CN201538660U - Simple hoisting device for mounting steel chimney tower - Google Patents

Simple hoisting device for mounting steel chimney tower Download PDF

Info

Publication number
CN201538660U
CN201538660U CN2009202292403U CN200920229240U CN201538660U CN 201538660 U CN201538660 U CN 201538660U CN 2009202292403 U CN2009202292403 U CN 2009202292403U CN 200920229240 U CN200920229240 U CN 200920229240U CN 201538660 U CN201538660 U CN 201538660U
Authority
CN
China
Prior art keywords
rope
fixed
fixed pulley
chain block
chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202292403U
Other languages
Chinese (zh)
Inventor
赵海莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2009202292403U priority Critical patent/CN201538660U/en
Application granted granted Critical
Publication of CN201538660U publication Critical patent/CN201538660U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a simple hoisting device for mounting steel chimney tower, which is characterized in that the simple hoisting device for mounting steel chimney tower comprises a standing pulley, a hoister, a first chain block, a second chain block, a third chain block, a first ear rope, a main dragging rope, a second ear rope, a guide pulley, a derrick, moving pulleys, standing pulleys, a lifting lug and a hoisting rope; the lower end of the derrick is hinged with the lifting lug and the upper end provided with the standing pulleys; the hoister is fixed in a base; one end of the hoisting rope of the hoister is orderly passed through the standing pulley, the guide pulley and the standing pulleys and then fixed with the standing pulleys through the moving pulleys; the moving pulleys are provided with a lifting hook; the standing pulley is fixed at the bottom of one side of a first tower that has been installed completely; the guide pulley is fixed at the top of one side of the first tower that has been installed completely; the lifting lug is fixed above one side of the first tower that has been installed completely. The utility model has the advantages of simple structure, convenient use and low cost.

Description

Be used for the simple and easy hoisting device that steel chimney tower is installed
Technical field
The utility model belongs to steel chimney tower installation Technology field, is specifically related to a kind of simple and easy hoisting device that steel chimney tower is installed that is used for.
Background technology
The heating furnace chimney is towering steel stack (overall height 74.5m, chimney are higher than pylon 15m), and the steel stack inwall is provided with refractory lining, and the segmentation erection weight is big, can't use large-scale hoisting machinery because the place is narrow.
The utility model content
The purpose of this utility model be to provide a kind of simple, convenient, cost is low is used for the simple and easy hoisting device that steel chimney tower is installed.
To achieve these goals, the technical solution of the utility model is: be used for the simple and easy hoisting device that steel chimney tower is installed, it is characterized in that comprising fixed pulley, winch, first chain block, second chain block, the 3rd chain block, the first ear rope, main dilatory rope, the second ear rope, leading sheave, pole, running block, fixed pulley group, hanger, elevator steel cable; The bottom and the hanger of pole are hinged, the upper end of pole is provided with the fixed pulley group, captive joint with the top of pole respectively in the first ear rope, main upper end of drawing rope, the second ear rope, the hoisting chain of corresponding successively first chain block of lower end difference of the first ear rope, main dilatory rope, the second ear rope, the hoisting chain of second chain block, the hoisting chain of the 3rd chain block connect; Winch is fixed on the basis, after an end of the elevator steel cable on the winch passes through fixed pulley, leading sheave, fixed pulley group successively, fixes with the fixed pulley group after walking around running block again, and running block is provided with suspension hook;
Fixed pulley is fixed on a side bottom of mounted first segment pylon, and leading sheave is fixed on a side roof part of mounted first segment pylon, and hanger is fixed on a upper lateral part of mounted first segment pylon.
The beneficial effects of the utility model are: the simple and easy hoisting device of selecting for use has characteristics simple in structure, easy to use, that cost is low.Be not subjected to the restriction of fabricating yard condition, workable, applied widely.Use this device mounting steel chimney, can cost-cutting, easy construction, safe and reliable, it is narrow to have solved the place effectively, the problem that erected cost is low, and have complex art economic benefit preferably.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Among the figure: 1-fixed pulley, 2-winch, 3-first chain block, 4-second chain block, 5-the 3rd chain block, the 6-first ear rope, the dilatory rope of 7-master, the 8-second ear rope, 9-leading sheave, the 10-pole, the 11-running block, 12-pylon cross bar or pylon support, 13-fixed pulley group, 14-first segment pylon, 15-hanger, 16-elevator steel cable.
The specific embodiment
As shown in Figure 1, be used for the simple and easy hoisting device that steel chimney tower is installed, comprise fixed pulley 1, winch 2, first chain block 3, second chain block 4, the 3rd chain block 5, the first ear rope 6, main dilatory rope 7, the second ear rope 8, leading sheave 9, pole 10, running block 11, fixed pulley group 13, hanger 15, elevator steel cable 16; The bottom of pole 10 and hanger 15 are hinged, the upper end of pole 10 is provided with fixed pulley group 13, captive joint with the top of pole 10 respectively in the first ear rope 6, main upper end of drawing rope 7, the second ear rope 8, the hoisting chain of corresponding successively first chain block 3 of lower end difference of the first ear rope 6, main dilatory rope 7, the second ear rope 8, the hoisting chain of second chain block 4, the hoisting chain of the 3rd chain block 5 connect; Winch 2 is fixed on the basis, and after an end of the elevator steel cable 16 on the winch 2 passed through fixed pulley 1, leading sheave 9, fixed pulley group 13 successively, it was fixing with fixed pulley group 13 to walk around running block 11 backs again, and running block 11 is provided with suspension hook;
Fixed pulley 1 is fixed on a side bottom of mounted first segment pylon 14, and leading sheave 9 is fixed on a side roof part of mounted first segment pylon 14, and hanger 15 is fixed on a upper lateral part of mounted first segment pylon.
Application of the present utility model: as shown in Figure 1, the hanging method of mounting steel chimney tower, it comprises the steps:
1) the first segment pylon of steel chimney tower (comprise cross bar and support, being called first segment pylon on the basis) adopts 16~25t wheel crane to install;
2) simple and easy hoisting device is installed: simple and easy hoisting device comprises fixed pulley 1, winch 2, first chain block 3, second chain block 4, the 3rd chain block 5, the first ear rope 6, main dilatory rope 7, the second ear rope 8, leading sheave 9, pole 10, running block 11, fixed pulley group 13, hanger 15, elevator steel cable 16; The bottom and the hanger 15 hinged (universal hinging) of pole (or claiming suspension rod) 10, the upper end of pole 10 is provided with fixed pulley group 13, the first ear rope (diameter 16mm) 6, main dilatory rope (diameter 16mm) 7, captive joint with the top of pole 10 respectively in the upper end of the second ear rope (diameter 16mm) 8, the first ear rope 6, main dilatory rope 7, the lower end of the second ear rope 8 is the hoisting chain of corresponding successively first chain block 3 respectively, the hoisting chain of second chain block 4, the hoisting chain of the 3rd chain block 5 connects (operates first chain block 3, second chain block 4, the 3rd chain block 5, can adjust the upper end height and the swing position overhead of pole 10, make the material that hangs reach desired location); Winch 2 is fixed on the basis (ground), after an end of the elevator steel cable 16 on the winch 2 passes through fixed pulley 1, leading sheave 9, fixed pulley group 13 successively, walks around that running block 11 back and fixed pulley group are 13 fixing (or fixes with the upper end of pole 10 again; Winch 2 rollings, running block 11 rises, and winch 2 unreels, and running block 11 descends, the pylon cross bar by the suspension hook band on the running block 11 or pylon support 12 risings reach desired location), running block 11 is provided with suspension hook;
According to " functional archiotecture construction handbook regulation steel pipe unipods pole generally adopts Φ 159mm~Φ 426mm solid drawn pipe to make, so adopt long 16m, Φ 168 * 10 poles { place at a side 2/3H of first segment pylon height adds the angle steel (be hanger) of 3 length of sides of weldering more than 50 } to lift at the pylon more than the first segment; H is the height of first segment pylon;
After the first segment pylon of steel chimney tower installs, fixed pulley 1 adopts the colligation of ф 16mm Lang lay rope to be fixed on a side bottom of mounted first segment pylon 14, leading sheave 9 is fixed on a side roof part of mounted first segment pylon 14, and hanger 15 is fixed on a upper lateral part (and with this suspension centre as the lifting pole) of mounted first segment pylon;
3) material of second of the steel chimney tower joint pylon (pylon cross bar or pylon support 12) lifts the installation site by simple and easy hoisting device (hang on the suspension hook of simple and easy hoisting device by material, implement to promote by the winch of simple and easy hoisting device, rise to the desired location and install, to satisfy the needs of the second joint tower hoisting);
4) after second of the steel chimney tower joint pylon (pylon cross bar or pylon support 12) installs, to move a upper lateral part that is fixed on the mounted second joint pylon on the hanger 15, the material (pylon cross bar or pylon support 12) of the 3rd joint pylon of steel chimney tower lifts the installation site by simple and easy hoisting device; The rest may be inferred, all installs up to steel chimney tower.

Claims (1)

1. be used for the simple and easy hoisting device that steel chimney tower is installed, it is characterized in that comprising fixed pulley (1), winch (2), first chain block (3), second chain block (4), the 3rd chain block (5), the first ear rope (6), main dilatory rope (7), the second ear rope (8), leading sheave (9), pole (10), running block (11), fixed pulley group (13), hanger (15), elevator steel cable (16); The bottom of pole (10) and hanger (15) are hinged, the upper end of pole (10) is provided with fixed pulley group (13), captive joint with the top of pole (10) respectively in the first ear rope (6), main upper end of drawing rope (7), the second ear rope (8), the hoisting chain of the hoisting chain of lower end corresponding successively first chain block of difference (3) of the first ear rope (6), main dilatory rope (7), the second ear rope (8), the hoisting chain of second chain block (4), the 3rd chain block (5) connects; Winch (2) is fixed on the basis, after one end of the elevator steel cable (16) on the winch (2) passes through fixed pulley (1), leading sheave (9), fixed pulley group (13) successively, it is fixing with fixed pulley group (13) to walk around running block (11) back again, and running block (11) is provided with suspension hook;
Fixed pulley (1) is fixed on a side bottom of mounted first segment pylon (14), and leading sheave (9) is fixed on a side roof part of mounted first segment pylon (14), and hanger (15) is fixed on a upper lateral part of mounted first segment pylon.
CN2009202292403U 2009-10-30 2009-10-30 Simple hoisting device for mounting steel chimney tower Expired - Fee Related CN201538660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202292403U CN201538660U (en) 2009-10-30 2009-10-30 Simple hoisting device for mounting steel chimney tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202292403U CN201538660U (en) 2009-10-30 2009-10-30 Simple hoisting device for mounting steel chimney tower

Publications (1)

Publication Number Publication Date
CN201538660U true CN201538660U (en) 2010-08-04

Family

ID=42590113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202292403U Expired - Fee Related CN201538660U (en) 2009-10-30 2009-10-30 Simple hoisting device for mounting steel chimney tower

Country Status (1)

Country Link
CN (1) CN201538660U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110329897A (en) * 2019-08-13 2019-10-15 宁波正宇紧固件有限公司 It is a kind of high intensity airfield runway rise withhold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110329897A (en) * 2019-08-13 2019-10-15 宁波正宇紧固件有限公司 It is a kind of high intensity airfield runway rise withhold
CN110329897B (en) * 2019-08-13 2021-01-01 宁波正宇紧固件有限公司 High-strength lifting buckle for airport runway

Similar Documents

Publication Publication Date Title
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN207244454U (en) Superelevation tower main cable saddle Lift-on/Lift-off System
CN205387439U (en) Mast hoisting accessory
CN101701499B (en) Hoisting method for mounting steel chimney tower
CN101713260B (en) Mounting method of steel chimney cylinder
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN202359500U (en) Cable feeder of automatic balance crane
CN202299574U (en) Plug-in type communication base station lifting tower
CN201634333U (en) Super-altitude gantry crane
CN108560510B (en) Movable overhaul platform for surface runner of hydropower station
CN206692230U (en) A kind of skyscraper row is hung
CN201538660U (en) Simple hoisting device for mounting steel chimney tower
CN210031529U (en) Automatic climbing platform for construction of hanging cable
CN203112386U (en) Tower type truss mounting structure without assistance of high altitude hoisting equipment
CN103101847B (en) Tower type truss installing structure and method without cooperation with altitude hoisting equipment
CN201762053U (en) Simple automatic hoisting rod
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN209367692U (en) It is a kind of to rise gantry type two-way lifter device certainly
CN204342318U (en) Single pulley type crane arm pull bar
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN207004055U (en) A kind of civil engineering pipeline movable stand
CN210598088U (en) Climbing frame lifting structure
CN215210558U (en) Integrated erection device for cable of cableway bridge
CN204455857U (en) A kind of truss coaster hoisting mechanism of large sections steel box-girder
CN202414930U (en) Flexible guide rail cable sliding trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA FIRST METALLURGICAL CONSTRUCTION GROUP CORPO

Free format text: FORMER NAME: CHINA FIRST METALLURGICAL CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee before: China First Metallurgical Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100804

Termination date: 20171030

CF01 Termination of patent right due to non-payment of annual fee