CN205114902U - Device of demolising that attaches wall pull rod of high void tower formula hoist - Google Patents
Device of demolising that attaches wall pull rod of high void tower formula hoist Download PDFInfo
- Publication number
- CN205114902U CN205114902U CN201520929883.4U CN201520929883U CN205114902U CN 205114902 U CN205114902 U CN 205114902U CN 201520929883 U CN201520929883 U CN 201520929883U CN 205114902 U CN205114902 U CN 205114902U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- wall
- attached
- tower crane
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
一种高空塔式起重机的附墙拉杆的拆除装置,包括卷扬机和吊装机构,所述吊装机构由吊装扒杆组成,吊装扒杆的后端通过固定钢丝绳软连接固定在结构支撑体上,以方便转角灵活固定,该结构支撑体可以是结构梁或楼板;所述吊装扒杆上安装有导向滑轮支架,导向滑轮支架上设有导向滑轮,该导向滑轮支架共有三个,分别设于吊装扒杆的根部、前臂部和臂尖部,吊装钢丝绳穿过三个导向滑轮连接至卷扬机;该高空塔式起重机的附墙拉杆的拆除装置解决了高空外附塔式起重机必须违章吊装方能拆除平衡臂处附墙拉杆的问题,避免在塔式起重机附墙拆除过程中发生伤物伤人事件,可以满足不同大小塔式起重机的附墙拉杆拆除,值得大力推广。
A device for removing a wall-attached pull rod of a high-altitude tower crane, including a hoist and a hoisting mechanism, the hoisting mechanism is composed of a hoisting pole, and the rear end of the hoisting pole is fixed on a structural support body through a fixed wire rope soft connection, so as to facilitate The corner is fixed flexibly, and the structural support body can be a structural beam or a floor slab; a guide pulley bracket is installed on the hoisting pole, and a guide pulley is arranged on the guide pulley bracket. There are three guide pulley brackets, which are respectively arranged on the hoisting pole The root, forearm and tip of the arm, the hoisting wire rope passes through three guide pulleys and is connected to the winch; the removal device of the wall-attached pull rod of the high-altitude tower crane solves the problem that the high-altitude external tower crane must be hoisted in violation of regulations to remove the balance arm Solve the problem of wall-attached tie rods, avoid the occurrence of injuries and injuries during the removal of tower cranes attached to the wall, and can meet the removal of wall-attached tie rods for tower cranes of different sizes, which is worthy of vigorous promotion.
Description
技术领域 technical field
本实用新型涉及大型工程机械领域,尤其是一种高空塔式起重机的附墙拉杆的拆除装置。 The utility model relates to the field of large-scale engineering machinery, in particular to a device for removing a wall-attached tie rod of a high-altitude tower crane.
背景技术 Background technique
随着国内高层建筑施工的逐渐成熟化,塔式起重机作为高层及超高层不可缺少的施工设备在建筑施工中起到举足轻重的作用,外附塔式起重机可随着建筑施工高度的增加而增加,该机械设备随着楼层的加高在加装与建筑结构连接的附墙链接体系后可顶升加高,该设备类型在高层建筑施工中应用非常广泛。塔式起重机由于其设计的原因,通常变幅幅度为0m~最大幅度,却平衡臂处无法吊装(平衡臂处为负幅度)。在建筑主体封顶前塔式起重机由于高度一直超过建筑高度可360度自由旋转所以附墙拉杆体系施工不存在吊装困难的问题,一旦结构封顶之后,塔式起重机在拆除前降节过程中,塔式起重机紧贴建筑物,此时塔式起重机无法动作,仅能从起重臂指向方向下降。因此此时平衡臂处的附墙拉杆较难拆除,一般情况下拆除作业工人使用小型吊装葫芦及钢丝绳配合拆除,一旦遇到角度不利情况或附墙拉杆较长的情况下常规拆除方法则显得捉襟见肘,如仍采用主钩方向的起升钢丝绳进行拆除作业则必须歪拉斜吊,该作业方法违反塔式起重机“十不吊”中的安全规定,同时如果结构幕墙或其他结构已施工完成,则极易造成伤物,更有甚者发生伤人事故。外附塔式起重机附墙拉杆拆除作为塔机降节拆除的重要步骤,其拆除的安全及进度直接关系到后续塔式起重机拆除工作的进展。 With the gradual maturity of domestic high-rise building construction, tower cranes, as an indispensable construction equipment for high-rise and super high-rise buildings, play a pivotal role in building construction. The external tower cranes can be increased with the increase of building construction height. With the increase of the floor, the mechanical equipment can be jacked up after installing the wall-attached link system connected with the building structure. This type of equipment is widely used in high-rise building construction. Due to its design, the tower crane usually has a range of amplitude from 0m to the maximum range, but it cannot be hoisted at the balance arm (the balance arm is negative range). Before the main body of the building is capped, the tower crane can freely rotate 360 degrees because the height has always exceeded the height of the building, so there is no problem of hoisting difficulties in the construction of the wall-attached rod system. The crane is close to the building. At this time, the tower crane cannot move, and can only descend from the direction the boom is pointing. Therefore, it is difficult to remove the wall-attached rod at the balance arm at this time. Generally, the demolition workers use small hoisting hoists and wire ropes to remove it. Once the angle is unfavorable or the wall-attached rod is long, the conventional removal method appears to be stretched. If the lifting wire rope in the direction of the main hook is still used for the demolition operation, it must be tilted and tilted. This operation method violates the safety regulations in the "Ten Do Not Lift" of tower cranes. It is very easy to cause injury, and what is more, an accident of injury occurs. The removal of the wall-attached tie rods of the external tower crane is an important step in the removal of the lower section of the tower crane. The safety and progress of its removal are directly related to the progress of the subsequent removal of the tower crane.
实用新型内容 Utility model content
本实用新型提供如下技术方案:一种高空塔式起重机的附墙拉杆的拆除装置,包括卷扬机和吊装机构,所述吊装机构由吊装扒杆组成,吊装扒杆的后端通过固定钢丝绳软连接固定在结构支撑体上;所述吊装扒杆上安装有导向滑轮支架,导向滑轮支架上设有导向滑轮,该导向滑轮支架共有三个,分别设于吊装扒杆的根部、前臂部和臂尖部,吊装钢丝绳穿过三个导向滑轮连接至卷扬机,该卷扬机通过固定高强度螺栓与结构支撑体固定,吊装钢丝绳的末端连接有吊索具。 The utility model provides the following technical proposal: a device for removing the wall-attached pull rod of a high-altitude tower crane, including a hoist and a hoisting mechanism, the hoisting mechanism is composed of a hoisting pole, and the rear end of the hoisting pole is fixed through a fixed steel wire rope soft connection On the structural support body; a guide pulley bracket is installed on the hoisting pole, and a guide pulley is arranged on the guide pulley bracket. There are three guide pulley brackets, which are respectively located at the root, forearm and arm tip of the hoisting pole The hoisting wire rope passes through three guide pulleys and is connected to the hoist, the hoist is fixed to the structural support by fixing high-strength bolts, and the end of the hoisting wire rope is connected to a sling.
作为本实用新型的进一步方案:所述卷扬机的底部均设有钢垫板。 As a further solution of the utility model: the bottom of the winch is provided with a steel backing plate.
作为本实用新型的进一步方案:所述吊装扒杆的前部底部设有一垫高马凳,垫高马凳底部通过固定高强度螺栓与结构支撑体固定。 As a further solution of the present utility model: the bottom of the front part of the hoisting pole is provided with a raised horse stool, and the bottom of the raised horse stool is fixed to the structural support by fixing high-strength bolts.
作为本实用新型的进一步方案:所述垫高马凳底部均设有钢垫板。 As a further solution of the utility model: the bottom of the elevated horse stool is provided with a steel backing plate.
与现有技术相比,本实用新型的有益效果是:该高空塔式起重机的附墙拉杆的拆除装置解决了高空外附塔式起重机必须违章吊装方能拆除平衡臂处附墙拉杆的问题,避免在塔式起重机附墙拆除过程中发生伤物伤人事件,通过合理的选用适宜大小的卷扬机、吊装扒杆可以满足不同大小塔式起重机的附墙拉杆拆除,同时通过调节固定钢丝绳的位置可将拆除扒杆很好的应用在不同位置处附墙拉杆拆除工作的应用当中,同时固定高强度螺栓的应用可满足不同厚度结构梁或楼板的连接要求,所有的结构件在使用完成后均可拆除后移装使用,设备可循环并无损耗,该装置能在保证施工安全的基础上有着较好、普遍的适用性,且能减少工期消耗并避免事故损失,值得大力推广。 Compared with the prior art, the beneficial effect of the utility model is: the removal device of the wall-attached rod of the high-altitude tower crane solves the problem that the high-altitude external tower crane must be hoisted in violation of regulations to remove the wall-attached rod at the balance arm, To avoid the occurrence of injury and injury during the demolition of the wall attached to the tower crane, the removal of the pull rods attached to the wall of tower cranes of different sizes can be satisfied by reasonably selecting the appropriate size hoist and hoisting pole. At the same time, by adjusting the position of the fixed wire rope, the The demolition pole is well applied in the application of the demolition work of the wall-attached rods at different positions. At the same time, the application of fixing high-strength bolts can meet the connection requirements of structural beams or floors of different thicknesses. All structural parts can be used after use. After dismantling and reinstalling, the equipment can be recycled without loss. This device can have good and universal applicability on the basis of ensuring construction safety, and can reduce construction period consumption and avoid accident losses. It is worthy of vigorous promotion.
附图说明 Description of drawings
图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;
图2为吊装扒杆的结构示意图; Fig. 2 is the structural representation of hoisting pole;
图3为吊装扒杆的俯视图; Fig. 3 is the top view of lifting rod;
图4为本实用新型的工作示意图。 Fig. 4 is the working schematic diagram of the utility model.
图中:1-卷扬机、2-吊装扒杆、3-固定钢丝绳、4-导向滑轮支架、5-吊装钢丝绳、6-固定高强度螺栓、7-吊索具、8-垫高马凳、9-钢垫板、21-结构支撑体、22-平衡臂方向拉杆、23-起重臂方向拉杆、24-塔吊塔身及附墙框、25-塔吊平衡臂、26-塔吊起重臂。 In the figure: 1-winch, 2-hoisting pole, 3-fixed wire rope, 4-guide pulley bracket, 5-hoisting wire rope, 6-fixed high-strength bolts, 7-sling, 8-raised horse stool, 9 -Steel backing plate, 21-Structural support body, 22-Tie rod in the direction of the balance arm, 23-Tie rod in the direction of the boom, 24-Tower crane tower body and attached wall frame, 25-Tower crane balance arm, 26-Tower crane jib.
具体实施方式 detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。 The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-4,本实用新型实施例中,一种高空塔式起重机的附墙拉杆的拆除装置,包括卷扬机1和吊装机构,所述吊装机构由吊装扒杆2组成,吊装扒杆2的后端通过固定钢丝绳3软连接固定在结构支撑体21上,以方便转角灵活固定,该结构支撑体21可以是结构梁或楼板;所述吊装扒杆2上安装有导向滑轮支架4,导向滑轮支架4上设有导向滑轮,该导向滑轮支架4共有三个,分别设于吊装扒杆2的根部、前臂部和臂尖部,吊装钢丝绳5穿过三个导向滑轮连接至卷扬机1,该卷扬机1通过固定高强度螺栓6与结构支撑体21固定,吊装钢丝绳5的末端连接有吊索具7;在一些安装场地下,为了防止碰撞建筑结构突出部位,该吊装扒杆2的前部底部设有一垫高马凳8,垫高马凳8底部通过固定高强度螺栓6与结构支撑体21固定;所述卷扬机1和垫高马凳8底部均设有钢垫板9,减小对安装面的压强,提高其稳定性。 Please refer to Fig. 1-4, in the embodiment of the present utility model, a kind of dismantling device of the tie rod attached to the wall of high-altitude tower crane, comprises winch 1 and hoisting mechanism, and described hoisting mechanism is made up of hoisting pole 2, hoisting pole 2 The rear end of the rear end is fixed on the structural support body 21 through the flexible connection of the fixed steel wire rope 3, so as to facilitate the flexible fixing of the corner. The structural support body 21 can be a structural beam or a floor slab; The pulley support 4 is provided with a guide pulley, and the guide pulley support 4 has three, which are respectively located at the root, the forearm and the tip of the arm of the hoisting pole 2. The hoisting wire rope 5 passes through the three guide pulleys and is connected to the hoist 1. The hoist 1 is fixed to the structural support body 21 by fixing high-strength bolts 6, and the end of the hoisting wire rope 5 is connected with a sling 7; in some installation sites, in order to prevent collision with the protruding parts of the building structure, the front bottom of the hoisting pole 2 There is a raised horse stool 8, and the bottom of the raised horse stool 8 is fixed with the structural support body 21 by fixing high-strength bolts 6; the hoist 1 and the raised horse stool 8 are provided with a steel backing plate 9 at the bottom, reducing the impact on the installation. The pressure on the surface improves its stability.
本实用新型的施工过程:根据吊装附墙拉杆的重量大小、附墙拉杆长度选择适宜的卷扬机1先通过钢垫板9、固定高强度螺栓6固定在结构适宜的楼板或者梁处,第二步焊接好吊装扒杆2,并在吊装扒杆2上焊接滑轮支架4,支架上安装导向滑轮。吊装扒杆2朝向吊装方位的附墙拉杆后用钢丝绳穿孔固定吊装扒杆2根部,垫高马凳8也采取同样的方式与结构支撑体21固定,吊装扒杆2高度略超过结构突出部位。紧固各处连接后启动卷扬机1放出吊装钢丝绳5穿过导向滑轮后穿好吊索具7后便可用于附墙拉杆的吊装,拆除完成一处附墙拉杆后通过调节固定钢丝绳3的固定位置可以将吊装扒杆2转向另一处进行的该处附墙拉杆的吊装,同时卷扬机1容绳量需满足吊装要求。 Construction process of the present utility model: according to the weight size of hoisting wall-attached pull rod, the length of attached wall pull-rod selects suitable hoist 1 and first passes steel backing plate 9, fixes high-strength bolt 6 and is fixed on the floor slab or the beam place of suitable structure, the second step Weld the hoisting pole 2, and weld the pulley bracket 4 on the hoisting pole 2, and guide pulleys are installed on the bracket. The hoisting pole 2 is fixed to the root of the hoisting pole 2 with a wire rope perforated towards the wall-attached pull bar in the hoisting direction, and the padded horse stool 8 is also fixed to the structural support body 21 in the same way, and the height of the hoisting pole 2 is slightly higher than the structural protrusion. After tightening all the connections, start the hoist 1 and release the hoisting wire rope 5 to pass through the guide pulley and put on the sling 7 and then it can be used for hoisting the wall-attached rod. After removing a wall-attached rod, adjust and fix the fixed position of the wire rope 3 The hoisting pole 2 can be turned to another place for hoisting of the tie rod attached to the wall at this place, and the rope capacity of the winch 1 must meet the hoisting requirements at the same time.
本实用新型的优点:该装置的设计应用避免了高空外附塔式起重机必须违章吊装方能拆除平衡臂处附墙拉杆的问题,避免在塔式起重机附墙拆除过程中发生伤物伤人事件,通过合理的选用适宜大小的卷扬机、吊装扒杆可以满足不同大小塔式起重机的附墙拉杆拆除,同时通过调节固定钢丝绳的位置可将拆除扒杆很好的应用在不同位置处附墙拉杆拆除工作的应用当中,同时固定高强度螺栓的应用可满足不同厚度结构梁或楼板的连接要求,所有的结构件在使用完成后均可拆除后移装使用,设备可循环并无损耗,该装置能在保证施工安全的基础上有着较好、普遍的适用性,且能减少工期消耗并避免事故损失。 The utility model has the advantages: the design and application of the device avoids the problem that the tower crane attached to the tower crane outside the high altitude must be hoisted against the regulations to remove the wall-attached rod at the balance arm, and avoids the occurrence of injury and injury during the removal process of the tower crane attached to the wall , through reasonable selection of suitable size hoist and hoisting rod, it can satisfy the removal of wall-attached rods of tower cranes of different sizes, and at the same time, by adjusting the position of the fixed wire rope, the demolition rod can be well applied in different positions for the removal of wall-attached rods In the application of work, the application of fixing high-strength bolts at the same time can meet the connection requirements of structural beams or floors of different thicknesses. All structural parts can be removed and reinstalled after use. The equipment can be recycled without loss. The device can On the basis of ensuring construction safety, it has good and universal applicability, and can reduce construction period consumption and avoid accident losses.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。 It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。 In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520929883.4U CN205114902U (en) | 2015-11-21 | 2015-11-21 | Device of demolising that attaches wall pull rod of high void tower formula hoist |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520929883.4U CN205114902U (en) | 2015-11-21 | 2015-11-21 | Device of demolising that attaches wall pull rod of high void tower formula hoist |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205114902U true CN205114902U (en) | 2016-03-30 |
Family
ID=55570528
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520929883.4U Expired - Fee Related CN205114902U (en) | 2015-11-21 | 2015-11-21 | Device of demolising that attaches wall pull rod of high void tower formula hoist |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205114902U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105883645A (en) * | 2016-06-29 | 2016-08-24 | 中交路桥华南工程有限公司 | How to remove the tower crane attachment device |
| CN106829739A (en) * | 2017-03-01 | 2017-06-13 | 南通庞源机械工程有限公司 | A kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar |
| CN107444935A (en) * | 2017-06-19 | 2017-12-08 | 五冶集团上海有限公司 | A kind of Anti-knocking method that ship unloaders cantilever girder pull bar is removed |
| CN108238552A (en) * | 2016-12-26 | 2018-07-03 | 广东庞源工程机械有限公司 | A kind of multi-functional bar of lying prone of the assembled being connect with structure |
-
2015
- 2015-11-21 CN CN201520929883.4U patent/CN205114902U/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105883645A (en) * | 2016-06-29 | 2016-08-24 | 中交路桥华南工程有限公司 | How to remove the tower crane attachment device |
| CN105883645B (en) * | 2016-06-29 | 2018-01-05 | 中交路桥华南工程有限公司 | Method for dismantling attachment device of tower crane |
| CN108238552A (en) * | 2016-12-26 | 2018-07-03 | 广东庞源工程机械有限公司 | A kind of multi-functional bar of lying prone of the assembled being connect with structure |
| CN108238552B (en) * | 2016-12-26 | 2019-06-11 | 广东庞源工程机械有限公司 | A kind of multi-functional bar of lying prone of the assembled being connect with structure |
| CN106829739A (en) * | 2017-03-01 | 2017-06-13 | 南通庞源机械工程有限公司 | A kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar |
| CN106829739B (en) * | 2017-03-01 | 2017-12-29 | 南通庞源机械工程有限公司 | A kind of method that tower crane attached wall pull bar is dismantled using suspension bridge |
| CN107444935A (en) * | 2017-06-19 | 2017-12-08 | 五冶集团上海有限公司 | A kind of Anti-knocking method that ship unloaders cantilever girder pull bar is removed |
| CN107444935B (en) * | 2017-06-19 | 2020-05-01 | 五冶集团上海有限公司 | Anti-collision method for dismantling pull rod of cantilever girder of ship unloader |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106115500B (en) | A kind of high-rise building is special, and tearing formula roofing open hangs and tears open certainly method certainly | |
| CN205114903U (en) | Demolition structure of tower crane counter weight | |
| CN101734560B (en) | High-altitude dismantling method of inside-climbing tower crane for towering structure construction | |
| CN205114902U (en) | Device of demolising that attaches wall pull rod of high void tower formula hoist | |
| CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
| CN108892060A (en) | A kind of crane upper mechanism is from dismantling device, crane and tears method open certainly | |
| CN103375022B (en) | Multi-functional dynamic rail attached lifting scaffold | |
| CN205419580U (en) | A hoist and mount system for dismantling tower crane overlength pull rod | |
| CN102320522B (en) | Hoisting in-place method for allowing large equipment to pass through ultrahigh hole | |
| CN205802841U (en) | Manual multifunctional ground jack | |
| CN209127874U (en) | A kind of concurrent lifting device | |
| CN202000647U (en) | Base device for lifting scaffold in elevator shaft | |
| CN208120600U (en) | A kind of quick provision for disengagement of large size inside-climbing tower crane | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| CN207079898U (en) | Outer hanging basket structure | |
| CN112279121A (en) | Method for dismantling tower crane | |
| CN104153561A (en) | Template climbing falling preventing system | |
| CN205590168U (en) | Overturning lifting device | |
| CN201882820U (en) | Automatic jacking device for buffer rod of variable-amplitude auxiliary arm of wheel crane | |
| CN210944589U (en) | Self-detaching attachment mechanism | |
| CN211283410U (en) | A hoisting protection device for assembly building | |
| CN210763910U (en) | Auxiliary force application structure for hoisting steel structure | |
| CN205367538U (en) | Swing crane and A cabinet frame thereof | |
| CN106836019B (en) | Adjustable large-scale component hanging apparatus for bridge strengthening repair | |
| CN217759938U (en) | A special lifting device for attached lift scaffold demolishs in air |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP02 | Change in the address of a patent holder |
Address after: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province Patentee after: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD. Address before: 510635 Unit 212, Second Floor, Comprehensive Building of Science and Technology Innovation Base, No. 80 Lanyue Road, Science City, Guangzhou High-tech Industrial Development Zone, Guangdong Province Patentee before: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD. |
|
| CP02 | Change in the address of a patent holder | ||
| CP02 | Change in the address of a patent holder |
Address after: Room 109-12, Building 3, 43 Yingbin Avenue West, Huadu District, Guangzhou City, Guangdong 510000 Patentee after: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD. Address before: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province Patentee before: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD. |
|
| CP02 | Change in the address of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |