EP3045417A1 - Stabilizing group for a tower crane and tower crane comprising such a group - Google Patents
Stabilizing group for a tower crane and tower crane comprising such a group Download PDFInfo
- Publication number
- EP3045417A1 EP3045417A1 EP16150845.2A EP16150845A EP3045417A1 EP 3045417 A1 EP3045417 A1 EP 3045417A1 EP 16150845 A EP16150845 A EP 16150845A EP 3045417 A1 EP3045417 A1 EP 3045417A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- group
- rotary
- counter jib
- tower crane
- stabilizing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/02—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with non-adjustable and non-inclinable jibs mounted solely for slewing movements
- B66C23/022—Pivot axis common with column
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
- B66C23/163—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements where only part of the column rotates, i.e. at least the bottom part is fixed
Definitions
- the present invention refers to a stabilizing group for a tower crane and to a tower crane comprising such a group, particularly but not exclusively able to be used in the building sector.
- tower cranes are jib lifting apparatuses comprising a vertical tower structure at the top of which a rotary group is mounted, constrained at one side to a lifting arm or jib and at the other side to a counter jib.
- cranes are provided with a complex system of motorised members and ropes for lifting, lowering and moving suspended loads.
- a translating trolley is mounted on the lifting arm, said trolley carrying a block supported by a rope for lifting loads; the trolley is normally moved thanks to the action of a moving rope that winds or unwinds on a trolley winch also mounted on the lifting arm.
- a counterweight and a hoisting winch about which the lifting rope winds or unwinds are mounted on the opposite side to the arm, on the counter jib.
- Tower cranes can, in general, be installed in fixed positions or equipped with sliding and/or elevation means.
- the vertical tower structure is constrained to a base structure that can consist of a trunk or of a plurality of foundation legs, generally four, or a fixed or translating base.
- tower cranes arrive at the building yard already partially preassembled so as to be able to be mounted on site through the use of crane truck or other suitable apparatuses.
- the on-site mounting procedure of tower cranes that are currently known provides an initial step in which the base structure is pre-arranged and in which the modular elements adapted for forming the trestle of the tower structure are assembled; thereafter, the so-called stabilizing group, generally made up of the rotary group and the counter jib on which a hoisting winch is possibly constrained, is fixed to such a structure. Finally, the lifting arm is fixed to the stabilizing group and, in particular, to the rotary group.
- the counter jib is stably constrained to the rotary group so as to become integral with it.
- This solution has as a strength point the possibility of providing the stabilizing group already ready with the lifting rope prearranged on the trolley and on the block which are in turn installed on holding arms applied to the rotary group.
- the counter jib is constrained to the rotary group so as to rotate about a hinge having a substantially horizontal axis.
- the stabilizing group is provided with a system of tie rods adapted for keeping the counter jib raised in a direction substantially perpendicular to the direction of extension of the tower structure.
- the counter jib is kept inclined upwards according to an angle greater than zero with respect to the hinging plane, so as to be able to compensate for the deflection of the tower.
- a stabilizing group of the aforementioned second type despite having a lower weight with respect to groups of the first type, can, however, suffers from some drawbacks during transportation to the building yard.
- the crane and, in particular, the stabilizing group are delivered in distinct parts that must be assembled at the building yard, which means an increase in mounting times and possibly the need to mount many pieces at great height.
- mount at great height is meant to indicate the group of the operations that workers must perform with the help of the crane truck at the final mounting height, for example 50 metres from the ground.
- the purpose of the present invention is to avoid the aforementioned drawbacks and, in particular, to devise a stabilizing group for a tower crane that is simpler to transport and to mount on the tower structure with respect to known stabilizing groups.
- Another purpose of the present invention is to provide a tower crane the mounting of which is simple and inexpensive.
- a tower crane is shown wholly indicated with 20.
- Such a tower crane 20 comprises a vertical tower structure 21, a stabilizing group 10 coupled with such a vertical tower structure 21 and a lifting arm 22 coupled with the stabilizing group 10.
- the vertical tower structure 21 comprises a plurality of modular tower elements adapted for being connected to one another, stacked one on top of the other, so as to form a trestle structure constrained to a base 23 fixed to the ground.
- the base 23 can consist of a trunk or a plurality of foundation legs or a fixed or translating base.
- the vertical direction coincides with the direction of extension of the tower structure substantially perpendicular to the plane of the ground where the crane is installed; consequently, the horizontal direction is any direction lying on a plane substantially perpendicular to the vertical direction.
- the stabilizing group 10 comprises a rotary group 30 arranged to be mounted at the top of the vertical tower structure 21 so as to be able to rotate about a vertical axis and to couple with the lifting arm 22.
- the rotary group 30 comprises a base body 31 intended to couple at the bottom with the vertical tower structure 21 and constrained at the top to a fifth wheel 32.
- the fifth wheel 32 is fixed at the top to a motorised rotary frame 33.
- a rotation pinion 34 is engaged in the rotary group 30 passing through the motorised rotary frame 33 and the fifth wheel 32 up to a fixing point on the base body 31.
- the stabilizing group 10 comprises a counter jib 40 that, through a hinge 11 having a horizontal axis, is coupled in a rotary manner to the aforementioned rotary group 30 on the opposite side to that intended for coupling with the lifting arm 22.
- the hinge 11 defines a horizontal hinging half-plane about which the counter jib 40 can rotate upwards or downwards. Such senses of rotation are defined with reference to the position taken up by the stabilizing group during its normal use, i.e. with respect to the position illustrated in figures 1 or 2 or 3 .
- the stabilizing group 10 comprises limiting means 45, 35 to limit the rotation of the counter jib itself 40 with respect to the rotary group 30 at least in one sense of rotation, i.e. downwards or upwards, with respect to the horizontal hinging half-plane.
- the limiting means 45, 35 can be arranged to limit the rotation of the counter jib 40 with respect to the rotary group 30 in both senses of rotation, i.e. both upwards and downwards, with respect to the horizontal hinging half-plane within a predetermined arc.
- the counter jib 40 is made in the form of an internally hollow beam.
- the limiting means 45, 35 comprise at least one abutment element 45 positioned internally on the upper and/or lower wall of the counter jib 40 and a plate element 35 jointly constrained to the rotary group 30 that projects inside the counter jib 40 so as to go into abutment against the at least one abutment element 45 during the rotation of the counter jib 40 with respect to the rotary group 30.
- the hinge 11 is positioned in a recess of the rotary group 30 and the limiting means 45, 35 comprise at least one abutment element positioned internally on the upper and/or lower wall of the recess.
- the counter jib 40 extends in the recess so as to go into abutment against the at least one abutment element during the rotation of the counter jib 40 with respect to the rotary group 30.
- the limiting means 45, 35 comprise at least one bar element constrained to the rotary group 30 through connection means like, for example, articulated arms.
- the at least one bar element extends outside the counter jib 40 above and/or below it, so that the counter jib 40 goes into abutment against the at least one bar element during the rotation of the counter jib 40 with respect to the rotary group 30.
- the limiting means 45, 35 are adjustable.
- the abutment elements 45 can, for example, be made through a bolt screw the head of which acts as an abutment for the plate element 35.
- Such a screw can be locked so as to project with respect to the inner surface of the beam by a predetermined length according to the width of the arc within which it is wished to limit the rotation of the counter jib 40 with respect to the rotary group 30.
- the stabilizing group 10 comprises a bracket element 12, preferably triangular, pivoted on the rotary group 30 at a first vertex 13, as can be seen in figure 1 .
- a second vertex 14 of such a bracket element 12 is constrained to a first end of at least one tie rod 15 through at least one corresponding articulated arm 16.
- the at least one tie rod 15 is then constrained in a rotary manner to the counter jib 40 at a second end.
- the bracket element 12 is arranged to reversibly pass from a folded rest position, in which the tie rod 15 is at rest, to a raised work position, in which the tie rod 15 exerts an upward traction on the counter jib 40.
- the bracket element 12 when the bracket element 12 takes up the raised work position it can be fixed in position by stably fastening a third vertex 17 to the rotary group 30.
- the third vertex 17 is inserted into a receiving seat 38 of the rotary group 30.
- a receiving seat 38 is preferably obtained in the interspace between two parallel plates mounted on the rotary group 30 and, more specifically, on the motorised rotary frame 33 and perforated so that such holes are substantially aligned with a coupling hole made on the bracket element 12 at the third vertex 17. In this way it is possible to quickly and easily pass a pin for coupling with the third vertex 17 of the bracket element 12.
- the stabilizing group 10 also comprises a hoisting winch 18 fixed onto the counter jib 40, for example at the opposite end to the hinging with the rotary group 30 as illustrated in figures 1 and 2 .
- a rope (not illustrated) for lifting loads is then wound onto such a hoisting winch 18.
- the rotary group 30, comprises support arms 36 at the portion intended for coupling with the lifting arm 22; a block-carrying trolley 37 is slidably constrained to such support arms 36.
- block-carrying trolley 37 is locked in position during the mounting steps and, once the mounting of the crane is complete, is left free to slide first on the support arms 36 and then on the lifting arm 22.
- the aforementioned lifting rope is brought up to the pulleys of the block already in the assembly shop in pre-assembly step so that, once the mounting of the crane is complete at the building yard, the rope is already in work position.
- the tower crane according to the present invention can be mounted as follows.
- the vertical tower structure 21 is assembled and fixed to the ground.
- the base 23 is fixed to the ground and then the trestle tower structure is mounted.
- the stabilizing group 10 is hoisted in its most complete configuration with the bracket element 12 in raised position through a crane truck 50. In this step the stabilizing group 10 is put in a harness and lifted up to the top of the vertical tower structure 21.
- the counter-weight ballasts 19 are mounted on the counter jib 40 so as to arrange the stabilizing group 10 to couple with the lifting arm 22.
- the lifting arm 22 is hoisted, which is then coupled with the rotary group 30 so as to allow the block-carrying trolley to slide on the lifting arm 22 itself.
- the stabilizing group 10 even in its most complete configuration is easily transportable to the building yard thanks to the presence of the limiting means of the rotation of the counter jib 40.
- the limitation of the downward rotation allows the stabilizing group 10 to be easily moved also lifting it through ropes fixed on the counter jib 40. Such movement is particularly useful and used during ground transportation, for example for storage in warehouses or containers.
- the whole of the rotary group 30 and the counter jib 40 can be moved even without the bracket element 12 and the tie rod 15.
- bracket element 12 can be arranged in the folded work position giving greater compactness to the stabilizing group.
- the limitation of upward rotation allows the stabilizing group 10 to be lifted in the mounting step, preventing the counter jib 40 and the rotary group 30 from flipping against one another.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
Description
- The present invention refers to a stabilizing group for a tower crane and to a tower crane comprising such a group, particularly but not exclusively able to be used in the building sector.
- As known, tower cranes are jib lifting apparatuses comprising a vertical tower structure at the top of which a rotary group is mounted, constrained at one side to a lifting arm or jib and at the other side to a counter jib.
- In addition, cranes are provided with a complex system of motorised members and ropes for lifting, lowering and moving suspended loads.
- In detail, a translating trolley is mounted on the lifting arm, said trolley carrying a block supported by a rope for lifting loads; the trolley is normally moved thanks to the action of a moving rope that winds or unwinds on a trolley winch also mounted on the lifting arm. A counterweight and a hoisting winch about which the lifting rope winds or unwinds are mounted on the opposite side to the arm, on the counter jib.
- Tower cranes can, in general, be installed in fixed positions or equipped with sliding and/or elevation means.
- In such cases, the vertical tower structure is constrained to a base structure that can consist of a trunk or of a plurality of foundation legs, generally four, or a fixed or translating base.
- In any case, generally, tower cranes arrive at the building yard already partially preassembled so as to be able to be mounted on site through the use of crane truck or other suitable apparatuses.
- The greater the degree of preassembly with which such cranes arrive at the building yard, the quicker the mounting times.
- However, in the preassembly phase, it is necessary to take into account the weights of the various components since the heavier and bulkier the single preassembled groups are, the more complex is their transport and the more expensive and difficult to be retrieved are the lifting and mounting means and apparatuses, like for example large-sized crane truck.
- Generally, the on-site mounting procedure of tower cranes that are currently known provides an initial step in which the base structure is pre-arranged and in which the modular elements adapted for forming the trestle of the tower structure are assembled; thereafter, the so-called stabilizing group, generally made up of the rotary group and the counter jib on which a hoisting winch is possibly constrained, is fixed to such a structure. Finally, the lifting arm is fixed to the stabilizing group and, in particular, to the rotary group.
- In particular, essentially two types of stabilizing groups are currently known.
- According to a first type, the counter jib is stably constrained to the rotary group so as to become integral with it.
- This solution has as a strength point the possibility of providing the stabilizing group already ready with the lifting rope prearranged on the trolley and on the block which are in turn installed on holding arms applied to the rotary group.
- However, such a stabilizing group has high constructive complexity, as well as substantial weight and bulk that make it difficult to move. Moreover, this stabilizing group is subjected alternately to compression and traction forces that can limit its durability. According to a second type, the counter jib is constrained to the rotary group so as to rotate about a hinge having a substantially horizontal axis.
- In this case, the stabilizing group is provided with a system of tie rods adapted for keeping the counter jib raised in a direction substantially perpendicular to the direction of extension of the tower structure.
- In particular, during the normal use of the crane, the counter jib is kept inclined upwards according to an angle greater than zero with respect to the hinging plane, so as to be able to compensate for the deflection of the tower.
- A stabilizing group of the aforementioned second type, despite having a lower weight with respect to groups of the first type, can, however, suffers from some drawbacks during transportation to the building yard.
- In order to make the transport to the building yard easier, the crane and, in particular, the stabilizing group are delivered in distinct parts that must be assembled at the building yard, which means an increase in mounting times and possibly the need to mount many pieces at great height.
- The term "mount at great height" is meant to indicate the group of the operations that workers must perform with the help of the crane truck at the final mounting height, for example 50 metres from the ground.
- The purpose of the present invention is to avoid the aforementioned drawbacks and, in particular, to devise a stabilizing group for a tower crane that is simpler to transport and to mount on the tower structure with respect to known stabilizing groups.
- Another purpose of the present invention is to provide a tower crane the mounting of which is simple and inexpensive.
- These and other purposes according to the present invention are accomplished by making a stabilizing group for a tower crane and a tower crane as outlined in the independent claims.
- Further characteristics of the stabilizing group for a tower crane and of the tower crane are the object of the dependent claims.
- The characteristics and advantages of a stabilizing group for a tower crane and of a tower crane according to the present invention will become clearer from the following description, given as an example and not for limiting purposes, referring to the attached schematic drawings, in which:
-
figure 1 is a schematic side view of a stabilizing group for a tower crane according to the present invention that has a triangular bracket element in folded rest position; -
figure 2 is a schematic side view of the stabilizing group offigure 1 during a moving step; -
figure 3 is a schematic side view of the stabilizing group according to the present invention during a moving step, where the stabilizing group has a triangular bracket element in raised work position; -
figure 4 is a schematic side view of a first step of the mounting of a tower crane according to the present invention; -
figure 5 is a schematic side view of a second step of the mounting of a tower crane according to the present invention; -
figure 6 is a schematic side view of a third step of the mounting of a tower crane according to the present invention; -
figure 7 is a schematic side view of a tower crane according to the present invention, during normal use; -
figure 8 is a partial section view of a detail offigure 3 indicated with VIII; -
figure 9 is a partial section view of a detail offigure 7 indicated with IX; -
figure 10 is a partial section view of a detail offigure 2 indicated with X. - With reference to the figures, a tower crane is shown wholly indicated with 20.
- Such a
tower crane 20 comprises avertical tower structure 21, a stabilizinggroup 10 coupled with such avertical tower structure 21 and alifting arm 22 coupled with the stabilizinggroup 10. - The
vertical tower structure 21 comprises a plurality of modular tower elements adapted for being connected to one another, stacked one on top of the other, so as to form a trestle structure constrained to abase 23 fixed to the ground. Thebase 23 can consist of a trunk or a plurality of foundation legs or a fixed or translating base. - In the present description the vertical direction coincides with the direction of extension of the tower structure substantially perpendicular to the plane of the ground where the crane is installed; consequently, the horizontal direction is any direction lying on a plane substantially perpendicular to the vertical direction.
- The stabilizing
group 10 comprises arotary group 30 arranged to be mounted at the top of thevertical tower structure 21 so as to be able to rotate about a vertical axis and to couple with thelifting arm 22. - In particular, in the illustrated embodiment, the
rotary group 30 comprises abase body 31 intended to couple at the bottom with thevertical tower structure 21 and constrained at the top to afifth wheel 32. Thefifth wheel 32, in turn, is fixed at the top to a motorisedrotary frame 33. Arotation pinion 34 is engaged in therotary group 30 passing through the motorisedrotary frame 33 and thefifth wheel 32 up to a fixing point on thebase body 31. - The stabilizing
group 10 comprises acounter jib 40 that, through ahinge 11 having a horizontal axis, is coupled in a rotary manner to the aforementionedrotary group 30 on the opposite side to that intended for coupling with thelifting arm 22. - In detail, the
hinge 11 defines a horizontal hinging half-plane about which thecounter jib 40 can rotate upwards or downwards. Such senses of rotation are defined with reference to the position taken up by the stabilizing group during its normal use, i.e. with respect to the position illustrated infigures 1 or 2 or 3 . - According to the present invention, the stabilizing
group 10 comprises limitingmeans rotary group 30 at least in one sense of rotation, i.e. downwards or upwards, with respect to the horizontal hinging half-plane. - Preferably, the limiting means 45, 35 can be arranged to limit the rotation of the
counter jib 40 with respect to therotary group 30 in both senses of rotation, i.e. both upwards and downwards, with respect to the horizontal hinging half-plane within a predetermined arc. - In the illustrated embodiment, the
counter jib 40 is made in the form of an internally hollow beam. In this case the limiting means 45, 35 comprise at least oneabutment element 45 positioned internally on the upper and/or lower wall of thecounter jib 40 and aplate element 35 jointly constrained to therotary group 30 that projects inside thecounter jib 40 so as to go into abutment against the at least oneabutment element 45 during the rotation of thecounter jib 40 with respect to therotary group 30. In particular, if thecounter jib 40 rotates downwards with respect to the horizontal hinging half-plane, theplate element 35 abuts against theupper abutment element 45; on the other hand, if thecounter jib 40 rotates upwards with respect to the horizontal hinging half-plane, theplate element 35 abuts against thelower abutment element 45. In a first alternative embodiment that is not illustrated, thehinge 11 is positioned in a recess of therotary group 30 and the limitingmeans counter jib 40 extends in the recess so as to go into abutment against the at least one abutment element during the rotation of thecounter jib 40 with respect to therotary group 30. - In a second alternative embodiment that is not illustrated, the limiting means 45, 35 comprise at least one bar element constrained to the
rotary group 30 through connection means like, for example, articulated arms. In this case, the at least one bar element extends outside thecounter jib 40 above and/or below it, so that thecounter jib 40 goes into abutment against the at least one bar element during the rotation of thecounter jib 40 with respect to therotary group 30. - Preferably, the limiting means 45, 35 are adjustable. In this case, the
abutment elements 45 can, for example, be made through a bolt screw the head of which acts as an abutment for theplate element 35. Such a screw can be locked so as to project with respect to the inner surface of the beam by a predetermined length according to the width of the arc within which it is wished to limit the rotation of thecounter jib 40 with respect to therotary group 30. - In a preferred embodiment of the present invention, the stabilizing
group 10 comprises abracket element 12, preferably triangular, pivoted on therotary group 30 at afirst vertex 13, as can be seen infigure 1 . Asecond vertex 14 of such abracket element 12 is constrained to a first end of at least onetie rod 15 through at least one correspondingarticulated arm 16. The at least onetie rod 15 is then constrained in a rotary manner to thecounter jib 40 at a second end. In this case, thebracket element 12 is arranged to reversibly pass from a folded rest position, in which thetie rod 15 is at rest, to a raised work position, in which thetie rod 15 exerts an upward traction on thecounter jib 40. - In particular, when the
bracket element 12 takes up the raised work position it can be fixed in position by stably fastening athird vertex 17 to therotary group 30. In particular, when thebracket element 12 is brought into the raised work position, thethird vertex 17 is inserted into a receivingseat 38 of therotary group 30. Such a receivingseat 38 is preferably obtained in the interspace between two parallel plates mounted on therotary group 30 and, more specifically, on the motorisedrotary frame 33 and perforated so that such holes are substantially aligned with a coupling hole made on thebracket element 12 at thethird vertex 17. In this way it is possible to quickly and easily pass a pin for coupling with thethird vertex 17 of thebracket element 12. - Preferably, the stabilizing
group 10 also comprises a hoistingwinch 18 fixed onto thecounter jib 40, for example at the opposite end to the hinging with therotary group 30 as illustrated infigures 1 and 2 . - A rope (not illustrated) for lifting loads is then wound onto such a
hoisting winch 18. - Advantageously, the
rotary group 30, according to a preferred embodiment of the present invention, comprisessupport arms 36 at the portion intended for coupling with the liftingarm 22; a block-carryingtrolley 37 is slidably constrained tosuch support arms 36. - In particular, the block-carrying
trolley 37 is locked in position during the mounting steps and, once the mounting of the crane is complete, is left free to slide first on thesupport arms 36 and then on the liftingarm 22. - In this case, the aforementioned lifting rope is brought up to the pulleys of the block already in the assembly shop in pre-assembly step so that, once the mounting of the crane is complete at the building yard, the rope is already in work position.
- As can be seen in
figures 4 to 6 , the tower crane according to the present invention can be mounted as follows. - In a first step the
vertical tower structure 21 is assembled and fixed to the ground. In particular, thebase 23 is fixed to the ground and then the trestle tower structure is mounted. - In a second step, the stabilizing
group 10 is hoisted in its most complete configuration with thebracket element 12 in raised position through acrane truck 50. In this step the stabilizinggroup 10 is put in a harness and lifted up to the top of thevertical tower structure 21. - Once the stabilizing
group 10 has been coupled with thevertical tower structure 21, the counter-weight ballasts 19 are mounted on thecounter jib 40 so as to arrange the stabilizinggroup 10 to couple with the liftingarm 22. - Indeed, after the mounting of the
ballasts 19 the liftingarm 22 is hoisted, which is then coupled with therotary group 30 so as to allow the block-carrying trolley to slide on the liftingarm 22 itself. - From the description that has been made the characteristics of the stabilizing group and of the tower crane object of the present invention are clear, just as the relative advantages are also clear.
- Firstly, indeed, the stabilizing
group 10 even in its most complete configuration is easily transportable to the building yard thanks to the presence of the limiting means of the rotation of thecounter jib 40. - In particular, the limitation of the downward rotation allows the stabilizing
group 10 to be easily moved also lifting it through ropes fixed on thecounter jib 40. Such movement is particularly useful and used during ground transportation, for example for storage in warehouses or containers. The whole of therotary group 30 and thecounter jib 40 can be moved even without thebracket element 12 and thetie rod 15. - On the other hand, where such a
bracket element 12 and thetie rod 15 have been mounted before transportation to the building yard, thebracket element 12 can be arranged in the folded work position giving greater compactness to the stabilizing group. - The limitation of upward rotation allows the stabilizing
group 10 to be lifted in the mounting step, preventing thecounter jib 40 and therotary group 30 from flipping against one another. - Finally, it is clear that the stabilizing group and the tower crane thus conceived can undergo numerous modifications and variants, all of which are covered by the invention; moreover, all the details can be replaced by technically equivalent elements. In practice, the materials used, as well as the sizes, can be whatever according to the technical requirements.
Claims (11)
- Stabilizing group (10) for a tower crane (20), of the type comprising a vertical tower structure (21) and a lifting arm (22), said stabilizing group (10) comprising:- a rotary group (30) arranged to be mounted at the top of said vertical tower structure (21) so as to be able to rotate about a vertical axis, said rotary group (30) also being arranged to couple with said lifting arm (22) ;- a counter jib (40) rotatably coupled through a hinge (11) having horizontal axis with said rotary group (30) on the opposite side to that intended for coupling with said lifting arm (22), said hinge (11) defining a horizontal hinging half-plane;said stabilizing group (10) being characterised in that it comprises limiting means (35, 45) for limiting the rotation of said counter jib (40) with respect to said rotary group (30) at least in one sense of rotation with respect to the horizontal hinging half-plane.
- Stabilizing group (10) for a tower crane (20) according to claim 1, wherein said limiting means (35, 45) are arranged to limit said rotation of said counter jib (40) with respect to said rotary group (30) in both senses of rotation with respect to the horizontal hinging half-plane within a predetermined arc.
- Stabilizing group (10) for a tower crane (20) according to claim 1 or 2, wherein said limiting means (35, 45) are adjustable.
- Stabilizing group (10) for a tower crane (20) according to one of the previous claims, wherein said counter jib (40) is made in the form of an internally hollow beam and said limiting means (35, 45) comprise:- at least one abutment element (45) positioned internally on the upper and/or lower wall of said counter Jib (40);- a plate element (35) constrained to said rotary group (30), said plate element (35) projecting inside said counter jib (40) so as to go into abutment against said at least one abutment element (45) during the rotation of said counter jib (40) with respect to said rotary group (30).
- Stabilizing group (10) for a tower crane (20) according to one of claims 1 to 3, wherein said hinge is positioned in a recess of said rotary group (30) and said limiting means (35, 45) comprise at least one abutment element positioned internally on the upper and/or lower wall of said recess of said rotary group (30), said counter jib (40) extending in said recess of said rotary group (30) so as to go into abutment against said at least one abutment element during the rotation of said counter jib (40) with respect to said rotary group (30).
- Stabilizing group (10) for a tower crane (20) according to one of claims 1 to 3, wherein said limiting means (35, 45) comprise:- at least one bar element constrained to said rotary group (30) through connection means, said at least one bar element extending outside said counter jib (40) above and/or below it (40), so that said counter jib (40) goes into abutment against said at least one bar element during the rotation of said counter jib (40) with respect to said rotary group (30).
- Stabilizing group (10) for a tower crane (20) according to one of the previous claims, wherein said stabilizing group (10) comprises a bracket element (12) pivoted on said rotary group (30) at a first vertex (13), a second vertex (14) of said bracket element (12) being constrained to a first end of at least one tie rod (15) through at least one corresponding articulated arm (16), said at least one tie rod (15) being constrained in a rotary manner to said counter jib (40) at a second end, said bracket element (12) being arranged to reversibly pass from a folded rest position, in which said tie rod (15) is at rest, and a raised work position in which said tie rod (15) exerts traction upwards on said counter jib (40), in said raised position a third vertex (17) of said bracket element (12) being stably fastened to said rotary group (30).
- Stabilizing group (10) for a tower crane (20) according to claim 7, wherein, when said bracket element (12) is taken into said raised work position, said third vertex (17) is inserted in a receiving seat (38) of said rotary group (30), said receiving seat (38) being obtained in the interspace between two parallel plates mounted on said rotary group (30) and perforated so that such holes are substantially aligned with a coupling hole made on said bracket element (12) at said third vertex (17).
- Stabilizing group (10) for a tower crane (20) according to one of the previous claims comprising a hoisting winch (18) fixed on said counter jib (40).
- Stabilizing group (10) for a tower crane (20) according to one of the previous claims, wherein said rotary group (30) at the portion intended for coupling with said lifting arm (22) comprises support arms (36) to which a block-carrying trolley (37) is slidably constrained.
- Tower crane (20) comprising:- a vertical tower structure (21) constrained to a base (23) ;- a stabilizing group (10) according to one of the previous claims coupled with said vertical tower structure (21);- a lifting arm (22) coupled with said stabilizing group (10).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ITMI20150019 | 2015-01-13 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3045417A1 true EP3045417A1 (en) | 2016-07-20 |
EP3045417B1 EP3045417B1 (en) | 2017-09-13 |
Family
ID=52633404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16150845.2A Not-in-force EP3045417B1 (en) | 2015-01-13 | 2016-01-12 | Stabilizing group for a tower crane and tower crane comprising such a group |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP3045417B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3293143A1 (en) * | 2016-09-09 | 2018-03-14 | Cargotec Finland Oy | Sts crane boom extension system and methods |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1842822A2 (en) * | 2006-04-05 | 2007-10-10 | Tgm S.R.L. | Crane and method of assembling it |
CN202508791U (en) * | 2012-03-15 | 2012-10-31 | 沈阳三洋建筑机械有限公司 | Novel tower section lead-in device |
CN203345976U (en) * | 2013-07-09 | 2013-12-18 | 中联重科股份有限公司 | Tower crane and introducing system thereof |
CN104045008A (en) * | 2014-05-30 | 2014-09-17 | 中联重科股份有限公司 | Sectional type balance arm and tower crane |
CN203998737U (en) * | 2014-05-12 | 2014-12-10 | 江苏大通重工有限公司 | The oblique back stay connecting device of Mini-tower hoist tool |
-
2016
- 2016-01-12 EP EP16150845.2A patent/EP3045417B1/en not_active Not-in-force
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1842822A2 (en) * | 2006-04-05 | 2007-10-10 | Tgm S.R.L. | Crane and method of assembling it |
CN202508791U (en) * | 2012-03-15 | 2012-10-31 | 沈阳三洋建筑机械有限公司 | Novel tower section lead-in device |
CN203345976U (en) * | 2013-07-09 | 2013-12-18 | 中联重科股份有限公司 | Tower crane and introducing system thereof |
CN203998737U (en) * | 2014-05-12 | 2014-12-10 | 江苏大通重工有限公司 | The oblique back stay connecting device of Mini-tower hoist tool |
CN104045008A (en) * | 2014-05-30 | 2014-09-17 | 中联重科股份有限公司 | Sectional type balance arm and tower crane |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3293143A1 (en) * | 2016-09-09 | 2018-03-14 | Cargotec Finland Oy | Sts crane boom extension system and methods |
Also Published As
Publication number | Publication date |
---|---|
EP3045417B1 (en) | 2017-09-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8469209B2 (en) | Removal apparatus for a torque converter and a starting motor from an auxiliary compartment on a gas turbine | |
CN105236276A (en) | Foldable gantry crane capable of ascending and descending | |
NL7909035A (en) | LIFTING EQUIPMENT, SUCH AS JACKET OR PORTAL CRANE, FOR HANDLING CONTAINERS. | |
US3777900A (en) | Building crane | |
US10239735B2 (en) | Method for assembling a crane and method for operating a crane | |
JPH05229779A (en) | Driven cargo engaging device equipped with remote control device | |
EP2345623B1 (en) | A system comprising a movable work platform, as well as an apparatus and a crane device | |
RU2307783C1 (en) | Tower crane | |
EP3045417B1 (en) | Stabilizing group for a tower crane and tower crane comprising such a group | |
NL2011985C2 (en) | Saddle and hook system. | |
EP2695844B1 (en) | Mobile built-up folding crane | |
JP5927718B2 (en) | Mobile safety equipment frame | |
KR20220062580A (en) | A combination comprising a crane, a load guide device arranged for mounting on a crane, and a load guide device for use in the assembly | |
CN110259087A (en) | Scaffold support structure and scaffold support system | |
US20230249947A1 (en) | An extension yoke for self-hoisting crane, a self-hoisting wind turbine crane with an extension yoke, and use of an extension yoke | |
CN105883645B (en) | The method for dismounting of tower crane attachment device | |
JP5535719B2 (en) | Simple assembly type derrick | |
CN114955894A (en) | Top-added-joint self-lifting type folding tower crane | |
EP3533750B1 (en) | Girder beam installation and removal system and method | |
US20120228255A1 (en) | Methods of removing a torque converter and a starting motor from an auxiliary compartment of a gas turbine | |
CN209493242U (en) | A kind of parallel crane of both arms | |
JP3230370U (en) | Lifting device | |
JPH08301590A (en) | Heavy load moving device | |
CN211971560U (en) | Column type cantilever crane | |
CN213679428U (en) | Box girder lifting appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20170119 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B66C 23/72 20060101ALI20170224BHEP Ipc: B66C 23/16 20060101ALI20170224BHEP Ipc: B66C 23/02 20060101AFI20170224BHEP |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: GP AUTOLIFT S.R.L. |
|
INTG | Intention to grant announced |
Effective date: 20170331 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 927935 Country of ref document: AT Kind code of ref document: T Effective date: 20171015 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016000330 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 3 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20170913 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171213 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 927935 Country of ref document: AT Kind code of ref document: T Effective date: 20170913 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171213 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171214 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20180105 Year of fee payment: 3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180113 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20180112 Year of fee payment: 3 Ref country code: TR Payment date: 20180102 Year of fee payment: 3 Ref country code: BE Payment date: 20180117 Year of fee payment: 3 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602016000330 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
26N | No opposition filed |
Effective date: 20180614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180112 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180112 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20190131 Year of fee payment: 4 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602016000330 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190801 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170913 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20160112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170913 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190112 |