CN101701499B - Hoisting method for mounting steel chimney tower - Google Patents

Hoisting method for mounting steel chimney tower Download PDF

Info

Publication number
CN101701499B
CN101701499B CN2009102726040A CN200910272604A CN101701499B CN 101701499 B CN101701499 B CN 101701499B CN 2009102726040 A CN2009102726040 A CN 2009102726040A CN 200910272604 A CN200910272604 A CN 200910272604A CN 101701499 B CN101701499 B CN 101701499B
Authority
CN
China
Prior art keywords
pylon
block
steel chimney
chimney tower
fixed pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009102726040A
Other languages
Chinese (zh)
Other versions
CN101701499A (en
Inventor
赵海莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2009102726040A priority Critical patent/CN101701499B/en
Publication of CN101701499A publication Critical patent/CN101701499A/en
Application granted granted Critical
Publication of CN101701499B publication Critical patent/CN101701499B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to the technical field of steel chimney tower mounting and construction, in particular to a hoisting method for mounting a steel chimney tower. The hoisting method for mounting a steel chimney tower is characterized by comprising the following steps of: (1) mounting a first section of the steel chimney tower by an automobile crane of 6-25t; (2) mounting a simple hoisting device, wherein lugs of the simple hoisting device are fixed on the upper part at one side of the mounted first tower section; (3) hoisting materials of a second section of the steel chimney tower to a mounting position through the simple hoisting device; (4) after the second section of the steel chimney tower is mounted, upwards moving the lugs and fixing the lugs on the upper part at one side of the mounted second tower section; hoisting the materials of a third section of the steel chimney tower to a mounting position through the simple hoisting device; and so on until all towers finish being mounted. The invention has the characteristics of simple structure, convenient use and low cost.

Description

The hanging method of mounting steel chimney tower
Technical field
The invention belongs to steel chimney tower installation Technology field, be specifically related to a kind of hanging method of mounting steel chimney tower.
Background technology
The heating furnace chimney is towering steel stack (overall height 74.5m, chimney are higher than pylon 15m), and the steel stack inwall is provided with refractory lining, and the segmentation erection weight is big, can't use large-scale hoisting machinery because the place is narrow.
Summary of the invention
The object of the present invention is to provide a kind of hanging method of simple, convenient, mounting steel chimney tower that cost is low.
To achieve these goals, technical scheme of the present invention is: the hanging method of mounting steel chimney tower is characterized in that it comprises the steps:
1) the first segment pylon of steel chimney tower adopts 16~25t mobile crane to install;
2) simple and easy hoisting device is installed: simple and easy hoisting device comprises fixed pulley 1, hoist engine 2, first Chain block 3, second Chain block 4, the 3rd Chain block 5, the first ear rope 6, main dilatory rope 7, the second ear rope 8, leading block 9, pole 10, running block 11, fixed pulley group 13, hanger 15, elevator steel cable 16; The bottom of pole 10 and hanger 15 hinged (universal hinging), the upper end of pole 10 is provided with (fixing) fixed pulley group 13, fixedly connected with the top of pole 10 respectively in the first ear rope 6, main upper end of drawing rope 7, the second ear rope 8, the hoisting chain of corresponding successively first Chain block 3 of lower end difference of the first ear rope 6, main dilatory rope 7, the second ear rope 8, the hoisting chain of second Chain block 4, the hoisting chain of the 3rd Chain block 5 connect; Hoist engine 2 is fixed on the basis, and after an end of the elevator steel cable 16 on the hoist engine 2 passed through fixed pulley 1, leading block 9, fixed pulley group 13 successively, it was fixing with fixed pulley group 13 to walk around running block 11 backs again, and running block 11 is provided with suspension hook;
After the first segment pylon of steel chimney tower installs, fixed pulley 1 is fixed on a side bottom of mounted first segment pylon 14, leading block 9 is fixed on a side roof part of mounted first segment pylon 14, and hanger 15 is fixed on a upper lateral part of mounted first segment pylon;
3) material of second of the steel chimney tower joint pylon lifts installation site (material is hung on the suspension hook of simple and easy hoisting device, implements to promote by the hoist engine of simple and easy hoisting device, rises to the precalculated position and installs) by simple and easy hoisting device;
4) after second of the steel chimney tower joint pylon installs, will move a upper lateral part that is fixed on the mounted second joint pylon on the hanger 15, the material of the 3rd joint pylon of steel chimney tower lifts the installation site by simple and easy hoisting device; The rest may be inferred, all installs up to steel chimney tower.
The invention has the beneficial effects as follows:
1, adopt said method, be not subjected to the restriction of fabricating yard condition, workable, applied widely.
2, the simple and easy hoisting device economic and reliable of selecting for use has characteristics simple in structure, easy to use, that cost is low.
3, use this method mounting steel chimney, can reduce cost, easy construction, safe and reliable, it is narrow to have solved the place effectively, the problem that mounting cost is low, and have comprehensive technology economic benefit preferably.
Description of drawings
Fig. 1 is a scheme of installation of the present invention;
Among the figure: 1-fixed pulley, 2-hoist engine, 3-first Chain block, 4-second Chain block, 5-the 3rd Chain block, the 6-first ear rope, the dilatory rope of 7-master, the 8-second ear rope, 9-leading block, the 10-pole, the 11-running block, 12-pylon cross bar or pylon support, 13-fixed pulley group, 14-first segment pylon, 15-hanger, 16-elevator steel cable.
The specific embodiment
As shown in Figure 1, the hanging method of mounting steel chimney tower, it comprises the steps:
1) the first segment pylon of steel chimney tower (comprise cross bar and support, being called first segment pylon on the basis) adopts 16~25t mobile crane to install;
2) simple and easy hoisting device is installed: simple and easy hoisting device comprises fixed pulley 1, hoist engine 2, first Chain block 3, second Chain block 4, the 3rd Chain block 5, the first ear rope 6, main dilatory rope 7, the second ear rope 8, leading block 9, pole 10, running block 11, fixed pulley group 13, hanger 15, elevator steel cable 16; The bottom and the hanger 15 hinged (universal hinging) of pole (or claiming suspension rod) 10, the upper end of pole 10 is provided with fixed pulley group 13, the first ear rope (diameter 16mm) 6, main dilatory rope (diameter 16mm) 7, fixedly connected with the top of pole 10 respectively in the upper end of the second ear rope (diameter 16mm) 8, the first ear rope 6, main dilatory rope 7, the lower end of the second ear rope 8 is the hoisting chain of corresponding successively first Chain block 3 respectively, the hoisting chain of second Chain block 4, the hoisting chain of the 3rd Chain block 5 connects (operates first Chain block 3, second Chain block 4, the 3rd Chain block 5, can adjust the upper end height and the swing position overhead of pole 10, make the material that hangs reach desired location); Hoist engine 2 is fixed on the basis (ground), after an end of the elevator steel cable 16 on the hoist engine 2 passes through fixed pulley 1, leading block 9, fixed pulley group 13 successively, walks around that running block 11 back and fixed pulley group are 13 fixing (or fixes with the upper end of pole 10 again; Hoist engine 2 rollings, running block 11 rises, and hoist engine 2 unreels, and running block 11 descends, the pylon cross bar by the suspension hook band on the running block 11 or pylon support 12 risings reach desired location), running block 11 is provided with suspension hook;
According to " functional archiotecture construction handbook regulation steel pipe unipods pole generally adopts Φ 159mm~Φ 426mm seamless steel pipe to make, so adopt long 16m, Φ 168 * 10 poles { place at a side 2/3H of first segment pylon height adds the angle steel (be hanger) of 3 length of sides of weldering more than 50 } to lift at the pylon more than the first segment; H is the height of first segment pylon;
After the first segment pylon of steel chimney tower installs, fixed pulley 1 adopts the colligation of ф 16mm Lang lay rope to be fixed on a side bottom of mounted first segment pylon 14, leading block 9 is fixed on a side roof part of mounted first segment pylon 14, and hanger 15 is fixed on a upper lateral part (and with this suspension centre as the lifting pole) of mounted first segment pylon;
3) material of second of the steel chimney tower joint pylon (pylon cross bar or pylon support 12) lifts the installation site by simple and easy hoisting device (hang on the suspension hook of simple and easy hoisting device by material, implement to promote by the hoist engine of simple and easy hoisting device, rise to the precalculated position and install, to satisfy the needs of the second joint tower hoisting);
4) after second of the steel chimney tower joint pylon (pylon cross bar or pylon support 12) installs, to move a upper lateral part that is fixed on the mounted second joint pylon on the hanger 15, the material (pylon cross bar or pylon support 12) of the 3rd joint pylon of steel chimney tower lifts the installation site by simple and easy hoisting device; The rest may be inferred, all installs up to steel chimney tower.

Claims (1)

1. the hanging method of mounting steel chimney tower is characterized in that it comprises the steps:
1) the first segment pylon of steel chimney tower adopts 16~25t mobile crane to install;
2) simple and easy hoisting device is installed: simple and easy hoisting device comprises fixed pulley (1), hoist engine (2), first Chain block (3), second Chain block (4), the 3rd Chain block (5), the first ear rope (6), main dilatory rope (7), the second ear rope (8), leading block (9), pole (10), running block (11), fixed pulley group (13), hanger (15), elevator steel cable (16); The bottom of pole (10) and hanger (15) are hinged, the upper end of pole (10) is provided with fixed pulley group (13), fixedly connected with the top of pole (10) respectively in the first ear rope (6), main upper end of drawing rope (7), the second ear rope (8), the hoisting chain of the hoisting chain of lower end corresponding successively first Chain block of difference (3) of the first ear rope (6), main dilatory rope (7), the second ear rope (8), the hoisting chain of second Chain block (4), the 3rd Chain block (5) connects; Hoist engine (2) is fixed on the basis, after one end of the elevator steel cable (16) on the hoist engine (2) passes through fixed pulley (1), leading block (9), fixed pulley group (13) successively, it is fixing with fixed pulley group (13) to walk around running block (11) back again, and running block (11) is provided with suspension hook;
After the first segment pylon of steel chimney tower installs, fixed pulley (1) is fixed on a side bottom of mounted first segment pylon (14), leading block (9) is fixed on a side roof part of mounted first segment pylon (14), hanger (15) is fixed on a upper lateral part of mounted first segment pylon, and fixed pulley (1), leading block (9) and hanger (15) are positioned at the same side of first segment pylon (14);
3) material of second of the steel chimney tower joint pylon lifts the installation site by simple and easy hoisting device;
4) after second of the steel chimney tower joint pylon installs, will move a upper lateral part that is fixed on the mounted second joint pylon on the hanger (15), the material of the 3rd joint pylon of steel chimney tower lifts the installation site by simple and easy hoisting device; The rest may be inferred, all installs up to steel chimney tower.
CN2009102726040A 2009-10-30 2009-10-30 Hoisting method for mounting steel chimney tower Expired - Fee Related CN101701499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102726040A CN101701499B (en) 2009-10-30 2009-10-30 Hoisting method for mounting steel chimney tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102726040A CN101701499B (en) 2009-10-30 2009-10-30 Hoisting method for mounting steel chimney tower

Publications (2)

Publication Number Publication Date
CN101701499A CN101701499A (en) 2010-05-05
CN101701499B true CN101701499B (en) 2011-07-27

Family

ID=42156423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102726040A Expired - Fee Related CN101701499B (en) 2009-10-30 2009-10-30 Hoisting method for mounting steel chimney tower

Country Status (1)

Country Link
CN (1) CN101701499B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101865593B (en) * 2010-06-30 2012-05-02 中国一冶集团有限公司 Method for installing device with air separating tower structure
CN103101847B (en) * 2013-01-31 2014-12-10 杭州国电大力机电工程有限公司 Tower type truss installing structure and method without cooperation with altitude hoisting equipment
CN104627849B (en) * 2015-02-03 2017-05-10 中建五局工业设备安装有限公司 Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN105781205B (en) * 2015-11-30 2018-02-06 中国化学工程第三建设有限公司 A kind of guider in place of the aerial group pair of heavy tower equipment segmental hoisting
CN111962821B (en) * 2020-07-10 2022-01-18 广东省工业设备安装有限公司 Automatic centering and inverting method for vertical shaft pipeline

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4187949A (en) * 1978-07-10 1980-02-12 Kawasaki Jukogyo Kabushiki Kaisha Derrick crane with wide horizontal swinging range of boom
DE4042003A1 (en) * 1990-12-22 1991-07-11 Eberswalde Kranbau Gmbh Derrick type crane with pulley block - has cable guide pulleys arranged so that jib is raised by cable which lifts load
CN2412964Y (en) * 2000-01-28 2001-01-03 赵卫东 Multi-sectional high pole artificial mounting device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4187949A (en) * 1978-07-10 1980-02-12 Kawasaki Jukogyo Kabushiki Kaisha Derrick crane with wide horizontal swinging range of boom
DE4042003A1 (en) * 1990-12-22 1991-07-11 Eberswalde Kranbau Gmbh Derrick type crane with pulley block - has cable guide pulleys arranged so that jib is raised by cable which lifts load
CN2412964Y (en) * 2000-01-28 2001-01-03 赵卫东 Multi-sectional high pole artificial mounting device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP昭53-8950A 1978.01.26
郝明.简易吊装装置在水利工程中的应用.《河北水利》.2005,(第5期),34. *

Also Published As

Publication number Publication date
CN101701499A (en) 2010-05-05

Similar Documents

Publication Publication Date Title
CN101701499B (en) Hoisting method for mounting steel chimney tower
CN101713260B (en) Mounting method of steel chimney cylinder
CN201545635U (en) Holding rod with double flat arms
CN205387439U (en) Mast hoisting accessory
CN108147273A (en) A kind of adjustable large-scale steel pipe suspender
CN102022000B (en) Layered casting device for concrete and construction method
CN201634333U (en) Super-altitude gantry crane
CN101927957B (en) Method for hoisting flue bent pipe of coke oven
CN201538660U (en) Simple hoisting device for mounting steel chimney tower
CN204510777U (en) Converter building construction lift platform
CN210031529U (en) Automatic climbing platform for construction of hanging cable
CN103539020B (en) Novel hoisting construction method and special hanging device
CN204342318U (en) Single pulley type crane arm pull bar
CN201665484U (en) Net rack bulk part suspending device
CN208684254U (en) A kind of steel reinforcement cage lowering equipment investing long spire stake machine fuselage
CN210049875U (en) Hydraulic oil pumping unit
CN110886242B (en) Method for installing composite cable saddle in anchor hole of suspension bridge tunnel in mountainous area
CN210973593U (en) Oil cylinder type lifting beam
CN209367692U (en) It is a kind of to rise gantry type two-way lifter device certainly
CN209024026U (en) A kind of reinforcing bar cage hoisting machine
CN207004055U (en) A kind of civil engineering pipeline movable stand
CN212712464U (en) Lifting boom
CN218145360U (en) Anti-drop's pipeline lifts by crane lifting hook
CN215210558U (en) Integrated erection device for cable of cableway bridge
CN202829430U (en) Movable type lifting appliance for comb plate expansion joint installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110727

Termination date: 20201030

CF01 Termination of patent right due to non-payment of annual fee