CN202214167U - tower crane with improved structure - Google Patents

tower crane with improved structure Download PDF

Info

Publication number
CN202214167U
CN202214167U CN2011202711993U CN201120271199U CN202214167U CN 202214167 U CN202214167 U CN 202214167U CN 2011202711993 U CN2011202711993 U CN 2011202711993U CN 201120271199 U CN201120271199 U CN 201120271199U CN 202214167 U CN202214167 U CN 202214167U
Authority
CN
China
Prior art keywords
tower
arranged above
crane
rotary
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202711993U
Other languages
Chinese (zh)
Inventor
周杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202711993U priority Critical patent/CN202214167U/en
Application granted granted Critical
Publication of CN202214167U publication Critical patent/CN202214167U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

Provided is a tower crane with an improved structure. A base section above (17) is arranged above a base (16), a standard section above (15) is arranged above the base section above (17), the standard section above (17) is positioned in a climbing stock (14), a lower support (21) is arranged above the standard section above (15), a rotary bearing (24) is arranged above the lower support (21), an upper support is arranged above the rotary bearing (24), and a rotary tower body (23) is arranged above the upper support (20). A tower top (4) is positioned above the rotary tower body (23), a cargo boom (9) is arranged on the right side of the rotary tower body (23), a balance arm (1) is arranged on the left of the rotary tower body (23), one end of a cargo boom pull rod (8) is arranged above an upper chord of the cargo boom (9), and the other end of the cargo boom pull rod (8) is arranged above the right of the tower top (4). One end of a balance arm pull rod (3) is arranged above a lifting point of the balance arm (1), and the other end of the balance arm pull rod (3) is arranged above the left of the tower top (4). A lift mechanism (2) is arranged above the balance arm (1), a jib lubbing mechanism (10) is arranged in the cargo boom, a rotary mechanism (22) is arranged above the upper support (20), a force moment limiter (5) is arranged under the left of the tower top (4), and a weight limiter (13) is arranged in the upper portion of the rotary tower body (23). The base section (17), the standard section (15) and a main chord of the metal structure of the improved structure tower crane are made of Q345 materials, and auxiliary rod members are made of Q235 materials. The tower crane with the improved structure can be applied to an 80 series tower crane. If each tower crane chooses intermediate value, steel materials can be saved by about 5%.

Description

The tower crane of optimizing structure
One, technical field
The tower crane of optimizing structure is used for building sites such as building, water conservancy, electric power, highway, station, harbour, petrochemical industry, nuclear station to be used.
Two, background technology
Existing tower crane metal construction material all is Q235.Do tower crane metal construction weight with the material of Q235 and expend steel greatly, tower crane foundation joint, standard knot are not optimized.
Three, utility model content
The tower crane metal construction of optimizing structure is: base section, standard knot.
The purpose of the utility model is a kind of tower crane of optimizing structure that is suitable for of design.After tower machine concrete foundation reaches set strength, it is characterized in that: base section is on the basis, and standard knot is on base section; Standard knot is in the climbing frame the inside, and undersetting is on standard knot, and pivoting support is on undersetting; Upper bracket is on pivoting support, and slewing tower is on upper bracket, and cat head is on slewing tower; Crane arm is face on the right of slewing tower, and equilibrium arm is on the left side of slewing tower, and crane arm pull bar one end is on the crane arm top boom; Crane arm pull bar one end is the right on cat head, and equilibrium arm pull bar one end is end left side on cat head on the equilibrium arm suspension centre.Lifting mechanism is on equilibrium arm; Luffing mechanism is in the crane arm the inside, and swing type mechanism is on upper bracket, and limiter of moment is at the cat head left lower side; The weight limits device is in the inside on slewing tower top; The base section of the tower crane metal construction of optimizing structure, standard knot main chord material are Q345, and auxiliary bar is the Q235 material, and the tower crane of optimizing structure connects with bearing pin, high strength bolt pair, spring cotter, high strength nut.
Here the main 80 tower machine structured datas that use on the tower crane of optimizing structure of explaining; Optimize structure standard knot, base section, pivoting support, the frame that climbs, slewing tower, crane arm, equilibrium arm and crane arm pull bar, equilibrium arm on the tower crane, the high sizes of length and width such as upper bracket, undersetting, cat head will diminish 3%~13%.
The utility model is compared with known technology, and the main chord material of base section, standard knot is Q345, and auxiliary bar is the Q235 material.The utility model is used on the 80 serial tower machines, gets intermediate value for every and can practice thrift the steel about 5%.
Four, description of drawings
Accompanying drawing 1 is the tower crane front view of optimizing structure:
Accompanying drawing 2 is to optimize structure tower crane A to partial enlarged drawing:
Accompanying drawing 3 is to optimize structure tower crane B to partial enlarged drawing:
Five, the specific embodiment
1. combine accompanying drawing 1,2,3 to describe: after tower machine concrete foundation [16] reached set strength, base section [17] was connected with anchor bolt [18], tightens with high strength nut [19].Standard knot [15] is connected with base section [17], and climbing frame [14] packs into standard knot [15], and undersetting [21] is connected with standard knot [15]; Pivoting support [24] is connected with undersetting [21]; Upper bracket [20] is connected with pivoting support [24], and slewing tower [23] is connected with upper bracket [20], and cat head [4] is connected with slewing tower [23]; Crane arm [9] is connected with the otic placode on slewing tower [23] the right; Equilibrium arm [1] is connected with the otic placode on slewing tower [23] left side, and crane arm pull bar [8] one ends are connected with crane arm [9] top boom, and crane arm pull bar [8] one ends are connected with cat head [4].Equilibrium arm pull bar [3] one ends are connected an end with equilibrium arm [1] suspension centre and are connected with cat head [4].Lifting mechanism [2] is connected with equilibrium arm [1].Luffing mechanism [7] is connected with crane arm [9]; Amplitude variation trolley [10] is connected with crane arm [9], and swing type mechanism [22] is connected with upper bracket [20], and limiter of moment [5] is connected with cat head [4]; Weight limits device [13] is connected with slewing tower [23], and operator's compartment [6] is connected with upper bracket [20].Electric cabinet [12] is connected with equilibrium arm [1], and suspension hook [11] is connected with steel rope on the lifting mechanism [2].The tower crane of optimizing structure connects with bearing pin, high strength bolt pair, spring cotter, high strength nut.Base section, standard knot main chord material are Q345, and auxiliary bar is the Q235 material, change structure tower crane 80 every of series and can practice thrift 2000 kilograms of materials.

Claims (1)

1. tower crane of optimizing structure is characterized in that: base section [17] is on basis [16], and standard knot [15] is on base section [17]; Standard knot [15] is in climbing frame [14] the inside, and undersetting [21] is on standard knot [15], and pivoting support [24] is on undersetting [21]; Upper bracket [20] is on pivoting support [24], and slewing tower [23] is on upper bracket [20], and cat head [4] is on slewing tower [23]; Crane arm [9] is at the right face of slewing tower [23], and equilibrium arm [1] is on the left side of slewing tower [23], and crane arm pull bar [8] one ends are at crane arm [9] above the top boom; Crane arm pull bar [8] one ends are on the last the right of cat head [4], and an end is on the last left side of cat head [4] above the suspension centre at equilibrium arm [1] for equilibrium arm pull bar [3] one ends, and lifting mechanism [2] is on equilibrium arm [1]; Luffing mechanism [10] is in the crane arm the inside; Swing type mechanism [22] is on upper bracket [20], and limiter of moment [5] is at cat head [4] left lower side, and weight limits device [13] is in the inside on slewing tower [23] top; The base section [17] of the tower crane metal construction of optimizing structure, standard knot [15] main chord material are Q345, and auxiliary bar is the Q235 material.
CN2011202711993U 2011-07-23 2011-07-23 tower crane with improved structure Expired - Fee Related CN202214167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202711993U CN202214167U (en) 2011-07-23 2011-07-23 tower crane with improved structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202711993U CN202214167U (en) 2011-07-23 2011-07-23 tower crane with improved structure

Publications (1)

Publication Number Publication Date
CN202214167U true CN202214167U (en) 2012-05-09

Family

ID=46013433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202711993U Expired - Fee Related CN202214167U (en) 2011-07-23 2011-07-23 tower crane with improved structure

Country Status (1)

Country Link
CN (1) CN202214167U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105174077A (en) * 2015-10-21 2015-12-23 无锡港盛重型装备有限公司 Novel tower crane equipment
CN106516998A (en) * 2016-12-30 2017-03-22 徐州建机工程机械有限公司 Movable arm and flat arm dual-purpose tower crane
CN106829759A (en) * 2017-04-01 2017-06-13 林涵 A kind of garden architecture construction crane machine of high stable
CN109516390A (en) * 2018-12-29 2019-03-26 浙江省特种设备检验研究院 A kind of flat-top tower crane and field installation process convenient for manpower transport's installation
CN112645224A (en) * 2020-12-17 2021-04-13 海宁虎霸重工有限公司 Tower crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105174077A (en) * 2015-10-21 2015-12-23 无锡港盛重型装备有限公司 Novel tower crane equipment
CN106516998A (en) * 2016-12-30 2017-03-22 徐州建机工程机械有限公司 Movable arm and flat arm dual-purpose tower crane
CN106829759A (en) * 2017-04-01 2017-06-13 林涵 A kind of garden architecture construction crane machine of high stable
CN109516390A (en) * 2018-12-29 2019-03-26 浙江省特种设备检验研究院 A kind of flat-top tower crane and field installation process convenient for manpower transport's installation
CN109516390B (en) * 2018-12-29 2024-03-08 浙江省特种设备科学研究院 Flat-head tower crane convenient for manual carrying and installation and field installation method
CN112645224A (en) * 2020-12-17 2021-04-13 海宁虎霸重工有限公司 Tower crane

Similar Documents

Publication Publication Date Title
CN202214167U (en) tower crane with improved structure
CN202016814U (en) Automatic structural gravity center balancing system
CN103848360B (en) A kind of group tower tower crane being provided with packaged type balance weight system
CN103832933A (en) Group tower type crane with auxiliary boom
CN102351129B (en) Super-lifting device for improving lifting performance of crane and crane
CN202508791U (en) Novel tower section lead-in device
CN202296907U (en) Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction
CN202214168U (en) High strength material tower crane
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN202099742U (en) Sling structure of bridge erecting machine
CN201737639U (en) Integral inverted hoist
CN201762039U (en) Novel flat-top tower crane
CN208982630U (en) External clamping angle steel fixed pulley
CN202193566U (en) Two-material combining tower crane
CN203624822U (en) Marine hanging beam with variable stay bar crotch
CN206569945U (en) A kind of crane arm Adaptable System of flat-top tower crane
CN206751229U (en) A kind of gantry crane for being easily installed and transporting
CN202322118U (en) Rigid telescopic hydraulic separate counter weight crane
CN204897220U (en) Frame bridge crane's bridge hoisting structure
CN201144134Y (en) Double herringbone hoisting derrick mast
CN204281029U (en) A kind of stressed clear and definite and adjustable operation platform suspender of suspension centre
CN201961955U (en) Dual C-shaped lifting sling for rolling plate
CN201236098Y (en) Combined pressure bar sling
CN201649667U (en) Reinforcement cage immersion guide frame
CN207062782U (en) A kind of cast-in-situ box girder prestressed stretch-draw support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20140723