CN201722080U - Whole-angle convolution type manual digging pile elevator - Google Patents

Whole-angle convolution type manual digging pile elevator Download PDF

Info

Publication number
CN201722080U
CN201722080U CN2010202645874U CN201020264587U CN201722080U CN 201722080 U CN201722080 U CN 201722080U CN 2010202645874 U CN2010202645874 U CN 2010202645874U CN 201020264587 U CN201020264587 U CN 201020264587U CN 201722080 U CN201722080 U CN 201722080U
Authority
CN
China
Prior art keywords
upright column
digging pile
whole
fixed
type manual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202645874U
Other languages
Chinese (zh)
Inventor
刘志刚
刘毅中
林海森
洪志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Engineering Contractor Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010202645874U priority Critical patent/CN201722080U/en
Application granted granted Critical
Publication of CN201722080U publication Critical patent/CN201722080U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A whole-angle convolution type manual digging pile elevator comprises upright columns, an elevating system, a suspension arm and a steel wire rope. The whole-angle convolution type manual digging pile elevator is characterized in that the upright columns include a fixed upright column and a movable upright column, the fixed upright column is fixed with the ground, the movable upright column is sleeved at the upper end of the fixed upright column and can rotate on the fixed upright column within 360 degrees, the suspension arm is mounted on a supporting plate at the upper end of the movable upright column and hinged with the supporting plate, the elevating system is fixedly connected with the movable upright column, and two ends of the steel wire rope are respectively connected with the elevating system and a hanging barrel. The whole-angle convolution type manual digging pile elevator is simple in structure and high in work efficiency, during usage, the elevating system and the suspension arm can rotate on the fixed upright column along with the movable upright column, and then the hanging barrel can move in 360 degrees to dump soil, thereby leading mounding load to be distributed uniformly, preventing stress of well walls from being concentrated, and keeping soil and wall protecting concrete stable relatively.

Description

Full-shape Clothoid type artificial digging pile gig
Technical field
The utility model belongs to building field, especially a kind of full-shape Clothoid type artificial digging pile gig.
Background technology
Though the artificial digging pile cost is lower, technology is simple, can arrange labour employment more, and its progress is slow, and is long in time limit, the labour intensity height.And its gig that adopts mostly is the fixed type gig greatly, and is very inconvenient when moving barrel spoir, can cause the mound load to concentrate simultaneously.
The utility model content
The purpose of this utility model just provides a kind of full-shape Clothoid type artificial digging pile gig of simple in structure, easy to use, high efficiency.
Full-shape Clothoid type artificial digging pile gig of the present utility model, comprise column, elevator system, arm, steel rope, be characterized in that column divides vertical columns and active column, vertical columns and ground are fixed, and active column is nested with the upper end at vertical columns, can rotate by 360 degree on vertical columns, arm is installed on the back plate of active column upper end, be hinged with back plate, elevator system and active column are affixed, and the two ends of steel rope link to each other with well-bucket with elevator system respectively.
Simple in structure, the high efficiency of full-shape Clothoid type artificial digging pile gig of the present utility model, during use, because elevator system, arm can rotate on vertical columns with active column, therefore, can move a barrel spoir by 360 degree, make mound load rectangular distribution, prevent that borehole wall Me power is concentrated, keep the soil body and retaining wall concrete relatively stable.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
A kind of full-shape Clothoid type artificial digging pile gig, comprise column, elevator system 3, arm 5, steel rope 4, be characterized in that column divides vertical columns 1 and active column 2, vertical columns 1 is fixed with ground, and active column 2 is nested with in the upper end of vertical columns 1, can rotate by 360 degree on vertical columns 1, arm 5 is installed on the back plate of active column 2 upper ends, be hinged with back plate, elevator system 3 is affixed with active column 2, and the two ends of steel rope 4 link to each other with well-bucket 6 with elevator system 3 respectively.

Claims (1)

1. full-shape Clothoid type artificial digging pile gig, comprise column, elevator system (3), arm (5), steel rope (4), it is characterized in that: column divides vertical columns (1) and active column (2), active column (2) is nested with the upper end in vertical columns (1), arm (5) is installed on the back plate of active column (2) upper end, be hinged with back plate, elevator system (3) is affixed with active column (2), and the two ends of steel rope (4) link to each other with well-bucket (6) with elevator system (3) respectively.
CN2010202645874U 2010-07-20 2010-07-20 Whole-angle convolution type manual digging pile elevator Expired - Lifetime CN201722080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202645874U CN201722080U (en) 2010-07-20 2010-07-20 Whole-angle convolution type manual digging pile elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202645874U CN201722080U (en) 2010-07-20 2010-07-20 Whole-angle convolution type manual digging pile elevator

Publications (1)

Publication Number Publication Date
CN201722080U true CN201722080U (en) 2011-01-26

Family

ID=43490388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202645874U Expired - Lifetime CN201722080U (en) 2010-07-20 2010-07-20 Whole-angle convolution type manual digging pile elevator

Country Status (1)

Country Link
CN (1) CN201722080U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102659043A (en) * 2012-05-11 2012-09-12 中建新疆建工(集团)有限公司 Improved dismounting device for buttress rod of tower crane
CN104310239A (en) * 2014-09-23 2015-01-28 申锡机械有限公司 Multifunctional hoistway lifting apparatus
CN105621267A (en) * 2014-10-31 2016-06-01 无锡晟欧船舶设备有限公司 Structure of lifting arm of crane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102659043A (en) * 2012-05-11 2012-09-12 中建新疆建工(集团)有限公司 Improved dismounting device for buttress rod of tower crane
CN102659043B (en) * 2012-05-11 2014-05-28 中建新疆建工(集团)有限公司 Improved dismounting device for buttress rod of tower crane
CN104310239A (en) * 2014-09-23 2015-01-28 申锡机械有限公司 Multifunctional hoistway lifting apparatus
CN105621267A (en) * 2014-10-31 2016-06-01 无锡晟欧船舶设备有限公司 Structure of lifting arm of crane

Similar Documents

Publication Publication Date Title
CN201722080U (en) Whole-angle convolution type manual digging pile elevator
CN202073325U (en) Combined type sizing outer wall safety net
CN104773654A (en) Concrete electric pole arrangement device
CN204568983U (en) A kind of adjustable height cable reel stent assembly
CN204384761U (en) A kind of bridge construction tower crane pile foundation sustaining wall
CN103993730B (en) Steel coal hopper abutting joint constructing operation platform
CN205132955U (en) Hoist and mount operation of electric power industry low latitude is with hoist and mount frame
CN202787296U (en) Foundation structure of anchor pole blower fan
CN204551558U (en) Multi function loader
CN204282365U (en) Pile tube locating rack
CN204311721U (en) Double-support hanging basket overhanging device
CN204000918U (en) Manual assembled type communication tower basis
CN202745459U (en) C80 high-intensity concrete large-top-diameter partially prestressed electric pole
CN202731402U (en) Wire pole boring and hoisting integrated machine
CN202194146U (en) Single-row-pile foundation pit bracing structure
CN205132956U (en) Portable simple and easy pole of embracing
CN202969961U (en) Curtain wall plate vertical hanging tool
CN204529148U (en) Cement electric pole press-rod apparatus
CN205400121U (en) Vertical interim strutting arrangement who props usefulness that trades
CN203715117U (en) Tower crane rapid to install
CN203568661U (en) Built-in tail-sliding lifting lug
CN202690091U (en) Fore poling bar type temporary support device used in anchor bolt support roadway construction
CN203128068U (en) Tractor with crane
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN201883695U (en) Spherical net rack vertical jacking equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUANGZHOU ENGINEERING CONTRACT GROUP CO., LTD.

Free format text: FORMER OWNER: LIU YIZHONG

Effective date: 20120410

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 330002 NANCHANG, JIANGXI PROVINCE TO: 510310 GUANGZHOU, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120410

Address after: 510310, 26 floor, general contracting group building, No. 376 middle Xingang Road, Haizhuqu District, Guangzhou, Guangzhou

Patentee after: Guangzhou Engineering Contract Group Co., Ltd.

Address before: 330002 Avenue in Jiangxi province Nanchang Hongdu 101 Factory No. 260 building 18 unit 1 Room 201

Patentee before: Liu Yizhong

CX01 Expiry of patent term

Granted publication date: 20110126

CX01 Expiry of patent term