CN109516390A - A kind of flat-top tower crane and field installation process convenient for manpower transport's installation - Google Patents

A kind of flat-top tower crane and field installation process convenient for manpower transport's installation Download PDF

Info

Publication number
CN109516390A
CN109516390A CN201811633265.XA CN201811633265A CN109516390A CN 109516390 A CN109516390 A CN 109516390A CN 201811633265 A CN201811633265 A CN 201811633265A CN 109516390 A CN109516390 A CN 109516390A
Authority
CN
China
Prior art keywords
tower
installation
arm section
crane
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811633265.XA
Other languages
Chinese (zh)
Other versions
CN109516390B (en
Inventor
金英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Special Equipment Inspection and Research Institute
Original Assignee
Zhejiang Special Equipment Inspection and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Special Equipment Inspection and Research Institute filed Critical Zhejiang Special Equipment Inspection and Research Institute
Priority to CN201811633265.XA priority Critical patent/CN109516390B/en
Publication of CN109516390A publication Critical patent/CN109516390A/en
Application granted granted Critical
Publication of CN109516390B publication Critical patent/CN109516390B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/66Outer or upper end constructions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The present invention relates to the hoisting technology fields of high-rise, Roof of Super High-Rise Building equipment installation, maintenance maintenance.Purpose be to provide it is a kind of convenient for manpower transport installation flat-top tower crane, the crane should have the characteristics that structure it is simple, it is easy for installation, be readily transported;Provided installation method should be conducive to operation, safe and reliable.Technical solution is: a kind of flat-top tower crane convenient for manpower transport's installation, including the chassis, the vertical tower body being fixed on chassis, the tower arm for being installed in rotation on tower body top being fixed on window cleaning equipment track;It is characterized by: the tower arm includes sequentially connected platform, counter-jib, tower head and crane arm;The tower head is mounted at the top of tower body by revolving bed;The crane arm and counter-jib are formed by connecting by several tower arm sections;The tower body is formed by connecting vertically by several standard knots;The standard knot is enclosed by four calibrated bolcks, and each calibrated bolck includes first connecting rod, the second connecting rod and two third connecting rods.

Description

A kind of flat-top tower crane and field installation process convenient for manpower transport's installation
Technical field
The present invention relates to the hoisting technology fields of high-rise, Roof of Super High-Rise Building equipment installation, maintenance maintenance, specifically A kind of field installation process of the flat-top tower crane installed convenient for manpower transport and the crane.
Background technique
To the window cleaning equipment maintenance and renovation being installed at the top of mansion, need 20 meters of amplitude for being mounted on top of building, The crane of 3.2 tons of lifting capacity, 15 meters of height at 20 meters of amplitudes.This is just needed by manpower, by being mounted in building Cargo Lift is transported to top of building installation, it is therefore desirable to consider following two problems: first is that steel construction outer dimension controls;Second is that Steel construction weight.
The control of steel construction outer dimension is relatively simple: should meet allows to lead to during the entire process of carrying in building The full-size crossed.As for the control of steel construction weight, to be not only suitble to manpower transport, it is also contemplated that crane is set as special type Standby safety in utilization.
Summary of the invention
The purpose of the present invention is overcome the shortcomings of to provide a kind of tack convenient for manpower transport's installation in above-mentioned background technique Derrick crane, the crane should have the characteristics that structure it is simple, it is easy for installation, be readily transported;Provided installation method is answered Conducive to operation, securely and reliably.
The technical scheme is that
A kind of flat-top tower crane convenient for manpower transport's installation, including the chassis, perpendicular being fixed on window cleaning equipment track The straight tower body being fixed on chassis, the tower arm for being installed in rotation on tower body top;It is characterized by:
The tower arm includes sequentially connected platform, counter-jib, tower head and crane arm;The tower head is installed by revolving bed At the top of tower body;The crane arm and counter-jib are formed by connecting by several tower arm sections;The tower body is vertical by several standard knots It is formed by connecting;
The standard knot is enclosed by four calibrated bolcks, and each calibrated bolck includes the first connecting rod arranged vertically, hangs down Directly it is fixed on the second connecting rod in the middle part of first connecting rod and both ends respectively fixed with first connecting rod, the second connecting rod two Third connecting rod;In the standard knot, connected between each calibrated bolck by hinged bolts, two neighboring first connecting rod Pass through Bolted angle connection between top and between bottom end;
The chassis includes the chassis beam connection being arranged in window cleaning equipment track, is fixed on chassis beam connection in X-shaped Four undercarriage beas of surrounding, the strut being connected between adjacent undercarriage bea two-by-two;One end of undercarriage bea is erected at window cleaning equipment track On, the other end is inserted into chassis beam connection;Four struts are in rectangular layout.
Connection strut is equipped between the chassis and the standard knot of bottom.
The platform is equipped with counterweight, lifting mechanism and Electric Appliance Cabinet;The crane arm is equipped with load lifting limiter, luffing Mechanism, loading trolley and suspension hook;The tower head is equipped with limiter of moment and swing mechanism.
The revolving bed includes undersetting, pivoting support, upper bracket;The upper bracket is made of two upper bracket blocks;Institute Undersetting is stated to be made of four undersetting blocks.
A kind of field installation process of flat-top tower crane;It carries out in accordance with the following steps:
1) chassis beam connection is fixed on window cleaning equipment track, undercarriage bea one end is supported on window cleaning equipment track, then The undercarriage bea other end is inserted into chassis beam connection and is connected with pin shaft, split pin is loaded onto;
2) calibrated bolck is bolted with chassis, four calibrated bolcks is linked to be entirety with bolt, it then will with bolt Angle steel is fixed between the first connecting rod of two calibrated bolcks, then installs connection support with pin shaft between calibrated bolck and undercarriage bea Bar, finally loads onto the ladder in standard knot, and the standard knot of bottom completes installation;Remaining calibrated bolck is assembled into standard knot, etc. To subsequent installation;
3) mounting platform is set up on the standard knot of bottom, then being sling with bottle gouard moved by hands needs standard knot to be mounted, and It is placed on the standard knot top of bottom, is fastened two standard knot connections with bolt;Mounting platform is risen into second standard On section, then with identical method successively install remaining standard knot, undersetting, pivoting support, upper bracket, tower head and swing mechanism;
4) gooseneck bracket is fixed on tower head, is loaded on installation sunpender;Rope is fastened on the first segment tower arm section of crane arm Rope, the crane arm sling convenient for ground staff's control can also assist in installation with anticollision;
5) the tower arm section is sling, the winding up of tower arm section penetrates pin shaft with tower head and connect, and loads onto split pin, the lower edge of tower arm section The pin shaft on tower head is inserted in the hole of connecting plate, while fastening is connect with tower head with bolt;Counter-jib is installed in the same way First segment tower arm section;
6) gooseneck bracket is mounted on the lower boom of first segment tower arm section of counter-jib, loads onto sunpender, lift counter-jib Second section tower arm section, the winding up of the tower arm section penetrate pin shaft with first segment tower arm section and connect, and load onto split pin;Under the tower arm section It is inserted in the connecting pin of the lower edge of first segment tower arm section, blending bolt connection fastening in the hole of string connecting plate;In the same way successively Install counter-jib;Sunpender is attached on the gooseneck bracket of Section of four counter-jib, with sunpender hoisting platform, then lifts lifting mechanism and be used in combination Pin shaft connecting platform, loads onto split pin;
7) gooseneck bracket of sunpender is fixed on the lower boom of mounted crane arm first segment tower arm section, loads onto and hangs Then loading trolley is attached on crane arm the second section tower arm section and is fixed, sling the tower arm section with sunpender and be attached to first by bar It saves on tower arm section, winding up for the tower arm section connects with pin shaft and load onto split pin, and the hole of the lower edge connecting plate of the tower arm section covers set Enter the pin shaft on the lower edge connecting plate of crane arm first segment tower arm section, then is connected with fastening;
8) lifting installation hanging basket, it is connect with loading trolley with pin shaft, loads onto split pin, two hanging baskets are separately mounted to The two sides of loading trolley;
With above-mentioned identical method, lifts pulley yoke and be mounted on the tower arm section of first segment crane arm, connected, hung with pin shaft It loads weight limitor to be mounted in the tower arm section of the second section crane arm, is connected with pin shaft, load onto split pin;Lift remaining The tower arm section of weighing arm, installation personnel can move sunpender by hanging basket, and two installation personnels are located in the hanging basket of two sides, are drawn The tower arm section firmly installed, moves forward loading trolley slowly, stops loading trolley by the Anti-breaking rope device on loading trolley In fixed position;
9) it is located at the platform on counter-jib with hanger erection, then lifts counterweight and Electric Appliance Cabinet, and be fixed by bolts to flat On platform, by operations linkage platform on platform;
10) wirerope is finally passed around, suspension hook is installed.
The beneficial effects of the present invention are:
Each component steel construction outer dimension of the invention is smaller, and meet allows to lead to during the entire process of carrying in building The full-size crossed;And main components can carry out decomposing convenient for manpower transport, so as to by being mounted in building Cargo Lift is transported to building top layer, then completes integral installation by manual handling to roof, while considering derrick crane As special equipment in the safety requirements of use process, various safety devices are complete, and are mechanical or electromechanical integrated product, It is adapted to severe construction environment, can ensure that the reliable operation of tower crane.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of Plays section of the present invention.
Fig. 3 is the schematic view of the front view of Plays block of the present invention.
Fig. 4 is the left view structural representation of Plays block of the present invention.
Fig. 5 is the schematic view of the front view of revolving bed and tower head in the present invention.
Fig. 6 is the schematic view of the front view of upper bracket in the present invention.
Fig. 7 is the schematic view of the front view of undersetting in the present invention.
Fig. 8 is the schematic view of the front view of upper bracket block in the present invention.
Fig. 9 is the schematic view of the front view of undersetting block in the present invention.
Figure 10 is the schematic view of the front view of crane arm in the present invention.
Figure 11 is the schematic view of the front view of counter-jib and platform in the present invention.
The overlooking structure diagram of chassis and window cleaning equipment track in Figure 12 present invention.
The schematic view of the front view of chassis and standard knot in Figure 13 present invention.
Figure 14 is the schematic diagram using mounting platform installation standard knot.
Figure 15 is the schematic diagram using mounting platform installation undersetting.
Figure 16 is the schematic diagram using rope installation counter-jib.
Figure 17 is the schematic diagram using rope installation crane arm.
Figure 18 is the schematic diagram for installing counterweight, lifting mechanism and Electric Appliance Cabinet.
Figure 19 is the schematic diagram for installing suspension hook.
Specific embodiment
Below in conjunction with Figure of description, the invention will be further described, but the invention is not limited to following embodiments.
As shown in Figure 1, a kind of flat-top tower crane convenient for manpower transport's installation, including chassis 1, tower body and tower Arm.
The chassis 1 is fixed on window cleaning equipment track and (participates in Figure 12), including 20, four undercarriage beas 22 of chassis beam connection With four struts 21.The chassis beam connection is arranged between two window cleaning equipment tracks 23, and four undercarriage beas are arranged in X-shaped Chassis beam connection surrounding, one end of undercarriage bea are erected on window cleaning equipment track, the other end insertion undercarriage bea connection of undercarriage bea In part and with pin shaft connection (chassis beam connection is equipped with corresponding socket, omits in figure), four struts it is in rectangular layout Chassis beam connection surrounding, it is solid with two undercarriage beas that the both ends of strut pass through hinged seat 21-1 (hinged seat is outsourcing piece) respectively It is fixed.
The tower body is fixed on chassis vertically, and tower body is formed by connecting vertically by several standard knots 2.The standard knot Including four head and the tail connection calibrated bolck, each calibrated bolck include arrange vertically first connecting rod 2.1 (first connecting rod up and down The fixed engaging lug 2.11 with aperture is respectively welded in both ends), vertical welding is fixed in the middle part of first connecting rod and horizontal Two third connecting rods 2.3 that second connecting rod 2.2 of arrangement and both ends are fixed with first connecting rod, the second connecting rod respectively (as shown in figure 3, the left end production of third connecting rod has through-hole, through-hole is aligned simultaneously with the aperture of engaging lug 2.11 by bolt It is interspersed to fix;The right end of second connecting rod and the right end of third connecting rod are also weldingly fixed on the attachment base with aperture jointly On 2.4), also by climb ear 2.5 and bolt with aperture, (bolt is interspersed in attachment base and climbs ear respectively between each calibrated bolck Aperture in and the two is connected and fixed) connection is integral, between the top of two neighboring first connecting rod and bottom end it Between also by the connection of horizontally disposed angle steel 24 (both ends of angle steel 24 respectively by the bolt with the interspersed cooperation of engaging lug aperture into Row connection).For the standard knot of bottom, the first connecting rod of calibrated bolck fixes (being bolted) in the chassis of chassis vertically Liang Shang is additionally provided with connection strut 26 between the first connecting rod of calibrated bolck and the undercarriage bea of chassis.
The tower arm is installed in rotation on the tower arm on tower body top, including successively horizontal connection (being bolted) Platform 34, counter-jib 11, tower head 12 and crane arm 15.The tower head is mounted at the top of tower body by revolving bed 10, is set on tower head Moment limiter (being omitted in figure) and swing mechanism 14.
The revolving bed (conventional structure) includes undersetting 6, pivoting support 7, upper bracket 8.The upper bracket passes through two Upper bracket block is formed by embedded assembly (conventional structure) and high strength exploitation, and upper bracket passes through M30 high-strength bolt It connect with tower head, is also connect by high-strength bolt with pivoting support.The undersetting is passed through embedded by four undersetting blocks Assembly (conventional structure) and high strength exploitation form, and undersetting is connected by the standard knot of M30 high-strength bolt and tower body, Also it is connect by high-strength bolt with pivoting support.
The crane arm and counter-jib are formed by connecting (conventional structure) by several tower arm sections.The cross section of the tower arm section For triangle, top boom is round steel and lower boom is square tube, is connected between tower arm section with pin shaft and high-strength bolt, tower arm section It is connect between tower head with pin shaft and high-strength bolt, the length of tower arm section is 1.5 meters, can satisfy manpower transport.
The crane arm (conventional structure) is formed by connecting by 14 tower arm sections.The crane arm is equipped with load lifting limiter 16, jib lubbing mechanism 17, loading trolley 18 and suspension hook 19.The counter-jib is formed by connecting by 4 tower arm sections, and platform is fixed on balance The left end (direction Fig. 1) of arm, platform are welded and with counter-jib by being connect with pin shaft by two section i-shaped roof beams 34.1.It is described Configuration platform is equipped with counterweight 32, lifting mechanism 9, electric cabinet 33, and is additionally provided with guardrail and aisle.
Each section of the invention is steel construction piece, is decomposed into several units, the height of each unit is low and quality compared with Small (being less than 250Kg), building top layer can be transported to by the Cargo Lift being mounted in building, then by manual handling to room It pushes up and completes to install.
Installation method of the invention are as follows:
1, chassis beam connection 20 is fixed on to the middle position of window cleaning equipment track 23, by manually by 22 one end of undercarriage bea It is supported on window cleaning equipment track 23, then the other end is inserted into chassis beam connection 20 and is connected with pin shaft, load onto split pin And it sufficiently opens;Then strut 21 is successively installed between undercarriage bea two-by-two, and (both ends of strut pass through swivel pin and hinged respectively Seat 21-1 is fixed, then hinged seat is fixed on undercarriage bea by swivel pin respectively);
2, calibrated bolck and chassis are bolted by M30, are connected four calibrated bolcks with special M24 high-strength bolt 27 It is integral, then angle steel 24 is fixed between the first connecting rod of two calibrated bolcks with special M14 bolt 25, then in standard Connection strut 26 is installed with pin shaft between the first connecting rod and undercarriage bea of block and (distinguishes preparatory fixed hinge in the both ends of connection strut Ear 26-1, then hingedly fixed hinged ear fixed in advance on hinged ear 26-1 and first connecting rod or undercarriage bea by pin shaft), The ladder in standard knot is finally loaded onto, the standard knot of bottom completes installation;Remaining calibrated bolck is assembled into standard knot, after waiting Continuous installation;
3, mounting platform 28 is set up on the standard knot 2 of bottom, then being sling with 1 ton of bottle gouard moved by hands needs standard to be mounted Section, and be placed on the standard knot of bottom, two standard knot connections are fastened with M30 high-strength bolt;Mounting platform is risen Onto second standard knot, then with identical method successively install remaining standard knot, undersetting 6, pivoting support 7, upper bracket 8, Tower head 12 and swing mechanism 14;
4, gooseneck bracket 29 is fixed in the 135*135 square tube of tower head 12, is loaded on installation sunpender 30;In crane arm 15 Rope 31 is fastened on first segment tower arm section, the crane arm 15 sling convenient for ground staff's control can also assist in peace with anticollision Dress, slings the tower arm section, the pin shaft for wearing diameter 85 with tower head that winds up of tower arm section connect, loads onto split pin and sufficiently open, tower The pin shaft of the diameter 40 on tower head is inserted in the hole of the lower edge connecting plate of arm joint, while with the high-strength bolt of M24 and tower head 12 Connection fastening;The first segment tower arm section of counter-jib is installed in the same way;
6, gooseneck bracket is mounted on to the lower boom appropriate location of the first segment tower arm section of counter-jib 11, sunpender 30 is loaded onto, hangs The second section tower arm section of counter-jib 11 is filled, the pin shaft for wearing diameter 70 with first segment tower arm section that winds up of the tower arm section connect, loads onto Split pin is simultaneously sufficiently opened, and the connecting pin of the lower edge of first segment tower arm section is inserted in the hole of the lower edge connecting plate of the tower arm section, and It is fastened with M24 high strength exploitation;Counter-jib is successively installed in the same way;Sunpender 30 is attached to hanging for Section of four counter-jib On pole socket, with 30 hoisting platform of sunpender, then lifting mechanism 9 and the pin shaft connecting platform with diameter 40 is lifted, wear split pin and fill It says good-bye out;
7, the gooseneck bracket 29 of sunpender 30 is fixed on the lower boom of mounted crane arm first segment tower arm section, is loaded onto Loading trolley 18, is then attached on crane arm the second section tower arm section and fixed by sunpender 30, slings the tower arm with sunpender 30 It saving and is attached on first segment tower arm section, winding up for the tower arm section is loaded onto split pin with the pin shaft connection of diameter 75 and is sufficiently opened, The pin shaft of diameter 35 on the lower edge connecting plate of crane arm first segment tower arm section is inserted in the hole of the lower edge connecting plate of the tower arm section, then It is connected and is fastened with M24 high-strength bolt;
8, lifting installation hanging basket, it is connect with loading trolley 18 with the pin shaft of diameter 18, split pin is loaded onto and sufficiently opens It opens, two hanging baskets are separately mounted to the two sides of loading trolley 18;
With above-mentioned identical method, lifts pulley yoke and be mounted on the tower arm section of first segment crane arm, with the pin of diameter 25 Axis connection, lifting load lifting limiter 16 are mounted in the tower arm section of the second section crane arm, are connected, are loaded into the pin shaft of diameter 35 Split pin and sufficiently opening;Lifting the tower arm section of remaining crane arm, installation personnel can move sunpender by hanging basket, and two Installation personnel is located in the hanging basket of two sides, is held the tower arm section installed, is moved forward loading trolley slowly, small by load-carrying Anti-breaking rope device (existing apparatus) on vehicle makes loading trolley be parked in fixed position;
9, it is positioned at the platform 34 on counter-jib with sunpender 30, then lifts counterweight 32 and Electric Appliance Cabinet 33, and use bolt It is fixed on platform, by operations linkage platform (existing apparatus) on platform 34, is fixed with M10 bolt;
10, wirerope is finally passed around, suspension hook 19 is installed.

Claims (5)

1. a kind of flat-top tower crane convenient for manpower transport's installation, including the chassis (1), perpendicular being fixed on window cleaning equipment track The straight tower body being fixed on chassis, the tower arm for being installed in rotation on tower body top;It is characterized by:
The tower arm includes sequentially connected platform (34), counter-jib (11), tower head (12) and crane arm (15);The tower head is logical Revolving bed (10) is crossed to be mounted at the top of tower body;The crane arm and counter-jib are formed by connecting by several tower arm sections;The tower body It is formed by connecting vertically by several standard knots (2);
The standard knot is enclosed by four calibrated bolcks, and each calibrated bolck includes the first connecting rod (2.1) arranged vertically, hangs down The second connecting rod (2.2) being directly fixed in the middle part of first connecting rod and both ends are solid with first connecting rod, the second connecting rod respectively Two fixed third connecting rods (2.3);In the standard knot, connected between each calibrated bolck by hinged bolts, it is two neighboring It is connected between the top of first connecting rod and by angle steel (24) between bottom end;
The chassis includes the chassis beam connection (20) being arranged in window cleaning equipment track, is fixed on chassis beam connection in X-shaped Four undercarriage beas (22) of surrounding, the strut (21) being connected between adjacent undercarriage bea two-by-two;One end of undercarriage bea is erected at wiping On window machine track, the other end is inserted into chassis beam connection;Four struts are in rectangular layout.
2. the flat-top tower crane according to claim 1 convenient for manpower transport's installation, it is characterised in that: the chassis Connection strut (26) is equipped between the standard knot of bottom.
3. the flat-top tower crane according to claim 2 convenient for manpower transport's installation, it is characterised in that: the platform It is equipped with counterweight (10), lifting mechanism (9) and Electric Appliance Cabinet (33);The crane arm is equipped with load lifting limiter (16), luffing Mechanism (17), loading trolley (18) and suspension hook (19);The tower head is equipped with limiter of moment and swing mechanism (14).
4. the flat-top tower crane according to claim 3 convenient for manpower transport's installation, it is characterised in that: the revolution Seat includes undersetting (6), pivoting support (7), upper bracket (8);The upper bracket is made of two upper bracket blocks;The undersetting It is made of four undersetting blocks.
5. a kind of field installation process of flat-top tower crane;It carries out in accordance with the following steps:
1) chassis beam connection is fixed on window cleaning equipment track, undercarriage bea one end is supported on window cleaning equipment track, then the bottom of by The other end of setting a roof beam in place insertion chassis beam connection is simultaneously connected with pin shaft, loads onto split pin;
2) calibrated bolck is bolted with chassis, four calibrated bolcks is linked to be entirety with bolt, then with bolt by angle steel It is fixed between the first connecting rod of two calibrated bolcks, then connection strut is installed with pin shaft between calibrated bolck and undercarriage bea, most The ladder in standard knot is loaded onto afterwards, and the standard knot of bottom completes installation;Remaining calibrated bolck is assembled into standard knot, is waited subsequent Installation;
3) mounting platform is set up on the standard knot (2) of bottom, then being sling with bottle gouard moved by hands needs standard knot to be mounted, and puts It sets on the standard knot top of bottom, is fastened two standard knot connections with bolt;Mounting platform is risen into second standard knot On, then with identical method successively install remaining standard knot, undersetting, pivoting support, upper bracket, tower head and swing mechanism;
4) gooseneck bracket is fixed on tower head, is loaded on installation sunpender;Rope is fastened on the first segment tower arm section of crane arm (31), the crane arm sling convenient for ground staff's control can also assist in installation with anticollision;
5) the tower arm section is sling, the winding up of tower arm section penetrates pin shaft with tower head and connect, and loads onto split pin, the lower edge connection of tower arm section The pin shaft on tower head is inserted in the hole of plate, while fastening is connect with tower head with bolt;The of counter-jib is installed in the same way One section tower arm section;
6) gooseneck bracket is mounted on the lower boom of first segment tower arm section of counter-jib, loads onto sunpender, lift the second of counter-jib Tower arm section is saved, the winding up of the tower arm section penetrates pin shaft with first segment tower arm section and connect, and loads onto split pin;The lower edge of the tower arm section connects It is inserted in the connecting pin of the lower edge of first segment tower arm section, blending bolt connection fastening in the hole of fishplate bar;It successively installs in the same way Counter-jib;Sunpender is attached on the gooseneck bracket of Section of four counter-jib, with sunpender hoisting platform, then lifts lifting mechanism and use pin shaft Connecting platform loads onto split pin;
7) gooseneck bracket of sunpender is fixed on the lower boom of mounted crane arm first segment tower arm section, loads onto sunpender, so Loading trolley is attached on crane arm the second section tower arm section and is fixed afterwards, the tower arm section is sling with sunpender and is attached to first segment tower arm On section, winding up for the tower arm section connects with pin shaft and loads onto split pin, and lifting is inserted in the hole of the lower edge connecting plate of the tower arm section Pin shaft on the lower edge connecting plate of arm first segment tower arm section, then it is connected with fastening;
8) lifting installation hanging basket, it is connect with loading trolley with pin shaft, loads onto split pin, two hanging baskets are separately mounted to load-carrying The two sides of trolley;
With above-mentioned identical method, lifts pulley yoke and be mounted on the tower arm section of first segment crane arm, connected, lifted with pin shaft Weight limitor (16) is mounted in the tower arm section of the second section crane arm, is connected with pin shaft, is loaded onto split pin;Lift remaining The tower arm section of weighing arm, installation personnel can move sunpender by hanging basket, and two installation personnels are located in the hanging basket of two sides, are drawn The tower arm section firmly installed, moves forward loading trolley slowly, stops loading trolley by the Anti-breaking rope device on loading trolley In fixed position;
9) it is located at the platform on counter-jib with hanger erection, then lifts counterweight and Electric Appliance Cabinet, and be fixed by bolts on platform, By operations linkage platform on platform;
10) wirerope is finally passed around, is installed suspension hook (19).
CN201811633265.XA 2018-12-29 2018-12-29 Flat-head tower crane convenient for manual carrying and installation and field installation method Active CN109516390B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811633265.XA CN109516390B (en) 2018-12-29 2018-12-29 Flat-head tower crane convenient for manual carrying and installation and field installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811633265.XA CN109516390B (en) 2018-12-29 2018-12-29 Flat-head tower crane convenient for manual carrying and installation and field installation method

Publications (2)

Publication Number Publication Date
CN109516390A true CN109516390A (en) 2019-03-26
CN109516390B CN109516390B (en) 2024-03-08

Family

ID=65797641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811633265.XA Active CN109516390B (en) 2018-12-29 2018-12-29 Flat-head tower crane convenient for manual carrying and installation and field installation method

Country Status (1)

Country Link
CN (1) CN109516390B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112645224A (en) * 2020-12-17 2021-04-13 海宁虎霸重工有限公司 Tower crane

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3944081A (en) * 1969-04-09 1976-03-16 General Crane Industries Limited Tower crane
EP0846650A1 (en) * 1996-12-03 1998-06-10 Potain Method and device for mounting jib tension elements on tower cranes
CN202214167U (en) * 2011-07-23 2012-05-09 周杨 tower crane with improved structure
CN102826463A (en) * 2012-09-11 2012-12-19 张月梅 Combined type pedestal of tower crane
CN203112386U (en) * 2013-01-31 2013-08-07 杭州国电大力机电工程有限公司 Tower type truss mounting structure without assistance of high altitude hoisting equipment
CN203545527U (en) * 2013-10-12 2014-04-16 中建三局建设工程股份有限公司 Tower crane and conversion base thereof
CN203807003U (en) * 2013-12-04 2014-09-03 中联重科股份有限公司 Tower crane mounting underframe
CN204588550U (en) * 2015-02-16 2015-08-26 国家电网公司 A kind of lifting mechanism inhead type lands electric power pole
CN104944300A (en) * 2015-06-26 2015-09-30 浙江省建设机械集团有限公司 Arm crane foundation
CN205527429U (en) * 2016-01-28 2016-08-31 国家电网公司 Jib crane is from jacking device
CN106276631A (en) * 2016-09-30 2017-01-04 庄爱军 A kind of roofing device for hoisting and crane and the method for dismounting of crane arm
CN209601982U (en) * 2018-12-29 2019-11-08 浙江省特种设备检验研究院 A kind of flat-top tower crane convenient for manpower transport's installation

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3944081A (en) * 1969-04-09 1976-03-16 General Crane Industries Limited Tower crane
EP0846650A1 (en) * 1996-12-03 1998-06-10 Potain Method and device for mounting jib tension elements on tower cranes
CN202214167U (en) * 2011-07-23 2012-05-09 周杨 tower crane with improved structure
CN102826463A (en) * 2012-09-11 2012-12-19 张月梅 Combined type pedestal of tower crane
CN203112386U (en) * 2013-01-31 2013-08-07 杭州国电大力机电工程有限公司 Tower type truss mounting structure without assistance of high altitude hoisting equipment
CN203545527U (en) * 2013-10-12 2014-04-16 中建三局建设工程股份有限公司 Tower crane and conversion base thereof
CN203807003U (en) * 2013-12-04 2014-09-03 中联重科股份有限公司 Tower crane mounting underframe
CN204588550U (en) * 2015-02-16 2015-08-26 国家电网公司 A kind of lifting mechanism inhead type lands electric power pole
CN104944300A (en) * 2015-06-26 2015-09-30 浙江省建设机械集团有限公司 Arm crane foundation
CN205527429U (en) * 2016-01-28 2016-08-31 国家电网公司 Jib crane is from jacking device
CN106276631A (en) * 2016-09-30 2017-01-04 庄爱军 A kind of roofing device for hoisting and crane and the method for dismounting of crane arm
CN209601982U (en) * 2018-12-29 2019-11-08 浙江省特种设备检验研究院 A kind of flat-top tower crane convenient for manpower transport's installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112645224A (en) * 2020-12-17 2021-04-13 海宁虎霸重工有限公司 Tower crane

Also Published As

Publication number Publication date
CN109516390B (en) 2024-03-08

Similar Documents

Publication Publication Date Title
CN100549348C (en) Construction method for hanging wide span arcuated open-web beam
CN103086279B (en) Vertical transportation construction method for building construction
CN106744257B (en) A kind of kiloton adjustable combined sling, assemble method and the method for lifting caisson
CN205387439U (en) Mast hoisting accessory
CN109231023B (en) Method for installing jib system of portal crane
CN209601982U (en) A kind of flat-top tower crane convenient for manpower transport's installation
CN214326960U (en) Indoor equipment for existing high-rise building hoisting large-scale device
CN208292530U (en) A kind of twin beams Grab Bucket Type Crane
CN212270712U (en) Construction device for mounting and dismounting steel box girder by suspension of bridge girder erection machine
CN109516390A (en) A kind of flat-top tower crane and field installation process convenient for manpower transport's installation
CN110562850B (en) Main tower integral hoisting system and method
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
CN207061699U (en) A kind of large-scale tower crane tower section introduces jacking system
CN105883645B (en) The method for dismounting of tower crane attachment device
CN211971577U (en) Tower crane system
CN210480628U (en) Rotatory hoist of two-way self-balancing
CN115258909A (en) Horizontal-lifting tail sliding system and method for offshore wind turbine tower
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN212559207U (en) Bridge floor crane
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN207890940U (en) A kind of derrick tower based on engineering mechanics
CN221253704U (en) Suspension arm
CN111453630A (en) Bridge deck crane and using method thereof
CN205419582U (en) Floor hoist
CN221165580U (en) Lifting appliance suitable for plate girder and box girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: 310009 No. 211, Kaixuan Road, Shangcheng District, Hangzhou City, Zhejiang Province

Applicant after: Zhejiang Institute of Special Equipment Science

Address before: 310020, 211 triumph Road, Hangzhou, Zhejiang, Jianggan District

Applicant before: ZHEJIANG PROVINCIAL SPECIAL EQUIPMENT INSPECTION AND Research Institute

Country or region before: China

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant