EP0703142A1 - End piece for the wishbone of a sailboard rig - Google Patents

End piece for the wishbone of a sailboard rig Download PDF

Info

Publication number
EP0703142A1
EP0703142A1 EP95112718A EP95112718A EP0703142A1 EP 0703142 A1 EP0703142 A1 EP 0703142A1 EP 95112718 A EP95112718 A EP 95112718A EP 95112718 A EP95112718 A EP 95112718A EP 0703142 A1 EP0703142 A1 EP 0703142A1
Authority
EP
European Patent Office
Prior art keywords
pipe bend
end piece
fastening
piece according
bend segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP95112718A
Other languages
German (de)
French (fr)
Other versions
EP0703142B1 (en
Inventor
Marc Namur
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FANATIC S.A.
Original Assignee
Fanatic Sports GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fanatic Sports GmbH filed Critical Fanatic Sports GmbH
Publication of EP0703142A1 publication Critical patent/EP0703142A1/en
Application granted granted Critical
Publication of EP0703142B1 publication Critical patent/EP0703142B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B32/00Water sports boards; Accessories therefor
    • B63B32/60Board appendages, e.g. fins, hydrofoils or centre boards
    • B63B32/64Adjustable, e.g. by adding sections, by removing sections or by changing orientation or profile
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H8/00Sail or rigging arrangements specially adapted for water sports boards, e.g. for windsurfing or kitesurfing
    • B63H8/20Rigging arrangements involving masts, e.g. for windsurfing
    • B63H8/21Wishbones
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H8/00Sail or rigging arrangements specially adapted for water sports boards, e.g. for windsurfing or kitesurfing
    • B63H8/20Rigging arrangements involving masts, e.g. for windsurfing
    • B63H8/23Rigging arrangements involving masts, e.g. for windsurfing for tensioning or trimming the clew of the sail, e.g. outhaul trimmers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H8/00Sail or rigging arrangements specially adapted for water sports boards, e.g. for windsurfing or kitesurfing
    • B63H8/50Accessories, e.g. repair kits or kite launching aids
    • B63H8/52Handheld cleats, cams or hooks for tensioning the downhaul or outhaul of a windsurfing sail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H9/00Marine propulsion provided directly by wind power
    • B63H9/04Marine propulsion provided directly by wind power using sails or like wind-catching surfaces
    • B63H9/08Connections of sails to masts, spars, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2221/00Methods and means for joining members or elements
    • B63B2221/06Methods and means for joining members or elements by riveting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2231/00Material used for some parts or elements, or for particular purposes
    • B63B2231/02Metallic materials
    • B63B2231/10Aluminium or aluminium alloys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2231/00Material used for some parts or elements, or for particular purposes
    • B63B2231/40Synthetic materials

Definitions

  • the invention relates to an end piece for the boom of a rig for surfboards.
  • the clew of the sail of a surfboard is usually tightened with a rope at the end of the boom.
  • Modern surfing technology is developing to achieve more precise control and maneuvering of the surfboard through stable, play-free attachment of the sail clew to the boom end piece and a tension-free leech of the sail.
  • the sail is increasingly trimmed via the length adjustment of the boom and no longer by tensioning a tamp attached to the clew of the sail and the boom end piece.
  • the boom end piece according to the invention ideally fulfills the requirements placed on the rig of a surfboard by modern surfing technology through a low-play, safe and quick attachment of the sail clew by means of a snap lock and also offers the possibility for attaching and trimming sails in the conventional way with a rope.
  • main spars 1 essentially consists of two main spars 1, which are connected at an acute angle to one another on the mast side by a boom head piece 2, two extension bars 3, which are telescopically received by the main spars 1 and are connected to one another on the left side by a boom end piece 4, and connecting sleeves 5 with locking levers 6 for locking the extension bars 3 with the main bars 1 at the length of the boom, which is set according to the sail size.
  • the boom is attached to the boom of a surfboard with the boom head piece 2 and held together by the sail tension, which runs from the clew 8 of the sail 7 to the boom end piece 4.
  • the boom end piece 4 according to FIGS. 2 to 6 consists of a plastic injection molded part, limited Elastic pipe bend segment 9, which is open to the inside, pushed onto a pipe bend 10 made of aluminum for fastening the extension bars 3 of the boom by means of snap closures 11 and fastened on the pipe bend 10.
  • An inwardly projecting flat pocket 12 with a wide through slot 13 for receiving the clew 8 of the sail 7 with an incorporated fastening eyelet 14 is formed on the top of the pipe bend segment 9.
  • the swivel hook 17 of the snap closure 16 protrudes outward with its hook-shaped actuating end 18 through the assembly opening 15 of the receiving pocket 12 of the pipe bend segment 9.
  • the swivel hook 17 is rotatably mounted on a hollow rivet 19 for fastening the pipe bend segment 9 on the pipe bend 10 for connecting the extension bars 3, the hollow rivet 19 being pushed through corresponding through holes 20 in the receiving pocket 12 for the snap closure 16, the pipe bend segment 9 and the pipe bend 10 .
  • the hook 17 swings out in the arrow direction a from the clew eye 14 of the sail 7, and at the same time the closing spring 21 acting on the swivel hook 17 is tensioned.
  • a slight finger pressure on the actuating end 18 of the swivel hook 17 is sufficient so that it snaps into the clew eye 14 of the sail 7 due to the spring force of the closing spring 21 in the direction of arrow b.
  • a deflection base 26 for the rope is formed on between the holding pockets 22 for a fastening rope on the underside of the pipe bend segment 9, the deflection base 26 having a central through-bore 27 for the fastening rivet 19 of the pipe bend segment 9.
  • Pipe bend 10, swivel hook 17, slip clamp 25 and fastening rivet 19 of the boom end piece 4 are made of aluminum.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Tents Or Canopies (AREA)
  • Forklifts And Lifting Vehicles (AREA)
  • Jib Cranes (AREA)
  • Vehicle Step Arrangements And Article Storage (AREA)
  • Walking Sticks, Umbrellas, And Fans (AREA)
  • Retarders (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Air Bags (AREA)
  • Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)
  • Holders For Apparel And Elements Relating To Apparel (AREA)
  • Emergency Lowering Means (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Steering Devices For Bicycles And Motorcycles (AREA)
  • Stringed Musical Instruments (AREA)
  • Professional, Industrial, Or Sporting Protective Garments (AREA)
  • Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)
  • Lubricants (AREA)
  • Mechanical Pencils And Projecting And Retracting Systems Therefor, And Multi-System Writing Instruments (AREA)
  • Absorbent Articles And Supports Therefor (AREA)

Abstract

The fitting has a tubular arc segment (9) fixed to a tubular arc (10), which is slid into the arms (3) of the branched boom. The arc segment has an inward projecting flat surface (12), with a wide slot (13), in order to receive a fastening loop (14), or eye, on the clew (8) of the sail (7). The fitting also has an integrated snap-lock (16), which has a spring-loaded (21) swivelling hook (17) for swinging into and out of the loop. The arc segment may be made from injection-moulded plastic, and the arc and the hook may be made from aluminium.

Description

Die Erfindung betrifft ein EndstĂĽck fĂĽr den Gabelbaum eines Riggs fĂĽr Surfbretter.The invention relates to an end piece for the boom of a rig for surfboards.

Ăśblicherweise wird das Schothorn des Segels eines Surfbretts mit einem Tampen am GabelbaumendstĂĽck festgespannt.The clew of the sail of a surfboard is usually tightened with a rope at the end of the boom.

Die moderne Technik beim Surfen entwickelt sich dahin, durch eine stabile, spielfreie Befestigung des Segelschothorns am Gabelbaumendstück sowie ein spannungsfreies Achterliek des Segels ein exakteres Steuern und Manövrieren des Surfbrettes zu erreichen. Das Trimmen des Segels erfolgt zunehmend über die Längenverstellung des Gabelbaumes und nicht mehr durch das Spannen eines am Schothorn des Segels und am Gabelbaumendstück befestigten Tampens.Modern surfing technology is developing to achieve more precise control and maneuvering of the surfboard through stable, play-free attachment of the sail clew to the boom end piece and a tension-free leech of the sail. The sail is increasingly trimmed via the length adjustment of the boom and no longer by tensioning a tamp attached to the clew of the sail and the boom end piece.

Diese moderne Surftechnik erfordert die Entwicklung eines neuen Gabelbaumendstücks, das eine stabile, spielfreie Verbindung zwischen dem Schothorn des Segels und dem Endstück ermöglicht.This modern surfing technique requires the development of a new boom end piece, which enables a stable, play-free connection between the clew of the sail and the end piece.

Diese Aufgabe ist erfindungsgemäß gelöst durch ein Gabelbaumendstück mit einem integrierten Schnappverschluß zur tampenlosen Befestigung des Segelschothorns gemäß Schutzanspruch 1.This object is achieved according to the invention by a fork end piece with an integrated snap lock for the rope-less attachment of the sail clew according to protection claim 1.

Die Unteransprüche sind auf vorteilhafte und zweckmäßige Weiterbildungen des Gabelbaumendstücks gerichtet.The subclaims are directed to advantageous and expedient developments of the boom end piece.

Das erfindungsgemäße Gabelbaumendstück erfüllt auf ideale Weise die durch die moderne Surftechnik an das Rigg eines Surfbretts gestellten Anforderungen durch eine spielarme, sichere und schnelle Befestigung des Segelschothorns mittels eines Schnappverschlusses und bietet weiterhin die Möglichkeit zur Befestigung und zum Trimmen von Segeln nach herkömmlicher Art mit einem Tampen.The boom end piece according to the invention ideally fulfills the requirements placed on the rig of a surfboard by modern surfing technology through a low-play, safe and quick attachment of the sail clew by means of a snap lock and also offers the possibility for attaching and trimming sails in the conventional way with a rope.

Das erfindungsgemäße Gabelbaumendstück ist nachstehend anhand von Zeichnungen erläutert. Es zeigt

Fig. 1
eine perspektivische Sprengdarstellung eines Gabelbaums fĂĽr das Rigg eines Surfbretts,
Fig. 2
eine Seitenansicht eines an dem GabelbaumendstĂĽck befestigten Schothorns eines Segels,
Fig. 3
eine Draufsicht des EndstĂĽcks,
Fig. 4
eine Unteransicht des EndstĂĽcks,
Fig. 5
einen Längsschnitt und
Fig. 6
eine Stirnansicht des EndstĂĽcks.
The boom end piece according to the invention is explained below with reference to drawings. It shows
Fig. 1
1 shows an exploded perspective view of a boom for the rig of a surfboard,
Fig. 2
2 shows a side view of a clew of a sail attached to the boom end piece,
Fig. 3
a plan view of the end piece,
Fig. 4
a bottom view of the end piece,
Fig. 5
a longitudinal section and
Fig. 6
an end view of the end piece.

Der Gabelbaum nach Fig. 1 besteht im wesentlichen aus zwei Hauptholmen 1, die mastseitig durch ein Gabelbaumkopfstück 2 spitzwinklig miteinander verbunden sind, zwei Verlängerungsholmen 3, die teleskopartig von den Hauptholmen 1 aufgenommen werden und achterliekseitig über ein Gabelbaumendstück 4 miteinander verbunden sind, sowie Verbindungshülsen 5 mit Sperrhebeln 6 zum Verriegeln der Verlängerungsholme 3 mit den Hauptholmen 1 bei der entsprechend der Segelgröße eingestellten Länge des Gabelbaumes.1 essentially consists of two main spars 1, which are connected at an acute angle to one another on the mast side by a boom head piece 2, two extension bars 3, which are telescopically received by the main spars 1 and are connected to one another on the left side by a boom end piece 4, and connecting sleeves 5 with locking levers 6 for locking the extension bars 3 with the main bars 1 at the length of the boom, which is set according to the sail size.

Der Gabelbaum wird mit dem Gabelbaumkopfstück 2 am hast eines Surfbrettes befestigt und durch die Segelverspannung zusammengehalten, die vom Schothorn 8 des Segels 7 zum Gabelbaumendstück 4 verläuft.The boom is attached to the boom of a surfboard with the boom head piece 2 and held together by the sail tension, which runs from the clew 8 of the sail 7 to the boom end piece 4.

Das Gabelbaumendstück 4 nach den Fign. 2 bis 6 besteht aus einem als Kunststoff-Spritzgießteil gefertigten, begrenzt elastischen Rohrbogensegment 9, das nach innen offen ist, auf einen Rohrbogen 10 aus Aluminium zur Befestigung der Verlängerungsholme 3 des Gabelbaumes mittels Schnappverschlüssen 11 aufgeschoben und auf dem Rohrbogen 10 befestigt ist.The boom end piece 4 according to FIGS. 2 to 6 consists of a plastic injection molded part, limited Elastic pipe bend segment 9, which is open to the inside, pushed onto a pipe bend 10 made of aluminum for fastening the extension bars 3 of the boom by means of snap closures 11 and fastened on the pipe bend 10.

An der Oberseite des Rohrbogensegments 9 ist eine nach innen vorkragende flache Tasche 12 mit einem breiten Durchgangsschlitz 13 zur Aufnahme des Schothorns 8 des Segels 7 mit einer eingearbeiteten Befestigungsöse 14 angeformt. Auf der Außenseite der Tasche 12 befindet sich eine Montageöffnung 15 für den Einbau eines Schnappverschlusses 16 mit einem federbeaufschlagten Schwenkhaken 17 zum Ein- und Ausschwenken in die bzw. aus der Schothornöse 14.An inwardly projecting flat pocket 12 with a wide through slot 13 for receiving the clew 8 of the sail 7 with an incorporated fastening eyelet 14 is formed on the top of the pipe bend segment 9. On the outside of the pocket 12 there is an assembly opening 15 for the installation of a snap lock 16 with a spring-loaded swivel hook 17 for swiveling in and out of the clew eyelet 14.

Der Schwenkhaken 17 des Schnappverschlusses 16 steht mit seinem hakenförmig ausgebildeten Betätigungsende 18 durch die Montageöffnung 15 der Aufnahmetasche 12 des Rohrbogensegmentes 9 nach außen vor. Der Schwenkhaken 17 ist auf einem Hohlniet 19 zur Befestigung des Rohrbogensegmentes 9 auf dem Rohrbogen 10 zur Verbindung der Verlängerungsholme 3 drehbar gelagert, wobei der Hohlniet 19 durch entsprechende Durchgangslöcher 20 der Aufnahmetasche 12 für den Schnappverschluß 16, des Rohrbogensegments 9 und des Rohrbogens 10 durchgesteckt ist.The swivel hook 17 of the snap closure 16 protrudes outward with its hook-shaped actuating end 18 through the assembly opening 15 of the receiving pocket 12 of the pipe bend segment 9. The swivel hook 17 is rotatably mounted on a hollow rivet 19 for fastening the pipe bend segment 9 on the pipe bend 10 for connecting the extension bars 3, the hollow rivet 19 being pushed through corresponding through holes 20 in the receiving pocket 12 for the snap closure 16, the pipe bend segment 9 and the pipe bend 10 .

Beim Öffnen des Schnappverschlusse 16 schwenkt der Haken 17 in Pfeilrichtung a aus der Schothornöse 14 des Segels 7 aus, und gleichzeitig wird die auf den Schwenkhaken 17 wirkende Schließfeder 21 gespannt. Zum Schließen des Schnappverschlusses 16 genügt ein leichter Fingerdruck auf das Betätigungsende 18 des Schwenkhakens 17, damit dieser aufgrund der Federkraft der Schließfeder 21 in Pfeilrichtung b in die Schothornöse 14 des Segels 7 einschnappt.When the snap lock 16 is opened, the hook 17 swings out in the arrow direction a from the clew eye 14 of the sail 7, and at the same time the closing spring 21 acting on the swivel hook 17 is tensioned. To close the snap lock 16, a slight finger pressure on the actuating end 18 of the swivel hook 17 is sufficient so that it snaps into the clew eye 14 of the sail 7 due to the spring force of the closing spring 21 in the direction of arrow b.

Auf der Unterseite des Rohrbogensegments 9 sind Taschen 22 mit einer Einfädelöffnung 23 und einem Durchsteckloch 24 zur Halterung eines mit einem Knoten versehenen Endes eines Tampens zur Befestigung des Schothorns 8 eines Segels 7 nach herkömmlicher Art angeformt, und in die Aufnahmetasche 12 des Rohrbogensegments 9 ist eine Belegklemme 25 zum Spannen des anderen Tampenendes eingesetzt.On the underside of the pipe bend segment 9 there are pockets 22 with a threading opening 23 and a push-through hole 24 for holding an end of a tamp provided with a knot molded to attach the clew 8 of a sail 7 in a conventional manner, and a slip clamp 25 is inserted into the receiving pocket 12 of the pipe bend segment 9 for tensioning the other end of the rope.

Zwischen den Haltetaschen 22 fĂĽr einen Befestigungstampen an der Unterseite des Rohrbogensegments 9 ist ein Umlenksockel 26 fĂĽr den Tampen angeformt, wobei der Umlenksockel 26 eine zentrale Durchgangsbohrung 27 fĂĽr den Befestigungsniet 19 des Rohrbogensegments 9 aufweist.A deflection base 26 for the rope is formed on between the holding pockets 22 for a fastening rope on the underside of the pipe bend segment 9, the deflection base 26 having a central through-bore 27 for the fastening rivet 19 of the pipe bend segment 9.

Rohrbogen 10, Schwenkhaken 17, Belegklemme 25 und Befestigungsniet 19 des GabelbaumendstĂĽcks 4 sind aus Aluminium hergestellt.Pipe bend 10, swivel hook 17, slip clamp 25 and fastening rivet 19 of the boom end piece 4 are made of aluminum.

Claims (8)

Endstück für den Gabelbaum eines Riggs für Surfbretter, gekennzeichnet durch ein nach innen offenes Rohrbogensegment (9), das auf einem Rohrbogen (10) zur Befefestigung der Holme (3) des Gabelbaumes aufgeschoben und auf dem Rohrbogen (10) befestigt ist, wobei an der Oberseite des Rohrbogensegments (9) eine nach innen vorkragende flache Tasche (12) mit einem breiten Durchgangsschlitz (13) zur Aufnahme des Schothorns (8) des Segels (7) mit einer eingearbeiteten Befestigungsöse (14) und einer auf der Außenseite angeordneten Montageöffnung (15) angeformt ist, sowie einen in die Tasche (12) eingebauten Schnappverschluß (16) mit einem federbeaufschlagten Schwenkhaken (17) zum Ein- und Ausschwenken in die bzw. aus der Schothornöse (14) des Segels (7).End piece for the boom of a rig for surfboards, characterized by an inwardly open pipe bend segment (9), which is pushed onto a pipe bend (10) for fastening the spars (3) of the boom and fastened on the pipe bend (10), whereby on the An inwardly projecting flat pocket (12) with a wide through slot (13) for receiving the clew (8) of the sail (7) with a built-in fastening eyelet (14) and an assembly opening (15 ) is molded, and a snap lock (16) built into the pocket (12) with a spring-loaded swivel hook (17) for swiveling in and out of the clew eyelet (14) of the sail (7). Endstück nach Anspruch 1, dadurch gekennzeichnet, daß der Schwenkhaken (17) des Schnappverschlusses (16) mit seinem hakenförmig ausgebildeten Betätigungsende (18) durch die Montageöffnung (15) der Aufnahmetasche (12) des Rohrbogensegments (9) nach außen vorsteht und daß die auf den Schwenkhaken (17) wirkende Schließfeder (21) beim Öffnen des Schnappverschlusses (16) gespannt wird.End piece according to claim 1, characterized in that the swivel hook (17) of the snap closure (16) with its hook-shaped actuating end (18) projects outwards through the assembly opening (15) of the receiving pocket (12) of the pipe bend segment (9) and that the the swivel hook (17) acting closing spring (21) is tensioned when the snap lock (16) is opened. Endstück nach Anspruch 1 und 2, dadurch gekennzeichnet, daß der Schwenkhaken (17) auf einem Hohlniet (19) zur Befestigung des Rohrbogensegments (9) auf dem Rohrbogen (10) zur Verbindung der Gabelbaumholme (3) drehbar gelagert ist, wobei der Hohlniet (19) durch entsprechende Durchgangslöcher (20) der Aufnahmetasche (12) für den Schnappverschluß (16), des Rohrbogensegments (9) und des Rohrbogens (10) durchgesteckt ist.End piece according to Claims 1 and 2, characterized in that the swivel hook (17) is rotatably mounted on a hollow rivet (19) for fastening the pipe bend segment (9) on the pipe bend (10) for connecting the boom stiles (3), the hollow rivet ( 19) through corresponding through holes (20) of the receiving pocket (12) for the snap lock (16), the pipe bend segment (9) and the pipe bend (10). Endstück nach einem der Ansprüche 1 bis 3, gekennzeichnet durch auf der Unterseite des Rohrbogensegments (9) angeformte Taschen (22) mit einer Einfädelöffnung (23) und einem Durchsteckloch (24) zur Halterung eines mit einem Knoten versehenen Endes eines Tampens zur Befestigung des Schothorns (8) eines Segels (7) sowie eine in die Aufnahmetasche (12) des Rohrbogensegments (9) eingesetzte Belegklemme (25) zum Spannen des anderen Tampenendes.End piece according to one of claims 1 to 3, characterized by pockets (22) formed on the underside of the pipe bend segment (9) with a threading opening (23) and a push-through hole (24) for holding one with a knot provided end of a tamp for fastening the clew (8) of a sail (7) and a slip clamp (25) inserted into the receiving pocket (12) of the pipe bend segment (9) for tensioning the other end of the rope. Endstück nach einem der Ansprüche 1 bis 4, gekennzeichnet durch einen zwischen den Haltetasche (22) für einen Befestigungstampen an der Unterseite des Rohrbogensegments (9) angeformten Umlenksockel (26) für den Tampen.End piece according to one of claims 1 to 4, characterized by a deflection base (26) for the rope, which is formed between the holding pocket (22) for a fastening rope on the underside of the pipe bend segment (9). Endstück nach Anspruch 5, dadurch gekennzeichnet, daß der Befestigungsniet (19) für das Rohrbogensegment (9) durch eine zentrale Bohrung (27) des Umlenksockels (26) durchgesteckt ist.End piece according to claim 5, characterized in that the fastening rivet (19) for the pipe bend segment (9) is pushed through a central bore (27) of the deflection base (26). Endstück nach einem der Ansprüche 1 bis 6, gekennzeichnet durch eine begrenzt elastische Ausbildung des als Kunststoff-Spritzgießteil gefertigten Rohrbogensegments (9)End piece according to one of claims 1 to 6, characterized by a limited elastic configuration of the pipe bend segment (9) manufactured as a plastic injection molded part. Endstück nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß der Rohrbogen (10), der Schwenkhaken (17), die Belegklemme (25) und der Befestigungsniet (19) aus Aluminium hergestellt sind.End piece according to one of claims 1 to 7, characterized in that the pipe bend (10), the swivel hook (17), the slip clamp (25) and the fastening rivet (19) are made of aluminum.
EP95112718A 1994-08-25 1995-08-11 End piece for the wishbone of a sailboard rig Expired - Lifetime EP0703142B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE9413579U DE9413579U1 (en) 1994-08-25 1994-08-25 End piece for the boom of a rig for surfboards
DE9413579U 1994-08-25

Publications (2)

Publication Number Publication Date
EP0703142A1 true EP0703142A1 (en) 1996-03-27
EP0703142B1 EP0703142B1 (en) 1998-12-16

Family

ID=6912731

Family Applications (1)

Application Number Title Priority Date Filing Date
EP95112718A Expired - Lifetime EP0703142B1 (en) 1994-08-25 1995-08-11 End piece for the wishbone of a sailboard rig

Country Status (17)

Country Link
US (1) US5566635A (en)
EP (1) EP0703142B1 (en)
JP (1) JPH08207888A (en)
KR (1) KR960007370A (en)
AT (1) ATE174563T1 (en)
AU (1) AU3024295A (en)
BR (1) BR9503798A (en)
CA (1) CA2156790A1 (en)
CZ (1) CZ211295A3 (en)
DE (3) DE9413579U1 (en)
FI (1) FI953949A (en)
HU (1) HUT72505A (en)
NO (1) NO953277L (en)
PL (1) PL309997A1 (en)
TR (1) TR199501033A2 (en)
TW (1) TW303333B (en)
ZA (1) ZA956439B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI342625B (en) 2007-02-14 2011-05-21 Neobulb Technologies Inc Light-emitting diode illuminating equipment
KR102178104B1 (en) * 2019-07-01 2020-11-12 정보경 Eco-friendly clay for kids and manufacturing method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8112417U1 (en) * 1981-09-24 Gerg, Blasius, 8019 Glonn Boom for a rig of a sail surfer
DE3401821A1 (en) * 1984-01-20 1985-07-25 Sander Spezialwerkzeug GmbH, 5650 Solingen Wishbone boom for a sailboard
US5239938A (en) * 1992-09-08 1993-08-31 Spradley Bruce S Quick-connect boom end

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1147208B (en) * 1981-05-05 1986-11-19 Amf Mares Sub Spa BOOM FOR SAILING TABLES
DE3742382A1 (en) * 1987-12-14 1989-06-22 Franz Schlittenbauer Device for trimming the sail of a sailboard
DE8909752U1 (en) * 1989-08-16 1989-09-28 SchĂĽtz-Werke GmbH & Co KG, 5418 Selters Clamping device for ropes on surfboards and sailboats
DE9302132U1 (en) * 1993-02-15 1993-04-22 Raith, Franz-Xaver, 8150 Holzkirchen Boom end piece for windsurf rigs

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8112417U1 (en) * 1981-09-24 Gerg, Blasius, 8019 Glonn Boom for a rig of a sail surfer
DE3401821A1 (en) * 1984-01-20 1985-07-25 Sander Spezialwerkzeug GmbH, 5650 Solingen Wishbone boom for a sailboard
US5239938A (en) * 1992-09-08 1993-08-31 Spradley Bruce S Quick-connect boom end

Also Published As

Publication number Publication date
TR199501033A2 (en) 1996-06-21
NO953277L (en) 1996-02-26
DE19509755A1 (en) 1996-02-29
BR9503798A (en) 1996-04-16
FI953949A (en) 1996-02-26
TW303333B (en) 1997-04-21
DE19509755C2 (en) 1997-06-05
AU3024295A (en) 1996-03-07
ZA956439B (en) 1996-03-22
HUT72505A (en) 1996-05-28
ATE174563T1 (en) 1999-01-15
KR960007370A (en) 1996-03-22
DE59504542D1 (en) 1999-01-28
US5566635A (en) 1996-10-22
EP0703142B1 (en) 1998-12-16
FI953949A0 (en) 1995-08-23
CA2156790A1 (en) 1996-02-26
JPH08207888A (en) 1996-08-13
NO953277D0 (en) 1995-08-21
HU9502374D0 (en) 1995-09-28
CZ211295A3 (en) 1996-03-13
DE9413579U1 (en) 1994-10-13
PL309997A1 (en) 1996-03-04

Similar Documents

Publication Publication Date Title
DE3011416A1 (en) CARABINE HOOK
EP0032573A1 (en) Wind direction indicator
DE2912868A1 (en) Boom-securing fitting on sailing surfboard - is used where sail is stretched between mast and boom, and consists of fork fitting grooves in sleeve around mast, with sockets for boom
DE19509755C2 (en) End piece for the boom of a rig for surfboards
DE3208340A1 (en) Glider rig
DE3319823A1 (en) Device for fastening and trimming the sail in windsurfing boards and sailing boats
EP0299218B1 (en) Attachment for a wishbone boom on sail boards
EP0446615B1 (en) Sailbatten, especially for sails of sailboards
EP0698549B1 (en) Length-adjustable wishbone boom for windsurfing boards
EP0198261B1 (en) Wishbone boom
DE8008624U1 (en) Device for connecting the handle device for windsurfers
DE3003625A1 (en) Sail-board rig with sail fixed to spar - has mast at corners only universal-joint-mounted with handholds along single-spar boom
EP0178489A1 (en) Device for a solvable connection of a cord connected to a wishbone of a sailing board and a surfboard
DE29723684U1 (en) Rig for surfboards
DE3802004C2 (en)
DE3129700A1 (en) Wishbone boom for a rig of a windsurfer
EP2052963A2 (en) Wishbone head piece
DE3806334A1 (en) Sailing craft, in particular a stand-up sailboard
DE19900834C2 (en) Segelrigg
DE3501991A1 (en) TRIMMING DEVICE FOR THE SAIL OF A SAILING BOARD
DE3915886A1 (en) Tensioning edge of sail - involves eccentrically mounted rotatable disc with circumferential
EP2052962A2 (en) Wishbone head piece
DE8027377U1 (en) Wind direction indicator for windsurfers
DE8122112U1 (en) FORK TREE FOR A RIGG OF A SAFE SURF
DE19538237A1 (en) Double mainsail for sailing boat

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI LU MC NL PT SE

RAX Requested extension states of the european patent have changed

Free format text: LT PAYMENT 950811;LV PAYMENT 950811;SI PAYMENT 950811

17P Request for examination filed

Effective date: 19960723

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: FANATIC S.A.

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

17Q First examination report despatched

Effective date: 19980603

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: LT PAYMENT 950811;LV PAYMENT 950811;SI PAYMENT 950811

LTIE Lt: invalidation of european patent or patent extension
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19981216

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19981216

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19981216

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19981216

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19981216

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19981216

REF Corresponds to:

Ref document number: 174563

Country of ref document: AT

Date of ref document: 19990115

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59504542

Country of ref document: DE

Date of ref document: 19990128

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: GERMAN

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990316

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990316

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990316

EN Fr: translation not filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 19981216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990811

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990811

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990820

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
BERE Be: lapsed

Owner name: S.A. FANATIC

Effective date: 19990831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20000229

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20001026

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020501