CN202099742U - Sling structure of bridge erecting machine - Google Patents
Sling structure of bridge erecting machine Download PDFInfo
- Publication number
- CN202099742U CN202099742U CN2011201765680U CN201120176568U CN202099742U CN 202099742 U CN202099742 U CN 202099742U CN 2011201765680 U CN2011201765680 U CN 2011201765680U CN 201120176568 U CN201120176568 U CN 201120176568U CN 202099742 U CN202099742 U CN 202099742U
- Authority
- CN
- China
- Prior art keywords
- lifting
- formation machine
- bridge formation
- erecting machine
- bridge erecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a sling structure of a bridge erecting machine, which comprises a lifting beam. A plurality of hinged seats are arranged on the detachable lifting beam which is formed by fixedly connecting two sections through a bolt and a nut, a movable pulley group is hinged to the hinged seats through shaft pins, a vertical pendulum is respectively arranged at two ends of the lifting beam, and a lifting shaft is respectively arranged on each vertical pendulum. Lifting hooks are fixed at the lowest ends of the lifting shafts, and the upper end face of each lifting hook is in a plane structure so as to form a larger supporting surface. The sling structure of the bridge erecting machine is simple in structure, strong in applicability and high in safety, can lift prefabricated concrete beams in different types of a high-speed rail, and greatly improves working efficiency.
Description
Technical field
The utility model relates to a kind of bridge formation machine, especially relates to a kind of bridge formation machine hanger structure that is applicable to the high ferro precast beam.
Background technology
At present, the bridge formation machine has become and has set up road bridge, conventional railway bridge; The visitor is the requisite engineering equipment of railway bridge specially, and well-known, bridge formation machine suspender is the important component part of bridge formation machine; If problem causes major accident possibly; What common suspender used all is by wire rope, compositions such as suspension hook, the handling of inapplicable and high ferro precast beam.
The utility model content
The purpose of the utility model is to provide a kind of bridge formation machine hanger structure, and it has characteristics simple in structure, that supporting capacity is strong and safe and reliable.
The purpose of the utility model is to realize through following technical scheme:
A kind of bridge formation machine hanger structure, it comprises hanging beam, said hanging beam is provided with several hinged seats; Running block is articulated on the hinged seat through pivot pin; And the two ends of said hanging beam are provided with pitch, are provided with hanging axis on the said pitch, said hanging axis be fixed with suspension hook bottom.
Especially, said hanging beam is removable, is formed by fixedly connecting through screw bolt and nut two sections.
Especially, the upper surface of said suspension hook is a plane structure.
The beneficial effect of the utility model does, said bridge formation machine hanger structure is not only simple in structure, and applicability is strong, and is safe, can the dissimilar prefabricated cement beam of high ferro of handling, increase work efficiency greatly.
Description of drawings
According to accompanying drawing and embodiment the utility model is done further explain below.
Fig. 1 is the structural representation of the utility model bridge formation machine hanger structure;
Fig. 2 is the lateral view of the utility model bridge formation machine hanger structure.
Among the figure:
1, hanging beam; 2, hanging axis; 3, running block; 4, pitch; 5, suspension hook; 6, hinged seat; 7, pivot pin; 8, axle head baffle plate.
The specific embodiment
Please with reference to Fig. 1 and shown in Figure 2, Fig. 1 is the structural representation of the utility model bridge formation machine hanger structure; Fig. 2 is the lateral view of the utility model bridge formation machine hanger structure.
In present embodiment, said bridge formation machine hanger structure comprises hanging beam 1, and said hanging beam 1 is removable; Be formed by fixedly connecting through screw bolt and nut two sections, so that can change the length of hanging beam 1 as required, and said hanging beam 1 is provided with several hinged seats 6; Offer through hole on the said hinged seat 6, running block 3 is articulated on the hinged seat 6 through the through hole that pivot pin 7 passes on the hinged seat 6, and said pivot pin 7 is outside equipped with axle head baffle plate 8; Said axle head baffle plate 8 is fixed on the hinged seat 6 through set bolt, and the two ends of said hanging beam 1 are provided with pitch 4, is provided with hanging axis 2 on the said pitch 4; Said hanging axis 2 be fixed with suspension hook 5 bottom; The upper surface of said suspension hook 5 is a plane structure, to form bigger supporting surface, improves the weight capacity of suspender.
During work, utilize suspension hook 5 to hook the prefabricated cement beam of high ferro, the bridge formation machine drives running block 3 drive hanging beams 1 and moves up or down; Not only simple in structure, and applicability is strong, safe; The dissimilar prefabricated cement beam of high ferro of ability handling is increased work efficiency greatly.
Claims (3)
1. bridge formation machine hanger structure; It is characterized in that: comprise hanging beam; Said hanging beam is provided with several hinged seats, and running block is articulated on the hinged seat through pivot pin, and the two ends of said hanging beam are provided with pitch; Be provided with hanging axis on the said pitch, said hanging axis be fixed with suspension hook bottom.
2. bridge formation machine hanger structure according to claim 1; It is characterized in that: said hanging beam is removable, is formed by fixedly connecting through screw bolt and nut two sections.
3. bridge formation machine hanger structure according to claim 1; It is characterized in that: the upper surface of said suspension hook is a plane structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201765680U CN202099742U (en) | 2011-05-30 | 2011-05-30 | Sling structure of bridge erecting machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201765680U CN202099742U (en) | 2011-05-30 | 2011-05-30 | Sling structure of bridge erecting machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202099742U true CN202099742U (en) | 2012-01-04 |
Family
ID=45385764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201765680U Expired - Fee Related CN202099742U (en) | 2011-05-30 | 2011-05-30 | Sling structure of bridge erecting machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202099742U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103663106A (en) * | 2013-12-12 | 2014-03-26 | 齐齐哈尔轨道交通装备有限责任公司 | Lifting beam for railway crane and railway crane |
CN104727224A (en) * | 2015-02-10 | 2015-06-24 | 中交一航局第一工程有限公司 | Lifting point hoisting method for large-tonnage prefabricated pier caps |
CN105438959A (en) * | 2015-12-23 | 2016-03-30 | 中交一航局第三工程有限公司 | Balance type prefabricated beam side mold hanger device |
CN105947873A (en) * | 2016-06-16 | 2016-09-21 | 王欢 | Coiling block pulley sling with ropes without intersection or included angles |
CN113321114A (en) * | 2021-06-30 | 2021-08-31 | 广西贵港建设集团有限公司 | Hoisting mechanism for municipal bridge construction and use method thereof |
-
2011
- 2011-05-30 CN CN2011201765680U patent/CN202099742U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103663106A (en) * | 2013-12-12 | 2014-03-26 | 齐齐哈尔轨道交通装备有限责任公司 | Lifting beam for railway crane and railway crane |
CN103663106B (en) * | 2013-12-12 | 2016-03-23 | 齐齐哈尔轨道交通装备有限责任公司 | For hanging beam and the locomotive crane of locomotive crane |
CN104727224A (en) * | 2015-02-10 | 2015-06-24 | 中交一航局第一工程有限公司 | Lifting point hoisting method for large-tonnage prefabricated pier caps |
CN105438959A (en) * | 2015-12-23 | 2016-03-30 | 中交一航局第三工程有限公司 | Balance type prefabricated beam side mold hanger device |
CN105947873A (en) * | 2016-06-16 | 2016-09-21 | 王欢 | Coiling block pulley sling with ropes without intersection or included angles |
CN113321114A (en) * | 2021-06-30 | 2021-08-31 | 广西贵港建设集团有限公司 | Hoisting mechanism for municipal bridge construction and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202099742U (en) | Sling structure of bridge erecting machine | |
CN113291973B (en) | Assembled building construction high accuracy hoist | |
CN106276615A (en) | A kind of crane may move driver's cabin | |
CN206126654U (en) | Adopt double -deck balance beam hoist of prestress wire hoist and mount large -tonnage component | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN202030434U (en) | Large-span whole-section hoisting sling for steel box girder | |
CN206680101U (en) | A kind of simple and convenient guardrail model sheetinstallat chassis | |
CN202829301U (en) | Lifting tool for steel rail | |
CN202245700U (en) | Hoisting tool for narrow coil hoisting | |
CN204624903U (en) | Elevator car rack | |
CN204689351U (en) | A kind of H profile steel structural elements suspender | |
CN202099745U (en) | Lifting appliance for bridge girder erection machine | |
CN202193533U (en) | Rotating mechanism of electromagnetic crane | |
CN201762053U (en) | Simple automatic derrick | |
CN204897220U (en) | Frame bridge crane's bridge hoisting structure | |
CN102296538A (en) | Lifting appliance of bridge erecting machine | |
CN201619942U (en) | Special hoisting tool for hoisting super large block of steel box girder | |
CN207685682U (en) | A kind of bridge hoisting mechanism | |
CN102367128B (en) | Device for testing balancing factor of elevator | |
CN202465115U (en) | Double main beam gantry crane | |
CN205906936U (en) | Glass curtain wall hoisting construction system | |
CN207632396U (en) | A kind of electric block equipped with height limiting device | |
CN207142685U (en) | A kind of semimounted single-beam crane | |
CN201236098Y (en) | Combined pressure bar sling | |
CN204751886U (en) | Batch reinforcing bar lifting device frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120104 Termination date: 20130530 |