CN2412964Y - Multi-sectional high pole artificial mounting device - Google Patents
Multi-sectional high pole artificial mounting device Download PDFInfo
- Publication number
- CN2412964Y CN2412964Y CN 00216347 CN00216347U CN2412964Y CN 2412964 Y CN2412964 Y CN 2412964Y CN 00216347 CN00216347 CN 00216347 CN 00216347 U CN00216347 U CN 00216347U CN 2412964 Y CN2412964 Y CN 2412964Y
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- high bar
- pulley
- wire rope
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a multi-sectional high rod artificial installation device, which adopts a steel pipe which is provided with a demountable and movable annular buckle as a main component. The movable annular buckle on the steel pipe is tied with a steel cable, and is connected with a hoister through a pulley wheel. Small rings on the bottom and the top of the steel pipe can be tied with the steel cable to be connected with the pulley wheel which is fixed on the ground. Then, stable operation can be kept. A lifting ring on the upper part of the steel pipe is used for lifting a high rod. The utility model adopts the mode that the steel pipe and the high rod to be loaded are fastened and lifted section by section to realize installation, with the advantages of simple structure, convenient and safe construction, and the reduction of state investment cost. The utility model can adapt to various places where topographic conditions are poor to carry out the installation and construction of communication circuits and power circuits.
Description
The artificial erecting device of the high bar of a kind of multistage can be used for communicating by letter, the installation of the high bar circuit of department such as electric power, belongs to homework department's elevator, lifting appliance technical field.
Along with the continuous development of science and technology, every construction of country rapidly advances, and has occurred the high bar of various rigidity of grafting segmenteds such as many 40 meters, 50 meters, 60 meters at home, is widely used in communication, departments such as electric power.In the prior art, the general method that all adopts the machinery lifting of high bar is installed, not only the cost height also is subjected to the restriction of fabricating yard, the place that high bar is set up is corresponding to be restricted, and produces wasting of resources phenomenon thus, has also pind down the development of communication, electric utility.
The purpose of this utility model is to provide the high bar of the succinct multistage of a kind of convenience artificial erecting device, makes it with low cost, construction safety, and the high bar that can adapt to various occasions is installed.
For realizing such purpose, it is critical piece that the utility model adopts the steel pipe that has detachable movable latch closure, is equipped with pulley and wire rope, takes to tighten up installation, lifting mode realization installation smoothly piecemeal with high bar to be installed.
The steel pipe length that the utility model adopts is not limit, and can be formed by connecting with flange for whole steel pipe yet, and generally at 10~20 meters long, diameter of steel tube requires to decide according to the construction object, generally at 150mm~250mm.A little ring is arranged at the steel pipe bottom, connects a pulley by wire rope on the ring, during work this pulley is fixed on the ground, and the assurance operation is steadily carried out.Steel pipe top also has a little ring, connects pulley respectively by several wire rope in case of necessity and fixes on the ground, increases the operation stationarity.In the bottom of steel pipe (general 5~10 meters), around steel pipe several dismountable movable latch closures are arranged, can slide up and down at steel pipe when loosening, can maintain static when tightening up, be with wire rope on one of them latch closure and connect a pulley, this pulley is fixed on the high bar that is mounted during construction, and wire rope links to each other with ground hoist engine by pulley.The also available wire rope of movable latch closure substitutes.
When on-the-spot high bar is installed, the little ring in steel pipe bottom is fixed on the ground by the pulley that wire rope connects, the detachable loose collar in steel pipe bottom is buckled the pulley that connects with wire rope be fixed on the high bar to be installed, and steel pipe is fixed tightly in movable latch closure or wire rope with high bar to be installed.Hoist engine drags wire rope, and steel pipe and high bar are holded up simultaneously.After first section high bar is in place, unclamps steel pipe and make it and upwards climb, the pulley that connects by the little ring of the steel pipe top second section high bar of slinging, and utilization activity latch closure tightens up steel pipe with it, carry out the 3rd section high bar after being in place again and install, and so forth, until finishing integral installation.
For understanding the technical solution of the utility model better, be further described below in conjunction with accompanying drawing.
Fig. 1 is structure of the present utility model and installation exercise schematic diagram.
As shown in the figure, steel pipe 3 has several detachable movable latch closures 4, is connected with steel cable on the movable latch closure 4, connects ground hoist engine 10 by pulley 8, and pulley 8 is fixed on when operation on the high bar 9 of multistage.A little ring 6 is arranged at steel pipe 3 bottoms, is the pulley 7 that is fastened on ground with wire rope, to keep the steady of steel pipe 3.Suspension ring 2 are arranged at the top of steel pipe 3, are used to lift by crane high bar section 5 to be installed, and a little ring 1 is also arranged at the top of steel pipe 3, can mix several wire rope where necessary, is fastened on the pulley on ground, and are steady with the lifting of high bar section 5 to be installed to guarantee steel pipe 3.Several dismountable movable latch closures 4 are arranged in the bottom of steel pipe 3, can tighten up motionlessly, the sliding up and down of steel pipe 3, be with wire rope on the movable latch closure 4 and connect the hoist engine 10 on ground by pulley 8 in the time of also can loosening.During construction pulley 8 is fixed on the high bar 9.The also available wire rope of movable latch closure 4 substitutes.
When on-the-spot high bar is installed, the little ring 6 in steel pipe 3 bottoms is fixed on the ground by the pulley 7 that wire rope connects, the pulley 8 that the detachable movable latch closure 4 usefulness wire rope in steel pipe 3 bottoms are connected is fixed on the high bar to be installed, and steel pipe 3 is fixed tightly in movable latch closure 4 or wire rope with high bar to be installed.Hoist engine 10 drags wire rope, and steel pipe 3 and high bar are holded up simultaneously.After first section high bar is in place, unclamp the movable latch closure 4 of steel pipe and steel pipe 3 is upwards climbed, utilize steel pipe top suspension ring 2 to connect the pulleys second section high bar of slinging again, and steel pipe 3 is tightened up with it with movable latch closure 4, carrying out the 3rd section high bar after being in place again installs, and so forth, until finishing integral installation.
The utility model is simple in structure, cost of investment is low, easy construction safety, be suitable on the mountain top, little roadside, and various vehicles can't open into or the relatively poor place construction of orographic condition such as resident Ji Mi district, make the installation of telecommunication circuit, power circuit not limited by geographical conditions, reduce the government investment cost.
Claims (2)
1, the artificial erecting device of the high bar of a kind of multistage, it is characterized in that detachable movable latch closure 4 is arranged on the steel pipe 3, be wire rope to be arranged and connect hoist engine 10 on the movable latch closure 4 by pulley 8, little ring 6 is arranged at steel pipe 3 bottoms, system is fastened on the pulley 7 on ground with wire rope, suspension ring 2 are arranged at steel pipe 3 tops, and little ring 1 is arranged at the top.
2, a kind of as the artificial erecting device of the high bar of the said multistage of claim 1, it is characterized in that said detachable movable latch closure 4 can substitute with wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00216347 CN2412964Y (en) | 2000-01-28 | 2000-01-28 | Multi-sectional high pole artificial mounting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00216347 CN2412964Y (en) | 2000-01-28 | 2000-01-28 | Multi-sectional high pole artificial mounting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2412964Y true CN2412964Y (en) | 2001-01-03 |
Family
ID=33582103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00216347 Expired - Fee Related CN2412964Y (en) | 2000-01-28 | 2000-01-28 | Multi-sectional high pole artificial mounting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2412964Y (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101701499B (en) * | 2009-10-30 | 2011-07-27 | 中国一冶集团有限公司 | Hoisting method for mounting steel chimney tower |
CN102635265A (en) * | 2012-05-11 | 2012-08-15 | 辽宁省电力有限公司盘锦供电公司 | Buffer |
WO2015106481A1 (en) * | 2014-01-16 | 2015-07-23 | 于佩 | Nodular cast iron inserting-connection tower rods |
CN105133916A (en) * | 2015-09-26 | 2015-12-09 | 国网青海省电力公司 | Auxiliary hanging bracket for mounting of upper frame on telegraph pole |
CN105781218A (en) * | 2016-03-24 | 2016-07-20 | 中铁十局集团有限公司 | Hoisting construction method for steel column in construction of protective support for existing overcrossing railway |
CN107013080A (en) * | 2015-11-13 | 2017-08-04 | 高世龙 | A kind of power network electric pole erection construction method |
CN111620254A (en) * | 2020-06-10 | 2020-09-04 | 中国电建集团山东电力建设有限公司 | Torch tube lifting and mounting system and method |
CN111779349A (en) * | 2020-05-22 | 2020-10-16 | 嘉兴恒创电力设计研究院有限公司平湖分公司 | Convenient tower mounting device and method |
-
2000
- 2000-01-28 CN CN 00216347 patent/CN2412964Y/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101701499B (en) * | 2009-10-30 | 2011-07-27 | 中国一冶集团有限公司 | Hoisting method for mounting steel chimney tower |
CN102635265A (en) * | 2012-05-11 | 2012-08-15 | 辽宁省电力有限公司盘锦供电公司 | Buffer |
CN102635265B (en) * | 2012-05-11 | 2014-07-09 | 辽宁省电力有限公司盘锦供电公司 | Buffer |
WO2015106481A1 (en) * | 2014-01-16 | 2015-07-23 | 于佩 | Nodular cast iron inserting-connection tower rods |
CN105133916A (en) * | 2015-09-26 | 2015-12-09 | 国网青海省电力公司 | Auxiliary hanging bracket for mounting of upper frame on telegraph pole |
CN107013080A (en) * | 2015-11-13 | 2017-08-04 | 高世龙 | A kind of power network electric pole erection construction method |
CN105781218A (en) * | 2016-03-24 | 2016-07-20 | 中铁十局集团有限公司 | Hoisting construction method for steel column in construction of protective support for existing overcrossing railway |
CN105781218B (en) * | 2016-03-24 | 2018-08-17 | 中铁十局集团有限公司 | The construction method for hanging of steel column in upper spanning existing railway protective stent construction |
CN111779349A (en) * | 2020-05-22 | 2020-10-16 | 嘉兴恒创电力设计研究院有限公司平湖分公司 | Convenient tower mounting device and method |
CN111620254A (en) * | 2020-06-10 | 2020-09-04 | 中国电建集团山东电力建设有限公司 | Torch tube lifting and mounting system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2412964Y (en) | Multi-sectional high pole artificial mounting device | |
CN102022019B (en) | A kind of method of complex terrain route split tower erection | |
CN201010459Y (en) | Flexible attaching device used for tower crane body | |
CN105794587B (en) | Fixing device and mounting method for transplanting tree body of hydropower engineering old big tree | |
CN209896574U (en) | High-altitude line sliding operation platform | |
CN211113194U (en) | Bracket-free hoisting swing system for steel box girder in shallow beach area of suspension bridge | |
CN212050266U (en) | Self-climbing crane for fan | |
CN210723967U (en) | Auxiliary tool for replacing 35-110kV strain single-string insulator | |
CN110512910A (en) | A kind of steel-making main building height integrally increases installation method across steel construction | |
CN106564819B (en) | A kind of heavy loop wheel machine peculiar to vessel and underwater mounting process | |
CN201343379Y (en) | Crane used for maintenance of large-size wind power equipment | |
CN212612005U (en) | Aerial work platform for cylindrical pier construction | |
CN211110944U (en) | Hoisting tool for converter valve anode reactor | |
CN112777496A (en) | Climbing type wind power generation hoisting crane | |
CN210313389U (en) | Hanging flower basket system that transversely slides | |
CN209780257U (en) | Steel structure high altitude construction device | |
CN205972979U (en) | Wheel hub transports frock | |
CN208516758U (en) | A kind of lightweight flange ring transfer device | |
CN214220652U (en) | Fixing device for assembling and disassembling cross beam | |
CN215711084U (en) | Hoisting structure of horizontal water turbine generator set | |
CN217840807U (en) | Suspension cage for steel structure welding | |
CN217705550U (en) | Portable quick detach dress tower wagon specialized tool case of track traffic contact net | |
CN216240042U (en) | Holding pole standing device | |
CN215926943U (en) | Transmission line steel pipe tower ring-shaped steel rib horizontal installation adjusting device | |
CN218397982U (en) | Electric power overhauls operation panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |