CN202508791U - Novel tower section lead-in device - Google Patents

Novel tower section lead-in device Download PDF

Info

Publication number
CN202508791U
CN202508791U CN2012200973572U CN201220097357U CN202508791U CN 202508791 U CN202508791 U CN 202508791U CN 2012200973572 U CN2012200973572 U CN 2012200973572U CN 201220097357 U CN201220097357 U CN 201220097357U CN 202508791 U CN202508791 U CN 202508791U
Authority
CN
China
Prior art keywords
beam body
lead
major axis
dolly
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200973572U
Other languages
Chinese (zh)
Inventor
苏洁
李国威
王芙蓉
王树桐
田亮
杨金勇
原俊霞
迟骋远
赵恩重
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG SANYO BUILDING MACHINERY CO Ltd
Original Assignee
SHENYANG SANYO BUILDING MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG SANYO BUILDING MACHINERY CO Ltd filed Critical SHENYANG SANYO BUILDING MACHINERY CO Ltd
Priority to CN2012200973572U priority Critical patent/CN202508791U/en
Application granted granted Critical
Publication of CN202508791U publication Critical patent/CN202508791U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a novel tower section lead-in device, which comprises a lead-in cross beam and a section adding device, wherein the lead-in cross beam comprises a beam body, a pull rod, a guardrail and a stop block; the section adding device adopts a mechanism transmission manner, and comprises a lead-in trolley, a sling and a transmission mechanism; the beam body comprises two pieces of I-beams and angle iron which are welded to form a truss frame structure; a plurality of pulleys are installed on a pulley bracket of the beam body; a support frame is installed at the front end of the beam body; a long shaft is installed on the support frame; short shafts are respectively arranged on the both sides of the long shaft; the short shafts are sheathed with winding drums; a handwheel is installed at the center part of the long shaft; the long shaft and the short shafts can achieve transmission through a pinion wheel and a gearwheel which are meshed mutually; in addition, a wire rope winds around the winding drums, and one end of the wire rope is fixed at the front end of the lead-in trolley and the other end of the wire rope is fixed at the rear end of the lead-in trolley through the pulleys. When in use, the novel tower section lead-in device is led in a tower section through a traction device, is suitable for the lead-in of the tower section of a large-scale tower crane, and is characterized by high efficiency, low cost, good safety, good reliability and the like, and is convenient to install.

Description

Novel body of the tower joint imported unit
Technical field
The utility model relates to the novel body of the tower standard knot of a kind of large-scale whip-typed tower crane imported unit.
Background technology
In recent years, along with China is high-rise, high-rise building is more and more, and the water conservancy and hydropower project, construction projects such as portal crane tool begin more to adopt tower crane, and large-scale, superhuge tower crane has obtained application more and more widely.The body of the tower joint imported unit of tower machine is the important component part of self-raising tower crane; At present; Most tower crane all adopts the introduction beam to introduce the body of the tower joint, and the dependence manpower directly draws or saves the process of accomplishing the body of the tower supernumerary segment with easy chain block pulling body of the tower.When quilt introduction standard knot volume and weight is excessive, only rely on manpower to be difficult to realize the introducing process of body of the tower joint.Increase difficulty for workmen's fitting operation; Introduction beam simple in structure has also caused the potential safety hazard of camp site.To the transformation of imported unit, the research and development of operating simple and easy, safe and reliable specialized equipment seems very important.
Summary of the invention
In order to solve the problem of above-mentioned existence, the utility model provides a kind of novel body of the tower joint imported unit, and this kind device can not only realize that the body of the tower joint of Large Towers machine introduces and unloading process, and compare with traditional form time saving and energy saving, safe and reliable.
The utility model solves the technical scheme that its technical matters adopted: novel body of the tower joint imported unit, and comprise and introduce crossbeam and add regulating device, it is characterized in that:
Described introduction crossbeam is made up of beam body, pull bar, guardrail, block; Described beam body which is provided with pulley bracket and is connected otic placode by two I-beam sections and the angle steel truss structure that is welded; Pull bar and beam body through be connected otic placode, bearing pin is fixed together, the fixed installation guardrail in beam body both sides, at the terminal block of installing of beam body,
The described regulating device that adds is made up of introduction dolly, suspender, transmission device; Introduce dolly and be installed on the bottom wing listrium of beam body master string, below introducing dolly, suspender is installed;
Described transmission device comprises pulley, major axis, minor axis, big gear wheel, miniature gears, reel, handwheel, bracing frame, steel rope; Several pulleys are installed on the pulley bracket of beam body; Front end at the beam body is installed bracing frame; A major axis is installed on bracing frame, is respectively equipped with minor axis in the major axis both sides, reel is sleeved on the minor axis; At the major axis central mounting handwheel is arranged, between major axis and the minor axis through intermeshing miniature gears and big gear wheel transmission; Steel rope is wrapped on the reel, is fixed on the front end of introducing dolly through pulley one end, and the other end is fixed on the rear end of introducing dolly.
The beneficial effect of the utility model: during use, install this novel body of the tower joint imported unit additional in the appropriate location of tower machine, when tower machine jacking supernumerary segment; On ground the suspender of imported unit is connected fasteningly with the body of the tower joint, amplitude variation trolley and suspension hook through tower machine self play sling, and it is hung on the introduction dolly of introduction beam; Installation personnel shakes the handwheel in the imported unit transmission device; Introduce the dolly on the crossbeam through rope traction, be with standard knot together to get in the stock, after the body of the tower of introducing saves main chord and the body of the tower main chord aligns; Handwheel stops operating; Make introduce the body of the tower joint be parked in body of the tower directly over, begin to shrink jacking cylinder, the body of the tower joint that makes introducing and body of the tower with turn round undersetting and link to each other.Squeeze into to connect and use bearing pin, connects fastening after, with suspender with introduce the standard knot disengaging, the contrarotation handwheel makes introduction dolly and suspender shift out stock, begins to prepare next supernumerary segment process.The unloading process of body of the tower joint is the inverse operation of introducing process.The utility model can improve increasing of Large Towers machine and unloading process, and the workmen of being convenient to simple in structure operates, and is safe and reliable, time saving and energy saving.
Description of drawings
Fig. 1 is the constructional drawing of novel body of the tower joint imported unit.
Fig. 2 is a structural representation of introducing crossbeam.
Fig. 3 is an A place enlarged drawing among Fig. 2.
Fig. 4 is the decomposition texture scheme drawing that adds regulating device.
Fig. 5 is a B-B generalized section among Fig. 4.
1-introduces crossbeam among the figure; 1.1-beam body; 1.2-pull bar; 1.3-guardrail; 1.4-block; 2-adds regulating device; 2.1-introduction dolly; 2.2-suspender; 2.2.1-U shape weldment; 2.3-transmission device; 2.3.1-pulley; 2.3.2-major axis; 2.3.3-minor axis; 2.3.4-major axis bearing; 2.3.5-minor axis bearing; 2.3.6-big gear wheel; 2.3.7-miniature gears; 2.3.8-reel; 2.3.9-handwheel; 2.3.10-bracing frame; 2.3.11-steel rope.
The specific embodiment
As shown in the figure, the novel body of the tower joint of a kind of tower crane imported unit adds regulating device 2 and forms by introducing crossbeam 1.Wherein introduce crossbeam and comprise beam body 1.1, pull bar 1.2, guardrail 1.3, block 1.4; Use bearing pin that the otic placode place that pull bar 1.2 is connected to beam body 1.1 is fixed with spring cotter; Guardrail is fixed on beam body 1.1 with bolt, is installed on the track of beam body 1.1 introducing dolly 2.1, the wheel that is about to introduce dolly 2.1 is suspended on the bottom wing listrium of beam body 1.1 main strings; Again with block 1.4 bolt togethers to the terminal A of beam body place; Utilize 14 pulley 2.3.1 that bearing pin and spring cotter will be equipped with bearing to be installed on the pulley bracket of beam body 1.1, two major axis bearing 2.3.4 and four minor axis bearing 2.3.5 are installed on the bracing frame 2.3.10 of beam body 1.1 front ends, major axis 2.3.2 is installed on the major axis bearing 2.3.4; Be respectively equipped with a minor axis 2.3.3 in major axis 2.3.2 both sides; Minor axis 2.3.3 is installed on the minor axis bearing 2.3.5, on two minor axis 2.3.3, is set with reel 2.3.8, at major axis 2.3.2 central mounting handwheel 2.3.9 is arranged; Between major axis 2.3.2 and the minor axis 2.3.3 through intermeshing miniature gears 2.3.7 and big gear wheel 2.3.6 transmission; Wear at last around steel rope 2.3.11 and make its winding reel 2.3.8 process pulley 2.3.1, an end is fixed to the front end of introducing dolly 2.1, and the other end is fixed on the rear end of introducing dolly 2.1; Use suspender 2.2 bottom plate system U-shaped weldment 2.2.1 to connect the body of the tower joint when waiting to introduce the body of the tower joint, so far accomplished the combination that adds regulating device and introduce crossbeam.

Claims (1)

1. novel body of the tower joint imported unit comprises and introduces crossbeam and add regulating device, it is characterized in that:
Described introduction crossbeam is made up of beam body, pull bar, guardrail, block; Described beam body which is provided with pulley bracket and is connected otic placode by two I-beam sections and the angle steel truss structure that is welded; Pull bar and beam body through be connected otic placode, bearing pin is fixed together, the fixed installation guardrail in beam body both sides, at the terminal block of installing of beam body,
The described regulating device that adds is made up of introduction dolly, suspender, transmission device; Introduce dolly and be installed on the bottom wing listrium of beam body master string, below introducing dolly, suspender is installed;
Described transmission device comprises pulley, major axis, minor axis, big gear wheel, miniature gears, reel, handwheel, bracing frame, steel rope; Several pulleys are installed on the pulley bracket of beam body; Front end at the beam body is installed bracing frame; A major axis is installed on bracing frame, is respectively equipped with minor axis in the major axis both sides, reel is sleeved on the minor axis; At the major axis central mounting handwheel is arranged, between major axis and the minor axis through intermeshing miniature gears and big gear wheel transmission; Steel rope is wrapped on the reel, is fixed on the front end of introducing dolly through pulley one end, and the other end is fixed on the rear end of introducing dolly.
CN2012200973572U 2012-03-15 2012-03-15 Novel tower section lead-in device Expired - Lifetime CN202508791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200973572U CN202508791U (en) 2012-03-15 2012-03-15 Novel tower section lead-in device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200973572U CN202508791U (en) 2012-03-15 2012-03-15 Novel tower section lead-in device

Publications (1)

Publication Number Publication Date
CN202508791U true CN202508791U (en) 2012-10-31

Family

ID=47061289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200973572U Expired - Lifetime CN202508791U (en) 2012-03-15 2012-03-15 Novel tower section lead-in device

Country Status (1)

Country Link
CN (1) CN202508791U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103058072A (en) * 2012-12-31 2013-04-24 大连理工大学 Large luffing jib tower crane introduction mechanism
CN103342300A (en) * 2013-07-19 2013-10-09 中联重科股份有限公司 Tower crane, introduction system thereof and standard knot introduction method
EP3045417A1 (en) * 2015-01-13 2016-07-20 GP Autolift S.r.l. Stabilizing group for a tower crane and tower crane comprising such a group
CN105800480A (en) * 2016-04-19 2016-07-27 山东丰汇设备技术有限公司 Tower crane jacking and introducing mechanism and method
CN107381381A (en) * 2017-09-01 2017-11-24 徐工集团工程机械股份有限公司 A kind of adjustable truss arm transport bushing device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103058072A (en) * 2012-12-31 2013-04-24 大连理工大学 Large luffing jib tower crane introduction mechanism
CN103058072B (en) * 2012-12-31 2015-04-08 大连理工大学 Large luffing jib tower crane introduction mechanism
CN103342300A (en) * 2013-07-19 2013-10-09 中联重科股份有限公司 Tower crane, introduction system thereof and standard knot introduction method
EP3045417A1 (en) * 2015-01-13 2016-07-20 GP Autolift S.r.l. Stabilizing group for a tower crane and tower crane comprising such a group
CN105800480A (en) * 2016-04-19 2016-07-27 山东丰汇设备技术有限公司 Tower crane jacking and introducing mechanism and method
CN107381381A (en) * 2017-09-01 2017-11-24 徐工集团工程机械股份有限公司 A kind of adjustable truss arm transport bushing device
CN107381381B (en) * 2017-09-01 2019-11-12 徐工集团工程机械股份有限公司 A kind of adjustable truss arm transport bushing device

Similar Documents

Publication Publication Date Title
CN202508791U (en) Novel tower section lead-in device
CN102070071B (en) Steel reinforcement cage hoisting method
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN202358849U (en) Small-size suspension crane
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN202322177U (en) Portable carrier for heavy electrical equipment
CN201292776Y (en) Ocean oil drilling platform derrick
CN202231327U (en) Heavy component hoisting tool in electrical cabinet
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN202214167U (en) tower crane with improved structure
CN201099575Y (en) Hanging basket rotatable material lifting equipment
CN202322118U (en) Rigid telescopic hydraulic separate counter weight crane
CN201756422U (en) Two-head-suspension tower crane
CN201647851U (en) Multifunctional building crane
CN204778275U (en) But balancing jack -up hoist
CN202072414U (en) Wind resistant device of cable loading crane
CN202175522U (en) Device for hoisting concrete pole
CN202529725U (en) Novel crane
CN202063650U (en) Heavy steel structure hoisting device with free derrick
CN202214168U (en) High strength material tower crane
CN202098670U (en) Wind turbine tower conveying and elevating auxiliary device
CN203612819U (en) H-shaped steel hanger
CN201236098Y (en) Combined pressure bar sling
CN204919525U (en) Strong machine that rams and combination formula top arm frame structure thereof
CN201635708U (en) Device for vertically adjusting balance of crank of beam-pumping unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121031