CN202099742U - Sling structure of bridge erecting machine - Google Patents

Sling structure of bridge erecting machine Download PDF

Info

Publication number
CN202099742U
CN202099742U CN2011201765680U CN201120176568U CN202099742U CN 202099742 U CN202099742 U CN 202099742U CN 2011201765680 U CN2011201765680 U CN 2011201765680U CN 201120176568 U CN201120176568 U CN 201120176568U CN 202099742 U CN202099742 U CN 202099742U
Authority
CN
China
Prior art keywords
lifting
formation machine
bridge formation
erecting machine
bridge erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201765680U
Other languages
Chinese (zh)
Inventor
王飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI AOMA HIGH SPEED RAIL TECHNOLOGY CO LTD
Original Assignee
WUXI AOMA HIGH SPEED RAIL TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI AOMA HIGH SPEED RAIL TECHNOLOGY CO LTD filed Critical WUXI AOMA HIGH SPEED RAIL TECHNOLOGY CO LTD
Priority to CN2011201765680U priority Critical patent/CN202099742U/en
Application granted granted Critical
Publication of CN202099742U publication Critical patent/CN202099742U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a sling structure of a bridge erecting machine, which comprises a lifting beam. A plurality of hinged seats are arranged on the detachable lifting beam which is formed by fixedly connecting two sections through a bolt and a nut, a movable pulley group is hinged to the hinged seats through shaft pins, a vertical pendulum is respectively arranged at two ends of the lifting beam, and a lifting shaft is respectively arranged on each vertical pendulum. Lifting hooks are fixed at the lowest ends of the lifting shafts, and the upper end face of each lifting hook is in a plane structure so as to form a larger supporting surface. The sling structure of the bridge erecting machine is simple in structure, strong in applicability and high in safety, can lift prefabricated concrete beams in different types of a high-speed rail, and greatly improves working efficiency.

Description

Bridge formation machine hanger structure
Technical field
The utility model relates to a kind of bridge formation machine, especially relates to a kind of bridge formation machine hanger structure that is applicable to the high ferro precast beam.
Background technology
At present, the bridge formation machine has become and has set up road bridge, conventional railway bridge; The visitor is the requisite engineering equipment of railway bridge specially, and well-known, bridge formation machine suspender is the important component part of bridge formation machine; If problem causes major accident possibly; What common suspender used all is by wire rope, compositions such as suspension hook, the handling of inapplicable and high ferro precast beam.
The utility model content
The purpose of the utility model is to provide a kind of bridge formation machine hanger structure, and it has characteristics simple in structure, that supporting capacity is strong and safe and reliable.
The purpose of the utility model is to realize through following technical scheme:
A kind of bridge formation machine hanger structure, it comprises hanging beam, said hanging beam is provided with several hinged seats; Running block is articulated on the hinged seat through pivot pin; And the two ends of said hanging beam are provided with pitch, are provided with hanging axis on the said pitch, said hanging axis be fixed with suspension hook bottom.
Especially, said hanging beam is removable, is formed by fixedly connecting through screw bolt and nut two sections.
Especially, the upper surface of said suspension hook is a plane structure.
The beneficial effect of the utility model does, said bridge formation machine hanger structure is not only simple in structure, and applicability is strong, and is safe, can the dissimilar prefabricated cement beam of high ferro of handling, increase work efficiency greatly.
Description of drawings
According to accompanying drawing and embodiment the utility model is done further explain below.
Fig. 1 is the structural representation of the utility model bridge formation machine hanger structure;
Fig. 2 is the lateral view of the utility model bridge formation machine hanger structure.
Among the figure:
1, hanging beam; 2, hanging axis; 3, running block; 4, pitch; 5, suspension hook; 6, hinged seat; 7, pivot pin; 8, axle head baffle plate.
The specific embodiment
Please with reference to Fig. 1 and shown in Figure 2, Fig. 1 is the structural representation of the utility model bridge formation machine hanger structure; Fig. 2 is the lateral view of the utility model bridge formation machine hanger structure.
In present embodiment, said bridge formation machine hanger structure comprises hanging beam 1, and said hanging beam 1 is removable; Be formed by fixedly connecting through screw bolt and nut two sections, so that can change the length of hanging beam 1 as required, and said hanging beam 1 is provided with several hinged seats 6; Offer through hole on the said hinged seat 6, running block 3 is articulated on the hinged seat 6 through the through hole that pivot pin 7 passes on the hinged seat 6, and said pivot pin 7 is outside equipped with axle head baffle plate 8; Said axle head baffle plate 8 is fixed on the hinged seat 6 through set bolt, and the two ends of said hanging beam 1 are provided with pitch 4, is provided with hanging axis 2 on the said pitch 4; Said hanging axis 2 be fixed with suspension hook 5 bottom; The upper surface of said suspension hook 5 is a plane structure, to form bigger supporting surface, improves the weight capacity of suspender.
During work, utilize suspension hook 5 to hook the prefabricated cement beam of high ferro, the bridge formation machine drives running block 3 drive hanging beams 1 and moves up or down; Not only simple in structure, and applicability is strong, safe; The dissimilar prefabricated cement beam of high ferro of ability handling is increased work efficiency greatly.

Claims (3)

1. bridge formation machine hanger structure; It is characterized in that: comprise hanging beam; Said hanging beam is provided with several hinged seats, and running block is articulated on the hinged seat through pivot pin, and the two ends of said hanging beam are provided with pitch; Be provided with hanging axis on the said pitch, said hanging axis be fixed with suspension hook bottom.
2. bridge formation machine hanger structure according to claim 1; It is characterized in that: said hanging beam is removable, is formed by fixedly connecting through screw bolt and nut two sections.
3. bridge formation machine hanger structure according to claim 1; It is characterized in that: the upper surface of said suspension hook is a plane structure.
CN2011201765680U 2011-05-30 2011-05-30 Sling structure of bridge erecting machine Expired - Fee Related CN202099742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201765680U CN202099742U (en) 2011-05-30 2011-05-30 Sling structure of bridge erecting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201765680U CN202099742U (en) 2011-05-30 2011-05-30 Sling structure of bridge erecting machine

Publications (1)

Publication Number Publication Date
CN202099742U true CN202099742U (en) 2012-01-04

Family

ID=45385764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201765680U Expired - Fee Related CN202099742U (en) 2011-05-30 2011-05-30 Sling structure of bridge erecting machine

Country Status (1)

Country Link
CN (1) CN202099742U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103663106A (en) * 2013-12-12 2014-03-26 齐齐哈尔轨道交通装备有限责任公司 Lifting beam for railway crane and railway crane
CN104727224A (en) * 2015-02-10 2015-06-24 中交一航局第一工程有限公司 Lifting point hoisting method for large-tonnage prefabricated pier caps
CN105438959A (en) * 2015-12-23 2016-03-30 中交一航局第三工程有限公司 Balance type prefabricated beam side mold hanger device
CN105947873A (en) * 2016-06-16 2016-09-21 王欢 Coiling block pulley sling with ropes without intersection or included angles
CN113321114A (en) * 2021-06-30 2021-08-31 广西贵港建设集团有限公司 Hoisting mechanism for municipal bridge construction and use method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103663106A (en) * 2013-12-12 2014-03-26 齐齐哈尔轨道交通装备有限责任公司 Lifting beam for railway crane and railway crane
CN103663106B (en) * 2013-12-12 2016-03-23 齐齐哈尔轨道交通装备有限责任公司 For hanging beam and the locomotive crane of locomotive crane
CN104727224A (en) * 2015-02-10 2015-06-24 中交一航局第一工程有限公司 Lifting point hoisting method for large-tonnage prefabricated pier caps
CN105438959A (en) * 2015-12-23 2016-03-30 中交一航局第三工程有限公司 Balance type prefabricated beam side mold hanger device
CN105947873A (en) * 2016-06-16 2016-09-21 王欢 Coiling block pulley sling with ropes without intersection or included angles
CN113321114A (en) * 2021-06-30 2021-08-31 广西贵港建设集团有限公司 Hoisting mechanism for municipal bridge construction and use method thereof

Similar Documents

Publication Publication Date Title
CN202099742U (en) Sling structure of bridge erecting machine
CN113291973B (en) Assembled building construction high accuracy hoist
CN106276615A (en) A kind of crane may move driver's cabin
CN206126654U (en) Adopt double -deck balance beam hoist of prestress wire hoist and mount large -tonnage component
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN202030434U (en) Large-span whole-section hoisting sling for steel box girder
CN206680101U (en) A kind of simple and convenient guardrail model sheetinstallat chassis
CN202829301U (en) Lifting tool for steel rail
CN202245700U (en) Hoisting tool for narrow coil hoisting
CN204624903U (en) Elevator car rack
CN204689351U (en) A kind of H profile steel structural elements suspender
CN202099745U (en) Lifting appliance for bridge girder erection machine
CN202193533U (en) Rotating mechanism of electromagnetic crane
CN201762053U (en) Simple automatic derrick
CN204897220U (en) Frame bridge crane's bridge hoisting structure
CN102296538A (en) Lifting appliance of bridge erecting machine
CN201619942U (en) Special hoisting tool for hoisting super large block of steel box girder
CN207685682U (en) A kind of bridge hoisting mechanism
CN102367128B (en) Device for testing balancing factor of elevator
CN202465115U (en) Double main beam gantry crane
CN205906936U (en) Glass curtain wall hoisting construction system
CN207632396U (en) A kind of electric block equipped with height limiting device
CN207142685U (en) A kind of semimounted single-beam crane
CN201236098Y (en) Combined pressure bar sling
CN204751886U (en) Batch reinforcing bar lifting device frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20130530