CN202744226U - Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane - Google Patents

Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane Download PDF

Info

Publication number
CN202744226U
CN202744226U CN 201220384562 CN201220384562U CN202744226U CN 202744226 U CN202744226 U CN 202744226U CN 201220384562 CN201220384562 CN 201220384562 CN 201220384562 U CN201220384562 U CN 201220384562U CN 202744226 U CN202744226 U CN 202744226U
Authority
CN
China
Prior art keywords
arm
hoisting
olecranon
tower crane
arm head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220384562
Other languages
Chinese (zh)
Inventor
周勇
张�浩
赵蓉
杨硕
常石
赖开云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Construction Co Sichuan Province
Original Assignee
Sichuan Jincheng Construction Machinery Co Ltd
SICHUAN NO3 CONSTRUCTION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jincheng Construction Machinery Co Ltd, SICHUAN NO3 CONSTRUCTION ENGINEERING Co filed Critical Sichuan Jincheng Construction Machinery Co Ltd
Priority to CN 201220384562 priority Critical patent/CN202744226U/en
Application granted granted Critical
Publication of CN202744226U publication Critical patent/CN202744226U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a hoisting tri-magnification rope winding olecranon-shaped arm head of a moving arm tower crane, belongs to the technical field of construction engineering machinery and aims at solving the technical problems of a lifting hook pulley group of the existing moving arm tower crane that a steel wire rope is apt to deform and damage, hoisting magnification changing is difficult, high altitude operation is large in danger, the hook is apt to twist and the like. The hoisting tri-magnification rope winding olecranon-shaped arm head is characterized in that an arm end guide pulley (3) is arranged at the middle position of an arm head lower layer plane (20) close to the arm head end, and an arm end straightener (7) is arranged at the middle position of the arm head lower layer plane (20) far away from the arm head end. Upper layer web rods (12) are symmetrically arranged on two sides of a reinforced rod (11) of an upper layer plane (10). A hoisting steel wire rope (4) winds a hook pulley group (5), is pulled to the end of a hoisting arm, winds the guide pulley (3) and is pulled to the hook position, and the hoisting steel wire rope (4) and a hook straightener (6) are connected in pivoting mode.

Description

The arm tower crane three multiplying power wiring olecranon-like arm heads that hoist
Technical field
The utility model patent relates to the constructional engineering machinery technical field, particularly the three multiplying power wiring olecranon-like arm heads that hoist of arm tower crane.
Background technology
The existing tower lifting of swing arm hoist the lifting hook pulley group adopt can swing with the jib vertical suspension bracket in plane that hoists, its principle is: hoist rope is by after the walking around of arm end leading sheave, but move into again swing hanger after moving into the sister block group of lifting hook pulley group, be fixed on the straight device of reason of arm end after moving into again the single-sheaved block group of lifting hook pulley group, realize hoisting four multiplying powers.When being converted to two multiplying powers such as need, but need with the swing hanger of arm end get hang after, the straight device of reason of arm end is positioned on the limit of arm end, hoist rope is by after the walking around of arm end leading sheave, after moving into the sister block group of lifting hook pulley group, raising line is fixed on the straight device of reason of arm end, realizes hoisting two multiplying powers.
Mainly there is following shortcoming in the existing tower lifting of the swing arm lifting hook pulley group that hoists:
1, raising line will reverse 90 ° at the leading sheave place, accelerates the deformation failure of steel rope;
2, hoist zoom rate difficulty, high-altitude application is dangerous large;
3, during the superelevation lifting altitude, two sheave shafts are apart from little, and suspension hook is easily beaten strand.
Summary of the invention
The utility model is intended to solve the existing tower lifting of the swing arm lifting hook pulley group that hoists and exists the dangerous large and suspension hook of the yielding destruction of steel rope, the zoom that hoists rate difficulty, high-altitude application easily to beat the technical matterss such as strand, but so that the easily arm tower crane three multiplying power wiring olecranon-like arm heads that hoist of a kind of actv. prevention suspension hook wire rope twisting, prolonging service life of steel wire, the conversion of the zoom that hoists rate to be provided.
The purpose of this utility model is achieved through the following technical solutions.
The arm tower crane of the present utility model three multiplying power wiring olecranon-like arm heads that hoist, arm end leading sheave 3 is located at the midway location of layer plane 20 nearly arm headends under the arm head, and the arm end is managed the midway location that straight device 7 is located at layer plane 20 arm ends far away under the arm head; The monosymmetric upper strata web member 12 that is provided with of the stirrup 11 of upper layer plane 10; Hoist rope 4 is walked around lifting hook pulley group 5, is pulled to the crane arm end and walks around arm end leading sheave 3 and be pulled to the suspension hook place again, and hoist rope 4 and suspension hook are managed straight device 6 sell mutually and connect.
The arm tower crane of the present utility model three multiplying power wiring olecranon-like arm heads that hoist, wherein said arm end is managed straight device 7 belows and is provided with overhauling nacelle.
The hoist beneficial effect of three multiplying power wiring olecranon-like arm heads of the utility model arm tower crane:
1. the conversion of 1,2,3 multiplying powers easily can realize hoisting;
2. lifting mechanism rope capacity deficiency and the long shortcoming of hoisting time when having solved arm tower crane superelevation lifting altitude;
3. solved the little shortcoming of general tower horn head assembly pulley wheelbase, make movable arm tower crane when the superelevation lifting altitude sheave shaft apart from increasing, but the problem of actv. prevention suspension hook wire rope twisting occurs.
Description of drawings
The structural representation of Fig. 1 the utility model
Fig. 2 is that the A of Fig. 1 is to local enlarged diagram
Fig. 3 overall work schematic diagram of the present utility model
Fig. 4 local work schematic diagram of the present utility model
Fig. 5 the utility model uses 1 multiplying power work schematic diagram
Fig. 6 the utility model uses 2 multiplying power work schematic diagrams
Fig. 7 the utility model uses 3 multiplying power work schematic diagrams
The number in the figure explanation:
1 lifting mechanism, 2 crane arm support assembly pulleys, 3 arm end leading sheaves, 4 hoist ropes, 5 lifting hook pulley groups, 6 suspension hooks are managed straight device, 7 arm ends are managed layer plane on the straight device, 10,11 stirrups, 12 upper strata web members, 20 times layer planes
The specific embodiment
The utility model detailed structure, application principle, effect and effect with reference to accompanying drawing 1-7, are explained by following embodiment.
The arm tower crane of the present utility model three multiplying power wiring olecranon-like arm heads that hoist, arm end leading sheave 3 is located at the midway location of layer plane 20 nearly arm headends under the arm head, and the arm end is managed the midway location that straight device 7 is located at layer plane 20 arm ends far away under the arm head; The monosymmetric upper strata web member 12 that is provided with of the stirrup 11 of upper layer plane 10; Hoist rope 4 is walked around lifting hook pulley group 5, is pulled to the crane arm end and walks around arm end leading sheave 3 and be pulled to the suspension hook place again, and hoist rope 4 and suspension hook are managed straight device 6 sell mutually and connect.The arm end is managed straight device 7 belows and is provided with overhauling nacelle.
During specific works, at first start lifting mechanism 1, emit hoist rope 4, traction hoist rope 4 passes arm end leading sheave 3 above crane arm support assembly pulley 2.Continue to emit hoist rope 4, allow hoist rope 4 drop down onto ground, prepare to install suspension hook.
As shown in Figure 5, cover of wedge and the suspension hook of hoist rope 4 ends are managed straight device 6 usefulness bearing pin pins even and put on spring cotter, be 1 multiplying power state this moment;
As shown in Figure 6, if will use 2 multiplying power work, then hoist rope 4 is walked around lifting hook pulley group 5, be pulled to the arm end and manage straight device 7 places and with bearing pin hoist rope 4 and arm end are managed straight device 7 pins and connect and put on spring cotter;
As shown in Figure 7, if will use 3 multiplying power work, then hoist rope 4 is walked around lifting hook pulley group 5, be pulled to the crane arm end and walk around arm end leading sheave 3, be pulled to again the suspension hook place and with bearing pin hoist rope and suspension hook managed straight device 6 pins even and put on spring cotter.
In sum, the utility model arm tower crane three multiplying power wiring olecranon-like arm heads that hoist, but actv. prevention suspension hook wire rope twisting, prolonging service life of steel wire, and have the technical characterstics such as the conversion of the zoom of hoisting rate is convenient.

Claims (2)

1. arm tower crane three multiplying power wiring olecranon-like arm heads that hoist, it is characterized in that: arm end leading sheave (3) is located at the midway location of the nearly arm headend of layer plane under the arm head (20), and the arm end is managed the midway location that straight device (7) is located at layer plane under the arm head (20) arm end far away; The monosymmetric upper strata web member (12) that is provided with of the stirrup (11) of upper layer plane (10); Hoist rope (4) is walked around lifting hook pulley group (5), is pulled to the crane arm end and walks around arm end leading sheave (3) and be pulled to the suspension hook place again, and hoist rope (4) and suspension hook are managed straight device (6) sell mutually and connect.
2. arm tower crane according to claim 1 three multiplying power wiring olecranon-like arm heads that hoist, it is characterized in that: described arm end is managed straight device (7) below and is provided with overhauling nacelle.
CN 201220384562 2012-08-06 2012-08-06 Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane Expired - Fee Related CN202744226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220384562 CN202744226U (en) 2012-08-06 2012-08-06 Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220384562 CN202744226U (en) 2012-08-06 2012-08-06 Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane

Publications (1)

Publication Number Publication Date
CN202744226U true CN202744226U (en) 2013-02-20

Family

ID=47703655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220384562 Expired - Fee Related CN202744226U (en) 2012-08-06 2012-08-06 Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane

Country Status (1)

Country Link
CN (1) CN202744226U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103601084A (en) * 2013-11-29 2014-02-26 三一汽车起重机械有限公司 Arm tip pulley mechanism, self-dismounting method thereof and crane
WO2015105414A1 (en) * 2014-01-10 2015-07-16 Itrec B.V. Double jib slewing pedestal crane
CN114105007A (en) * 2021-12-03 2022-03-01 徐工集团工程机械股份有限公司建设机械分公司 Winding method for increasing multiplying power of arm head pulley and crane

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103601084A (en) * 2013-11-29 2014-02-26 三一汽车起重机械有限公司 Arm tip pulley mechanism, self-dismounting method thereof and crane
WO2015105414A1 (en) * 2014-01-10 2015-07-16 Itrec B.V. Double jib slewing pedestal crane
CN105934402A (en) * 2014-01-10 2016-09-07 伊特里克公司 Double-cantilever rotary pedestal crane
CN105934402B (en) * 2014-01-10 2017-07-11 伊特里克公司 Double-cantilever rotary pedestal crane
CN107215791A (en) * 2014-01-10 2017-09-29 伊特里克公司 Double-cantilever rotary base crane and ship comprising same
US9790062B2 (en) 2014-01-10 2017-10-17 Itrec B.V. Double jib slewing pedestal crane
EP3357856A1 (en) * 2014-01-10 2018-08-08 Itrec B.V. Double jib slewing pedestal crane
CN107215791B (en) * 2014-01-10 2018-11-06 伊特里克公司 Double-cantilever rotary base crane and ship comprising same
US10501290B2 (en) 2014-01-10 2019-12-10 Itrec B.V. Double jib slewing pedestal crane
CN114105007A (en) * 2021-12-03 2022-03-01 徐工集团工程机械股份有限公司建设机械分公司 Winding method for increasing multiplying power of arm head pulley and crane

Similar Documents

Publication Publication Date Title
CN201901539U (en) Internal climbing type and external climbing type tower crane with luffing jib
CN201495048U (en) Double movable-arm crane used for iron tower installation
CN201545635U (en) Holding rod with double flat arms
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN101670982B (en) Maintenance gantry crane
CN2858608Y (en) Folding dual-horizontal-arm self-rising crane
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN103708360B (en) Swing arm tower crane, standard knot introduction system thereof and standard knot introduction method
CN201746270U (en) Hoisting mechanism of crane
CN202880719U (en) Olecranon-shaped arm head of hoisting multiplying power winding rope of movable arm tower-type crane
CN201495051U (en) Crane jib for flat-top tower crane
CN101100267A (en) Hoisting device for loop wheel machine
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN102992203A (en) Simple hoisting device for steel structure bridge installation
CN202390116U (en) High-intensity small-tonnage hoist
CN202296838U (en) Crane hook set and crane using same
CN201722053U (en) Hoisting mechanism used for upright column hoisting
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN202988609U (en) Diagonal bracing type derrick crane
CN201762053U (en) Simple automatic hoisting rod
CN205590168U (en) Overturning lifting device
CN101934994A (en) Building high-altitude vertical hoisting double-guide cable system and assisting method
CN202296894U (en) Single-boom gantry crane
CN109279519A (en) A kind of replacing options of Lift Mechanism in Power Hoist wirerope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: SICHUAN JINCHENG BUILDING MACHINERY CO., LTD.

Effective date: 20140813

Owner name: SICHUAN JINCHENG BUILDING MACHINERY CO., LTD.

Free format text: FORMER OWNER: SICHUAN NO. 3 CONSTRUCTION ENGINEERING COMPANY

Effective date: 20140813

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 610051 CHENGDU, SICHUAN PROVINCE TO: 610091 CHENGDU, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140813

Address after: The 8 group of Jinniu District Taurus Township village of Chengdu City, Sichuan province 610091 Chunfeng

Patentee after: SICHUAN JINCHENG CONSTRUCTION MACHINERY Co.,Ltd.

Address before: 610051, No. 162, Section 1, ring road, Chengdu, Sichuan

Patentee before: NO.3 CONSTRUCTION COMPANY SICHUAN PROVINCE

Patentee before: SICHUAN JINCHENG CONSTRUCTION MACHINERY Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: SICHUAN NO. 3 CONSTRUCTION ENGINEERING COMPANY

Free format text: FORMER OWNER: SICHUAN JINCHENG BUILDING MACHINERY CO., LTD.

Effective date: 20150624

Owner name: SICHUAN JINCHENG BUILDING MACHINERY CO., LTD.

Effective date: 20150624

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150624

Address after: 610051, No. 162, Section 1, ring road, Chengdu, Sichuan

Patentee after: NO.3 CONSTRUCTION COMPANY SICHUAN PROVINCE

Patentee after: SICHUAN JINCHENG CONSTRUCTION MACHINERY Co.,Ltd.

Address before: The 8 group of Jinniu District Taurus Township village of Chengdu City, Sichuan province 610091 Chunfeng

Patentee before: SICHUAN JINCHENG CONSTRUCTION MACHINERY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20210806

CF01 Termination of patent right due to non-payment of annual fee