CN202415019U - Rapidly erected tire type crane - Google Patents

Rapidly erected tire type crane Download PDF

Info

Publication number
CN202415019U
CN202415019U CN2012200338071U CN201220033807U CN202415019U CN 202415019 U CN202415019 U CN 202415019U CN 2012200338071 U CN2012200338071 U CN 2012200338071U CN 201220033807 U CN201220033807 U CN 201220033807U CN 202415019 U CN202415019 U CN 202415019U
Authority
CN
China
Prior art keywords
tower
crane
rear end
crane arm
cargo boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200338071U
Other languages
Chinese (zh)
Inventor
姜开典
张培伟
李龙杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINING SITONG ENGINEERING MACHINERY Co Ltd
Original Assignee
JINING SITONG ENGINEERING MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINING SITONG ENGINEERING MACHINERY Co Ltd filed Critical JINING SITONG ENGINEERING MACHINERY Co Ltd
Priority to CN2012200338071U priority Critical patent/CN202415019U/en
Application granted granted Critical
Publication of CN202415019U publication Critical patent/CN202415019U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a rapidly erected tire type crane comprising a chassis, a revolving platform, a lifting winch, a hoisting winch, a four-linkage bracket, a folding arm device, a cargo boom front end, an amplitude varying wire rope expansion bracket, a locking device, a cargo boom rear end, an internal crane house and an external crane house, wherein the chassis is connected to the revolving frame through bolts; the lifting winch and the hoisting winch are fixed on the revolving platform through bolts; the amplitude varying wire rope expansion bracket is fixed on the cargo boom front end through bolts; the locking device is fixed on the cargo boom rear end through bolts; the cargo boom front end and the cargo boom rear end are connected through the folding arm device; the cargo boom rear end is connected to the internal crane house through a pin shaft; a slide block is mounted between the internal crane house and the external crane house so as to slide and stretch; and the external crane house is connected to the revolving frame through the four-linkage bracket. The crane has the beneficial effects that the structure is simple, and the mounting, erecting and transportation are convenient, so that the working efficiency is improved.

Description

Fast frame rubber tired crane
Technical field
The utility model relates to a kind of hoisting crane, relates in particular to a kind of fast frame rubber tired crane.
Background technology
Existing tower crane generally is made up of jib, body of the tower, cat head, hoisting mechanism, erecting device, swing type mechanism, luffing mechanism and traveling gear, must water underpin as required before installing, and erection mode generally is that secondary property is set up; Both earlier upright body of the tower; Treat after body of the tower stands directly jib to be installed again, car hosit of whole erection process need, a 5-6 installer, the time that spends one day just can be set up completion; Its installation, set up, transportation is complicated, time-consuming.
The utility model content
The utility model technical matters to be solved is: a kind of fast frame rubber tired crane is provided; Its self-powered traveling gear, whole erection process need not other hoisting crane and assist, and only need 2 people to accomplish; And need not aloft work, can in 30 minutes, accomplish and set up.
The utility model is that the technical scheme that problem adopted of the above-mentioned proposition of solution is:
A kind of fast frame rubber tired crane; Comprise chassis 1, turn table 2, lift winch 3, hoisting winding 5, four connection-rod support 7, folding arm device 8, crane arm front end 9, luffing steel rope expansion bracket 10, latching device 11, crane arm rear end 12, interior body of the tower 13, outer body of the tower 14; Chassis 1 and turn table 2 bolt togethers; Lift winch 3, hoisting winding 5 are fixed by bolts on the turn table 2, and luffing steel rope expansion bracket 10 is through bolt crane arm front end 9, and latching device 11 is through bolt crane arm rear end 12; Crane arm front end 9 is connected by folding arm device 8 with crane arm rear end 12; Crane arm rear end 12 and interior body of the tower 13 are connected through bearing pin, and slide block sliding extension each other is housed between interior body of the tower 13 and the outer body of the tower 14, and outer body of the tower 14 is connected with turn table 2 through four connection-rod support 7.
The principle of work of the utility model:
Erection process: after hoisting crane arrives control position, at first, start lift winch 3 four supporting leg adjustment of chassis 1 usefulness level; Steel rope is walked around fixed pulley group 4, running block 6, under the support of four connection-rod support 7, erects body of the tower; After body of the tower is vertical, be fixed together outer body of the tower 14 with turn table 2 with latch, extract latch then; Continue to start lift winch 3, after body of the tower 13 rises to control position in making, be fixed together interior body of the tower 13 with outer body of the tower 14 with latch.
In the process that interior body of the tower 13 rises; Crane arm leaves body of the tower simultaneously under the pulling of fixed length drag-line, crane arm front end 9 launches under the effect of folding arm device 8 slowly simultaneously; Crane arm stretches the back that puts in place and is locked the crane arm rear and front end by latching device 11; The telescopic adjustment of luffing steel rope is accomplished by luffing steel rope expansion bracket 10, and the erection process of whole hoisting crane is all accomplished, and hoisting crane begins to get into mode of operation.
Pack up process: hoisting crane pack up process and erection process is opposite, shrink telescopic oil cylinder, the luffing steel rope fluffs; Folding arm device 8 folds crane arm, extracts latch, starts lift winch 3; Interior body of the tower 13 slowly descends, and crane arm closes up with body of the tower gradually simultaneously, after interior body of the tower 13 puts in place; Be fixed together outer body of the tower 14 and interior body of the tower 13 with latch, continue to start lift winch 3, whole body of the tower together with crane arm under the support of four connection-rod support 7; Fell slowly, arrived folded state until level.
The beneficial effect of the utility model is: simple in structure, and install, set up, convenient transportation, increase work efficiency.
Description of drawings
Fig. 1 is the structural representation of the utility model running condition;
Fig. 2 is the structural representation of the utility model folded state.
Wherein, 1-chassis, 2-turn table, 3-lift winch, 4-fixed pulley group; The 5-hoisting winding, 6-running block, 7-four connection-rod support, 8-folding arm device, 9-crane arm front end; 10-luffing steel rope expansion bracket, 11-latching device, 12-crane arm rear end, body of the tower in the 13-, the outer body of the tower of 14-.
The specific embodiment
Further specify the embodiment of the utility model below in conjunction with accompanying drawing.
Referring to Fig. 1-2; The described a kind of fast frame rubber tired crane of this specific embodiment; Comprise chassis 1, turn table 2, lift winch 3, hoisting winding 5, four connection-rod support 7, folding arm device 8, crane arm front end 9, luffing steel rope expansion bracket 10, latching device 11, crane arm rear end 12, interior body of the tower 13, outer body of the tower 14; Chassis 1 and turn table 2 bolt togethers; Lift winch 3, hoisting winding 5 are fixed by bolts on the turn table 2, and luffing steel rope expansion bracket 10 is through bolt crane arm front end 9, and latching device 11 is through bolt crane arm rear end 12; Crane arm front end 9 is connected by folding arm device 8 with crane arm rear end 12; Crane arm rear end 12 and interior body of the tower 13 are connected through bearing pin, and slide block sliding extension each other is housed between interior body of the tower 13 and the outer body of the tower 14, and outer body of the tower 14 is connected with turn table 2 through four connection-rod support 7.
The principle of work of this specific embodiment:
Erection process: after hoisting crane arrives control position, at first, start lift winch 3 four supporting leg adjustment of chassis 1 usefulness level; Steel rope is walked around fixed pulley group 4, running block 6, under the support of four connection-rod support 7, is erected body of the tower by Fig. 2 state; After body of the tower is vertical; Be fixed together outer body of the tower 14 with turn table 2 with latch, extract latch then, continue to start lift winch 3; After body of the tower 13 rises to control position as shown in Figure 1 in making, be fixed together interior body of the tower 13 with outer body of the tower 14 with latch.
In the process that interior body of the tower 13 rises; Crane arm leaves body of the tower simultaneously under the pulling of fixed length drag-line, crane arm front end 9 launches under the effect of folding arm device 8 slowly simultaneously; Crane arm stretches the back that puts in place and is locked the crane arm rear and front end by latching device 11; The telescopic adjustment of luffing steel rope is accomplished by luffing steel rope expansion bracket 10, and the erection process of whole hoisting crane is all accomplished, and hoisting crane begins to get into mode of operation.
Pack up process: hoisting crane pack up process and erection process is opposite, shrink telescopic oil cylinder, the luffing steel rope fluffs; Folding arm device 8 folds crane arm, extracts latch, starts lift winch 3; Interior body of the tower 13 slowly descends, and crane arm closes up with body of the tower gradually simultaneously, after interior body of the tower 13 puts in place; Be fixed together outer body of the tower 14 and interior body of the tower 13 with latch, continue to start lift winch 3, whole body of the tower together with crane arm under the support of four connection-rod support 7; Fell slowly, arrived folded state until level.
The beneficial effect of this specific embodiment is: simple in structure, and install, set up, convenient transportation, increase work efficiency.

Claims (1)

1. fast frame rubber tired crane; It is characterized in that: comprise chassis (1), turn table (2), lift winch (3), hoisting winding (5), four connection-rod support (7), folding arm device (8), crane arm front end (9), luffing steel rope expansion bracket (10), latching device (11), crane arm rear end (12), interior body of the tower (13), outer body of the tower (14); Chassis (1) and turn table (2) bolt together; Lift winch (3), hoisting winding (5) are fixed by bolts on the turn table (2); Luffing steel rope expansion bracket (10) is through bolt crane arm front end (9); Latching device (11) is through bolt crane arm rear end (12), and crane arm front end (9) is connected by folding arm device (8) with crane arm rear end (12), and crane arm rear end (12) are connected through bearing pin with interior body of the tower (13); Slide block sliding extension each other is housed between interior body of the tower (13) and the outer body of the tower (14), and outer body of the tower (14) is connected with turn table (2) through four connection-rod support (7).
CN2012200338071U 2012-01-01 2012-01-01 Rapidly erected tire type crane Expired - Fee Related CN202415019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200338071U CN202415019U (en) 2012-01-01 2012-01-01 Rapidly erected tire type crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200338071U CN202415019U (en) 2012-01-01 2012-01-01 Rapidly erected tire type crane

Publications (1)

Publication Number Publication Date
CN202415019U true CN202415019U (en) 2012-09-05

Family

ID=46739803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200338071U Expired - Fee Related CN202415019U (en) 2012-01-01 2012-01-01 Rapidly erected tire type crane

Country Status (1)

Country Link
CN (1) CN202415019U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103482490A (en) * 2013-09-13 2014-01-01 江苏捷诚车载电子信息工程有限公司 Vehicle-mounted folding hand-operated crane
CN104925676A (en) * 2015-07-08 2015-09-23 湖北浩天专用汽车有限公司 Vehicle-mounted tower-type aerial working system
CN105460807A (en) * 2015-11-24 2016-04-06 徐州重型机械有限公司 All-terrain crane
CN109083425A (en) * 2018-09-26 2018-12-25 河北卓达建材研究院有限公司 A kind of assembled wall installation equipment
CN109231090A (en) * 2018-09-26 2019-01-18 山东飞越钢结构工程有限公司 A kind of movable type wall construction platform
CN109534182A (en) * 2018-11-09 2019-03-29 湖南维尔力德科技有限公司 Mobile quickly assembling Novel crane
CN113135505A (en) * 2021-04-26 2021-07-20 郑州新大方重工科技有限公司 Truss structure follow-up telescopic system with guide mechanism, crane and guide method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103482490A (en) * 2013-09-13 2014-01-01 江苏捷诚车载电子信息工程有限公司 Vehicle-mounted folding hand-operated crane
CN103482490B (en) * 2013-09-13 2015-07-08 江苏捷诚车载电子信息工程有限公司 Vehicle-mounted folding hand-operated crane
CN104925676A (en) * 2015-07-08 2015-09-23 湖北浩天专用汽车有限公司 Vehicle-mounted tower-type aerial working system
CN105460807A (en) * 2015-11-24 2016-04-06 徐州重型机械有限公司 All-terrain crane
CN105460807B (en) * 2015-11-24 2018-10-09 徐州重型机械有限公司 The full Terrain Cranes
CN109083425A (en) * 2018-09-26 2018-12-25 河北卓达建材研究院有限公司 A kind of assembled wall installation equipment
CN109231090A (en) * 2018-09-26 2019-01-18 山东飞越钢结构工程有限公司 A kind of movable type wall construction platform
CN109534182A (en) * 2018-11-09 2019-03-29 湖南维尔力德科技有限公司 Mobile quickly assembling Novel crane
CN113135505A (en) * 2021-04-26 2021-07-20 郑州新大方重工科技有限公司 Truss structure follow-up telescopic system with guide mechanism, crane and guide method

Similar Documents

Publication Publication Date Title
CN202415019U (en) Rapidly erected tire type crane
CN203128112U (en) Bi-directional traction stretchable lifting arm
CN103145051B (en) Separated hoisting device of offshore wind turbine generator, and installation method
CN202746979U (en) Remotely-controlled movable hydraulic hoisting illumination lamp tower
CN101985917B (en) Splitting installation and construction method of marine wind generating set and equipment thereof
CN205421253U (en) Novel piling machine
CN105421859A (en) Electricity grid telegraph pole erecting device and construction method
CN102862919A (en) Vehicle-mounted tower crane
CN109441361A (en) A kind of pile frame and its vertical mast method
CN204714403U (en) A kind of extension mast and configure the engineering machinery vehicle of this mast
CN201176852Y (en) Oil rig derrick and foundation lifting device
CN206014349U (en) A kind of rollover stand
CN201883750U (en) Cable pole erecting device
CN208700331U (en) A kind of cable unwinding device
CN204000870U (en) A kind of the collapsible column of machine
CN103663183A (en) Fast self-mounting tower crane
CN2763570Y (en) Integral standing type wind power generator
CN203430008U (en) Integrally movable type construction platform for cast-in-situ of elevator shaft
CN202594665U (en) Multifunctional engineering truck
CN202322180U (en) Domestic small-size hoist
CN201347330Y (en) A-shaped frame landing gear of crawler crane
CN2040091U (en) Multi-purpose housting device
CN113928987A (en) Wind driven generator mounting device and method
CN209163736U (en) A kind of pile frame
CN202175522U (en) Device for hoisting concrete pole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20150101

EXPY Termination of patent right or utility model