CN203199850U - Elevator counter-weight frame upper beam assembly structure - Google Patents

Elevator counter-weight frame upper beam assembly structure Download PDF

Info

Publication number
CN203199850U
CN203199850U CN 201320140528 CN201320140528U CN203199850U CN 203199850 U CN203199850 U CN 203199850U CN 201320140528 CN201320140528 CN 201320140528 CN 201320140528 U CN201320140528 U CN 201320140528U CN 203199850 U CN203199850 U CN 203199850U
Authority
CN
China
Prior art keywords
rope sheave
sheave
rope
elevator
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320140528
Other languages
Chinese (zh)
Inventor
王亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HIRSCHMANN ELEVATOR CO Ltd
Original Assignee
TIANJIN HIRSCHMANN ELEVATOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HIRSCHMANN ELEVATOR CO Ltd filed Critical TIANJIN HIRSCHMANN ELEVATOR CO Ltd
Priority to CN 201320140528 priority Critical patent/CN203199850U/en
Application granted granted Critical
Publication of CN203199850U publication Critical patent/CN203199850U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

The utility model relates to an elevator counter-weight frame upper beam assembly structure which comprises a rope sheave top plate, a rope sheave shaft clamping plate, a rope sheave and side beams. The upper end and the lower end of the rope sheave top plate are provided with the two side beams, and the rope sheave is installed on the rope sheave top plate and is fixed by a rope sheave shaft clamping plate. The elevator counter-weight frame upper beam assembly structure is characterized in that a rope sheave shaft hole formed in the rope sheave top plate is an opened semicircle shaft hole, a rope sheave shaft is installed in the semicircle shaft hole, the rope sheave shaft clamping plate is installed on the rope sheave top plate on the side of the rope sheave shaft, and the rope sheave shaft is installed on the rope sheave top plate in a positioning mode through the rope sheave shaft clamping plate. According to the elevator counter-weight frame upper beam assembly structure, the rope sheave is installed at last in the production and assembly process of a counter-weight frame, weight reduction and simplification in the assembly process of the counter-weight frame are achieved, production efficiency is improved, and dangerousness is reduced; after an elevator is installed, the rope sheave can be taken down when only the rope sheave shaft clamping plate is disassembled, the maintenance and repair of the rope sheave can be conducted conveniently, and the cost of maintenance and repair after the installation of elevator of is reduced.

Description

A kind of elevator counterweight framework upper beam mounting structure
Technical field
The utility model belongs to the lift facility field, relate to that elevator counterweight framework assembling is produced and the elevator installation after the maintenance of counterweight framework, relate to a kind of elevator counterweight framework upper beam mounting structure.
Background technology
In the elevator production process, the assembling of counterweight framework is a very important link.And in the counterweight frame assembled, rope sheave is that weight is very heavy and hold damageable parts.In existing counterweight framework is put the beams in place assembling, must pulley set will be contained on the rope sheave top board at the process initial stage of assembling counterweight framework, then assembling miscellaneous part and carrying out debugging work.So weight and the damageable parts of appearance will participate in most of process of counterweight frame assembled, so that assembling process is slow, production efficiency is low, dangerous property; And existing elevator for the maintenance maintenance of counterweight framework upper beam rope sheave, also must with just carrying out after the whole counterweight framework dismounting, so just cause the in the future increase of maintenance cost after installation.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art part, provides that a kind of packaging efficiency is high, safety good, maintenance and repair elevator counterweight framework upper beam mounting structure easily,
The purpose of this utility model is achieved through the following technical solutions:
A kind of elevator counterweight framework upper beam mounting structure, comprise rope sheave top board, sheave shaft clamp, rope sheave and curb girder, at rope sheave mounting of roof plate rope sheave, and fix with the sheave shaft clamp, then curb girder is installed at rope sheave top board two ends, is it is characterized in that: the made rope sheave axis hole of described rope sheave top board is open semicircle axis hole, installing rope wheel shaft in this semicircle axis hole, installing rope wheel shaft clamp on the rope sheave top board at sheave shaft cotter way place, by the sheave shaft clamp with the sheave shaft location and installation on the rope sheave top board.
Advantage of the present utility model and beneficial effect are:
1, this mounting structure adopts novel rope sheave top board and sheave shaft clamp, have open axle hole on the rope sheave top board, what be used in conjunction with it is novel sheave shaft clamp, realize in the counterweight framework assembling process, rope sheave is placed on last installation, and (counterweight sheave is heavier, and be difficult for installing), reach lightweight, the simplification of counterweight framework assembling process.
2, after this mounting structure can make the elevator installation, can take off rope sheave after only dismantling the sheave shaft clamp, convenient rope sheave be carried out maintenance and repair, accomplish to have improved production efficiency, reduce danger, reduce the maintenance and repair expense after the elevator installation.
Description of drawings
Fig. 1 is counterweight framework upper beam mounting structure schematic diagram of the present utility model;
Fig. 2 is rope sheave top board structure schematic diagram of the present utility model;
Fig. 3 is sheave shaft clamp structure enlarged diagram of the present utility model.
The specific embodiment
For further understanding content of the present utility model, Characteristic, hereby exemplify following examples, and cooperate accompanying drawing to be described in detail as follows.Need to prove, the present embodiment is descriptive, is not determinate, can not limit thus protection domain of the present utility model.
A kind of elevator counterweight framework upper beam mounting structure comprises rope sheave top board 1, curb girder 5 and rope sheave 4, at rope sheave mounting of roof plate rope sheave, is fixedly mounted with two parallel curb girders at the upper/lower terminal of rope sheave top board.
Innovative point of the present utility model is:
The made rope sheave axis hole 6 of described rope sheave top board is open semicircle axis hole, and installing rope wheel shaft 2 in this semicircle axis hole is installed a sheave shaft clamp 3 at the rope sheave top board of sheave shaft side.The mounting structure of sheave shaft clamp and rope sheave top board is: the upper and lower bilateral symmetry of described semicircle axis hole is shaped with two mounting holes 7, to should also being shaped with two mounting holes 8 on the sheave shaft clamp of two position of mounting hole, corresponding mounting hole by install tightening screw can make the sheave shaft clamp with the sheave shaft location and installation on the rope sheave top board.
Mounting means of the present utility model is:
First two rope sheave top boards and two curb girders are fitted together, after good each parameter of debugging, then the counterweight sheave axle of counterweight sheave is put into the open semicircle axis hole of rope sheave top board, utilized the sheave shaft clamp fastener to fit together at last, finish the production of counterweight framework.
Realize in the counterweight framework assembling process by above step, rope sheave is placed on last installation (counterweight sheave is heavier, and is difficult for installing), accomplishes assembling process lightweight, speed production efficient; And after the elevator installation, can only dismantle the sheave shaft clamp, can take off rope sheave, convenient rope sheave be carried out maintenance and repair, reduce the maintenance and repair expense after the elevator installation.

Claims (1)

1. elevator counterweight framework upper beam mounting structure, comprise rope sheave top board, sheave shaft clamp, rope sheave and curb girder, at rope sheave mounting of roof plate rope sheave, and fix with the sheave shaft clamp, then curb girder is installed at rope sheave top board two ends, is it is characterized in that: the made rope sheave axis hole of described rope sheave top board is open semicircle axis hole, installing rope wheel shaft in this semicircle axis hole, installing rope wheel shaft clamp on the rope sheave top board at sheave shaft cotter way place, by the sheave shaft clamp with the sheave shaft location and installation on the rope sheave top board.
CN 201320140528 2013-03-26 2013-03-26 Elevator counter-weight frame upper beam assembly structure Expired - Fee Related CN203199850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320140528 CN203199850U (en) 2013-03-26 2013-03-26 Elevator counter-weight frame upper beam assembly structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320140528 CN203199850U (en) 2013-03-26 2013-03-26 Elevator counter-weight frame upper beam assembly structure

Publications (1)

Publication Number Publication Date
CN203199850U true CN203199850U (en) 2013-09-18

Family

ID=49143980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320140528 Expired - Fee Related CN203199850U (en) 2013-03-26 2013-03-26 Elevator counter-weight frame upper beam assembly structure

Country Status (1)

Country Link
CN (1) CN203199850U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792764A (en) * 2016-09-02 2018-03-13 三菱电机大楼技术服务株式会社 Elevator counterweight, the construction appliance of counterweight and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792764A (en) * 2016-09-02 2018-03-13 三菱电机大楼技术服务株式会社 Elevator counterweight, the construction appliance of counterweight and construction method
CN107792764B (en) * 2016-09-02 2021-01-05 三菱电机大楼技术服务株式会社 Elevator counterweight device, construction tool of counterweight device and construction method

Similar Documents

Publication Publication Date Title
CN203199850U (en) Elevator counter-weight frame upper beam assembly structure
CN103669882A (en) Method for conducting component installation with steel wire ropes serving as rails in industrial factory building
CN103318745B (en) A kind of lightweight special hanger and installation method thereof
CN202401583U (en) Steel structure connecting component
CN105384089A (en) Tower crane cargo boom pull rod structure
CN203289011U (en) Tension cross arm hoisting device
CN204980945U (en) Supplementary tower crane dismounting device
CN203345912U (en) Portable special suspension tool
CN204772354U (en) Frock is lifted to reducing
CN203715156U (en) Convenient crane
CN203697905U (en) Engine air condition compressor installation component
CN203306967U (en) Rapid assembly device for pulley block
CN202808121U (en) Machine-room-less rope hitch plate assembly
CN202429925U (en) Tower crane
CN206903180U (en) Upper suspension centre supporting structure
CN204558921U (en) A kind of power distribution cabinet of electric machine controller
CN104652833A (en) Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building
CN203428763U (en) Trolley pulley beam
CN205241107U (en) Tower crane boom rod structure
CN203382362U (en) Reusable mounting type box-shaped tail-suspension hanger system
CN203845631U (en) Lifting beam
CN201979481U (en) Device for dismounting vertically arranged heavy air valves of reciprocating type compressor unit
CN203939249U (en) Wallboard hanger structure
CN202248935U (en) Lifting device used at construction site of unit curtain wall sheet
CN202713049U (en) Motor fine adjusting device capable of lifting motor without lifting equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130918

Termination date: 20160326

CF01 Termination of patent right due to non-payment of annual fee