CN104528547A - Cargo boom pull rod structure, cargo boom and crane - Google Patents
Cargo boom pull rod structure, cargo boom and crane Download PDFInfo
- Publication number
- CN104528547A CN104528547A CN201410838889.0A CN201410838889A CN104528547A CN 104528547 A CN104528547 A CN 104528547A CN 201410838889 A CN201410838889 A CN 201410838889A CN 104528547 A CN104528547 A CN 104528547A
- Authority
- CN
- China
- Prior art keywords
- lug plate
- plate
- tower top
- crane
- lug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/64—Jibs
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
The invention discloses a cargo boom pull rod structure. The cargo boom pull rod structure comprises a single-lug plate, double-lug plates, a connecting shaft and a blocking part, wherein the double-lug plate is arranged at the inner side of the tower top, two groups of corresponding connecting holes are formed at two ends of the double-lug plate, the single-lug plate is arranged between the double-lug plates, connecting holes are formed at two ends of the single-lug plate, the connecting shaft penetrates through the tower top and the connecting holes on the double-lug plate and the single-lug plate, and the blocking part is arranged between the two sides of the double-lug plate and the tower top. According to the cargo boom pull rod structure, a pull rod is connected with the tower top through transition of the single-lug plate and the double-lug plates, a pulling plate assembly with complex structure is removed, the using performance is met, the connecting mode is simplified, the vertical tower can be installed conveniently, and the working efficiency of the vertical tower is improved.
Description
Technical field
The present invention relates to a kind of tower crane, specifically a kind of crane arm Tiebar structure, crane arm and hoisting crane.
Background technology
Existing crane arm pull bar carries out combined mounting structure form by arm-tie assembly and tower top, and tower top part as depicted in figs. 1 and 2, installs long bi-lug plate 2 outside tower top 1, assembles short bi-lug plate 3 inside tower top; As shown in Figure 3, be assembled into primarily of the first connecting panel 4, second connecting panel 5, the 3rd connecting panel 6, the first connecting panel 4 and the 3rd connecting panel 6 are arranged on the second connecting panel 5 arm-tie components; During assembling hoisting crane pull bar, arm-tie assembly is arranged on the tower top assembled, namely the first connecting panel 4 is placed between long bi-lug plate 2 and passes through pinned connection, 3rd connecting panel 6 is placed on short bi-lug plate 3 pinned connection, and then long draw 7 is connected with arm-tie assembly with short rod 8, this version is complicated, traffic cost, manufacturing cost are high, production cycle is long, and arm-tie assembly is not mounted on tower top when delivery, mainly carry out when Ta Xiangchang assembling, it is consuming time that complicated work consuming is installed in vertical tower phase field.
In prior art, the material of otic placode adopts dead-soft steel usually, and as a further improvement on the present invention, described monaural plate and described bi-lug plate adopt high strength steel, while proof strength, reduce otic placode weight.
To sum up, compared with prior art, the present invention selects single bi-lug plate transition to be connected with tower top by pull bar, eliminate baroque arm-tie assembly, simplify connection mode while meeting in-use performance, be convenient to vertical tower is installed, reasonably design the length of single, double otic placode simultaneously especially.Its advantage is as follows:
1, version is simple, and production and processing is convenient.Arm-tie instead of complicated arm-tie kit form, and structure is simple, improves the production cycle, reduces productive costs, improves the efficiency of production and processing.
2, installation, convenient disassembly.Do not need pretty troublesome original arm-tie assembly lifting being installed to tower top place when installing, dismantling, improve installation effectiveness yet.
The present invention also provides a kind of crane arm being provided with above-mentioned crane arm Tiebar structure.Because above-mentioned crane arm Tiebar structure has above-mentioned technique effect, therefore, the crane arm being provided with this Tiebar structure also should possess corresponding technique effect.
In addition the present invention's also a kind of hoisting crane being provided with above-mentioned crane arm, this crane arm is removably connected to described hoisting crane.Equally also should possess above-mentioned corresponding technique effect.
Summary of the invention
For above-mentioned prior art Problems existing, the invention provides a kind of crane arm Tiebar structure, crane arm and hoisting crane, convenient installation, connection mode of optimizing structure, reduces installation, manufacturing cost,
To achieve these goals, a kind of crane arm Tiebar structure of the present invention, comprises monaural plate, bi-lug plate, adapter shaft, and barrier parts; Described bi-lug plate is positioned at inside tower top, and bi-lug plate two ends are provided with two groups of corresponding connecting bores; Described monaural plate is between bi-lug plate, and monaural plate two ends are provided with connection hole; Three is connected with the connecting bore on monaural plate through tower top, bi-lug plate by described adapter shaft; Described barrier parts are arranged between bi-lug plate both sides and tower top.
Bi-lug plate is arranged on inside tower top, and and have space between tower top, vibration is produced in crane job, the bi-lug plate on adapter shaft and monaural plate can be made to rock, in order to prevent the generation of rocking, barrier parts are installed between bi-lug plate both sides and tower top, as further scheme of the present invention, these barrier parts are spacer, and spacer is set on adapter shaft, fill up the space between bi-lug plate and tower top.
Accompanying drawing explanation
Fig. 1 is prior art structural representation;
Fig. 2 be in Fig. 1 B-B to cutaway view;
Fig. 3 is prior art arm-tie assembly schematic diagram
Fig. 4 is structural representation of the present invention;
Fig. 5 be in Fig. 4 B-B to cutaway view;
In figure: 1, tower top, 2, long bi-lug plate, 3, short bi-lug plate, the 4, first connecting panel, the 5, second connecting panel, the 6, the 3rd connecting panel, 7, long draw, 8, short rod, 9, monaural plate, 10, bi-lug plate, 11, adapter shaft, 12, spacer.
Detailed description of the invention
In order to make those skilled in the art person understand the present invention program better, below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
As shown in Figure 4 and Figure 5, crane arm Tiebar structure of the present invention, comprises monaural plate 9, bi-lug plate 10, adapter shaft 11, and barrier parts; Bi-lug plate 10 is positioned at inside tower top 1, and bi-lug plate 10 two ends are provided with two groups of corresponding connecting bores; Monaural plate 9 is between bi-lug plate 10, and monaural plate 9 two ends are provided with connection hole; Three is connected with the connecting bore on monaural plate 9 through tower top 1, bi-lug plate 10 by adapter shaft 11; Barrier parts are arranged between bi-lug plate 10 both sides and tower top 1.
In crane job, produce vibration, the bi-lug plate 10 on adapter shaft 11 being made to rock with monaural plate 9, in order to prevent connecting shakiness, barrier parts being installed between bi-lug plate both sides and tower top.A kind of embodiment of barrier parts of the present invention is spacer 12, and spacer 12 is set on adapter shaft 11, fills up the space between bi-lug plate 10 and tower top 1.
On the basis of said structure, monaural plate 9 and described bi-lug plate 10 adopt high strength steel to make, and compared with being material, while ensure that intensity, reduce otic placode weight with existing employing dead-soft steel.
The present invention's single, double otic placode 9,10 transition, is connected pull bar with tower top, eliminates baroque arm-tie assembly in prior art, the simultaneously size of the single, double otic placode 9,10 of reasonably optimizing especially, monaural plate 9 length is 950mm, and bi-lug plate length is 1050mm, to reduce pull bar kind.
The present invention also provides a kind of crane arm being provided with above-mentioned crane arm Tiebar structure.Because above-mentioned crane arm Tiebar structure has above-mentioned technique effect, therefore, the crane arm being provided with this Tiebar structure also should possess corresponding technique effect.In addition the present invention's also a kind of hoisting crane being provided with above-mentioned crane arm, this crane arm is removably connected to described hoisting crane.Equally also should possess above-mentioned corresponding technique effect.
Claims (5)
1. a crane arm Tiebar structure, is characterized in that, comprises monaural plate (9), bi-lug plate (10), adapter shaft (11), and barrier parts;
Described bi-lug plate (10) is positioned at tower top (1) inner side, and bi-lug plate (10) two ends are provided with two groups of corresponding connecting bores;
Described monaural plate (9) is positioned between bi-lug plate (10), and monaural plate (9) two ends are provided with connection hole;
Three is connected with the connecting bore on monaural plate (9) through tower top (1), bi-lug plate (10) by described adapter shaft (11);
Described barrier parts are arranged between bi-lug plate (10) both sides and tower top (1).
2. crane arm Tiebar structure according to claim 1, is characterized in that, described barrier parts are spacer (12), and spacer (12) is set on adapter shaft (11), fill up the space between bi-lug plate (10) and tower top (1).
3. crane arm Tiebar structure according to claim 1 and 2, is characterized in that, described monaural plate (9) and described bi-lug plate (10) adopt high strength steel.
4. a crane arm, is characterized in that, comprises the crane arm Tiebar structure as described in any one of claim 1-3.
5. a hoisting crane, is characterized in that, comprises crane arm as claimed in claim 4, and described crane arm is removably connected to described hoisting crane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410838889.0A CN104528547A (en) | 2014-12-30 | 2014-12-30 | Cargo boom pull rod structure, cargo boom and crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410838889.0A CN104528547A (en) | 2014-12-30 | 2014-12-30 | Cargo boom pull rod structure, cargo boom and crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104528547A true CN104528547A (en) | 2015-04-22 |
Family
ID=52844246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410838889.0A Pending CN104528547A (en) | 2014-12-30 | 2014-12-30 | Cargo boom pull rod structure, cargo boom and crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104528547A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105384089A (en) * | 2015-10-30 | 2016-03-09 | 徐州建机工程机械有限公司 | Tower crane cargo boom pull rod structure |
CN106429897A (en) * | 2016-10-31 | 2017-02-22 | 徐州建机工程机械有限公司 | Fixing device for cargo boom pull rod |
CN106904543A (en) * | 2017-03-02 | 2017-06-30 | 哈尔滨理工大学 | A kind of new derrick runway girder pull bar installation plate pulling device |
CN109502477A (en) * | 2018-12-21 | 2019-03-22 | 中铁九桥工程有限公司 | A kind of large-tonnage bridge floor crane anchoring rod system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6422408B1 (en) * | 1999-01-27 | 2002-07-23 | Potain | Method and device for mounting the masthead of tower cranes |
CN202492307U (en) * | 2011-12-01 | 2012-10-17 | 中联重科股份有限公司 | Connecting joint for crane arm pull rod and tower crane with same |
CN202924633U (en) * | 2012-11-15 | 2013-05-08 | 中联重科股份有限公司 | Cargo boom pull rod and tower crane comprising cargo boom pull rod |
CN103287995A (en) * | 2013-06-03 | 2013-09-11 | 哈尔滨华拓金属结构有限公司 | Supporting pulling plate type boom pull rod of tower crane and installation method |
CN204434136U (en) * | 2014-12-30 | 2015-07-01 | 徐州建机工程机械有限公司 | Crane arm Tiebar structure, crane arm and hoisting crane |
-
2014
- 2014-12-30 CN CN201410838889.0A patent/CN104528547A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6422408B1 (en) * | 1999-01-27 | 2002-07-23 | Potain | Method and device for mounting the masthead of tower cranes |
CN202492307U (en) * | 2011-12-01 | 2012-10-17 | 中联重科股份有限公司 | Connecting joint for crane arm pull rod and tower crane with same |
CN202924633U (en) * | 2012-11-15 | 2013-05-08 | 中联重科股份有限公司 | Cargo boom pull rod and tower crane comprising cargo boom pull rod |
CN103287995A (en) * | 2013-06-03 | 2013-09-11 | 哈尔滨华拓金属结构有限公司 | Supporting pulling plate type boom pull rod of tower crane and installation method |
CN204434136U (en) * | 2014-12-30 | 2015-07-01 | 徐州建机工程机械有限公司 | Crane arm Tiebar structure, crane arm and hoisting crane |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105384089A (en) * | 2015-10-30 | 2016-03-09 | 徐州建机工程机械有限公司 | Tower crane cargo boom pull rod structure |
CN106429897A (en) * | 2016-10-31 | 2017-02-22 | 徐州建机工程机械有限公司 | Fixing device for cargo boom pull rod |
CN106904543A (en) * | 2017-03-02 | 2017-06-30 | 哈尔滨理工大学 | A kind of new derrick runway girder pull bar installation plate pulling device |
CN109502477A (en) * | 2018-12-21 | 2019-03-22 | 中铁九桥工程有限公司 | A kind of large-tonnage bridge floor crane anchoring rod system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104528547A (en) | Cargo boom pull rod structure, cargo boom and crane | |
CN204434136U (en) | Crane arm Tiebar structure, crane arm and hoisting crane | |
CN202707051U (en) | Adjustable coal blocking device and coal mining machine | |
CN204288714U (en) | Spherical LED display | |
CN201494993U (en) | Precoder machine-room-less elevator tractor | |
CN206242901U (en) | Automobile engine bracket reinforcement structure | |
CN205392968U (en) | Electronic sand screen is used in construction | |
CN204210295U (en) | A kind of anti-pull bar of turning round suspends | |
CN208293615U (en) | A kind of pre-fabricated electric cables straight line well | |
CN205400038U (en) | Exempt from stupefied vertical template structure of back of body | |
CN104315249B (en) | Pipeline industry installation method | |
CN103147513B (en) | Spatial Cable net and change the method for rope | |
CN203379745U (en) | Filter with supporting structure | |
CN203920900U (en) | Capstan winch connection structure before a kind of commercial vehicle/comm..vehicle | |
CN206099680U (en) | Hydroelectric set rotor magnetic pole dismouting specialized tool | |
CN202767147U (en) | Wheel excavator landing legs and dozer blade installation assembly | |
CN203477870U (en) | Combined aluminum alloy section bar | |
CN204692771U (en) | A kind of integrated steel pipe | |
CN203656125U (en) | Reduction gearbox body | |
CN204175538U (en) | Concrete pump | |
CN201997464U (en) | Sieve plate installing structure | |
CN210768287U (en) | Hinge assembly on washing machine | |
CN203505039U (en) | Push-pull rod for connection | |
CN203373798U (en) | Upper frame of excavator and excavator | |
CN202140749U (en) | Machine frame shield plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150422 |
|
RJ01 | Rejection of invention patent application after publication |