CN102659043A - Improved sustaining wall rod dismantling device of tower type crane - Google Patents

Improved sustaining wall rod dismantling device of tower type crane Download PDF

Info

Publication number
CN102659043A
CN102659043A CN2012101447136A CN201210144713A CN102659043A CN 102659043 A CN102659043 A CN 102659043A CN 2012101447136 A CN2012101447136 A CN 2012101447136A CN 201210144713 A CN201210144713 A CN 201210144713A CN 102659043 A CN102659043 A CN 102659043A
Authority
CN
China
Prior art keywords
crane arm
pulley
loading boom
crane
jib loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101447136A
Other languages
Chinese (zh)
Other versions
CN102659043B (en
Inventor
李桂江
王跃辉
张学利
李应新
吴瑶庆
翟华
赵蓉
杨启云
慕建华
朱利平
关挺
秦龙山
高存伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Xinjiang Construction and Engineering Group Co Ltd
Original Assignee
CSCEC Xinjiang Construction and Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Xinjiang Construction and Engineering Group Co Ltd filed Critical CSCEC Xinjiang Construction and Engineering Group Co Ltd
Priority to CN201210144713.6A priority Critical patent/CN102659043B/en
Publication of CN102659043A publication Critical patent/CN102659043A/en
Application granted granted Critical
Publication of CN102659043B publication Critical patent/CN102659043B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention belongs to the field of tower type cranes for buildings, and in particular relates to an improved sustaining wall rod dismantling device of a tower type crane, which comprises a tower type crane balance arm main beam, wherein the lower end of a jib loading boom is hinged with the lower end of a jib loading boom support frame together and is fixedly arranged on the tower type crane balance arm main beam, the upper end of the jib loading boom support frame is hinged with the lower end of a jib loading boom pull rod together, the upper end of the jib loading boom pull rod is hinged with the upper end of the jib loading boom together, the top end of the jib loading boom is provided with a jib loading boom top end pulley, a wire fixed pulley is fixedly arranged on the tower type crane balance arm main beam, a steel rope is connected with the wire fixed pulley, the jib loading boom top end pulley and a lifting hook movable pulley together, and the jib loading boom support frame and the jib loading boom pull rod regulate the hoisting angle of the jib loading boom through a regulating pulley mechanism. By using the improved sustaining wall rod dismantling device, no limit by rotation of the jib loading boom exists, a sustaining wall rod can be dismantled after the improved sustaining wall rod dismantling device is installed in a proper position, thus potential safety hazards of incline pulling and incline hoisting of the tower type crane are eliminated.

Description

The stripping assembly of a kind of improved tower crane sustaining wall bar
Technical field
The invention belongs to tower crane for building field, particularly relate to the stripping assembly of a kind of improved tower crane sustaining wall bar.
Background technology
At present the dismounting of tower crane sustaining wall bar all is to utilize the master winch mechanism of tower machine self to remove, and does not have special device to remove in the equipment that producer dispatches from the factory, in unloading process when dismantling the first road sustaining wall bar; The tower machine can rotate freely, outside conveniently dismantling, and remaining several roads sustaining wall; The tower machine all can not rotate when dismounting; Can not arrive desirable lifting position, so just increase the dismounting difficulty, also certainly will have the situation of pull and hang sideling; Increase the danger of operation, also increased the probability that safety misadventure takes place.
Summary of the invention
Technical matters to be solved by this invention is: when tower crane is removed the sustaining wall bar, do not receive the restriction of crane arm rotation, can carry out the dismounting of sustaining wall bar after installing in place, eliminate the potential safety hazard of tower machine pull and hang sideling.
Solving the problems of the technologies described above the technical scheme that is adopted is: the stripping assembly of a kind of improved tower crane sustaining wall bar; Comprise tower machine equilibrium arm girder; Hinged and fixed being arranged on the tower machine equilibrium arm girder in the lower end of the lower end of crane arm and crane arm bracing frame; The lower end of the upper end of crane arm bracing frame and crane arm pull bar is hinged; The upper end of crane arm pull bar and the upper end of crane arm are hinged, and the top of crane arm is being provided with crane arm top pulley, and the lead fixed pulley is fixedly installed on the tower machine equilibrium arm girder; Steel cable links together through winch and lead fixed pulley, crane arm top pulley and the suspension hook movable pulley that is arranged on tower machine equilibrium arm girder, and the tail end of steel cable is cemented in the upper end of crane arm.Below the suspension hook movable pulley, connecting and playing the weight equalizer bar, crane arm bracing frame and crane arm pull bar are regulated the lifting angle of crane arm through regulating pulley mechanism.Described regulating mechanism is made up of pulley of installing on crane arm bracing frame and the crane arm pull bar hinge-point and fixed adjusting fixed pulley and the steel rope that is arranged on the tower machine equilibrium arm girder; Jig is installed on steel cable, regulates the lifting angle of the length realization adjusting crane arm of steel rope through jig.Two ends at described weight equalizer bar are being provided with through hole.
In the practice, device of the present invention is installed in through removable mode on the tower machine equilibrium arm girder of tower crane, the sustaining wall bar can be removed after dismantling and finishing, and removes to be installed on the tower crane that needs dismounting sustaining wall bar reuse, and is very convenient.
Beneficial effect of the present invention: in use do not receive the restriction of crane arm rotation, can carry out the dismounting of sustaining wall bar after installing in place, eliminated the potential safety hazard of tower machine pull and hang sideling; Because of angle is suitable, in unloading process,, reduced the danger of operation also for the operating personnel has reduced the dismounting difficulty, also reduced the probability that safety misadventure takes place, be worth wideling popularize in China.
Description of drawings
Below in conjunction with accompanying drawing the present invention is further described.
Accompanying drawing 1 is a main TV structure scheme drawing of the present invention.
The specific embodiment
The stripping assembly of a kind of improved tower crane sustaining wall bar; Shown in accompanying drawing 1; Comprise tower machine equilibrium arm girder 1; Hinged and fixed being arranged on the tower machine equilibrium arm girder 1 in the lower end of the lower end of crane arm 5 and crane arm bracing frame 4, the lower end of the upper end of crane arm bracing frame 4 and crane arm pull bar 3 is hinged, and the upper end of the upper end of crane arm pull bar 3 and crane arm 5 is hinged; The top of crane arm 5 is being provided with crane arm top pulley 7; Lead fixed pulley 11 is fixedly installed on the tower machine equilibrium arm girder 1, and steel cable 8 links together with lead fixed pulley 11, crane arm top pulley 7 and suspension hook movable pulley 9 through the winch 2 that is arranged on tower machine equilibrium arm girder 1, and the tail end of steel cable 8 is cemented in the upper end of crane arm 5.Below suspension hook movable pulley 9, connecting and playing weight equalizer bar 10, crane arm bracing frame 4 is regulated the lifting angle of crane arm 5 with crane arm pull bar 3 through regulating pulley mechanism.Described regulating mechanism is made up of pulley and fixed adjusting fixed pulley 6 and the steel rope that is arranged on the tower machine equilibrium arm girder 1 installed on crane arm bracing frame 4 and crane arm pull bar 3 hinge-points; Jig 12 is installed on steel cable, regulates the lifting angle of the length realization adjusting crane arm 5 of steel rope through jig 12.At the two ends of described weight equalizer bar 10 through hole 13 is being set.
In the practice, the inventive system comprises following a few part: the crane arm that assembles, lifting motor, pulley, steel rope and brake part.This device is fixed on the equilibrium arm of tower machine when using; Its principle installs the electric winding plant of a cover additional for the correct position at tower machine equilibrium arm; Can lift by crane, remove member easily; Install crane arm and fixing and adjust hoisting mechanism in actual installation and the operating process, after each parts of inspection and assurance device connect fastening intact and brake intact, Φ 8 steel ropes are worn walk around pulley and hang up properly the dismounting work of carrying out the sustaining wall bar behind the sustaining wall bar wall bar that needs dismounting; After fixedly remove at the two ends of sustaining wall bar, utilize hoisting mechanism that sustaining wall bar safety is fallen earthward.

Claims (3)

1. improved tower crane sustaining wall bar stripping assembly; Comprise tower machine equilibrium arm girder (1); It is characterized in that: hinged and fixed being arranged on the tower machine equilibrium arm girder (1) in the lower end of the lower end of crane arm (5) and crane arm bracing frame (4); The lower end of the upper end of crane arm bracing frame (4) and crane arm pull bar (3) is hinged; The upper end of the upper end of crane arm pull bar (3) and crane arm (5) is hinged; The top of crane arm (5) is being provided with crane arm top pulley (7); Lead fixed pulley (11) is fixedly installed on the tower machine equilibrium arm girder (1), and steel cable (8) links together with lead fixed pulley (11), crane arm top pulley (7) and suspension hook movable pulley (9) through the winch (2) that is arranged on tower machine equilibrium arm girder (1), and the tail end of steel cable (8) is cemented in the upper end of crane arm (5); Below suspension hook movable pulley (9), connecting and playing weight equalizer bar (10), crane arm bracing frame (4) is regulated the lifting angle of crane arm (5) with crane arm pull bar (3) through regulating pulley mechanism.
2. a kind of improved tower crane sustaining wall bar according to claim 1 stripping assembly; It is characterized in that: described regulating mechanism is made up of pulley and fixed adjusting fixed pulley (6) and the steel rope that is arranged on the tower machine equilibrium arm girder (1) installed on crane arm bracing frame (4) and crane arm pull bar (3) hinge-point; Jig (12) is installed on steel cable, regulates the lifting angle of the length realization adjusting crane arm (5) of steel rope through jig (12).
3. a kind of improved tower crane sustaining wall bar according to claim 1 stripping assembly is characterized in that: at the two ends of described weight equalizer bar (10) through hole (13) is being set.
CN201210144713.6A 2012-05-11 2012-05-11 Improved sustaining wall rod dismantling device of tower type crane Expired - Fee Related CN102659043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210144713.6A CN102659043B (en) 2012-05-11 2012-05-11 Improved sustaining wall rod dismantling device of tower type crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210144713.6A CN102659043B (en) 2012-05-11 2012-05-11 Improved sustaining wall rod dismantling device of tower type crane

Publications (2)

Publication Number Publication Date
CN102659043A true CN102659043A (en) 2012-09-12
CN102659043B CN102659043B (en) 2014-05-28

Family

ID=46768668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210144713.6A Expired - Fee Related CN102659043B (en) 2012-05-11 2012-05-11 Improved sustaining wall rod dismantling device of tower type crane

Country Status (1)

Country Link
CN (1) CN102659043B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103434942A (en) * 2013-08-12 2013-12-11 苏州金螳螂幕墙有限公司 Plate hoisting device
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line
CN103950841A (en) * 2014-04-16 2014-07-30 山东送变电工程公司 Auxiliary hoisting device for outer-side cross arms of crank arm of wine glass type ultrahigh-voltage transmission line iron tower
CN104289825A (en) * 2014-08-27 2015-01-21 洛阳双瑞特种合金材料有限公司 Steel seamless flux-cored wire used in mixed gas of AR and CO2
CN110436357A (en) * 2019-08-28 2019-11-12 中建八局第二建设有限公司 A kind of comprehensive tower crane device of large bridges construction
CN110905273A (en) * 2019-12-10 2020-03-24 河南送变电建设有限公司 Construction device for assembling super-long cross arm

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0943578A2 (en) * 1998-03-19 1999-09-22 KABUSHIKI KAISHA KOBE SEIKO SHO also known as Kobe Steel Ltd. Crane
CN201485194U (en) * 2009-07-22 2010-05-26 秦皇岛天业通联重工股份有限公司 60T walking type full-swing erecting crane
CN201722080U (en) * 2010-07-20 2011-01-26 刘毅中 Whole-angle convolution type manual digging pile elevator
JP2011126608A (en) * 2009-12-15 2011-06-30 Nishimatsu Constr Co Ltd Crane boom contact prevention sensor and mounting structure for crane boom contact prevention sensor
KR101072841B1 (en) * 2010-03-31 2011-10-14 권혁봉 The jib crane control apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0943578A2 (en) * 1998-03-19 1999-09-22 KABUSHIKI KAISHA KOBE SEIKO SHO also known as Kobe Steel Ltd. Crane
CN201485194U (en) * 2009-07-22 2010-05-26 秦皇岛天业通联重工股份有限公司 60T walking type full-swing erecting crane
JP2011126608A (en) * 2009-12-15 2011-06-30 Nishimatsu Constr Co Ltd Crane boom contact prevention sensor and mounting structure for crane boom contact prevention sensor
KR101072841B1 (en) * 2010-03-31 2011-10-14 권혁봉 The jib crane control apparatus
CN201722080U (en) * 2010-07-20 2011-01-26 刘毅中 Whole-angle convolution type manual digging pile elevator

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103434942A (en) * 2013-08-12 2013-12-11 苏州金螳螂幕墙有限公司 Plate hoisting device
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line
CN103950841A (en) * 2014-04-16 2014-07-30 山东送变电工程公司 Auxiliary hoisting device for outer-side cross arms of crank arm of wine glass type ultrahigh-voltage transmission line iron tower
CN103924816B (en) * 2014-04-16 2015-11-25 山东送变电工程公司 A kind of mounting method of UHV transmission line wine glass-shaped steel tower
CN104289825A (en) * 2014-08-27 2015-01-21 洛阳双瑞特种合金材料有限公司 Steel seamless flux-cored wire used in mixed gas of AR and CO2
CN110436357A (en) * 2019-08-28 2019-11-12 中建八局第二建设有限公司 A kind of comprehensive tower crane device of large bridges construction
CN110436357B (en) * 2019-08-28 2024-03-22 中建八局第二建设有限公司 Omnidirectional tower crane device for large-scale bridge engineering construction
CN110905273A (en) * 2019-12-10 2020-03-24 河南送变电建设有限公司 Construction device for assembling super-long cross arm

Also Published As

Publication number Publication date
CN102659043B (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN102659043B (en) Improved sustaining wall rod dismantling device of tower type crane
CN201458596U (en) Crane with self-dismounting device
US20170067447A1 (en) Wind Turbine Blade Removal and Installation System and Method
CN100519396C (en) Gin pole integrated dismounting method for tower crane
CN101548100A (en) Suspension device for wind wheel blade, method of mounting wind wheel blade, and method of constructing wind-driven generator
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN102071644A (en) Lifting installation method of integral bridge arch rib
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN106276631A (en) A kind of roofing device for hoisting and crane and the method for dismounting of crane arm
CN104477736A (en) Shaft elevator installation method
CN102381639A (en) Crane
CN205222535U (en) Dismounting device of tower machine balancing weight piece
CN115285821B (en) System and method for quickly separating new and old steel wire ropes from each other and replacing ropes of multi-rope friction type elevator
US11279593B2 (en) Compensation line storing apparatus, jump lift and the usage method thereof
CA2714715C (en) Method and device for exchanging roller batteries
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN203959697U (en) The equalizing bar of hoisting platform truss
CN105060138A (en) Disassembling and installation method for tower crane attachment
CN101337642A (en) Aerial disassembly process for big arm of tower crane with horizontal arm and device thereof
CN203284167U (en) Hanging cable pulley overhauling device of large bridge crane
CN106013795A (en) Method for detaching a chimney hydraulic lifting device for thermal power station
CN201857225U (en) Hoisting device for bridge crane frame
CN104386598A (en) Dismantling method for tower crane jib
CN104495645A (en) Structure capable of mounting and dismounting balancing weight automatically by tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140528

Termination date: 20170511