CN105384089A - Tower crane cargo boom pull rod structure - Google Patents
Tower crane cargo boom pull rod structure Download PDFInfo
- Publication number
- CN105384089A CN105384089A CN201510720339.3A CN201510720339A CN105384089A CN 105384089 A CN105384089 A CN 105384089A CN 201510720339 A CN201510720339 A CN 201510720339A CN 105384089 A CN105384089 A CN 105384089A
- Authority
- CN
- China
- Prior art keywords
- plate
- tie rod
- tie
- rod
- pull rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 230000001105 regulatory effect Effects 0.000 claims 2
- 238000004519 manufacturing process Methods 0.000 abstract description 10
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 8
- 238000011900 installation process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
本发明公开了一种塔机起重臂拉杆结构,包括单个塔顶滑轮(3)、内拉板(1)、外拉板(2)、内拉杆(5)、外拉杆(6),还包括两端分别连接内拉板(1)、内拉杆(5)的内调节板(7),以及两端分别连接外拉板(2)、外拉杆(6)的外调节板(8)。有益效果是取消拉板器结构,并减少了塔顶滑轮组数量,使起重臂拉杆制造变得简单、成本降低,通过增加内外调节板,使拉杆在安装过程中轻松就位。
The invention discloses a tower crane jib tie rod structure, comprising a single tower top pulley (3), an inner tie plate (1), an outer tie plate (2), an inner tie rod (5), an outer tie rod (6), and It includes an inner adjustment plate (7) whose two ends are respectively connected to the inner pull plate (1) and the inner pull rod (5), and an outer adjustment plate (8) whose two ends are respectively connected to the outer pull plate (2) and the outer pull rod (6). The beneficial effect is that the puller structure is canceled, and the number of pulley blocks at the top of the tower is reduced, so that the manufacture of the jib tie rod is simplified and the cost is reduced. By adding the inner and outer adjustment plates, the tie rod can be easily placed in place during installation.
Description
技术领域 technical field
本发明涉及一种拉杆结构,尤其涉及一种塔机起重臂拉杆结构。 The invention relates to a tie rod structure, in particular to a tower crane lifting arm tie rod structure.
背景技术 Background technique
现有塔机起重臂拉杆的设计,如图1-图7所示,起重臂拉杆采用拉板器结构、塔顶采用双滑轮组结构。起重臂拉杆安装时,起升钢丝绳依次通过塔顶滑轮、拉板器滑轮、塔顶滑轮后固定在拉板器上,最后用销轴将拉板器与塔顶内外拉杆拉板连接起来。 The design of the jib tie rod of the existing tower crane is shown in Figures 1-7. The jib tie rod adopts a puller structure, and the tower top adopts a double pulley block structure. When installing the boom pull rod, the hoisting steel wire rope passes through the tower top pulley, puller pulley, and tower top pulley in turn and is fixed on the puller, and finally the puller is connected with the inner and outer tie rod pull plates at the top of the tower with a pin.
上述结构的缺点在于滑轮组多、结构重、制造复杂、成本高,具体说明如下:1、由于塔顶滑轮组有两个,拉板器上还有一个,导致滑轮组数量多,成本高;2、由于拉板器的结构重量大、部件多,导致制造成本高;3、结构部件多,安装复杂。 The disadvantage of the above structure is that there are many pulley blocks, heavy structure, complicated manufacture, and high cost. The specific description is as follows: 1. Since there are two pulley blocks on the top of the tower and one on the puller, the number of pulley blocks is large and the cost is high; 2. Due to The plate pulling device has a large structural weight and many parts, resulting in high manufacturing cost; 3. There are many structural parts and complicated installation.
发明内容 Contents of the invention
针对上述现存的技术问题,本发明提供一种塔机起重臂拉杆结构,使塔机起重臂拉杆的制造简单,成本低廉,安装方便。 In view of the above existing technical problems, the present invention provides a tower crane jib tie rod structure, which makes the manufacture of the tower crane jib tie rod simple, low in cost and easy to install.
为实现上述目的,本发明提供一种塔机起重臂拉杆结构,包括单个塔顶滑轮、内拉板、外拉板、内拉杆、外拉杆,还包括两端分别连接内拉板、内拉杆的内调节板,以及两端分别连接外拉板、外拉杆的外调节板。 In order to achieve the above object, the present invention provides a tower crane jib tie rod structure, which includes a single tower top pulley, an inner pull plate, an outer pull plate, an inner pull rod, and an outer pull rod, and also includes two ends connected to the inner pull plate and the inner pull rod respectively. The inner adjustment plate, and the outer adjustment plate whose two ends are respectively connected to the outer pull plate and the outer pull rod.
进一步,还包括安装钢丝绳,其经过塔顶滑轮后,直接固定在外拉杆上。 Further, it also includes installing a steel wire rope, which is directly fixed on the outer pull rod after passing through the tower top pulley.
进一步,还包括安装钢丝绳,其经过塔顶滑轮后,直接固定在内拉杆上。 Further, it also includes installing a steel wire rope, which is directly fixed on the inner tie rod after passing through the tower top pulley.
本发明通过取消拉板器结构,并减少了塔顶滑轮组数量,使起重臂拉杆制造变得简单、成本降低,通过增加内外调节板,使拉杆在安装过程中轻松就位。具有如下有益效果: The invention eliminates the structure of the puller and reduces the number of pulley blocks on the top of the tower, so that the manufacture of the boom pull rod is simplified and the cost is reduced. By adding internal and external adjustment plates, the pull rod can be easily placed in place during installation. It has the following beneficial effects:
1、由于结构形式简单,部件少,所以制造过程变得方便快捷。 1. Due to the simple structure and few parts, the manufacturing process becomes convenient and quick.
2、由于结构重量轻、滑轮组少,所以设计制作的成本降低了。 2. Because the structure is light in weight and there are few pulley blocks, the cost of design and manufacture is reduced.
3、由于组装部件变少,所以安装过程也变得快捷。 3. Since the assembly parts are reduced, the installation process becomes quicker.
附图说明 Description of drawings
图1为现有塔机起重臂拉杆的结构示意图; Fig. 1 is the structural representation of existing tower crane jib pull rod;
图2为图1中塔顶拉板部分的结构示意图; Fig. 2 is the structural representation of tower top drawing plate part among Fig. 1;
图3为图2中A-A向的结构示意图; Fig. 3 is a schematic structural diagram of A-A direction in Fig. 2;
图4为图2中B-B向的结构示意图; Fig. 4 is a schematic structural diagram of B-B direction in Fig. 2;
图5为图1中拉杆部分的结构示意图; Fig. 5 is a structural schematic diagram of the pull rod part in Fig. 1;
图6为图5中C-C向的结构示意图; Fig. 6 is a schematic structural diagram of C-C direction in Fig. 5;
图7为图5中D-D向的结构示意图; Fig. 7 is a schematic structural diagram of D-D direction in Fig. 5;
图8为本发明的结构示意图; Fig. 8 is a structural schematic diagram of the present invention;
图9为图8中A-A向的结构示意图; Fig. 9 is a schematic structural diagram of direction A-A in Fig. 8;
图10为图8中B-B向的结构示意图。 FIG. 10 is a schematic structural diagram of the B-B direction in FIG. 8 .
图中:1、内拉板,2、外拉板,3、塔顶滑轮,4、拉板器,5、内拉杆,6、外拉杆,7、内调节板,8、外调节板。 Among the figure: 1, inner pull plate, 2, outer pull plate, 3, tower top pulley, 4, plate puller, 5, inner pull rod, 6, outer pull rod, 7, inner adjustment plate, 8, outer adjustment plate.
具体实施方式 detailed description
下面结合附图对本发明作进一步说明。 The present invention will be further described below in conjunction with accompanying drawing.
如图8-图10所示,本发明包括安装钢丝绳、单个塔顶滑轮3、内拉板1、外拉板2、内拉杆5、外拉杆6,还包括两端分别连接内拉板1、内拉杆5的内调节板7,以及两端分别连接外拉板2、外拉杆6的外调节板8。 As shown in Figures 8-10, the present invention includes installing a steel wire rope, a single tower top pulley 3, an inner pull plate 1, an outer pull plate 2, an inner pull rod 5, and an outer pull rod 6, and also includes connecting the inner pull plate 1, The inner adjustment plate 7 of the inner tie rod 5, and the outer adjustment plate 8 whose two ends are respectively connected with the outer tie plate 2 and the outer tie rod 6.
起重臂拉杆安装时,一般先安装外拉杆6再安装内拉杆5,所以先将安装钢丝绳绕过塔顶滑轮3直接固定在外拉杆6上,通过外调节板8调节外拉板2、外拉杆6的安装位置;然后将安装钢丝绳绕过塔顶滑轮3直接固定在内拉杆5上,通过内调节板7调节内拉板1、内拉杆5的安装位置。 When installing the jib tie rod, generally install the outer tie rod 6 first and then install the inner tie rod 5, so first install the steel wire rope around the tower top pulley 3 and directly fix it on the outer tie rod 6, and adjust the outer tie plate 2 and the outer tie rod through the outer adjustment plate 8 6; then install the steel wire rope around the tower top pulley 3 and directly fix it on the inner tie rod 5, and adjust the installation positions of the inner tie plate 1 and the inner tie rod 5 through the inner adjustment plate 7.
本发明塔顶采用单滑轮组,去除了起重臂拉杆拉板器,通过起重臂拉杆的内外调节板,使起重臂拉杆在安装时具有调节就位的功能,具有部件少、结构轻、成本低等优点。 The tower top of the present invention adopts a single pulley block, removes the boom tie rod puller, and through the inner and outer adjustment plates of the boom tie rod, the boom tie rod has the function of adjusting in place during installation, with fewer parts, light structure, Low cost and other advantages.
通过应用该技术,XGT80DQ(5610-6)的起重臂拉杆不但在生产和安装过程中非常方便、快捷,还缩短了生产周期及生产成本。同时也对其它产品的设计具有重要的参考价值和应用价值。 By applying this technology, the boom tie rod of XGT80DQ (5610-6) is not only very convenient and fast in the production and installation process, but also shortens the production cycle and production cost. At the same time, it also has important reference value and application value for the design of other products.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510720339.3A CN105384089A (en) | 2015-10-30 | 2015-10-30 | Tower crane cargo boom pull rod structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510720339.3A CN105384089A (en) | 2015-10-30 | 2015-10-30 | Tower crane cargo boom pull rod structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105384089A true CN105384089A (en) | 2016-03-09 |
Family
ID=55416938
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510720339.3A Pending CN105384089A (en) | 2015-10-30 | 2015-10-30 | Tower crane cargo boom pull rod structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105384089A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106365050A (en) * | 2016-11-10 | 2017-02-01 | 徐州建机工程机械有限公司 | Novel pull rod fast installation structure |
| CN106904543A (en) * | 2017-03-02 | 2017-06-30 | 哈尔滨理工大学 | A kind of new derrick runway girder pull bar installation plate pulling device |
| CN106927376A (en) * | 2017-05-08 | 2017-07-07 | 哈尔滨理工大学 | A kind of new derrick runway girder Tiebar structure |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1031530A1 (en) * | 1999-02-26 | 2000-08-30 | Potain | Device for simultaneously folding or unfolding elements of the tip of the crane-jib |
| CN202492307U (en) * | 2011-12-01 | 2012-10-17 | 中联重科股份有限公司 | Connecting head for jib tie rod and tower crane having the same |
| CN202625668U (en) * | 2012-06-13 | 2012-12-26 | 山东永力起重机械股份有限公司 | Adjustment device for crane boom pull rod |
| CN202924633U (en) * | 2012-11-15 | 2013-05-08 | 中联重科股份有限公司 | Boom tie rod and tower crane including the boom tie rod |
| CN103287995A (en) * | 2013-06-03 | 2013-09-11 | 哈尔滨华拓金属结构有限公司 | Supporting pulling plate type boom pull rod of tower crane and installation method |
| CN104528547A (en) * | 2014-12-30 | 2015-04-22 | 徐州建机工程机械有限公司 | Cargo boom pull rod structure, cargo boom and crane |
| CN205241107U (en) * | 2015-10-30 | 2016-05-18 | 徐州建机工程机械有限公司 | Tower crane boom rod structure |
-
2015
- 2015-10-30 CN CN201510720339.3A patent/CN105384089A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1031530A1 (en) * | 1999-02-26 | 2000-08-30 | Potain | Device for simultaneously folding or unfolding elements of the tip of the crane-jib |
| CN202492307U (en) * | 2011-12-01 | 2012-10-17 | 中联重科股份有限公司 | Connecting head for jib tie rod and tower crane having the same |
| CN202625668U (en) * | 2012-06-13 | 2012-12-26 | 山东永力起重机械股份有限公司 | Adjustment device for crane boom pull rod |
| CN202924633U (en) * | 2012-11-15 | 2013-05-08 | 中联重科股份有限公司 | Boom tie rod and tower crane including the boom tie rod |
| CN103287995A (en) * | 2013-06-03 | 2013-09-11 | 哈尔滨华拓金属结构有限公司 | Supporting pulling plate type boom pull rod of tower crane and installation method |
| CN104528547A (en) * | 2014-12-30 | 2015-04-22 | 徐州建机工程机械有限公司 | Cargo boom pull rod structure, cargo boom and crane |
| CN205241107U (en) * | 2015-10-30 | 2016-05-18 | 徐州建机工程机械有限公司 | Tower crane boom rod structure |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106365050A (en) * | 2016-11-10 | 2017-02-01 | 徐州建机工程机械有限公司 | Novel pull rod fast installation structure |
| CN106904543A (en) * | 2017-03-02 | 2017-06-30 | 哈尔滨理工大学 | A kind of new derrick runway girder pull bar installation plate pulling device |
| CN106927376A (en) * | 2017-05-08 | 2017-07-07 | 哈尔滨理工大学 | A kind of new derrick runway girder Tiebar structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207878295U (en) | Suspension bridge cable changing device | |
| CN204454235U (en) | A kind of novel many suspension centres equalizing bar device | |
| CN105384089A (en) | Tower crane cargo boom pull rod structure | |
| CN104003291B (en) | A kind of power plant boiler equipment installation single track is walked suspender | |
| CN203462444U (en) | Device for operating plane steel gate by hydraulic hoist | |
| CN205241107U (en) | Tower crane boom rod structure | |
| CN205034944U (en) | Web hoisting accessory | |
| CN204265218U (en) | A kind of power station unit internal head cover special hanger | |
| CN203112332U (en) | Eccentric lifting device for dome | |
| CN205132977U (en) | Movable swing arm tower machine installation wire rope | |
| CN204342318U (en) | Single pulley type crane arm pull bar | |
| CN206126705U (en) | Jib loading boom pull rod fixing device | |
| CN106927376A (en) | A kind of new derrick runway girder Tiebar structure | |
| CN104512818A (en) | Auxiliary device for mounting tower crane | |
| CN105366559A (en) | Small hoisting machine fixed on channel steel framework | |
| CN204281029U (en) | A kind of stressed clear and definite and adjustable operation platform suspender of suspension centre | |
| CN204342316U (en) | For installing the auxiliary device of tower crane | |
| CN203529713U (en) | High-voltage bushing hoisting structure | |
| CN202721386U (en) | utility model | |
| CN201647800U (en) | Adjustable unequal-length wire rope sling | |
| CN204752033U (en) | Tower machine balance arm pull rod connection structure | |
| CN104355225B (en) | A kind of power station unit internal head cover hanging method | |
| CN205294697U (en) | A heavy burden structure for material hoist mechanism that reciprocates | |
| CN204156423U (en) | 500kV jumper string wire clamp thread-lifting hook | |
| CN204281126U (en) | Crane arm pull bar and there is the tower crane of this pull bar |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160309 |
|
| WD01 | Invention patent application deemed withdrawn after publication |