EP0737640B1 - Verfahren und Vorrichtung zum Einführen einer Hilfsstapelaufnahme - Google Patents

Verfahren und Vorrichtung zum Einführen einer Hilfsstapelaufnahme Download PDF

Info

Publication number
EP0737640B1
EP0737640B1 EP96105193A EP96105193A EP0737640B1 EP 0737640 B1 EP0737640 B1 EP 0737640B1 EP 96105193 A EP96105193 A EP 96105193A EP 96105193 A EP96105193 A EP 96105193A EP 0737640 B1 EP0737640 B1 EP 0737640B1
Authority
EP
European Patent Office
Prior art keywords
sheet
auxiliary
brake
set forth
auxiliary pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP96105193A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP0737640A2 (de
EP0737640A3 (de
Inventor
Roland Hirth
Edmund Klein
Richard Mack
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heidelberger Druckmaschinen AG
Original Assignee
Heidelberger Druckmaschinen AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE19612280A external-priority patent/DE19612280C2/de
Application filed by Heidelberger Druckmaschinen AG filed Critical Heidelberger Druckmaschinen AG
Publication of EP0737640A2 publication Critical patent/EP0737640A2/de
Publication of EP0737640A3 publication Critical patent/EP0737640A3/de
Application granted granted Critical
Publication of EP0737640B1 publication Critical patent/EP0737640B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H31/00—Pile receivers
    • B65H31/32—Auxiliary devices for receiving articles during removal of a completed pile
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2513/00—Dynamic entities; Timing aspects
    • B65H2513/10—Speed
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2801/00—Application field
    • B65H2801/03—Image reproduction devices
    • B65H2801/21—Industrial-size printers, e.g. rotary printing press

Definitions

  • the invention relates to a method and a device for introducing a Auxiliary stack pick-up over a main stack to be removed with continuous feeding of further sheets, the Introduction of the auxiliary stack frame in the direction of sheet travel and synchronized with the course of a sheet to be deposited over the Main stack is done.
  • DE 40 01 565 A discloses a sheet delivery device Sheet printing machine.
  • a Control device proposed that the bow catcher and / or the bow stop depending on that Parameters influencing sheet placement behavior in particular Operating parameters of the sheet printing machine activated.
  • DE 42 42 259 A relates to a sheet-fed rotary printing press with a sample sheet delivery.
  • the solution proposed there relates to a sheet-fed rotary printing press, the Boom in addition to at least one main stack, at least one auxiliary stack for one Trial sheet delivery, the sheet transporting funding and release organs for Release of the sheet from the funding either over the main stack or over the Has auxiliary stack.
  • sensors are provided for determining the sheet position, send the electrical impulses to a computer for machine control.
  • a automatic sample sheet delivery is in a selectable sample sheet delivery cycle
  • Computer can be preselected, with a documentation assigned to the test sheet by im Continuous printing registered measurement data with an associated sample sheet characteristic coding can be stored in the computer.
  • An auxiliary stack carrier is in Direction of conveyance of the sheets in sync with their speed insertable between two sheets and takes in one Auxiliary stacks temporarily the incoming sheets.
  • the auxiliary stack carrier has a small layer thickness and remains under the auxiliary stack, so that it serves as a base when it is deposited on the replaced main stack carrier is effective.
  • Such an auxiliary stack carrier can either cut from a web roll or individually from an interchangeable cassette be removed.
  • the invention has for its object a method and an apparatus of the type mentioned develop in such a way that an auxiliary stack pickup at a high-speed machine can be introduced without it impairment of sheet travel and sheet deposit is coming.
  • the advantage of the solution according to the invention is that the introduction of the auxiliary stack pick-up in a completely undisturbed Operational flow is possible.
  • a high Print speed can be maintained, and the The introduction of the auxiliary stack pickup takes place without any impairment the sheet run or the sheet deposit.
  • There are no separating elements such as suction pads or the like required to insert a gap for the Generate auxiliary batch pickup.
  • the auxiliary stack can be picked up exactly the speed of the sheets to be deposited be what it allows a precisely defined number of Separate bow. This in turn enables the new stack to be assigned to a specific arch. This can be of great Be important if using digital exposure during the Run the printing press a new printing form on the Plate cylinders is applied.
  • the Auxiliary pile pickup is controlled so that its front End together with the front end of the sheet to be discarded the position above the machine-facing end of the Main stack reached and that the auxiliary stack pickup at the same speed as the arch over the Main stack moves.
  • Auxiliary pile pickup and to be discarded Arch together reach the stop on end of the main stack facing away from the machine, whereby the Occurrence of a relative speed between the top the auxiliary stack holder and the underside of the one to be deposited Avoidable bow and a clean storage of the bow is achievable.
  • the speed of the Auxiliary batch recording of the speed of the bow correspond by the speed of the Auxiliary pile pickup and the speed of the sheet brake be coordinated. This also serves one Avoiding any relative speeds between sheets and auxiliary batch pickup, which is particularly important when a machine is running in perfecting mode, therefore the underside of the sheet, which is on the auxiliary pile holder comes to rest, is printed.
  • the control device senses thoughts Machine actual data like the current one Machine speed, machine angle and that Sheet format.
  • the position of the gripper opening curve is about one associated with this drive with the drive of the Bow brake and its acceleration profile by comparison with those in a memory of the control device stored data matched.
  • the drives of the Auxiliary pile pick-up of the sheet brake and its braking surface and the gripper opening curve adjustment are from the Control device depending on the actual machine data controlled.
  • the stack separation of main and auxiliary stacks is now independent of the skill of an operator.
  • the braking surface passes through the sheet brake while retracting the auxiliary stack frame Movement profile, which up to the time of opening the Gripper corresponds to the speed of the gripper while the braking surface of the bow brake after this time of the gripper opens a negative acceleration up to Reaching the desired sheet delivery speed of the sheet to be discarded.
  • the Auxiliary stack pick up the drive assigned to it automatically to reduce mechanical and electrical loads hold; for this purpose, the auxiliary batch pickup leading linear units with leading and trailing sections Mistake.
  • Fig. 1 shows an auxiliary stack holder 1 with a Path-speed diagram 11, in which the Speed curve 14 of the auxiliary stack holder 1 is shown.
  • the auxiliary stack holder 1 is schematic illustrated, it can be used as a plate, rake or other Be trained.
  • a linear unit 15 ensures that Auxiliary pile pick-up horizontal movement and one Drive shaft 16 is connected to a drive unit, that means high acceleration and short-term braking enables.
  • the Auxiliary stack holder 1 is this with your Leading edge at the level of line 19, which the Rest position of the withdrawn auxiliary stack holder 1 marked.
  • the Auxiliary stack holder 1 accelerated strongly before insertion in such a way that they position 6 am machine-facing end of the main stack 2 at the same time reached a sheet 3 to be discarded. She starts hers Acceleration is therefore also a step ahead the sheet to be deposited 3.
  • the auxiliary stack holder 1 moves then synchronized with the sheet 3 to be filed over the Main stack 2, being in a position 7 simultaneously with OEM sheet 3 is braked to turn away from the machine End 8 of the main stack 2 to come to a stop.
  • the Path-speed diagram 11 shows the speed 13 the auxiliary stack holder 1 via the described path 12.
  • FIG. 2 and 3 show a schematically shown Sheet delivery 10, the auxiliary stack pickup in FIG. 2 is in rest position 19.
  • Fig. 3 shows the Auxiliary stack holder 1 during insertion.
  • Fig. 2 shows the auxiliary stack holder 1 in the rest position 19 and above it a gripper 9 of the sheet delivery 10, which has a sheet 3 transported in sheet travel direction 4 to him on the Put down main stack 2.
  • the auxiliary stack holder 1 since the main stack 2 is removed to be, the auxiliary stack holder 1 must be inserted. In the position 19 shown, it has a head start in front of the bow 3 and accelerated until reaching the Position 6 at the machine-facing end 5 of Main stack 2 such that it has its front end arrives simultaneously with the front end of the arch 3 and also has the same speed as the sheet 3.
  • the auxiliary stack receptacle 1 moves and the sheet 3 synchronously over the main stack 2 until they are the Reach position 7 where braking begins.
  • This Machine position is drawn in Fig. 3.
  • a sheet brake 18, for example as a suction roller is trained, in action and brakes the bow 3.
  • the gripper 9 of the sheet delivery 10 First open the gripper 9 of the sheet delivery 10, and the Auxiliary stack holder 1 is braked to the same extent as sheet 3.
  • Auxiliary stack holder 1 and sheet 3 move continue until you have the end 8 of the Reach main stack 2 and the sheet 3 on one Stops abutment 17 on the auxiliary stack holder 1. Now the main stack 2 can be removed as all following sheet 3 on the auxiliary stack holder 1 lay down.
  • the Auxiliary stack holder 1 After removing the main stack 2, the Auxiliary stack holder 1 are pulled out again so that o Place sheet 3 on a pallet of main stack 2, or the auxiliary stack holder 1 remains and takes the new one Main stack 2 on. In this case, the Auxiliary stack holder 1 from the linear unit 15 and the Drive 16 are separated and a new one Auxiliary batch pickup 1 are available when on again Main stack 2 should be removed.
  • the sheet brake 18 includes one Braking surface 29, on the one hand by a suction roll jacket under vacuum can be formed, other also a circumferential braking surface in the form of a Band can be.
  • 3 is also one Gripper opening curve 20.1 shown by one Pivot point 20.2 by means of a not shown here Actuator 20 can be adjusted so that a roller 30th of the respectively passing gripper 9 with a first one Section of the contour 20.3 of said gripper opening curve 20.1 comes into contact, which is intended for normal main stack delivery is.
  • the gripper opening curve 20.1 can also are pivoted such that the sheets to be deposited 3 one Sample sheet collection will be sent, then the second Section of the contour 20.3 of the gripper opening curve 20.1 for the rollers 30 of the grippers 9 active.
  • the sheet delivery 10 comprises the movable in linear units 15 Auxiliary batch pickup recorded 1. This is carried out via a separate drive 16a moved in the horizontal direction.
  • the Drive 16a acts on a belt 26 which is one Deflection 27 is performed; in an analogous way is about the Drive shaft 16 the opposite linear unit 15 driven.
  • the linear units 15 can in the front and in the rear area with a leading or stopping track be provided to the loads for the drive 16a minimize.
  • a limit switch 21 By means of a limit switch 21, the Auxiliary stack holder 1 the motor 16a when it reaches Switch off the end position (see Fig. 5) automatically.
  • Fig. 6 shows the control device with the drives for the braking surface 29 of the pivoting of the Gripper opening curve 20.1 and the auxiliary stack holder 1 in Dependence on the actual data acquisition of the machine be coordinated.
  • the machine actual value detection 25 takes over, for example a rotary encoder on the machine angle 25.2.
  • the Sheet format 25.3 becomes the default setting before the start of the job the sheet guides are entered in the feeder and delivery therefore already available as a parameter.
  • the Machine speed 25.1 is measured continuously and is the control device 24 as a parameter also before.
  • the Control devices 24 are for certain Print speeds and sheet formats Target value specifications for the position of the gripper opening curve 20.1 Braking surface speed and the Insertion speed of the auxiliary stack holder 1 over the Main stack 2 filed.
  • a simultaneous entry movement from auxiliary pile holder 1 and sheet leading edge 3 to enable, the angular position 25.2 of the machine must also be known. Therefore, information about the Actual angular position of the machine is required.
  • the drives 16a, 18a and 20 their respective Actual data is transmitted to the control device 24.
  • the drive 16a for the auxiliary stack holder 1 current actual position of the auxiliary stack holder 1, at the Drives 18a and 20 the current braking surface speed or the current position of the gripper opening curve 20.1.
  • the current position or speed values for the Drives 16a, 18a and 20 become the control device 24 transmitted and are therefore there for a vote of Target / actual data before.
  • an optimal delay value can be preset - that is a target value is specified - the one to achieve the Desired depositing speed of the sheet to be deposited 3 leads.
  • the auxiliary stack holder 1 must be extended upon arrival of the The leading edge of the sheet 3 to be deposited is done. To do this, the Auxiliary stack holder 1 starts to move out with the phase position the machine, therefore the Actual value acquisition of the machine angle 25.2.
  • the predefined speed of the braking surface 29 depends on the conveying speed of the sheets 3 to be deposited, the onset of the braking process by opening the grippers 9 and thus from the position of the gripper opening curve 20.1 and from the machine angle 25.2.
  • the drive 16a is after reaching the extended position the auxiliary stack holder 1 - over the main stack 2 - through a limit switch 21 can be switched off.
  • a Emergency stop button 22 can be seen from the sheet delivery 10 Machine can be stopped while using the Non-stop button 23 the batch separation process in auxiliary and Main stack is only initiated.
  • the non-stop button 23 gives the start signal for the sequence described above Procedural steps.
  • the movement profile (see Fig. 1), which the drive 18a the braking surface 29 depending on machine and Has to pass through substrate parameters corresponds to Time 7 of the speed of the grippers 9. After that go through a delay until the desired one Storage speed is reached.
  • an abrupt Delay edge can also be a gradually falling Delay edge slope can be specified.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Discharge By Other Means (AREA)
  • Pile Receivers (AREA)
  • Supply, Installation And Extraction Of Printed Sheets Or Plates (AREA)
EP96105193A 1995-04-15 1996-04-01 Verfahren und Vorrichtung zum Einführen einer Hilfsstapelaufnahme Expired - Lifetime EP0737640B1 (de)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
DE19514176 1995-04-15
DE19514176 1995-04-15
DE19612280 1996-03-28
DE19612280A DE19612280C2 (de) 1995-04-15 1996-03-28 Vorrichtung zur kontinuierlichen Auslage von Bogen

Publications (3)

Publication Number Publication Date
EP0737640A2 EP0737640A2 (de) 1996-10-16
EP0737640A3 EP0737640A3 (de) 1997-08-13
EP0737640B1 true EP0737640B1 (de) 2001-07-04

Family

ID=26014422

Family Applications (1)

Application Number Title Priority Date Filing Date
EP96105193A Expired - Lifetime EP0737640B1 (de) 1995-04-15 1996-04-01 Verfahren und Vorrichtung zum Einführen einer Hilfsstapelaufnahme

Country Status (4)

Country Link
US (1) US5707058A (enExample)
EP (1) EP0737640B1 (enExample)
JP (1) JPH08337350A (enExample)
CN (1) CN1144770A (enExample)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19620938C2 (de) * 1996-05-24 2002-01-24 Heidelberger Druckmasch Ag Verfahren zum abschmierfreien Ablegen von Druckbogen auf einen Stapel
DE19642804C2 (de) * 1996-10-17 2002-11-07 Heidelberger Druckmasch Ag Einstellvorrichtung für eine Greiferöffnungskurve in einem Kettenausleger einer Bogendruckmaschine
US6689875B1 (en) * 1999-06-09 2004-02-10 Vlaams Interuniversitair Instituut Voor Biotechnologie Vzw Molecular characterization of chromosome translocation t(11;18)(q21;q21) and its correlation to carcinogenesis
SE523483C2 (sv) * 2000-09-18 2004-04-20 Straalfors Ab Anordning för transport av ark i en anordning i vilken ingår en höghastighetsprinter
SE523475C2 (sv) 2000-09-18 2004-04-20 Straalfors Ab Anordning för stackning av ark
SE523467C2 (sv) * 2000-09-18 2004-04-20 Straalfors Ab Anordning för sidoförflyttning av ark
US7871070B2 (en) * 2005-03-09 2011-01-18 Padana Ag Material handling apparatus
EP1958906B1 (en) * 2007-02-14 2016-11-30 Komori Corporation Sheet delivery/guide apparatus
EP2361865B1 (de) * 2010-02-19 2015-09-16 Müller Martini Holding AG Verfahren und Vorrichtung zum Bilden von Stapeln aus einem Schuppenstrom von Druckprodukten
CN106144614A (zh) * 2016-08-18 2016-11-23 江苏华宇印涂设备集团有限公司 金属板暂存装置
TWI783345B (zh) * 2020-02-13 2022-11-11 大陸商博斯特(上海)有限公司 用於將板材堆儲存於一轉換機中之裝置及轉換機

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3271027A (en) * 1962-09-04 1966-09-06 Minnesota Mining & Mfg Stacking device
US3477712A (en) * 1967-08-28 1969-11-11 Harris Intertype Corp Sheet handling machine with continuous delivery
US3567047A (en) * 1969-01-22 1971-03-02 Simpson Timber Co Stacking apparatus for wood veneer and other sheet material
US3960374A (en) * 1972-06-15 1976-06-01 Harris-Intertype Corporation Sheet delivery system
DE2819563C2 (de) * 1978-05-05 1984-12-13 Hans 5216 Niederkassel Lehmacher Vorrichtung zum Stapeln von Kunststoffbeuteln
DE3112558C2 (de) * 1981-03-30 1983-02-17 M.A.N.- Roland Druckmaschinen AG, 6050 Offenbach Vorrichtung zum zwischenzeitlichen Auffangen von Bogen bei Stapelwechsel in einem Bogenausleger
US4643414A (en) * 1984-04-07 1987-02-17 Miller-Johannisberg Druckmaschinen Gmbh Sheet-delivery control and regulating apparatus
DE3413597A1 (de) * 1984-04-11 1985-10-24 Jagenberg AG, 4000 Düsseldorf Vorrichtung zum ablegen von in einem bogenfluss transportierten bogen in einem stapel
US4712787A (en) * 1986-04-14 1987-12-15 Princiotta Sr Raymond A Stacking apparatus
JPS6467161A (ja) * 1987-09-07 1989-03-13 不二製油株式会社 加工大豆胚芽の製造法
DE4001565A1 (de) * 1990-01-20 1991-07-25 Heidelberger Druckmasch Ag Bogenausleger einer bogendruckmaschine
DE4011286A1 (de) * 1990-04-06 1991-10-17 Heidelberger Druckmasch Ag Bogenausleger fuer druckmaschinen oder dergleichen
DE4221928B4 (de) * 1992-07-03 2004-06-24 Heidelberger Druckmaschinen Ag Vorrichtung zum Non-Stop-Stapelwechsel im Ausleger einer Druckmaschine

Also Published As

Publication number Publication date
EP0737640A2 (de) 1996-10-16
CN1144770A (zh) 1997-03-12
EP0737640A3 (de) 1997-08-13
US5707058A (en) 1998-01-13
JPH08337350A (ja) 1996-12-24

Similar Documents

Publication Publication Date Title
DE3046107C2 (de) Vorrichtung zum Ablegen von Bogen zu einem Stapel
DE19819490C1 (de) Ausleger für eine Bogenrotationsdruckmaschine
EP0270943B1 (de) Verfahren und Anordnung zum Bilden von Stapeln aus blattförmigem Material (Blättern)
DE2639676C2 (de) Vorrichtung zum Beschicken eines Rundstapelbogenanlegers
DE2421271A1 (de) Verfahren und vorrichtung zur bildung einer eng aufgefaecherten reihe von druckboegen
EP0737640A2 (de) Verfahren zum Einführen einer Hilfsstapelaufnahme
DE19616047B4 (de) Zusammentragmaschine
EP0790206A1 (de) Verfahren zum automatischen Stapelwechsel
DE4431669B4 (de) Vorrichtung zum Ablegen von mit einer Druckmaschine im fortlaufenden Betrieb erstellten, unterschiedlichen Produkten
DE19905263C1 (de) Vorrichtung und Verfahren zur Probebogenentnahme
DE10057963A1 (de) Verfahren und Vorrichtung zum Vereinzeln und Transportieren von Bogen
DE3785316T2 (de) Blattzufuehrvorrichtung.
DE3941993C1 (enExample)
DE10137536A1 (de) Verfahren zum Befördern von Bogen in einem Anleger einer Bogen verarbeitenden Druckmaschine
EP1507727B1 (de) Auslegevorrichtung an einer bogenverarbeitungsmaschine
DE19612280C2 (de) Vorrichtung zur kontinuierlichen Auslage von Bogen
EP0751086B1 (de) Vorrichtung zum Entfernen von Lufteinschlüssen aus Papierstapeln
WO1998034865A1 (de) Stapelwechselvorrichtung
DE19508254B4 (de) Verfahren zum Transportieren von einzelnen Bogen
EP0578614B1 (de) Vorrichtung zum Überführen von im Schuppenstrom geförderten Druckprodukten
EP1059257A2 (de) Verfahren zum Betreiben einer Bogen verarbeitenden Maschine
DE102017221220B4 (de) Bogenverarbeitende Maschine
EP1582490B1 (de) Vorrichtung zum Zuführen eines geschuppten Bogenstromes
DE10349896B4 (de) Bogendruckmaschine und Verfahren zum Betreiben einer Bogendruckmaschine
DE10053162A1 (de) Verfahren zur Aussonderung von Einzelbogen bei einer Druckmaschine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19960418

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): CH DE FR GB LI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): CH DE FR GB LI

17Q First examination report despatched

Effective date: 19990429

RTI1 Title (correction)

Free format text: METHOD OF AND DEVICE FOR INTRODUCING AN AUXILIARY PILE RECEIVER

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): CH DE FR GB LI

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59607198

Country of ref document: DE

Date of ref document: 20010809

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20010829

ET Fr: translation filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20030325

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20030505

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040401

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040430

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040430

GBPC Gb: european patent ceased through non-payment of renewal fee
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20050419

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20050427

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061101

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20061230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060502