CN106904543A - A kind of new derrick runway girder pull bar installation plate pulling device - Google Patents
A kind of new derrick runway girder pull bar installation plate pulling device Download PDFInfo
- Publication number
- CN106904543A CN106904543A CN201710119949.7A CN201710119949A CN106904543A CN 106904543 A CN106904543 A CN 106904543A CN 201710119949 A CN201710119949 A CN 201710119949A CN 106904543 A CN106904543 A CN 106904543A
- Authority
- CN
- China
- Prior art keywords
- adjustable plate
- plate
- pulling device
- interior
- short rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
Invention describes a kind of new derrick runway girder pull bar installation plate pulling device, mainly by outer adjustable plate(Sequence number 1)With interior adjustable plate(Sequence number 2)Composition, both pass through hinge.Outer adjustable plate is connected by bearing pin one end with long draw, and the connection of outer adjustable plate and tower top outer arm-tie is realized by hoist rope;Interior adjustable plate is connected by bearing pin one end with short rod, realizes that interior arm-tie departs from the dismounting of outer arm-tie by hoist rope after outer adjustable plate is connected and finished, and adjustable plate is connected with arm-tie in tower top in completion.The invention has the advantages that cancelling pulley, the connecting plate of original pull bar device, interior adjustable plate is adjusted to single plate structure, and reduces tower top assembly pulley quantity, effective reduces cost;Steel wire rope suspension centre is set on short rod, controllability and the flexibility of interior adjustable plate is realized, installation difficulty is reduced, the security in installation process is improved;Plate pulling device is designed as dismountable structure type, thus with applicable ability it is strong, be widely used the characteristics of.
Description
Technical field
Patent of the present invention is related to derrick crane to manufacture field, the particularly installation of derrick runway girder pull bar.
Background technology
Recently as the fast development of China's economy, the quickening of Development of China's Urbanization, the use of derrick crane is increasingly
Extensively, this gives the manufacture of derrick crane, installs proposition requirement higher.Existing lifting arm brace device structure such as Fig. 1-3 institutes
Show, scheme of installation is as shown in figure 4, tower top is using sister block structure (shown in Fig. 5), when pull bar is installed, hoist rope(Fig. 4
Sequence number 4)Pass sequentially through tower top pulley I(Fig. 4 sequence numbers 1), plate pulling device pulley(Fig. 4 sequence numbers 3), tower top pulley II(Fig. 4 sequence numbers 1)Afterwards
It is fixed on the outer adjustable plate suspension centre of plate pulling device, starts raising structure, the company of plate pulling device and outer arm-tie in tower top is realized by bearing pin
Connect, due to outer adjustable plate(Fig. 4 sequence numbers 5)With interior adjustable plate(Fig. 4 sequence numbers 9)Type of attachment is non-removable structure type, because
This completes outer adjustable plate and tower top outer arm-tie(Fig. 4 sequence numbers 2)Fixation after, the position of interior adjustable plate is to maintain static, while
It is adjustable plate and tower top in realizing because the interference of pulley makes interior adjustable plate section to realize the fixation of steel wire rope and interior adjustable plate
Interior arm-tie(Fig. 4 sequence numbers 10)Fixation just can only be by connecting plate(Fig. 4 sequence numbers 8)Machining accuracy ensure, simultaneously because peace
It is work high above the ground during dress, is influenceed by complex working conditions such as wind loads, increase installation difficulty, influences the safety of operating personnel
Property.Therefore this kind of structure type presence is more expensive to manufacture, installation procedure is complicated, installation effectiveness is low, installation process security is low
The problems such as.
The content of the invention
The present invention proposes a kind of New crane arm brace plate pulling device structure, solves pull bar device manufacturing cost in the prior art
High, installation procedure is complicated, installation effectiveness is low, the low problem of installation process security.
The present invention is a kind of derrick runway girder pull bar plate pulling device structure design:It is made up of outer adjustable plate and interior adjustable plate, two
Person cancels plate pulling device pulley, connecting plate by hinge, and interior adjustable plate is adjusted to single plate structure, while by tower top pulley number
Amount reduces 1(As shown in Figure 7), structure type is simple, low cost of manufacture;Steel wire rope suspension centre is set on short rod, is realized interior
The controllability of adjustable plate and flexibility, reduce installation difficulty, improve the security in installation process;Because plate pulling device is designed as
Dismountable structure type and suspension centre is set on short rod, can be according to crane arm, the weight of lifting arm brace and lifting mechanism
Lifting capacity be adjusted in lifting long draw and connect after, recurrence is hung short rod and is connected, thus with applicable ability it is strong, answer
Use extensive advantage.
Beneficial effects of the present invention are:The installation procedure of lifting arm brace can be simplified, manufacturing cost is reduced, improved and installed
The flexibility of process and efficiency, improve the security in installation process, while having the characteristics of being widely used.
Brief description of the drawings
It is of the invention by taking the lifting arm brace installation process of domestic certain tower crane model as an example for ease of explanation, by following
Specific implementation and accompanying drawing are described in detail.
The existing plate pulling device mounting structure figures of Fig. 1;
Fig. 2 Section A-A figures;
Fig. 3 section B-B figures;
The existing plate pulling device scheme of installations of Fig. 4;
Fig. 5 C-C schematic cross-sections;
Fig. 6 is long draw scheme of installation;
Fig. 7 is D-D schematic cross-sections;
Fig. 8 is that adjustable plate disassembles schematic diagram inside and outside pull bar device;
Fig. 9 is short rod scheme of installation;
Figure 10 is single use the outer adjustable plate of pull bar device and installs long draw schematic diagram;
Figure 11 is single use adjustable plate in pull bar device and installs short rod schematic diagram;
In Fig. 9:
Sequence number 1:Tower top pulley, sequence number 2:Hoist rope, sequence number 3:Tower top outer arm-tie, sequence number 4:Pull bar device outer adjustable plate, sequence
Numbers 5:Long draw, sequence number 6:Short rod, sequence number 7:Adjustable plate, sequence number 8 in pull bar device:Arm-tie in tower top.
Specific embodiment
It is specific below by what is shown in accompanying drawing to make the object, technical solutions and advantages of the present invention of greater clarity
Embodiment describes the present invention.However, it should be understood that these descriptions are merely illustrative, and it is not intended to limit model of the invention
Enclose.Additionally, in the following description, the description to known features and technology is eliminated, it is of the invention to avoid unnecessarily obscuring
Concept.
With reference to accompanying drawing to being originally described in further detail, accompanying drawing is simplified schematic diagram, only illustrates in a schematic way
This basic structure, therefore it only shows the structure relevant with sheet.
Long draw is installed and illustrates the installation as shown in fig. 6, to realize crane arm long draw and short rod, is needed first by plate pulling device
Outer adjustable plate(Sequence number 4)With interior adjustable plate(Sequence number 7)Respectively with crane arm long draw(Sequence number 5), short rod(Sequence number 6)Connection,
By hoisting mechanism steel wire rope(Sequence number 2)Directly it is fixed with outer adjustable plate suspension centre after bypassing tower top pulley, starts lifting mechanism,
Plate pulling device is driven to realize docking and fixation for the outer adjustable plate of pull bar device and tower top outer arm-tie.
The outer adjustable plate of plate pulling device and interior adjustable plate disassemble signal as shown in figure 8, by raising structure steel wire rope(Sequence number 2)With
Short rod(Sequence number 6)Suspension centre is fixed and starts lifting mechanism adjustment tightening force, completes the dismounting of inside and outside adjustable plate.
The installation signal of short rod as shown in figure 9, respectively have one degree of freedom at adjustable plate and tower top outer arm-tie in plate pulling device,
Can easily achieve a butt joint and be fixed with bearing pin.
Pull bar device outer adjustable plate is used alone long draw signal is installed as shown in Figure 10, by outer regulation after plate pulling device is disassembled
Plate is individually attached with long draw, realizes the connection and fixation of long draw and tower top.
Adjustable plate in pull bar device is used alone short rod signal is installed as shown in figure 11, by interior regulation after plate pulling device is disassembled
Plate is individually attached with short rod, realizes the connection and fixation of short rod and tower top.
General principle of the invention, principal character and advantages of the present invention has been shown and described above.The technology of the industry
Personnel it should be appreciated that the present invention is not limited to the above embodiments, simply explanation described in above-described embodiment and specification this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and its
Equivalent thereof.
Claims (4)
1. a kind of new derrick runway girder pull bar installation plate pulling device, is mainly made up of outer adjustable plate and interior adjustable plate, both
By hinge, cancel former plate pulling device pulley and adjustable plate, steel wire rope suspension centre is set on short rod, while plate pulling device is designed
For dismountable structure type is used with according to the selection of the lifting capacity of different crane arms, lifting arm brace weight and lifting mechanism
Mode.
2. the plate pulling device structure type according to right 1, is made up of outer adjustable plate and interior adjustable plate, and both are cut with scissors by bearing pin
Connect, cancel plate pulling device pulley, connecting plate, interior adjustable plate is adjusted to single plate structure, while tower top pulley quantity is reduced into 1, tool
There is structure type simple, the characteristics of low cost of manufacture.
3. according to right 1, steel wire rope suspension centre is set on short rod, controllability and the flexibility of interior adjustable plate is realized,
Installation difficulty is reduced, the security in installation effectiveness and installation process is improved.
4. according to right 1, because plate pulling device is designed as dismountable structure type and on short rod sets suspension centre, can root
It is adjusted to after lifting long draw and connection according to the lifting capacity of crane arm, the weight of lifting arm brace and lifting mechanism, recurrence
Hang short rod and connect, therefore with applicable ability is strong, widely used advantage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119949.7A CN106904543A (en) | 2017-03-02 | 2017-03-02 | A kind of new derrick runway girder pull bar installation plate pulling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119949.7A CN106904543A (en) | 2017-03-02 | 2017-03-02 | A kind of new derrick runway girder pull bar installation plate pulling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106904543A true CN106904543A (en) | 2017-06-30 |
Family
ID=59186673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710119949.7A Pending CN106904543A (en) | 2017-03-02 | 2017-03-02 | A kind of new derrick runway girder pull bar installation plate pulling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106904543A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000247578A (en) * | 1999-02-26 | 2000-09-12 | Taisei Corp | Simply handling wire tension machine |
CN104528547A (en) * | 2014-12-30 | 2015-04-22 | 徐州建机工程机械有限公司 | Cargo boom pull rod structure, cargo boom and crane |
CN204342318U (en) * | 2014-12-09 | 2015-05-20 | 徐州建机工程机械有限公司 | Single pulley type crane arm pull bar |
CN204384748U (en) * | 2014-12-30 | 2015-06-10 | 湖南大汉至诚建设机械有限公司 | A kind of crane arm pull bar tap shelf structure |
CN105384089A (en) * | 2015-10-30 | 2016-03-09 | 徐州建机工程机械有限公司 | Tower crane cargo boom pull rod structure |
CN106365050A (en) * | 2016-11-10 | 2017-02-01 | 徐州建机工程机械有限公司 | Novel pull rod fast installation structure |
-
2017
- 2017-03-02 CN CN201710119949.7A patent/CN106904543A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000247578A (en) * | 1999-02-26 | 2000-09-12 | Taisei Corp | Simply handling wire tension machine |
CN204342318U (en) * | 2014-12-09 | 2015-05-20 | 徐州建机工程机械有限公司 | Single pulley type crane arm pull bar |
CN104528547A (en) * | 2014-12-30 | 2015-04-22 | 徐州建机工程机械有限公司 | Cargo boom pull rod structure, cargo boom and crane |
CN204384748U (en) * | 2014-12-30 | 2015-06-10 | 湖南大汉至诚建设机械有限公司 | A kind of crane arm pull bar tap shelf structure |
CN105384089A (en) * | 2015-10-30 | 2016-03-09 | 徐州建机工程机械有限公司 | Tower crane cargo boom pull rod structure |
CN106365050A (en) * | 2016-11-10 | 2017-02-01 | 徐州建机工程机械有限公司 | Novel pull rod fast installation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109231023B (en) | Method for installing jib system of portal crane | |
CN204917648U (en) | Turbine rotor lifts by crane instrument | |
CN205114902U (en) | Device of demolising that attaches wall pull rod of high void tower formula hoist | |
CN103991800A (en) | Roof surface crane for building | |
CN101701499B (en) | Hoisting method for mounting steel chimney tower | |
CN204778366U (en) | Handling hoist is coiled to three -jaw formula steel wire | |
CN205985954U (en) | Transformer substation's " V type " suspends strain insulator string hoisting support in midair | |
CN203159080U (en) | Floating-type crane | |
CN106904543A (en) | A kind of new derrick runway girder pull bar installation plate pulling device | |
CN209242474U (en) | Wind-powered electricity generation single blade high-altitude mounting hanger | |
CN111792527A (en) | Single-beam crane with anti-swing mechanism | |
CN206373831U (en) | A kind of derrick runway girder pull bar is installed and uses simple plate pulling device | |
CN207404702U (en) | A kind of security grabhook of derrick crane | |
CN204265218U (en) | A kind of power station unit internal head cover special hanger | |
CN103145055B (en) | Arm joint, truss arm and there is its hoisting crane | |
CN212609006U (en) | Hoisting tool for cooling pipeline of flexible direct-current converter valve | |
CN210480628U (en) | Rotatory hoist of two-way self-balancing | |
CN208843629U (en) | A kind of crane upper mechanism is from dismantling device and crane | |
CN207312945U (en) | The lifting fixed structure of assembly type Shackle assembly and crane arm | |
CN205241107U (en) | Tower crane boom rod structure | |
CN205653025U (en) | Wind wheel lifting device | |
CN201520593U (en) | L-shaped hanger | |
CN205346622U (en) | Steel constructs component bikini and lifts by crane installation device | |
CN203903770U (en) | Multi-hoisting-point hoisting and installing device for chimney | |
CN204384748U (en) | A kind of crane arm pull bar tap shelf structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170630 |
|
WD01 | Invention patent application deemed withdrawn after publication |