CN104386598A - Dismantling method for tower crane jib - Google Patents

Dismantling method for tower crane jib Download PDF

Info

Publication number
CN104386598A
CN104386598A CN201410470790.XA CN201410470790A CN104386598A CN 104386598 A CN104386598 A CN 104386598A CN 201410470790 A CN201410470790 A CN 201410470790A CN 104386598 A CN104386598 A CN 104386598A
Authority
CN
China
Prior art keywords
crane
arm
jib
ship
compound type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410470790.XA
Other languages
Chinese (zh)
Inventor
张淑芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Qiyuan Technology Development Co Ltd
Original Assignee
Shaanxi Qiyuan Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Qiyuan Technology Development Co Ltd filed Critical Shaanxi Qiyuan Technology Development Co Ltd
Priority to CN201410470790.XA priority Critical patent/CN104386598A/en
Publication of CN104386598A publication Critical patent/CN104386598A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention relates to the field of machinery equipment installation and disassembly methods, in particular to a dismantling method for a tower crane jib. The method comprises the steps of: dismantling part of the platform at the downstream side of a main pier in advance and shortening the hanging distance; dismantling clump weights and a lifting hook, conducting first release to dismantle 4-6 sections of the jib, utilizing a combined crane ship to lay the jib flat slowly and then loosening the hook to let an inner pull rod bear all the jib weight; then dismantling outer pull rods one by one; performing tensioning with a chain block between a 3rd section of jib and a 4th section of jib, tying two hawser cables to two ends of jib 4-6, performing control respectively from the ship and a trestle, dismantling a connecting pin between the 3rd section of jib and a 4th section of jib, carrying out dismantling from bottom to top in order, and dismantling two pins at the jib root to let the jib break away from a slewing bearing, and then slowly lowering the jib to the platform. The method provided by the invention loosens the jib pull rods twice, disintegrate the jib in the air and realizes dismantling in sections, also has low requirement for the construction environment, has no need for large scale equipment, and saves the construction cost.

Description

The method for dismounting of derrick runway girder
Technical field
The present invention relates to mechanized equipment installation and removal method field, be specifically related to the method for dismounting of derrick runway girder.
Background technology
After derrick runway girder is removed and normally unclasped by crane arm pull bar, after the connection of the inside and outside pull bar of disposable releasing and crane arm, crane arm is removed by entirety.But the restriction often due to field condition or weight-lifting equipment in actual demolishing process, and have to crane arm pull bar to carry out unclasping for twice, aloft disintegrate crane arm, and segmentation is removed.And the connection of the inside and outside pull bar of disposable releasing and crane arm, need adopt main equipment, condition is harsh, and construction cost is too high.
In order to solve the problem, the invention provides one and carried out unclasping for twice by crane arm pull bar, aloft disintegrate crane arm, and segmentation is removed, and require low to construction environment, without the need to main equipment, saves the method for dismounting of the derrick runway girder of construction cost.
The method for dismounting of derrick runway girder of the present invention, comprises the following steps:
The first step, removes and prepares, and is removed by the Partial flats in main pier downstream in advance, shortens and hangs distance; Tower machine is fallen voluntarily joint to minimum altitude, retain 3 standard knots; Crawler crane installs brachium, and fixing near stem crawler crane being moved to covered barge; Ballast is carried out at cabin afterbody concrete block; Compound type crane ship concrete block carries out examination and hangs, and checks whether crawler crane lifting performance and stability of ship meet the demands;
Second step, remove clump weight, clump weight amounts to 5 pieces, 4 pieces large 1 piece little, removes needs and hangs height about 45m, selects high tide level to be hung out by clump weight block-by-block with compound type crane ship;
3rd step, removes suspension hook, is transferred to by suspension hook on platform, is then removed by the fixed end of master winch steel rope, opens main winch, is recovered to by wirerope-winding on reel; Amplitude variation trolley is moved on to crane arm root, and be temporarily fixed on crane arm; Variable-amplitude steel wire rope is removed rear winding from amplitude variation trolley to be recovered on the reel of luffing winch;
4th step, first time unclasps dismounting 4 ~ 6 and saves crane arm, selects tidal level to carry out operation more than during lm; Be wound up into by hoist rope in the assembly pulley of back stay, in order to unclasp pull bar, lifted by crane by arm end by crane arm with compound type crane ship, suitable tensioning hoist rope, removes the pin of arm-tie, slowly unclasps hoist rope, lax back stay; After outside link is completely lax, removes the pin at another place, then reclaim hoist rope, back stay is stretching, the pin that first time removes is installed again, makes back stay stressed; Crane arm is slowly set level rear loose hook by compound type crane ship, allows draw-in bar bear the weight of whole crane arm; Then outside link is removed one by one; Suspension centre is selected the point midway at Section 5 arm, compound type crane ship slowly hoists, play lift to 10 about t to stop hoisting, tighten up with chain block between 3,4 joint arms, two cable wind ropes are fastened at arm 4 ~ 6 two ends, control from ship and trestle respectively, to collide with the crane arm of crawler crane after free removal; Remove the connecting pin between the 3rd, 4 joint arms, remove according to order from bottom to top, after dismounting, slowly unclasp cucurbit, release impulsive force; The cucurbit of removing between 3,4 joints connects, and transfers on platform by arm joint 4 ~ 6;
5th step, removes Section 3 crane arm, removes pull bar, remove Section 3 arm with compound type crane ship with compound type crane ship, lifts by crane amplitude variation trolley and is pulled out crane arm, transfer on platform with compound type crane ship
6th step, second time is loosened dismounting 1 ~ 2 and is saved crane arm, location of being cast anchor by compound type crane ship; Compound type crane ship, by 1 ~ 2 joint boom hoist, makes it rotate up about 5 °, lax draw-in bar, and suitable tensioning hoist rope, again removes the pin reinstalled, slowly unclasp hoist rope, lax back stay; Allow tower cap lean forward, with lower link bar tower cap fixed and keep the attitude that leans forward; Remove two pins of the inside and outside pull bar of crane arm end, slowly crane arm is set level, allow pull bar throw off from end; Remove two pins at arm root place, allow crane arm depart from pivoting support, then slowly transfer to platform.
Crane arm pull bar carries out unclasping for twice by the present invention, and aloft disintegrate crane arm, and segmentation is removed, and requires low to construction environment, without the need to main equipment, saves construction cost.
Detailed description of the invention
The method for dismounting of derrick runway girder, comprises the following steps:
The first step, removes and prepares, and is removed by the Partial flats in main pier downstream in advance, shortens and hangs distance; Tower machine is fallen voluntarily joint to minimum altitude, retain 3 standard knots; Crawler crane installs brachium, and fixing near stem crawler crane being moved to covered barge; Ballast is carried out at cabin afterbody concrete block; Compound type crane ship concrete block carries out examination and hangs, and checks whether crawler crane lifting performance and stability of ship meet the demands;
Second step, remove clump weight, clump weight amounts to 5 pieces, 4 pieces large 1 piece little, removes needs and hangs height about 45m, selects high tide level to be hung out by clump weight block-by-block with compound type crane ship;
3rd step, removes suspension hook, is transferred to by suspension hook on platform, is then removed by the fixed end of master winch steel rope, opens main winch, is recovered to by wirerope-winding on reel; Amplitude variation trolley is moved on to crane arm root, and be temporarily fixed on crane arm; Variable-amplitude steel wire rope is removed rear winding from amplitude variation trolley to be recovered on the reel of luffing winch;
It is characterized in that the method for dismounting of derrick runway girder also comprises the 4th step, first time unclasps dismounting 4 ~ 6 and saves crane arm, selects tidal level to carry out operation more than during lm; Be wound up into by hoist rope in the assembly pulley of back stay, in order to unclasp pull bar, lifted by crane by arm end by crane arm with compound type crane ship, suitable tensioning hoist rope, removes the pin of arm-tie, slowly unclasps hoist rope, lax back stay; After outside link is completely lax, removes the pin at another place, then reclaim hoist rope, back stay is stretching, the pin that first time removes is installed again, makes back stay stressed; Crane arm is slowly set level rear loose hook by compound type crane ship, allows draw-in bar bear the weight of whole crane arm; Then outside link is removed one by one; Suspension centre is selected the point midway at Section 5 arm, compound type crane ship slowly hoists, play lift to 10 about t to stop hoisting, tighten up with chain block between 3,4 joint arms, two cable wind ropes are fastened at arm 4 ~ 6 two ends, control from ship and trestle respectively, to collide with the crane arm of crawler crane after free removal; Remove the connecting pin between the 3rd, 4 joint arms, remove according to order from bottom to top, after dismounting, slowly unclasp cucurbit, release impulsive force; The cucurbit of removing between 3,4 joints connects, and transfers on platform by arm joint 4 ~ 6;
5th step, removes Section 3 crane arm, removes pull bar, remove Section 3 arm with compound type crane ship with compound type crane ship, lifts by crane amplitude variation trolley and is pulled out crane arm, transfer on platform with compound type crane ship;
6th step, second time is loosened dismounting 1 ~ 2 and is saved crane arm, location of being cast anchor by compound type crane ship; Compound type crane ship, by 1 ~ 2 joint boom hoist, makes it rotate up about 5 °, lax draw-in bar, and suitable tensioning hoist rope, again removes the pin reinstalled, slowly unclasp hoist rope, lax back stay; Allow tower cap lean forward, with lower link bar tower cap fixed and keep the attitude that leans forward; Remove two pins of the inside and outside pull bar of crane arm end, slowly crane arm is set level, allow pull bar throw off from end; Remove two pins at arm root place, allow crane arm depart from pivoting support, then slowly transfer to platform.
Last crane arm is all transferred on trestle and platform after removing and is stacked temporarily, undertaken disintegrating by floor times such as compound type crane ship utilizations, entrucking, shipped off-site, so far, the dismounting work of crane arm all completes, and the remainder of tower machine removed by the box-like crane ship of available set.
Crane arm pull bar carries out unclasping for twice by the present invention, and aloft disintegrate crane arm, and segmentation is removed, and requires low to construction environment, without the need to main equipment, saves construction cost.

Claims (1)

1. the method for dismounting of derrick runway girder, comprises the following steps:
The first step, removes and prepares, and is removed by the Partial flats in main pier downstream in advance, shortens and hangs distance; Tower machine is fallen voluntarily joint to minimum altitude, retain 3 standard knots; Crawler crane installs brachium, and fixing near stem crawler crane being moved to covered barge; Ballast is carried out at cabin afterbody concrete block; Compound type crane ship concrete block carries out examination and hangs, and checks whether crawler crane lifting performance and stability of ship meet the demands;
Second step, remove clump weight, clump weight amounts to 5 pieces, 4 pieces large 1 piece little, removes needs and hangs height about 45m, selects high tide level to be hung out by clump weight block-by-block with compound type crane ship;
3rd step, removes suspension hook, is transferred to by suspension hook on platform, is then removed by the fixed end of master winch steel rope, opens main winch, is recovered to by wirerope-winding on reel; Amplitude variation trolley is moved on to crane arm root, and be temporarily fixed on crane arm; Variable-amplitude steel wire rope is removed rear winding from amplitude variation trolley to be recovered on the reel of luffing winch;
It is characterized in that the method for dismounting of derrick runway girder also comprises the 4th step, first time unclasps dismounting 4 ~ 6 and saves crane arm, selects tidal level to carry out operation more than during lm; Be wound up into by hoist rope in the assembly pulley of back stay, in order to unclasp pull bar, lifted by crane by arm end by crane arm with compound type crane ship, suitable tensioning hoist rope, removes the pin of arm-tie, slowly unclasps hoist rope, lax back stay; After outside link is completely lax, removes the pin at another place, then reclaim hoist rope, back stay is stretching, the pin that first time removes is installed again, makes back stay stressed; Crane arm is slowly set level rear loose hook by compound type crane ship, allows draw-in bar bear the weight of whole crane arm; Then outside link is removed one by one; Suspension centre is selected the point midway at Section 5 arm, compound type crane ship slowly hoists, play lift to 10 about t to stop hoisting, tighten up with chain block between 3,4 joint arms, two cable wind ropes are fastened at arm 4 ~ 6 two ends, control from ship and trestle respectively, to collide with the crane arm of crawler crane after free removal; Remove the connecting pin between the 3rd, 4 joint arms, remove according to order from bottom to top, after dismounting, slowly unclasp cucurbit, release impulsive force; The cucurbit of removing between 3,4 joints connects, and transfers on platform by arm joint 4 ~ 6;
5th step, removes Section 3 crane arm, removes pull bar, remove Section 3 arm with compound type crane ship with compound type crane ship, lifts by crane amplitude variation trolley and pulled out with compound type crane ship
Crane arm, transfers on platform;
6th step, second time is loosened dismounting 1 ~ 2 and is saved crane arm, location of being cast anchor by compound type crane ship; Compound type crane ship, by 1 ~ 2 joint boom hoist, makes it rotate up about 5 °, lax draw-in bar, and suitable tensioning hoist rope, again removes the pin reinstalled, slowly unclasp hoist rope, lax back stay; Allow tower cap lean forward, with lower link bar tower cap fixed and keep the attitude that leans forward; Remove two pins of the inside and outside pull bar of crane arm end, slowly crane arm is set level, allow pull bar throw off from end; Remove two pins at arm root place, allow crane arm depart from pivoting support, then slowly transfer to platform.
CN201410470790.XA 2014-09-16 2014-09-16 Dismantling method for tower crane jib Pending CN104386598A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410470790.XA CN104386598A (en) 2014-09-16 2014-09-16 Dismantling method for tower crane jib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410470790.XA CN104386598A (en) 2014-09-16 2014-09-16 Dismantling method for tower crane jib

Publications (1)

Publication Number Publication Date
CN104386598A true CN104386598A (en) 2015-03-04

Family

ID=52604582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410470790.XA Pending CN104386598A (en) 2014-09-16 2014-09-16 Dismantling method for tower crane jib

Country Status (1)

Country Link
CN (1) CN104386598A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692261A (en) * 2015-03-24 2015-06-10 启东建筑集团有限公司 Symmetrical dismounting construction method for attachment device of tower crane
CN105712218A (en) * 2016-03-31 2016-06-29 中国建筑第八工程局有限公司 Construction method for changing lifting arm of heavy horizontal-arm tower crane at high altitude

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692261A (en) * 2015-03-24 2015-06-10 启东建筑集团有限公司 Symmetrical dismounting construction method for attachment device of tower crane
CN105712218A (en) * 2016-03-31 2016-06-29 中国建筑第八工程局有限公司 Construction method for changing lifting arm of heavy horizontal-arm tower crane at high altitude

Similar Documents

Publication Publication Date Title
CN100519396C (en) Gin pole integrated dismounting method for tower crane
CN104284857A (en) Heavy lifting apparatus and method
CN102587288B (en) Method for lifting steel box girder segments of cable-stayed bridge
CN103863955A (en) A self-introducing system and a tower crane with the self-introducing system
CN106315426B (en) A kind of assembling flat-top tower crane for building is installed, jacking method
CN107697817A (en) A kind of novel tower slings the method that weighing arm becomes length in the air
CN108975181A (en) A kind of method for dismounting of derrick crane
CN110104571B (en) Wire rope pre-tightening method for offshore engineering cranes
CN201362571Y (en) Equipment of cross beam for hoisting arch-first and girder-late tied bars arch bridge
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
CN104386598A (en) Dismantling method for tower crane jib
CN115522460A (en) A method for hoisting stiffening beams of suspension bridges
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN211971577U (en) Tower crane system
CN111762697B (en) Large-span cable crane dismantling construction method adjacent to railway business line
CN109132880B (en) Method for disassembling portal crane
CN114784708B (en) Composite cable installation method for newly-built jacket
CN109279519B (en) Method for replacing steel wire rope of tower crane hoisting mechanism
CN111392612A (en) Device and method for high-altitude self-disassembly of tower crane arm rod
CN102061681A (en) Fixed dual-hoisting point cantilever track type joist truss installing method
CN105883645B (en) Method for dismantling attachment device of tower crane
CN205132977U (en) Movable swing arm tower machine installation wire rope
CN115367637A (en) Construction process method for sectionally disassembling large arm of tower head pull rod type tower crane
CN113200465B (en) Aerial dismantling method of tower crane for special structure construction
CN116161564A (en) Disassembly construction method of tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150304