre à leur sommet, et raccordés entre eux, respectivement, à leur base et à une hauteur intermédiaire, par deux traverses horizontales 24 et 25. Les extrémités inférieures des deux montants 23 comportent des tenons respectifs 26, percés chacun d'un trou de brochage 27. Les extrémités supérieures rapprochées des deux montants 23 sont assemblées à un autre tenon 28, percé de deux trous 29 et 30, l'un antérieur et l'autre postérieur.The front part 21 of the arrow holder 5 is associated with arrow 6 and, more in particular, at the foot of the arrow 12. This front part 21 comprises two converging uprights 23, joined to each other at their top, and connected between them, respectively, at their base and at an intermediate height, by two horizontal crosspieces 24 and 25. The lower ends of the two uprights 23 have respective pins 26, each pierced with a broaching hole 27. The close upper ends of the two uprights 23 are assembled to another tenon 28, pierced with two holes 29 and 30, one anterior and the other posterior.

    L'extrémité postérieure du pied de flèche 12 comporte, de chaque côté, une chape 31 à ouverture dirigée vers le bas, recevant l'un des tenons inférieurs 26 de la partie avant 21 du porte-flèche 5. Un bossage 32 sur chacun de ces tenons 26, et un axe de sécurité 33 (voir détail sur figure 3), interdisent le désaccouplement entre chaque chape 31 et le tenon 26 correspondant.The rear end of the jib foot 12 comprises, on each side, a yoke 31 with opening directed downwards, receiving one of the tenons lower 26 of the front part 21 of the arrowhead 5. A boss 32 on each of these pins 26, and a safety pin 33 (see detail in Figure 3), prohibit uncoupling between each yoke 31 and the corresponding pin 26.

    En se référant encore aux figures 2 et 3, la partie avant 21 du porte-flèche 5 est aussi reliée au pied de flèche 12 par l'intermédiaire d'une béquille 34, constituée de deux tronçons inégaux 35 et 36, articulés entre eux autour d'un axe intermédiaire 37. Le premier tronçon 35, de plus grande longueur, est articulé par une extrémité à une chape 38 liée à la traverse 25 de la partie avant 21 du porte-flèche 5 ; il comporte, à son extrémité opposée, une plaque d'appui 39 destinée à reposer sur la membrure supérieure 40 du pied de flèche 12. Le second tronçon 36, de plus petite longueur, est articulé autour d'un axe 41 à l'extrémité postérieure de la membrure supérieure 40 du pied de flèche 12. Sur la figure 3, la béquille 34 est représentée en position repliée, position dans laquelle elle limite le pivotement vers l'avant de la partie avant 21 du porte-flèche 5. En position dépliée, la même béquille 34 limite le pivotement vers l'arrière de la partie avant 21 du porte-flèche 5. L'angle entre les deux positions limites de cette partie avant 21 du porte-flèche 5 est de l'ordre de 5°.Referring again to Figures 2 and 3, the front part 21 of the arrow holder 5 is also connected to the jib base 12 by means of a crutch 34, consisting of two unequal sections 35 and 36, hinged together around an intermediate axis 37. The first section 35, of greater length, is articulated at one end to a yoke 38 linked to the crosspiece 25 of the part front 21 of the arrow holder 5; it has, at its opposite end, a plate support 39 intended to rest on the upper chord 40 of the jib foot 12. The second section 36, of shorter length, is articulated around an axis 41 at the rear end of the upper chord 40 of the jib foot 12. In FIG. 3, the stand 34 is shown in the folded position, position in which it limits the forward pivoting of the front part 21 of the arrow holder 5. In the unfolded position, the same stand 34 limits pivoting towards the rear of the front part 21 of the arrowhead 5. The angle between the two limit positions of this front part 21 of the arrow holder 5 is of the order of 5 °.

    La partie arrière 22 du porte-flèche 5 est associée à la contreflèche 8. Cette partie arrière 22 comprend deux montants principaux convergents 42, réunis l'un à l'autre à leur sommet, et raccordés entre eux, respectivement à leur base et à une hauteur intermédiaire, par deux traverses horizontales 43 et 44. Les extrémités inférieures des deux montants 42 comportent des tenons respectifs 45, percés chacun d'une ouverture 46. Les extrémités supérieures rapprochées des deux montants 42 sont assemblées à une chape 47, dont chaque branche comporte deux perçages, l'un antérieur et l'autre postérieur. La partie arrière 22 du porte-flèche 5 comprend encore deux bielles de retenue 48, articulées par leurs extrémités supérieures sous la chape 47. L'extrémité inférieure de chaque bielle 48 porte une chape 49.The rear part 22 of the jib holder 5 is associated with the jib 8. This rear part 22 includes two converging main uprights 42, joined to each other at their apex, and connected to each other, respectively to their base and at an intermediate height, by two horizontal crosspieces 43 and 44. The lower ends of the two uprights 42 have tenons respective 45, each pierced with an opening 46. The upper ends close to the two uprights 42 are assembled to a yoke 47, of which each branch has two holes, one anterior and the other posterior. The rear part 22 of the boom holder 5 further comprises two retaining rods 48, articulated by their upper ends under the yoke 47. The end lower of each connecting rod 48 carries a yoke 49.

    L'extrémité antérieure de la contreflèche 8 comporte, de chaque côté, une chape 50 à ouverture dirigée vers le bas, recevant l'un des tenons inférieurs 45 de la partie arrière 22 du porte-flèche 5. Un bossage 51 sur chacun de ces tenons 45, et un axe de sécurité 52, interdisent le désaccouplement entre chaque chape 50 et le tenon 45 correspondant - voir figures 2 et 4.The anterior end of the jib 8 has, on each side, a clevis 50 with opening directed downwards, receiving one of the tenons lower 45 of the rear part 22 of the arrowhead 5. A boss 51 on each of these tenons 45, and a safety axis 52, prohibit the uncoupling between each clevis 50 and the corresponding tenon 45 - see Figures 2 and 4.

    Dans une forme de réalisation particulière (voir figure 10), la partie arrière 22 du porte-flèche 5 comporte une bretelle 53 articulée sur les montants principaux 42, et prévue pour déporter le point d'attache des élingues de manutention, comme détaillé ci-après.In a particular embodiment (see Figure 10), the part rear 22 of the arrowhead 5 has a strap 53 articulated on the uprights main 42, and designed to offset the attachment point of the slings handling, as detailed below.

    A titre facultatif, la partie arrière 22 du porte-flèche 5 comprend au moins une barre de liaison 81, articulée sur la traverse 44. Cette barre est fixée sur la partie avant 21 du porte-flèche, une fois la grue entièrement assemblée, et sert de barre de triangulation renforçant la liaison entre les parties avant 21 et arrière 22 du porte-flèche 5.Optionally, the rear part 22 of the arrow holder 5 comprises at least a connecting bar 81, articulated on the crosspiece 44. This bar is fixed on the front part 21 of the jib holder, once the crane is fully assembled, and serves triangulation bar reinforcing the connection between the front parts 21 and rear 22 of the boom holder 5.

    En se référant de nouveau à la figure 2, le mât-cabine 10 comporte, à son sommet, deux chapes 54 situées respectivement des deux côtés du mât-cabine et tournées vers l'avant, deux autres chapes 55 situées respectivement des deux côtés du mât-cabine et tournées vers l'arrière, et deux pattes 56 situées respectivement des deux côtés du mât-cabine et tournées vers le haut. Les deux chapes avant 54 du mât-cabine 10 sont prévues pour recevoir les tenons inférieurs 26 de la partie avant 21 du porte-flèche 5, ainsi que les chapes postérieures 31 du pied de flèche 12. Les deux chapes arrière 55 du mât-cabine 10 sont prévues pour recevoir les tenons inférieurs 45 de la partie arrière 22 du porte-flèche 5, ainsi que les chapes antérieures 50 de la contreflèche 8. Enfin, les deux pattes 56 du mât-cabine 10, percées chacune d'une lumière, sont prévues pour recevoir les chapes inférieures 49 des bielles de retenue 48 de la partie arrière 22 du porte-flèche 5.Referring again to FIG. 2, the mast-cabin 10 comprises, at its top, two yokes 54 located respectively on both sides of the mast-cabin and facing forward, two other yokes 55 located respectively on both sides of the mast and rearward, and two legs 56 located respectively on both sides of the cabin mast and facing upwards. The two front yokes 54 of the mast-cabin 10 are provided to receive the lower pins 26 of the front part 21 of the arrowhead 5, as well as the posterior yokes 31 of the jib foot 12. The two rear yokes 55 of the mast-cabin 10 are provided to receive the lower lugs 45 of the part rear 22 of the arrowhead 5, as well as the front yokes 50 of the counterjib 8. Finally, the two legs 56 of the mast-cabin 10, each pierced of a light, are provided to receive the lower yokes 49 of the connecting rods retainer 48 of the rear part 22 of the jib holder 5.

    On notera encore qu'à l'état définitivement monté, la chape supérieure 47 de la partie arrière 22 du porte-flèche 5 reçoit le tenon supérieur 28 de la partie avant 21 du même porte-flèche, l'imbrication de ces deux éléments étant illustrée par la figure 5 qui représente la région du sommet 15 de la tête de mât.It will also be noted that in the definitively assembled state, the upper yoke 47 of the rear part 22 of the arrowhead 5 receives the upper lug 28 of the front part 21 of the same arrowhead, the nesting of these two elements being illustrated by FIG. 5 which represents the region of the vertex 15 of the head of mast.

    On décrira maintenant le mode opératoire suivi pour le montage de la grue à tour.We will now describe the procedure followed for mounting the tower crane.

    Une première phase consiste en l'assemblage, au sol, des éléments de la contreflèche 8 et des parties associées, à l'aide d'un engin de manutention de faible capacité (charge maximale par exemple inférieure ou égale à 4 tonnes). Les éléments du double tirant 19 de la contreflèche 8 sont alors mis en place, de même que la partie arrière 22 du porte-flèche 5, de manière à constituer une structure d'allure triangulaire, formée de la contreflèche 8, du double tirant 19 et de ladite partie arrière 22.A first phase consists in assembling, on the ground, elements of the jib 8 and associated parts, using a handling machine low capacity (maximum load for example less than or equal to 4 tonnes). The elements of the double tie 19 of the jib 8 are then put in place, as well as the rear part 22 of the arrow holder 5, so as to constitute a triangular-looking structure, formed of the counter-jib 8, of the double tie 19 and said rear part 22.

    Une deuxième phase consiste en l'assemblage, au sol, des éléments de la flèche 6 et des parties associées, toujours à l'aide d'un engin de manutention de faible capacité. Les éléments successifs de la flèche 6 sont alignés et assemblés entre eux et le chariot 7 est aussi mis en place. La partie avant 21 du porte-flèche est amenée, sa béquille 34 étant repliée et reposant, par sa plaque d'appui 39, sur la membrure supérieure 40 du pied de flèche 12 - voir figure 6. Les deux lignes de tirants 13 et 14 de la flèche 8 sont aussi installées : les parties arrière 13a ou 14a de ces tirants 13 et 14 sont réunies par une double bielle 82, qui vient s'accrocher sur un bossage 83 formé autour du trou antérieur 29 du tenon 28 situé au sommet de la partie avant 21 du porte-flèche (voir figure 5), la double bielle 82 étant maintenue en position accrochée par un organe de serrage. La partie avant 13b ou 14b de chaque tirant 13 ou 14, encore séparée de la partie arrière, est liée au point 16 ou 17 à la membrure supérieure 40 de la flèche 6. Comme le montrent les détails agrandis A et B de la figure 6, pour le tirant 14 de plus grande longueur, l'extrémité avant de la partie arrière 14a comporte une chape 57, et l'extrémité arrière de la partie avant 14b de ce tirant comporte un tenon 58 de préférence avec lumière ou vice-versa. Il est aussi prévu un rouleau 59 monté à l'extrémité avant de la partie arrière 14a de la ligne de tirants 14, ce rouleau 59 pouvant rouler sur la membrure supérieure 40.A second phase consists in assembling, on the ground, elements of arrow 6 and associated parts, still using a handling machine low capacity. The successive elements of arrow 6 are aligned and assembled together and the carriage 7 is also put in place. The front part 21 of the boom holder is brought, its stand 34 being folded and resting, by its support plate 39, on the upper chord 40 of the jib foot 12 - see figure 6. The two lines of tie rods 13 and 14 of arrow 8 are also installed: the rear parts 13a or 14a of these tie rods 13 and 14 are joined by a double connecting rod 82, which hangs on a boss 83 formed around the hole anterior 29 of the pin 28 located at the top of the front part 21 of the arrow holder (see Figure 5), the double rod 82 being held in the hooked position by a clamping member. The front part 13b or 14b of each tie 13 or 14, still separated from the rear part, is linked to point 16 or 17 to the frame upper 40 of arrow 6. As shown in the enlarged details A and B of Figure 6, for the tie rod 14 of greater length, the front end of the rear part 14a has a yoke 57, and the rear end of the part before 14b of this tie rod has a lug 58 preferably with light or vice versa. There is also a roller 59 mounted at the front end of the rear part 14a of the line of tie rods 14, this roller 59 being able to roll on the upper chord 40.

    Pour rapprocher les deux parties de chaque tirant 13 ou 14 de la flèche 6, l'on utilise une élingue 60 passant sur deux poulies déplaçables 61, et sur le crochet 62 de l'engin de manutention précité - voir le détail C de la figure 6.To bring the two parts of each tie 13 or 14 closer to the arrow 6, a sling 60 is used passing over two movable pulleys 61, and on the hook 62 of the aforementioned handling device - see detail C in FIG. 6.

    Au moyen de l'élingue 60, il est d'abord procédé au rapprochement des deux parties 14a et 14b de la ligne de tirants supérieurs 14, de plus grande longueur, et ces parties sont brochées entre elles par un axe liant la chape 57 avec le tenon 58, dont la lumière laisse subsister un jeu - voir figure 7.By means of the sling 60, the approximation of the two parts 14a and 14b of the line of upper tie rods 14, of greater length, and these parts are stitched together by an axis connecting the yoke 57 with the pin 58, the light of which leaves a play - see Figure 7.

    A l'aide de la même élingue 60, et des mêmes poulies déplaçables 61, il est ensuite procédé au rapprochement des deux parties 13a et 13b de la ligne de tirants inférieure 13, de plus petite longueur, ces deux parties étant aussi finalement brochées entre elles - voir figure 8.Using the same sling 60, and the same movable pulleys 61, it then the two parts 13a and 13b of the line are brought together lower tie rods 13, of shorter length, these two parts also being finally stitched together - see Figure 8.

    Toutes les opérations décrites jusqu'ici sont réalisées au sol.All the operations described so far are carried out on the ground.

    La phase suivante consiste, au moyen d'un engin de levage de forte capacité (charge maximale par exemple égale ou supérieure à 10 tonnes), et à l'aide d'élingues adaptées, à réaliser une manutention de l'ensemble formé par la contreflèche 8, par le double tirant 19 et par la partie arrière 22 du porte-flèche 5, pour lever cet ensemble et l'amener sur le mât-cabine 10, comme illustré d'une façon générale par la figure 9.The next phase consists, by means of a heavy lifting machine capacity (maximum load for example equal to or greater than 10 tonnes), and using adapted slings, to carry out handling of the assembly formed by the jib 8, by the double tie 19 and by the rear part 22 of the jib holder 5, to lift this assembly and bring it to the mast-cabin 10, as illustrated generally in Figure 9.

    On réalise alors, suivant l'axe horizontal 18, un brochage liant l'extrémité antérieure de la contreflèche 8 et la base de la partie arrière 22 du porte-flèche 5 avec le mât-cabine 10. Comme le montre le détail D de la figure 9, il est aussi procédé au brochage, par un axe 63, des chapes 49 situées aux extrémités inférieures des deux bielles de retenue 48 de la partie arrière 22 du porte-flèche 5 sur les pattes 56 correspondantes de la partie supérieure du mât-cabine 10. Cette liaison comportant un jeu vertical, grâce à la lumière 64 ménagée dans chaque patte 56, l'ensemble ainsi mis en place est finalement libéré vers l'arrière par pivotement autour de l'axe 18, à l'aide de l'engin de levage utilisé, jusqu'à la venue en butée de l'axe de brochage 63 à une extrémité de la lumière 64.One then carries out, along the horizontal axis 18, a broaching binding the end front of the jib 8 and the base of the rear part 22 of the jib holder 5 with the mast-cabin 10. As shown in detail D in FIG. 9, it is also broaching, by an axis 63, of the yokes 49 situated at the ends lower of the two retaining rods 48 of the rear part 22 of the jib holder 5 on the corresponding legs 56 of the upper part of the mast-cabin 10. This link comprising a vertical clearance, thanks to the light 64 formed in each leg 56, the assembly thus put in place is finally released backwards by pivoting around axis 18, using the lifting used, until abutment pin 63 comes into abutment at a light end 64.

    Cette phase est réalisable, dans un premier mode de mise en oeuvre illustré par la figure 10, à l'aide d'un ensemble d'élingues particulières, composé de deux élingues avant 65 et de deux élingues arrière 66, de longueur prédéfinie, suspendues au même crochet 67 de l'engin de levage. Les deux élingues avant 65 sont attachées en un point 68, à la base de la partie arrière 22 du porte-flèche 5, et elles passent sur la bretelle 53 déployée, de manière à être déviées sur l'extrémité 69 de cette bretelle 53 qui constitue ainsi un point d'attache déporté. Les deux élingues arrière 66 sont attachées en des points symétriques 70, situés vers l'arrière de la structure de la contreflèche 8. Lors du levage de l'ensemble, le double tirant 19 de la contreflèche 8 est aligné et tendu, et la structure de la contreflèche 8 reste en position sensiblement horizontale, position qui est maintenue pendant les opérations (précédemment décrites) de brochage de cet ensemble sur le mât-cabine 10.This phase is achievable, in a first mode of implementation illustrated by FIG. 10, using a set of particular slings, composed of two front slings 65 and two rear slings 66, of predefined length, suspended from the same hook 67 of the lifting gear. The two front slings 65 are attached at a point 68, at the base of the rear part 22 of the arrowhead 5, and they pass over the deployed strap 53, so as to be deflected on the end 69 of this strap 53 which constitutes thus a deported attachment point. The two rear slings 66 are attached at symmetrical points 70, situated towards the rear of the structure of the counter-arrow 8. When lifting the assembly, the double tie rod 19 of the counterjib 8 is aligned and taut, and the structure of jib 8 remains in substantially horizontal position, position which is maintained during pinning operations (previously described) of this assembly on the mast-cabin 10.

    Selon un deuxième mode de mise en oeuvre, illustré par la figure 11, la manutention de l'ensemble considéré est réalisée à l'aide d'un autre ensemble d'élingues particulières, composé encore de deux élingues avant 71 et de deux élingues arrière 72, de longueur prédéfinie. Les deux élingues avant 71 sont attachées au point 68, à la base de la partie arrière 22 du porte-flèche 5, et ne subissent ici aucune déviation entre le crochet 67 et le point d'attache 68. Les deux élingues arrière 72 sont attachées aux points 70, situés vers l'arrière de la structure de la contreflèche 8. Lors du levage de l'ensemble, les deux élingues avant 71 maintiennent la partie arrière 22 du porte-flèche 5 pivotée vers l'arrière par rapport à la structure de la contreflèche 8, en position de butée contre la chape 50 par l'axe 52, de telle sorte que les éléments 73, 74 et 75 de la ligne de tirants 19 forment une ligne brisée. La structure de la contreflèche 8 est manutentionnée en formant, par rapport à l'horizontale, un angle a assez important, par exemple égal ou supérieur à 15°. Cette inclinaison de la contreflèche 8 est conservée lors des opérations (précédemment décrites) de brochage de l'ensemble sur le mât-cabine 10. Une fois ce brochage réalisé, la contreflèche 8 est pivotée autour de son axe 18 de brochage sur le mât-cabine 10, jusqu'à venir en position sensiblement horizontale, les éléments 73, 74 et 75 du double tirant 19 se trouvant alors alignés et mis en tension.According to a second embodiment, illustrated in FIG. 11, the handling of the assembly in question is carried out using another assembly special slings, still composed of two front slings 71 and two rear slings 72, of predefined length. The two front slings 71 are attached to point 68, at the base of the rear part 22 of the arrowhead 5, and do not undergo here no deviation between the hook 67 and the attachment point 68. The two rear slings 72 are attached to the points 70, located towards the rear of the structure of the jib 8. When lifting the assembly, the two slings front 71 keep the rear part 22 of the jib holder 5 pivoted towards the rear relative to the structure of the jib 8, in the stop position against the yoke 50 by the axis 52, so that the elements 73, 74 and 75 of the line of tie rods 19 form a broken line. The structure of the jib 8 is handled by forming, with respect to the horizontal, an angle a sufficient important, for example equal to or greater than 15 °. This tilt of the counter-arrow 8 is retained during the operations (previously described) of pinout of the assembly on the mast-cabin 10. Once this pinout has been carried out, the counterjib 8 is pivoted about its pin 18 of broaching on the mast-cabin 10, until they come into a substantially horizontal position, the elements 73, 74 and 75 of the double tie 19 then being aligned and tensioned.

    Les figures 12 à 14 illustrent un troisième mode de mise en oeuvre, concernant l'assemblage et la manutention de l'ensemble formé par la contreflèche 8, le ou les tirants 19 et la partie arrière 22 du porte-flèche 1.FIGS. 12 to 14 illustrate a third embodiment, concerning the assembly and handling of the assembly formed by the jib 8, the tie rod (s) 19 and the rear part 22 of the jib holder 1.

    La figure 12 illustre l'opération de brochage des tirants 19, effectuée au sol. Pour cette opération, la partie arrière 22 du porte-flèche 5 est mise en place dans son articulation à l'avant de la structure de la contreflèche 8, et maintenue en position sensiblement verticale (par exemple avec une légère inclinaison vers l'arrière, l'angle β étant de 87° environ), à l'aide de l'engin de manutention de faible capacité. Il est alors procédé au brochage de la ou chaque ligne de tirants 19.FIG. 12 illustrates the pinning operation of the tie rods 19, carried out at ground. For this operation, the rear part 22 of the arrow holder 5 is brought into place in its articulation at the front of the structure of the jib 8, and maintained in a substantially vertical position (for example with a slight tilt backwards, the angle β being approximately 87 °), using the low capacity handling. It is then proceeded to the pinout of the or each line of tie rods 19.

    Ensuite, comme montré sur la figure 13, il est procédé, à l'aide du même engin de manutention, au basculement vers l'avant de la partie arrière 22 du porte-flèche 5, jusqu'à une position inclinée vers l'avant (l'angle γ étant égal par exemple à 9° environ). Dans son basculement, la partie arrière 22 du porte-flèche 5 entraíne avec elle les tirants 19, qui sont ainsi mis en "pré-tension". Cette position de basculement de la partie arrière 22 du porte-flèche 5 est maintenue par une butée arrière, mise en place au niveau de l'articulation, pour maintenir la pré-tension du ou des tirants 19 - voir détail K de la figure 13.Then, as shown in figure 13, it is proceeded, using the same handling equipment, when tilting the rear part 22 of the arrowhead 5, to a forward tilted position (the angle γ being equal for example at around 9 °). In its tilting, the rear part 22 of the arrow holder 5 drives with it the tie rods 19, which are thus put in "pre-tension". This tilting position of the rear part 22 of the jib holder 5 is held by a rear stop, placed at the level of the joint, to maintain the pre-tension of the tie rod (s) 19 - see detail K in Figure 13.

    Puis, à l'aide de l'engin de levage de forte capacité, et d'élingues avant 71 et arrière 72 de longueur courante, dont les points d'attache respectifs 68 et 70 sont situés sur la structure de la contreflèche 8, il est procédé au levage de l'ensemble, comme montré sur la figure 14. La répartition des poids conduit alors à l'obtention d'un angle d'inclinaison α de l'ordre de 6°, pour la contreflèche 8, par rapport à l'horizontale (la partie arrière 22 du porte-flèche 5 s'inclinant vers l'avant d'un angle δ égal à 15° environ).Then, using the heavy lifting equipment, and slings front 71 and rear 72 of current length, including attachment points respectively 68 and 70 are located on the structure of the jib 8, it is proceeded to lift the assembly, as shown in Figure 14. The weight distribution then leads to an angle of inclination α of the order of 6 °, for the counter-jib 8, relative to the horizontal (the rear part 22 of the arrow holder 5 tilting forwards by an equal angle δ at around 15 °).

    Comme le précédent, ce dernier mode de mise en oeuvre rend inutile tout organe de déviation pour les élingues 71 et 72. De plus, l'angle d'inclinaison a de la contreflèche, de l'ordre de 6°, est ici plus sécurisant que l'angle de 15° ou plus atteint dans le précédent mode de mise en oeuvre. Cet angle a plus faible évite d'introduire des efforts horizontaux sur la tête de mât et sur le mât 2, lors du démontage de la contreflèche 8.Like the previous one, this last mode of implementation makes useless any deflection member for slings 71 and 72. In addition, the angle inclination of the counter-jib, of the order of 6 °, is safer here that the angle of 15 ° or more reached in the previous setting mode artwork. This angle has smaller avoids introducing horizontal forces on the masthead and on the mast 2, during the disassembly of the jib 8.

    Ensuite, l'ensemble constitué par la flèche 6, par les tirants de flèche 13 et 14 et par la partie avant 21 du porte-flèche 5 est manutentionné, à l'aide d'un engin de levage de forte capacité, cet ensemble étant levé et amené sur le mât-cabine 10, dans le prolongement de l'ensemble avec contreflèche 8 précédemment monté. Cette opération est illustrée par la figure 15, sur laquelle les élingues utilisées avec l'engin de levage sont indiquées en 76. Au cours de l'opération, comme montré par le détail E de la figure 12, la béquille 34 reste repliée. Les deux tirants 13 et 14 restent détendus.Then, the assembly constituted by the arrow 6, by the tie rods 13 and 14 and by the front part 21 of the jib holder 5 is handled, using a high capacity lifting device, this assembly being lifted and brought to the mast-cabin 10, as an extension of the assembly with counter-jib 8 previously mounted. This is illustrated in Figure 15, in which the slings used with the hoist are indicated in 76. During the operation, as shown in detail E in FIG. 12, the stand 34 remains folded up. The two tie rods 13 and 14 remain relaxed.

    Il est alors procédé à un brochage, suivant un axe horizontal 77, pour lier l'extrémité postérieure du pied de flèche 12 et la base de la partie avant 21 du porte-flèche 5 au mât-cabine 10.There is then a pinout, along a horizontal axis 77, to link the rear end of the jib foot 12 and the base of the front part 21 from the boom holder 5 to the cabin mast 10.

    A l'aide de l'engin de levage, la flèche 6 est ensuite légèrement pivotée vers le haut autour de son axe de brochage 77 avec le mât-cabine 10 (position visible sur la figure 15), la partie avant 21 du porte-flèche 5 effectuant alors un pivotement correspondant vers l'arrière. Le tenon supérieur 28 de la partie avant 21 du porte-flèche 5 s'engage ainsi dans la chape supérieure 47 de la partie arrière 22 de ce porte-flèche 5. Comme le montre le détail F de la figure 15, il est procédé alors à un brochage d'approche, avec jeu, entre le tenon 28 et la chape 47, au moyen d'un axe 78 qui traverse le trou postérieur 30 du tenon et les perçages correspondants de la chape 47, le diamètre du trou 30 étant supérieur à celui de l'axe 78.Using the lifting device, the arrow 6 is then slightly pivoted upwards around its broaching axis 77 with the mast-cabin 10 (position visible in FIG. 15), the front part 21 of the jib holder 5 then performing a corresponding pivoting backwards. The upper tenon 28 of the part front 21 of the arrowhead 5 thus engages in the upper yoke 47 of the rear part 22 of this arrowhead 5. As shown in detail F in the figure 15, an approach pinning is then carried out, with play, between the stud 28 and the yoke 47, by means of an axis 78 which crosses the rear hole 30 of the tenon and the corresponding holes of the yoke 47, the diameter of the hole 30 being greater than that of axis 78.

    Dans la phase suivante, illustrée par la figure 16, la flèche 6 est abaissée et ramenée sensiblement à l'horizontale, par pivotement inverse autour de son axe de brochage 77 avec le mât-cabine 10, à l'aide de l'engin de levage. La partie arrière 22 du porte-flèche 5 est entraínée vers l'avant, par le brochage d'approche précédemment réalisé, le sommet de cette partie arrière 22 décrivant un arc de cercle centré sur l'axe 18, tandis que le sommet de la partie avant 21 du porte-flèche 5 se déplace selon un arc de cercle centré sur l'axe 77, le mouvement se poursuivant jusqu'à alignement du trou antérieur 29 du tenon 28 avec les perçages correspondants de la chape 47, au point d'intersection des deux arcs de cercle précités. Simultanément, les tirants 13 et 14 de la flèche 6 s'alignent et se tendent, tandis que la béquille 34 se déplie (voir détail H de la figure 16).In the next phase, illustrated by FIG. 16, the arrow 6 is lowered and brought back substantially to the horizontal, by reverse pivoting around its broaching axis 77 with the mast-cabin 10, using the lifting. The rear part 22 of the arrow holder 5 is driven forward, by the approach pinout previously made, the top of this rear part 22 describing an arc centered on the axis 18, while the apex of the front part 21 of the arrowhead 5 moves in an arc centered on axis 77, the movement continuing until alignment of the anterior hole 29 of stud 28 with the corresponding holes in clevis 47, at point of intersection of the two above-mentioned arcs. Simultaneously, tie rods 13 and 14 of arrow 6 line up and stretch, while the stand 34 unfolds (see detail H in Figure 16).

    Il est alors procédé au brochage définitif liant les sommets des parties avant 21 et arrière 22 du porte-flèche 5 entre eux, ainsi qu'à la double bielle 82 de liaison des tirants 13 et 14, en introduisant un axe 79 au travers du trou antérieur 29 du tenon 28 et des perçages correspondants de la chape 47 - voir détail G de la figure 16, ainsi que figure 5. Le porte-flèche 5 est alors constitué en une structure rigide, de forme triangulaire, dont les trois côtés sont formés respectivement par le sommet du mât-cabine 10, par la partie avant 21 (en particulier les montants 23) et par la partie arrière 22 (en particulier les montants 42).It is then proceeded to the final broaching linking the tops of the parts front 21 and rear 22 of the arrowhead 5 between them, as well as the double connecting rod 82 connecting tie rods 13 and 14, by introducing an axis 79 through the hole anterior 29 of the tenon 28 and the corresponding holes of the clevis 47 - see detail G of FIG. 16, as well as FIG. 5. The arrow holder 5 is then constituted in a rigid structure, triangular in shape, the three sides of which are formed respectively by the top of the mast-cabin 10, by the front part 21 (in particularly the uprights 23) and by the rear part 22 (in particular the amounts 42).

    Une petite plateforme 80 avec garde-corps, portée par la partie arrière 22 du porte-flèche 5, permet aux intervenants d'effectuer en toute sécurité les opérations de brochage précédemment décrites, liant les sommets respectifs des parties avant 21 et arrière 22 du porte-flèche 5.A small platform 80 with railing, carried by the rear part 22 of the arrowhead 5, allows responders to safely perform the broaching operations previously described, linking the respective vertices of the front 21 and rear 22 parts of the jib holder 5.

    On notera qu'après réalisation par l'axe 79 du brochage définitif, liant les sommets des parties avant 21 et arrière 22 du porte-flèche 5, les bielles de retenue 48 sont libérées de tout effort, l'axe de brochage 63 venant en un point intermédiaire de la longueur de chaque lumière 64 - voir le détail J de la figure 16.It will be noted that after completion by the axis 79 of the final pinout, linking the tops of the front 21 and rear 22 parts of the jib holder 5, the connecting rods retainer 48 are released from any effort, the pin axis 63 coming at a point intermediate the length of each light 64 - see detail J in the figure 16.

    Les élingues 76 peuvent désormais être détachées de la flèche 6, celle-ci étant maintenue en position sensiblement horizontale par les seuls tirants 13 et 14, tendus entre le sommet 15 du porte-flèche 5 et les points 16 et 17 - voir figure 17.The slings 76 can now be detached from the boom 6, the latter being held in a substantially horizontal position by the single tie rods 13 and 14, stretched between the top 15 of the arrowhead 5 and points 16 and 17 - see figure 17.

    Enfin, en utilisant l'engin de levage désormais libéré, il est procédé au lestage de la contreflèche 8, en amenant et en fixant, à l'arrière de la structure de cette contreflèche 8, les blocs constituant le contrepoids 9 - voir figure 18. La grue est alors prête pour entrer en service.Finally, using the lifting gear now released, it is proceeded to ballast of the jib 8, by bringing and fixing, at the rear of the structure of this counter-jib 8, the blocks constituting the counterweight 9 - see FIG. 18. The crane is then ready to enter service.

    Facultativement, comme l'illustrent les figures 15 à 17, un ou plusieurs blocs constitutifs du contrepoids 9 peuvent être déjà mis en place sur la contreflèche 8 dans des phases intermédiaires du montage de la grue.Optionally, as illustrated in Figures 15 to 17, one or more counterweight 9 can already be installed on the counterjib 8 in the intermediate stages of the crane assembly.

    Les figures 19 à 22 illustrent, en variante de ce qui vient d'être décrit, une autre version du brochage de la partie supérieure du porte-flèche 5. Cette variante met en oeuvre les moyens suivants, bien visibles sur la figure 20 ainsi que sur les détails N et R :FIGS. 19 to 22 illustrate, as a variant of what has just been described, another version of the pinout of the upper part of the arrowhead 5. This variant implements the following means, clearly visible in FIG. 20 as well only on details N and R:

    La partie avant 21 du porte-flèche 5 comporte, à son sommet, un tenon 28 muni d'un trou arrière 30 pour le brochage de la ligne de tirants 19 de la contreflèche 8, et d'un trou avant 29 pour le brochage définitif des deux parties, respectivement avant 21 et arrière 22, du porte-flèche 5.The front part 21 of the arrow holder 5 has, at its top, a tenon 28 provided with a rear hole 30 for the broaching of the line of tie rods 19 of the counterjib 8, and a front hole 29 for the final broaching of the two parts, front 21 and rear 22, respectively, of the arrowhead 5.

    La partie arrière 22 du porte-flèche 5 comporte, à son sommet, une chape 47 munie d'un trou 84 pour le brochage définitif des deux parties 21 et 22 du porte-flèche 5. La chape 47 est aussi munie, extérieurement, de rondelles latérales 85 coaxiales au trou 84 précité ; ces rondelles 85, soudées sur la chape 47, possèdent un diamètre intérieur égal à celui de l'axe de brochage définitif.The rear part 22 of the arrow holder 5 has, at its top, a yoke 47 provided with a hole 84 for the final broaching of the two parts 21 and 22 of the arrowhead 5. The yoke 47 is also provided, externally, with side washers 85 coaxial with the above-mentioned hole 84; these washers 85, welded on clevis 47, have an internal diameter equal to that of the axis of final pinout.

    La ligne de tirants 19 de la contreflèche 8 comporte, à son extrémité antérieure, deux bielles de montage 86 et 87. La première bielle 86 est une double bielle, composée de deux plaques symétriques, laquelle assure la liaison entre l'extrémité de la ligne de tirants 19 et les rondelles latérales 85 portées par la chape supérieure 47 de la partie arrière 22 du porte-flèche 5. La seconde bielle 87, notamment en forme de chape, est logée à l'intérieur de la double bielle 86, et elle est reliée à l'extrémité de la ligne de tirants 19, au même point que la première bielle 86. L'entraxe de la seconde bielle 87 est légèrement inférieur, par exemple de 2 mm, à celui de la double bielle 86.The line of tie rods 19 of the jib 8 comprises, at its end front, two connecting rods 86 and 87. The first connecting rod 86 is a double connecting rod, composed of two symmetrical plates, which ensures the connection between the end of the tie rod line 19 and the side washers 85 carried by the upper yoke 47 of the rear part 22 of the arrowhead 5. The second connecting rod 87, in particular in the form of a yoke, is housed inside the double rod 86, and it is connected to the end of the line of tie rods 19, to the same point as the first connecting rod 86. The center distance of the second connecting rod 87 is slightly lower, for example 2 mm, than that of the double rod 86.

    Le brochage de la contreflèche 8 s'effectue en reliant le double tirant 19 à l'extrémité supérieure de la partie arrière 22 du porte-flèche 5 au moyen de la première bielle (double bielle) 86, la seconde bielle 87 se trouvant en attente.The broaching of the counterjib 8 is carried out by connecting the double tie rod 19 at the upper end of the rear part 22 of the jib holder 5 by means of the first connecting rod (double connecting rod) 86, the second connecting rod 87 being on standby.

    Le brochage de la flèche 6 s'effectue en reliant la triangulation de cette flèche, au niveau de son extrémité supérieure et plus particulièrement du trou arrière 30 du tenon 28, à l'extrémité du double tirant 19 de la contreflèche 8, par l'intermédiaire de la seconde bielle 87.The pinout of the arrow 6 is carried out by connecting the triangulation of this arrow, at its upper end and more particularly the hole rear 30 of the stud 28, at the end of the double tie 19 of the counter-jib 8, via the second connecting rod 87.

    Ces opérations de brochage sont effectuées dans la position de la flèche 6 montrée sur la figure 18 (flèche légèrement pivotée vers le haut), de manière analogue à ce qui a déjà été illustré sur la figure 15. These broaching operations are carried out in the position of the arrow 6 shown in FIG. 18 (arrow slightly pivoted upwards), so similar to what has already been illustrated in FIG. 15.

    Dans la phase suivante (figure 20), la flèche 6 est abaissée, et les tirants 13 et 14 de la flèche 6 sont mis en tension. Simultanément; la ligne de tirants 19 de la contreflèche 8 est entraínée vers l'avant par la seconde bielle 87, et la partie arrière 22 du porte-flèche 5, maintenue par la première bielle 86, est entraínée vers l'avant par son propre poids. Le mouvement relatif entre la partie arrière 22 et la partie avant 21 du porte-flèche 5, qui se produit alors, correspond sensiblement à la différence d'entraxes entre la première bielle 86 et la seconde bielle 87, et ceci permet l'alignement parfait des trous de brochage définitif respectifs 29 et 84 des deux parties 21 et 22 de porte-flèche, au cours de la mise en tension des tirants.In the next phase (Figure 20), the arrow 6 is lowered, and the tie rods 13 and 14 of arrow 6 are tensioned. Simultaneously; the line of tie rods 19 of the jib 8 is driven forward by the second connecting rod 87, and the rear part 22 of the arrowhead 5, held by the first connecting rod 86, is driven forward by its own weight. The relative movement between the rear part 22 and the front part 21 of the arrow holder 5, which then occurs, substantially corresponds to the difference in center distances between the first connecting rod 86 and the second connecting rod 87, and this allows the perfect alignment of the holes of respective final pinout 29 and 84 of the two parts 21 and 22 of the arrowhead, during the tensioning of the tie rods.

    Il est alors procédé au brochage définitif, liant les sommets des parties avant 21 et arrière 22 du porte-flèche 5 entre eux, par introduction d'un axe 79 au travers des trous précédemment mis en alignement - voir détail R de la figure 21. Les bielles de retenue 48 sont alors libérées de tout effort, de même que la béquille 34 - comparer les détails L et M de la figure 19 respectivement avec les détails P et Q de la figure 21.It is then proceeded to the final broaching, linking the tops of the parts front 21 and rear 22 of the arrowhead 5 between them, by introducing an axis 79 through the previously aligned holes - see detail R of the Figure 21. The retaining rods 48 are then released from any effort, likewise as the stand 34 - compare the details L and M of figure 19 respectively with details P and Q in figure 21.

    Enfin, les élingues 76 peuvent être détachées de la flèche 6, maintenue par les seuls tirants 13 et 14 tendus, cette phase finale étant montrée sur la figure 22.Finally, the slings 76 can be detached from the boom 6, maintained by the only tension rods 13 and 14, this final phase being shown on the figure 22.

    Cette variante possède comme avantage, en comparaison avec la version précédemment décrite, de ne plus exiger une réalisation très précise des entraxes des trous aux sommets des parties avant 21 et arrière 22 du porte-flèche 5, donc de s'affranchir d'une contrainte dimensionnelle.This variant has the advantage, in comparison with the previously described version, to no longer require a very precise realization of the centers of the holes at the tops of the front 21 and rear 22 parts of the arrow-holder 5, therefore to overcome a dimensional constraint.

    Le démontage de la partie tournante 4 de la grue est réalisable, par une série d'opérations inverses de celles précédemment décrites, en séparant d'abord les deux parties 21 et 22 du porte-flèche 5, puis en manutentionnant d'une part l'ensemble composé de la flèche 6, de la partie avant 21 du porte-flèche 5 et des tirants 13 et 14, et d'autre part l'ensemble composé de la contreflèche 8, de la partie arrière 22 du porte-flèche 5 et du double tirant 19. Une fois séparées, les deux parties 21 et 22 du porte-flèche 5 offrent un encombrement minimal, pour leur transport et leur stockage.The rotating part 4 of the crane can be dismantled by means of a series of reverse operations from those previously described, separating first the two parts 21 and 22 of the jib holder 5, then by handling on the one hand, the assembly composed of arrow 6, of the front part 21 of the arrow holder 5 and tie rods 13 and 14, and on the other hand the assembly composed of the counterjib 8, the rear part 22 of the jib holder 5 and the double tie 19. Once separated, the two parts 21 and 22 of the arrow holder 5 provide a minimum space requirement, for their transport and storage.

    L'on ne s'éloignerait pas du cadre de l'invention, telle que définie dans les revendications :

    • en modifiant l'ordre des opérations de prémontage au sol de l'ensemble avec flèche et de l'ensemble avec contreflèche, voire même en réalisant ces opérations simultanément pour les deux ensembles .
    • en appliquant le même procédé, avec les adaptations nécessaires, à des grues avec flèches et/ou contreflèches possédant des tirants en nombre différent de celui considéré dans les exemples précédemment décrits, et illustrés au dessin ;
    • en constituant le porte-flèche, toujours par réunion d'une partie avant et d'une partie arrière séparables, mais avec la forme d'un polygone à quatre côtés, tel que rectangle ou trapèze, au lieu d'une forme triangulaire (en vue de côté) ;
    • en modifiant la constitution des deux parties du porte-flèche, ou de l'une d'elles, la partie avant ou arrière du porte-flèche étant réalisable sous la forme d'un seul montant, au lieu d'une structure en treillis à deux montants.
    One would not depart from the scope of the invention, as defined in the claims:
    • by modifying the order of ground pre-assembly operations for the jib assembly and the jib assembly, or even performing these operations simultaneously for the two assemblies.
    • by applying the same process, with the necessary adaptations, to cranes with jibs and / or jibs having tie rods in numbers different from that considered in the examples previously described, and illustrated in the drawing;
    • by constituting the arrowhead, always by joining a separable front part and a rear part, but with the shape of a polygon with four sides, such as rectangle or trapezoid, instead of a triangular shape (in side view) ;
    • by modifying the constitution of the two parts of the arrow holder, or of one of them, the front or rear part of the arrow holder being able to be produced in the form of a single upright, instead of a lattice structure with two amounts.

    Claims (24)

    Procédé pour le montage de la partie tournante, plus particulièrement de la tête de mât d'une grue à tour, dont la partie tournante (4) comprend une tête de mât ou porte-flèche (5), une flèche distributrice (6) articulée par son extrémité postérieure à la face avant du porte-flèche (5) et reliée au sommet (15) du porte-flèche (5) par un ou plusieurs tirants (13, 14), et une contreflèche (8) articulée par son extrémité antérieure à la face arrière du porte-flèche (5) et reliée au sommet (15) du porte-flèche (5) par un ou plusieurs tirants (19),
    caractérisé en ce qu'il consiste : à assembler au sol un ensemble formé par la contreflèche (8), son ou ses tirants (19) et une partie arrière (22) du porte-flèche (5) réalisé en deux parties séparables (21, 22), à savoir une partie avant (21) et la partie arrière (22), et à assembler aussi au sol un autre ensemble formé par la flèche (6), son ou ses tirants (13, 14) et la partie avant (21) du porte-flèche (5) ; à l'aide d'un engin de manutention ou de levage, à lever l'ensemble prémonté formé par la contreflèche (8), son ou ses tirants (19) et la partie arrière (22) du porte-flèche (5), et à assembler par brochage cet ensemble suivant un axe horizontal (18), sur le pivot tournant ou sur un élément de mât ou mât-cabine (10) lié à ce pivot tournant ; à l'aide de l'engin de manutention ou de levage, à lever l'ensemble prémonté formé par la flèche (6), son ou ses tirants (13, 14) et la partie avant (21) du porte-flèche (5), et à assembler par brochage cet ensemble, suivant un axe horizontal (77), sur le pivot tournant ou le mât-cabine (10) ; à lier entre eux par au moins un axe de brochage (78, 79) les sommets respectifs (28, 47) des parties avant (21) et arrière (22) du porte-flèche (5).
    Method for mounting the rotating part, more particularly the mast head of a tower crane, the rotating part (4) of which comprises a mast head or jib holder (5), an articulated distributing jib (6) by its end posterior to the front face of the jib holder (5) and connected to the top (15) of the jib holder (5) by one or more tie rods (13, 14), and a jib (8) articulated by its end anterior to the rear face of the arrow holder (5) and connected to the top (15) of the arrow holder (5) by one or more tie rods (19),
    characterized in that it consists: in assembling on the ground an assembly formed by the jib (8), its tie rod (s) (19) and a rear part (22) of the jib holder (5) produced in two separable parts (21, 22), namely a part front (21) and the rear part (22), and also to assemble on the ground another assembly formed by the arrow (6), its tie rod (s) (13, 14) and the front part (21) of the arrow holder ( 5); using a handling or lifting device, to lift the pre-assembled assembly formed by the jib (8), its tie rod (s) (19) and the rear part (22) of the jib holder (5), and to assemble by broaching this assembly along a horizontal axis (18), on the rotary pivot or on a mast or mast-cabin element (10) linked to this rotary pivot; using the handling or lifting device, to lift the pre-assembled assembly formed by the arrow (6), its tie rod (s) (13, 14) and the front part (21) of the arrow holder (5 ), and to assemble by broaching this assembly, along a horizontal axis (77), on the rotary pivot or the mast-cabin (10); to link together by at least one broaching axis (78, 79) the respective vertices (28, 47) of the front (21) and rear (22) parts of the jib holder (5).
    Procédé selon la revendication 1, caractérisé en ce que l'assemblage au sol de l'ensemble formé par la flèche (6), son ou ses tirants (13, 14) et la partie avant (21) du porte-flèche (5) est effectué en liant de façon articulée la base (26) de la partie avant (21) du porte-flèche (5) à l'extrémité postérieure (31) du pied de flèche (12), et en liant aussi la partie avant (21) du porte-flèche (5) au pied de flèche (12) par un moyen (34) limitant le pivotement, vers l'avant et vers l'arrière, de la partie avant (21) du porte-flèche (5) relativement à la flèche (6). Method according to claim 1, characterized in that the assembly on the ground of the assembly formed by the arrow (6), its tie rod (s) (13, 14) and the front part (21) of the arrow holder (5) is made by hinging the base (26) of the front part (21) of the arrow holder (5) at the rear end (31) of the boom foot (12), and also linking the front part (21) of the boom holder (5) at the jib foot (12) by means (34) limiting the pivoting, towards the front and towards the rear, from the front part (21) of the jib holder (5) relative to the arrow (6). Procédé selon la revendication 2, caractérisé en ce que l'angle entre les deux positions limites de la partie avant (21) du porte-flèche (5) est de l'ordre de 5°.Method according to claim 2, characterized in that the angle between the two limit positions of the front part (21) of the arrow holder (5) is around 5 °. Procédé selon l'une quelconque des revendications 1 à 3, caractérisé en ce que l'opération d'assemblage au sol de l'ensemble formé par la flèche (6), son ou ses tirants (13, 14) et la partie avant (21) du porte-flèche (5) comprend, pour le ou chaque tirant (13, 14) de la flèche (6), la fixation d'une partie arrière (13a, 14a) du tirant au sommet (28) de la partie avant (21) du porte-flèche (5), la fixation d'une partie avant (13b, 14b) du même tirant en un point intermédiaire (16, 17) de la flèche (6), le rapprochement des parties arrière (13a, 14a) et avant (13b, 14b) du tirant (13, 14) à l'aide d'une élingue (60) tirée par un engin auxiliaire de manutention ou de levage, et le brochage de l'extrémité avant (57) de la partie arrière (13a, 14a) du tirant sur l'extrémité arrière (58) de la partie avant (13b, 14b) du tirant.Method according to any one of claims 1 to 3, characterized in that the assembly operation on the ground of the assembly formed by the arrow (6), its tie rod (s) (13, 14) and the front part (21) of the jib holder (5) includes, for the or each tie (13, 14) of the boom (6), the fixing of a rear part (13a, 14a) of the tie rod at the top (28) of the front part (21) of the arrowhead (5), the fixing of a front part (13b, 14b) of the same tie in one intermediate point (16, 17) of the arrow (6), the bringing together of the parts rear (13a, 14a) and front (13b, 14b) of the tie rod (13, 14) using a sling (60) pulled by an auxiliary handling or lifting machine, and the broaching of the front end (57) of the rear part (13a, 14a) of the tie rod on the end rear (58) of the front part (13b, 14b) of the tie rod. Procédé selon l'une quelconque des revendications 1 à 4, caractérisé en ce que le levage de l'ensemble formé par la contreflèche (8), son ou ses tirants (19) et la partie arrière (22) du porte-flèche (5) est réalisé à l'aide d'élingues comprenant des élingues avant (65) attachées à la base (68) de la partie arrière (22) du porte-flèche (5), et passant sur un organe de déviation (53) porté par cette partie arrière (22), et des élingues arrière (66) attachées (en 70) à la structure de la contreflèche (8) , de manière à maintenir la structure de la contreflèche (8) sensiblement horizontale au cours du levage de cet ensemble et de son brochage sur le pivot tournant ou le mât-cabine (10), le ou les tirants (19) de la contreflèche (8) étant alignés et tendus.Method according to any one of claims 1 to 4, characterized in that the lifting of the assembly formed by the jib (8), its or its tie rods (19) and the rear part (22) of the jib holder (5) is produced using slings comprising front slings (65) attached to the base (68) of the rear part (22) of the arrow holder (5), and passing over a deflection member (53) carried by this rear part (22), and rear slings (66) attached (in 70) to the structure of the jib (8), so as to maintain the structure of the substantially horizontal jib (8) during the lifting of this assembly and its pinout on the turning pivot or the mast-cabin (10), the or the tie rods (19) of the jib (8) being aligned and tensioned. Procédé selon l'une quelconque des revendications 1 à 4, caractérisé en ce que le levage de l'ensemble formé par la contreflèche (8), son ou ses tirants (19) et la partie arrière (22) du porte-flèche (5) est réalisé à l'aide d'élingues comprenant des élingues avant (71) attachées à la base (68) de la partie arrière (22) du porte-flèche (5), mais ne subissant aucune déviation, et des élingues arrière (72) attachées (en 70) à la structure de la contreflèche (8), les élingues (71,72) étant de longueur adaptée pour maintenir la structure de la contreflèche (8) en position inclinée par rapport à l'horizontale, au cours du levage de cet ensemble et de son brochage sur le pivot tournant ou le mât-cabine (10), la partie arrière (22) du porte-flèche (5) étant pivotée vers l'arrière de telle sorte que le ou les tirants (19) restent détendus, et en ce que, après brochage dudit ensemble sur le pivot tournant ou le mât-cabine (10), la structure de la contreflèche (8) est ramenée à l'horizontale, et le ou les tirants (19) sont mis en tension. Method according to any one of claims 1 to 4, characterized in that the lifting of the assembly formed by the jib (8), its or its tie rods (19) and the rear part (22) of the jib holder (5) is produced using slings comprising front slings (71) attached to the base (68) of the rear part (22) of the arrowhead (5), but not undergoing any deviation, and rear slings (72) attached (at 70) to the structure of the jib (8), the slings (71,72) being of a length adapted to maintain the structure of the counter-jib (8) in an inclined position relative to the horizontal, during lifting of this assembly and its pinout on the turning pivot or the mast-cabin (10), the rear part (22) of the jib holder (5) being pivoted backwards so that the tie rod (s) (19) remain relaxed, and in that, after broaching of said assembly on the rotary pivot or the mast-cabin (10), the structure of the jib (8) is brought back to the horizontal, and the tie rod (s) (19) are tensioned. Procédé selon la revendication 6, caractérisé en ce que la structure de la contreflèche (8) forme, par rapport à l'horizontale, un angle (a) égal ou supérieur à 15°, au cours du levage et du brochage de l'ensemble concerné.Method according to claim 6, characterized in that the structure of the jib (8) forms, with respect to the horizontal, an angle (a) equal or greater than 15 °, during the lifting and broaching of the assembly concerned. Procédé selon l'une quelconque des revendications 1 à 4, caractérisé en ce que, après mise en pré-tension du ou des tirants (19) de la contreflèche (8), par basculement vers l'avant de la partie arrière (22) du porte-flèche (5), le levage de l'ensemble formé par la contreflèche (8), son ou ses tirants (19) et la partie arrière (22) du porte-flèche (5) est réalisé à l'aide d'élingues comportant des élingues avant (71) et des élingues arrière (72) attachées (en 68, 70) à la structure de la contreflèche (8), de manière à maintenir la structure et la contreflèche (8) sensiblement horizontale, ou du moins faiblement inclinée sur l'horizontale, au cours du levage et du brochage de l'ensemble concerné.Method according to any one of claims 1 to 4, characterized in that, after the pre-tensioning of the tie rod (s) (19) (8), by tilting the rear part (22) of the jib holder (5) towards the front, the lifting of the assembly formed by the jib (8), its tie rod (s) (19) and the rear part (22) of the jib holder (5) is produced using slings comprising front slings (71) and rear slings (72) attached (at 68, 70) to the structure of the jib (8), so as to maintain the structure and substantially horizontal jib (8), or at least slightly inclined on horizontal, during the lifting and pinning of the assembly concerned. Procédé selon la revendication 8, caractérisé en ce que la structure de la contreflèche (8) forme, par rapport à l'horizontale un angle (α) de l'ordre de 6°, au cours du levage et du brochage de l'ensemble concerné.Method according to claim 8, characterized in that the structure of the counter-jib (8) forms, with respect to the horizontal, an angle (α) of the order 6 °, during the lifting and broaching of the concerned assembly. Procédé selon l'une quelconque des revendications 1 à 9, caractérisé en ce qu'il comprend encore, après l'opération de brochage (en 18) de l'ensemble comprenant la contreflèche (8) et la partie arrière (22) du porte-flèche (5) sur le pivot mobile ou le mât-cabine (10), la réalisation d'une liaison provisoire (48, 49, 56, 63) avec jeu maintenant la partie arrière (22) du porte-flèche (5) en position dressée, en attendant le brochage (en 78, 79) du sommet (28) de la partie avant (21) du porte-flèche (5) sur le sommet (47) de ladite partie arrière (22).Process according to any one of Claims 1 to 9, characterized in that it still comprises, after the broaching operation (in 18) of the assembly comprising the jib (8) and the rear part (22) of the jib holder (5) on the movable pivot or the mast-cabin (10), making a connection provisional (48, 49, 56, 63) with clearance holding the rear part (22) of the boom holder (5) in the upright position, pending the pinout (at 78, 79) of the top (28) of the front part (21) of the arrow holder (5) on the top (47) of said rear part (22). Procédé selon l'une quelconque des revendications 1 à 10, caractérisé en ce que le levage de l'ensemble formé par la flèche (6), son ou ses tirants (13, 14) et la partie avant (21) du porte-flèche (5) est effectué à l'aide d'élingues (76), en maintenant la flèche (6) sensiblement horizontale jusqu'à son brochage sur le pivot tournant ou le mât-cabine (10), puis en faisant pivoter la flèche (6) légèrement vers le haut autour de l'axe (77) réalisant ce brochage, pour réaliser (en 78) un brochage d'approche avec jeu entre le sommet (28) de la partie avant (21) et le sommet (47) de la partie arrière (22) du porte-flèche (5).Process according to any one of Claims 1 to 10, characterized in that the lifting of the assembly formed by the arrow (6), its or its tie rods (13, 14) and the front part (21) of the arrow holder (5) is made at using slings (76), keeping the arrow (6) substantially horizontal until it is pinned on the turning pivot or the mast-cabin (10), then rotating the arrow (6) slightly upwards around the axis (77) carrying out this pinout, to make (in 78) an approach pinout with clearance between the top (28) of the front part (21) and the top (47) of the part rear (22) of the boom holder (5). Procédé selon la revendication 11, caractérisé en ce qu'après la réalisation (en 78) du brochage d'approche, il est procédé à un pivotement inverse de la flèche (6) entraínant vers l'avant la partie arrière (22) du porte-flèche (5), et à la réalisation d'un brochage définitif (en 79) assurant la rigidification du porte-flèche (5), le brochage définitif étant réalisé au point d'intersection d'un arc de cercle, centré sur l'axe de brochage (18) de la contreflèche (8) sur le pivot tournant ou le mât-cabine (10), suivant lequel se déplace le trou de brochage définitif (84) du sommet (47) de la partie arrière (22) du porte-flèche (5) et d'un autre arc de cercle, centré sur l'axe de brochage (77) de la flèche (6) sur le pivot tournant ou le mât-cabine (10), suivant lequel se déplace le trou de brochage définitif (29) du sommet (28) de la partie avant (21) du porte-flèche (5).Method according to claim 11, characterized in that after the realization (in 78) of the approach pinout, there is a pivoting reverse of the arrow (6) driving forward the rear part (22) of the arrow holder (5), and to the achievement of a final pinout (in 79) ensuring the stiffening of the arrowhead (5), the final pinout being carried out at the point intersection of a circular arc, centered on the broaching axis (18) of the counter-jib (8) on the turning pivot or the mast-cabin (10), according to which moves the final broaching hole (84) from the top (47) of the rear part (22) of the arrowhead (5) and another arc, centered on the broaching axis (77) of the arrow (6) on the turning pivot or the mast-cabin (10), according to which moves the final broaching hole (29) from the top (28) of the front part (21) of the arrow holder (5). Dispositif pour la mise en oeuvre du procédé de montage de la partie tournante d'une grue à tour selon l'une quelconque des revendications 1 à 12, caractérisé en ce qu'il comprend, en combinaison : une partie avant (21) de porte-flèche (5), comportant des montants (23) liés rigidement entre eux et pourvus à leurs extrémités inférieures de tenons (26) ou chapes, coopérant avec des chapes (31) ou tenons prévus à l'extrémité postérieure du pied de flèche (12), ainsi qu'avec des chapes (54) ou tenons prévus sur le pivot tournant ou le mât-cabine (10), une partie arrière (22) de porte-flèche (5), séparable de la partie avant (21) et comportant des montants (42) liés rigidement entre eux et pourvus à leurs extrémités inférieures de tenons (45) ou chapes, coopérant avec des chapes (50) ou tenons prévus à l'extrémité antérieure de la structure de la contreflèche (8), ainsi qu'avec des chapes ou tenons (55) prévus sur le pivot tournant ou le mât-cabine (10), les parties avant (21) et arrière (22) du porte-flèche (5) étant encore pourvues, à leurs sommets respectifs, d'organes complémentaires tels que tenon (28) et chape (47), pour la liaison par brochage entre ces deux parties (21, 22). Device for implementing the method of mounting the rotating part of a tower crane according to any one of claims 1 to 12, characterized in that it comprises, in combination: a front part (21) of a jib holder (5), comprising uprights (23) rigidly connected to each other and provided at their lower ends with tenons (26) or yokes, cooperating with yokes (31) or tenons provided for the posterior end of the jib foot (12), as well as with yokes (54) or tenons provided on the rotary pivot or the mast-cabin (10), a rear part (22) of the arrowhead (5), separable from the front part (21) and comprising uprights (42) rigidly linked together and provided at their lower ends with tenons (45) or yokes, cooperating with yokes (50) or tenons provided at the anterior end of the structure of the jib (8), as well as with yokes or tenons (55) provided on the rotary pivot or the mast-cabin (10), the front (21) and rear (22) parts of the jib holder (5) being still provided, at their respective tops, with complementary members such as tenon (28) and clevis (47), for the connection by broaching between these two parts (21, 22). Dispositif selon la revendication 13, caractérisé en ce que la partie avant (21) du porte-flèche (5) est reliée, par l'intermédiaire d'une béquille (34) constituée de deux tronçons inégaux (35, 36) articulés entre eux (en 37), à la partie postérieure du pied de flèche (12), l'un des tronçons (35) de la béquille (34) comportant un organe d'appui (39) sur le pied de mât (12), de manière à limiter le pivotement, vers l'avant et vers l'arrière, de la partie avant (21) du porte-flèche (5), relativement à la flèche (6).Device according to claim 13, characterized in that the part front (21) of the boom holder (5) is connected, by means of a stand (34) consisting of two unequal sections (35, 36) hinged together (at 37), at the rear part of the boom foot (12), one of the sections (35) of the stand (34) comprising a support member (39) on the mast foot (12), so as to limit the pivoting, forward and backward, of the front part (21) of the arrow holder (5), relative to the arrow (6). Dispositif selon la revendication 13 ou 14, caractérisé en ce que le ou chaque tirant (13, 14) de la flèche (6) comprend une partie arrière (13a, 14a) brochée au sommet de la partie avant (21) du porte-flèche (5) et une partie avant (13b, 14b) séparable de la partie arrière et liée à un point (16, 17) de la flèche (6), l'extrémité avant de la partie arrière (13a, 14a) comportant une chape (57) et l'extrémité arrière de la partie avant (13b, 14b) comportant un tenon (58) de préférence avec lumière ou vice-versa, et des moyens comprenant une élingue (60) et des poulies (61) étant prévus pour le rapprochement des parties arrière (13a, 14a) et avant (13b, 14b) du tirant, en vue de leur liaison par brochage, par un axe liant la chape (57) avec le tenon (58).Device according to claim 13 or 14, characterized in that the or each tie (13, 14) of the arrow (6) comprises a rear part (13a, 14a) embossed at the top of the front part (21) of the arrow holder (5) and a front part (13b, 14b) separable from the rear part and linked to a point (16, 17) of the arrow (6), the front end of the rear part (13a, 14a) comprising a yoke (57) and the rear end of the front part (13b, 14b) comprising a post (58) preferably with light or vice versa, and means comprising a sling (60) and pulleys (61) being provided for the approximation of the rear (13a, 14a) and front (13b, 14b) parts of the tie rod, view of their connection by broaching, by an axis connecting the clevis (57) with the tenon (58). Dispositif selon la revendication 15, caractérisé en ce que, dans le cas d'une flèche (6) à deux lignes de tirants (13,14), les parties arrière (13a, 14a) des deux lignes de tirants sont réunies par une double bielle (82) venant s'accrocher sur un bossage (83) formé autour d'un trou (29) du tenon (28) situé au sommet de la partie avant (21) du porte-flèche (5).Device according to claim 15, characterized in that, in the in the case of an arrow (6) with two lines of tie rods (13,14), the rear parts (13a, 14a) of the two lines of tie rods are joined by a double connecting rod (82) coming hang on a boss (83) formed around a hole (29) of the stud (28) located at the top of the front part (21) of the arrow holder (5). Dispositif selon l'une quelconque des revendications 13 à 16, caractérisé en ce que la partie arrière (22) du porte-flèche (5) comporte des bielles de retenue (48), prévues pour relier le sommet (47) de cette partie arrière (22) au pivot mobile ou au mât-cabine (10), l'extrémité inférieure de chaque bielle (48) portant de préférence une chape (49) prévue pour coopérer avec des pattes (56) du mât-cabine (10), par l'intermédiaire d'un axe de brochage (63) traversant une lumière ménagée dans chaque patte (56).Device according to any one of Claims 13 to 16, characterized in that the rear part (22) of the arrow holder (5) has retaining rods (48), designed to connect the top (47) of this part rear (22) to the movable pivot or to the mast-cabin (10), the lower end of each connecting rod (48) preferably carrying a yoke (49) provided to cooperate with lugs (56) of the cabin mast (10), by means of an axis of pinout (63) passing through a lumen formed in each tab (56). Dispositif selon l'une quelconque des revendications 13 à 17, pour la mise en oeuvre du procédé selon la revendication 5, caractérisé en ce que la partie arrière (22) du porte-flèche (5) comporte une bretelle (53) articulée sur ses montants principaux (42), et prévue pour déporter le point d'attache des élingues de manutention (65).Device according to any one of Claims 13 to 17, for the implementation of the method according to claim 5, characterized in that the rear part (22) of the boom holder (5) comprises a strap (53) articulated on its main uprights (42), and designed to offset the attachment point of the handling slings (65). Dispositif selon l'une quelconque des revendications 13 à 18, pour la mise en oeuvre du procédé selon la revendication 8 ou 9, caractérisé en ce qu'il est prévu une butée arrière qui maintient la position de basculement de la partie arrière (22) du porte-flèche (5), pour maintenir la pré-tension du ou des tirants (19) de la contreflèche (8).Device according to any one of Claims 13 to 18, for the implementation of the method according to claim 8 or 9, characterized in that that a rear stop is provided which maintains the tilting position of the rear part (22) of the jib holder (5), to maintain the pre-tension of the tie rods (19) of the jib (8). Dispositif selon l'une quelconque des revendications 13 à 19, caractérisé en ce que le tenon (28) et la chape (47) complémentaires, prévus aux sommets des parties avant (21) et arrière (22) du porte-flèche (5), comportent des trous (29, 30) antérieurs et postérieurs correspondants, respectivement pour la réalisation d'un brochage d'approche (axe 78) avec jeu, et d'un brochage définitif (axe 79), entre le tenon (28) et la chape (47).Device according to any one of Claims 13 to 19, characterized in that the additional post (28) and the clevis (47), provided to the tops of the front (21) and rear (22) parts of the jib holder (5), have corresponding front and rear holes (29, 30), respectively for carrying out an approach pinout (axis 78) with play, and a final pinout (axis 79), between the tenon (28) and the clevis (47). Dispositif selon la revendication 20, caractérisé en ce que le ou les tirants (19) de la contreflèche (8) comportent, à l'extrémité antérieure, deux bielles de montage (86, 87), à savoir une double bielle (86) assurant la liaison avec des rondelles latérales (85) portées par la chape (47) prévue au sommet de la partie arrière (22) du porte-flèche (5), et une autre bielle notamment en forme de chape (87), logée à l'intérieur de la double bielle (86) et possédant un entraxe légèrement inférieur à celui de la double bielle (86), l'autre bielle (87) étant prévue pour être reliée à un trou arrière (30) du tenon (28) prévu au sommet de la partie avant (21) du porte-flèche (5), avant le brochage définitif.Device according to claim 20, characterized in that the one or more tie rods (19) of the jib (8) have, at the anterior end, two mounting rods (86, 87), namely a double rod (86) ensuring the connection with side washers (85) carried by the yoke (47) provided at the top of the rear part (22) of the jib holder (5), and another connecting rod in particular form of yoke (87), housed inside the double connecting rod (86) and having a center distance slightly less than that of the double connecting rod (86), the other connecting rod (87) being provided to be connected to a rear hole (30) of the stud (28) provided at top of the front part (21) of the arrow holder (5), before the final broaching. Dispositif selon l'une quelconque des revendications 13 à 21, caractérisé en ce qu'est encore prévue, à hauteur intermédiaire du porte-flèche (5), au moins une barre de liaison (81) entre les parties avant (21) et arrière (22) du porte-flèche (5).Device according to any one of Claims 13 to 21, characterized in that it is still provided, at the intermediate height of the arrow holder (5), at least one connecting bar (81) between the front (21) and rear parts (22) of the arrow holder (5). Dispositif selon l'une quelconque des revendications 13 à 22, caractérisé en ce que la base de la partie arrière (22) du porte-flèche (5), l'extrémité antérieure de la contreflèche (8) et le sommet du mât-cabine (10) sont liés entre eux en un seul point, suivant le même axe de brochage (18).Device according to any one of Claims 13 to 22, characterized in that the base of the rear part (22) of the arrow holder (5), the front end of the jib (8) and the top of the cabin mast (10) are linked together at a single point, along the same broaching axis (18). Dispositif selon l'une quelconque des revendications 13 à 23, caractérisé en ce que la base de la partie avant (21) du porte-flèche (5), l'extrémité postérieure de la flèche (6) et le sommet du mât-cabine (10) sont liés entre eux en un seul point, suivant le même axe de brochage (17).Device according to any one of Claims 13 to 23, characterized in that the base of the front part (21) of the arrow holder (5), the rear end of the boom (6) and the top of the mast-cabin (10) are linked together at a single point, along the same broaching axis (17).
    EP00420008A 1999-01-27 2000-01-18 Method and device for mounting of the top of the tower of tower cranes Expired - Lifetime EP1024106B1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    FR9901114 1999-01-27
    FR9901114A FR2788758B1 (en) 1999-01-27 1999-01-27 METHOD AND DEVICE FOR MOUNTING THE MASTER HEAD OF TOWER CRANES

    Publications (2)

    Publication Number Publication Date
    EP1024106A1 true EP1024106A1 (en) 2000-08-02
    EP1024106B1 EP1024106B1 (en) 2005-05-25

    Family

    ID=9541451

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP00420008A Expired - Lifetime EP1024106B1 (en) 1999-01-27 2000-01-18 Method and device for mounting of the top of the tower of tower cranes

    Country Status (8)

    Country Link
    US (1) US6422408B1 (en)
    EP (1) EP1024106B1 (en)
    JP (1) JP2000255983A (en)
    KR (1) KR100684296B1 (en)
    DE (1) DE60020275T2 (en)
    ES (1) ES2241563T3 (en)
    FR (1) FR2788758B1 (en)
    RU (1) RU2258664C2 (en)

    Cited By (8)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP1840076A1 (en) * 2006-03-30 2007-10-03 Manitowoc Crane Group France An assembly for a tower crane made up of a camber and its ballast
    EP1842822A2 (en) * 2006-04-05 2007-10-10 Tgm S.R.L. Crane and method of assembling it
    EP2639196A1 (en) * 2010-10-14 2013-09-18 Changsha Zoomlion Heavy Industry Science & Technology Development Co., Ltd. Tower crane and balance arm tension rod structure thereof and mounting method for the structure
    CN103863953A (en) * 2014-02-13 2014-06-18 徐州建机工程机械有限公司 Rapidly mounted pull rod structure of flat-top crane
    CN104030175A (en) * 2014-05-12 2014-09-10 江苏大通重工有限公司 Connection apparatus for rear-oblique pull rod of miniature tower-type hoisting machinery
    CN105110205A (en) * 2015-09-29 2015-12-02 中建二局第二建筑工程有限公司深圳分公司 Reverse disassembling method for tower crane
    CN107697817A (en) * 2017-10-30 2018-02-16 北京紫竹慧建设服务股份有限公司 A kind of novel tower slings the method that weighing arm becomes length in the air
    US12012313B2 (en) 2018-09-13 2024-06-18 Liebherr-Werk Biberach Gmbh Crane

    Families Citing this family (25)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    ES2332457T3 (en) * 2003-02-25 2010-02-05 Hydralift Amclyde, Inc. RADIAL SUPPORT BEARING FOR CRANE.
    KR100833970B1 (en) 2007-04-27 2008-05-30 케이엔에프중공업주식회사 Swivel apparatus for tower crane
    DE202008004663U1 (en) * 2008-04-04 2009-08-13 Liebherr-Werk Ehingen Gmbh Lattice boom crane and lattice boom
    DE102008038775B4 (en) * 2008-08-12 2011-03-03 Frans Verheijen Tower Crane
    CN101880012A (en) * 2010-07-21 2010-11-10 上海三一科技有限公司 Transition structure for crane jib
    BRPI1100106B1 (en) * 2011-01-20 2022-08-23 Passini Montagem, Comércio E Locação De Equipamentos Ltda – Me TOWER CRANE AND METHOD OF ASSEMBLY, DISASSEMBLY AND ASCENSION DISPLACEMENT IN ELEVATOR WELL
    EP2797830B1 (en) 2011-12-30 2016-03-09 National Oilwell Varco, L.P. Deep water knuckle boom crane
    CN102616680A (en) * 2012-04-05 2012-08-01 中联重科股份有限公司 Tower crane connecting plate and tower crane with same
    CN102745607B (en) * 2012-07-26 2015-08-19 中联重科股份有限公司 Balance arm and tower crane
    CN102942124B (en) * 2012-11-15 2015-02-11 中联重科股份有限公司 Tower crane
    CN102922280B (en) * 2012-11-15 2016-02-03 中联重科股份有限公司 Tower crane boom mounting method and auxiliary mounting pull rod applied by same
    CN103071989B (en) * 2012-11-15 2015-07-01 中联重科股份有限公司 Tower crane boom segmented installation method and auxiliary installation stay bar thereof
    CN104981424B (en) 2012-12-13 2017-07-28 国民油井华高有限合伙公司 Long-range fluctuation compensation system
    CN104528547A (en) * 2014-12-30 2015-04-22 徐州建机工程机械有限公司 Cargo boom pull rod structure, cargo boom and crane
    FR3046152B1 (en) * 2015-12-23 2017-12-29 Manitowoc Crane Group France LIFTING UNIT, RECEIVABLE CRANE CRANE COMPRISING SUCH A LIFTING UNIT AND METHOD FOR ASSEMBLING SUCH CRANE
    CN106195549B (en) * 2016-08-18 2019-03-08 维高时代(北京)科技有限公司 A kind of vehicle-mounted camera rockerarm
    CN106081910A (en) * 2016-08-18 2016-11-09 无锡石油化工起重机有限公司 Possesses the derrick crane of diversification information collection function
    KR101831409B1 (en) * 2016-08-19 2018-02-22 주식회사 에버다임 Tower crane
    CN107082376B (en) * 2016-11-22 2018-02-09 唐汉庆 A kind of tower crane device for construction
    CN107082367B (en) * 2016-11-22 2018-03-13 裘润波 A kind of tower crane device in construction site
    CN107215788B (en) * 2017-06-20 2019-01-08 朗丝窗饰有限公司 The anti-kink structure of building tower crane device
    DE202017107301U1 (en) 2017-09-01 2018-12-07 Liebherr-Werk Biberach Gmbh Tower Crane
    DE102018101705A1 (en) 2018-01-25 2019-07-25 Liebherr-Werk Biberach Gmbh tower crane
    CN109435915A (en) * 2018-10-23 2019-03-08 江苏威龙新能源汽车有限公司 A kind of battery boom hoisting for new-energy automobile
    CN113415740B (en) * 2021-08-04 2023-08-18 上海振华重工(集团)股份有限公司 Guide frame on front girder of quay crane and installation method thereof

    Citations (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    GB965025A (en) * 1961-07-31 1964-07-29 Potain & Cie Ets F Improvements in or relating to foldable tower cranes
    FR2551041A1 (en) * 1983-08-22 1985-03-01 Harnischfeger Corp ARTICULATION DEVICE FOR A TOWER CRANE HAVING AN INACTIVE OR STORAGE POSITION
    EP0635450A1 (en) 1993-06-22 1995-01-25 Potain Method and device for mounting the jibs of tower cranes
    EP0846650A1 (en) 1996-12-03 1998-06-10 Potain Method and device for mounting jib tension elements on tower cranes

    Family Cites Families (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US844990A (en) * 1906-03-17 1907-02-19 William L Allan Derrick.
    US2049653A (en) * 1934-04-23 1936-08-04 American Hoist & Derrick Co Excavating machine
    US4569453A (en) * 1982-01-28 1986-02-11 Amca International Loading and unloading crane and method of operation therefor
    NL8303181A (en) 1983-09-15 1985-04-01 Texas Industries Inc TRACTOR FITTED WITH A LIFTING DEVICE.
    DE3510116A1 (en) * 1984-04-25 1985-10-31 Liebherr-Werk Biberach Gmbh, 7950 Biberach Tower crane slewing at the top

    Patent Citations (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    GB965025A (en) * 1961-07-31 1964-07-29 Potain & Cie Ets F Improvements in or relating to foldable tower cranes
    FR2551041A1 (en) * 1983-08-22 1985-03-01 Harnischfeger Corp ARTICULATION DEVICE FOR A TOWER CRANE HAVING AN INACTIVE OR STORAGE POSITION
    EP0635450A1 (en) 1993-06-22 1995-01-25 Potain Method and device for mounting the jibs of tower cranes
    EP0846650A1 (en) 1996-12-03 1998-06-10 Potain Method and device for mounting jib tension elements on tower cranes

    Cited By (13)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP1840076A1 (en) * 2006-03-30 2007-10-03 Manitowoc Crane Group France An assembly for a tower crane made up of a camber and its ballast
    FR2899217A1 (en) * 2006-03-30 2007-10-05 Potain Soc Par Actions Simplif "ASSEMBLY CONSISTING OF A COUNTER-ARROW AND ITS LEST, FOR CRANE A TOUR"
    EP1842822A2 (en) * 2006-04-05 2007-10-10 Tgm S.R.L. Crane and method of assembling it
    EP1842822A3 (en) * 2006-04-05 2009-02-18 Tgm S.R.L. Crane and method of assembling it
    EP2639196A1 (en) * 2010-10-14 2013-09-18 Changsha Zoomlion Heavy Industry Science & Technology Development Co., Ltd. Tower crane and balance arm tension rod structure thereof and mounting method for the structure
    EP2639196A4 (en) * 2010-10-14 2014-03-12 Zoomlion Heavy Ind Sci & Tech Tower crane and balance arm tension rod structure thereof and mounting method for the structure
    CN103863953A (en) * 2014-02-13 2014-06-18 徐州建机工程机械有限公司 Rapidly mounted pull rod structure of flat-top crane
    CN104030175A (en) * 2014-05-12 2014-09-10 江苏大通重工有限公司 Connection apparatus for rear-oblique pull rod of miniature tower-type hoisting machinery
    CN105110205A (en) * 2015-09-29 2015-12-02 中建二局第二建筑工程有限公司深圳分公司 Reverse disassembling method for tower crane
    CN105110205B (en) * 2015-09-29 2017-09-19 中建二局第二建筑工程有限公司深圳分公司 A kind of reverse method for dismounting of derrick crane
    CN107697817A (en) * 2017-10-30 2018-02-16 北京紫竹慧建设服务股份有限公司 A kind of novel tower slings the method that weighing arm becomes length in the air
    CN107697817B (en) * 2017-10-30 2019-01-18 北京紫竹慧建设服务股份有限公司 A kind of method of tower crane crane arm elongated degree in the air
    US12012313B2 (en) 2018-09-13 2024-06-18 Liebherr-Werk Biberach Gmbh Crane

    Also Published As

    Publication number Publication date
    JP2000255983A (en) 2000-09-19
    ES2241563T3 (en) 2005-11-01
    FR2788758A1 (en) 2000-07-28
    EP1024106B1 (en) 2005-05-25
    DE60020275T2 (en) 2006-05-11
    RU2258664C2 (en) 2005-08-20
    KR20000053630A (en) 2000-08-25
    DE60020275D1 (en) 2005-06-30
    FR2788758B1 (en) 2001-02-23
    KR100684296B1 (en) 2007-02-20
    US6422408B1 (en) 2002-07-23

    Similar Documents

    Publication Publication Date Title
    EP1024106B1 (en) Method and device for mounting of the top of the tower of tower cranes
    EP1468955B1 (en) Dismountable assembly device for jib elements of a tower crane
    EP0635450B1 (en) Method and device for mounting the jibs of tower cranes
    EP1184328B1 (en) Cable arrangement for tower crane
    EP1031530B1 (en) Device for simultaneously folding or unfolding elements of the tip of the crane-jib
    EP1667931B1 (en) Lifting device
    EP0846650B1 (en) Method and device for mounting jib tension elements on tower cranes
    EP1048605B1 (en) Multiple function crane with telescope jib
    EP1301431B1 (en) Articulated jib crane
    EP0468907A1 (en) Pliable supporting-console for wall-forms
    FR2688378A1 (en) FRONT LIFTING DEVICE, FOR AGRICULTURAL TRACTOR OR THE LIKE, AND WEIGHT HOLDER FOR SUCH A DEVICE.
    EP0360702B1 (en) Collapsible crane with a jib comprising two or three elements articulating upon one another
    CA2377356A1 (en) Apparatus for handling a load, vehicle including it and process for elevating a load with such a vehicle
    EP0870726B1 (en) Self erecting crane with a sideways foldable jib in the transport position
    FR2906798A1 (en) CHASSIS WITH SUPPORT ARMS FOR LIFT UNIT
    EP0612899A1 (en) Scaffolding-platform and method for erecting scaffolds with such platform
    FR2867497A1 (en) Concrete block stripping assistance device for use in building construction, has base mounted on wheels for carrying support mast, and mast head to be stopped against nearby stripping plate or concrete slab during lifting of telescopic mast
    EP1057776B1 (en) Articulated jib crane
    FR2662579A1 (en) Spraying boom for moving vehicle (machine)
    FR2636616A1 (en) Folding crane with a gib having two or three mutually articulated elements.
    FR2838415A1 (en) DEVICE FOR LIFTING AND FILLING THE MAT AND TILTING THE ARROW OF A CRANE
    FR2956424A1 (en) Cantilever working platform for manufacturing construction equipment, has frame supported and fixed against load-bearing wall or on slab by floor, and anchoring device integrated to floor
    FR2520211A1 (en) Variable orientation cantilevered parasol - has central mast pivoted to end of radial support arm and supporting two independent hubs to which ribs and counter-ribs are hinged
    FR2570362A1 (en) Method for installing a gantry crane intended in particular for loading and unloading containers, installation for the implementation of this method and gantry crane obtained
    FR2986543A1 (en) Frame for roof or canopy of fast restaurant, has swiveling articulations designed to articulate rafter, and set of connecting units arranged for deployment of rafter and for deployment of set of articulations and tie-beam

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): CH DE ES IT LI

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    17P Request for examination filed

    Effective date: 20001030

    AKX Designation fees paid

    Free format text: CH DE ES IT LI

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): CH DE ES IT LI

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REF Corresponds to:

    Ref document number: 60020275

    Country of ref document: DE

    Date of ref document: 20050630

    Kind code of ref document: P

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: NV

    Representative=s name: CABINET GERMAIN & MAUREAU

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FG2A

    Ref document number: 2241563

    Country of ref document: ES

    Kind code of ref document: T3

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060131

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060131

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20060228

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: ES

    Payment date: 20100129

    Year of fee payment: 11

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: IT

    Payment date: 20100122

    Year of fee payment: 11

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20100113

    Year of fee payment: 11

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R119

    Ref document number: 60020275

    Country of ref document: DE

    Effective date: 20110802

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110118

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FD2A

    Effective date: 20120220

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110119

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110802