The utility model content
The purpose of this utility model be to provide a kind of simple, convenient, cost is low is used for the simple and easy hoisting device that steel chimney tower is installed.
To achieve these goals, the technical solution of the utility model is: be used for the simple and easy hoisting device that steel chimney tower is installed, it is characterized in that comprising fixed pulley, winch, first chain block, second chain block, the 3rd chain block, the first ear rope, main dilatory rope, the second ear rope, leading sheave, pole, running block, fixed pulley group, hanger, elevator steel cable; The bottom and the hanger of pole are hinged, the upper end of pole is provided with the fixed pulley group, captive joint with the top of pole respectively in the first ear rope, main upper end of drawing rope, the second ear rope, the hoisting chain of corresponding successively first chain block of lower end difference of the first ear rope, main dilatory rope, the second ear rope, the hoisting chain of second chain block, the hoisting chain of the 3rd chain block connect; Winch is fixed on the basis, after an end of the elevator steel cable on the winch passes through fixed pulley, leading sheave, fixed pulley group successively, fixes with the fixed pulley group after walking around running block again, and running block is provided with suspension hook;
Fixed pulley is fixed on a side bottom of mounted first segment pylon, and leading sheave is fixed on a side roof part of mounted first segment pylon, and hanger is fixed on a upper lateral part of mounted first segment pylon.
The beneficial effects of the utility model are: the simple and easy hoisting device of selecting for use has characteristics simple in structure, easy to use, that cost is low.Be not subjected to the restriction of fabricating yard condition, workable, applied widely.Use this device mounting steel chimney, can cost-cutting, easy construction, safe and reliable, it is narrow to have solved the place effectively, the problem that erected cost is low, and have complex art economic benefit preferably.
The specific embodiment
As shown in Figure 1, be used for the simple and easy hoisting device that steel chimney tower is installed, comprise fixed pulley 1, winch 2, first chain block 3, second chain block 4, the 3rd chain block 5, the first ear rope 6, main dilatory rope 7, the second ear rope 8, leading sheave 9, pole 10, running block 11, fixed pulley group 13, hanger 15, elevator steel cable 16; The bottom of pole 10 and hanger 15 are hinged, the upper end of pole 10 is provided with fixed pulley group 13, captive joint with the top of pole 10 respectively in the first ear rope 6, main upper end of drawing rope 7, the second ear rope 8, the hoisting chain of corresponding successively first chain block 3 of lower end difference of the first ear rope 6, main dilatory rope 7, the second ear rope 8, the hoisting chain of second chain block 4, the hoisting chain of the 3rd chain block 5 connect; Winch 2 is fixed on the basis, and after an end of the elevator steel cable 16 on the winch 2 passed through fixed pulley 1, leading sheave 9, fixed pulley group 13 successively, it was fixing with fixed pulley group 13 to walk around running block 11 backs again, and running block 11 is provided with suspension hook;
Fixed pulley 1 is fixed on a side bottom of mounted first segment pylon 14, and leading sheave 9 is fixed on a side roof part of mounted first segment pylon 14, and hanger 15 is fixed on a upper lateral part of mounted first segment pylon.
Application of the present utility model: as shown in Figure 1, the hanging method of mounting steel chimney tower, it comprises the steps:
1) the first segment pylon of steel chimney tower (comprise cross bar and support, being called first segment pylon on the basis) adopts 16~25t wheel crane to install;
2) simple and easy hoisting device is installed: simple and easy hoisting device comprises fixed pulley 1, winch 2, first chain block 3, second chain block 4, the 3rd chain block 5, the first ear rope 6, main dilatory rope 7, the second ear rope 8, leading sheave 9, pole 10, running block 11, fixed pulley group 13, hanger 15, elevator steel cable 16; The bottom and the hanger 15 hinged (universal hinging) of pole (or claiming suspension rod) 10, the upper end of pole 10 is provided with fixed pulley group 13, the first ear rope (diameter 16mm) 6, main dilatory rope (diameter 16mm) 7, captive joint with the top of pole 10 respectively in the upper end of the second ear rope (diameter 16mm) 8, the first ear rope 6, main dilatory rope 7, the lower end of the second ear rope 8 is the hoisting chain of corresponding successively first chain block 3 respectively, the hoisting chain of second chain block 4, the hoisting chain of the 3rd chain block 5 connects (operates first chain block 3, second chain block 4, the 3rd chain block 5, can adjust the upper end height and the swing position overhead of pole 10, make the material that hangs reach desired location); Winch 2 is fixed on the basis (ground), after an end of the elevator steel cable 16 on the winch 2 passes through fixed pulley 1, leading sheave 9, fixed pulley group 13 successively, walks around that running block 11 back and fixed pulley group are 13 fixing (or fixes with the upper end of pole 10 again; Winch 2 rollings, running block 11 rises, and winch 2 unreels, and running block 11 descends, the pylon cross bar by the suspension hook band on the running block 11 or pylon support 12 risings reach desired location), running block 11 is provided with suspension hook;
According to " functional archiotecture construction handbook regulation steel pipe unipods pole generally adopts Φ 159mm~Φ 426mm solid drawn pipe to make, so adopt long 16m, Φ 168 * 10 poles { place at a side 2/3H of first segment pylon height adds the angle steel (be hanger) of 3 length of sides of weldering more than 50 } to lift at the pylon more than the first segment; H is the height of first segment pylon;
After the first segment pylon of steel chimney tower installs, fixed pulley 1 adopts the colligation of ф 16mm Lang lay rope to be fixed on a side bottom of mounted first segment pylon 14, leading sheave 9 is fixed on a side roof part of mounted first segment pylon 14, and hanger 15 is fixed on a upper lateral part (and with this suspension centre as the lifting pole) of mounted first segment pylon;
3) material of second of the steel chimney tower joint pylon (pylon cross bar or pylon support 12) lifts the installation site by simple and easy hoisting device (hang on the suspension hook of simple and easy hoisting device by material, implement to promote by the winch of simple and easy hoisting device, rise to the desired location and install, to satisfy the needs of the second joint tower hoisting);
4) after second of the steel chimney tower joint pylon (pylon cross bar or pylon support 12) installs, to move a upper lateral part that is fixed on the mounted second joint pylon on the hanger 15, the material (pylon cross bar or pylon support 12) of the 3rd joint pylon of steel chimney tower lifts the installation site by simple and easy hoisting device; The rest may be inferred, all installs up to steel chimney tower.