CN102922280B - The auxiliary installation pull bar of derrick runway girder installation method and application thereof - Google Patents

The auxiliary installation pull bar of derrick runway girder installation method and application thereof Download PDF

Info

Publication number
CN102922280B
CN102922280B CN201210460623.8A CN201210460623A CN102922280B CN 102922280 B CN102922280 B CN 102922280B CN 201210460623 A CN201210460623 A CN 201210460623A CN 102922280 B CN102922280 B CN 102922280B
Authority
CN
China
Prior art keywords
crane arm
pull bar
connecting portion
auxiliary installation
jib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210460623.8A
Other languages
Chinese (zh)
Other versions
CN102922280A (en
Inventor
阳云华
李桂芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zoomlion Heavy Industry Science and Technology Co Ltd
Original Assignee
Zoomlion Heavy Industry Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zoomlion Heavy Industry Science and Technology Co Ltd filed Critical Zoomlion Heavy Industry Science and Technology Co Ltd
Priority to CN201210460623.8A priority Critical patent/CN102922280B/en
Publication of CN102922280A publication Critical patent/CN102922280A/en
Application granted granted Critical
Publication of CN102922280B publication Critical patent/CN102922280B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention provides the auxiliary installation pull bar of a kind of derrick runway girder installation method and application thereof, described auxiliary installation pull bar is hung on counter-jib or/and revolving dial for being drawn by described crane arm in tower machine installation process temporarily, described crane arm has the first end of close revolving dial and relative with this first end and away from the second end of revolving dial, described auxiliary installation pull bar comprises tension and relaxed state, in described tension, described auxiliary installation pull bar is tightened in the first end of described crane arm and counter-jib or/and to hold described crane arm temporarily between revolving dial, under described relaxed state, described auxiliary installation pull bar is loosely connected to the first end of described crane arm and counter-jib or/and between revolving dial.

Description

The auxiliary installation pull bar of derrick runway girder installation method and application thereof
Technical field
The present invention relates to derrick runway girder installing area, and particularly about the auxiliary installation pull bar of a kind of derrick runway girder installation method and application thereof.
Background technology
In recent years, along with building trade develops in depth, building tower crane (being called for short tower machine) is widely used.Promoting the use of of tower machine, changes the means of transportation of the vertical and level of construction gradually, for operating personnel create safe operating condition, also improves operating efficiency simultaneously.
When installing whole tower machine, all parts being assembled on ground, then with crane gear, all parts is completed assembling aloft.Due to the relative miscellaneous part of crane arm, size is large, quality weight, when installing tower machine according to the quality choice hanging device of crane arm.
General existing derrick runway girder installation method comprises the following steps:
1, at ground assembling crane arm, and crane arm pull bar, loading trolley, jib lubbing mechanism etc. are installed on crane arm;
2, with suitable crane gear lifting crane arm;
3, crane arm is installed to relevant position, and good with pinned connection;
4, crane arm pull bar is connected with support;
5, be connected with support by counter-jib pull bar, then progressively transferred by crane arm, make crane arm pull bar stressed, last loose hook, crane arm installs.
But whole crane arm assembles on ground, need large assembled place, especially for ultra-large type tower machine, jib length reaches 80 meters or longer, and when installing for narrow construction site or the water surface, cannot provide assembled place.In addition, crane arm, crane arm pull bar, loading trolley etc., quality weight, especially for ultra-large type tower machine, quality reaches more than 70 tons, and setting height(from bottom) is the highest substantially, needs the crane gear that elevating capacity is large, and installation cost is high; This type of crane gear also needs enough places in addition, and in narrow job site, large crane gear also cannot be applied.
Summary of the invention
The invention provides a kind of auxiliary installation pull bar of derrick runway girder, install with the segmentation of hoisting aids arm, the crane gear that available elevating capacity is little completes crane arm and installs or remove, and reduces installation cost, and reduces the requirement to place, space in crane arm installation process.
In addition, the present invention also provides a kind of derrick runway girder installation method, adopts above-mentioned auxiliary installation pull bar to carry out segmentation installation to crane arm.
For reaching above-mentioned advantage, the invention provides a kind of auxiliary installation pull bar of derrick runway girder, being hung on counter-jib or/and revolving dial for being drawn by described crane arm in tower machine installation process temporarily; Described crane arm has the first end of close revolving dial and relative with this first end and away from the second end of revolving dial, described auxiliary installation pull bar comprises tension and relaxed state, in described tension, described auxiliary installation pull bar is tightened in the first end of described crane arm and counter-jib or/and to hold described crane arm temporarily between revolving dial, under described relaxed state, described auxiliary installation pull bar is loosely connected to the first end of described crane arm and counter-jib or/and between revolving dial.
In an embodiment of the invention, described auxiliary installation pull bar comprises first segment unit, and at least one end of described first segment unit is provided with mounting hole, is equipped with bearing pin in described mounting hole, and described bearing pin can slide in described mounting hole.
In an embodiment of the invention, described auxiliary installation pull bar also comprises second section unit, and described first segment unit and described second section unit are joined end to end by described bearing pin.
In an embodiment of the invention, described first segment unit comprises stock and is positioned at the first connecting portion and second connecting portion of stock two end, described second section unit comprises stock and is positioned at the first connecting portion and second connecting portion of stock two end, second connecting portion of described first segment unit and the first connecting portion of described second section unit link together, first connecting portion of described first segment unit is used for being connected with the crane arm of tower machine, and the second connecting portion of described second section unit is used for being connected with the counter-jib of tower machine.
In an embodiment of the invention, the second connecting portion of described first segment unit is provided with described mounting hole, and the first connecting portion of described second section unit is provided with circular hole, and described bearing pin wears described circular hole and is fixed in described circular hole.
In an embodiment of the invention, the first connecting portion of described first segment unit is provided with circular hole, and the first connecting portion of described first segment unit is fixedly connected with described crane arm by bearing pin; Second connecting portion of described second section unit is provided with circular hole, and the second connecting portion of described second section unit is fixedly connected with described counter-jib by bearing pin.
In an embodiment of the invention, described first segment unit comprises stock and is positioned at the first connecting portion and second connecting portion of stock two end, described first connecting portion is used for being connected with the crane arm of tower machine, described second connecting portion is used for being connected with the counter-jib of tower machine, described first connecting portion and the second connecting portion one of them be provided with described mounting hole, described first connecting portion and the second connecting portion wherein another is provided with circular hole.
The present invention also provides a kind of derrick runway girder installation method, comprises step:
Crane arm first sections is winched to relevant position, and the described lower end of crane arm first sections is connected in the first hinge pivotable with the revolving dial of tower machine;
Be connected with crane arm first sections one end of auxiliary installation pull bar, the other end of auxiliary installation pull bar is with counter-jib or/and revolving dial is connected, and then put down suspension hook, described auxiliary installation pull bar is tension;
First pull bar is connected between support and described crane arm first sections;
If crane arm also has other sections, then lift other sections of crane arm, namely other sections of crane arm is sling successively and install and be connected on the last sections of adjacent crane arm, and the corresponding pull bar of other sections of crane arm is connected between described support and other sections of crane arm;
Described crane arm is rotated around described first hinge, counter-jib pull bar is connected on described support and described counter-jib;
Naturally put down by described crane arm, the corresponding pull bar tensioning of described first pull bar and described other sections of crane arm is to hold described crane arm, and described auxiliary installation pull bar is relaxed state.
Compare prior art, the auxiliary installation pull bar of derrick runway girder installation method of the present invention and application thereof, in installation process, auxiliary pull bar of installing connects crane arm first sections peace weighing apparatus arm, crane arm first sections and other component of tower machine is made to realize being rigidly connected, thus can install the implementation segmentation of long crane arm, reduce the requirement to place, space in crane arm installation process; Adopt the Combination Design of mounting hole and bearing pin, crane arm after completing installation a little toward upwarping, can relative bending by two components of mounting hole and pinned connection, thus auxiliary installation pull bar is not stressed, do not affect the operation of crane arm; In addition, due to the effect of auxiliary installation pull bar, crane arm can also realize segmentation dismounting, and auxiliary installation after pull bar is removed can also recycle.
For above and other objects of the present invention, feature and advantage can be become apparent, preferred embodiment cited below particularly, and coordinate institute's accompanying drawings, be described in detail below.
Accompanying drawing explanation
Fig. 1 is tower machine complete machine structure schematic diagram.
Fig. 2 A is the front schematic view of the auxiliary installation pull bar of present pre-ferred embodiments derrick runway girder.
Fig. 2 B is the auxiliary side schematic view installing pull bar.
Fig. 2 C is auxiliary front schematic view of installing the first segment unit of pull bar.
Fig. 2 D is the auxiliary side schematic view installing the first segment unit of pull bar.
Fig. 2 E is auxiliary front schematic view of installing the second section unit of pull bar.
Fig. 2 F is the auxiliary side schematic view installing the second section unit of pull bar.
Fig. 3 A is crane arm first sections assembled.
Fig. 3 B is crane arm second sections assembled.
Fig. 3 C is crane arm the 3rd sections assembled.
Fig. 4 is the schematic diagram installing crane arm first sections.
Fig. 5 is the schematic diagram installing crane arm second sections.
Fig. 6 is the schematic diagram installing crane arm the 3rd sections.
Fig. 7 is the enlarged drawing of VII encircled portion in Fig. 1.
Detailed description of the invention
The auxiliary pull bar of installing of derrick runway girder installation method application of the present invention carries out segmentation installation to crane arm.Please refer to Fig. 1, tower machine 100 comprises auxiliary installation pull bar 10, tower body 20, counter-jib 30, counter-jib pull bar 40, crane arm 50, crane arm pull bar 60 and support 70.Tower body 20 top is provided with revolving dial 22, and the end of counter-jib 30, support 70 and crane arm 50 is arranged on revolving dial 22 respectively.Be appreciated that according to different types, revolving dial 22 only can comprise upper bracket, also may further include the slewing tower being suitable for arranging driver's cabin.Only comprise in the type of upper bracket at revolving dial 22, counter-jib 30, support 70 are connected with upper bracket respectively with crane arm 50.In the type that revolving dial 22 comprises upper bracket and slewing tower, counter-jib 30, support 70 are connected with slewing tower respectively with crane arm 50.
Auxiliary pull bar 10 of installing is hung on counter-jib 30 or/and revolving dial 22 for being drawn by crane arm 50 in tower machine 100 installation process temporarily.Auxiliary pull bar 10 of installing comprises tension and relaxed state, in tension, auxiliary install pull bar 10 be tightened in crane arm 50 and counter-jib or between 30/ and revolving dial 22 to hold crane arm 50 temporarily, in a relaxed state, auxiliary pull bar 10 of installing loosely is connected to crane arm 50 and counter-jib 30 or/and between revolving dial 22.
Please refer to Fig. 2 A-2D, the auxiliary installation pull bar 10 of present pre-ferred embodiments comprises the first segment unit 12 and second section unit 14 that interconnect, and first segment unit 12 comprises a stock 121 and is positioned at the first connecting portion 122, second connecting portion 123 of stock 121 2 end.First connecting portion 122 is provided with axis hole 122a.Second connecting portion 123 is provided with mounting hole 123a.
Please refer to Fig. 2 E-2F, second section unit 14 comprises stock 141 and is positioned at the first connecting portion 142, second connecting portion 143 of stock 141 2 end.First connecting portion 142, second connecting portion 143 is respectively equipped with axis hole 142a, 143a.
Second connecting portion 123 of first segment unit 12 is connected by bearing pin 16 with the first connecting portion 142 of second section unit 14, and bearing pin 16 is through mounting hole 123a and axis hole 142a, and bearing pin 16 can slide in described mounting hole 123a.The diameter of axis hole 142a is slightly larger than the diameter of bearing pin 16.
Auxiliary two ends installing pull bar 10, the first connecting portion 122 of first segment unit 12 and the second connecting portion 143 of second section unit 14, be respectively used to be connected with counter-jib 30, crane arm 50.
According to the size in assembled place and the ability of crane gear during installation crane arm 50, determine that crane arm 50 is divided into how many sections and installs, certainly when various conditions permit, sections is as far as possible longer, to reduce aerial work number of times.Be installed as with crane arm 50 point of three sections the installation method that example is illustrated derrick runway girder below, its step comprises:
(1) please refer to Fig. 3 A-3C, crane arm 50 is assembled into the first sections 50a, the second sections 50b on ground and the 3rd sections 50c loading trolley 80 is installed on crane arm first sections 50a;
(2) please refer to Fig. 4, the lower boom of crane arm first sections 50a left part, to relevant position, is connected with revolving dial 22 first hinge pivotable by bearing pin by lifting crane arm first sections 50a.
(3) end of one end of auxiliary installation pull bar 10 with the top boom 52 (Fig. 7) of crane arm first sections 50a is connected, the auxiliary other end installing pull bar 10 is connected with counter-jib 30 or/and revolving dial 22, then suspension hook 200 is put down, auxiliary pull bar 10 of installing in tension, thus makes crane arm 50 be connected with the hinge eliminant of other structures to become one to be rigidly connected;
(4) the first pull bar 60a is connected between support 70 and crane arm first sections 50a;
(5) please refer to Fig. 5, lifting crane arm second sections 50b is to relevant position, and be also connected between the crane arm pull bar 60b of crane arm second sections 50b with support 70 with pinned connection, crane gear can put down suspension hook 200;
(6) the second pull bar 60b is connected between support 70 and crane arm second sections 50b;
(7) please refer to Fig. 6, crane arm the 3rd sections 50c is to relevant position in lifting, by crane arm the 3rd sections 50c and crane arm second sections 50b pinned connection good;
(8) described crane arm 50 is rotated around described first hinge, counter-jib pull bar 40 is connected on described support 70 and described counter-jib 30;
(9) naturally put down by crane arm 50, the corresponding pull bar 60b tensioning of the first pull bar 60a and other sections of crane arm 50 is to hold crane arm 50, and auxiliary pull bar 10 of installing is in relaxed state.After installation, crane arm 50 has certain upwarping (being generally about 1 °), please refer to Fig. 7, distance between the top boom 52 of crane arm first sections 50a and counter-jib 30 shortens, and again because auxiliary installation pull bar 10 is with mounting hole 123a, therefore auxiliary pull bar 10 of installing is in case of bending, the effect do not stressed, therefore do not need to remove, when removing tower machine 100, crane arm 50 can segmentedly be removed.
Be appreciated that crane arm 50 installed by application auxiliary installation pull bar 10 of the present invention, crane arm 50 also only can be divided into a sections and install.In the present embodiment, the first connecting portion 122 of first segment unit 12 and the second connecting portion 143 of second section unit 14 realize being rigidly connected with counter-jib 30, crane arm first sections 50a by bearing pin respectively.But in other embodiments, auxiliary two ends installing pull bar 10 also can realize being rigidly connected with counter-jib 30, crane arm first sections 50a by alternate manners such as flanges respectively.
Be appreciated that according to the distance of crane arm 50 to counter-jib 30, auxiliary pull bar 10 of installing also can comprise a joint or more piece.When auxiliary installation pull bar 10 is a joint, second connecting portion 123 with mounting hole 123a passes through pinned connection with counter-jib 30 or crane arm first sections 50a, thus crane arm 50 is installed when being upturned, second connecting portion 123 can bend with the junction of counter-jib 30 or crane arm first sections 50a, and auxiliary pull bar 10 of installing does not stress.
Auxiliary pull bar 10 of installing is not limited to said structure, first segment unit 12 also can all arrange mounting hole 123a by two ends, second section unit 14 also one end or two ends can arrange mounting hole 123a, and auxiliary two ends installing pull bar 10 are connected with counter-jib 30, crane arm first sections 50a respectively by bearing pin.
Auxiliary pull bar 10 segmentation installation derrick runway girder 50 of installing is adopted to have at least following advantage:
1, the segmented installation of crane arm 50, avoids disposable lifting, reduces the requirement to crane gear ability, saves mounting cost, no longer requires large assembled place and carrys out assembled crane arm 50;
2, whole machine installation is complete, crane arm 50 has certain upwarping, top boom 52 and counter-jib 30 distance of crane arm 50 shorten, again because auxiliary installation pull bar 10 is with mounting hole 123a, therefore auxiliary pull bar 10 of installing is in case of bending, the effect do not stressed, therefore do not need to remove, when removing tower machine, crane arm 50 can segmentedly be removed, and auxiliary pull bar 10 of installing is removed rear recycling.
3, providing new method for installing tower machine 100 at the water surface, having widened the scope of application of tower machine 100.
The above, only embodiments of the invention, not any pro forma restriction is done to the present invention, although the present invention discloses as above with embodiment, but and be not used to limit the present invention, any those skilled in the art, do not departing within the scope of technical solution of the present invention, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be do not depart from technical solution of the present invention content, according to any simple modification that technical spirit of the present invention is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (7)

1. the auxiliary installation pull bar of a derrick runway girder, counter-jib is hung on or/and revolving dial for being drawn by described crane arm in tower machine installation process temporarily, described crane arm has the first end of close revolving dial and relative with this first end and away from the second end of revolving dial, described auxiliary installation pull bar comprises first segment unit and second section unit, described first segment unit and described second section unit are joined end to end by bearing pin, described auxiliary installation pull bar comprises tension and relaxed state, in described tension, described auxiliary installation pull bar is tightened in the first end of described crane arm and counter-jib or/and to hold described crane arm temporarily between revolving dial, under described relaxed state, described auxiliary installation pull bar is loosely connected to the first end of described crane arm and counter-jib or/and between revolving dial.
2. the auxiliary installation pull bar of derrick runway girder as claimed in claim 1, it is characterized in that: at least one end of described first segment unit is provided with mounting hole, is equipped with described bearing pin in described mounting hole, described bearing pin can slide in described mounting hole.
3. the auxiliary installation pull bar of derrick runway girder as claimed in claim 2, it is characterized in that: described first segment unit comprises stock and is positioned at the first connecting portion and second connecting portion of stock two end, described second section unit comprises stock and is positioned at the first connecting portion and second connecting portion of stock two end, second connecting portion of described first segment unit and the first connecting portion of described second section unit link together, first connecting portion of described first segment unit is used for being connected with the crane arm of tower machine, second connecting portion of described second section unit is used for the counter-jib of tower machine or/and revolving dial is connected.
4. the auxiliary installation pull bar of derrick runway girder as claimed in claim 3, it is characterized in that: the second connecting portion of described first segment unit is provided with described mounting hole, first connecting portion of described second section unit is provided with circular hole, and described bearing pin wears described circular hole and is fixed in described circular hole.
5. the auxiliary installation pull bar of derrick runway girder as claimed in claim 3, it is characterized in that: the first connecting portion of described first segment unit is provided with circular hole, the first connecting portion of described first segment unit is fixedly connected with described crane arm by bearing pin; Second connecting portion of described second section unit is provided with circular hole, the second connecting portion of described second section unit by bearing pin with described counter-jib or/and revolving dial is fixedly connected with.
6. the auxiliary installation pull bar of a derrick runway girder, counter-jib is hung on or/and revolving dial for being drawn by described crane arm in tower machine installation process temporarily, described crane arm has the first end of close revolving dial and relative with this first end and away from the second end of revolving dial, described auxiliary installation pull bar comprises first segment unit, described first segment unit comprises stock and is positioned at the first connecting portion and second connecting portion of stock two end, described first connecting portion is used for being connected with the crane arm of tower machine, described second connecting portion is used for the counter-jib of tower machine or/and revolving dial is connected, described first connecting portion and the second connecting portion one of them be provided with mounting hole, described first connecting portion and the second connecting portion wherein another is provided with circular hole, described auxiliary installation pull bar comprises tension and relaxed state, in described tension, described auxiliary installation pull bar is tightened in the first end of described crane arm and counter-jib or/and to hold described crane arm temporarily between revolving dial, under described relaxed state, described auxiliary installation pull bar is loosely connected to the first end of described crane arm and counter-jib or/and between revolving dial.
7. a derrick runway girder installation method, is characterized in that, comprises step:
Crane arm first sections is winched to relevant position, and the described lower end of crane arm first sections is connected in the first hinge pivotable with the revolving dial of tower machine;
Auxiliary installation pull bar described in claim 1-6 any one is provided, one end of auxiliary installation pull bar is connected with crane arm first sections, the other end of auxiliary installation pull bar is with counter-jib or/and revolving dial is connected, and then put down suspension hook, described auxiliary installation pull bar is tension;
First pull bar is connected between support and described crane arm first sections;
If crane arm also has other sections, then lift other sections of crane arm, namely other sections of crane arm is sling successively and install and be connected on the last sections of adjacent crane arm, and the corresponding pull bar of other sections of crane arm is connected between described support and other sections of crane arm;
Described crane arm is rotated around described first hinge, counter-jib pull bar is connected on described support and described counter-jib;
Naturally put down by described crane arm, the corresponding pull bar tensioning of described first pull bar and described other sections of crane arm is to hold described crane arm, and described auxiliary installation pull bar is relaxed state.
CN201210460623.8A 2012-11-15 2012-11-15 The auxiliary installation pull bar of derrick runway girder installation method and application thereof Active CN102922280B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210460623.8A CN102922280B (en) 2012-11-15 2012-11-15 The auxiliary installation pull bar of derrick runway girder installation method and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210460623.8A CN102922280B (en) 2012-11-15 2012-11-15 The auxiliary installation pull bar of derrick runway girder installation method and application thereof

Publications (2)

Publication Number Publication Date
CN102922280A CN102922280A (en) 2013-02-13
CN102922280B true CN102922280B (en) 2016-02-03

Family

ID=47637281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210460623.8A Active CN102922280B (en) 2012-11-15 2012-11-15 The auxiliary installation pull bar of derrick runway girder installation method and application thereof

Country Status (1)

Country Link
CN (1) CN102922280B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108910729A (en) * 2018-09-29 2018-11-30 山东以琳智能科技有限公司 A kind of device and method improving prestressing force crane arm tower crane stress

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2788758B1 (en) * 1999-01-27 2001-02-23 Potain Sa METHOD AND DEVICE FOR MOUNTING THE MASTER HEAD OF TOWER CRANES
CN2426870Y (en) * 2000-04-14 2001-04-18 中国建筑科学研究院建筑机械化研究分院 Lifting and distributing two-purpose tower crane
CN201756421U (en) * 2010-07-27 2011-03-09 周明忠 High-strength tower type crane drawing rod
CN202022684U (en) * 2011-04-22 2011-11-02 上海庞源建筑机械租赁有限公司 Wall-attached extensible pull rod of tower crane
CN102381643B (en) * 2011-11-08 2013-03-13 中联重科股份有限公司 Tower crane
CN102616678B (en) * 2012-04-13 2014-01-15 三一重工股份有限公司 Inclined-pulling device of tower crane and tower crane

Also Published As

Publication number Publication date
CN102922280A (en) 2013-02-13

Similar Documents

Publication Publication Date Title
CN106081926A (en) Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN109231023B (en) Method for installing jib system of portal crane
CN205527410U (en) Balanced heavy device of installing and removing by oneself of tower crane
CN103420281B (en) The attaching/detaching apparatus of hoisting crane and accessory structure thereof, method for dismounting and installation method
CN102659043A (en) Improved sustaining wall rod dismantling device of tower type crane
CN102922280B (en) The auxiliary installation pull bar of derrick runway girder installation method and application thereof
CN113481869A (en) Method for assembling and disassembling capping beam platform
CN102351129A (en) Super-lifting device for improving lifting performance of crane and crane
CN202483439U (en) Counter-weight self-assembly and self-disassembly device for rotary drilling rig
CN201385979Y (en) Rotary lifting bent
CN103145055B (en) Arm joint, truss arm and there is its hoisting crane
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN212609006U (en) Hoisting tool for cooling pipeline of flexible direct-current converter valve
CN205500562U (en) A can dismantle hanging beam for hoist and mount of heavy goods
CN103541574B (en) Steel-making diffusing tower installation construction in narrow regions
CN202369291U (en) Winch mounting structure of automobile crane
CN103071989B (en) Method for mounting tower crane boom in sections and auxiliary mounting support rod for method
CN201809040U (en) Mobile loading platform for hoisting coal economizer of alkali recovery boiler
CN205555924U (en) A system's device for high altitude dismantlement tower crane
CN103015323B (en) Beam body hoisting device
CN201857225U (en) Hoisting device for bridge crane frame
CN202358822U (en) Hoisting structure for oil field skid block
CN205772783U (en) Steel beam column boom hoisting
CN205132987U (en) Tower crane jib loading boom arm internode wear to sell hydro -cylinder supporting structure
CN104495645A (en) Structure capable of mounting and dismounting balancing weight automatically by tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20130213

Assignee: ZOOMLION HEAVY INDUSTRY SCIENCE&TECHNOLOGY DEVELOPMENT Co.,Ltd. WEINAN BRANCH

Assignor: ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY Co.,Ltd.

Contract record no.: X2023980042749

Denomination of invention: Installation method and application of auxiliary installation rod for tower crane boom

Granted publication date: 20160203

License type: Common License

Record date: 20231008

Application publication date: 20130213

Assignee: Zoomlion Construction Crane Co.,Ltd.

Assignor: ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY Co.,Ltd.

Contract record no.: X2023980042704

Denomination of invention: Installation method and application of auxiliary installation rod for tower crane boom

Granted publication date: 20160203

License type: Common License

Record date: 20231008

EE01 Entry into force of recordation of patent licensing contract